Outline
• Testing Process• Testing Approach• Test Results• Project Plan• Test Product Management• Automation• Technical Challenges• Future Work
Testing Process
• Colloboration with the Development and Maintenance Team – In Charge of Fixing the Defects
• We Test the Product; D&M Fixes Found Defects
• A new version of the product is put up every week
• Every week Regression Testing is performed
Testing Approach
• Black Box Testing– Tool separated in four units• Data Input• Data Modification• Printing• Saving
Testing Approach
Black Box Testing• Data Input
• Scenarios
• Data Modification• Scenarios
• Printing • Scenarios
• Saving• Scenarios
Testing Approach
• White Box Testing– Using JUnit to test all the functions – Nine Testing Packages– 72 tests
Test Results
• AcceptanceTest Results– DTE Actions: 3 P 1 F– DTE Conditions : 6 P 0 F– DTE Metadata: 4 P 2 F– DTE Variables: 4 P 0 F– DTE Save/Print/Change: 8 P 4 F
• Total Results: 25 P 7 F
Test Results
• Unit Test Results– Data Input
Test Results
• Unit Test Results– Data Modification
Test Results
• Unit Test Results– Printing
Test Results
• Unit Test Results– Saving
Test Results• JUnit Test Results– Decision Table Class : 16 P 0 F– Condition Expression Class: 1 P 7 F– Condition Class: 7 P 0 F– Data Type Class: 5 P 0 F– DTE Variables: 6 P 0 F– Response Variables: 7 P 0 F– State Variables: 7 P 0 F– Stimuli Class: 7 P 0 F– Variable Class: 9 P 0 F
• Total Results: 65 P 7 F
Test Results
• Regression Test Results -
Test Results
• Regression Test Results– Resounding Bugs - bugs that still
existed after an attempt of fixing them• Printing to DTP • Save does not operate properly• Changing of Model Name• Error Checking
Project Plan
• Decision Table Project Plan• Progress Indicators– If the number of bugs in the end is less
than the initial bugs that we found• End Bugs < Initial Bugs
Test Product Management
• The author, Ricardo Eights, using NetBeans for development
• When a change is made the new version is put up on the website: http://www.cis.famu.edu/~reights/
• Old versions are still kept for back up purposes
Automation Difficulties
• Most potential tools are not free.• Free source tools requires expert
skills in Java to implement the automation– Contained execution issues.
Automation: Future Work
• Link up with a Java expert for the possibility of implementing the Automation.
• Our default option will be to create enough test cases that will satisfy the agreement of whether or not testing is sufficient.
Technical Challenges
• It seems that when certains bugs are fixed, more bugs appear
• At times a mixture of bugs appear after a fix has occured.
• Tools for gui application automation seems intangible
Future Work
• Inspections– Will Occur on the LOC for Printing and
Saving • Reason: Seems to be one of the bigger
problems
– Roles:• Author – Ricardo• Inspectors – Jude, Chi, and Preston• Reader – Sabrina• Moderator - Jamilia
Questions