Department of Education Powerstown, Educate Together Fire Safety Survey Report Project Number > 15527 Reference > 15527R003 FINAL DRAFT

Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

Department of Education

Powerstown, Educate Together Fire Safety Survey Report

Project Number > 15527

Reference > 15527R003 FINAL DRAFT

Page 2: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

15527R003 (Powerstown, Educate Together) FINAL DRAFT Department of Education 15527 13/05/2016

Michael Slattery Associates

19 Windsor Place

Lower Pembroke Street

Dublin 2

t: +353 (0)1 6765713

f: +353 (0)1 6785247

Department of Education

Powerstown, Educate Together

15527R003

Draft for Comment, Issue, E Electronic (Emailed PDF), H hardcopy.

Initials: MS: Michael Slattery, BF: Brendan Finlay, GH: Graeme Hansell, MG: Mark Gavin, AB: Alan Beggs, MGS:

Matthew Salisbury, MJG: Michael Green, RH: Raymond Hamill, TS: Tony Slattery, DS: David Slattery, SME:

Sean McEleney, MQ: Michael Quinn, AS: Adrian Sutton, BW: Brendan Wheeler, NMG: Niall McGuinness, NM:

Nicola Meadows

Author Details: Raymond Hamill, email: [email protected].

Document Transmittal

Sheet

DATE DAY 19 13

OF MONTH 02 05

ISSUE YEAR 16 2016

TO Person Company

DR

AF

T

FIN

AL

DR

AF

T

Project Managers Mark O’Neill KSN E

Brendan Doyle KSN E

AUTHOR > RH

CHECKER > BW

DAY MONTH YEAR Issue

13 05 16

Description Fire Safety Survey

File Address J:\15000\15500 - 15599\15527\2 MSA Reports

Doc Ref 15527R003 FINAL DRAFT

Page 3: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

15527R003 (Powerstown, Educate Together) FINAL DRAFT Department of Education 15527 13/05/2016

CONTENTS

/1 INTRODUCTION 2

BUILDING SUMMARY 3

1.1 Description: 3

1.2 Executive Summary 3

APPENDIX A

Photographic Survey

APPENDIX B

Floor Plan Drawing 08-055-FC-003, Revision A,

from Granted FSCA Reg. Ref. No. 08/4049

©This report and/or its contents, information and its design principles are the exclusive property of Michael

Slattery Associates and are not to be reproduced in any means or to be used for any other project without written

agreement of Michael Slattery Associates.

All rights reserved by the law of copyright are reserved by Michael Slattery Associates and may be protected by

court proceedings for damages and/or injunctions and costs.

Page 4: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

15527R003 (Powerstown, Educate Together) FINAL DRAFT Department of Education 15527 Page 2 of 5 13/05/2016

/1 INTRODUCTION

As requested by the Department of Education, MSA carried out an initial visual survey of Powerstown Educate Together Primary School, Powerstown Road, Tyrellstown, Dublin 15, on 12th November 2015. After this initial inspection a more detailed inspection which included opening up works was carried out in part on both 19th & 20th January 2016.

Prior to the inspection, MSA were issued with a copy of the Fire Safety Certificate Application cover letter, application form, fee exemption form and a copy of the drawings, which were submitted for approval dated 18th February 2008. MSA did not receive a copy of the compliance report submitted nor a copy of the actual Grant of Fire Safety Certificate for this building prior to the inspections.

MSA carried out a review of the FSC file in Fingal Council Offices on 1st April 2016 and it transpired that a revised floor plan drawing 08-055-FC-003, Revision A and a revised compliance report, were submitted for approval on 7th April 2008. MSA obtained a copy of the revised report and a copy of the Grant of Fire Safety Certificate (Reg. Ref. No. 08/4049), which was issued with no conditions attached. Refer Appendix B of this report for a copy of revised floor plan drawing 08-055-FC-003, Revision A.

It is therefore noted that although the drawing on the attached photographic survey site report is not the final granted FSC drawing, the MSA comments and recommendations in this report take account of the revised submission dated 7th April 2008.

It is noted that the codes used in the FSCA to demonstrate compliance with Part B (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the Environment, Heritage and Local Government and Building Bulletin 7 “Fire and the design of educational buildings”, Department of Education and Science published by HMSO.

The surveys comprised of opening up works to sections of plasterboard to check construction form and to look for firestopping/cavity barriers and included looking above the suspended ceilings. A general review of emergency lighting/exit signage and fire detection & alarm coverage was carried out, but no testing of these systems took place.

Page 5: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

15527R003 (Powerstown, Educate Together) FINAL DRAFT Department of Education 15527 Page 3 of 5 13/05/2016

BUILDING SUMMARY

1.1 Description:

The school building comprises of primarily 8no. classrooms over two levels (ground and first floor level) with support and staff rooms. The construction comprises of box steel sections acting as structure supporting the first floor level and continue up to support the roof, with similar box sections and steel I beams supporting the first floor level construction.

The building layout appears to be generally in accordance with drawing 08-055-FC-003, Revision A, other than the following;

(a) Room shown on drawing in attached site survey report as SER 1 on first floor

level, was declared as being used as a store with a protected lobby between it

and the stairs. This room does not appear to be used as a store and the lobby

is not being used as a protected lobby as it contains significant fireload.

(b) SER 4 at ground floor level is currently being used for storage, however this

room was not constructed as a store room. Recommend SER 1 (discussed in

item (a) above and SER 4 at ground floor level revert to their intended use in the

granted Fire Safety Certificate design.

1.2 Executive Summary

The primary concerns are as follows.

(i) The elements of structure supporting the first floor structure require 60minutes fire resistance.

The horizontal steel box sections which form part of the structure from what we could view above suspended ceilings, have sporadic coverage of what appears to be intumescent paint. The paint is visibly missing in various locations to either, entire steel members, or individual faces of the steel members (partial coverage). This paint cannot be confirmed by MSA from these inspections as being intumescent paint or that it has adequate coating coverage, where applied.

Vertical steel box sections which are located either within partitions or the external wall enclosure, appear to be only encased in 12.5mm plasterboard which will not achieve 60minutes fire rating. It is noted that there are conflicting specifications called up on the Architects drawings for the partition and wall lining construction e.g. outline specification calls up “12.5mm Gyproc Wallboard or equal and approved” and section drawing indicates “12.5mm Duraline”. It is noted clear what boards have been used. It being noted that Duraline board is either 13.5mm or 15mm thick.

(ii) The compartmentation committed too in the FSC is not as currently constructed onsite in terms of both the fire rating required and the follow on requirement for cavity barriers in the external wall cavity, which, also do not appear to have been installed.

There are numerous conflicting references in the FSC application documents with regards to the provision / requirement of compartmentation for this school. However there is a clear commitment that the construction of the first floor and the sub-dividing partitions at ground and first floor level will be constructed to achieve 60minutes compartment rating.

Page 6: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

15527R003 (Powerstown, Educate Together) FINAL DRAFT Department of Education 15527 Page 4 of 5 13/05/2016

Unfortunately by committing to the compartmentation, there is a requirement for cavity barriers in line of the floor and to the sub-dividing partitions within the external wall cavities and these do not appear to have been installed.

There is a reasonable case for the removal of the fire rating of the sub-dividing 60minute compartment rated partitions altogether or even a reduction in the fire rating between the rooms (cross corridor fire door and overhead fire rated partition still required as a minimum).

There is also a good case for removing the compartmentation status of the first floor to a fire resisting floor and this would remove the requirement for cavity barrier at the floor level around the perimeter.

Any alterations to the fire ratings to that already approved would have to be agreed with the Fire Authority and may require a revised FSCA for any reduction/removal of the designated compartmentation lines.

Even if the above agreement could be achieved with the Fire Authority, there is still a requirement in Table 3.2 (item 4) of Technical Guidance Document B for vertical cavity barriers in the cavity walls at junctions with other fire resisting wall e.g. walls to stairwells, to external plantroom/store and cross corridor sub-dividing partitions and at 20m centres.

(iii) Construction of compartment walls and floors to be constructed from non-combustible materials.

This commitment was given in the FSCA compliance report and appears to be extremely onerous as the relevant section of Technical Guidance Document B referenced does not require compartment floors or walls in a school of this size to be constructed from non-combustible materials. The floor and compartment walls comprise of timber construction (in-part) and clearly do not comply with this commitment. This should be addressed in a Revised Fire Safety Certificate Application.

(iv) The cross corridor fire doors and corridor section of corridor do not line up with the corresponding sub-dividing 60minute compartment partitions at either ground or first floor level. This is also connected with the issues in item (ii) above.

If as noted in item (ii) above agreement was reached with the Fire Authority for a reduced rating of the 60minutes compartment line to say 30minutes fire rating then this issue is resolved. If not then sections of the corridor partition where the doors are off-set require to be also upgraded to 60minutes.

(v) The partitions separating the external store/plant or the D.C.C. room from the adjacent rooms do not appear to have been constructed to achieve the 60minutes fire rating in the granted FSC design.

Single layer of approx. 12.5mm plasterboard on classroom and corridor sides of partitions. The lift shaft enclosure could not be checked due to lift car lining.

(vi) The reception area hatch at ground floor adjacent to Final Exit A is not fire rated and the fire detection activated fire shutter called up in the FSCA has not been installed.

(vii) Where soil/drainage pipes pass through the first floor level there is no evidence of fire collars or fire wraps present.

Firestopping of these penetrations required to protect the structure of the first floor.

(viii) Please refer to the site specific items in Appendix 1. You will note significant issues with;

service penetrations not being letter boxed out as they pass through the fire rated partitions,

Page 7: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

15527R003 (Powerstown, Educate Together) FINAL DRAFT Department of Education 15527 Page 5 of 5 13/05/2016

inappropriate or non-existing firestopping,

issues with non-taping or filling of joints in fire rated partitions, above suspended ceiling level,

small sections of plasterboard omitted from fire rated partitions and inappropriately firestopped,

incomplete/incorrect detail at head of fire rated plasterboard partitions to protect head stud,

issues with missing smoke seals and threshold gaps on fire doors,

issues with maintaining escape routes clear of combustible goods etc.

Page 8: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

15527R003 (Powerstown, Educate Together) FINAL DRAFT Department of Education 15527 Appendix A 13/05/2016

Appendix A

Photographic Survey

Page 9: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

Raymond Hamill Associate Fire Engineer

Michael Slattery Associates 19 Windsor Place

Lower Pembroke Street Dublin 2

Powerstown Educate Together Primary School Description Site surveys carried out 12th November 2015 and 19th & 20th January 2016 Address : Powerstown Road, Tyrellstown, Dublin 15 Generated on - 13/05/2016Stages - Powerstown Educate Together Primary School Building trades - Exit Signage - Fire Doorsets - Fire rated glass screens - Firestopping - General Issues - Intumescent Paint /Steel protection - Plasterboard Partitions StakeholdersDrawings - 08-055-FC-003_Tyrrelstown Floor Plans (Powerstown Educate Together Primary School)

Page 10: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

2

54

13

14

29

31

44

73 83

88

104

105106

4

6

9

11

12

15

16

17

20

25

32

454647

4950

51

55

6364

65

66

98

1

18

28

30

36

67

77

78

82

9096

100

2

3

19

21

22

23

24

33

35

37

38

40

41

43

48

5253

5657

68

69

70

74

75

76

80

81

84

87

89

91

92

93

9495

97

99

101

102

34

39

42

58

72

27

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

Page 11: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

3

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

1 ! Not attributed " No deadline # Not completed $ No final dischargeSmoke seals required to fire doors

2 ! Not attributed " No deadline # Not completed $ No final dischargeFirestopping required to service penetrations, Plasterboard partitions required joints to be taped and filled Pink foam removed and steel sections checked for full intumescent spray protection and plasterboard partitions should be properly framed out to maintain the fire rating to separate the accommodation from the escape route. Service penetrations require to be properly fire stopped.

3 ! Not attributed " No deadline # Not completed $ No final dischargeSame issues with Firestopping and plasterboard joints as other locations

Page 12: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

4

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

4 ! Not attributed " No deadline # Not completed $ No final dischargeServices not properly fire stopped. No letterbox detail in partition. Inside metal trunking requires fire stopping.

6 ! Not attributed " No deadline # Not completed $ No final dischargePink foam being used in lieu of intumescent paint on not visible sides of steel box frames and for fire stopping along the compartment line. Samples of foam removed from the school showed very questionable fire resistance properties of the foam (if any). Bracing box frame is not fire protected and provides a heat sink route into the main box section.

Page 13: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

5

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

9 ! Not attributed " No deadline # Not completed $ No final dischargeConstruction appears to be two layers of 12.5mm plasterboard either side of partitions over door what appears to be intumescent paint on the steel sections is applied very inconsistent and unevenly. No samples of the intumescent paint were taken for tests to access if it is an intumescent paint product. No DFT readings were recorded either, to check protection applied. Incorrect service penetration details in plasterboard partitions, Inappropriate Firestopping pink/red foam used Internal of electrical box metal trunking to be checked for Firestopping Joints in plasterboard partition require to be taped and filled

Page 14: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

6

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

11 ! Not attributed " No deadline # Not completed $ No final dischargePinkish and orange coloured foam used to all gaps and around services should be removed and firestopped with alternative firestopping systems with letterbox construction in partitions where required. Plasterboard ceiling is damaged and requires repair.

12 ! Not attributed " No deadline # Not completed $ No final dischargeFire stopping issues above the drip tray and potentially no Firestopping internally of the electrical box trunking (intumescent pillows)

Page 15: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

7

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

13 ! Not attributed " No deadline # Not completed $ No final dischargeFire load in stairwell to be removed

14 ! Not attributed " No deadline # Not completed $ No final dischargeOpenable window by actuator at half landing has a restrictor fitted. Refer also item 31.

15 ! Not attributed " No deadline # Not completed $ No final dischargeServices to be fire stopped properly and letterbox detail required to plasterboard partitions around service penetrations

Page 16: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

8

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

16 ! Not attributed " No deadline # Not completed $ No final dischargeBracing and purlin penetrations require proper fire stopping. Pinkish foam should be removed. Plasterboard scribbled in around the various penetrations and gaps sealed with a fire mastic.

Page 17: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

9

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

17 ! Not attributed " No deadline # Not completed $ No final dischargeVarious examples of incorrect and incomplete fire stopping above suspended ceiling in the store.

Page 18: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

10

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

18 ! Not attributed " No deadline # Not completed $ No final dischargeSmoke seals required. All fire doors to be checked for smoke seals

19 ! Not attributed " No deadline # Not completed $ No final dischargeIncorrect products and details for fire stopping to head of partition and to penetrations.

20 ! Not attributed " No deadline # Not completed $ No final dischargeSimilar fire stopping and partition issues as elsewhere.

Page 19: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

11

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

21 ! Not attributed " No deadline # Not completed $ No final dischargeSimilar fire stopping and partition issues as elsewhere.

22 ! Not attributed " No deadline # Not completed $ No final dischargeSimilar fire stopping and partition issues as elsewhere.

Page 20: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

12

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

23 ! Not attributed " No deadline # Not completed $ No final dischargePartition to classroom from stair side Purlin runs along top of partition tight to partition studs, therefore plasterboard does not run up past the purlins and in fact stops short of the purlins by 20-25mm Other sides No firestop around purlins, to service penetrations, Un protected steel box sections in partition

Page 21: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

13

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

24 ! Not attributed " No deadline # Not completed $ No final dischargeRoom side of partition to stairs Similar fire stopping and partition issues as elsewhere. Gap at head of partition requires fire stopping.

25 ! Not attributed " No deadline # Not completed $ No final dischargeOpposite side of partition to item 6 and similar issues

Page 22: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

14

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

27 ! Not attributed " No deadline # Not completed $ No final dischargeAccess hatch has no fire rating and fire alarm activated fire shutter called up in the FSCA has not been installed.

28 ! Not attributed " No deadline # Not completed $ No final dischargeNo smoke seals to fire doors

29 ! Not attributed " No deadline # Not completed $ No final dischargeFire load within stairs should be removed

Page 23: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

15

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

30 ! Not attributed " No deadline # Not completed $ No final dischargeNo smoke seals on fire doors

31 ! Not attributed " No deadline # Not completed $ No final dischargeThere is a commitment given in the compliance report as follows; " Both the 2no. protected stairway enclosures will be provided with an openable window at first floor level as in accordance with paragraph 5.4.3.2(i) of TGD Part B. Please note since this window is over a mid landing area which is not accessible the window will be linked to the fire alarm system which will open upon activation of the fire alarm and will be manually openable for fire service use". This commitment was not known about prior to our inspections, therefore the link and activation by the fire alarm to automatically opening the windows at the upper landing level should be checked on site for compliance with the fire safety strategy for this building.

Page 24: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

16

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

32 ! Not attributed " No deadline # Not completed $ No final dischargeFirestopping required to service penetrations between reception area and the escape route Also plasterboard partitions require tape and fill

33 ! Not attributed " No deadline # Not completed $ No final dischargePartition between lobby and reception area above suspended ceiling requires significant remedial works.

Page 25: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

17

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

34 ! Not attributed " No deadline # Not completed $ No final dischargeInside face of external wall is missing above the main entrance door shows the steel work not protected.

Page 26: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

18

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

35 ! Not attributed " No deadline # Not completed $ No final dischargeJoints and head not taped and filled on classroom side of partition Stair side most likely requires similar treatment

36 ! Not attributed " No deadline # Not completed $ No final dischargeCross corridor doors off set towards SER 3 by around 500mm Vision panel on door is partially obstructed and creates a potential health and safety issue. There is a commitment in the revised submission to the Fire Authority dated 7th April 2015 that the cross corridor doors at both ground and first floor level are upgraded to 60minute self closing fire doors.

Page 27: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

19

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

37 ! Not attributed " No deadline # Not completed $ No final dischargeTwo layers of 12.5mm either side of partition

38 ! Not attributed " No deadline # Not completed $ No final dischargeTwo layers of 12.5mm plasterboard recorded on either side of partition 39 ! Not attributed " No deadline # Not completed $ No final dischargeOnly exposed steel appears to have intumescent paint and bracing has no protection applied

Page 28: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

20

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

40 ! Not attributed " No deadline # Not completed $ No final dischargeRecorded. Single layer plaster board to return sections of corridor T-junction between fire rated and I fire rated partitions are not closed off Return section does not achieve 60minutes fire resistance. FSC application has been reviewed and 60minutes fire rating was committed to in the FSC application.

41 ! Not attributed " No deadline # Not completed $ No final dischargeSingle layer of 12.5mm plasterboard on SER side of partition shared with the ESB room and thus unlikely that this partition achieves the 60minutes fire rating called up on the drawing. Refer also item 43. 42 ! Not attributed " No deadline # Not completed $ No final dischargeRecorded. Single layer of 12.5mm plasterboard (not sufficient to provide 60minutes fire rating to the structural steel sections) Plastic 120mm timber stud with quilt insulation between 35mm aero board with counter battens Outside panel Steel box sections are not fire rated. No vertical cavity barriers noted at junction.

43 ! Not attributed " No deadline # Not completed $ No final dischargeSingle 12.5mm plasterboard on principals office side of partition, therefore this partition does not appear to provide the 60minutes fire separation as declared on this drawing. The fire safety certificate application report and any supplementary submission should be checked to see if a reduced fire rating was proposed or agreed.

Page 29: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

21

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

44 ! Not attributed " No deadline # Not completed $ No final dischargeSER room 4 used as store but room is not constructed as a store e.g. Partitions should achieve 30minutes fire rating and door should achieve a FD30s rating

45 ! Not attributed " No deadline # Not completed $ No final dischargeSoil waste pipes appear to be cleanly cored through the plasterboard. No fire collar fitted And no fire wrap visible

46 ! Not attributed " No deadline # Not completed $ No final dischargeSimilar to item 45, 47 ! Not attributed " No deadline # Not completed $ No final dischargeNo fire collars fitted and extensive damage to ceiling at service penetrations reduce the protection to the first floor level structure which is declared to be 60 minutes fire rated

Page 30: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

22

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

48 ! Not attributed " No deadline # Not completed $ No final dischargeHole drilled in ceiling to confirm 2h Layers of 12.5mm plasterboard

49 ! Not attributed " No deadline # Not completed $ No final dischargeLarge section of plasterboard partition requires repair and appropriate fire stopping above door Joints require tape and filling

Page 31: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

23

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

50 ! Not attributed " No deadline # Not completed $ No final dischargeFirst two photos show partition between stair and classroom Third photo shows holes in plasterboard to outside walls and exposes stairwell to the external cavity which does not appear to have vertical cavity barriers.

Page 32: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

24

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

51 ! Not attributed " No deadline # Not completed $ No final dischargeUnprotected and partially protected steel Plasterboard joints not taped and filled Firestopping problems Damage to ceiling to be repaired

Page 33: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

25

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

52 ! Not attributed " No deadline # Not completed $ No final dischargeJoints not taped and filled

53 ! Not attributed " No deadline # Not completed $ No final dischargeAll the plasterboard partitions above the ceiling in the cleans store require joints to be taped and filled

54 ! Not attributed " No deadline # Not completed $ No final dischargeFlags in the corridor obstruct vision of the exit signage

Page 34: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

26

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

55 ! Not attributed " No deadline # Not completed $ No final dischargeToilet wastes and soil vent pipes do not have any fire collars fitted and other Firestopping issues noted with fire protection of the first floor level construction

Page 35: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

27

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

56 ! Not attributed " No deadline # Not completed $ No final dischargePlasterboard walls on plant room sides are all two layers of 12.5mm plasterboard (recorded).

57 ! Not attributed " No deadline # Not completed $ No final dischargePlasterboard partition shared with SER 1 stops at base of box steel. Plywood backing and timber head piece exposed

Page 36: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

28

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

58 ! Not attributed " No deadline # Not completed $ No final dischargeSteel box sections in external store are not fire protected Box steel sections in wall partially painted. Clarification of intumescent paint being used and adequate DFT cannot be verified at this stage. Paint is very light in the gap between the steels Connecting box bracing section is not fire rated

63 ! Not attributed " No deadline # Not completed $ No final dischargeRecorded. 12.5mm plasterboard Plastic 120mm timber studs with quilt insulation Counter battens with aero board 3mm foil back insulation External panel No evidence of firestop at floor level recorded.

Page 37: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

29

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

64 ! Not attributed " No deadline # Not completed $ No final dischargeNo evidence of horizontal fire stop at floor level Or vertical cavity barrier

65 ! Not attributed " No deadline # Not completed $ No final dischargeNo evidence of vertical cavity barrier

66 ! Not attributed " No deadline # Not completed $ No final dischargeFirestopping required to protect the first floor level construction

Page 38: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

30

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

67 ! Not attributed " No deadline # Not completed $ No final dischargeThere are missing smoke seals and intumescent strips to the door surround. It is noted that the revised information submitted 7th April 2015, included a commitment for this door to the DCC room to be upgraded to a 60minute self closing fire door (FD60s) This commitment was not known about during our inspection. There were no photographic records taken during the inspection of any visible I'd tags on the and the fire rating cannot be confirmed/assumed. Other than the photographs do not appear to indicate that the door on site is thick enough to achieve this required fire rating. Therefore an entirely new FD60s doorset is required to the DCC room.

68 ! Not attributed " No deadline # Not completed $ No final dischargeFirestopping issues around internal side of DCC room above suspended ceiling level. Including some gaps to plasterboard, bored hole and inappropriate Firestopping to service penetrations Noted, two layers of 12.5mm plasterboard to inside side of partitions

Page 39: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

31

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

69 ! Not attributed " No deadline # Not completed $ No final dischargeCorridor side of partition to DCC room Single layer of 12.5mm plasterboard recorded Similar issues with fire rating as no 41 & 43 Repairs required to partition as it currently stands Firestopping required Joints require to be taped and filled

70 ! Not attributed " No deadline # Not completed $ No final dischargeUnprotected or partially protected structural steel. Firestopping and plasterboard issues as per other locations

Page 40: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

32

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

72 ! Not attributed " No deadline # Not completed $ No final dischargeUnprotected and partially unprotected steel recorded

73 ! Not attributed " No deadline # Not completed $ No final dischargeStairs not to be used for storage

74 ! Not attributed " No deadline # Not completed $ No final dischargePlasterboard is not carried past steels

Page 41: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

33

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

75 ! Not attributed " No deadline # Not completed $ No final dischargeAbove doors to stairs from corridor

76 ! Not attributed " No deadline # Not completed $ No final dischargeVarious examples of inaccurate or incomplete partition construction/fire stopping to stairwell partition.

Page 42: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

34

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

77 ! Not attributed " No deadline # Not completed $ No final dischargeGaps on door to be checked and also smoke seals

78 ! Not attributed " No deadline # Not completed $ No final dischargeCross corridor door is off set from sub dividing partitions in adjacent rooms. Similar issue also as per item 40 with regards to partitions. There is a commitment in the revised submission to the Fire Authority dated 7th April 2015 that the cross corridor doors at both ground and first floor level are upgraded to 60minute self closing fire doors.

80 ! Not attributed " No deadline # Not completed $ No final dischargeBack of stairs from classroom side

Page 43: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

35

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

81 ! Not attributed " No deadline # Not completed $ No final discharge

Page 44: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

36

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

82 ! Not attributed " No deadline # Not completed $ No final dischargePhoto of door to new room at head of stairs

83 ! Not attributed " No deadline # Not completed $ No final dischargeNew room/lobby outside SER 1 is included in the Revised floor plan drawing 08-055-FC-003, Revision A. This room should not contain any combustible items as it is declared as a protected lobby between a storeroom (identified on this drawing as S.E.R. 1) and the stairs. 84 ! Not attributed " No deadline # Not completed $ No final dischargeRecorded. Two layers of 12.5mm plasterboard either side of compartment wall

Page 45: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

37

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

87 ! Not attributed " No deadline # Not completed $ No final dischargeVarious examples of inaccurate or incomplete partition construction/fire stopping.

88 ! Not attributed " No deadline # Not completed $ No final dischargeRoom recorded for reference only.

Page 46: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

38

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

89 ! Not attributed " No deadline # Not completed $ No final discharge

90 ! Not attributed " No deadline # Not completed $ No final dischargeFire door keep shut sign on door No smoke seals Not sure why this door is indicated as a fire door.

Page 47: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

39

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

91 ! Not attributed " No deadline # Not completed $ No final discharge

Page 48: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

40

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

92 ! Not attributed " No deadline # Not completed $ No final discharge

93 ! Not attributed " No deadline # Not completed $ No final discharge

Page 49: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

41

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

94 ! Not attributed " No deadline # Not completed $ No final discharge

95 ! Not attributed " No deadline # Not completed $ No final discharge

96 ! Not attributed " No deadline # Not completed $ No final dischargeThreshold gap 15mm, should be a maximum of 8mm

Page 50: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

42

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

97 ! Not attributed " No deadline # Not completed $ No final discharge

98 ! Not attributed " No deadline # Not completed $ No final dischargePartition above new door to stairs

99 ! Not attributed " No deadline # Not completed $ No final dischargeFirestopping and partition incorrect details on partition to stairs

100 ! Not attributed " No deadline # Not completed $ No final dischargeFire door certification for both levels of lift to be checked to achieve the fire rating shown

Page 51: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

43

Drawing: 08-055-FC-003_Tyrrelstown Floor Plans - Stage: Powerstown Educate Together Primary School

101 ! Not attributed " No deadline # Not completed $ No final dischargeIt is unlikely that the t-junctions between fire rated and non-fire rated partitions have been constructed as per system details. Steel box sections do not permit the timber studs to be located in the correct position. 102 ! Not attributed " No deadline # Not completed $ No final dischargeTwo layers of 12.5mm plasterboard recorded on both sides of partition. No action required. Photos accidentally deleted. 104 ! Not attributed " No deadline # Not completed $ No final dischargeThis room in the revised information to the Fire Authority dated 7th April 2015, declared this room as a store room. However, this room is possible currently used as a S.E.R. Room instead. 105 ! Not attributed " No deadline # Not completed $ No final dischargeThere is a commitment in the revised information submitted to the Fire Authority dated 7th April 2008, that the final exits A& B are to achieve 2100mm clear width. These final exit clear widths must to checked again for compliance as we were not aware of this committed prior to our inspection. 106 ! Not attributed " No deadline # Not completed $ No final dischargeRefer item 105.

Page 52: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the

15527R003 (Powerstown, Educate Together) FINAL DRAFT Department of Education 15527 Appendix B 13/05/2016

Appendix B

Floor Plan Drawing

08-055-FC-003,Revision A

for Granted FSC

Reg. Ref No. 08/4049

Page 53: Department of Education Powerstown, Educate Together€¦ · (Fire) of the Building Regulations, were Technical Guidance Document B (Fire Safety) published by the Minister for the