19
PLANS TAKES A LEAP TO VIVID CREATIONS

December 2013 PDF - Life Republicliferepublic.in/images/site_progress/LR_dec_2013.pdf · Kolte-Patil I-Ven Township (Pune) Ltd. Survey No.74, Marunji, Hinjewadi-Marunji-Karsarsai

  • Upload
    letuyen

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

PLANS TAKES A LEAP TO VIVID CREATIONS

1st session of Anisha Global School has started in June 2013 from play group to 7th standard.

A fully functional CBSE school – Anisha Global-Alpha Future, stIndia's 1 Future School.

• Facilitate anytime, anywhere through real-time collaboration among peers and self-directed learning

• Digital curriculum empowered by MC online

• Collaborative and investigative learning

• AOM (Anisha on mobile) to promote learning related to History, Heritage & National Education

• Access to global learning resources and expertise

• Digital Museum-outbound learning experiences on Mobiles / Tablets

Unique features• CBSE Curriculum in an enhanced

learning environment

• 28 students in each class

• 7 acres of State of the art campus

• Optional extended schooling until 7 pm for Music, dramatics, art, sports and learning

Highlights

Innovative Learning Through Technology

Actual PhotoActual PhotoActual Photo

Ÿ Work for water management and environment engineering is 70% completeŸ Infrastructure work for road is in progressŸ Civil work for canal bridge, compound wall for sector level is in progressŸ Landscape activities and water body at entrance are in progress.

Infrastructure

AB Road CH 0 Entry gate area. G1 Water body area Civil work complete & Finishing work is in progress.

1st Rotary. G1 area landscape work.

CH. 0 to CH.35 Road side Landscape work.

CC1 road side landscape .

CH. 0 to CH.35 Road side Landscape work.

Switching Station work complete.

DE road PQC work complete. DE Road side landscape work is in progress.

AB road side landscape CH. 330 to 600

AB road CH 725 to 950 PQC work complete at RHS

AB road CH. 330 to 600

AB road CH 725 to 950 Streetscape work is in progress.

WTP aeration fountain Super structure work is in progress. WTP chemical House super structure work is in progress.

II1 road WMM work is in progress.

FF1 Road BM work is in progress..

Fire Station A Building Gr. Floor Slab complete. 1st Floor slab work is in progress.

AB Road & FF1 Road Junction DBM work Complete.

2nd AvenueWork for compound wall, drainage line network, water distribution network, storm water

lines, Main gate complex are complete.

Sector amenities including play court, swimming pool, amphy-theatre are complete and

other amenities like club house, children's play area are 95% complete.

Planter, Water edge, Foot path &WMM,DBM Plantation, Street Light Pole Fixing Complete between Row No.1 & 2 .

Water line, Electric lines, Storm Water, Chamber,GSB, Water edge Casting, WMM Complete, Footpath paving, street light pole Fixing, DBM Work Complete Between 3rd &4th .

Final touch up is in progress at 1st row.

FF1 Road BM work is in progress..

Final touch up is in progress at 2nd row.

AB Road & FF1 Road Junction DBM work Complete.

Club House Texture Finishing Work Complete.

Children's Play Equipment Fixing Complete.

Play court area Belle drain fixing & concrete Tremix flooring, Kotta Fixing work Complete.

Club House Gymnasium Equipment fixing Complete.

S.T.P. Civil work completed. Pump installation work Complete. Gas Bank R.C.C Brickwork & Roofing Plastering painting Complete.

A Part I podium parking Shear wall work complete & plinth work is in progress.

A Building Part II plinth casting work complete. Sector B Building Part I Slab work complete & Podium parking slab Shear wall work is in progress.

Sector B Building Part II S/wall work complete & Slab work is in progress.

3rd AvenueRecently launched 1 and 2 BHK apartments.Building A and B- Podium parking wall work complete & Slab work is in progress.

4th AvenueRCC work for building A, B and C is complete till 22nd floor. Finishing work for mentioned buildings is in progress.RCC work for building D is complete till 19th floor and for building E is complete till 15th floor. Sector development including club house, STP and swimming pool is initiated.

A building Toilet dado work is in progress A building gypsum work WIP and aluminum window WIP.

A building gypsum work WIP and aluminum window WIP.

A Building Lobby flooring work is in progress. A Building Kitchen dado work is in progress.

C Building Dry balcony flooring work is in progress.

D building 20th Floor is in progress. E building 16th slab is in progress

Podium between A & B building Waterproofing work is in progress.

Podium between B & C pour 3 Complete & Padadii work is in progress.

Work in progress for 4th Avenue Clubhouse

A & B Bldg., Kitchen dado Work in Progress. B Bldg., Gypsum, firefighting & false ceiling work in progress.

A Bldg. False ceiling to hide the firefighting pipes A & B Bldg. Toilet dado Work In Progress.

6th AvenueŸ RCC work for building A and B is complete till 21st floorŸ OHT and LMR work is 100% completeŸ Finishing work is in progressŸ Commercial Building – Brick work and plaster is 95% complete

UGT:- Slab work Complete & Ramp work is in Progress S.T.P.- Slab Shuttering and reinforcement work is in progress.

Commercial Bldg., Brickwork & Plaster is in Progress.

7th AvenueŸ R-7 RCC Work completedŸ Finishing work is 60% CompleteŸ Sub Station, club house and swimming pool RCC work initiated

A & B Building RCC Work Complete.

A & B Building Toilet Dado Work in Progress.

A & B Building Gypsum, False ceiling work in progress.

A & B Bldg. Drawing Room

A & B Building Kitchen work in progress.

Sector Podium 1- Water Proofing work is in progress. (STP RCC Work is Completed)

C Building OHT & LMR Shuttering & reinforcement in progress D Bldg. LMR & OHT work is in progress.

F Building- 22nd Floor RCC Complete & Terrace RCC work is in progress.

Sector Podium 2- Water Proofing Work Is In progress.(UGT RCC Work is Completed)

D & F Bldg. terrace railing & Sliding door work is in progress

C, D & F Building Gypsum, Flooring, Kitchen Dado & False Ceiling work is in progress.