34
Page 1 of 34 Delhi Electricity Regulatory Commission Terms and Conditions For Appointment of Auditors for Audit of Billing and Metering system for Audit of Current Operational Electricity Billing System of: 1) BSES Rajdhani Power Limited (BRPL) 2) BSES Yamuna Power Limited (BYPL) 3) Tata Power Delhi Distribution Limited (TPDDL) 4) New Delhi Municipal Council (NDMC) July, 2015 Important Mile-stones Notice inviting Tender : 15/07/2015 at 03:00 PM Pre-bid meeting with potential Bidders : 30/07/2015 at 03:00 PM Last date of submission of Bid Proposals : 05/08/2015 at 11:00 AM Opening of Technical Bids : 05/08/2015 at 03:00 PM Presentation on Technical Bid : 07/08/2015 at 03:00 PM Opening of Financial Bids : 14/08/2015 at 03:00 PM

Delhi Electricity Regulatory Commission - DERC of Billing and...Page 1 of 34 Delhi Electricity Regulatory Commission Terms and Conditions For Appointment of Auditors for Audit of Billing

Embed Size (px)

Citation preview

Page 1 of 34

Delhi Electricity Regulatory Commission

Terms and Conditions

For

Appointment of Auditors for Audit of Billing and Metering system for

Audit of Current Operational Electricity Billing System of:

1) BSES Rajdhani Power Limited (BRPL)

2) BSES Yamuna Power Limited (BYPL)

3) Tata Power Delhi Distribution Limited (TPDDL)

4) New Delhi Municipal Council (NDMC)

July, 2015

Important Mile-stones

Notice inviting Tender : 15/07/2015 at 03:00 PM

Pre-bid meeting with potential Bidders : 30/07/2015 at 03:00 PM

Last date of submission of Bid Proposals : 05/08/2015 at 11:00 AM

Opening of Technical Bids : 05/08/2015 at 03:00 PM

Presentation on Technical Bid : 07/08/2015 at 03:00 PM

Opening of Financial Bids : 14/08/2015 at 03:00 PM

DRAFT TENDER Version 1 Page 2 of 34

Sub: Appointment of Auditors for Audit of Billing and Metering system of Current

Operational Electricity Billing System in BRPL, BYPL, TPDDL and NDMC.

Method of selection: Quality & Cost Based System (QCBS)

Delhi Electricity Regulatory Commission, Viniyamak Bhawan, C-Block, Shivalik,

Malviya Nagar, New Delhi (herein after referred to as “DERC” or “The Commission”) intends to

appoint Auditors (hereinafter referred to as Consultant) for Audit of Billing and Metering

system of Current Operational Electricity Billing System in BSES Rajdhani Power Limited (BRPL),

BSES Yamuna Power Limited (BYPL) ,Tata Power Delhi Distribution Limited (TPDDL) and New

Delhi Municipal Council (NDMC) (hereinafter referred to as DISCOM).

The scope of work shall involve audit of Current Operational Electricity Billing System

for the period commencing from 1st April 2014 up to 30th June 2015. The list of activities that

need to be undertaken is broadly enclosed at Annexure-A1. The Consultant is expected to

make himself fully aware of all applicable laws, a broad list is enclosed as Annexure A2.

The Consultant shall critically examine the various documents as well as the systems in

vogue at the respective DISCOM so as to ascertain its adequacy and efficacy and submit a

report to the Commission. In the report, the consultant shall clearly bring out any deviations/

lapses/ deficiencies in the metering and billing system with respect to the requirements under

the law. If during the course of assignment the Consultant comes across or identifies any area

needing improvement, same shall be explicitly brought out in the report.

The list of activities as detailed at Annexure-A1 are thus purely for the purpose of

guidance and not exhaustive. There may be some element of overlapping in the list. The

consultant shall be required to collect any additional information/data that may be felt

necessary and make presentations to the Commission for better understanding and

completion of the task. This list can be further discussed at the time of pre-bid meeting and

suitably amplified.

The following general terms and conditions are applicable with regard to submission of

quotation for Evaluation and Award of Contract.

1) The officers of the selected Bidder shall be deputed in offices of DISCOMs on the basis

of Authorization Letter of the Commission.

2) No Bidder shall submit more than one Bid for the Project. A Bidder bidding individually

DRAFT TENDER Version 1 Page 3 of 34

or as a member of a Consortium shall not be entitled to submit another bid either

individually or as a member of any Consortium, as the case may be. Change in

Consortium shall not be permitted unless approved by the Commission.

3) In case the Bidder is a Consortium, then the term Bidder shall include each Member of

such Consortium and the members thereof should furnish a Power of Attorney in favour

of the Lead Member in the format at Annexure-A3.

4) A Bidder shall not have a conflict of interest (the “Conflict of Interest”) that affects the

Bidding Process. Any Bidder found to have a Conflict of Interest shall be disqualified. In

the event of disqualification, the Commission shall be entitled to forfeit and appropriate

the Bid Security/Performance Security, as the case may be, as mutually agreed genuine

pre-estimated loss and damage likely to be suffered and incurred by the Commission

and not by way of penalty for, interalia, the time, cost and effort of the Commission ,

including consideration of such Bidder’s proposal (the “Damages”), without prejudice to

any other right or remedy that may be available to the Commssion under the Bidding

Documents. Without limiting the generality of the above, a Bidder shall be deemed to

have a Conflict of Interest affecting the Bidding Process, if:

a) the Bidder, its Member or Associate (or any constituent thereof) and any other

Bidder, its Member or any Associate thereof (or any constituent thereof ) have

common controlling shareholders or other ownership interest; provided that this

disqualification shall not apply in cases where the direct or indirect shareholding

of a Bidder, its Member or an Associate thereof (or any shareholder thereof

having a shareholding of more than 5% (five percent) of the paid up and

subscribed share capital of such Bidder, Member or Associate, as the case may be

in the other Bidder, its Member or Associate, is less than 5% (five Per cent) of the

subscribed and paid up equity share capital thereof; provided further that this

disqualification shall not apply to any ownership by a bank, insurance company,

pension fund or a public financial institution referred to in sub- section (72) of

section 2 of the Companies Act,2013. For the purposes of this Clause 4, be

computed as follows: (aa) where any intermediary is controlled by a person

through management control or otherwise , the entire shareholding held by such

controlled intermediary in any other person (the “Subject Person”) shall be taken

into account for computing the shareholding of such controlling person in the

Subject Person ; and (bb) subject always to sub-clause (aa) above, where a person

does not exercise control over an intermediary, which has shareholding in the

Subject Person , the computation of indirect shareholding of such person in the

Subject Person shall be undertaken on a proportionate basis; provided, however,

DRAFT TENDER Version 1 Page 4 of 34

that no such shareholding shall be reckoned under this sub-clause (bb) if the

shareholding of such person in the intermediary is less than 26% of the

subscribed and paid up equity shareholding of such intermediary ;or

b) a constituent of such Bidder is also a constituent of another Bidder ;or

c) Such Bidder, its Member or any Associate thereof receives or has received any

direct or indirect subsidy, grant, concessional loan or subordinated debt from any

other Bidder, its Member or any Associate thereof; or

d) Such Bidder has same legal representative for purposes of this Bid as any other

Bidder ;or

e) Such Bidder, or any Associate thereof, has a relationship with another Bidder, or

any Associate thereof, directly or through common third party/parties, that puts

either or both of them in a position to have access to each other’s information

about, or to influence the Bid of either or each other.

5) The said Report to be submitted to the Commission within 3 (Three) months from the

issue of contract.

6) The staff of the Commission may call the officers of the bidder for sample verification of

Billing discrepancies/logic.

7) Quotations should be sent in a sealed envelope super-scribing on top of Envelope

“Appointment of Auditors for Audit of Billing and Metering system of Current

Operational Electricity Billing System in BRPL, BYPL, TPDDL and NDMC respectively”

containing Earnest Money Deposit (EMD), Technical Bid (Annexure-B) and Financial Bid

in separate sealed envelopes. The Financial Bid shall consist of 3 separate sealed

envelopes comprising of 3 separate Financial Bids for each DISCOM (Annexure-C1, C2,

C3 and C4). Accordingly, Bidder should submit EMD, Technical Bid and Financial Bid in

separate envelopes. The EMD will be opened first and the Technical bid shall be opened

only for those bidders whose EMD is in order. Only those Bidders who qualify in the

Technical Bid will be called for attending the opening of the Financial Bids. For the

purpose of qualification under the Technical Bid, the bidders may be called for

clarification/presentation.

8) Each page of bid should be numbered and signed by the authorized signatory with the

seal of the Bidder and the forwarding letter must indicate the details of the enclosures

attached.

9) The Bidder shall submit only one Original set of the Bid and two copies marked as

Copy -1 and Copy -2.

DRAFT TENDER Version 1 Page 5 of 34

10) Bidder to quote their rates on lump-sum basis for each DISCOM separately:

a) Exclusive of applicable taxes, but inclusive of all other expenses along with

detailed profile and past experience of the bidder provided at Annexure-B of

the bidder.

b) Fee for the assignment has to be mentioned separately

(Annexure-C1, C2, C3 and C4).

c) No TA/DA shall be admissible for the Bidder for any journey in connection with

the assignment.

11) Consultant shall be paid as follows:

a) For Services Rs._________(Rupees_______________________only)

b) Reimbursement of applicable Taxes to be indicated by the Consultant-

Rs._________(Rupees_______________________only)

c) Total Charges of Rs._________(Rupees_______________________only):

12) The payment of fee to Consultant shall be made by the Commission after the deduction

of applicable tax at source.

13) The final payment shall be made after completion of assignment and acceptance of

report by the Commission (details of payments are provided in the Contract Agreement

annexed herewith as Annexure-D).

14) DERC has the right to replace the Bidder, after its appointment and re award the job if it

is found that the reporting / certification being submitted in phases are not of desired

standard.

15) An EMD of Rs. 10,000/- (Rupees ten thousand only) to be submitted in a separate sealed

envelope along with the Technical Bid in the form of a Pay Order/Demand Draft in

favour of “The Secretary, DERC”, payable at New Delhi, in a separate sealed envelope.

Milestones as per which invoices for fees shall be raised by Consultant

% of contract value

Submission of Final Report after initial interaction with Commission based on a draft report

70%

Acceptance of report by the Commission 30%

DRAFT TENDER Version 1 Page 6 of 34

16) Any bid not accompanied by EMD in accordance with the above stipulation shall be

rejected as being non-responsive.

17) EMD of the unsuccessful bidders shall be returned to them at the earliest after expiry of

the final bid validity and latest after the acceptance of the contract by the successful

bidder.

18) EMD shall be refunded to the successful bidder on receipt of Performance Security after

award of job.

19) Criterion for Technical evaluation-

Specific experience of the Bidder relevant to the assignment with emphasis on

handling Billing and Metering system Audit/Information System Audit.

Adequacy of the proposed methodology and work plan - The qualifying proposal

should qualify under all the sub-criteria, viz.

(a) Technical Approach & Methodology 30 (Thirty) Maximum Marks -

The Bidder shall explain their understanding of the objectives of the

Assignment/job, approach to the Assignment/job, methodology for carrying

out the activities and obtaining the expected output. They shall highlight the

issues being addressed and their importance, and explain the technical

approach they would adopt to address them. They shall also explain the

methodologies proposed to adopt and highlight the compatibility of those

methodologies with the proposed approach. The maximum marks for

methodology content will be 20 marks.

Further, the bidder who has maximum experience in Audit of Billing and

Metering System will be awarded full 10 marks and others will be given on pro-

rata basis.

(b) Work Plan 30 (Thirty) Maximum Marks - The proposed work plan shall

be consistent with the technical approach and methodology, showing

understanding of the TOR and ability to translate them into a feasible working

plan. A list of the final documents, including reports, drawings, and tables to be

delivered as final output, shall be included here. The work plan shall be

consistent with the Work Schedule indicating Week wise and Activity wise flow

of the assignment with key professionals.

(c) Organisation & Staffing 40 (Forty) Maximum Marks - The Bidder shall

propose and justify the structure and composition of their team. They shall list

DRAFT TENDER Version 1 Page 7 of 34

the main disciplines of the Assignment/job, the key expert responsible, and

proposed technical and support staff.

The sub-criterion to be followed for evaluation of the key professionals shall be

i) Educational Qualifications and

ii) Experience (i.e. experience in carrying out similar assignments/Jobs).

The Bidder shall propose atleast the following key professional for each DISCOM

(BRPL, BYPL , TPDDL and NDMC separately):

Particular Minimum No. of key

professional Marks

CISA Qualified

1

Min. of 5 marks. Additional marks to be assigned on proportionate basis based on highest no. proposed by any bidder subject to maximum of 10 marks

SAP Expert

1

Min. of 5 marks. Additional marks to be assigned on proportionate basis based on highest no. proposed by any bidder subject to maximum of 10 marks

Electrical Engineer

1

Min. of 5 marks. Additional marks to be assigned on proportionate basis based on highest no. proposed by any bidder subject to maximum of 10 marks

Total 30 marks

Experience of the key professionals

Marks to be assigned on proportionate basis based on highest no. of experience proposed by any bidder subject to maximum of 10 marks subdivided as follows: 1) CISA qualified – 3.33 marks 2) SAP Expert – 3.33 marks 3) Electrical Engineer- 3.33 marks

Grand Total 40 marks

(d) Presentation to the Commission – After opening of the Technical Bid, Bidders

shall deliver presentation to the Commission based on their credentials in support

of the points listed at 19(a), 19(b) and 19(c) above.

DRAFT TENDER Version 1 Page 8 of 34

20) The minimum qualifying total score, for the technical bid shall be 70. The financial bids

of only those bidders shall be opened whose score shall be 70 or above in technical

bids. After completion of the technical evaluation, the Commission shall inform those

Bidders whose proposals did not meet the minimum qualifying mark or were

considered non-responsive to the TOR and the financial proposal etc. of such non-

responsive bids shall be returned un-opened on completion of the selection process.

The list of bidders whose offers have been selected after technical evaluation

shall be displayed at the website and notice board of the Commission’s Office Such

selected bidders may attend the opening of financial bids at the office of the

Secretary, DERC

21) Financial Evaluation:

The financial proposals of the technically qualified Bidder shall be opened by the

Evaluation Committee in presence of those bidders of consultant/s or their

representatives whose bids are short listed for financial evaluation.

i. The proposal with lowest evaluated cost shall be given a financial score of 100

and other proposals shall be given financial scores that are inversely

proportional to their prices.

22) Final Evaluation:

Final Evaluation of the bids shall entail selection of Bidder after adding scores of

Technical and Financial proposals with respective weight-age, which shall be 0.70 for

Technical bid and 0.30 for Financial bid.

23) The Commission will select the bidder with the highest score and discuss the detailed

work plan with them.

24) DERC may hold review meetings fortnightly, or more frequently if so needed, with the

Bidder during which senior/key personnel of Bidder shall be present.

a) The successful bidder shall enter into a contract agreement with the

Commission in the prescribed format as per Annexure ‘D’ and shall commence

the assignment as per schedule assigned by the Commission.

b) The successful bidder shall furnish a “Performance Bank Guarantee” equal to

10% of the value of contract, within 1(one) week of signing the contract

agreement which shall be valid for 90 days after the completion of the

assignment.

c) If the Bidder, selected for award of contract on basis of above procedure, fails

to enter into a contract agreement within the time limit of 21 days , the

DRAFT TENDER Version 1 Page 9 of 34

Commission shall invite the Bidder who has obtained the second highest score

on consideration of Financial and Technical bids for award of the contract for

carrying out the assignment.

25) The successful bidder shall take urgent steps to execute the Contract agreement within

21 days of issue of letter of award. Non fulfillment of this condition of executing a

contract by the Bidder or Consultant awarded the Contract, would constitute

sufficient ground for annulment of the award and forfeiture of Earnest Money

Deposit. However the Commission in its discretionary power, on a specific request by

the bidder which has been awarded the contract may relax this condition with the

reasons recorded in writing.

26) The Bidder shall not utilize or publish or disclose or part with any statistics, data or

information collected for the purpose of assignment, without written consent of the

Commission. The Bidder shall be duty bound to hand over the entire records of

assignment to the Commission before the expiry of the contract. The Bidder shall be

responsible for any explanation/description in the matter of billing for metering audit.

27) The Commission reserves the right to award the total assignment or to delete any part

of assignment or reject any bid without assigning any reasons for the same. Failure to

provide all information or conceal any information material to award of contract shall

be at bidder’s own risk and may result into rejection of the proposal.

28) Each bidder shall submit period of validity of the bid document, which shall not be less

than 180 days.

29) The successful bidder shall give a certificate of Compliance for all its statutory

obligations.

30) The Bid Schedule shall be as under:

1 Notice inviting Tender 15/07/2015 at 3:00 PM

2 Pre-bid meeting with prospective bidders 30/07/2015 at 3:00 PM

3 Last Date of Receipt of Bid Proposals 05/08/2015 at 11:00 AM

4 Opening of Technical Bid 05/08/2015 at 03:00 PM

5 Presentation on Technical Bid 07/08/2015 at 03:00 PM

6 Intimation of results of Technical Bids 13/08/2015 at 03:00 PM

7 Opening of Financial Bids 14/08/2015 at 03:00 PM

8 Selection and Award of Assignment 21/08/2015

DRAFT TENDER Version 1 Page 10 of 34

31) Any modification in the offers after the opening of bids proposal will not be

considered.

32) A Power of Attorney duly notarised by the Notary Public on a non judicial stamp paper

of Rs. 100/- , indicating that the person(s) signing the bid has the authority to sign the

bid and that the bid is binding upon the Bidder during the full period of its validity,

shall be submitted.

33) The tender document can be either downloaded from the Commission’s website

(http://www.derc.gov.in/) or a copy may be obtained from the Commission’s office.

34) In case, any information/clarification is required in respect of tender, the

representatives of the bidder may visit DERC Office during Pre-Bid meeting/forward

their queries at least 1 hour before the schedule date and time of pre-bid meeting. If

required, the representatives of the bidder may also visit DERC Office during working

hours 9:30 AM to 6:00 PM (on working days) before Technical Bid Opening date to

seek clarification.

35) Quotations received after the given date and time will not be considered. DERC Office

will not be responsible for any postal delay.

36) Bids to be submitted in a sealed envelope clearly indicating “Appointment of Auditors

for Audit of Current Operational Electricity Billing System in BRPL, BYPL TPDDL and

NDMC” respectively both contained in the main envelope duly sealed which shall be

open on the scheduled date.

37) The bids should be sent by post or deposited in Tender Box available at Reception of

DERC from 16/07/2015 upto 11:00 AM on 05/08/2015 at the following address duly

marked:

The Secretary,

Delhi Electricity Regulatory Commission,

Viniyamak Bhawan,

C-Block, Shivalik, Malviya Nagar,

New Delhi – 110 017.

Telefax: 011-26673608,

E-mail: [email protected]

38) DERC reserves the right to accept or reject any or all the bids without assigning any

reason.

DRAFT TENDER Version 1 Page 11 of 34

PROPOSAL SUBMISSION FORM

To,

The Secretary, Delhi Electricity Regulatory Commission Viniyamak Bhawan, C-Block, Shivalik, Malviya Nagar, New Delhi – 110 017

Sir/Madam,

We, the undersigned, offer to provide the services for undertaking the assignments

relating to ____________________in accordance with your bid document ref.______________

dtd. ____.

We are hereby submitting our proposal for undertaking the assignment in one Original

and two copies marked as “Original” and Copy no.-1 and Copy no.-2 respectively in the

prescribed formats, which includes the Technical Proposal and the Financial Proposal sealed

under separate envelopes. Each page of the proposal has been numbered and signed by the

Authorized Signatory.

A Power of Attorney duly notarised by the Notary Public, indicating that the person(s)

signing the bid has the authority to sign the bid and that the bid is binding upon the Bidder

during the full period of its validity is enclosed.

It is also confirmed that presently we are not handling any assignment that would be in

conflict

with this assignment or place us in a position of not being able to carry out this assignment

objectively and impartially.

Demand drafts/pay orders no. _______________dated. __________for Rs. 10,000/-

(Rupees ten thousand only) as EMD, in favour of Secretary, DERC payable at New Delhi is

enclosed herewith.

We understand that you are not bound to accept any Proposal you receive.

DRAFT TENDER Version 1 Page 12 of 34

Yours sincerely, Authorized Signatory: Name and Title of Signatory:

Name of the Bidder:

Encl. As above

DRAFT TENDER Version 1 Page 13 of 34

Annexure-A1

List of activities required to be under taken:

1) The major activities to be covered in Scope of Work would involve determining/

ascertaining and verification/reconciliation in respect of the following for the period

1st April, 2014 to 30th June, 2015.

A. Billing and Metering System

(I) Pre billing activity

a) whether all the consumers in the area of distribution licensees has

metered connection. If NO, then

i. reasons for unmetered supply, if any, and

ii. breakup of Consumers having metered & unmetered supply in

terms of:

(a) number of consumers,

(b) energy supplied and

(c) the financial value .

b) whether Meter reading for all the consumers is being entered into the

billing system on a fixed interval (i.e. monthly, bi-monthly etc.)

c) the number and Percentage of consumers in each billing cycle where

meter reading has been missed and follow-up action thereof.

d) the number and Percentage of consumers where manual meter reading

has been entered into the system along with the quantum of energy and

the amount involved thereof.

e) the number and Percentage of consumers where meter reading has been

entered automatically without manual intervention .

f) percentage of rejected meter readings both in case of automatic meter

reading by the system as well as manual meter reading together with the

quantum of energy and the amount involved thereof.

g) the Steps taken for removing the discrepancy for such cases where meter

readings have been rejected by the system or otherwise.

h) Reconciliation of number of consumers with meter reading received

during a particular period.

i) Steps taken for those consumers where meter reading has not been

received during a particular cycle.

j) Whether audit trail is being maintained by the system. If not, the reasons

thereof.

DRAFT TENDER Version 1 Page 14 of 34

k) Whether exception report is being generated by the system. If not, the

reasons thereof.

l) Action taken report from the management on cases of exceptional meter

reading (i.e. unusually high meter reading for a particular billing cycle

compared to past average, opening meter reading is higher than closing

meter reading etc.)

(II) Processing of Bills

a) Whether all the consumers have pre-defined sanctioned load and other

parameters necessary for generation of bills is available in the system. If NO,

the reasons thereof.

b) Whether bills are being raised as per the specified billing cycle. If NO, then

what is the deviation, in terms of Number of Consumers as well as Energy.

In all such cases, whether the financial adjustment has been given to the

consumer pursuant to Commission's directions/orders.

c) Whether Fixed charges are being calculated based on the applicable tariff

schedule and Regulations.

d) whether Provision of Time of Day metering and computation of

corresponding Tariff against all the consumers who are covered under Time

of Day Tariff is available in the system or not. If NO, the reasons thereof and

how the metering and computation of Tariff for such TOD consumers is

being undertaken.

e) Efficacy and correctness of metering and billing system in respect of various

elements of billing, such as:

i. Provision of PPAC computation available in the system as per

applicable orders.

ii. Provision of energy charges computation as per slabs/categories

defined in the applicable tariff schedule.

iii. Provision of voltage discount into the system.

iv. Provision of KVAH and KWH billing into the system as per applicable

category.

v. Computation of 8% additional surcharge.

vi. Computation of electricity duty

vii. Interest on consumers security deposit.

viii. Additional SLD Charges.

ix. Computation for enforcement/theft cases as per applicable

Rules/Regulations.

x. Computation of temporary surcharge.

xi. Computation of penalty for load violation as per applicable

Regulations.

DRAFT TENDER Version 1 Page 15 of 34

xii. Computation of surcharge and rebate based on ToD slot as per

applicable tariff schedule.

xiii. Maintenance charges of street lights.

xiv. Load violation surcharge.

xv. Computation of subsidy, wherever applicable.

xvi. Provision of providing annual discount based on number of bills

raised –and this being regularly done or not? Default analysis if any

to be checked.

(III) Post Billing Activity:

a) Re-conciliation of consumers into the system with meter reading entered

into the system and bills issued.

b) Action taken report for the consumers where bills have not been issued

during a particular cycle.

c) The reasons for non-issuance of bills where meter reading is available.

d) Exception report generated from the system.

e) Action taken on exception report generated by the system.

B. Activities Related to Collection:

a) Whether collection is being credited against particular bills.

b) Treatment of under/over collection against particular bills.

c) Whether system accepts cash payments more than prescribed limit-

safeguards to prevent cash collection beyond authorized amount of Rs.

4000/-

d) Action taken report in case of outstanding more than due date as per

applicable Rules/Regulations.

e) Control over collection accounts.

f) Designated bank accounts/agencies where the collection against bills is

deposited.

g) Transfer from collection account to designated operational account.

h) Mode of payment recorded into the system i.e. cash/cheque/credit card

etc.

i) Identification of Centers of collection i.e. own account, internet, mobile

payment, designated drop banks etc.

C. Regulatory Reports

a) Whether Form 2.1a as prescribed by the Commission is generated

automatically through the billing system

DRAFT TENDER Version 1 Page 16 of 34

b) Whether other regulatory reports are being generated manually or

through the system

D. Verification of Corrective Actions:

In this important stage, whether verification of successful implementation of

the corrective action has been taken on the finding of the auditor and details

thereof.

DRAFT TENDER Version 1 Page 17 of 34

Annexure A2

The Scope of Work will be majorly governed by various Regulations/Acts as follows:

a) Electricity Act, 2003

b) National Tariff Policy

c) Delhi Electricity Supply Code & Performance Standards Regulations 2007

d) Delhi Electricity Supply Code and Performance Standards (Amendment)

Regulations, 2015

e) Multi Year Tariff Regulations 2011 for Generation, Transmission and

Distribution

f) State Grid Code Regulations, 2008 and Amendments

g) Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy)

Regulations, 2014

h) Delhi Electricity Regulatory Commission (Demand Side Management)

Regulations, 2014

i) Delhi Electricity Regulatory Commission Comprehensive (Conduct of

Business) Regulations, 2001 and Amendments

j) Delhi Electricity Regulatory Commission (terms and conditions for Open

Access) Regulations, 2005 and Amendments

k) Tariff Order issued by the Commission

l) Specific regulatory orders issued by the Commission from time to time.

DRAFT TENDER Version 1 Page 18 of 34

Annexure A3

Power of Attorney for Lead Member of Consortium

(Refer Clause 3 of general terms and conditions ) Whereas the ………………………………………………(the “Authority”) has invited bids from pre-

qualified and short-listed parties for the ………………………………………………..Project (the

“Project”).

Whereas, …………………………………., …………………………………………………………………and

……………………….

(collectively the “Consortium”) being Members of the Consortium are interested in bidding

for the Project in accordance with the terms and conditions of the Request for Proposals

and other connected documents in respect of the Project, and

Whereas, it is necessary for the Members of the Consortium to designate one of them as

the Lead Member with all necessary power and authority to do for and on behalf of the

Consortium, all acts, deeds and things as may be necessary in connection with the

Consortium’s bid for the Project and its execution.

NOW THEREFORE KNOW ALL MEN BY THESE PRESENTS

We,………………………………………having our registered office at…………………….,

M/s…………………………..,having our registered office at ………………………,(hereinafter

collectively referred to as the “Principals”) do hereby irrevocably designate, nominate,

constitute, appoint and authorise M/s …………………………………, having its registered office at

……………………………., being one of the Members of the Consortium, as the Lead Member and

true and lawful attorney of the Consortium (herein referred to as the “Attorney”) and

hereby irrevocably authorise the Attorney (with power to sub-delegate) to conduct all

business for and on behalf of the Consortium and any one of us during the bidding process

and, in the event the Consortium is awarded the Concession/Contract, during the execution

of the Project, and in this regard, to do on our behalf and on behalf of the Consortium , all or

any of such acts ,deeds or things as are necessary or required or incidental to the

submission of its bid for the Project, including but not limited to signing and submission of

all applications, bids and other documents and writing ,accept the Letter of Award,

participate in bidders’ and other conferences, respond to queries, submit

information/documents, sign and execute contracts and undertakings consequent to

acceptance of the bid of the Consortium and generally to represent the Consortium in all its

dealings with the Authority , and/ or any other Government Agency or any person , in all

matters in connection with or relating to or arising out of the Consortium bid for the Project

and/or upon award thereof till the Concession Agreement is entered into with the

Authority.

DRAFT TENDER Version 1 Page 19 of 34

AND hereby agree to ratify and confirm all acts, deeds and things done or caused to be

done by our said Attorney pursuant to and in exercise of the powers conferred by this

power of Attorney and that all acts, deeds and things done by our said Attorney in exercise

of the power hereby conferred shall and shall always be deemed to have been done by

us/Consortium.

IN WITNESS WHEREOF WE THE PRINCIPALS ABOVE NAMED HAVE EXCEURED THIS POWER

OF ATTORNEY ON THIS…..DAY OF ….20…..

For……….. (Signature, Name & Title)

For………..

(Signature, Name & Title) For………..

(Signature, Name & Title)

(Executants) (To be executed by all the members of the Consortium)

Witness: 1. 2. Notes:

The mode of execution of the Power of Attorney should be in accordance with the procedure, if any,

laid down by the applicable law and the charter documents of the executant(s) and when it is

required, the same should be under common seal affixed in accordance with the required procedure.

Wherever required, the Bidder should submit for verification the extract of the charter documents

and documents such as a board or shareholders resolution/power of attorney in favour of the person

executing this Power of Attorney for the delegation of power hereunder on behalf of the Bidder.

For a Power of Attorney executed and issued overseas, the document will also have to be legalised by

the Indian Embassy and notarised in the jurisdiction where the Power of Attorney is being issued.

However, the Power of Attorney provided by Bidders from countries that have signed the Hague

Legislation Convention 1961 are not required to be legalised by the Indian Embassy if it carries a

conforming Appostille certificate.

DRAFT TENDER Version 1 Page 20 of 34

Annexure-B TECHNICAL BID

S. No. Particular

1. Name of the bidder

2. Single Firm/Consortium, details to be provided (copy to be attached)

3. Bidder Registration No. (copy to be attached)

4. Pan No. (copy to be attached)

5. Service Tax Registration No. (copy to be attached)

6. TIN No. (copy to be attached)

7. CAG Empanelment no. with year (copy to be attached)

8. Address of the Bidder (Head Office/Registered Office)

9. Phone No. & Fax No.

10. Year of Establishment of the Bidder

11. No. of Partners

12. Name of Partners & membership no.

13. No. of Employees Regular

14. No. of CISA/DISA certified professionals

15. No. of SAP Experts

16. No. of Electrical Engineers

17. No. of Companies for which Billing and Metering Audit was carried out

(list of be given as separate annexure alongwith credentials)

18.

No. of Power Distribution Companies, if any, for which Billing and

Metering Audit has been carried out (Name to be given as separate

annexure alongwith credentials)

DRAFT TENDER Version 1 Page 21 of 34

19.

Name of person responsible for DERC assignment and his /her team

(with academic qualification & experience):

Particulars Educational

Qualification Experience

(in yrs.)

TEAM LEADER ……… ………

TEAM MEMBER - 1 ……… ………

TEAM MEMBER – 2 ……… ………

TEAM MEMBER - 3 ……… ………

……… ……… ………

20. Estimated time for completion

21. Any other information

Name & Signature of the Authorized Person

(Stamp)

DRAFT TENDER Version 1 Page 22 of 34

Annexure-C-1

FINANCIAL BID for BRPL

Name of the Bidder:

SI. No. Particular Amount in Rs Amount in Words

1. TOTAL BID AMOUNT (in Rs.)

(Exclusive of taxes)

Name & Signature of the Authorized Person

(Stamp)

DRAFT TENDER Version 1 Page 23 of 34

Annexure-C-2

FINANCIAL BID for BYPL

Name of the Bidder:

SI. No. Particular Amount in Rs Amount in Words

1. TOTAL BID AMOUNT (in Rs.)

(Exclusive of taxes)

Name & Signature of the Authorized Person

(Stamp)

DRAFT TENDER Version 1 Page 24 of 34

Annexure-C-3

FINANCIAL BID for TPDDL

Name of the Bidder:

SI.No. Particular Amount in Rs Amount in Words

1. TOTAL BID AMOUNT (In Rs.)

(Exclusive of taxes)

Name & Signature of the Authorized Person

(Stamp)

DRAFT TENDER Version 1 Page 25 of 34

Annexure-C-4

FINANCIAL BID for NDMC

Name of the Bidder:

SI. No. Particular Amount in Rs Amount in Words

1. TOTAL BID AMOUNT (in Rs.)

(Exclusive of taxes)

Name & Signature of the Authorized Person

(Stamp)

DRAFT TENDER Version 1 Page 26 of 34

ANNEXURE – D

(Contract Agreement to be signed by Consultant with DERC)

This ARTICLES OF AGREEMENT made on this ……… day of …………2015

BETWEEN:

Delhi Electricity Regulatory Commission a statutory Body set up by the Government of NCT

of Delhi under the Delhi Electricity Reforms Act, 2000 and having its office at Viniyamak

Bhawan, C-Block, Shivalik, Near Malviya Nagar, New Delhi – 110 017, hereinafter referred to

as the “Commission’) (which expression shall unless excluded by or repugnant to the

context or meaning thereof, includes its successors and permitted assigns) of the FIRST

PART

AND

_________________________________Company registered under the Companies Act,

1956 and having its office at, _________________________________hereinafter referred

to as the __________________________Consultant (which expression shall unless excluded

or repugnant to the context or meaning thereof include its successors and permitted

assigns) of the SECOND PART.

(The Commission and the ____________ are individually referred to as the “Party” and

collectively as the “parties”).

WHEREAS the Commission has awarded the contract on the basis of open bids to the party

of the SECOND PART as a Consultant for Appointment for Audit of Billing and Metering

system of Current Operational Electricity Billing System in BSES Rajdhani Power Limited

(BRPL), BSES Yamuna Power Limited (BYPL) ,Tata Power Delhi Distribution Limited (TPDDL)

and New Delhi Municipal Council (NDMC) more precisely explained in the ‘Terms of

Reference’ contained in the bid document dated_____________________”.

M/s ______________________________have agreed to provide services to the Commission

on the terms and conditions hereinafter contained.

NOW Parties to these Present hereby agree as follows:

DRAFT TENDER Version 1 Page 27 of 34

1. __________is hereby the Commission for the aforementioned assignment.

___________ shall commence the assignment from zero date, which is hereby

mutually agreed between the Commission and the Consultant

as____________________.

2. The Consultant shall execute and complete the assignment as per the workplan and

activity schedule mentioned herein.

WORK PLAN AND ACTIVITY SCHEDULE

S. No. Description Time

(No. of days)

1 Placement of officers of the Consultant at DISCOMs office

2 Submission of Draft Report to DERC

3 Presentation to the Commission

4 Submission of Final Report to DERC

Scope of Work:

3. The Scope of Work will be majorly governed by various Regulations/Acts as follows:

a) Electricity Act, 2003

b) National Tariff Policy

c) Delhi Electricity Supply Code & Performance Standards Regulations 2007

d) Delhi Electricity Supply Code and Performance Standards (Amendment)

Regulations, 2015

e) Multi Year Tariff Regulations 2011 for Generation, Transmission and

Distribution

f) State Grid Code Regulations, 2008 and Amendments

g) Delhi Electricity Regulatory Commission (Net Metering for Renewable

Energy) Regulations, 2014

h) Delhi Electricity Regulatory Commission (Demand Side Management)

Regulations, 2014

i) Delhi Electricity Regulatory Commission Comprehensive (Conduct of

Business) Regulations, 2001 and Amendments

j) Delhi Electricity Regulatory Commission (terms and conditions for Open

Access) Regulations, 2005 and Amendments

k) Tariff Order issued by the Commission

l) Specific regulatory orders issued by the Commission from time to time.

4. The major activities to be covered in Scope of Work are as follows:

DRAFT TENDER Version 1 Page 28 of 34

Pre billing activity

a) whether all the consumers in the area of distribution licensees has

metered connection. If NO, then

i. reasons for unmetered supply, if any, and

ii. breakup of Consumers having metered & unmetered supply in

terms of:

(a) number of consumers,

(b) energy supplied and

(c) the financial value .

b) whether Meter reading for all the consumers is being entered into the

billing system on a fixed interval (i.e. monthly, bi-monthly etc.)

c) the number and Percentage of consumers in each billing cycle where

meter reading has been missed and follow-up action thereof.

d) the number and Percentage of consumers where manual meter reading

has been entered into the system along with the quantum of energy and

the amount involved thereof.

e) the number and Percentage of consumers where meter reading has been

entered automatically without manual intervention .

f) percentage of rejected meter readings both in case of automatic meter

reading by the system as well as manual meter reading together with the

quantum of energy and the amount involved thereof.

g) the Steps taken for removing the discrepancy for such cases where meter

readings have been rejected by the system or otherwise.

h) Reconciliation of number of consumers with meter reading received

during a particular period.

i) Steps taken for those consumers where meter reading has not been

received during a particular cycle.

j) Whether audit trail is being maintained by the system. If not, the reasons

thereof.

k) Whether exception report is being generated by the system. If not, the

reasons thereof.

l) Action taken report from the management on cases of exceptional meter

reading (i.e. unusually high meter reading for a particular billing cycle

compared to past average, opening meter reading is higher than closing

meter reading etc.)

Processing of Bills

DRAFT TENDER Version 1 Page 29 of 34

a) Whether all the consumers have pre-defined sanctioned load and other

parameters necessary for generation of bills is available in the system. If

NO, the reasons thereof.

b) Whether bills are being raised as per the specified billing cycle. If NO,

then what is the deviation, in terms of Number of Consumers as well as

Energy. In all such cases, whether the financial adjustment has been given

to the consumer pursuant to Commission's directions/orders.

c) Whether Fixed charges are being calculated based on the applicable tariff

schedule and Regulations.

d) whether Provision of Time of Day metering and computation of

corresponding Tariff against all the consumers who are covered under

Time of Day Tariff is available in the system or not. If NO, the reasons

thereof and how the metering and computation of Tariff for such TOD

consumers is being undertaken.

e) Efficacy and correctness of metering and billing system in respect of

various elements of billing, such as:

i. Provision of PPAC computation available in the system as per

applicable orders.

ii. Provision of energy charges computation as per slabs/categories

defined in the applicable tariff schedule.

iii. Provision of voltage discount into the system.

iv. Provision of KVAH and KWH billing into the system as per applicable

category.

v. Computation of 8% additional surcharge.

vi. Computation of electricity duty

vii. Interest on consumers security deposit.

viii. Additional SLD Charges.

ix. Computation for enforcement/theft cases as per applicable

Rules/Regulations.

x. Computation of temporary surcharge.

xi. Computation of penalty for load violation as per applicable

Regulations.

xii. Computation of surcharge and rebate based on ToD slot as per

applicable tariff schedule.

xiii. Maintenance charges of street lights.

xiv. Load violation surcharge.

xv. Computation of subsidy, wherever applicable.

xvi. Provision of providing annual discount based on number of bills

raised –and this being regularly done or not? Default analysis if any

to be checked.

Post Billing Activity:

DRAFT TENDER Version 1 Page 30 of 34

a) Re-conciliation of consumers into the system with meter reading entered

into the system and bills issued.

b) Action taken report for the consumers where bills have not been issued

during a particular cycle.

c) The reasons for non-issuance of bills where meter reading is available.

d) Exception report generated from the system.

e) Action taken on exception report generated by the system.

Activities Related to Collection:

a) Whether collection is being credited against particular bills.

b) Treatment of under/over collection against particular bills.

c) Whether system accepts cash payments more than prescribed limit-

safeguards to prevent cash collection beyond authorized amount of Rs.

4000/-

d) Action taken report in case of outstanding more than due date as per

applicable Rules/Regulations.

e) Control over collection accounts.

f) Designated bank accounts/agencies where the collection against bills is

deposited.

g) Transfer from collection account to designated operational account.

h) Mode of payment recorded into the system i.e. cash/cheque/credit card

etc.

i) Identification of Centers of collection i.e. own account, internet, mobile

payment, designated drop banks etc.

Regulatory Reports

a) Whether Form 2.1a as prescribed by the Commission is generated

automatically through the billing system

b) Whether other regulatory reports are being generated manually or

through the system

Verification of Corrective Actions:

In this important stage, whether verification of successful implementation of

the corrective action has been taken on the finding of the auditor and details

thereof.

Other Issues:

5. The above description of scope of work is purely indicative and not exhaustive.

DRAFT TENDER Version 1 Page 31 of 34

Changes/additions can be made by DERC as and when required for better

understanding the task, and also on the feedback of the Consultant from time to time

to enhance the value of the study, without changing its basic nature.

6. Consultant shall be paid charges on completion of milestones as contained in

Contract Agreement enclosed herewith. All payments as indicated above shall be

released within Thirty (30) days of the receipt of invoice subject to adherence to the

terms and conditions by the Consultant as per the contract agreement executed

between the Consultant and DERC.

7. The Consultant agrees and undertakes that the respective tasks shall be performed

& completed only by the personnel mentioned in Annexure-B hereinabove and that if

any change in the composition of the said team is necessitated, the CONSULTANT

(second party) shall seek prior permission of the Commission to effect the changes.

8. Consultant shall be paid as follows:

d) For Services Rs._________(Rupees_______________________only)

e) Reimbursement of applicable Taxes to be indicated by the Consultant-

Rs._________(Rupees_______________________only)

f) Total Charges of Rs._________(Rupees_______________________only):

9. The payment of fee to Consultant shall be made by the Commission after the

deduction of applicable tax at source.

10. The Consultant shall within one week of signing of this agreement provide

performance security by way of Performance Bank Guarantee @ 10% of the total

contract value in a format acceptable to the Commission from any scheduled Bank

which shall be valid for a period of six months beyond the scheduled completion date,

Milestones as per which invoices for fees shall be raised by Consultant

% of contract

value

Submission of Final Report after initial interaction with Commission based on a draft report

70%

Acceptance of report by the Commission 30%

DRAFT TENDER Version 1 Page 32 of 34

extendable suitably in case of extension of period of contract.

11. The Commission shall be entitled to evaluate the interim reports submitted by the

Consultant in stages and the Consultant shall incorporate / restructure the report/ and

auditor’s finding as per the recommendations of the Commission within such

reasonable time as may be prescribed by the Commission.

12. The Commission shall make payments to the Consultant within 30 days of the date

of receipt of Invoice for the individual milestone, in the Commissions’ office subject to

acceptance of deliverables wherever required unless prevented by reasons beyond its

control and in the latter case the Consultant shall not be entitled to claim any interest

or damages on account of such delay.

13. The Consultant shall be liable to the Commission for the performance of its

obligations in this Agreement as a result of any default of the Consultant except the

following limitations:

a. The Consultant shall not be liable for any damage or injury caused by or arising out

of the act, omission, neglect or default of any person other than the Consultant.

b. The Consultant shall not be liable for any loss or damage caused by or arising out of

circumstances over which the Consultant has no control.

c. The total liability of the Consultant under this clause shall be limited to 10% of the

charges mentioned in Clause 3 except for gross negligence or any damage on account

of the Consultant, for which the Consultant shall be fully liable.

d. It is mutually agreed between the parties that the time will be the essence of this

CONTRACT/AGREEMENT. The Consultant, (the party of the second part,) shall adhere

to the time schedule as prescribed in this AGREEMENT and complete the work within

the stipulated time frame, failing which the party of the second part would be liable

for a penalty which may go upto Rs.5000/- per day, subject to a maximum of 10% of

entire value of contract, for each day of delay beyond the time stipulated in this

AGREEMENT, provided that each day of delay beyond time schedule is attributable

solely to the CONSULTANT. The Commission’s decision in this matter will be binding

on all parties.

14. No TA/DA shall be admissible for the Consultant for local journey in connection

with the assignment.

DRAFT TENDER Version 1 Page 33 of 34

15. The Commission reserves its right to amend, foreclose, terminate or cancel the

engagement of the Consultant without assigning any reasons. In such cases Consultant

shall be paid remuneration after taking into consideration the part of work completed

prior to such foreclosure, termination or cancellation of the engagement as may be

decided by the Commission, and the decision of the Commission shall be conclusive

and binding. The remuneration so fixed and paid shall be deemed to be the final

payment in such cases.

16. Any information of confidential nature, which may be so marked by the

Commission, which comes to the knowledge or in the possession of the Consultant or

of any of its employees by virtue of their engagement on subject matter of this

contract; shall not be disclosed by the Consultant or its employees to any

unauthorized person in any manner. Any breach of this clause without prejudice to

any other action that may be initiated as per law, shall also subject the Consultant to a

liability to pay to the Commission such compensation for damages as may be decided

by the Commission keeping in view the nature, manner and motive of the information

disclosed and the extent of the damage caused by such unauthorized disclosure.

Provided that any information that was (a) rightfully already known to Consultant at

the time of its disclosure, (b) independently developed by Consultant without

referring to the Commission’s confidential information, (c) known to the public

through a source other than Consultant, or (d) disclosed to Consultant by a third party

not having an obligation of non disclosure to the proprietor of the information, shall

not be deemed to be confidential information for the purposes of this agreement.

Provided further that the obligation of confidentiality on Consultant shall not apply

where such confidential information is required to be disclosed under any law.

17. The Consultant undertakes that they are not handling any assignment that would

be in conflict with this assignment or place them in a position of not being able to

carry out this assignment objectively and impartially..

18. In case the firm fails to fulfill its obligations, the Commission would be entitled to

invoke the performance Bank Guarantee as furnished by the firm and the amount

mentioned in the Performance Bank Guarantee shall stand forfeited.

19. In respect of any matter for which no provision has been made in this agreement,

DRAFT TENDER Version 1 Page 34 of 34

the provisions contained in the general instructions of the Government on the subject

of engagement of CONSULTANT shall apply. All the letters issued by the Commission

and the proposal and clarifications submitted by the CONSULTANT shall form part of

this agreement.

20. In case of any differences or disputes between the parties arising out of this

AGREEMENT, the matter shall be dealt with in accordance with the provisions of the

Arbitration and Conciliation Act, 1996. Delhi courts will have jurisdiction in the matter

if the dispute is not settled within the provisions of Arbitration and Conciliation Act,

1996.

IN WITNESS WHEREOF the Consultant and Secretary to the Commission on behalf of

the Commission have hereto put their hands on the day and the year first above

written.

( ) ( )

Authorised Signatory Secretary

Consultant DERC

Witness :

1.

2.