ITEMS UND NRO VECES ALTURA ANCHO LARGO SUB-TOTAL TOTAL
1.0.
1.1. M3
5 2.6 0.25 3.6 11.706 2.6 0.17 3.8 10.08
1.2.17 2.8 0.25 0.25 2.98
1.3.5 0.15 0.25 3.6 0.686 0.15 0.25 3.8 0.86
1.4.5 0.8 0.25 3.6 3.606 0.4 0.25 3.8 2.28 32.16
2.0.2.1. M3
1 1.3 0.6 2.6 2.032.2.
5 1.6 1.2 3.6 34.567 1.6 1.2 3.8 51.07 87.66
3.0. M31 0.10 9.001 0.8 72.00 81.00
4.0. M31 0.2 0.4 60 4.80 4.80
3.0.3.1. M3 1473.2. M3 109.58
257
TRAMO 2-2TRAMO 1-1
DESCRIPCION
DEMOLICION
DEMOLICION DE MURO DE ALBAÑILERIA
TRAMO 1-1TRAMO 2-2
TRAMO 1-1
METRADO PARA DEMOLICION Y EXCAVACION DE CERCO PERIMETRICO
ELIMINACION DE MATERIAL EXCAVADO
ELIMANACION DE MATERIALELIMINACION DE MATERIAL DEMOLIDO
VOLUMEN TOTAL A ELIMINAR
EXCAVACION DE ZANJA PARA MURO DE CONTENCIONTRAMO 1-1TRAMO 2-2
EXCAVACION DE ZANJASEXCAVACION DE ZANJAS PARA CIMIENTOSTRAMO 1
TRAMO 2-2
DEMOLICION DE SOBRECIMIENTO
DEMOLICION DE VIGAS
DEMOLICION DE COLUMNA
TRAMO 1-1
DEMOLICION DE PATIO INTERNOPISO DE CONCRETOEXCAVACION DE MATERIAL DEMOLICION DE VEREDAVEREDA