Upload
taya
View
31
Download
0
Embed Size (px)
DESCRIPTION
U.S. Transportation Command. Defense Transportation Coordination Initiative (DTCI) Overview Briefing LTC Leslie Sullivan Dec 06. Mission. - PowerPoint PPT Presentation
Citation preview
1
Defense Transportation Coordination Initiative (DTCI)
Overview Briefing
LTC Leslie SullivanDec 06
U.S. Transportation Command
2
Mission
Partner with a world-class transportation services provider (3PL) to manage CONUS distribution of
material for selected Service and Defense Logistics Agency (DLA) shipping locations. Leverage the
winning coordinator’s existing commercial business with his “best commercial practices” and our large volume of DOD freight to achieve efficiencies in
distribution and associated cost savings.
3
Why are we doing this?
Over 600 CONUS shipping locations More receiving locations No enterprise-wide vision, collaboration or direction
3PLs are particularly effective in the commercial world So why not DoD? Our SE region “pilot program” gave OSD confidence to press ahead We can garner efficiencies as well as cost savings….
Improve operational effectiveness Support strong small business participation Improve customer confidence Reduce cycle times (defined as time from request for movement to delivery) Increase efficiencies Develop a partnership to integrate commercial best practices Enable process improvements Achieve cost savings Integrate seamlessly with the DoD Strategic Distribution System Protect operational capability like a DoD critical infrastructure asset
DTCIGoals
4
Guidance and Oversight
Office of the Secretary of Defense (OSD) Transportation Policy is strong lead Acquisition, General Counsel, Comptroller, others provide support
Distribution “governance” Steering Group Senior Task Force Executive Board Combatant Commander’s Council Other groups as required
USTRANSCOM DTCI Project Manager reports directly to Commander Acquisition provides acquisition policy and contracting support
Services, Defense Logistics Agency, and Supporting Agencies
5
Industry Players
Dozens of participants in pre-proposal discussions
Trade Associations American Trucking Association (ATA) National Defense Transportation Association (NDTA) Transportation Intermediaries Association (TIA) Several others….
6
DTCI Site ActivationPhase I
Phase II
Phase III
Joint/DLA
Air Force
Marine
USPFOArmy
Navy
7
Functional Concept (PWS requirements)
DTCI coordinator will: Arrange, coordinate, monitor, and control freight shipments from
notification to delivery
Manage and optimize enterprise operations while providing exception reporting
Process timely payments to subcontractors and carriers for services provided
Accept, process and facilitate claims resulting from loss or damage
Manage carrier quality and performance Assist in the ID and delivery of astray freight Provide In-Transit Visibility (ITV) to government systems and real-time
access to shipment info Perform shipment optimization, consolidation and routing services Provide management info and accounting reports Collaboratively develop, recommend and implement process
improvements
8
Exclusions
• OCONUS freight movements (Theater controlled)• Vendor shipments• OCONUS unit moves• Universal service ocean carrier contracts• Household goods to include DPM moves• DOD organic equipment moves• On-site local drayage contracts• Bulk and Missile fuels• Small package contracts• Privately owned vehicles• Sensitive and/or classified shipments• Arms, ammunition and explosives• Cash/Collect on delivery shipments
9
Performance Thresholds
On-time pickup – 98%
On-time delivery – 98%
Loss and damage-free shipments – 98%
Process loss and damage claims in a timely manner – 99%
within 120 days
IT systems available for use – 99%
Small business subcontracting – 20% first year
Market Research and Industry discussions indicate thresholds are achievable
10
How will we measure performance?
• Quality Assurance Surveillance Plan (QASP)– Performance Objectives and Thresholds– Surveillance responsibilities of the government– Procedures for evaluating performance and resolving issues
• Program Management Review (PMR)
• Comparison of contractors monthly report against Transportation Officer (TO) shipper system/hard copy data
– QA Representative on site forwards to DTCI PMO quarterly– If sub-standard performance, a % of management services will be reduced
• Random Inspections
• Web-based Process Change Request System / Customer Feedback