Car Barn Training Center
U.S. Commission of Fine Arts
Concept Design Presentation February 21, 2013
7/29/2019 Dcstreetcar Cbtc Cfa 021813
2/31
February 2013 - 2
Concept Redesign
The preliminary design concept was presented to the Historic Preservation Review Board on November 1st,
and the Commission of Fine Arts on November 15th.
Following these first reviews, and in response to comments received from HPRB and CFA, DDOT directed the
DC Streetcar Program Management Team (PMT) to assume the design work from the Design Build Team (DBT).
January 9th Work Session - HPRB, CFA, DDOT, Design Team Review of previous comments received by HPRB and CFA, and discussion on potential design directions
January 23rd Work Session - HPRB, CFA, DDOT, Design Team
Presentation and review of 3 alternative concepts addressing site improvements, landscape, architecture, materials and
notion of civic
Preference for the contained scheme that relocated the entry to the southwest of the building was the group consensus
deserving further development
January 31st Work Session - HPRB, CFA, DDOT, Design Team
Review of 3 further developed architectural and landscape concepts Podium, Punched and Lateral.
Attributes of all 3 concepts were identified as having strengths.
Staff recommended refining concepts into 2 concepts for submission to HPRB and CFA.
Upon receiving concept approvals, DDOT will direct the PMT to develop bridging documents that will be
provided to the DBT.
The PMT will be providing oversight of the DBT through development of the construction documents and
construction of the facility.
7/29/2019 Dcstreetcar Cbtc Cfa 021813
3/31
February 2013 - 3
Project Site
7/29/2019 Dcstreetcar Cbtc Cfa 021813
4/31
February 2013 - 4
Previous Submission
7/29/2019 Dcstreetcar Cbtc Cfa 021813
5/31
February 2013 - 5
Previous Submission
7/29/2019 Dcstreetcar Cbtc Cfa 021813
6/31
February 2013 - 6
CFA and HPRB Review Comments
Summary of Comments:
The CFA and HPRB accepted the location.
Sensitive landscape and infrastructure design is essential.
Building design and massing should be simplified. Design needs to be more civic.
7/29/2019 Dcstreetcar Cbtc Cfa 021813
7/31
February 2013 - 7
Campus Context
Spingarn
Phelps
Brown
Young
Langston Terrace
Site
Langston Golf Course
7/29/2019 Dcstreetcar Cbtc Cfa 021813
8/31
February 2013 - 8
Site Context and Design Response
7/29/2019 Dcstreetcar Cbtc Cfa 021813
9/31
February 2013 - 9
Site and Infrastructure Design
7/29/2019 Dcstreetcar Cbtc Cfa 021813
10/31
February 2013 - 10
Streetcar Yard Materials
7/29/2019 Dcstreetcar Cbtc Cfa 021813
11/31
February 2013 - 11
Streetcar Yard Materials
7/29/2019 Dcstreetcar Cbtc Cfa 021813
12/31
February 2013 - 12
Low Impact Development / Stormwater Management
7/29/2019 Dcstreetcar Cbtc Cfa 021813
13/31
February 2013 - 13
Landscape Materials - Trees
7/29/2019 Dcstreetcar Cbtc Cfa 021813
14/31
February 2013 - 14
Landscape Materials Vines and Green Screens
7/29/2019 Dcstreetcar Cbtc Cfa 021813
15/31
February 2013 - 15
Architectural Concepts
7/29/2019 Dcstreetcar Cbtc Cfa 021813
16/31
February 2013 - 16
Site Understanding
7/29/2019 Dcstreetcar Cbtc Cfa 021813
17/31
February 2013 - 17
Conceptual Floor Plans
7/29/2019 Dcstreetcar Cbtc Cfa 021813
18/31
February 2013 - 18
Architectural Concepts
7/29/2019 Dcstreetcar Cbtc Cfa 021813
19/31
February 2013 - 19
Aerial View Looking North
Scheme 1 Vertical / Civic
Scheme 2 Horizontal / Podium
7/29/2019 Dcstreetcar Cbtc Cfa 021813
20/31
February 2013 - 20
Conceptual Building Sections
Scheme 1 Vertical / Civic
Scheme 2 Horizontal / Podium
7/29/2019 Dcstreetcar Cbtc Cfa 021813
21/31
February 2013 - 21
Building Elevation Benning Road
Scheme 1 Vertical / Civic
Scheme 2 Horizontal / Podium
7/29/2019 Dcstreetcar Cbtc Cfa 021813
22/31
February 2013 - 22
Building Entry
Scheme 1 Vertical / Civic
Scheme 2 Horizontal / Podium
7/29/2019 Dcstreetcar Cbtc Cfa 021813
23/31
February 2013 - 23
Building Elevation 26th Street NE
Scheme 1 Vertical / Civic
Scheme 2 Horizontal / Podium
7/29/2019 Dcstreetcar Cbtc Cfa 021813
24/31
February 2013 - 24
Building Elevation West Side and Entry Approach
Scheme 1 Vertical / Civic
Scheme 2 Horizontal / Podium
7/29/2019 Dcstreetcar Cbtc Cfa 021813
25/31
February 2013 - 25
Building Elevation North Side / Wash Bay
Scheme 1 Vertical / Civic
Scheme 2 Horizontal / Podium
7/29/2019 Dcstreetcar Cbtc Cfa 021813
26/31
February 2013 - 26
Architectural Materials
7/29/2019 Dcstreetcar Cbtc Cfa 021813
27/31
February 2013 - 27
View from Benning Road
Scheme 1 Vertical / Civic
Scheme 2 Horizontal / Podium
7/29/2019 Dcstreetcar Cbtc Cfa 021813
28/31
February 2013 - 28
Landscape Design Building Entry
Scheme 1 Vertical / Civic
Scheme 2 Horizontal / Podium
7/29/2019 Dcstreetcar Cbtc Cfa 021813
29/31
February 2013 - 29
View from Benning Road and 26th Street NE
Scheme 1 Vertical / Civic
Scheme 2 Horizontal / Podium
7/29/2019 Dcstreetcar Cbtc Cfa 021813
30/31
February 2013 - 30
Campus Context
Benning Road and 26th St. NE Elevations
Scheme 1 Vertical / Civic
7/29/2019 Dcstreetcar Cbtc Cfa 021813
31/31
February 2013 - 31
Questions?