Ghiro Andrea – Burzio Gianfranco 20 Novembre, 2010 WP1 - Requirements DECISIVE

DECISIVE

Embed Size (px)

DESCRIPTION

DECISIVE. WP1 - Requirements. AGENDA. Topic & goals Tasks decomposition Relationships to other WPs Timing of tasks Proposed deliverables & delivery time Partners in the WP1 & tasks Proposed task leaders. Topic & goals. - PowerPoint PPT Presentation

Citation preview

Ghiro Andrea – Burzio Gianfranco

20 Novembre, 2010

WP1 - Requirements

DECISIVE

Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

AGENDA

• Topic & goals

• Tasks decomposition

• Relationships to other WPs

• Timing of tasks

• Proposed deliverables & delivery time

• Partners in the WP1 & tasks

• Proposed task leaders

Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

WP1 covers the work on the specification of the business requirements and needs that the project is looking to answer. Commercial existing tools and European Patents will be analyzed in order to evaluate the needs about:

•learning from previous versions of the product

•hand-over of models to new engineering teams

•supporting product-management in steering the product requirements.

Precise and testable requirements will be identified in order to cover these main areas:

•DECISIVE application monitoring,

•interfaces between DECISIVE models,

•DECISIVE human-centric tools interfaces, and

•decision-support to product management during the decision phase.

An appropriated test methodology will be defined in order to verify the requirements fulfilling during the

verification and validation phases.

Topic & goals

Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

WP1 will accomplish the following activities:

• Evaluate the current state-of-the-art approaches related to evolutionary development in the model-based engineering of embedded systems.

• Define requirements for tools and methodologies in order to provide:

non-intrusive analysis and monitoring techniques to systematically collect information during the evolutions

decision support for the synthesis of system architectures model management and visualization, to automate the management of

models and improve comprehension during the system evolution

• Identify safety and certification requirements

• Define test methodologies to apply during validation phase

• Preliminary definition of candidate validation cases and scenarios

Topic & goals

Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

The tasks to be accomplished in Work Package 1 are summarized in the table below.

Tasks decomposition

Task Description

T1.1 State of the art. Collecting relevant and significant industry control use cases

T1.2 Identification of the monitoring requirements

T1.3 Identification of the interfaces requirements

T1.4 Identification of the human interface requirements

T1.5 Identification of the decision-support requirements

T1.6 Identification of safety and certification requirements

T1.7 Preliminary validation cases and test methodology definition

Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

Relationships to other WPs

WP1 is the starting point for all the other WPs: • Requirements defined in this WP are input for WP2, WP3, WP4, WP5. • Preliminary validation cases and scenarios defined in this WP will be used in WP6 for the industrial validation phase

Main risks related to this WP are:• not well defined requirements• not well defined test methodologies• not correct or not enough candidate validation case definition

Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

Timing of tasks

Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

Proposed deliverables & delivery time

Two Deliverable are planned for WP1:• D1.1 – Business requirements and needs• D1.2 – Preliminary validation case

Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

Partners in the WP1 & tasks

Task Partners

T1.1 Atego, IKER, NXP-A, NXP-D, UEF, UoO

T1.2 CEA, FHG-HHI, ISYS, UEF, UoO

T1.3 CEA, CISC, UoO

T1.4 BHL, CAU, CRF, LDZ, RTU, UES

T1.5 CRF, ISYS, LDZ, NXP-D, RTU

T1.6 Atego, AVL, IKER

T1.7 Atego, CRF, IKER, MU, NXP-A, NXP-D, PHILIPS, UES

WP Partners

WP1 Atego, AVL, BHL, CAU, CEA, CISC, CRF, FHG-HHI, IKER, ISYS, LDZ, MU, NXP-A, NXP-D, PHILIPS, RTU, UES, UEF, UoO

Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

Partners in the WP1 & tasks

Partner T1.1 T1.2 T1.3 T1.4 T1.5 T1.6 T1.7 Total PHILIPS 12 12AVL 16 16CISC 4 4NXP-A 2 3 5UEF 6 6 12UoO 7 7 6 20Atego 4 4 4 12CEA 1 2 2 1 6BHL 4 4CAU 3 3FHG 6 6NXP‐D 2 1 2 5CRF 4 4 4 12 24LDZ 1 1 2RTU 2 3 5IKER 5 5 4 14ISYS 3 2 5MU 5 5UES 2 2 4

27 24 12 16 11 30 44 164

Inserire Titolo EventoThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

Proposed WP1 task leaders

Task Partner

T1.1 IKER

T1.2 FHG-HHI

T1.3 UoO

T1.4 BHL

T1.5 RTU

T1.6 AVL

T1.7 PHILIPS