Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
Session ID:
Prepared by:
Remember to complete your evaluation for this session within the app!
11019
Optimizing Manufacturing Cycle using
Oracle Fusion Cloud Manufacturing
Cloud Manufacturing Key Features
April 08, 2019
Rajeev Rungta
Lead Consultant – Infosys
Agenda
Introduction
About Infosys
Speaker
Manufacturing Flow
Features – User’s Expectation
Key Components in EBS and Cloud
Salient Features of Cloud
Material Availability Rules & Assignment
Key Learnings
Q & A
The next-generation technology
services company - Infosys
Infosys helps enterprises create and execute strategies for their digital transformation. We help our clients find the right
problems to solve, and to solve these effectively. Our team of innovators, across the globe, is differentiated by the imagination,
knowledge and experience, across industries and technologies that we bring to every project we undertake.
Corporate
Founded in Pune, India in 1981
$11 billion in revenues
1,191 clients
Clients in over 45 countries
84 offices and 116 development centers
People
200,000+ employees globally
35% women employees
Automation repurposed 11,000 people’s effort into more
valuable tasks
Zero Bench for sustained engagement of employees
15,000 projects driven by employees innovating through Zero Distance
Learning
World’s largest corporate university
135,000+ employees trained in Design Thinking
17,435 engineers trained in 3+ programming languages
15,000+ employees trained in new technologies & platforms
967 employees mentored in executive leadership
Purpose
Use advances in technology to amplify human potential
$500 million innovation fund
98.3% business is repeat business
2% of avg. net profits over 3 fiscals to Infosys Foundation
Award winning sustainable delivery centers
Speaker Introduction
Rajeev Rungta
• Lead Consultant in Enterprise Solutions group of Infosys Limited.
• Over 12 years of experience in end-to-end business transformation
engagements leveraging Oracle Applications.
• Consulted for multiple clients in Discrete Manufacturing Space in US,
Europe and Asia.
• Oracle Certified “Manufacturing Cloud” & “Product Hub Cloud”
Implementation Specialist.
• Presented paper in forums – OAUG COLLABORATE and UKOUG APPS.
Manufacturing Flow
Manufacturing is tightly linked with BOM for Item Structures; Purchasing for Bought Out Components; Quality for WO Assemblies as well as Components/ Operations; Inventory for Component Issues/Returns, Assembly Completions; ASCP for Planning of Work Orders/ Components/ Scheduling; Costing for Work Order Costs; and GL for Posting all the costs of recorded Transactions
Manufacturing Flow
Quote Order Engineering Planning & Sourcing Manufacturing
Apply Hold(Engineering)
Order Creation
Enter ETO Item
Prepare Design
Communicate Quote
NegotiationRelease Hold (Engineering)
Engineering Design
Create Bill of Material
Create Items
Establish Sourcing of Items with Suppliers
Identify Work Centers
Check availability of materials, capacity
Release Planned Orders on Suppliers
Release Work Orders
Move OperationsRecord resource usage
Rolled up Cost allocated to Project
Modify Operations (as required)
Adjust Capacity(Uncertain Change)
Perform Component Pick
Quote Win
Create Routing
Complete Assembly
Shipping
Allocate Assembly to Customer Order
Pick, Pack and Ship
Schedule Order
Create Project
Quality Check(Rework / Scrap )
Project Billing
Process Step
Legend
Manufacturing Flow
Quote Order Engineering Planning & Sourcing Manufacturing
Apply Hold(Engineering)
Order Creation
Enter ETO Item
Prepare Design
Communicate Quote
NegotiationRelease Hold (Engineering)
Engineering Design
Create Bill of Material
Create Items
Establish Sourcing of Items with Suppliers
Identify Work Centers
Check availability of materials, capacity
Release Planned Orders on Suppliers
Release Work Orders
Move OperationsRecord resource usage
Rolled up Cost allocated to Project
Modify Operations (as required)
Adjust Capacity(Uncertain Change)
Perform Component Pick
Quote Win
Create Routing
Complete Assembly
Shipping
Allocate Assembly to Customer Order
Pick, Pack and Ship
Schedule Order
Create Project
Quality Check(Rework / Scrap )
Project Billing
Process Step
Legend
Features – User’s Expectation
Simple Processes Moving Setups from across InstanceEasy To Handle Speed
Features – User’s Expectation
Mobile App
Simple Processes Moving Setups from across InstanceEasy To Handle Speed
Features – User’s Expectation
Mobile App Faster Communication
Simple Processes Moving Setups from across InstanceEasy To Handle Speed
Features – User’s Expectation
Mobile App Faster Communication Graphics and Infolets
Simple Processes Moving Setups from across InstanceEasy To Handle Speed
Features – User’s Expectation
Mobile App Faster Communication Graphics and Infolets Self Service Reports
Simple Processes Moving Setups from across InstanceEasy To Handle Speed
Cloud MFG Features
• Ease of Setups
• Conversion / Data Migration / Interfacing
• Manufacturing Execution
• Mobile App
• Analytics and Reporting
• Social Networking in Manufacturing Process
Work Definition
• Combines item structure and routing into a single view.
• Visually design a manufacturing process consisting of materials, resources, operations using
drag and drop
Item Revision and Effectivity
Structure/BOM
Components
Operations
Material Availability Rules & Assignment Flow
Configure Rules( Item, Category, Start Date)
( Inclusion Criteria – Status, Fence)Exclusion Criteria - Component
Material Availability Rules & Assignment Flow
Configure Rules( Item, Category, Start Date)
( Inclusion Criteria – Status, Fence)Exclusion Criteria - Component
Calculate Material Availability
Material Availability Rules & Assignment Flow
Configure Rules( Item, Category, Start Date)
( Inclusion Criteria – Status, Fence)Exclusion Criteria - Component
Calculate Material Availability View Work Order Assignment
Material Availability Rules & Assignment Flow
Configure Rules( Item, Category, Start Date)
( Inclusion Criteria – Status, Fence)Exclusion Criteria - Component
Calculate Material Availability View Work Order Assignment
View Material AvailabilityIdentify any Shortage –View Expected Supplies
Material Availability Rules & Assignment Flow
Configure Rules( Item, Category, Start Date)
( Inclusion Criteria – Status, Fence)Exclusion Criteria - Component
Calculate Material Availability View Work Order Assignment
View Material AvailabilityIdentify any Shortage –View Expected Supplies
Force Assign/ Un assign to fulfill Priority Work Orders
Material Availability Rules & Assignment Flow
Configure Rules( Item, Category, Start Date)
( Inclusion Criteria – Status, Fence)Exclusion Criteria - Component
Calculate Material Availability View Work Order Assignment
View Material AvailabilityIdentify any Shortage –View Expected Supplies
Force Assign/ Un assign to fulfill Priority Work Orders
Release & Pick Components of Work Order(s)
Material Availability Rules & Assignment
Configure Material Availability Rules
Prioritize work orders by specific attributes such as Item, Customer, Or Date Criteria. Include work orders on the basis of time fence, work order status, or work order subtype. Exclude noncritical materials from material availability check. Exclude work orders from material unassignment on manual adjustment.
• View Shortage by reviewing the prioritized list of work orders and the material assigned to the work orders
• Review materials with shortages and affected work orders and expected supplies to address the material shortages.
• Adjust material assignments for work order prioritization and preview the force assigned and unassigned workorders.
• Change work order status to release the prioritized work orders with critical materials available, and hold work orderswith material shortages.
Material Availability Rules & Assignment
Configure Material Availability Rules
Prioritize work orders by specific attributes such as Item, Customer, Or Date Criteria. Include work orders on the basis of time fence, work order status, or work order subtype. Exclude noncritical materials from material availability check. Exclude work orders from material unassignment on manual adjustment.
• View Shortage by reviewing the prioritized list of work orders and the material assigned to the work orders
• Review materials with shortages and affected work orders and expected supplies to address the material shortages.
• Adjust material assignments for work order prioritization and preview the force assigned and unassigned workorders.
• Change work order status to release the prioritized work orders with critical materials available, and hold work orderswith material shortages.
Material Availability Rules & Assignment – Data Set
FG1234
SA12
SA34
P01
P02
P03
P04
FG3456
SA34
SA56
P03
P04
P05
P06
Finished Good
Subassembly
Purchased Item
Finished Good
Subassembly
Purchased Item
Work Orders created
Scenario – Material Availability Workbench
Scenarios
Work Order Sequencing based on Item
Work Order Sequencing based on Item & Start Date
Multiple Work Orders with Different Start Date
Exclusion Criteria (Remove Released Work Orders)
View Shortage / Expected Supplies
Manual Reassigning of material
Mass Release / Pick of Work Orders
Assignment Based On – Item
Rule Setup- Defined for assembly (FG1234)
Material Availability Assignment- Honors Rule Sequence ( Item)
Assignment Based On – Item & Start Date (Descending)
Rule Setup• Defined for assembly (FG3456)• Start Date (Descending)
Existing Work Orders
Assignment Based On – Item & Start Date (Descending)
Rule Setup• Defined for assembly (FG3456)• Start Date (Descending)
Existing Work Orders
Assignment Priority based on Rule
Assignment Based On – Multiple Work Orders With Different Start Date
Rule Setup• Defined for assembly (FG3456)• Start Date (Ascending)
Existing Work Orders
Assignment Based On – Multiple Work Orders With Different Start Date
Rule Setup• Defined for assembly (FG3456)• Start Date (Ascending)
Assignment Priority based on Rule
Existing Work Orders
Assignment – Prioritize Work Order by excluding Released Work Orders
Rule Setup (Inclusion)• Neglect Released Work Orders
Assignment – Prioritize Work Order by excluding Released Work Orders
Rule Setup (Inclusion)• Neglect Released Work Orders
Assignment Priority based on Rule
Assignment – Based on Work Order Priority & Start Date
Rule Setup• Priority (Ascending)• Start Date (Descending)
Existing Work Orders
Assignment – Based on Work Order Priority & Start Date
Rule Setup• Priority (Ascending)• Start Date (Descending)
Existing Work Orders
Assignment Priority based on Rule
Mass Release / Pick
Ability to Multi Select Work Orders- Release- Un release- Hold- Release and Pick Materials
Impact on Un Releasing a Picked Work Order..
Work Order (FG1234) Released
FG1234
SA12
SA34
P01
P02
P03
P04
Finished Good
Subassembly
Purchased Item
Component Availability
Impact on Un Releasing a Picked Work Order..
Manage Reservation & Pick - Component is allocated to Work Order
Impact on Un Releasing a Picked Work Order
Manage Reservation & Pick - Full Quantity is available for Reservation
Un Release Work Order
Material Assignment WorkbenchScenarios Available Remarks
Assignment based on- Item , Item Category- Dates (Start, Descending)- Work Order Priority
Also Included are –• User Item Type, Work Order Status, Type• Customer• Scheduled Ship Date
Inclusion- Work Order Status
Inclusion- Time Fence
Exclusion- Component
Reassign Work Orders- Force Assign / Un assign
View Expected Supplies- Shortage
Mass ReleaseMass Pick
Un Release (De allocate components )
Features – User’s Expectation
Mobile App Faster Communication Graphics and Infolets Self Service Reports
Simple Processes Moving Setups from across InstanceEasy To Handle Speed
Cloud MFG Features
• Ease of Setups
• Conversion / Data Migration / Interfacing
• Manufacturing Execution
• Mobile App
• Analytics and Reporting
• Social Networking in Manufacturing Process
Ease - Setups
Ease of Setups
Simplified Setup Manager feature
Hierarchy of setup tasks used to complete full Manufacturing Module at one place
Ease of Default Setups
Upon setting up of default setup of work area, work center, resources - standard operations are
automatically created
Item Structure and WIP synchronization
Manufacturing Engineer gets a notification triggered through PIM
Manufacturing Master Data defining process
Data model with graphical editing tool which helps to build a sequence of operations to complete
a Work Definition
Drag and drop the required Items or Resources at the operationSpeed
Easiness
Conversion
Conversion / Data Migration / Interfacing:
No Technical Development
No custom programs or APIs
Availability of FBDI and ADFDI Templates
Items
Item Structures – Standard
Work Orders
Work Order Operations Transactions
Work Order Resource Transactions
Work Order Material Transactions
Work Order Completion Transactions
Work Order less Transactions
Repetitive Functional Setups for different Test Cycles (like CRP to UAT)
Replicate the Setups through Manage Configuration Packages
Speed
Easiness
Migration
Manufacturing Execution
Manufacturing Execution:
Dispatch List
All Work Order Execution Steps accessed from single place
Quick Complete Work Order using 2 Clicks
WIP Job Workbench
Manage / Monitor work orders in just few clicks
Inbuilt graphs give an overview of work order / operation performance and exceptions
Serialized Manufacturing
Association of Serial Number – Predefined / during Work Order Release
Individual Operation for each specific Serial Numbers
Supports graphical representation of Product Genealogy
Work Order Types
Rework & Transform Work Orders for handing repair/non standard jobs
Speed
Easiness
Recording
Mobile App
Supervisory Console
Search for any work order by specifying attributes like work order number, item number, serial
number.
Use the camera of mobile device to scan the barcode of the work order and search for it.
View sets of work orders classified on the basis of:
work orders starting today
work orders completing today
work orders on hold
work orders past due
work order operations past due
work orders with open exceptions
Email capability to send work order details
Releasing Work Order using quick swipe action
Mobility
Reporting
Social Networking
Reduction in Response and Decision Making Time
Collaborate socially to manage work orders and resolve shop floor issues
Below attributes can be enabled for the work order object
Work Order Number
Start Date
Completion Date
Item
Item Description
Quantity
Unit of Measure (UOM)
Status
Actual Completion Date
Customer
Speed
Collaborate
Key Learnings
Parameters Details
Conversion,
Interface
Identify the entities and templates (FBDI, ADFDI, Import Batch )
Data Cleansing
Use of EFFs, additional fields in FBDI Templates
Material Availability
Workbench
Configure Material Availability Rules
Monitor Component Availability
Mass Release , Pick, Hold, Un Release
Re Prioritize Work Order (Force Assign / Un assign of components)
Handle Shortage , View Expected Supplies
Work Order
Execution
Identify the process steps related to Material Transaction
Identify the MES ( Resource charge - Start , Stop, Pause for simultaneous resource)
Completion of last operation results in completion and stocking of Assembly
Ease in modifying Operation - material requirements & resources in single screen
Quality Inspection &
Cost
Supports Inline and adhoc Quality Inspection
Non Conformance – Automatic generation & Approval process
Assembly cost is updated upon closing of work order
Reports &
Templates
OTBI capability for real time reporting
Frequent upgrades of cloud results in changes of FBDI/WebServices format
Social Networking Faster decision making and Prompt resolutions of any issues
Session ID:
Remember to complete your evaluation for this session within the app!
11019