DECODINGCODE PROCESS 101
Frank Lohmann
November 2019CIPH Webinar
CODES CANADA = National Collaboration
75 years of collaboration and partnership betweenProvinces and Territories, NRC and the independent Canadian Commission on Building and Fire Codes
2
• Open & transparent model codes development• Regulatory impact analysis for all changes• Funded by the federal government• Research and evidence‐based codes• Consensus‐based decision making• Bilingual documents
Benefits of National Model Codes
3
Increased national uniformity creates economic prosperity
Partnership focuses on national benefits
Example: Plumbing Products
$24 Billion Canadian trade of residential plumbing/heating products$4.5 Billion total cost per year for testing and certificationOnly 10% of standards are harmonized
Potential Economic Benefit - Reducing duplicate testing and certification
could save Canadian consumers between $120 to $150 Million per year(CIPH)
4
Canada Free Trade Agreement
5
Intergovernmental agreementon Free Codes & Harmonization
- signed by Can. (Trade) Ministers - came into force on July 1, 2017- modernizes internal trade:
- comprehensive free trade rules - alignment w. int’l obligations - open government procurement- protecting public policy objectives- strengthen domestic trade- reconciling regulatory barriers
https://www.cfta‐alec.ca
RCT
Harmonizing Construction Codes
How does RCT work?1. A barrier to trade is identified (Codes)2. 14 Gov’ts work to establish an agreement3. The barrier to trade is being reconciled
6
What will be in the Agreement?
Reduction of variations- Technical Requirements only
Timely AdoptionFree Codes
7
Transformation of the national
code development system
PARTNERSHIP
8
Who is working on developing construction codes?
Codes & Guides Development System
Canadian Commission on Building and Fire Codes
National Research CouncilCodes Canada
Provinces and Territories &Provincial Territorial Policy Advisory Committee on Codes
9
Codes & Guides Development System
IndependenceBalanceConsensus
ExpertiseEvidenceNeutrality
Legislative AuthorityPolicy Goals
10
What does Codes Canada do?
CODES CANADAOperates the code development process Provides technical expertise and project managementEdits, translates, produces & markets codes & guidesInforms stakeholdersGenerates technical information / analysis / presentationsResponds to technical enquiries from code users
11
Who else is involved?
12
You
Partners & Stakeholders
13
Roles and Responsibilities
Outlines:- roles and responsibilities
of the CCBFC and its committees- provisions and procedures - code development process- supporting role of NRC- communication with the public
Available online
14
CCBFC Committees & Interactions
15
CCBFCExecutiveCommittee
SC-HSBSC-EE SC-FPSC-HP SC-UE
SC-SDSC-ED SC-ES SC-HMA
40 + Task Groups and Working Groups
PTPACC
Joint Task Groups
TGs/WGS
CCBFC Selection Committee
SC Nominating Committee
Membership Selection• CCBFC Selection Cmt recommends
• NRC Director General appoints
• SC Nominating Committee recommends
• CCBFC Chair decides
• NRC sends appointment letters
CCBFC
9 Standing Committees• HVAC and Plumbing (SC-HP)
• Energy Efficiency (SC-EE)
• Earthquake Design (SC-ED)
• Environmental Separation (SC-ES)
• Fire Protection (SC-FP)
• Hazardous Materials and Activities (SC-HMA)
• Housing and Small Buildings (SC-HSB)
• Structural Design (SC-SD)
• Use and Egress (SC-UE)
CCBFC Committees & Interactions
16
ExecutiveCommittee
SC-HSBSC-EE SC-FPSC-HP SC-UE
SC-SDSC-ED SC-ES SC-HMA
40 + Task Groups and Working Groups
TGs/WGS
PTPACC
Joint Task Groups
NATIONAL MODEL CODES
17
What does a code look like?
Why model codes?
18
Today’s Codes & Guides
50+ Codes published since 1941Latest editions of 4 codes
- National Building Code 2015- National Fire Code 2015- National Plumbing Code 2015- National Energy Code for Buildings 2015
Paper & Electronic
3 Guides, supplements and commentaries- User's Guide–NBC 2010, Structural Commentaries - Illustrated Guide–Part 9 NBC 2010, Housing and Small Buildings- User’s Guide–National Energy Code of Canada for Buildings 2011
19
National Building Code (2015 NBC)
Division A – Objectives, Application (Legislative/Policy)Division B – Acceptable Solutions (Technical)
- Part 1 General- Part 2 Reserved (soon to be farm buildings)- Part 3 Fire Protection, Occupant Safety and Accessibility- Part 4 Structural Design- Part 5 Environmental Separation- Part 6 Heating, Ventilating and Air-conditioning- Part 7 Plumbing Services- Part 8 Safety at Construction and Demolition Sites- Part 9 Housing and Small Buildings
Division C – Administrative Requirements
20
National Plumbing Code (2015 NPC)
Division A – Objectives, Application (Legislative/Policy)Division B – Acceptable Solutions (Technical)
- Part 1 General- Part 2 Plumbing Systems
- Section 2.1 Materials & Equipment- Section 2.2 Piping- Section 2.4 Drainage Systems- Section 2.5 Venting Systems- Section 2.6 Potable Water Systems- Section 2.7 Non-Potable Water Systems- Section 2.8 Objectives & functional Statement Attributions
Division C – Administrative Requirements
21
22
How does the Codes Process work?
Codes Development Process
Process is open, transparent, continuous and consensus-based. Key Features
- One common process for all codes- Balanced by region and interest categories- Substantial public involvement
23
Code Development Process
From change request to code provision- change request from proponent- standing committee review & recommendation- CCBFC work plan approval - standing committee reviews code and develops changes - public review- standing committee revision and final recommendation- CCBFC decision- publication of Codes
24
Principles of SMART Regulation
Proposed changes criteria• Within scope and objectives of code?• Need to be regulated? • Minimum level of performance?• Enforceable & measurable?• Satisfies cost-benefit analysis?
25
Expanding the Scope / Policy Review
26 CODES CANADA — Build on Expertise
Policy Review
Codes as Instrument Choice
Scope & Objectives
Technical Development
Impact Analysis
Commission / P/T Authoritieswith advice from Provinces & Territories
and input from Stakeholders
Standing Committees
27
How does the Codes Process work –for Standards?
Process for New Standards
- Request (Proponent to Committee)- Task Approval / Policy Review (Commission to Committee)- Proposed Change (Committee)- Public Review (Committee to Public/Stakeholders)- Revision (Committee)- Decision (Commission)- Code Publication (NRC)
28
SC
CCBFC
CCR PR CCBFCSCSC PCF ACCEPT
WITHDRAWDEFER
Process for Referenced Standards
- Extranet (SDO staff to Committee)- Single Proposed Change for all updates (Committee)- Public Review (Committee to Public/Stakeholders)- Revision (Committee)- Decision (Commission)- Code Publication (NRC)
29
SC
CCBFC
CCR PR CCBFCSCSC PCF ACCEPT
WITHDRAWDEFER
CODES PROCESS
30
Access Points
31
Access Points
1. Submit Requests
2. Participate in Committees
3. Submit Public Review Comments
4. Inform CCBFC Priorities New
1
2
3
4
Participate in the process
https://nrc.canada.ca/en/certifications‐evaluations‐standards/codes‐canada/codes‐development‐process
National Code Development Priorities
Technical enquiries
Codes Canada provides opinions on National Codes requirementsOnly to regulatory officials
https://nrc.canada.ca/en/certifications‐evaluations‐standards/codes‐canada/codes‐canada‐technical‐enquiries
CODES PROCESS
35
What’s going on right now?
Meetings Update
August 7 / 8 – Standing Committee Nomination (members only)September 11 - 13 – Executive Committee (members only)October 3 / 4 – PTPACC Meeting (members only)October 22 to December 23 – 1st 2019 Public Review (public)January 13 to March 13 – 2nd 2019 Public Review (public)December 12 2019 – CCBFC Teleconference (public)May 2020 (tbc) – All SCs review public comments and revise proposed changes (public)Sep 2020 (tbc) – CCBFC Approval (public)Early 2021 (tbc) – Publication of all codes
36
CODES 101
37
Take Aways
Take Aways
Volunteer or observe on a Standing Committee or Task Group (Working Groups are member-only)Submit code change requestsSubmit public review commentsParticipate in priorities discussion
and there is more: - Respond to information requests - Attend training sessions or webinars- Conduct research to inform
committee decisions
38
39
Questions?
Significant Proposed Changes to the National Plumbing Code
Author: Taous AchourTechnical Advisor
NPC 2020
CODES CANADA
Outline
2
1. Seismicity2. Piping and transfer systems3. Potable and non-potable water
systems4. New materials and equipment
Posted for public review – Fall 2019
3
Seismicity
Seismic restraint and design
Requirements from the NBC apply to plumbing systems in the NPC
4
5
Piping and transfer systems
Nominal Pipe Size (NPS)
6
PEX fittings and tubing
7
Use of copper tube for urinals
8 PR– Fall 2019
Neutralization tanks
New requirements:- Separate venting to outdoor air- Vent sizing requirements
Help prevent:- Premature corrosion and failure of the building’s sanitary
venting system- Improper sizing of vents
9
Protection from backflow
10 PR– Fall 2019
11
Potable and non-potable water systems
Protection of drinking water from chemical contamination
12
NSF/ANSI/CAN 61 "Drinking Water System components - Health effects"
PR– Fall 2019
Non-potable water in health carefacilities
13 PR– Fall 2019
Rainwater harvesting
14
Safely be connected
Good engineering practice
Properly labeled
Safe location
15
New materials and equipment
Personal hygiene devices for water closets
Reference to ASME A112.4.2/CSA B45.16-15, “Personal Hygiene Devices for Water Closets”
16
Water temperature control
17
ASSE 1070/ASME A112.1070/CSA B125.70, “Performance Requirements for Water Temperature Limiting Devices”
Safer temperatures for everyone A maximum water temperature of 43 °C in
health care and senior residence facilities
PR– Fall 2019
Low lead
18
ASME A112.4.14/CSA B125.14, “Manually Operated Valves for Use in Plumbing Systems”ASME A112.18.6/CSA B125.6, "Flexible Water Connectors”
PR– Fall 2019
PE-RT
19
CSA B137.18, "Polyethylene of Raised Temperature Tubing for Pressure Applications”
New acceptable material
Greater design flexibility
Fibrocement pipe and fittings
20
CAN/CSA-B127.3-18, “Fibrocement Drain, Waste, and Vent Pipe and Pipe Fittings”
PR– Fall 2019
Co-extruded Polyvinyl Chloride (C-PVC) drain pipes
21 PR– Fall 2019
ASTM F3128, "Standard Specification for Poly(Vinyl Chloride) (PVC) Schedule 40 Drain, Waste, and Vent Pipe with a Cellular Core”
Additional option
Residential installations only
Thank you
22
CONTACTTaous AchourTechnical advisor, Codes Canada1200 Montreal RdOttawa ONK1A [email protected]