SITE INVESTIGATIONAND GEOTECHNICAL EVALUATION FOR
PROPOSED JORDANIAN DEVELOPMENT AREA PROJECTPLOT 21, BASIN 2 AL SAHEL AL SHEMALI AL SHRQI
DEAD SEA JORDAN
S12000003
PREPARED FORTAHAN & BUSHNAQ CONSULTANTS
AMMAN, JORDANMARCH 2012
8/12/2019 Dead See Final Soil Report
2/143
8/12/2019 Dead See Final Soil Report
3/143
8/12/2019 Dead See Final Soil Report
4/143
Geot. Eng. M.M / S12000003 2 of 33
TABLE OF CONTENTSPage
LETTER OF TRANSMITTAL 1TABLE OF CONTENTS 2-3
1.0 INTRODUCTION.............................................................................................................41.1 Purpose of Study:.............................................................................................................. 41.2 Scope of Work:.................................................................................................................. 4
2.0 PROJECT AND SITE DESCRIPTION .........................................................................5
3.0 GENERAL GEOLOGY ................................................................................................ 5
4.0 SEISMICITY AND EARTHQUAKES...................................................................... 10
5.0 FIELD EXPLORATION AND LABORATORY TESTING .................................. 105.1 Field Exploration: ........................................................................................................... 105.1.1 Drilling and Sampling: ................................................................................................ 105.2 Laboratory Testing:........................................................................................................ 13
6.0 SURFACE AND SUBSURFACE CONDITIONS..................................................... 146.1 Ground Materials: ....................................................................................................... 146.2 In-Situ Test Results: ....................................................................................................... 156.2.1 Standard Penetration Test (SPT):................................................................................ 156.3 Groundwater and Cavities:............................................................................................ 206.4 Material Chemical Properties..................................................................................... 206.4.1 Sulphate Content ...................................................................................................... 206.4.2 Chloride Content in Ground Materials.................................................................. 21
7.0 CONCLUSIONS AND RECOMMENDATIONS..................................................... 237.1 Foundation Depth and Type ....................................................................................... 237.2 Allowable Bearing Pressure ........................................................................................ 267.3 Foundation Settlement: ............................................................................................... 287.4 Subgrade Reaction:...................................................................................................... 297.5 Excavation Methods: ................................................................................................... 297.6 Excavation of Side Slopes:........................................................................................... 297.7 Drainage: ...................................................................................................................... 307.8 Backfill Materials, Selected Engineered Fill and Compaction Criteria: ................ 307.9 Earth Pressure.............................................................................................................. 317.10 Foundation Excavation Inspection: ........................................................................... 32
8.0 STANDARD OF CARE .............................................................................................. 32
8/12/2019 Dead See Final Soil Report
5/143
Geot. Eng. M.M / S12000003 3 of 33
Page
APPENDICES 33
Appendix A Logs of Boreholes and Test Pits ..Appendix B Generalized Subsurface Profiles ..Appendix C Laboratory Test Results ...Appendix D Chemical Analysis and Standard Figures and Tables Appendix E Geology, Seismicity and Earthquake Maps .
LIST OF FIGURES
Figure No. 1 General Site Plan..................................................... 7Figure No. 2 Photos of the proposed site. 8 & 9
LIST OF TABLES
Table No. 1 Building Names, Number of Floors, Floors Areas and F.F.Ls .. 5Table No. 2 Borehole Numbers, Locations, Elevations, F.F.Ls and Depths ... 11 & 12Table No. 3 Test Pits Numbers, locations, F.F.Ls and Depths 12Table No. 4 SPT Results .. 16Table No. 5 Laboratory Test Results of Boreholes . 17Table No. 6 Laboratory Test Results of Test Pits 18Table No. 7 Materials Types and Properties ... 19Table No. 8 Chemical Test Results................................................................ 21
Table No. 9 Structures, FFL, Depth and Type of footings. ... 25Table No. 10 Design SPT Values..................................................................... 27Table No. 11 Structures and Net Allowable Bearing Pressure........................ 27Table No. 12 Settlement values.. 28Table No. 13 Material Properties used in stability analysis... 32
8/12/2019 Dead See Final Soil Report
6/143
Geot. Eng. M.M / S12000003 4 of 33
1.0 INTRODUCTION
This report presents the results of the site investigation and geotechnical evaluation for the proposed Jordanian Development Area project to be constructed at the eastern Dead Sea shore- Jordan . This report presents the summary of field, laboratory testing and engineeringanalysis for the proposed project site.
1.1 Purpose of Study:
The purpose of this study is to determine the surface and subsurface conditions at the project site along with the physical, mechanical and chemical properties of the foundationground in order to provide recommendations for design and construction of thefoundations of the proposed project. This study is also aimed to provide recommendationon side slopes during constructers' excavation.
1.2 Scope of Work:
The scope of work consisted of the following:
1. Collecting information and maps particular to the project site such as public services,site plan and land use maps.
2. Making visits to the site to collect information about present land use, surfacetopography, geological features and surface drainage.
3. Drilling and sampling of twenty five (25) borings.
4. Excavation of six (6) test pits.
5. Carrying out the necessary laboratory tests.
6. Performing engineering analyses based on field and laboratory findings.
7. Providing conclusions and recommendations for foundation design and construction.
8/12/2019 Dead See Final Soil Report
7/143
Geot. Eng. M.M / S12000003 5 of 33
2.0 PROJECT AND SITE DESCRIPTION
Based on the provided information received from the client, it is understood that the proposed project will consist of several buildings with approximate foot print areas, number of floors
and finish floor levels (F.F.L) as indicated in the following table:
Table 1: Building Names, Number of Floors, Floor Areas and F.F.L.s
The site located on the eastern shore of the Dead Sea / Jordan. The site is boarded by anexisting paved road from the north-east, the Dead Sea from the south-west, the existing"Holiday Inn" hotel from the north-west side and by unutilized plots from south-east side. Thesite slopes down toward the Dead Sea direction with an average slope of about 10%. It iscrossed by deeply incised, steep sided and relatively wide wadi.
A general site plan showing the location of the project and both drilled boreholes andexcavated test pits is presented in Figure No. 1 . Figure No.2 shows some of the project site
photos.
3.0 GENERAL GEOLOGY
Based on the geological map of the area (Al Karama 3153-IV), the project area belongs toLisan Formation of Jordan Valley Group of Quaternary Period and Pleistocene Epoch. Thisformation consists predominantly of millimeter-to-centimeter-laminated, very weak, friable,low density, white, calcareous mudstone with alternating white marl, greenish brown clay andevaporates. In the water saturated state they behave as soft clays. Micro-faults and controlledlaminations are typical. This formation was formed in brackish water of the Lisan Lake which
occupied the Dead Sea basin during the Late Pleistocene. Sandy gravel lenses are common within the Lisan Marl. The thickness of these lenses mayvary form few centimeters to more than one meter.
Building Name F.F.L(m)
Max FootPrint Area
(m2)
Max. No.of Floors
Main Building 7Second Basement -406.15 3159First Basement -401.95 5139
Building A -409.35 758.0 2Building B, C & D -412.67 1378 3
8/12/2019 Dead See Final Soil Report
8/143
Geot. Eng. M.M / S12000003 6 of 33
At the project site, the lisan Marl Materials are unconformably overlain by recent yellow soilconsist of yellow-brown to gray brown humus-rich silty clay to clayey silt and alluvial fan(ALF) sediments composed of boulder, cobbles and gravel of sandstone and limestone inclayey-silty sand matrix.
No faults or other special geological features were observed on the geological map or duringour site inspections. However, the site is structurally controlled by Red Sea-Dead Sea rift faultsystem. Geological Map is present in Appendix E.
8/12/2019 Dead See Final Soil Report
9/143
8/12/2019 Dead See Final Soil Report
10/143
8/12/2019 Dead See Final Soil Report
11/143
8/12/2019 Dead See Final Soil Report
12/143
Geot. Eng. M.M / S12000003 10 of 33
4.0 SEISMICITY AND EARTHQUAKES
According to the Jordanian seismic code (published by the ministry of public works andhousing in October 2005), the site lies within Zone (3) , with a seismic zone factor of Z=0.30 .
The formations are classified as (S D) type. The seismic factors related to the accelerationCa=0.36 ; whereas, the seismic factor related to the velocity CV=0.54 . These factors should beused in the design of the proposed project.
5.0 FIELD EXPLORATION AND LABORATORY TESTING
5.1 Field Exploration:
The field exploration consisted of borehole drilling; test pits excavation and field densitytesting.
5.1.1 Drilling and Sampling:
Twenty five (25) boreholes were drilled between February 5 th and March 5 th, 2012.The boreholes were drilled to approximate depths ranging from 10 to 23m below theexisting ground level. The locations of these borings are indicated in Figure No. 1 . The borehole information is presented in Tables No. 2 .
The locations of the boreholes were selected and marked in the field by the staff ofACES. Table No. 2 shows the borings names, locations (coordinates), elevations,F.F.L's, and exploration depths. The elevations at the top of boreholes were estimatedaccording to the topographic map provided by the client and should be consideredapproximate. Samples were visually examined and described by ACES staffaccording to ASTM D2488-09a.
The drilling was executed with " Edeco (36/1) rotary rig, mounted on Mercedestruck 1417, capacity 400m " and " Toho 2P rotary rig, mounted on Mercedes truckLK608, capacity 800m " using the rotary air flush percussion drilling technique .
Standard Penetration Tests (SPT) was performed at various depths in the drilled boreholes to obtain the approximate dynamic resistance of the ground materials. Thetests were performed in accordance with ASTM D 1586-08a (Standard Test Methodfor Standard Penetration Test (SPT) and Split-Barrel Sampling of Soils).
The SPT blow counts at different depths are presented on logs of borings (AppendixA). The definition of Standard Penetration Test (SPT) and useful SPT correlations are
8/12/2019 Dead See Final Soil Report
13/143
Geot. Eng. M.M / S12000003 11 of 33
presented in the legend of borings logs (also in Appendix A). Further discussion onthe results obtained from SPT is presented in Section 6.4.
Disturbed but representative soil samples were retrieved from inside the split spoon
samplers used in the SPT test. The recovered samples were placed in air-tight plastic bags to maintain the moisture content.
Percussion (down-the-whole hammering) drilling techniques were used at otherintervals where no SPT sampling was performed.
Table No. 2Borehole Numbers, Locations, Elevations, F.F.Ls and Depths
CoordinatesNo. Elevation(m)
F.F.L(m)
Depth(m) Easting Northing
BH1 -403.0 -412.67 16 206067 128529
BH2 -400.0 -412.67 19 206085 128543
BH3 -398.8 -412.67 23 206104 128553
BH4 -397.0 -412.67 22 206116 128572
BH5 -407.5 -412.67 14 206108 128595
BH6 -407.0 -412.67 12 206093 128592
BH7 -407.0 -412.67 15 206094 128611
BH9 -403.5 -409.35 15 206024 128640
BH10 -403.5 -409.35 12 206013 128640
BH11 -403.5 -406.15 15 205997 128653
BH12 -402.5 -406.15 14 206019 128662
BH13 -401.2 -406.15 17 206027 128673
BH14 -400.5 -406.15 20 206049 128657
BH15 -399.5 -406.15 17 206067 128668
BH16 -399.3 -406.15 17 206054 128682
BH17 -397.5 -406.15 23 206055 128702
BH18 -396.5 -406.15 20 206081 128706
BH19 -397.5 -406.15 19 206074 128694
BH20 -397.7 -406.15 22 206081 128681
BH22 -397.4 -401.95 22 206097 128676
8/12/2019 Dead See Final Soil Report
14/143
Geot. Eng. M.M / S12000003 12 of 33
Table No. 2 ContBorehole Numbers, Locations, Elevations, F.F.Ls and Depths
CoordinatesNo.
Elevation(m)
F.F.L(m)
Depth(m) Easting Northing
BH24 -406.0 -401.95 14 206130 128649
BH25 -406.2 -401.95 10 206120 128641
BH26 -403.0 -401.95 10 206141 128635
BH27 -395.5 -401.95 20 206158 128612
BH28 -400.5 -406.15 16 206042 128670
5.1.2 Excavation of Test Pits:
Six (6) test pits were excavated between February 3 rd and February 27 th, 2012. The test pits were excavated to a depth of 1m deep for recommendation of proposed culvert and buildings where the drilling with rig was not possible due to accessibility. Thenumbers, locations (coordinates) and depths of each test pit are listed in Table No. 3 .The locations of the excavated test pits are also shown on the site plan in Figure No. 1 .Test pit logs are presented in Appendix A while test pit photos are presented inAppendix E.
Bulk samples were obtained from the test pits for laboratory testing (e.g., naturalmoisture content, direct shear test, unconfined compressive test, sieve analysis andAtterberg limits ). The results of these tests are summarized in Table No. 8.
Table No. 3Test Pits Numbers, Locations, F.F.L's and Depths
CoordinatesNo. Elevation(m)
Depth(m) Easting Northing
TP1 -413.0 1.0 206070 128617TP2 -415.0 1.0 206090 128631TP3 -401.0 1.0 206143 128619TP4 -415.0 1.0 206050 128635TP5 -415.0 1.0 206037 128625
TP6 -407.0 1.0 206122 128654
8/12/2019 Dead See Final Soil Report
15/143
Geot. Eng. M.M / S12000003 13 of 33
5.2 Laboratory Testing:
In order to determine the physical and mechanical properties of the ground materials, the
following tests were performed according to American Society for Testing and Materials(ASTM) Standards:
ASTM D2216-05, Standard Test Method for Laboratory Determination ofWater (Moisture) Content of Soil, Rock and Soil Aggregate Mixtures .
ASTM D 422-63(2007), Standard Test Method for Particle-Size Analysis ofSoils.
ASTM D 4318-10, "Standard Test Methods for Liquid Limit, Plastic Limit, andPlasticity Index of Soils."
ASTM D 3080-04 , "Standard Test Method for Direct Shear Test of Soils underConsolidated Drained Conditions."
ASTM D 2166-06, "Standard Test Method for Unconfined Compressive Strengthof Cohesive Soil."
Chemical Tests According to the procedures outlined in British standard B.S.1377:1990
The results of these tests are summarized in Table No. 6 whereas the test sheets are presented in Appendix C.
The encountered materials are described in the logs of test pits (see Appendix A ).
8/12/2019 Dead See Final Soil Report
16/143
Geot. Eng. M.M / S12000003 14 of 33
6.0 SURFACE AND SUBSURFACE CONDITIONS
6.1 Ground Materials:
From Boreholes
The drilled boreholes generally encountered the following materials:
Fill material composed of loose fine coarse grain sand and gravel and cobblesof sandstone, limestone, chert and basalt with few asphalt and concretefragments. This material was encountered in all boreholes except : BH1, BH2,BH3 and BH4. It extends from the surface level to an approximate depthranging from 0.5m to 6.0m below the existing ground surface.
Alluvial deposits composed of alternated to intercalated lenses of brownish
yellow gravely sand to sandy gravel with silty to marly clay. This material wasencountered at the surface of BH1, BH2, BH3 and BH4 or below the fillmaterial of BH5 and BH6 and extended to depth ranging from 1.5m to 13.0m
below the existing ground surface.
Alluvial (wadi) material composed of varicolored gravel and cobbles ofsandstone, limestone, chert and basalt with coarse grained sand. This materialwas encountered below the fill material in boreholes BH9, BH10, BH12, BH15,BH16, BH18, BH19, BH20, BH22, BH24, BH25, BH26 and BH28 andextended to depth ranging from 5.0m to 10.0m or to the end of this boreholes.
Grayish off white fine to medium grained sand alternated with thin silty sandand some coarse sandy gravel. This material was encountered below the fill oralluvial material in boreholes BH9, BH10, BH11, BH12, BH13, BH14, BH15,BH18, BH22, BH25, BH26 and BH27 and extended to the end of these
boreholes.
Grayish yellow to greenish gray firm to stiff marly clay (lisan marl) intercalated with white aragonite gravely sand. This material was encountered
below the alluvial or fill material in boreholes BH1, BH2,BH3, BH4, BH5,BH6, BH7, BH18, BH20, BH24, BH27 and BH28 and extended to the end ofthese boreholes.
Generalized subsurface profiles are presented in Appendix B . More information about theencountered materials can be obtained from the logs of borings ( Appendix A ).
8/12/2019 Dead See Final Soil Report
17/143
Geot. Eng. M.M / S12000003 15 of 33
Note that the grain size analyses performed on the fill and alluvial materials in boreholesare not representative of the formation as it was performed on the disturbed samplesobtained during drilling where all the gravels, cobbles and boulders were broken into
pieces. On the other hand, the grain size analyses performed on the materials from tests
pits are more representative.
From Test Pits
The encountered material in test pits TP1, TP3 and TP5 were Lisan marl materialscomposed of soft to very stiff, thinly laminated bands of greenish gray clay and whitearagonite marl, with some fine grained sand lenses. The material encountered in test pitTP2 and TP4 was grayish yellow highly weathered disintegrated clayey silt and TP6 wasAlluvial deposits composed of gravel and cobbles of sandstone, limestone and chert withcoarse grained sand and some silty sand.
More information about the encountered materials can be obtained from the logs of test pits ( Appendix A ).
6.2 In-Situ Test Results:
The in-situ testing mainly composed of two types: SPT within the drilled borehole andfield density on the excavated test pits.
6.2.1 Standard Penetration Test (SPT):
Standard Penetration Test (SPT) was performed at various depths in the fill, alluvial
deposits, sand and lisan marl materials to obtain approximate dynamic resistance ofthe ground materials. Several empirical correlations have been established to relate theSPT blow count (N) with relative density and friction angle for granular materials.
Table No. 4 presents the SPT depth in each borehole, the materials at that depth, SPT blow counts and the corresponding SPT N values. The definition of SPT and usefulSPT correlations for granular soils are presented in the legend to boring logs(Appendix A). The SPT (N) value ranged: from 16 to refusal in fill materials; from 25to refusal in the alluvial and sand materials and from 18 to refusal in lisan marlmaterials. The measured blow counts (N) classify the alluvial, sandy and lisan marlmaterials as " medium dense to very dense". However, the relatively high N value may
have resulted from the presence of gravel and cobbles within the soil matrix.
8/12/2019 Dead See Final Soil Report
18/143
Geot. Eng. M.M / S12000003 16 of 33
Table No. 4SPT Results
N-value is the sum of the second and third number of blows.
6.3 Materials Physical and Mechanical Properties:The laboratory test results of boreholes and test pits are summarized in Table No. 5 and6. Further information about the materials encountered, geological description and their
physical properties can be obtained from Table No. 7 .
BH No. Depth
(m)
Encountered
MaterialSPT blows N-
Value8.0 Lisan marl 50 in 5cm. >50BH-01
9.5 Lisan marl 11/12/22 3411.0 Lisan marl 11/9/9 18
BH-0212.5 Lisan marl 10/10/9 1913.0 Lisan marl 8/10/11 21
BH-0414.5 Lisan marl 10/10/12 225.0 Alluvial 21/33/50 in 10cm >50
BH-097.0 Alluvial 38/50 in 8cm >502.0 Fill 11/13/15 28
BH-104.0 Fill 9/14/17 311.5 Fill 8/9/13 22
BH-113 Fill 14/17/21 383 Fill 7/8/9 17
BH-126 Alluvial 8/15/10 25
5.5 Sand 13/17/20 37BH-13
7.5 Sand 16/19/25 446.0 Alluvial 22/50 in 6cm >50
BH-228.0 Alluvial 50 in 9cm >502 Alluvial 12/15/24 39
BH-247 Alluvial 9/17/22 39
2.5 Fill 7/9/8 17BH-25
5.0 Alluvial 50 in 11cm. >503.0 Fill 37/50 in 12cm. >50
BH-266.0 Sand 21/32/50 in 8cm >505.5 Fill 4/7/9 16
BH-277.0 Sand 50 in 50cm. >50
8/12/2019 Dead See Final Soil Report
19/143
Geot. Eng. M.M / S12000003 17 of 33
Table No. 5Laboratory Test Results of Boreholes
Atterberg Limits Grain Size DistributionBH
No. Depth(m) M.C(%)
Specific
GravityLL(%)
PL(%)
PI(%)
G(%)
S(%)
M(%)
C(%)
Material
1 10.0-11.0 10.48 17 13 4 0 75 20 5 Lisan Marl
12.0-13.0 8.09 0 79 16 5 Lisan Marl 215.0-17.0 4.94 0 79 16 5 Lisan Marl
14.0-15.0 9.80 - 0 74 20 6 Lisan Marl49.0-10.0 5.82 Alluvial
5 6.0-7.0 7.26 - 0 65 27 8 Alluvial
3.0-4.0 - 22 73 4 1 Alluvial68.0-9.0 2.01 - 0 82 14 4 Alluvial
4.0-5.0 8.85 - 10 63 21 6 Lisan Marl77.0-8.0 5.91 - 2 79 15 4 Lisan marl
11 6.0-8.0 0.39 - 2 91 6 1 Sand
6.0-7.5 0.67 - 32 61 5 2 Alluvial129.0-12.0 0.33 - 5 89 5 1 Sand
9.0-10.0 3.71 - 0 88 10 2 Sand13 13.0-14.0 1.80 - 0 90 8 2 Sand
7.0-8.0 1.92 - 7 82 9 2 Alluvial2211.0-12.0 1.38 - 0 86 11 3 Sand
7.0-8.0 28.03 Alluvial249.0-1.0 16.22 - 5 55 31 9 Alluvial
4.0-5.0 2.15 - 12 78 8 2 Alluvial255.0-6.0 6.78 - 4 72 17 7 Alluvial
7.0-8.0 2.32 - 0 81 15 4 Sand2713.0.14.0 7.23 - 2 74 18 6 Lisan Marl
M.C: Moisture ContentG: Gravel S: Sand M: Silt C: ClayL.L: Liquid Limit P.L: Plastic Limit P.I: Plasticity Index
8/12/2019 Dead See Final Soil Report
20/143
Geot. Eng. M.M / S12000003 18 of 33
Table No. 6
Laboratory Test Results of Test Pits
M.C: Moisture ContentG: Gravel S: Sand M: Silt C: ClayL.L: Liquid Limit P.L: Plastic Limit P.I: Plasticity Index C : Cohesion : Angle of Internal Friction
Direct shearTest Results Atterberg Limits Grain Size Distribution
Material
TPNo. Depth
(m)M.C(%) C(KPa)
(Degree)
LL(%)
PL(%)
PI(%)
G(%)
S(%)
M(%)
C(%)
qu(kg/cm 2)
1 0.0-1.0 11.91 38.6 21.3 17.3 0 2.2 53.9 43.9 2.51 Lisan marl
2 0.0-1.0 14.67 42.4 22.8 19.6 1.5 7.6 46.4 44.5 Clayey silt
3 0.0-1.0 17.41 5.70 31.14 36.3 22.3 14 0 1.4 51.0 47.6 3.62 Lisan marl
5 0.0-1.0 24.53 34.0 20.0 14.0 0.0 7.0 73.0 20.0 Lisan marl
6 0.0-1.0 1.96 48.0 49.0 3.0 0.0 Alluvial
8/12/2019 Dead See Final Soil Report
21/143
Geot. Eng. M.M / S12000003 19 of 33
Table No. 7Materials Types and Properties
ApproximateDepths
(m)Geological Description Summary of TestsResults
Plasticity/Expansiveness
See logs of borings,(Appendix A).
Fill material composed of loose finecoarse grain sand and gravel andcobbles of sandstone, limestone, chertand basalt with few asphalt andconcrete fragments.
- -
See logs of borings,(Appendix A).
Alluvial deposits composed ofalternated to intercalated lenses of
brownish yellow gravely sand tosandy gravel with silty to marly clay.
M/C : 0.67-28.03%G : 0.0-32%
S : 55-82%M : 4-31%C : 1-9%
P : N.P
See logs of borings,(Appendix A).
Alluvial (wadi) material composedof varicolored gravel and cobbles ofsandstone, limestone, chert and basaltwith coarse grained sand.
See logs of borings,(Appendix A).
Grayish off white fine to mediumgrained sand alternated with thin siltysand and some coarse sandy gravel.
M/C : 0.33-2.32%G : 0-5%S : 81-90%M : 6-15%
C : 1-4%
P : N.P
See logs of borings,(Appendix A).
Grayish yellow to greenish gray firmto stiff marly clay (lisan marl) intercalated with white aragonitegravely sand.
M/C : 4.94-10.48%G : 0-10%S : 63-79%M : 15-21%C : 4-6%LL : 17%PL : 13%PI : 4%
P: LowPE: Low
M.C: Moisture Content
G: Gravel S: Sand M: Silt C: ClayL.L: Liquid Limit P.L: Plastic Limit P.I: Plasticity Index PE : Potential of Expansiveness P: Plasticity
8/12/2019 Dead See Final Soil Report
22/143
Geot. Eng. M.M / S12000003 20 of 33
6.3 Groundwater and Cavities:
No free ground water or cavities were encountered in any of the boreholes to the drilleddepths during or after the completion of drilling activities. However, the surface hydrology
is outside the scope of this study.
6.4 Material Chemical Properties
6.4.1 Sulphate Content
Sulphate content (expressed as [ SO 3]) for the tested soil samples are shown inTable No. 8.
Sulphate attack to concrete is well documented phenomena and is caused by the presence of high sulphate content either by the ingress of the sulphate of the
surrounding environment, such as foundations soils, or by the presence of sulphatein the concrete ingredients, such as sand or aggregate, or both.
The attack results in a considerable internal expansion which may lead to crackingand disintegration of the concrete.
Based on the sulphate content present in the foundations soils; this site can beclassified within class 3 as categorized in BS 5328:Part 1 (see Appendix D). Therequirements of BS 5328:Part 1 for class (3) are to use ordinary portland cement,sulphate resisting portland cement, or blast furnace portland cement or supersulphated cement with minimum cement content of 320 and 340 kg/m3 and
maximum free water to cement ratio of 0.5 and 0.5, respectively.
Taking into consideration the characteristics of the proposed project, its functionand the presence of ground water, it is recommended that the overall site be treatedas class (3) which presents the severe conditions.
8/12/2019 Dead See Final Soil Report
23/143
Geot. Eng. M.M / S12000003 21 of 33
6.4.2 Chloride Content in Ground Materials
The chloride content for the tested soil samples are also presented in Table No. 8.
There is no widely accepted view on the concentration which chlorides becomesignificant in soil or ground water, but limited experience in the region suggests itmay be as low as 0.05%, particularly in situations where alternate wetting anddrying or capillary rise affect the concrete (CIRIA Guide, 1983).
As shown in Table No. 8 , the chloride content in the tested soil samples is morethan 0.05% and is considered significant.
Table No. 8Chemical Test Results
BH-No Depth(m)Encountered
MaterialSulphateContentSO3 (%)
ChlorideContentCl (%)
CarbonateContent
CaCO 3 (%)
pHValue
BH 4 14.0-15.0 Lisan marl 0.249 0.298 42.47 8.18
BH 13 9.0-10.0 Sand 0.427 0.149 53.44 8.64
BH 22 7.0-8.0 Alluvial 0.160 0.213 52.43 8.82
6.4.3 pH Value
Soil pH is one of the most common soil chemical measurements. It provides theinvestigator with information about the solubility of various soil compounds, theadsorption behavior of ions to soil surface and the microbial activity of soilsystem. The measured pH values listed in Table No. 9 indicate that the testedsamples are alkaline, with values ranging from 8.18-8.82. These values areconsidered not detrimental to steel.
6.4.4 Carbonate Content
Carbonate content in the tested samples is considered slightly high (i.e., more than40%), which is normal due to the nature of alluvial material.
8/12/2019 Dead See Final Soil Report
24/143
Geot. Eng. M.M / S12000003 22 of 33
6.4.5 General Recommendations
Where resistance is needed against both sulphates and chlorides, it is highlyrecommended to protect the concrete from the soil and groundwater with
waterproofing membrane or tanking, and a compromise has to be made onthe type of cement used. Generally, cement containing at least 3.5% but not morethan 9% C3A is preferred. Each situation should be considered on its merits.
It is advisable that the designer shall consult CIRIA Guide to ConcreteConstruction in the Gulf Region, once the exposure conditions of the designedstructures are finally determined, in order to determine, more accurately, thecement type (Figure 6 - Appendix D ) and range of specifications limitsrequirements for minimum cement content, maximum water cement ratio andminimum cover for reinforcement (Table 13 Appendix D ).
8/12/2019 Dead See Final Soil Report
25/143
Geot. Eng. M.M / S12000003 23 of 33
7.0 CONCLUSIONS AND RECOMMENDATIONS
According to the field and laboratory investigation, subsurface conditions, engineeringanalysis and practical experience, we believe that the proposed project can be satisfactorily
supported by the ground at the site, provided that the following recommendations areconsidered:
7.1 Foundation Depth and Type
Main Building (Block C).
Foundation of the Main building are to be constructed at an approximate elevationof -407.0m and -403.0m. The investigation indicated that part of the main building site(adjacent to Holiday Inn Hotel site) is covered by dumped fill reaching 6m in thickness.
Most of these fill materials will be removed to reach the design level of foundation.However, if any dumped fill will remain below the design level, it should be eithercompletely removed or excavated to a minimum depth of 1.5m and replaced by selectedfill materials, as described herein later.
The investigation indicated that ground materials encountered at the expected foundationlevel of the main building are alluvial deposits, lisan marl, and/or engineered fillmaterial (due to difference in elevations and especially, above the proposed culvert),which are characterized by large variations in properties and strength parameters in bothvertical and horizontal extends. Therefore, foundations may be subjected to significantdifferential settlement and differential movement may cause damage to the foundations
and structures. Accordingly, raft foundations are essential to support the 6-7 story main building.
However, if the client chooses not to adopt this solution and assuming that occurrence ofsome minor cracks (especially within the partition walls, in the plaster, in the interface
between different structural elements, along water and electrical installations, etc.) isacceptable, the following alternative may be adopted.
a. Unify foundation ground by Excavating of minimum of 1.5m below foundationlevels
b. Backfill the over excavations with selected fill up to a height of 1.2m. Theselected fill shall be a soil or soil rock mixture, which is free from organicmatter or other deleterious substances. It shall not contain rocks or lumps over15 cm in greatest dimension, and not more than 15 percent larger than 7 cm.
8/12/2019 Dead See Final Soil Report
26/143
Geot. Eng. M.M / S12000003 24 of 33
The fine materials (passing sieve 200) shall not exceed 35 percent (materialsclassified as A-1-a, A1-b and/or A-2-4 according to AASHTO Classificationare considered suitable for this purpose). Selected fill shall be spread in liftsnot exceeding 20 cm in uncompacted thickness, moisture conditioned to its
optimum moisture content, and compacted to a dry density not less than 95 %of the maximum dry density as obtained by modified proctor compaction test(ASTM D 1557).
c. The remaining top 30cm of the over excavation shall be backfilled either withcyclopean concrete (plain concrete with approximately 40% stones) or withengineered fill.
If engineered fill is used, it should be spread into two lifts and each lift shall becompacted to a dry density not less than 97 percent of the maximum density asobtained by modified proctor compaction test (ASTM D 1557-09). The
plasticity index for the base course material shall not be more than 6 percent. Itshall be composed of graded crushed stone satisfying all the requirements of
base course materials according to the Standard Specifications for theConstruction of Roads and Bridges, Ministry of Public Works, Jordan.
d. Foundations system with sufficient rigidity (i.e, strip foundation and/or isolatedfooting with tie beam constructed at foundation level) can be erected on thefoundation ground prepared as described above.
e. Foundations constructed as described herein shall be designed using a netallowable bearing pressure value of 1.5 kg/cm 2.
Building AFoundation of the building A are to be constructed at an approximate elevation of -410.5m. Ground materials encountered at the above elevation are alluvial deposits,and/or fill material. These deposits are characterized by large variations in propertiesand strength parameters in both vertical and horizontal extends. Therefore, foundationsmay be subjected to significant differential settlement and differential movement maycause damage to the foundations and structures. Accordingly, shallow foundationssystem with sufficient rigidity is recommended to support the two (2) story building. Inorder to enhance the rigidity of the foundation systems, foundations shall be tiedtogether with ground tie beams constructed at the foundation level.
Differential settlement may also be reduced by reduction of the transmitted pressure,which, in turn, can be achieved by separating the foundations from the foundationground by a 30 cm thick cyclopean concrete layer (i.e., plain concrete withapproximately 40% stones).
8/12/2019 Dead See Final Soil Report
27/143
Geot. Eng. M.M / S12000003 25 of 33
Building B, C & D
Foundation of the building B, C & D are to be constructed at an approximate elevation
of -413.5m. Ground materials encountered at the above elevation are lisan marl.Although, these materials are relatively homogeneous, significant variations in strength
parameters in both vertical and horizontal extend may take place as a result of the possible local water submergence. Accordingly, shallow foundation systems withsufficient rigidity are recommended to support the 3 story building. In order to enhancethe rigidity of the foundation systems, foundations shall be tied together with ground tie
beams constructed at the foundation level.
Differential settlement may also be reduced by reduction of the transmitted pressure,which, in turn, can be achieved by separating the foundations from the foundationground by a 30 cm thick cyclopean concrete layer (i.e., plain concrete with
approximately 40% stones).
Based on the above mentioned analysis for the proposed structures, finish floor levels(F.F.L), bearing materials, depth of foundations and foundations types are provided inTable No.9:
Table No.9: Structures, Finish Floor Levels, Depth and Type of Foundations.
Structure Name BH No. F.F.L(m)BearingMaterial
Depth offoundations
(m)
Type offoundations
(m)
Main Building
BH11, BH12, BH13,BH14, BH15,BH16, BH17, BH18, BH19, BH20,BH22, BH24, BH25, BH26, BH27,
BH28, TP2, TP3 & TP6
-406.15&
-401.95
Alluvial &Lisan marl 1.5
Raft/Isolated/Strip
Building A BH8, BH10, TP4 & TP5 -409.35 Alluvial 1.5 Isolated/Strip
Building B,C &D BH1, BH2, BH3, BH4, BH5, BH6& BH7 -412.67 Lisan marl 2.0 Isolated/Strip
Culvert TP1, TP2 & TP3 Lisan marl 1.0 Raft
8/12/2019 Dead See Final Soil Report
28/143
Geot. Eng. M.M / S12000003 26 of 33
7.2 Allowable Bearing Pressure
Allowable bearing pressure was calculated based on settlement consideration as
proposed by Meyerhofs theory, for 25.4 mm (1 in.) of estimated maximum settlement,
qnet.all (kN/m 2) = 7.99 NC N 2
28.3128.3
+
B B
Fd; (for B > 1.22m)
Since Meyerhof proposed his original correlation, researchers have observed that itsresults are rather conservative. Later, Meyerhof (1965) suggested that the net allowable
bearing pressure should be increased by about 50%. Bowles (1977) proposed that themodified form of the bearing pressure equation be expressed as
qnet.all (kN/m 2) = 11.98 NC N 2
28.3
128.3
+
B
BFd
4.25
, mmS ; (for B > 1.22m)
Where:
NC N: corrected standard penetration number,
NC N: N x 9.78 ( )2, //1 mkN N N : measured standard penetration test N value. N: effective overburden pressure.
As mentioned earlier, there is a large variation in the soil strength in both horizontal
and vertical extends as indicated from the SPT test results. Therefore, second lowestvalues below foundation influence are taken into consideration in bearing capacitycomputing, as presented below.
Many authors do not consider correction to N values of SPT for depth shallower than 5.0m. Other correction factor is considered based on used hammer energy. The correctionfactor of this type the used in the investigation hammer is 0.75. Accordingly, theadopted corrected number of blows for shallow foundations are as follows:
8/12/2019 Dead See Final Soil Report
29/143
Geot. Eng. M.M / S12000003 27 of 33
Table No. 10Design SPT Values
Structure Name SPT N blowsCorrectedN value
(design value)Main Building 18 13
Building A 17 12Building B, C & D 22 16
Culvert 17 12
B = Foundation Width,
F d = Foundation Depth Factor; Fd =
+
B
D f 33.01 1.33 ,
S = tolerable settlement in mm.
For large width, B, e.g. mat foundations, the preceding equation can be approximated
(assuming
+
B B8.32
18.32 1) as
qnet.all (kN/m2 ) 11.98 NC N F d
4.25, mmS
; or
qnet.all (kN/m2 ) 11.98NC N
+
4.25,
33.01mmS
B
D f
15.93 NC N 4.25, mmS .
Based on the above, the following net allowable bearing pressure values arerecommended.
Table No. 11Structure Name and Net Allowable Bearing Pressure
Net allowable bearing pressurekg/cm 2 Structure Name
Raft Isolated/Strip
Main Building 2.3 1.5Building A 1.4
Building B, C & D 1.9Culvert 2.1
8/12/2019 Dead See Final Soil Report
30/143
Geot. Eng. M.M / S12000003 28 of 33
7.3 Foundation Settlement:
The consolidation settlement for the alluvial materials is expected to be insignificant
(negligible). The elastic (immediate) settlement of the materials can be calculated usingthe following equation based on the theory of elasticity [e.g, Timoshenko and Goodier(1951)]:
s = qa xB (1- 2) IEs
Where:s: settlement of the corner of a rectangular base (mm). qa: net allowable bearing pressureB: the width of the foundation, approximately equal to 1.0m for isolated (square strip and
raft) footings
I: combined depth, roughness and bedrock thickness influence factor, which is equal to: 0.88 for square footing 2.1 for strip & raft footing ( L/B=10 )
: the Poisson's ratio of the materials; is generally about 0.3 for soils.E: Youngs modulus of soilE= 7000 N0.5 Therefore, the estimated foundation settlement is:
Table No.12: Settlement values:
Since the fill materials is erratic and does not have uniform engineering properties,settlements could not be predicted using conventional settlement calculations. However, ifconstruction was performed according to the recommendations above, settlements areexpected to be within allowable limits.
Settlementcm per meter widthStructure qa
Kg/cm2
EKg/cm 2 Square
0.88Strip2.10
Raft2.10
Main Building (Raft) 2.3 0.3 300 0.61 1.46 1.46Main Building (Isolated) 1.5 0.3 300 0.40 0.96 -Building A 1.4 0.3 290 0.39 0.92 -Building B, C & D 1.9 0.3 330 0.46 1.10 -
Culvert 2.1 0.3 290 1.38
8/12/2019 Dead See Final Soil Report
31/143
Geot. Eng. M.M / S12000003 29 of 33
7.4 Subgrade Reaction:
For the design of raft foundations on these layers, the conservative value of the modulus
of sub-grade reaction is calculated using the allowable bearing pressure ( 1.5 Kg/cm2
) asfollow:
For design of culvert and main building raft foundations, the following modulus ofsubgrade reaction may be calculated from the standard penetration number of blows (Nvalue):
K 0.3 = 1.8 Ncor (MN/m 3) (Scott 1981),K 0.3 (for base diameter of 0.3m)
Accordingly, the (K 0.3) value will be : (1.8*13=23.4 MN/m 3 ( 2.3kg/cm 3))
For Main Building (
2.3kg/cm3
) For Culvert ( 2.1kg/cm 3)For foundation size correction:
K s = K 0.3 2
23.0
+
B B assuming that foundation ground behave as granular soil.
Where (B) is foundation width.
7.5 Excavation Methods:
It is expected that the excavation will be carried out through the fill, lisan marl and alluvialmaterials. Therefore, pneumatic equipment such as jackhammer will be needed in additionto the conventional excavation equipment such as loaders and dozers for excavation workat the site.
7.6 Excavation of Side Slopes:
To minimize the stability problems, the temporary excavation sides should be cut at a faceinclination not steeper than o ne horizontal to one vertical (1H: 1V) for the fill andalluvial materials.
If these side slopes can not be achieved for insufficient lateral distance or for any otherreason, temporary lateral support (shoring) system may be necessary and should beconsidered.
8/12/2019 Dead See Final Soil Report
32/143
Geot. Eng. M.M / S12000003 30 of 33
7.7 Drainage:
It is recommended to protect the foundation ground and excavation from surface water both during and after construction by providing proper drainage and protection system andmaintaining the sewer and water system of the buildings continuously. The rain water andsurface water (if any) which is collected from the rain water ducts and from groundsurface should be directed away from the buildings.
Proper drainage should also be provided at all retaining walls (if any) in the form of either perforated drain pipes or weep holes across the wall. A filter/drainage blanket or layerapproximately 50 cm wide should be backfilled against all retaining walls consisting ofopen graded filter materials (single size gravel may also be used). Gradation requirementsfor filter material are outlined in the following paragraph.
7.8 Backfill Materials, Selected Engineered Fill and Compaction Criteria:
The existing fill materials are considered suitable for backfilling purposes.
Backfill Materials:
The materials to be used for backfilling purposes under bottom slab and behindunderground walls shall be a soil or soil-rock mixture, which is free from organic matteror other deleterious substances. It shall not contain rocks or lumps over 15 cm in greatestdimension, and not more than 15 percent larger than 7 cm. The fine materials (passingsieve 200) shall not exceed 35 percent. The plasticity index for the backfill material shall
not be more than 10 percent. It shall be spread in lifts not exceeding 20cm in uncompactedthickness, moisture conditioned to its optimum moisture content, and compacted todensity not less than 95 percent of the maximum dry density as obtained by modified
proctor compaction test (ASTM D 1557-09).
Selected Engineered Fill:
The engineered fill materials shall be composed of well graded granular material. It shall be spread in lifts not exceeding 20cm in uncompacted thickness, moisture conditioned toits optimum moisture content and compacted to a dry density not less than 97 percent ofthe maximum density as obtained by modified proctor compaction test (ASTM D 1557-
09). The plasticity index for the selected fill material shall not be more than 6 percent.
8/12/2019 Dead See Final Soil Report
33/143
Geot. Eng. M.M / S12000003 31 of 33
Retaining Walls:
The backfill materials immediately behind the retaining walls (if any) shall consist offilter/drainage materials composed of clean coarse sand and gravel or crushed stoneconforming to the following gradation requirements:
Sieve Size Percentage Passing by Weight2 1/2" 1001 1/2" 80-1003/4" 60-95No. 4 35-65No. 8 25-50
No. 30 5-25No. 200 0-3
(Single size gravel may also be used as an alternative to the above filter materials).
These materials shall extend vertically from the bottom of the walls to a level ofapproximately 1m below the finished ground level behind the walls. The top 1m shall be
backfilled with relatively impervious materials.
7.9 Earth Pressure
Assuming that there are no sustained surcharges, no back slope and no hydrostatic pressure conditions, the following soil parameters may be used in the design (based on ourexperience with similar materials).
Table No. 13 Material Properties used in stability analysis
* For earth pressure calculation, cohesion should be considered zero due to tension cracks.
Material TypesUnit
Weight(g/cm 3)
Cohesion( C )
(kg/cm 2)
Angle ofInternalFriction
( )(Degree)
Coef. ofActiveEarth
PressureKa
Coef. ofPassiveEarth
PressureKp
Coef. ofEarth
Pressureat rest
KoFill materials 1.8 2.0 30 0.33 3.00 0.5
Alluvial materials 2.0 5.0 35 0.27 3.69 0.42
Lisan Marl materials 1.6 0.2 12 0.65 1.54 0.79
Selected fillmaterials 2.0 0.1 30 0.33 3.00 0.50
Filter materials 2.0 0.0 34 0.28 3.54 0.44
8/12/2019 Dead See Final Soil Report
34/143
Geot. Eng. M.M / S12000003 32 of 33
7.10 Foundation Excavation Inspection:
The recommendations given in this report are based on the assumption that the subsurface
materials and conditions do not deviate appreciably from those disclosed in the borings.
Our office should be notified, in writing, immediately after all foundation excavations and before foundation construction to inspect the excavations and confirm that the requiredground is reached and all the undesirable and loose materials are removed.
8.0 STANDARD OF CARE
Arab Center for Engineering Studies has endeavored to provide their services in a manner thatfeatures appropriate professional practice and the level of care and skill ordinarily exercised
by members of the profession. No other representation, expressed or implied, is included or
intended in this document.
It should be noted that the boreholes show subsurface conditions at the locations, dates, anddepths indicated and it is not warranted that they are strictly representative of the materialsand conditions at other locations, times, and greater depths than indicated.
8/12/2019 Dead See Final Soil Report
35/143
Geot. Eng. M.M / S12000003 33 of 33
APPENDICES
8/12/2019 Dead See Final Soil Report
36/143
8/12/2019 Dead See Final Soil Report
37/143
LEGEND TO BORING LOGSSYMBOLS FOR COMMON SOIL AND ROCK TYPES
CLAY SILT SAND GRAVEL COBBLES & BOULDERS
PEAT FILL
CHALK MARL LIMESTONE CHERT CLAYSTONE
SILTSTONE SANDSTONE
SHALE BASALT
PHOSPHATE
SAMPLER TYPE
SampleDisturbance
HAMMER
Disturbed
CORE BARREL
RelativelyUndisturbed
AUGER
Disturbed
SHELBY TUBE
Undisturbed
DRIVE CYLENDER(Manual)Relatively
Undisturbed
DRIVE BARREL
RelativelyUndisturbed
DRIVE SPLIT SPOON(S.P.T.)
Disturbed
S.P.T. (Blows/30cm) : The number of blows, in the Standard Penetration test, required to drive a five centimeter diameter split tubesampler a distance of thirty centimeters using sixty three and half kilograms weight falling seventy six centimeters
Fine Grained Soils Coarse Grained Soils
S.P.T(Blows
/30cm)Consistency Field Identification
UnconfinedCompressive
Strength(kg/cm 2)
S.P.T(Blows/ 30cm)
Density Field IdentificationRelativeDensity
(%)
0-2 Very Soft Easily penetrated several cmswith fist.
50 Very Dense
Requires blasting or heavyequipment to loosen.
80-100
>30 Hard Indented with difficulty bythumb nail.
>4.0
Recovery : The percentage of length of core recovered in each run to the total length of the core run.R.Q.D. : The Rock Quality Designation is the percentage of the sum of lengths of intact core pieces ten centimeters or longer to thetotal length of the core run.Point Load Strength and Unconfined Compressive Strength : In the point load test, a rock core is loaded between two steel conesand failure occurs by tensile splitting. A point load strength index, Is, is calculated as the ratio of the applied load, P, at rupture to thesquare of the distance, H, between the loading points: Is = P / H 2.A correlation that is commonly used between the point load index and the unconfined compressive strength, qu, of a cylinder with alength to diameter ratio of 2 to 1 is: qu = 24 Is (50). . Where Is (50) is the point load strength corrected to a diameter of 50mm (Brock and Franklin, 1972).
Rock Quality Rock Strength Rock Quality Designation,
RQD (%)Rock QualityDescription
Description Uniaxial Compressive Strength(MPa)
0 - 25 Very Poor Extremely Weak 0.3-1.0 25 - 50 Poor Very Weak 1.0-5.0 50 - 70 Fair Weak 5.0-30.0 70 - 90 Good Medium Strong 30.0-50.0
90 - 100 Excellent Strong 50.0-100.0 Very Strong 100.0-250.0
Extremely Strong > 250.0
ARAB CENTER FOR ENGINEERING STUDIES
8/12/2019 Dead See Final Soil Report
38/143
Logged By : Melena M.
*From (8.0-16.0)m; Increase of sand
-404.50
50 in 5cm.
11
T C R ( % )
Field Records
Grayish yellow to greenish gray firm to stiff marly clay(lisan marl) intercalated with white aragonite gravelysand.
SAMPLE KEY
Alluvial deposits composed of alternated to intercalatedlenses of brownish yellow gravely sand to sandy gravelwith silty to marly clay.
Sheet 1 of 2
E l e v a
t i o n
( m )
Description S y m
b o
l
D e p
t h ( m )
S a m p
l e T y p e Core Recovery
12 22
>50
*From (1.5-8.0)m; Increase of clayey marl (lisan marl).
34
S C R ( % )
Checked By : Mustafa B.
0-15cm
15-30cm
30-45cm R
Q D ( % )
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
PercussionStandard PenetrationTestRock Core
Total Depth (m): 16
Ground Level (m): -403.0
Coordinates: N=128,529.00 E=206,067.00
0
1
2
3
4
5
6
7
8
9
10
11
12
13REMARKS:
SPT Records
TCR:SCR:RQD:
Appendix
Drilling Method : Rotary Percussive
Boring Started : 06-02-2012 Rig : Toho2
Boring Completed : 07-02-2012 Driller : MA
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-01
Page 1 /
Core Dia (mm):
Casing Depth (m) : -
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
8/12/2019 Dead See Final Soil Report
39/143
Total Depth (m): 16
Ground Level (m): -403.0
Coordinates: N=128,529.00 E=206,067.00
Core Recovery
Logged By : Melena M.
SPT Records
REMARKS:
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
S y m
b o
l
PercussionStandard PenetrationTestRock Core
TCR:SCR:RQD:
Sheet 2 of 2
SAMPLE KEY
Bottom of borehole-419.00
T C R ( % )
S a m p
l e T y p e
D e p
t h ( m )
R Q D ( % )
E l e v a
t i o n
( m )
Description
Page 2 /
Field Records
Core Dia (mm):
Casing Depth (m) : -
13
14
15
16
15-30cm
30-45cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-01
0-15cm
Drilling Method : Rotary Percussive
Boring Started : 06-02-2012 Rig : Toho2
Boring Completed : 07-02-2012 Driller : MA
Appendix
S C R ( % )
Checked By : Mustafa B.
8/12/2019 Dead See Final Soil Report
40/143
Alluvial deposits composed of alternated to intercalatedlenses of brownish yellow gravely sand to sandy gravelwith silty to marly clay.
Grayish yellow to greenish gray firm to stiff marly clay(lisan marl) intercalated with white aragonite gravelysand.*From (2.0-5.0)m; Increase of clayey marl (lisan marl).
*From (5.0-19)m; Increase of sand
-402.00
11
S a m p
l e T y p e
T C R ( % )
Sheet 1 of 2
R Q D ( % )
E l e v a
t i o n
( m )
Description S y m
b o
l
D e p
t h ( m )
10
9
10
9
9 19
SAMPLE KEY
18
S C R ( % )
Checked By : Mustafa B.
0-15cm
Core Recovery
30-45cm
Field Records
0
1
2
3
4
5
6
7
8
9
10
11
12
13
15-30cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
SPT Records
REMARKS:
Appendix
Logged By : Melena M.
Total Depth (m): 19
Ground Level (m): -400.0
Coordinates: N=128,543.00 E=206,085.00
PercussionStandard PenetrationTestRock Core
Drilling Method : Rotary Percussive
Boring Started : 07-02-2012 Rig : Toho2
Boring Completed : 08-02-2012 Driller : MA
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-02
TCR:SCR:RQD:
Core Dia (mm):
Casing Depth (m) : -
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
Page 1 /
8/12/2019 Dead See Final Soil Report
41/143
Total Depth (m): 19
Ground Level (m): -400.0
Coordinates: N=128,543.00 E=206,085.00
Core Recovery
Logged By : Melena M.
SPT Records
REMARKS:
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
S y m
b o
l
PercussionStandard PenetrationTestRock Core
TCR:SCR:RQD:
Sheet 2 of 2
SAMPLE KEY
Bottom of borehole-419.00
T C R ( % )
S a m p
l e T y p e
D e p
t h ( m )
R Q D ( % )
E l e v a
t i o n
( m )
Description
Page 2 /
Field Records
Core Dia (mm):
Casing Depth (m) : -
13
14
15
16
17
18
19
15-30cm
30-45cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-02
0-15cm
Drilling Method : Rotary Percussive
Boring Started : 07-02-2012 Rig : Toho2
Boring Completed : 08-02-2012 Driller : MA
Appendix
S C R ( % )
Checked By : Mustafa B.
8/12/2019 Dead See Final Soil Report
42/143
-410.80
Alluvial deposits composed of alternated to intercalatedlenses of brownish yellow gravely sand to sandy gravelwith silty to marly clay.*From (0.0-2.0)m; Increase of yellow fine to medium
grained sand.
*From (2.0-4.0)m; Incrase of sand with thin bituminousdark gray silty clay
*From (4.0-6.0)m; Incease of medium to coarse grainedsand
*From (6.0-7.0)m; Incease of sand with thin bituminousdark gray silty clay
Grayish off white fine to medium grained sand alternatedwith thin silty sand and some coarse sandy gravel.*From (7.0-12.0)m; Increase of medium coarse grainedsand with few fine gravel.
Grayish yellow to greenish gray firm to stiff marly clay(lisan marl) intercalated with white aragonite gravelysand.
Sheet 1 of 2
9
13
T C R ( % )
Field Records
SAMPLE KEY
R Q D ( % )
>50
27
25
50 in 7cm >50
50 in 3cm.
Drilling Method : Rotary Percussive
Boring Started : 19-02-2012 Rig : Toho2
Boring Completed : 19-02-2012 Driller : MA
Appendix
S C R ( % )
Checked By : Mustafa B.
0-15cm
E l e v a
t i o n
( m )
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
-405.80
15-30cm
0
1
2
3
4
5
6
7
8
9
10
11
12
13
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows30-45
cm
SPT Records
S a m p
l e T y p e
Borehole No.BH-03
D e p
t h ( m )
S y m
b o
l Core Recovery
Description
Logged By : Melena M.
REMARKS:
Total Depth (m): 23
Ground Level (m): -398.8
Coordinates: N=128,553.00 E=206,104.00
Core Dia (mm):
Casing Depth (m) : -
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
Page 1 /
TCR:SCR:RQD:
PercussionStandard PenetrationTestRock Core
8/12/2019 Dead See Final Soil Report
43/143
Total Depth (m): 23
Ground Level (m): -398.8
Coordinates: N=128,553.00 E=206,104.00
Core Recovery
Logged By : Melena M.
SPT Records
REMARKS:
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
S y m
b o
l
PercussionStandard PenetrationTestRock Core
TCR:SCR:RQD:
Sheet 2 of 2
SAMPLE KEY
Bottom of borehole-421.80
T C R ( % )
S a m p
l e T y p e
D e p
t h ( m )
R Q D ( % )
E l e v a
t i o n
( m )
Description
Page 2 /
Field Records
Core Dia (mm):
Casing Depth (m) : -
13
14
15
16
17
18
19
20
21
22
23
15-30cm
30-45cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-03
0-15cm
Drilling Method : Rotary Percussive
Boring Started : 19-02-2012 Rig : Toho2
Boring Completed : 19-02-2012 Driller : MA
Appendix
S C R ( % )
Checked By : Mustafa B.
8/12/2019 Dead See Final Soil Report
44/143
PercussionStandard PenetrationTestRock Core
E l e v a
t i o n
( m )
Description S y m
b o
l
D e p
t h ( m )
S a m p
l e T y p e Core Recovery
Logged By : Melena M.
SPT Records
REMARKS:
Total Depth (m): 22
Ground Level (m): -397.0
Coordinates: N=128,572.00 E=206,116.00
Sheet 1 of 2
*From (4.0-11.0)m; Incrase of sandy gravel.
*From (1.0-4.0)m; Increase of highly weathered coarse
grained sand with gravel and some bituminous clay.
*From (11.0-13.0)m; alternated with some light graymarl.
T C R ( % )
Field Records
SAMPLE KEY
R Q D ( % )
Alluvial deposits composed of alternated to intercalatedlenses of brownish yellow gravely sand to sandy gravelwith silty to marly clay.
0-15cm
30-45cm
0
1
2
3
4
5
6
7
8
9
10
11
12
13
15-30cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
TCR:SCR:RQD:
Page 1 /
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Drilling Method : Rotary Percussive
Boring Started : 15-02-2012 Rig : Toho2
Boring Completed : 15-02-2012 Driller : MA
Appendix
Checked By : Mustafa B.
Borehole No.BH-04
S C R ( % )
Core Dia (mm):
Casing Depth (m) : -
8/12/2019 Dead See Final Soil Report
45/143
R Q D ( % )
Logged By : Melena M.
-410.00
-419.00
8
10
T C R ( % )
Field Records
Bottom of borehole
SAMPLE KEY
Grayish yellow to greenish gray firm to stiff marly clay(lisan marl) intercalated with white aragonite gravelysand.
Sheet 2 of 2
Description S y m
b o
l
D e p
t h ( m )
S a m p
l e T y p e Core Recovery
10
10
11
12
21
E l e v a
t i o n
( m )
22
S C R ( % )
Checked By : Mustafa B.
0-15cm
30-45cm
13
14
15
16
17
18
19
20
21
22
15-30cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
REMARKS:
SPT Records
Total Depth (m): 22
Ground Level (m): -397.0
Coordinates: N=128,572.00 E=206,116.00
PercussionStandard PenetrationTestRock Core
TCR:SCR:RQD:
Page 2 / Appendix
Drilling Method : Rotary Percussive
Boring Started : 15-02-2012 Rig : Toho2
Boring Completed : 15-02-2012 Driller : MA
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-04
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
Core Dia (mm):
Casing Depth (m) : -
8/12/2019 Dead See Final Soil Report
46/143
Logged By : Melena M.
E l e v a
t i o n
( m )
Description S y m
b o
l
D e p
t h ( m )
S a m p
l e T y p e
SAMPLE KEY
SPT Records
REMARKS:
Total Depth (m): 14
Ground Level (m): -407.5
Coordinates: N=128,595.00 E=206,108.00
Sheet 1 of 2
Core Recovery
Fill material composed of loose fine coarse grain sandand gravel and cobbles of sandstone, limestone, chertand basalt with few asphalt and concrete fragments.
Alluvial materials composed of brown to light brown fineto course grained sand and very fine frained sandy siltwith alternating sub-rounded to sub angular gravel,cobbles and occasional boulders of limestone chertsandstone.
Grayish yellow to greenish gray firm to stiff marly clay(lisan marl) intercalated with white aragonite gravelysand.* From (5.0-9.0)m; Alternated clayey marl and fine tomedium sand with some dark gray bituminous silty clay
R Q D ( % )
-410.00
-413.00
T C R ( % )
Field Records
* From (9.0-14.0)m; Increase of light gray sand with grayclayey silt intercalations.
PercussionStandard PenetrationTestRock Core
0-15cm
30-45cm
0
1
2
3
4
5
6
7
8
9
10
11
12
13
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
TCR:SCR:RQD:
Page 1 /
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
Core Dia (mm):
Casing Depth (m) : -
15-30cm
Checked By : Mustafa B.
Borehole No.BH-05
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Drilling Method : Rotary Percussive
Boring Started : 12-02-2012 Rig : Toho2
Boring Completed : 12-02-2012 Driller : MA
Appendix
S C R ( % )
8/12/2019 Dead See Final Soil Report
47/143
Total Depth (m): 14
Ground Level (m): -407.5
Coordinates: N=128,595.00 E=206,108.00
Core Recovery
Logged By : Melena M.
SPT Records
REMARKS:
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
S y m
b o
l
PercussionStandard PenetrationTestRock Core
TCR:SCR:RQD:
Sheet 2 of 2
SAMPLE KEY
Bottom of borehole-421.50
T C R ( % )
S a m p
l e T y p e
D e p
t h ( m )
R Q D ( % )
E l e v a
t i o n
( m )
Description
Page 2 /
Field Records
Core Dia (mm):
Casing Depth (m) : -
13
14
15-30cm
30-45cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-05
0-15cm
Drilling Method : Rotary Percussive
Boring Started : 12-02-2012 Rig : Toho2
Boring Completed : 12-02-2012 Driller : MA
Appendix
S C R ( % )
Checked By : Mustafa B.
8/12/2019 Dead See Final Soil Report
48/143
8/12/2019 Dead See Final Soil Report
49/143
Core Recovery
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
Page 2 /
TCR:SCR:RQD:
PercussionStandard PenetrationTestRock Core
Total Depth (m): 12
Ground Level (m): -407.0
Coordinates: N=128,592.00 E=206,093.00
REMARKS:
SPT Records
Bottom of borehole
T C R ( % )
Field Records
SAMPLE KEY
R Q D ( % )
Logged By : Melena M.
E l e v a
t i o n
( m )
Description S y m
b o
l
D e p
t h ( m )
S a m p
l e T y p e
Core Dia (mm):
Casing Depth (m) : -
30-45cm
0-15cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
Appendix
Sheet 2 of 2
Borehole No.BH-06
15-30cm
Drilling Method : Rotary Percussive
Boring Started : 13-02-2012 Rig : Toho2
Boring Completed : 13-02-2012 Driller : MA
S C R ( % )
Checked By : Mustafa B.
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
8/12/2019 Dead See Final Soil Report
50/143
Sheet 1 of 2
Fill material composed of loose fine coarse grain sandand gravel and cobbles of sandstone, limestone, chertand basalt with few asphalt and concrete fragments.
Grayish yellow to greenish gray firm to stiff marly clay(lisan marl) intercalated with white aragonite gravelysand.
* From (5.0-9.0)m; Increase of fine sand with dark gray
bituminous clayey silt.
-409.00
6
12
10
T C R ( % )
Field Records
SAMPLE KEY
R Q D ( % )
>50
8
50 in 8cm
12
9 17
26
* From (9.0-13.0)m; Increase of light gray madium tocoarse grained sand.
14
* From (2.0-5.0)m; increase of moist gray marlalternated with medium graine sand.
Drilling Method : Rotary Percussive
Boring Started : 14-02-2012 Rig : Toho2
Boring Completed : 14-02-2012 Driller : MA
Appendix
S C R ( % )
Checked By : Mustafa B.
0-15cm
15-30cm
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
30-45cm
0
1
2
3
4
5
6
7
8
9
10
11
12
13
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows S
a m p
l e T y p e
D e p
t h ( m ) Core Recovery
S y m
b o
l
Borehole No.BH-07
Logged By : Melena M.
Description
E l e v a
t i o n
( m )
SPT Records
REMARKS:
Page 1 /
Total Depth (m): 15
Ground Level (m): -407.0
Coordinates: N=128,611.00 E=206,094.00
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
Core Dia (mm):
Casing Depth (m) : -
TCR:SCR:RQD:
PercussionStandard PenetrationTestRock Core
8/12/2019 Dead See Final Soil Report
51/143
S a m p
l e T y p e Core Recovery
Logged By : Melena M.
SPT Records
Page 2 /
Description
Total Depth (m): 15
Ground Level (m): -407.0
Coordinates: N=128,611.00 E=206,094.00
Sheet 2 of 2
REMARKS:
* From (13.0-15.0)m; Increase of grayish black mediumsand with high silty clay.
Bottom of borehole-422.00
D e p
t h ( m )
Field Records S y m
b o
l
SAMPLE KEY
R Q D ( % )
E l e v a
t i o n
( m )
TCR:SCR:RQD:
T C R ( % )
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
30-45cm
PercussionStandard PenetrationTestRock Core
13
14
15
0-15cm
15-30cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
Borehole No.BH-07
Core Dia (mm):
Casing Depth (m) : -
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Drilling Method : Rotary Percussive
Boring Started : 14-02-2012 Rig : Toho2
Boring Completed : 14-02-2012 Driller : MA
Appendix
S C R ( % )
Checked By : Mustafa B.
8/12/2019 Dead See Final Soil Report
52/143
8/12/2019 Dead See Final Soil Report
53/143
Total Depth (m): 15
Ground Level (m): -403.5
Coordinates: N=128,640.00 E=206,024.00
Core Recovery
Logged By : Melena M.
SPT Records
REMARKS:
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
S y m
b o
l
PercussionStandard PenetrationTestRock Core
TCR:SCR:RQD:
Sheet 2 of 2
SAMPLE KEY
Bottom of borehole-418.50
T C R ( % )
S a m p
l e T y p e
D e p
t h ( m )
R Q D ( % )
E l e v a
t i o n
( m )
Description
Page 2 /
Field Records
Core Dia (mm):
Casing Depth (m) : -
13
14
15
15-30cm
30-45cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-09
0-15cm
Drilling Method : Rotary Percussive
Boring Started : 26-02-2012 Rig : Edico 32-1
Boring Completed : 26-02-2012 Driller : AN
Appendix
S C R ( % )
Checked By : Mustafa B.
8/12/2019 Dead See Final Soil Report
54/143
Sheet 1 of 1
Fill material composed of loose fine coarse grain sandand gravel and cobbles of sandstone, limestone, chertand basalt with few asphalt and concrete fragments.
Alluvial (wadi) material composed of varicolored graveland cobbles of sandstone, limestone, chert and basaltwith coarse grained sand.
Grayish off white fine to medium grained sand alternatedwith thin silty sand and some coarse sandy gravel.
Bottom of borehole
-409.50
-413.50
E l e v a
t i o n
( m )
11
9
T C R ( % )
Field Records
SAMPLE KEY
R Q D ( % )
31
13
14
15 28
17
-415.50
Appendix
S C R ( % )
Checked By : Mustafa B.
0-15cm
15-30cm
30-45cm
Drilling Method : Rotary Percussive
Boring Started : 26-01-2012 Rig : Toho2
Boring Completed : 26-01-2012 Driller : KMQ
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
Description
REMARKS:
Logged By : Melena M.
Core Recovery
0
1
2
3
4
5
6
7
8
9
10
11
12
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
S a m p
l e T y p e SPT Records
D e p
t h ( m )
S y m
b o
l
Total Depth (m): 12
Ground Level (m): -403.5
Coordinates: N=128,640.00 E=206,013.00
Borehole No.BH-10
Core Dia (mm):
Casing Depth (m) : -
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
Page 1 /
TCR:SCR:RQD:
PercussionStandard PenetrationTestRock Core
8/12/2019 Dead See Final Soil Report
55/143
Core Recovery
Fill material composed of loose fine coarse grain sandand gravel and cobbles of sandstone, limestone, chertand basalt with few asphalt and concrete fragments.
Grayish off white fine to medium grained sand alternatedwith thin silty sand and some coarse sandy gravel.
-409.50
8
14
Field Records
SAMPLE KEY
Sheet 1 of 2
E l e v a
t i o n
( m )
Description S y m
b o
l
D e p
t h ( m )
S a m p
l e T y p e
T C R ( % )
9
17
13
21 38
R Q D ( % )
22
S C R ( % )
Checked By : Mustafa B.
0-15cm
15-30cm
0
1
2
3
4
5
6
7
8
9
10
11
12
13
30-45cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
REMARKS:
SPT Records
Appendix
Logged By : Melena M.
PercussionStandard PenetrationTestRock Core
Drilling Method : Rotary Percussive
Boring Started : 05-02-2012 Rig : Toho2
Boring Completed : 06-02-2012 Driller : KMQ
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-11
Total Depth (m): 15
Ground Level (m): -403.5
Coordinates: N=128,653.00 E=205,997.00
TCR:SCR:RQD:
Core Dia (mm):
Casing Depth (m) : -
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
Page 1 /
8/12/2019 Dead See Final Soil Report
56/143
Total Depth (m): 15
Ground Level (m): -403.5
Coordinates: N=128,653.00 E=205,997.00
Core Recovery
Logged By : Melena M.
SPT Records
REMARKS:
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
S y m
b o
l
PercussionStandard PenetrationTestRock Core
TCR:SCR:RQD:
Sheet 2 of 2
SAMPLE KEY
Bottom of borehole-418.50
T C R ( % )
S a m p
l e T y p e
D e p
t h ( m )
R Q D ( % )
E l e v a
t i o n
( m )
Description
Page 2 /
Field Records
Core Dia (mm):
Casing Depth (m) : -
13
14
15
15-30cm
30-45cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-11
0-15cm
Drilling Method : Rotary Percussive
Boring Started : 05-02-2012 Rig : Toho2
Boring Completed : 06-02-2012 Driller : KMQ
Appendix
S C R ( % )
Checked By : Mustafa B.
8/12/2019 Dead See Final Soil Report
57/143
7
S y m
b o
l
Fill material composed of loose fine coarse grain sandand gravel and cobbles of sandstone, limestone, chertand basalt with few asphalt and concrete fragments
Alluvial (wadi) material composed of varicolored graveland cobbles of sandstone, limestone, chert and basaltwith coarse grained sand.
Grayish off white fine to medium grained sand alternatedwith thin silty sand and some coarse sandy gravel.
-408.50
-411.50
T C R ( % )
Sheet 1 of 2
SAMPLE KEY
R Q D ( % )
E l e v a
t i o n
( m )
Description
25
8
15
9 17
Field Records
10
0
1
2
3
4
5
6
7
8
9
10
11
12
13
S C R ( % )
Checked By : Mustafa B.
0-15cm
D e p
t h ( m )
30-45cm
Appendix
15-30cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
8
Total Depth (m): 14
Ground Level (m): -402.5
Coordinates: N=128,662.00 E=206,019.00
Logged By : Melena M.
SPT Records Core Recovery
Drilling Method : Rotary Percussive
Boring Started : 05-02-2012 Rig : Edico 32-1
Boring Completed : 06-02-2012 Driller : AN
REMARKS:
S a m p
l e T y p e
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-12
PercussionStandard PenetrationTestRock Core
Core Dia (mm):
Casing Depth (m) : -
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
Page 1 /
TCR:SCR:RQD:
8/12/2019 Dead See Final Soil Report
58/143
Total Depth (m): 14
Ground Level (m): -402.5
Coordinates: N=128,662.00 E=206,019.00
Core Recovery
Logged By : Melena M.
SPT Records
REMARKS:
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
S y m
b o
l
PercussionStandard PenetrationTestRock Core
TCR:SCR:RQD:
Sheet 2 of 2
SAMPLE KEY
Bottom of borehole-416.50
T C R ( % )
S a m p
l e T y p e
D e p
t h ( m )
R Q D ( % )
E l e v a
t i o n
( m )
Description
Page 2 /
Field Records
Core Dia (mm):
Casing Depth (m) : -
13
14
15-30cm
30-45cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-12
0-15cm
Drilling Method : Rotary Percussive
Boring Started : 05-02-2012 Rig : Edico 32-1
Boring Completed : 06-02-2012 Driller : AN
Appendix
S C R ( % )
Checked By : Mustafa B.
8/12/2019 Dead See Final Soil Report
59/143
Core Recovery
Fill material composed of loose fine coarse grain sandand gravel and cobbles of sandstone, limestone, chertand basalt with few asphalt and concrete fragments.
Grayish off white fine to medium grained sand alternatedwith thin silty sand and some coarse sandy gravel.
-407.2013
16
Field Records
SAMPLE KEY
Sheet 1 of 2
E l e v a
t i o n
( m )
Description S y m
b o
l
D e p
t h ( m )
S a m p
l e T y p e
T C R ( % )
17
19
20
25 44
R Q D ( % )
37
S C R ( % )
Checked By : Mustafa B.
0-15cm
15-30cm
0
1
2
3
4
5
6
7
8
9
10
11
12
13
30-45cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
REMARKS:
SPT Records
Appendix
Logged By : Melena M.
PercussionStandard PenetrationTestRock Core
Drilling Method : Rotary Percussive
Boring Started : 23-02-2012 Rig : Toho2
Boring Completed : 23-02-2012 Driller : KMQ
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-13
Total Depth (m): 17
Ground Level (m): -401.2
Coordinates: N=128,673.00 E=206,027.00
TCR:SCR:RQD:
Core Dia (mm):
Casing Depth (m) : -
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
Page 1 /
8/12/2019 Dead See Final Soil Report
60/143
8/12/2019 Dead See Final Soil Report
61/143
8/12/2019 Dead See Final Soil Report
62/143
Total Depth (m): 20
Ground Level (m): -400.5
Coordinates: N=128,657.00 E=206,049.00
Core Recovery
Logged By : Melena M.
SPT Records
REMARKS:
Drilling Medium : Air Flush
Boring Dia (mm) : 99.2
Casing Dia (mm): 122.5
S y m
b o
l
PercussionStandard PenetrationTestRock Core
TCR:SCR:RQD:
Sheet 2 of 2
SAMPLE KEY
Bottom of borehole-420.50
T C R ( % )
S a m p
l e T y p e
D e p
t h ( m )
R Q D ( % )
E l e v a
t i o n
( m )
Description
Page 2 /
Field Records
Core Dia (mm):
Casing Depth (m) : -
13
14
15
16
17
18
19
20
15-30cm
30-45cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Quality Designation
NBlows
Project : Jor danian Development Area
Proj ect Ref. No. : S12000003
Location : Dead Sea, Jor dan
Client : Tahan & Bus hnaq Consultants
Borehole No.BH-14
0-15cm
Drilling Method : Rotary Percussive
Boring Started : 25-02-2012 Rig : Toho2
Boring Completed : 25-02-2012 Driller : KMQ
Appendix
S C R ( % )
Checked By : Mustafa B.
8/12/2019 Dead See Final Soil Report
63/143
PercussionStandard PenetrationTestRock Core
E l e v a
t i o n
( m )
Description S y m
b o
l
D e p
t h ( m )
S a m p
l e T y p e Core Recovery
Logged By : Melena M.
SPT Records
REMARKS:
Sheet 1 of 2
-405.50
Fill material composed of loose fine coarse grain sandand gravel and cobbles of sandstone, limestone, chertand basalt with few asphalt and concrete fragments
Alluvial (wadi) material composed of varicolored graveland cobbles of sandstone, limestone, chert and basaltwith coarse grained sand.
Grayish off white fine to medium grained sand alternatedwith thin silty sand and some coarse sandy gravel.
-402.50
T C R ( % )
Field Records
SAMPLE KEY
R Q D ( % )
15-30cm
Total Depth (m): 17
Ground Level (m): -399.5
Coordinates: N=128,668.00 E=206,067.00
0
1
2
3
4
5
6
7
8
9
10
11
12
13
0-15cm
Ground Water TableTotal Core RecoverySolid Core RecoveryRock Q