THIS ADDENDUM MUST BE ACKNOWLEDGED.
THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2231 as follows:
1.1 ADDENDUM
A. Addendum No. 02
1.2 PROJECT
A. McKinley-Thatcher and Lincoln Elementary Schools
1.3 OWNER
A. Denver Public Schools
1.4 DATE
A. April 17, 2014
1.5 ARCHITECT
A. Anderson Hallas Architects, PC 715 Fourteenth Street, Golden, Colorado 80401
1.6 DESCRIPTION
A. This Addendum forms a part of Contract Documents and modifies original Specifications and Drawings, dated March 19, 2014, which were issued for bid on April 4, 2014.
B. Each Bidder shall acknowledge receipt of this Addendum in space provided in Bid Form.
C. Each Bidder shall be responsible for reading every item in this Addendum in order to determine to what extent work is affected.
D. Each Bidder shall be responsible for advising all subcontractors and material suppliers of this Addendum.
E. Each item in the Addendum is descriptive of items in Drawings and Specifications which are either added to, changed, or deleted.
F. Execute each item, herein listed, in complete conformance with all applicable sections of Drawings and Specifications.
PART 2 – GENERAL
2.1 GENERAL COMMENT
A. LINCOLN ELEMENTARY SCHOOL-The third floor custodial room has existing shelves that will need to be partially removed for the installation of the new VFD’s. The least amount of shelving should be removed so as to allow for the installation of the new VFD’s.
Denver Public Schools Purchasing Department
1617 S. Acoma St. Denver, Colorado 80223
INVITATION TO BID 14-MC-2231
ADDENDUM NUMBER TWO April 17, 2014
PART 3 – DRAWINGS
3.1 ARCHITECTURAL
A. Sheet A2.1: Detail 2-Correct note to read, “INFILL W/ NEW 1-HR RATED PARTITION. RE: 4/A2.2”.
3.2 ELECTRICAL
A. Sheet E.102 –Added note.
B. Sheet E.201 –Added note, clarified manufacturer.
If your proposal has been submitted and you wish to amend it, please modify your proposal on company letterhead. The amended proposal must be received prior to or included at the time and date set for the proposal opening. Each modification submitted to the District's Purchasing Office located at 1617 S. Acoma St. Denver, CO 80223. It must have Vendor’s name and return address and the applicable RFP number and title of the RFP clearly marked on the face of the envelope. If more than one modification is submitted, the modification bearing the latest date of receipt by the District's Strategic Sourcing Office will be considered the valid modification. *****This addendum must be acknowledged, whether or not you amend your proposal.*****
This Addendum must be included in your submittal or proposal, providing you do not need to amend your proposal.
PRINT OR TYPE YOUR INFORMATION
Name of Company: ____________________________________________ Fax: _____________
Address: ________________________ City/State: ________________ Zip: ______________
Contact Person: ___________________ Title: _____________________ Phone: ___________
Authorized Representative’s Signature: ____________________________ Phone: ___________
Printed Name: ____________________ Title: _____________________ Date: _____________
Approved by: ______________ Date: _____________
Reviewed by: ______________ Date: _____________
14-MC-2231 Addendum # 2
PANEL
LP2A
E102
3
PANEL
LP3A
E102
5
E102
4
PANEL "LMP3"
FEEDER ROUTED
ABOVE THE CEILING
FS
LMP3-4
E2
E3
GFILMP3-2
NEW PANEL
"LMP3"
PANEL
"LMP3"
FEEDER
EXH. FAN #1A VFD
LMP3-1,3,5
EXH. FAN #1B VFD
LMP3-7,9,11
EXH. FAN #1C VFD
LMP3-13,15,17
CU1
GFIWP
E2-36
E2-26,28
PANEL
"LMP3"
FEEDER
FCU1
E2-2,4
DEPARTMENT OF FACILITIES MANAGEMENT
OVERALL SECOND FLOOR PLAN1 SCALE: 1" = 20'-0"
3025 S. Parker Road, Suite 1100
Aurora, CO 80014-2950
303.696.2602 fax 303.696.0812
www.ssgroupinc.com
SSG Project Number: 14001.00
SSG MEP, Inc.
MEP
SSG
OVERALL THIRD FLOOR PLAN2 SCALE: 1" = 20'-0"
25
2-2
23
1-E
L-E
102
GENERAL NOTES
1. ALL EQUIPMENT INTEGRATED INTO THE FIRE ALARM SYSTEM SHALL BE SUCH THAT
WHEN SMOKE IS DETECTED AND THE FIRE ALARM SYSTEM IS IN ALARM, THE
MECHANICAL EQUIPMENT IS DE-ENERGIZED.
2. THE ELECTRICAL CONTRACTOR SHALL COORDINATE THE FINAL LOCATION OF ALL
EQUIPMENT WITH THE MECHANICAL CONTRACTOR PRIOR TO INSTALLATION.
3. ANY ROUTING OF WIRING WHICH IS BELOW THE CEILING IN THE CORRIDORS AND/OR
CLASSROOMS SHALL BE INSTALLED IN WIRE MOLD. WIRE MOLD SHALL BE WIRE
MOLD 7000 SERIES OR APPROVED EQUAL.
4. ALTERNATE ROUTING WILL BE EVALUATED BUT DOES NEED TO BE APPROVED BY
THE DPS PROJECT MANAGER AND ENGINEER PRIOR TO INSTALLATION TO AVOID
UNNECESSARY WALL PENETRATIONS.
5. THE ELECTRICAL CONTRACTOR SHALL SEAL COMPLETELY AROUND ANY
WALL/FLOOR PENETRATIONS. THE CONTRACTOR SHALL REMOVE ANY ACCESS
EXCESS THAT PROTRUDES THE SURFACE OF THE WALL.
6. THE FIRE ALARM CONTRACTOR SHALL FIELD VERIFY THAT ALL THE EXISTING
CLASSROOM TRANSFER FANS ARE INTERLOCKED WITH THE FACP. THE INTERLOCK
BETWEEN THE TWO SHALL BE SUCH THAT WHEN THE FIRE ALARM IS IN "ALARM"
STATUS, THE TRANSFER FANS ARE DE-ENERGIZED.
KEYED NOTES #
1. THE MECHANICAL CONTRACTOR SHALL PROVIDE AND
INSTALL A NEW FIRE/SMOKE DAMPER ABOVE THE
EXISTING DOOR WHERE THE NEW DUCTWORK
PENETRATES THE WALL. THE FIRE ALARM CONTRACTOR
SHALL INTEGRATE THE NEW FIRE/SMOKE DAMPER INTO
THE FIRE ALARM SYSTEM.
2. THE ELECTRICAL CONTRACTOR SHALL PROVIDE AND
INSTALL A NEW 208V., 30 AMP, 2-POLE NON-FUSED
DISCONNECT SWITCH IN A NEMA 3R ENCLOSURE FOR
NEW CU.
3. NEW GFCI WEATHERPROOF CONVENIENCE DUPLEX
RECEPTACLE MOUNTED ON UNISTRUT PER DETAIL NOTE
4, THIS SHEET.
4. THE ELECTRICAL CONTRACTOR SHALL INSTALL
DISCONNECT SWITCH AND RECEPTACLE ON EXTERIOR
SCHOOL WALL. THE RECEPTACLE SHALL BE MOUNTED
BELOW THE DISCONNECT SWITCH.
5. PROVIDE AND INSTALL NEW PANEL FEEDER CONDUIT.
CONDUIT SHALL BE ROUTED UP ABOVE THE THIRD FLOOR
LAY-IN CEILING ON UNISTRUT THEN TURN INTO THE WALL
AND PENETRATE INTO THE BUILDING. ALL WALL AND
ROOF PENETRATIONS FOR THE NEW FEEDER CONDUIT
SHALL HAVE A WEATHER TIGHT SEAL. PAINT CONDUIT TO
MATCH EXTERIOR BUILDING.
6. PROVIDE AND INSTALL NEW DUPLEX RECEPTACLE
BENEATH NEW VFD.
7. THE ELECTRICAL CONTRACTOR SHALL PROVIDE AND
INSTALL A NEW 208V., 30 AMP, 2-POLE NON-FUSED
DISCONNECT SWITCH IN A NEMA 1 ENCLOSURE FOR NEW
FCU.
1
ENLARGED THIRD FLOOR PLAN5 SCALE: 1/8" = 1'-0"
FLOOR CUSTODIAL CLOSET4 SCALE: 1/4" = 1'-0"
ENLARGED THIRD
6
2
3
4
4
5
ENLARGED DATA 222 3 SCALE: 1/8" = 1'-0"
7
5
2
2
2
2
DEPARTMENT OF FACILITIES MANAGEMENT
3025 S. Parker Road, Suite 1100
Aurora, CO 80014-2950
303.696.2602 fax 303.696.0812
www.ssgroupinc.com
SSG Project Number: 14001.00
SSG MEP, Inc.
MEP
SSGKEYED NOTES #
1. THE ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL A NEW
208V., 3-PHASE, 150AMP. ENCLOSED SHUNT TRIP CIRCUIT BREAKER IN A
NEMA 1 ENCLOSURE. MOUNT THE ENCLOSED CIRCUIT BREAKER AS
CLOSE TO THE MDC AS POSSIBLE. SHUNT TRIP ON THE CIRCUIT BREAKER
SHALL BE INTERLOCKED WITH THE NEW FIRE ALARM PANEL LOCATED IN
THE MAIN FIRST FLOOR OFFICE. EXTEND A NEUTRAL CONDUCTOR THRU
THE ENCLOSURE. THE NEW ENCLOSURE SHALL NOT BE WIDER THAN 16"
TO FIT BETWEEN THE EXISTING MDC AND UTILITY METER. REFER TO
DETAIL 1, SHEET E101 FOR MORE INFORMATION.
2. MAIN DISTRIBUTION CENTER IS CURRENTLY BEING METERED PER NEC
220.87 FOR 30 DAYS TO ESTABLISH AN EXISTING LOAD FOR THE
PANELBOARD.
3. PANEL E2 IS CURRENTLY BEING METERED PER NEC 220.87 FOR 30 DAYS
TO ESTABLISH AN EXISTING LOAD FOR THE PANEL.
4. MAIN DISTRIBUTION CENTER HAS (4) BUCKETS SIMILAR TO THIS AT THE
TOP OF THE DISTRIBUTION SECTION. ONLY ONE IS SHOWN FOR CLARITY.
5. THE ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL (3) NEW
200A FRNR FUSES TO REPLACE THE EXISTING (2) 175A AND (1) 200A FUSES
PROTECTING PANEL E2 AND E3.
6. PROVIDE BUS TAP KIT TO TAP OFF THE TOP OF EACH PHASE BUS.
CONTRACTOR SHALL DRILL INTO EACH PHASE BUS FOR ATTACHING TAPS.
THIS WILL REQUIRE THE MAIN DISTRIBUTION CENTER TO BE
DE-ENERGIZED FOR A PERIOD OF TIME. COORDINATE DOWN TIME WITH
DPS 7 DAYS PRIOR TO MOVING FORWARD WITH DE-ENERGIZING THE
ELECTRICAL SYSTEM. PROVIDE A FIRE WATCH DURING ANY TIME THE
MDC IS DE-ENERGIZED.
7. CONDUCTOR LENGTH BETWEEN LUG TAP AND ENCLOSED CIRCUIT
BREAKER SHALL BE NO LONGER THAN 10'-0".
8. THE EXISTING LOAD IS CONNECTED TO TWO POLES OF THE 3-POLE
DISCONNECT (PHASES A AND B).
M
M
T NG
TO
CWP
#6 CU TO
GND ROD
60A3P
60A
FRN-R
200A3P
200A
FRN-R
200A3P
200A
FRN-R
LP1A
LP2A
LP3A
E2
E3
EXISTING MAIN DISTRIBUTION CENTER (MDC)
600AMP, 208/120V, 3ɸ, 4W. 35,000 AIC RATINGX
EXISTING EXCEL ENERGY
150 KVA PAD MOUNTED
TRANSFORMER. 208/120V,
3ɸ, 4W SECONDARY.
CT
600A3P
100A3P
70A
FRN-R
AUDIT
100A2P
100A
FRN-R
E1
30A2P
30A
FRN-R
UNIVENT
60A2P
60A
FRN-R
EL1A
60A2P
50A
FRN-R
GYM
200A3P
200A
FRN-R
LPH
8 8 8 8
200A3P
200A
FRN-R
LPJ
200A3P
200A
FRN-R
L1K
100A3P
100A
FRN-R
LR
30A3P
SPARE
100A3P
35A
FRN-R
ELEVATOR
(4#8, 1#8
GND) 1"C.
EXISTING ELECTRICAL ONE-LINE DIAGRAM1 SCALE: NONE
SPAREUNKNOWN
25
2-2
23
1-E
L-E
201
150A
3P
LMP3
1
7
6
4
3[(4 #3/0 THWN CU)] 2"C.
FEEDER SCHEDULE
2
3 3
NOTE 2
X0X X1
X X2
X X3
LOAD CALCULATION
307 AMPS
384 AMPSEXISTING LOAD AT 208V, 3Ø PER
NEC 220.87, MULTIPLY BY 1.25%
NEW LOAD ADDED TO SERVICE
NEW MDF COOLING UNIT
• CONDENSING UNIT
• FAN COIL UNIT
• RECEPTACLE/DAMPERS
14.1 AMPS
5.1 AMPS
1.5 AMPS
25.2 AMPS
25.2 AMPS
25.2 AMPS
4.5 AMPS
TOTAL LOAD NOW ON MDC (AT 208V, 3Ø) 484.8 AMPS
5
PER CURRENT METERING DURATION (12
DAYS), MAXIMUM AMPERAGE FROM
METERING THE SERVICE IS:
NEW PANEL LMP3
• EXHAUST FAN #1A
• EXHAUST FAN #1B
• EXHAUST FAN #1C
• RECEPTACLE
FIRE ALARM
SHUNT TRIP
(STAGE)
2
2