Golden Demo Manufacturing Basics

SAP Business ByDesign Reference Systems

Demo Script

Manufacturing Basics

Classification: Internal and for Partners

Version: 20171218

Page 2: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 2

Disclaimer

This demo script is based on the ByD Reference System for the Almika model company. There are several country versions

of the Almika ByD implementation available. The content is similar but deviates especially with respect to language support,

names and object descriptions. Sample data used in this demo script relates to the US country version – for other country

versions different data samples might be relevant.

A prerequisite for being able to fully understand this demo script and run the demo, is a sound system knowledge on SAP

Business ByDesign. General assumption is that you are familiar with the Learning Center content available in your ByD

system at: Home Self-Services – Learning Center.

Although the script has been tested carefully you might nevertheless encounter different system behavior when running a

demo in an actual Almika demo tenant.

Release Statement

This version of the demo script is released for the following country versions of the ByD Reference System for the Almika

model company:

• US – United Stated, as of demo release ByD 1705

• DE – Germany, as of demo release ByD 1705

• UK – United Kingdom, as of demo release ByD 1705

• FR – France, as of demo release ByD 1705

• AT – Austria, as of demo release ByD 1705

• CH – Switzerland, as of demo release ByD 1705

• NL – Netherlands, as of demo release ByD 1705

• CA – Canada, as of demo release ByD 1705

• MX – Mexico, as of demo release ByD 1705

• AU – Australia, as of demo release ByD 1705

• CN – China, as of demo release ByD 1705

• IN – India, as of demo release ByD 1705

The demo release basically is determined by the time when the demo tenant has been provisioned for demo usage, a demo

tenant provided between mid of March and mid of June 2018 is part of the demo release ByD 1802.

As of demo release ByD 1802 the release status of your ByD demo tenant can be identified in the Company-Specific-Help:

You can find a help entry “ByD <nnnn> Demo Guides <CC>” under Help – Company-Specific-Help. <nnnn> specifies the

demo release of your ByD demo tenant, e.g. ‘1802’ – released in February 2018. <CC> specifies the country version of your

demo tenant, e.g. ‘US’ – Almika US country version. The version-controlled demo guides provided in this help entry match to

the demo release and the country version of your ByD demo tenant. Please be aware that the demo guides are not specific

to the country version, only the version of the demo guide is specific to your ByD demo tenant.

Page 3: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 3

Table of Content

1 Demo Script Overview ................................................................................................................................... 4

1.1 Demo Overview ...................................................................................................................................... 4

1.2 Intended Audience.................................................................................................................................. 4

1.3 Protagonists ........................................................................................................................................... 4

1.4 Business Pain Points .............................................................................................................................. 4

1.5 Key Messages and Value Proposition ..................................................................................................... 5

1.6 Story Flow Summary .............................................................................................................................. 7

2 Technical Requirements ................................................................................................................................ 8

2.1 System Access Information ..................................................................................................................... 8

2.2 User Accounts ........................................................................................................................................ 8

3 Demo Steps .................................................................................................................................................... 9

3.1 Manufacturing Basics ............................................................................................................................. 9

3.1.1 Create Sales Order .................................................................................................................... 9

3.1.2 Monitor Supply Planning Exceptions......................................................................................... 10

3.1.3 Execute Material Requirements Planning (MRP)....................................................................... 11

3.1.4 Show Material Flow ................................................................................................................. 12

3.1.5 Start Resource Planning .......................................................................................................... 14

3.1.6 Run Load Leveling ................................................................................................................... 15

3.1.7 Change Source of Supply ........................................................................................................ 16

3.1.8 View Resource Master ............................................................................................................. 17

3.1.9 Release Production Proposals and Purchase Proposal ............................................................. 19

3.1.10 Check Production Order........................................................................................................... 20

3.1.11 Post Goods Receipt ................................................................................................................. 22

3.1.12 Release Production Orders ...................................................................................................... 23

3.1.13 Confirm Production Orders....................................................................................................... 24

3.1.14 Release Customer Demand ..................................................................................................... 25

3.1.15 Post Goods Issue .................................................................................................................... 26

3.1.16 Create Customer Invoice ......................................................................................................... 26

4 Scenario Quick Guide and Key Master Data ................................................................................................ 28

4.1 Manufacturing Basics ........................................................................................................................... 28

Page 4: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 4

1 Demo Script Overview

1.1 Demo Overview

The Manufacturing Basics scenario enables your company to produce goods and place them in stock. Your customer

demands such as sales orders or service orders can then be covered using this existing stock. You define demand

management procedures to define the appropriate make-to-stock strategies that best suit your company’s business

requirements. Using forecast demand, you can plan for periodic demand. Customer demands are then covered by this

produced or procured stock and consume the forecast demand per the predefined demand management procedures.

Multi-level supply planning ensures that the goods receipts for all required products, including product specifications, are

planned on time which, in turn, means that you can trigger the creation of purchase orders and production orders on time. If

all required components are in stock, you only need to create production orders. Releasing the production order triggers the

creation of a production lot and all the necessary production tasks (supply, make, and check) required to commence

execution.

When the final confirmation is complete, the system automatically posts the produced stock to the predefined production

output area and triggers inventory and financial accounting updates. From here you can deliver the product to the customer.

The key features that are part of this scenario are linked to the ByDesign high level features of Transparency, Adaptability

and Efficiency, which, in turn, lays the foundations of Profitability and Growth, which are the main pillars of any business.

Transparency is provided by Supply Planning views through multiple levels of production and procurement.

Efficiency is provided by the Integrated Best Business Practice flow for Make to Stock.

Adaptability is provided by alternate sourcing of production.

1.2 Intended Audience

SAP internal: Sales, Presales, New hires

SAP external: CEO, CIO, Logistics Management

1.3 Protagonists

Sales Manager

Supply Planner

Purchaser

Warehouse Manager

1.4 Business Pain Points

Manufacturing organizations must carefully balance inventory in the form of components, sub-assemblies, and finished

goods to meet customer demand while keeping investments in working capital to a minimum to deliver profit to their

stakeholders. Many smaller organizations lack the tools to accomplish this task. Below are some common issues we see on

a regular basis.

Sales has no visibility to inventory or projected inventory and cannot provide accurate Available to Promise information

to their customers.

Page 5: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 5

Planning may be disconnected or even offline in spreadsheets and is usually executed on a weekly basis. This means

the management of exceptions is delayed by several days on average.

The determination of requirements through multiple levels of production is difficult to manage in basic tools so many

companies resort to holding excess inventory to meet customer demand.

Planning is usually only possible on a system wide basis run periodically. Planning for a single top level finished good is

not possible and must wait for the entire run. This delays reaction to issues.

Best practice methods such as MRP are not always understood because the results are not visual in nature, they are

just numbers.

Exceptions are many times lost in the mass of transactions to be processed.

Capacity planning at any level is rare in the smaller systems. This causes exceptions because capacity constraints

cause issues a good portion of the time.

Capacity planning needs to start simple and then be flexible to model rapid changes in schedule to meet changing

customer demand.

The output of planning is many times manual so requisitions and production orders are prone to errors.

Final planning and communication of work authorization to the production floor may make assumptions the production

workers know how to build items instead of providing all the details.

Production feedback is not always performed due to the detail nature of the transactions. This introduces errors in

inventory and causes missed shipments.

Shipping methods need to start simple, but have the capability to integrate to systems like UPS Worldship to improve

efficiency or reduce dual entry.

Invoicing is sometimes difficult because customers may require different invoicing approaches such as weekly invoices

for one customer and individual invoices for others.

The overriding issues are a lack of visibility, integration, and best practices in a common platform.

1.5 Key Messages and Value Proposition

Overview

A common ByDesign theme includes high level business goals to improve profitability, and build a foundation for growth. To

support these goals ByDesign provides Transparency, Efficiency, and Adaptability, as well as an integrated solution to

support a two-tier enterprise.

Key Features and Associated Benefits

Real Time Available to Promise provides immediate transparency into the supply chain. If you need details on possible delivery dates based on current plans you can drill down.

o Transparency of the supply chain through ATP improves accuracy of delivery commitments to customers. Satisfied customers tend to return increasing sales and profitability.

o Transparency of the supply chain also reduces the need for expediting and overtime. This reduces costs and improves profit.

Planning Exceptions are available in real time without the need to run MRP providing transparency to issues.

o Transparency of exceptions in real time improves efficiency by highlighting issues immediately increasing efficiency. Other systems usually do not highlight exceptions until you run MRP so there is a delay in issue identification.

Material Requirements Planning is streamlined and simple with the planning workbench.

MRP can be executed for a single item if needed for immediate action without the delay of a full MRP run.

Planning is adaptable to schedule in the past or not.

Page 6: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 6

o Simplified and adaptable MRP improves efficiency because you can take immediate action as needed to manage exceptions. This reduces expediting and improves profitability.

Graphical view of requirements through a multi-level BOM.

Visual representation of exceptions

o Transparency of the dependencies and exceptions make it easier and more efficient to take required actions on a timely basis leading to efficiency and improved profit.

Integrated Capacity Management for critical resources.

Flexible Production Calendars

o Visual representation of capacity and load increase capacity planning efficiency.

Source of supply options include alternate production models or external purchasing.

o Source of supply options provide adaptability in the supply chain to better meet customer demand and support growth.

Resources can have independent schedules modified over time for both the amount of time they will operate as well as their anticipated utilization percentage.

o The adaptability of resource schedules allows you to model the business accurately and better manage growth.

The Planning workbench integrates and automates supply chain requisitions.

o Integrated requisitions throughout multiple levels of the Bill of Material from a single source increase efficiency.

Stock and Demand Overview provides a last minute verification all components are available. This minimizes work in process by avoiding open production orders waiting on components.

o Transparency of the supply chain reduces working capital and increases profit.

The production order can be a shop floor traveling document tailored to your requirements with all the information manufacturing needs to produce the product.

o The production order is an example of a best practice that increases efficiency.

Exception based receiving transactions reduce data entry time and errors.

Directed put away increases accuracy of inventory.

o Automated entries and best practice features like directed put away increase efficiency.

Multiple options for releasing orders provide adaptability to managing tasks.

o The ability to manage production orders with transparency of components or rapid release improves efficiency leading to improved profit.

The ability to manage production orders with transparency of components or rapid release improves efficiency leading to improved profit.

Best practice production feedback is built into the system.

There are options for detailed feedback or summary “As Planned” entries that reduce feedback time.

o Transparency of production through feedback is a best practice that significantly improves efficiency and improves profit.

The customer demand work list provides visibility to the backlog of shipments to be made and the available inventory to meet this demand.

o Transparency across the supply chain with integrated Available to Promise checks is another best practice

example improving efficiency.

Exception based shipping transactions reduce data entry time and errors.

Automated picking logic increases accuracy of inventory.

o Automated entries and best practice features like exception based shipping increase efficiency.

o Options for shipping provide adaptability to support future growth.

Multiple options for invoicing depending on business requirements.

Options for invoicing provide adaptability to support future growth.

Page 7: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 7

1.6 Story Flow Summary

This demo covers the business processes depicted in the orange boxes:

Outbound Delivery

Creating Demand

Planning Supply

Plan material

Check and resolve an exception

Plan capacity

Create Sales Order

Executing Production

Execute production tasks

Initiating Outbound Delivery

Processing Outbound Delivery

Creating Customer Invoices

Procurement

Initiating Purchasing

Processing Purchase Orders

Processing Inbound Deliveries

Initiating Production

Release production order

Create production order

Initiate production

Page 8: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 8

2 Technical Requirements

2.1 System Access Information

To run the demo, you need access to a ByD demo tenant for the Almika model company, which is available in different

country versions.

2.2 User Accounts

The following user accounts for ByD Almika implementation are to be used to run the demo:

Predefined User ID User Name Password Component

SUPPLYPLANNER01P Richard Stone Welcome1 SAP Business ByDesign

FINANCIAL02 Iris Green Welcome1 SAP Business ByDesign

Page 9: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 9

3 Demo Steps

3.1 Manufacturing Basics

3.1.1 Create Sales Order

What to Say

Introduction

We start in Sales Order Management and create a new Sales Order.

The ATP check for this particular product is red. That means we do not have any of this product on stock.

We release the Sales Order.

Key Features and Advantages

Real Time Available to Promise provides immediate transparency into the supply chain. If you need details on possible delivery dates based on current plans you can drill down.

Value Statement

Transparency of the supply chain through ATP improves accuracy of delivery commitments to customers. Satisfied customers tend to return increasing sales and profitability.

Transparency of the supply chain also reduces the need for expediting and overtime. This reduces costs and improves profit.

What to Do

Logon as SUPPLYPLANNER01P.

WoC Sales Orders New Sales Order

Account Name: CP100110

Requested Date: <Today> + 3 weeks

Product ID: P100401

Quantity: 200 ea

Mouse over red ATP check

Submit Release Order

What you Should See

Page 10: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 10

3.1.1 Create Sales Order

3.1.2 Monitor Supply Planning Exceptions

What to Say

Introduction

We move to Supply Planning.

First of all, let’s look at the exceptions that we have. Without the MRP run there is automatically an exception created

in the system. The exception list provides transparency into all exceptions immediately.

Key Features and Advantages

Planning Exceptions are available in real time without the need to run MRP providing transparency to issues.

Value Statement

Transparency of exceptions in real time improves efficiency by highlighting issues immediately increasing efficiency. Other systems usually do not highlight exceptions until you run MRP so there is a delay in issue identification.

What to Do

WoC Supply Planning Exceptions Products

Show All Products with Exceptions By Selection and Find P100401

Click Open Product Planning Details

Page 11: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 11

What you Should See

Exception for stock shortage also visible

3.1.3 Execute Material Requirements Planning (MRP)

What to Say

Introduction

We see that we have a total demand of 200 ea and a total supply of 0 ea.

If we look at the time based elements in the Supply and Demand List, we see the new sales order that we created. It

is highlighted in red. So we immediately see what the exception is.

We go ahead and run the Materials Requirements Planning on a Multi BoM Level.

Key Features and Advantages

Material Requirements Planning is streamlined and simple with the planning workbench.

MRP can be executed for a single item if needed for immediate action without the delay of a full MRP run.

Planning is adaptable to schedule in the past or not.

Page 12: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 12

3.1.3 Execute Material Requirements Planning (MRP)

Value Statement

Simplified and adaptable MRP improves efficiency because you can take immediate action as needed to manage exceptions. This reduces expediting and improves profitability.

What to Do

Click Run Planning Multi BoM Level

Allow Planning Proposals Creation in Past = No; Click OK.

Click Save.

What you Should See

3.1.4 Show Material Flow

What to Say

Introduction

We open the Material Flow for the new Production Proposal.

The system provides a graphical view of what the material requirements are for a multi-level BoM.

We can see the Sales Order driving the requirement. The system automatically uses the Lead Time Offset to create a

production proposal of the top-level product P100401. Then it explodes down to the next level.

We see a 2nd production proposal on the next level (P100109). On the 3rd level a purchase proposal was created for

one of the raw materials (P100119), the other raw materials are on stock (P100515, P100110).

We can also see that if we want to deliver the sales order in time, production would need to start in the past. So,

before we launch the production, we need to have a look at it from a resource perspective.

Page 13: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 13

Key Features and Advantages

Graphical view of requirements through a multi-level BOM.

Visual representation of exceptions

Value Statement

Transparency of the dependencies and exceptions make it easier and more efficient to take required actions on a timely basis leading to efficiency and improved profit.

What to Do

In the Supply and Demand List, select line for Production Proposal.

Click Open Material Flow.

Click Graphic.

Do not close this screen! We will continue here later!

What you Should See

Page 14: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 14

3.1.5 Start Resource Planning

What to Say

Introduction

We look at the Resource Load to make sure that we have enough capacity available to build this product.

We see the green line representing the capacity that we have available. The red bars represent demand against that

capacity.

In this example, we are working for three days and have four days off. MRP assumes an infinite capacity, so it just

drops in the demand.

Page 15: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 15

3.1.5 Start Resource Planning

Key Features and Advantages

Integrated Capacity Management for critical resources.

Flexible Production Calendars

Value Statement

Visual representation of capacity and load increase capacity planning efficiency.

What to Do

WoC Supply Planning Resource Load.

Show All Resource Loads By Selection and Find 100003.

What you Should See

3.1.6 Run Load Leveling

What to Say

Introduction

We open the resource planning and want the system to automatically level the load.

After the load leveling we see a new load graph. We see the original demand in blue. The system has leveled the

load, it has moved the production order to the front

Key Features and Advantages

Automated capacity planning tools such as load leveling reduce planning efforts.

Page 16: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 16

3.1.6 Run Load Leveling

Value Statement

Automated capacity planning increases efficiency through reduced manual effort.

What to Do

Click Open.

Click Run Load Leveling.

Input Parameters for Run Load Leveling:

Start Date: <Today>

End Date: <Today + 4 weeks>

Click OK.

Click Load Graph.

Click Close (Do not save changes!).

What you Should See

3.1.7 Change Source of Supply

What to Say

Introduction

You can resolve shortages in a couple of ways. One option is to change the source of supply.

Page 17: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 17

3.1.7 Change Source of Supply

In this example, we have our standard released production model. We also have another production model available.

We can even go outside the company and purchase this capacity from a third party source using the purchasing

contract.

Key Features and Advantages

Source of supply options include alternate production models or external purchasing.

Value Statement

Source of supply options provide adaptability in the supply chain to better meet customer demand and support growth.

What to Do

WoC Supply Planning Resource Load.

Show All Resource Loads By Selection and Find 100001.

Click Open.

Click Load Graph.

Click on one of the orange bars.

Click Load Table and look for the selected line in the Resource Load table.

Under Details: Operation List click Actions Change Source of Supply.

Click Cancel.

What you Should See

3.1.8 View Resource Master

What to Say

Introduction

A second option to resolve resource issues is to increase capacity.

We can drill down into this particular resource for the schedule and make changes.

Under Operating Times, we see Standard Operating Times: We normally run this resource 5 days a week from 9 a.m.

to 5 p.m.

Page 18: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 18

3.1.8 View Resource Master

On Time-Dependent Operating Times, we can maintain for a particular period of time that the resource runs for an

extra day or for an extended time during these days. In this example, it runs from 7 a.m. to 11 p.m. in March 2013.

So we can change these times and expand the capacities.

Key Features and Advantages

Resources can have independent schedules modified over time for both the amount of time they will operate as well as their anticipated utilization percentage.

Value Statement

The adaptability of resource schedules allows you to model the business accurately and better manage growth.

Page 19: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 19

What to Do

WoC Supply Planning Resource Load

Click on Link to Resource 100001 Washing Machine at the top of the screen.

Click on Resource ID.

Click View All.

Select tab Operating Times.

Select sub-tab Standard Operating Times.

Select sub-tab Time-Dependent Operating Times.

What you Should See

3.1.9 Release Production Proposals and Purchase Proposal

What to Say

Introduction

Now that we have resolved any capacity constraints, we come back to the Material Flow.

From the Material Flow we can take action.

We release the purchase proposal and it changes into a purchase request.

Then we release the production proposals for the 2nd level component and for the finished good.

Key Features and Advantages

The Planning workbench integrates all calculated order proposal, enables decision making and automates supply chain requisitions.

Page 20: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 20

Value Statement

Integrated requisitions throughout multiple levels of the Bill of Material from a single source increase efficiency.

What to Do

Change back to Material Flow of Production Proposal.

In the planning table, click the link of the Production Proposal for P100109 and click Release.

Then, click the link of the Production Proposal for P100401 and click Release.

Click the link of the Purchase Proposal and click Release.

Click Save and Close.

What you Should See

3.1.10 Check Production Order

What to Say

Introduction

Now we go to the Production Control and open the production order of the 2nd level component P100109.

First we have a look at the Stock and Demand Overview. Before we release a production order to the floor, we should

check if we have enough quantity of the raw materials available. We see that for one material we do not have enough

stock on hand. So we do not want to release this production order.

Then we can have a look at what the production order would look like, if we were to release it. In the preview, we see,

the bar code, the finished good, the times and the different operations, activities and the respective input products.

Page 21: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 21

3.1.10 Check Production Order

Key Features and Advantages

Stock and Demand Overview provides a last minute verification all components are available. This minimizes work in process by avoiding open production orders waiting on components.

The production order can be a shop floor traveling document tailored to your requirements with all the information manufacturing needs to produce the product.

Value Statement

Transparency of the supply chain reduces working capital and increases profit.

The production order is an example of a best practice that increases efficiency.

What to Do

WoC Production Control Production Orders By Order Header

Show Production Orders - In Preparation

Select Production Order for P100109.

Click Edit.

Click Stock and Demand Overview.

Click OK.

Click Preview.

Close without saving.

Page 22: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 22

What you Should See

3.1.11 Post Goods Receipt

What to Say

Introduction

We know the missing component was ordered automatically so we go to execute the receipt.

The purchase order has the status ‘Ordered’, so we can post the goods receipt.

We can let the system propose the quantities. If this were a multiple line receipt, we would only need to enter any

exceptions. This saves time and increases accuracy.

The Target Logistics Area is automatically filled.

Key Features and Advantages

Exception based receiving transactions reduce data entry time and errors.

Directed put away increases accuracy of inventory.

Value Statement

Automated entries and best practice features like directed put away increase efficiency.

What to Do

WoC Inbound Logistics Purchase Orders

Show Open Purchase Orders.

Select Purchase Order for P100119.

Click Post Goods Receipt.

Page 23: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 23

3.1.11 Post Goods Receipt

Click Propose Quantities.

Delivery Notification ID: <any value>

Click Save and Close.

3.1.12 Release Production Orders

What to Say

Introduction

We go back into the production order and do the Stock and Demand Overview again. Now we have got all the

products that we need for production.

So we can now release this production order and send it down to the floor.

The Stock inquiry is not mandatory. If we know that there is enough stock available or it will be by the time the order is

executed, we can simply release the production order without opening it.

Key Features and Advantages

The ability to manage production orders with transparency of components or rapid release improves efficiency leading to improved profit.

Value Statement

The ability to manage production orders with transparency of components or rapid release improves efficiency leading to improved profit.

What to Do

WoC Production Control Production Orders By Order Header

Show Production Orders - In Preparation

Select Production Order for P100109.

Click Edit.

Click Stock and Demand Overview.

Click OK.

Click Release.

Click Close.

Select Production Order for P100401.

Click Release.

Page 24: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 24

What you Should See

3.1.13 Confirm Production Orders

What to Say

Introduction

Production feedback is critical to managing the supply chain as well as providing visibility to issues in production for

management review.

We have completed the production and want to confirm the production orders.

When doing a confirmation, we enter the quantity that we produced. We see the Open Quantity, the Planned Quantity,

the Output product, the Input Products and the Activities. This allows us to enter all the feedback necessary into the

system.

If everything works according to plan, we do not have to enter all the confirmation details but do a Confirmation as

Planned.

Key Features and Advantages

Best practice production feedback is built into the system.

There are options for detailed feedback or summary “As Planned” entries that reduce feedback time.

Value Statement

Transparency of production through feedback is a best practice that significantly improves efficiency and improves profit.

What to Do

WoC Production Control Task Control.

Page 25: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 25

3.1.13 Confirm Production Orders

Show All Production Tasks By Selection.

Select task with status ‘Not Started’ for P100109.

Click Confirm.

Confirmed Quantity: <planned quantity> ea

Go to tabs Output Products, Input Products, and Activities.

Change status Finish.

Click Save. Click Close.

Select task with status ‘Not Started’ for P100401.

Click Confirm as Planned.

Change Status Finish.

3.1.14 Release Customer Demand

What to Say

Introduction

Now that production is complete we are going to change roles and move to the warehouse where we are monitoring

the customer shipment process.

We want to prepare the picking and shipping of the finished product by releasing the customer demand that the sales

order has generated. The ATP still indicates that we do not have the product available. So we first check the

availability again. The ATP turns green, because after the production execution we have the product on stock.

Now we go ahead and release the customer demand.

Key Features and Advantages

The customer demand work list provides visibility to the backlog of shipments to be made and the available inventory to meet this demand.

Value Statement

Transparency across the supply chain with integrated Available to Promise checks is another best practice example improving efficiency.

What to Do

WoC Outbound Logistics Control Customer Demand.

Show Orders Created Today.

Find sales order from 1st step. Edit and check the Line Items

Click Actions Check Availability.

Click Release.

Click Save.

Page 26: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 26

3.1.15 Post Goods Issue

What to Say

Introduction

Now that the pick tickets have been sent to picking we change roles again as the warehouse worker we need to

provide feedback to the system for our work performed.

We navigate to the delivery proposals and select Post Goods Issue.

There are several options for shipping. We are going to do a very simple manual feedback. You could use bar code

data collection, move through a two-step process, or even integrate with shipping systems such as UPS Worldship

using a partner provided solution such as PaceJet to integrate the two systems.

We select propose quantities. The source Logistics Area is automatically filled by the system.

Again, we see the possibility of many line items to be shipped where the propose quantities and logistics information

population can save significant time and reduce errors.

We go ahead and release the outbound delivery.

Key Features and Advantages

Exception based shipping transactions reduce data entry time and errors.

Automated picking logic increases accuracy of inventory.

Value Statement

Automated entries and best practice features like exception based shipping increase efficiency.

Options for shipping provide adaptability to support future growth.

What to Do

WoC Outbound Logistics Delivery Proposals.

Show All Proposals by Selection.

Find sales order from 1st step.

Click Post Goods Issue.

Click Propose Quantities.

Click Release.

3.1.16 Create Customer Invoice

What to Say

Introduction

Now that we have shipped the product we change roles again to execute the invoicing.

There are many options for invoicing. We are going to do a simple manual invoice, but you could also invoice groups

of orders or do invoicing on a periodic basis.

Page 27: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 27

3.1.16 Create Customer Invoice

We invoice the delivery of the product.

We see that the delivery is ready to be invoiced. We release the invoice request.

In this scenario we have seen how ByDesign provides Transparency throughout the supply chain, Efficiency with

integrated flow of materials, and Adaptability with multiple options for processing. These drive improved profitability

and a foundation for growth.

Key Features and Advantages

Multiple options for invoicing depending on business requirements.

Value Statement

Options for invoicing provide adaptability to support future growth.

What to Do

Logon as FINANCIAL02.

WoC Customer Invoicing Invoice Requests.

Show To Be Invoiced Invoice Requests.

Find sales order from 1st step.

Click Invoice.

Click Release.

Page 28: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 28

4 Scenario Quick Guide and Key Master Data

This chapter is intended as a quick reference for experienced users who have understood the basics of the business process

and have already completed the scenario. If this section is not needed, please delete it.

4.1 Manufacturing Basics

Steps Summary

Path Data to Use/Enter Activity

Step 1 – Create Sales Order

WoC Sales Orders New

Sales Order

Account Name: CP100110

Requested Date: <Today> + 3 weeks

Product ID: P100401

Quantity: 200 ea

Submit Release Order

Step 2 – Monitor Supply Planning Exceptions

WoC Supply Planning

Exceptions Products

Show All Products with Exceptions By

Selection and Find P100401

Open Product Planning Details

Step 3 – Execute Material Requirements Planning (MRP)

Run Planning Multi BoM Level

Allow Planning Proposals Creation In

Past = No.

Save.

Step 4 – Show Material Flow

Select Production Proposal.

Open Material Flow Graphic.

Do not close this screen! We will

continue here later!

Step 5 – Start Resource Planning

WoC Supply Planning

Resource Load.

Show All Resource Loads By Selection

and Find 100003.

Step 6 – Run Load Leveling

Open.

Run Load Leveling.

Input Parameters for Run Load

Leveling:

Start Date: <Today>

Page 29: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 29

Path Data to Use/Enter Activity

End Date: <Last day of actual month>

Load Graph.

Close (Do not save changes!).

Step 7 – Change Source of Supply

WoC Supply Planning

Resource Load.

Show All Resource Loads By Selection

and Find 100001.

Open Load Graph.

Click on one of the orange bars.

Select line with resource load.

Actions Change Source of Supply.

Click Cancel.

Step 8 – View Resource Master

Click on Link to Resource

100001 Washing Machine.

Edit.

Tab Operating Times. sub-tab

Standard Operating Times.

sub-tab Time-Dependent

Operating Times.

Step 9 – Release Production Proposals and Purchase Proposal

Change back to Material Flow

of Production Proposal.

Select Purchase Proposal

Release.

Select Production Proposal for

P100109 Release.

Select Production Proposal for

P100401 Release.

Save and Close.

Step 10 – Check Production Order

WoC Production Control

Production Orders By

Order Header

Show Production Orders - In Preparation

Select Production Order for P100109.

Edit.

Stock and Demand Overview.

Preview.

Close without saving.

Step 11 – Post Goods Receipt

WoC Inbound Logistics

Purchase Orders

Show Open Purchase Orders.

Select Purchase Order for P100119.

Post Goods Receipt.

Propose Quantities.

Delivery Notification ID: <any value>

Save and Close.

Step 12 – Release Production Orders

Page 30: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 30

Path Data to Use/Enter Activity

WoC Production Control

Production Orders By

Order Header

Show Production Orders - In Preparation

Select Production Order for P100109.

Select Production Order for P100401.

Edit.

Stock and Demand Overview.

Release.

Close.

Release.

Step 13 – Confirm Production Orders

WoC Production Control

Task Control.

Show All Production Tasks By Selection.

Select task for P100109.

Select task for P100401.

Confirm.

Confirmed Quantity: 200 ea

Go to tabs Output Products, Input

Products, and Activities.

Change Status Finished.

Save. Close.

Confirm as Planned.

Change Status Finished.

Step 14 – Release Customer Demand

WoC Outbound Logistics

Control Customer Demand.

Show All Orders by Selection.

Find sales order from 1st step.

Actions Check Availability.

Release.

Step 15 – Post Goods Issue

WoC Outbound Logistics

Delivery Proposals.

Show All Proposals by Selection.

Find sales order from 1st step.

Post Goods Issue.

Propose Quantities.

Release.

Step 16 – Create Customer Invoice

WoC Customer Invoicing

Invoice Requests.

Show To Be Invoiced Invoice Requests.

Find sales order from 1st step.

Invoice.

Release.

Page 31: Demo Script - SAP UI · PDF file1 Demo Script Overview ... 4 Scenario Quick Guide and Key Master Data ... actions on a timely basis leading to efficiency and improved profit

Golden Demo Manufacturing Basics

Document Version: 20171218 31

Copyright

© 2017 SAP SE or an SAP affiliate company. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of

SAP SE or an SAP affiliate company.

The information contained herein may be changed without prior notice. Some software products marketed by SAP SE and its

distributors contain proprietary software components

of other software vendors. National product specifications may vary.

These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation

or warranty of any kind, and SAP or its affiliated companies shall not be liable for errors or omissions with respect to the

materials. The only warranties for SAP or SAP affiliate company products and services are those that are

set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be

construed as constituting an additional warranty.

In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business outlined in this

document or any related presentation, or to develop or release any functionality mentioned therein. This document, or any

related presentation, and SAP SE’s or its affiliated companies’ strategy and possible future developments, products, and/or

platform directions and functionality are all subject to change and may be changed by SAP SE or its affiliated companies at

any time for any reason without notice. The information in this document is not a commitment, promise, or legal obligation to

deliver any material, code, or functionality. All forward-looking statements are subject to various

risks and uncertainties that could cause actual results to differ materially from expectations. Readers are cautioned not to

place undue reliance on these forward-looking statements, and they should not be relied upon in making purchasing

decisions.

SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate company) in Germany and other countries. All other product and service names mentioned are the trademarks of their respective companies. See http://global.sap.com/corporate-en/legal/copyright/index.epx