15
Deliver Today … Build the Future Leventis Motors 2, Wharf Road, Apapa Lagos

Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Deliver Today … Build the Future

Leventis Motors

2, Wharf Road, Apapa

Lagos

Page 2: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Eicher 1080

Page 3: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Technical specification

Engine Model : E483TC,116 Hp Diesel 4-Cylinder

GVW : 8.3Tons

Payload : 5.5 Tons

Wheelbase : 3765 mm

Transmission : Manual, 5 Forward,1 Reverse

Fuel : 100 Liters

Overall length: 16.5 Feet

Fuel Efficient and Low maintenance cost

Page 4: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Product features

Page 5: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Product features

Page 6: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Application Vehicles

Page 7: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Application Segment

Page 8: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Customer Value Proposition

Page 9: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Customer Value Proposition

Page 10: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Customer Value Proposition

Page 11: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Customer Value Proposition

Page 12: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Operating Economics

Page 13: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

Eicher -Genuine Parts

13

Page 14: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

After Sales Support Leventis motors won't discard you after

purchase, we are equipped with strong aftersales

support and also we offer 24/7 Mobile workshop

for quick response and repairs in transit

nationwide.

Page 15: Deliver Today … Build the Future - Leventis Motors · 2020-03-19 · Crankshaft grinding and polishing; (max Length 1.5m) Engine block re - sleeving/re-boring/line boring (max length

15

Machine shop

Our service includes;

● Crankshaft grinding and polishing; (max Length 1.5m)

● Engine block re - sleeving/re-boring/line boring (max length 1.4m)

● Diesel engine overhaul.

●EPS and Manual gearbox overhaul.

●Front and rear axle overhaul.

●Diesel injection system components repairs and re-calibration.

● Connecting rod overhaul- small/big end bushing replacement/reconditioning.

●Cylinder Head overhaul- Valve re facing/Lapping - Seat/ Guide Replacement

● Grinding-Drums/Flywheel

● Surface Grinding + Milling

● Construction Equipment-Track/ Roller + Hydraulic Repairs