DEIMOS – 17 January Ontogrid Presentation Ontogrid Presentation Presentation Meeting Jan
Citation preview
DEIMOS – 17 January 2005 1 Ontogrid Presentation
OntoGrid OntoGrid Business Case, Business Case,
User Requirements Analysis User Requirements Analysis and and
Test Set Definition Test Set Definition For Quality Analysis For Quality Analysis
Platform Platform PresentationPresentation
((ontogrid-dms-ptt-001-11ontogrid-dms-ptt-001-11))
Ana Isabel Mediavilla
DEIMOS – 17 January 2005 2 Ontogrid Presentation
• Ontogrid Presentation:Ontogrid Presentation:
– Business Approach
– Quality Platform
– Use case I:Correlation products and mission status
– Use case II: Validation of an instrument based in their product files
• DiscussionDiscussion
AgendaAgenda
DEIMOS – 17 January 2005 3 Ontogrid Presentation
Ontogrid PresentationOntogrid Presentation
Presentation Presentation Meeting 17-19 Jan Meeting 17-19 Jan
DEIMOS – 17 January 2005 4 Ontogrid Presentation
• Business ProcessesBusiness Processes
– All business processes are in charge of monitor and control of a satellite or a set of satellites for getting valuable data (products) from the instruments. These data is for covering the mission of the satellite.
• Satellite is a hardware and software equipment with a concrete mission. For example: Mission from Satellites
• Instrument is a hardware and software component, which allows making measures of specific type.
– For example in Envisat: » Envisat Satellite with its instruments» Use of an instrument:http://envisat.esa.int/instruments/tour-index/asar
/animation_2.htm
• Mission is the objective of any element, in this case of the satellite. – For example in Envisat: Envisat data supports earth science research and
allows monitoring of the evolution of environmental and climatic changes.
• Products or product files are files generated by an instrument directly (level 0) or processed after being generated by an instrument.
Business (I/VIII)Business (I/VIII)
DEIMOS – 17 January 2005 5 Ontogrid Presentation
Navigation process(II/VIII)Navigation process(II/VIII)
Navigation process:Navigation process: Verify and control the navigation of the satellite.
Inputs: Inputs: Configuration data
Outputs: Outputs: Products files and auxiliary files
Actors:Actors: ·– MCS– PDS·– Satellite
DEIMOS – 17 January 2005 6 Ontogrid Presentation
Navigation process(III/VIII)Navigation process(III/VIII)
: PDS : QualityAnalysis&ReportGeneration : MCS : ConfigurationData&DataSatellite : Satellite
Distribute Quality Reports
Modification configuration: satellite and instruments
Store the configuration data from satellite
Send telecommands
Send telemetry
Store product files
Build product files from telemetry and processing of telemetry
DEIMOS – 17 January 2005 7 Ontogrid Presentation
Quality process (IV/VIII)Quality process (IV/VIII)
Quality process: Quality process: Monitorization and control of the instruments included in the satellite and all the parameters involved in the data acquisition.
Inputs:Inputs: Products files and auxiliary files
Outputs:Outputs: Reports for “Research and developers”.
Actors: ·Actors: ·– PDS·– Research and
Development·– DEIMOS– ESA Maintenance
DEIMOS – 17 January 2005 8 Ontogrid Presentation
Quality process (V/VIII)Quality process (V/VIII)
DIM or Data Ingestion Module
: PDS :
ESAMaintenance : QualityAnalysis&ReportGeneration
: MCS : ConfigurationData&DataSatellite : ResearchAndDevelopment
Modification configuration: satellite and instruments
Generate the data to be included in database based in product files
DPM or Data Presentation Module
Generate the Quality Report
Product file discovery
Distribute Quality Report
Distribute Quality Report
Configure a Use Case
Subscribe to a specific Quality Report
Subscribe to a specific Quality Report
DEIMOS – 17 January 2005 9 Ontogrid Presentation
Development Process (VI/VIII)Development Process (VI/VIII)
• Develop process: Develop process: Creation of a customized solution for providing new specific reports from the data extracted from the satellites.
• Inputs:Inputs: Description of the report content
• Outputs:Outputs: DIM, DPM and new configuration
• Actors: ·Actors: ·– DEIMOS– ESA Development– ESA Maintenance– Research and
Development
DEIMOS – 17 January 2005 10 Ontogrid Presentation
Quality platform (QUARC): Quality Process (VII/VIIIQuality platform (QUARC): Quality Process (VII/VIII))
• Quality Platform: Quality Platform: – QUARC in grid– Use Cases
• Generate and distribute report (DPM/DIM)
• Add subscription to a report
• Monitor System• Configure Use
Case• Control System
– Actors: ·• PDS• ESA Maintenance
– Administrator– Configurer
• Research and Development
• DEIMOS (Not included because it is not automatic)
Monitor system Configure Use Case
Administrator
Control system
Configurer
Client Report could be one of these two actors:
ESA Maintenance could be one of these two actors:
Researcher and Developer
Add subscription to a report
PDS
Generate and Distribute reports
DEIMOS – 17 January 2005 11 Ontogrid Presentation
Grid Use Cases: Development Process (VIII/VIIIGrid Use Cases: Development Process (VIII/VIII))
• GRID USE CASES:GRID USE CASES:
– Development process
– Developed elements:• DIM• DPM • Use Case configuration
DEIMOS – 17 January 2005 12 Ontogrid Presentation
Quality Platform: Problems (I/IV)Quality Platform: Problems (I/IV)
• Development CostDevelopment Cost– Ad-hoc development of DIM and DPM
• Unambiguous languageUnambiguous language– Complicate mapping from scientific language and technical language
• Reduction the data transferReduction the data transfer – Big product files– Lots of product files– Unused product files– Ad-hoc searching of files
• Reduction the processing time: On time quality reportsReduction the processing time: On time quality reports– Data transfer– Data storage in the database– Sequential DIMs and DPMs
• Fault ToleranceFault Tolerance– Unique equipment with the whole system
• Multiple access control Multiple access control – Replicate in system and in the resources machines
DEIMOS – 17 January 2005 13 Ontogrid Presentation
Quality Platform: OntoGrid Solutions (II/IV)Quality Platform: OntoGrid Solutions (II/IV)
• Development Cost Development Cost – Create semi-automatic development for DIMs and DPMs
• Reduction the data transferReduction the data transfer Big product files Lots of product files < Unused product files Ad-hoc searching of files: Dynamic Resource Discovery Increase the interconnection between equipments
• Reduction the processing time ??Reduction the processing time ?? Data transfer: Reduce the data processing due to reduce of data transfer. Data storage in the database Sequential DIMs and DPMs: Parallel several tasks < Increase the time of searching product file
• Decrease the time of searching due policy “incentive the success acquisition”
• Fault Tolerance Fault Tolerance – DIMs and DPMs could be started-up in any place.
• Multiple access control Multiple access control – Unify access control.
DEIMOS – 17 January 2005 14 Ontogrid Presentation
Quality Platform: Open Points (III/IV)Quality Platform: Open Points (III/IV)
• Scalability problem of computationScalability problem of computation
• Definition of generic and standard list of possible logics over the fields in Definition of generic and standard list of possible logics over the fields in different filesdifferent files
• Quality platform implementation depending on basic OntoGrid platformQuality platform implementation depending on basic OntoGrid platform
DEIMOS – 17 January 2005 15 Ontogrid Presentation
Quality Platform:Quality Platform: Architecture Architecture
DEIMOS – 17 January 2005 16 Ontogrid Presentation
ObjectiveObjective– Report presenting the correct working of an instrument in
the timeInputInput
– Some products from some instruments from Envisat
OutputOutput– EnviSat Instrument Availability Interruptions: A history of
the periods of unavailability for various instruments onboard EnviSat. This is presented in a table by instrument, unavailability start or unavailability end. An example of presentation is: Availability table
– Line in plotXY per each instrument and in the time
Use Case I: Interfaces (I/III)Use Case I: Interfaces (I/III)
DEIMOS – 17 January 2005 17 Ontogrid Presentation
ExecutionExecution
– Retrieved some product files for some instruments using time filter. Optional retrieval, if a file is not available.
– Filtering the extracted files through some fields included in the product file: ACQUISITION_STATION, PROC_CENTER
– Mapping for language discrepancies: • PROC_CENTER (different name for the same elements), • PROC_TIME (different format time)
– Composition of each product data over the satellite change modes.
– Generate the output report
– Distribute the output report to the subscribers.
Use Case I: Execution (II/III)Use Case I: Execution (II/III)
DEIMOS – 17 January 2005 18 Ontogrid Presentation
ValidationValidation
– Configure the test case: Include the DPM, DIM and configure data (DPM, DIM, scheduler, workflow)
– Verify the selected files used as referenced.
– Check the report against the selected files using EnviView to visualize the referenced product files.
Use Case I: Validation (III/III)Use Case I: Validation (III/III)
DEIMOS – 17 January 2005 19 Ontogrid Presentation
ObjectiveObjective– Report presenting the correct working of an instrument in
the time. For this task, it is generated a report showing the list of periods with an adequate level of quality. In fact, the quality of an instrument is based in the quality of its product files.
• product quality is based in elimination policy for reducing the list of measures to the ones with adequate level of quality.
InputInput– Several product files from ASAR instrument.
OutputOutput– Line in plotXY per ASAR instrument and in the time. The
elimination policy will be displayed also.
Use Case II: Interfaces (I/III)Use Case II: Interfaces (I/III)
DEIMOS – 17 January 2005 20 Ontogrid Presentation
ExecutionExecution
– Retrieved some product files for ASAR instrument using time filter.
– Elimination Plan or policy• This elimination plan is done by instrument: one policy per each
product file type and the conjunction of all the policies. The elimination plan is based in condition with and annotation per each data record per file. In fact the condition per data record is built with conjunction of simple conditions. Hereafter a simple condition consists of field name (See table “Table 8 Fields for file type”) with an operator and a value. The operator could be <, >, = or !=. The value could be a number or a string.
– Generate the output report
– Distribute the output report to the subscribers.
Use Case II: Execution (II/III)Use Case II: Execution (II/III)
DEIMOS – 17 January 2005 21 Ontogrid Presentation
ValidationValidation
– Configure the test case: Include the DPM, DIM and configure data (DPM, DIM, scheduler, workflow)
– Verify the selected files used as referenced.
– Check the report against the selected files using EnviView to visualize the referenced product files.
Use Case II: Validation (III/III)Use Case II: Validation (III/III)
DEIMOS – 17 January 2005 22 Ontogrid Presentation
ConclusionsConclusions
DiscussionsDiscussions