Page 1 of 2 Project No. 41859-C,P,E
DESIGN AND CONSTRUCTION GROUP
THE GOVERNOR NELSON A. ROCKEFELLER
EMPIRE STATE PLAZA
ALBANY, NY 12242
ADDENDUM NO. 3 TO PROJECT NO. 41859
CONSTRUCTION WORK, PLUMBING WORK AND ELECTRICAL WORK
REPLACE WATER TOWER & WATER SOFTENING SYSTEM
EASTERN CORRECTIONAL FACILITY
30 INSTITUTION ROAD
PO BOX 338
NAPANOCH, NY 12458
December 5, 2017
NOTE:This Addendum forms a part of the Contract Documents. Insert it in the Project Manual.
Acknowledge receipt of this Addendum in the space provided on the Bid Form.
SPECIFICATIONS – CONSTRUCTION WORK
1. SECTION 087100 FINISH HARDWARE, Paragraph 2.05A Delete Items Nos. 3 through 6 and
add:
“10. Furnish uncombinated cores/cylinders for keying by Best Access Solutions, Code 330
Keyway K BE1C7K1-626.
11. Furnish sufficient drivers, core springs (1 bag of 22S), pins (1 bag each of A-0 thru A-5.
B-2 thru B-19) and caps (1/bag of 21C) for pinning by the Facility.
12. Furnish 50 blank Best keys.”
2. SECTION 331216 WATER UTILITY DISTRIBUTION VALVES, Part 2, Add paragraph:
“2.08 LINE STOPPING
A. Line stopping may be done by equipment manufactured by “Hydra-Stop”
Inc., or “IPSCO” International Piping Services Co.”
SPECIFICATIONS – PLUMBING WORK
3. SECTION 409213 ELECTRICALLY OPERATED PRIMARY CONTROL VALVES: Discard
the section bound in the Project Manual and substitute the attached Section (409213-1 through
409213-3) noted “Revised: 11/30/2017.”
4. SECTION 331210 WATER SYSTEM CONTROL, Delete entire section.
DRAWINGS
5. Drawing Nos. E-102, E-104, E-105, & E-106 Noted “Revised Drawing 11/30/2017” accompany
this Addendum and supersede the same numbered originally issued drawings.
Page 2 of 2 Project No. 41859-C,P,E
6. Drawing C-105, Detail No. 5, Note No. 1, Change note to read: “PROVIDE CONCRETE
BLOCKING TO ALL PIPELINES 4” DIAMETER AND LARGER AT HYDRANTS, TEES,
PLUGS, CAPS AND BENDS. BLOCKING SHALL BE COMPOSED OF CONCRETE
HAVING A COMPRESSIVE STRENGTH OF NOT LESS THAN 3,000 PSI AND SLUMP OF
2”-4”. PLACE BLOCKING BETWEEN SOLID GROUND AND FITTING TO BE
ANCHORED. ENSURE THAT ALL ANCHORED FITTINGS AND JOINTS REMAIN
ACCESSIBLE.”
END OF ADDENDUM
Margaret F. Larkin
Executive Director
Design and Construction
Updated 06/20/2011
Printed 11/29/2017 409213- 1 Project No. 41859-P
SECTION 409213
ELECTRICALLY OPERATED PRIMARY CONTROL VALVES
Revised: 11/30/2017
PART 1 GENERAL
1.01 RELATED WORK SPECIFIED ELSEWHERE
A. Potable Water Process Piping: Section 402323
B. Water Softener System: Section 466316
1.02 REFERENCES
A. AWWA C530 – Pilot Operated Control Valves
1.03 SUBMITTALS
A. Submit product data under provisions of Section 013300.
B. Product Data: Provide data on materials and accessories.
C. Manufacturer's Certificate: Certify that products meet or exceed specified
requirements.
1.04 QUALITY ASSURANCE
A. Valves: Manufacturer's name and pressure rating marked on valve body.
1.05 DELIVERY, STORAGE AND HANDLING
A. Deliver, store, protect and handle products to site under provisions of Section
016500.
B. Deliver and store valves in shipping containers with labeling in place.
PART 2 PRODUCTS
2.01 FLOW CONTROL VALVES
A. 131 Series, as Manufactured by CLA-VAL. Model 131G-
01ABCDNPSKCHxHHFC, 150F, DS, CS2-SS 120vac, X105LCW
Updated 06/20/2011
Printed 11/29/2017 409213- 2 Project No. 41859-P
1. Valve body and cover: epoxy-coated ductile iron, flanged ends, 250 PSI.
2. Disc retainer and diaphragm washer: cast iron.
3. Stainless steel valve trim: removable cover bearing of the main valve, the
disc guide, and the main valve seat
4. Disc: Buna-N Rubber
5. Diaphragm: Nylon reinforced Buna-N Rubber
6. Stem, nut and spring: Stainless steel
7. Electronic controller: VC22-D Series powered by 115 volt single phase
power supply from the main control panel on the skid. This device shall have
a 115/60, 10 amp output for each of the command solenoids. It shall be
configured to receive a 4-20 mA command signal and a 4-20 mA feedback
signal. Contractor will be responsible to make connections to these terminal
strip contacts. The VC22-D will initiate appropriate valve modulation based
upon deviation. The controller shall be provided with terminal strips clearly
marked for connection of power supply, command and feedback analog
signals.
8. Additional features: flow clean strainer, pilot isolation valves, flow control
(closing), check valve with isolation valve, CV flow control (opening),
internal check feature.
9. Provide two (2) solenoid valves on the valve pilot system to be controlled by
the electronic controller. Each solenoid will have a by-pass valve to allow for
manual override.
10. All pilot tubing and fittings shall be stainless steel.
11. The valve inlet and outlet will have installed 4 ½” oil filled gauges, with
gauge pressure readings of 0-160 PSI.
PART 3 EXECUTION
3.01 INSTALLATION
A. All valves and valve accessories shall be installed by workers thoroughly experienced
in such work and all valve work shall be properly supported and aligned and present
a neat and workmanlike appearance. All other required temporary or permanent
supports for the valves shall be included in this contract to the approval of the
Engineer.
3.02 INSTALLATION OF VALVES AND ACCESSORIES
A. Inspection - All valves and accessories are subject to inspection by the Engineer at
the point of delivery for manufacturer, direction of opening, freedom of operation,
Updated 06/20/2011
Printed 11/29/2017 409213- 3 Project No. 41859-P
tightness of pressure-containing bolt, cleanliness of valve ports and especially seating
surfaces, handling damage, cracks and any other damage.
B. Valves found to be either defective or damaged shall be rejected and immediately
removed from the job site.
C. Handling - All valves and boxes shall be loaded and unloaded by lifting with hoists
or skidding under control with ropes in order to avoid shock or damage. Under no
circumstances shall valves and boxes be dropped.
D. Storage - Valves, joint accessories and valve boxes, if stored, shall be kept safe from
damage. The interior of the valve and the joint accessories shall be kept free from
dirt or foreign matter at all times.
E. Installation - All valves shall be set in a plumb position.
F. Perform operating tests on valves as per the manufacturer’s recommendations to
determine they are in satisfactory operating condition.
G. The electronic valve controller shall control the solenoids on the combination
electronic flow limiting valve based on the 4-20mA flow command set-points and a
4-20 mA feedback signal from the PLC provided with the water softener skid. It
shall receive a flow set-point for the purposes of blending raw water and treated
water. The valve shall maintain a remote (flow) set point, based on the flow
generated by the blend meter from the PLC. In the event of a power failure, the valve
shall remain in its last position.
H. Electronic controller shall be installed and wired to the valve solenoids and the main
control panel by the Contractor.
I. An authorized factory agent with not less than ten years of experience with these
components shall be available for ½ day (4 hours on site) to perform the valve start-
up services. The agent shall program and calibrate the electronic controller which
shall receive a remote 4-20mA set point (desired flow) as an input to the electronic
controller. This same agent shall be available for a second, ½ day (4 hours on site)
start-up service call if required to verify field wiring of the valve to the PLC/main
control panel.
END OF SECTION
X
X
X
X
X
XX
XX
X
X
X
X
X
E
E
E
E
E
E
E
E
E
E
E
W
Partial Electrical Site Plan1 SCALE: 1" = 30'
MATCH LINE SEE SHEET E-101A A
PARTIAL ELECTRICALSITE PLAN
E-102
1.5 MG GLASS-FUSED TO STEEL ELEVATED WATER STORAGE TANK (N.I.C.)
GRADING & CONTRACT LIMIT LINE
3 - 4/0 AWG. IN 2 1/2" E.C. (SEE NOTE #1)
NOTES:1. CONTRACTOR SHALL STUB NEW FEEDERS INTO SECONDARY COMPARTMENT
OF TRANSFORMER TR4. TERMINATE NEW FEEDERS TO AVAILABLE BUSS WITHINTRANSFORMER. PROVIDE NEW TERMINATION LUGS AS REQUIRED.
SEE NOTE 1
2. PROVIDE TRENCHING, CONDUIT, CONDUCTORS, TAP CONNECTION FROM TR-4TO NEW TANK PP-1. BACKFILL AND RESTORE DISTURBED AREAS.
Melville, NY • White Plains, NY • New City, NY • Albany, NY • Parsippany, NJ • Howell, NJ
architects+
engineers
REVISED DRAWING11/30/2017
GROUNDROD, TYP.FOR 2
MANHOLECOVER LIP
#4/0 GROUNDLOOP. SUPPORTAND FASTEN TOMANHOLE WALL
NON-METALLICCABLE RACK,TYP., NOTE 1
NOTES:1. NUMBER OF CABLE RACKS SHOWN IS FOR REFERENCE
ONLY. ACTUAL NUMBER OF RACKS MAY VARY PERMANHOLE. CONTRACTOR SHALL PROVIDED A MINIMUMOF 4 CABLE RACKS.
CONDUITPENETRATION
3E-102
NON-METALLICCABLE ARM, TYP.,NOTE 1
NOTES:1. NUMBER OF CABLE RACK ARMS SHOWN IS FOR
REFERENCE ONLY. ACTUAL NUMBER OF RACK ARMSMAY VARY PER MANHOLE. CONTRACTOR SHALLPROVIDED A MINIMUM OF 4 CABLE RACKS.
FINISHED GRADE
H-20 RATED DOUBLECOVER AND FRAME
NON-METALLICSTANCHION
GROUNDROD, TYP.
SCALE:Electrical Pullbox - Plan View2 N.T.S.
SCALE:Electrical Pullbox - Section View3 N.T.S.
ADJUST TO GRADE WITHBRICK AND MORTAR -WATERPROOF SIDESAND TOP
LIFTING LUGS,TYP.
34" LAYER OF MORTAR.SLOPE FLOOR TO DRAIN
STAINLESSSTEELMOUNTINGHARDWARE,TYP.
6" SDR-30 PIPE, 30" LONG,FILLED WITH SELECTGRANULAR MATERIAL
#3 @ 6" EACHWAY, TYP.
4-1/2"
30"
30" SQUARE
6"
NOTES:CONTRACTOR SHALL EXTEND AND RETERMINATE EXISTING POWERAND CONTROL CONDUIT AND WIRING TO SKID MOUNTED MAINCONTROL PANEL AND AIR COMPRESSOR VIA JUNCTION BOX.
WATER SOFTENER SYSTEM MAIN CONTROLPANEL (WSCP, NOTE 1)
2 #12 AWG + #12 AWG GND IN 3/4" E.C.
TO "WSCP"
EXISTING POWER PANEL PP-25 (NOTES 2,3)
PANEL PP-25S (NOTE 3)
4 #8 AWG + #10 AWGGND IN 1" E.C.
CONTRACTOR SHALL REMOVE EXISTING PLUG END AND REPLACE WITHPLUG END TO MATCH TWIST-LOCK RECEPTACLE.
JUNCTION BOX, SEE NOTE 1
MANUFACTURER RECOMMENDEDCABLE IN 3/4" E.C.
1.
2.
3.
CONTRACTOR SHALL PROVIDE 50A/3P CIRCUIT BREAKER INEXISTING PANEL PP-25.
CONTRACTOR SHALL RELOCATE (1) 20A/1P CIRCUIT BREAKERTO PANEL PP-25S TO ALLOW FOR INSTALLATION OF 50A/3PCIRCUIT BREAKER.
4.
4"Ø TURBO FLOW METER(N.I.C.)
AIR COMPRESSOR FORPNEUMATIC SYSTEM PROVIDEDBY MANUFACTURER ON SKID(N.I.C.), SEE NOTE 4
EXISTING PLANT CONTROL PANEL (NOTE 1)
2 SETS OF 2#12 AWG + #12 AWG GND IN (2) 3/4" E.C. (CONTROL PANELAND GENERAL POWER) + 2 SETS OF 2#10 AWG + #10 AWG GND IN (2)3/4" E.C. (REGEN PUMP NO. 1 AND REGEN PUMP NO. 2)
J
120 3W
20A TL
SHIELDED TWISTED PAIR IN 1/2" PVC CONDUIT(TEMPORARY TANK LEVEL SIGNAL)
TO EXISTING ELEVATED TANK LEVEL TRANSMITTER
DESIGN & CONSTRUCTION
FOR A LANDSCAPE ARCHITECT, IS A VIOLATION OF THENEW YORK STATE EDUCATION LAW AND/OR REGULATIONS
ENGINEER FOR AN ENGINEER OR LANDSCAPE ARCHITECT
UNLESS DONE UNDER THE DIRECTION OF A COMPARABLE
AND IS A CLASS 'A' MISDEMEANOR.
PROFESSIONAL, I.E. ARCHITECT FOR AN ARCHITECT,
THE ALTERATION OF THIS MATERIAL IN ANY WAY,
WARNING:
CONTRACT:
TITLE:
LOCATION:
SHEET TITLE:
DESIGNED BY:
PROJECT
DRAWN BY:
DRAWING NUMBER:
FIELD CHECK:
APPROVED:
SHEET OF
CONSULTANT
NUMBER:
Melville, NY • White Plains, NY • New City, NY • Albany, NY • Parsippany, NJ • Howell, NJ
architects+
engineers
CLIENT:
41859-E
ELECTRICAL
1 10/19/2017 BID DOCUMENT3 11/30/2017 ADDENDUM NO. 3
REVISED DRAWING11/30/2017
C:\U
sers
\am
anfre
di\D
eskt
op\R
evit
Loca
ls\O
GS
T120
2_C
entra
l15_
P_a
man
fredi
BR
6CB
.rvt
11/3
0/20
17 3
:28:
51 P
M
DEPARTMENT OF CORRECTIONS ANDCOMMUNITY SUPERVISION
FCC
AMT
REPLACE WATER TOWER ANDWATER SOFTENING SYSTEM
EASTERNCORRECTIONAL FACILITYNAPANOCH, NEW YORK
PARTIAL FIRST FLOORELECTRICAL PLAN AND
PANEL SCHEDULE
E-104
27 29
SCALE: 3/8" = 1'-0"1 Partial First Floor Electrical Plan
TC - Time Clock Control(All Phases to be balanced to within 7% Actual Load Totals) SF - Subfeed
HACR - Heating, A/C & RefrigerationGFCI - Ground Fault Circuit InterrupterPA - Handle Padlock AttchmentAUX - Auxillary Contacts
Total: 0.0 kVA 0.0 A ST - Shunt Trip TypeC 0.0 kVA LO - Handle Lock-off Device
B 0.0 kVA AS - Powerlink AS BreakerConnected Totals: A 0.0 kVA Breaker Option
SPARE -- 20 A 1 PP-25S-17 0 VA 0 VA PP-25S-18 1 20 A -- SPARESPARE -- 20 A 1 PP-25S-15 0 VA 0 VA PP-25S-16 1 20 A -- SPARE
SPARE -- 20 A 1 PP-25S-13 0 VA 0 VA PP-25S-14 1 20 A -- SPARE
SPARE -- 20 A 1 PP-25S-11 0 VA 0 VA PP-25S-12 1 20 A -- SPARESPARE -- 20 A 1 PP-25S-9 0 VA 0 VA PP-25S-10 1 20 A -- SPARESPARE -- 20 A 1 PP-25S-7 0 VA 0 VA PP-25S-8 1 20 A -- SPARE
REGEN PUMP NO. 2 -- 30 A 1 PP-25S-5 0 VA 0 VA PP-25S-6 1 20 A -- SPARETEMP WTR SOFT GEN PWR -- 20 A 1 PP-25S-3 0 VA 0 VA PP-25S-4 1 30 A -- REGEN PUMP NO. 1
RELOCATED PP-25 CKT -- 20 A 1 PP-25S-1 0 VA 0 VA PP-25S-2 1 20 A -- TEMP WATER SOFT CP
Load Description BreakerOption Trip Poles Circ No. A B C A B C Circ No. Poles Trip Breaker
Option Load Description
NEMA Type Enclosure Type 1
Panel Type: Mounting: Surface Options: Notes:
Manufacturer: SIEMENS Mains: 50A MCB Mains Rating: 125 A
Panelboard: PP-25S Voltage: 120/208V Phase: 3 Wire 4 A.I.C. Rating: 22,000
Name
Panel ScheduleSCALE: NO SCALE2
MARK DATE DESCRIPTION
LT
1E-105
PP1-1PP1-2
WP PP1-3
WP
POWER PANEL PP1
3 4/0 AWG IN 2-1/2" E.C.
BEACON LIGHTMAINTENANCE SWITCH
A
B
12"Ø INLET/OUTLET PIPE
OVERFLOW PIPE
GFCIWP
PP1-3
PP1-9
TANK MIXER CONTROLPANEL (TMCP)
HEAT TRACE CABLE CONTROLLER(N.I.C.) (SEE NOTE 11)
TANK LEVEL TRANSMITTER(N.I.C.) (SEE NOTE 11)
RELOCATED RTU PANEL
PP1-7
PP1-4SHIELDED TWITSTED PAIRIN 3/4" E.C.
PP1-6
12"Ø FLANGED C.L.D.I. TANKINLET PIPE
F1AC
F1AC EUH-1
.
PP1-12,14
.
PP1-8,10
EUH-2
PP1-5
TO RTUPANEL
2 #10 AWG + #10 AWGGND IN 3/4" E.C.
2 #10 AWG + #10 AWGGND IN 3/4" E.C.
.WP
PP1-3
PP1-3
.
TO RTU PANEL
4 #12 AWG IN 3/4" E.C.
RELOCATED OMNI ANTENNA
K
PCC .
P1-9
F2
BEACON LIGHT MOUNTED TOEXTENDED POST (C-CONTRACT)ON HANDRAIL
PP1-5 VIA PHOTOCELL ANDMAINTENANCE SWITCH
B
F1B
F1B
B
GCFI WP
PC
MOUNT PHOTOCELL10'-0" A.F.G.
MOUNT 7'-0"ABOVE PLATFORM
HEAT TRACE CONTROLPANEL (BY CONTRACT 'C')
MOUNTRECEPTACLE 18"ABOVE PLATFORM
F1AA
F1BB
F1BB
F1BB
F1BB
F1BB
MIXING SYSTEMMANUFACTURER'SCABLE
ACTIVE MIXINGSYSTEM
NEMA 4X STAINLESSSTEEL JUNCTION BOX(TANK EXTERIOR)
2#8 AWG + #8 AWGGND IN 1" E.C. FROMTANK MIXERCONTROL PANEL(TMCP)
F1AA
10" LONG GALVANIZED INTERIORCONDUIT CHANNEL SUPPORTBRACKETS AT 10' O.C. PROVIDECHANNEL HARDWARE TOCONTRACT-C TO MOUNTCONDUITS AND FIXTURES, TYP.
10" LONG GALVANIZEDEXTERIOR CONDUITCHANNEL SUPPORTBRACKETS AT 10' O.C.PROVIDE CHANNELHARDWARE TOCONTRACT-C TOMOUNT CONDUITS ANDFIXTURES, TYP.
NOTE:1. ALL MOUNTING APPURTENANCES TO BE
ATTACHED TO THE TANK, BUT ARE NOTPROVIDED WITH THE NEW ELEVATEDSTORAGE TANK ARE TO BE COORDINATEDWITH THE C-CONTRACT FOR INSTALLATION.
TYP. OF 8, EVENLY SPACED
C
DESIGN & CONSTRUCTION
FOR A LANDSCAPE ARCHITECT, IS A VIOLATION OF THENEW YORK STATE EDUCATION LAW AND/OR REGULATIONS
ENGINEER FOR AN ENGINEER OR LANDSCAPE ARCHITECT
UNLESS DONE UNDER THE DIRECTION OF A COMPARABLE
AND IS A CLASS 'A' MISDEMEANOR.
PROFESSIONAL, I.E. ARCHITECT FOR AN ARCHITECT,
THE ALTERATION OF THIS MATERIAL IN ANY WAY,
WARNING:
CONTRACT:
TITLE:
LOCATION:
SHEET TITLE:
DESIGNED BY:
PROJECT
DRAWN BY:
DRAWING NUMBER:
FIELD CHECK:
APPROVED:
SHEET OF
CONSULTANT
NUMBER:
Melville, NY • White Plains, NY • New City, NY • Albany, NY • Parsippany, NJ • Howell, NJ
architects+
engineers
CLIENT:
41859-E
ELECTRICAL
1 10/19/2017 BID DOCUMENT3 11/30/2017 ADDENDUM NO. 3
REVISED DRAWING11/30/2017
C:\U
sers
\am
anfre
di\D
eskt
op\R
evit
Loca
ls\O
GS
T120
2_C
entra
l15_
P_a
man
fredi
BR
6CB
.rvt
11/3
0/20
17 3
:28:
57 P
M
DEPARTMENT OF CORRECTIONS ANDCOMMUNITY SUPERVISION
FCC
AMT
REPLACE WATER TOWER ANDWATER SOFTENING SYSTEM
EASTERNCORRECTIONAL FACILITYNAPANOCH, NEW YORK
ELECTRICAL TANKPLANS
E-105
28 29
SCALE: 1/8" = 1'-0"2 Electrical Tank Plan
SCALE: 1" = 10'-0"1 Electrical Tank Elevation
NOTES:1. PROVIDE GALVANIZED CHANNEL SUPPORTS AS REQUIRED TO
SECURELY MOUNT TANK MIXER CONTROL PANEL, RTU ANDPP1 AND TANK GENERAL RECEPTACLE. ALL MOUNTINGHARDWARE AND ACCESSORIES SHALL BE STAINLESS STEEL.
2. PROVIDE ALL REQUIRED WIRING NECESSARY BETWEENSWITCHES FOR COMPLETE LIGHTING CONTROL. WIRE SIZESHALL EQUAL POWER FEED SIZE.FIXTURE INDICATED WITH CIRCUIT DESIGNATIONS SHALLBE CONNECTED TO LINE SIDE OF CIRCUIT.
3.
4. FIXTURE INDICATED WITH LETTER DESIGNATIONS SHALL BECONNECTED TO THE SWITCH WITH CORRESPONDING LETTERDESIGNATION.
5.
PROVIDE BOX AND ACCESSORIES AS PER MANUFACTURERSRECOMMENDATION FOR ALL SWITCHES OCCUPANCYSENSORS AND/OR POWER PACKS.
CONTRACTOR SHALL PROVIDE AN UNSWITCHED POWERFEED TO ALL EMERGENCY LIGHTS AND FIXTURES PROVIDEDWITH EMERGENCY BATTERY BACK UP LIGHTING TO THECIRCUIT AS SHOWN.
7.
CONTRACTOR SHALL PROVIDE 12" OF FLEXIBLE LIQUID-TIGHTCONDUIT FOR ALL RIGID GALVANIZED-STEEL CONDUIT RUNSEXCEEDING 30'-0" AND FOR ALL CONNECTIONS TO ALLDEVICES (NOT LIMITED TO LOCATIONS SHOWN ON DRAWINGS)TO ALLOW FOR NORMAL TANK DEFLECTION.
8.
CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ALLREQUIRED MOUNTING BRACKETS FOR LIGHTING, SWITCHES,RECEPTACLES, AND ASSOCIATED CONDUIT AND WIRING.
9.
6.
PROVIDE AND INSTALL A DEDICATED NEUTRAL FOR EACHCIRCUIT. CONTRACTORS NOT PERMITTED TO USE COMMONNEUTRALS.
CONTRACTOR SHALL PROVIDE A 100W STRIP HEATER(CALORITECH FS SERIES STRIP HEATER OR APPROVEDEQUAL) AND A THERMOSTAT INSIDE THE RTU ENCLOSURE.CONTRACTOR SHALL PROVIDE A 20A/1P CIRCUIT FOR THESTRIP HEATER.
10.
PP1-3
1E-106
COORDINATE WITH CONTRACT 'C' AS REQUIRED FOR FINALTERMINATIONS.
11.
LIGHTING FIXTURE SCHEDULETYPE MFG. MODEL NO. LAMPS VOLTAGE MOUNTING REMARKS MOUNTING HEIGHT
NO. PER FIXTURE TYPE WATTS
F1A
F1B
F2
LUMARK
LUMARK
DIALIGHT
LDWP-GL-6B-MT-EMLED-CD
LDWP-GL-6B-MT
CWLFR/120-240
1
1
1
LED
LED
LED
46
46
51
UNV
UNV
120
SURFACE
SURFACE
SURFACE
W/ EMERGENCY BATTER PACK
W/ INTEGRAL PUSHBUTTONPHOTOCELL AND EMERGENCY
BATTERY PACK
12' A.F.F., U.O.N.
REFER TO PLANS FORMOUNTING HEIGHT, U.O.N.
----
CONTRACTOR SHALL PROVIDE ALL NEW MOUNTINGHARDWARE TO SECURELY MOUNT RELOCATED RTU PANEL.
12.
N
PC INTERMATIC K-4221C SURFACE
REFER TO PLANS FORMOUNTING HEIGHT, U.O.N.
10' A.F.G., U.O.N.
MARK DATE DESCRIPTION
POWER FROMTANK MIXERCONTROL PANEL
MANUFACTURER'SCABLE
TANK ROOF
INSIDE TANK
BOLTED 4" STAINLESS STEELFLANGE WITH THREADED CAP.COORDINATE REQUIREDDIAMETER WITH CONTRACT 'C'(N.I.C.)
4" STAINLESS STEELNIPPLE, GLASS COATED(N.I.C.)
NEMA TYPE 4 FRP JUNCTIONBOX
4" ROOF PENETRATION
6′′1/2
" MIN
.
HDPE WASHER SEALS, SEAL WITHNSF-61 APPROVED SEALANT
316 STAINLESS STEEL NUT
PANEL "PP1"120/208V, 1Ø,3-WIRE, 18CIRCUIT, WITHINTEGRALSURGESUPPRESSION
TANKMIXERCONTROLPANEL
M
SUBMERSIBLETANK MIXER
GFCI DUPLEXRECEPTACLE ON TANK
ROOF (20AMP/120V)PROVIDE
WEATEHRPROOF IN-USE COVER
L
20A/1P GFEP
20A/1P
BEACONLIGHT ONTANKROOF
LIGHT SWITCH INNEMA 4XENCLOSURE WITHWEATHERPROOFCOVER ATENTRANCE TOTANK
SERVICE GROUND FORSEPARATELY DERIVEDSYSTEM AS PER NEC, TYP.
D
B
NOTES:1. PROVIDE ADDITIONAL LUGS TO TERMINATE NEW FEEDERS TO
EXISTING TRANSFORMER TR-4 SECONDARY BUS.
100A/2P MCB
A
C
D D
EXISTINGTRANSFORMER TR-4,SEE NOTE 1
4.5KW
D
D
30A/2P
30A/2P
4.5KW
THERMALLY RATED SWITCH INNEMA 3R ENCLOSURE WITHWEATHERPROOF COVER
ELEVATED TANK
2. PROVIDE REDUCER LUGS TO ALLOW FOR OVERSIZED FEEDERS TOBE TERMINATED TO PANEL PP1.
FEEDER SCHEDULE
FEEDER CONDUCTOR AND CONDUITS FEEDER SCHEDULE
A
B
C
D
2 #12 AWG + #12 AWG GND IN 3/4" E.C.
3 4/0 AWG IN 2-1/2" E.C.
2 #10 AWG + #10 AWG GND IN 3/4" E.C.
2 #8 AWG + #8 AWG GND IN 1" E.C.
20A/1P
PC LKEYEDMAINTENANCESWITCH
PHOTOCELL (INTERMATICMODEL K-4221C)TANK BEACON LIGHT
120V
TANK MIXER PANEL PP1
KEYEDMAINTENANCESWITCH FORBEACON LIGHT
GALVANIZED STEELBACKPLATE
12 GA. 1-1/2" x 1-7/8"GALVANIZED STEELCHANNEL (TYP.)
RELOCATEDRTU PANEL
Panel Wiring Schedule (1-Phase)
Panelboard:
Manufacturer:
Panel Type:
NEMA Type Enclosure
PP1
SIEMENS
NEMA 3R
Voltage:
Mains:
Mounting:
120/208V
100A MCB
Surface
Phase:
Mains Rating:
Options:
1
100 A
Wire
Notes:
A.I.C. Rating:
Connected Totals:
Total:
AB
6.0 kVA6.4 kVA
60 A
AS - Powerlink AS Breaker
LO - Handle Lock-off DeviceST - Shunt Trip TypeAUX - Auxillary ContactsPA - Handle Padlock AttachmentGFCI - Ground Fault Circuit InterrupterHACR - Heating, A/C & RefrigerationSF - SubfeedTC - Time Clock Control(All Phases to be balanced to within 7% Actual Load Totals)
Load Description BreakerOption Trip Poles Circ No. A B A B Circ No. Poles Trip Breaker
Option Load Description
GROUND FLOOR LIGHTINGTANK RECEPTACLE
BEACON LIGHTTANK MIXER
SPARESPARE
------
GFEP----
20 A20 A20 A20 A20 A20 A
111111
4
368900
TANK LADDER LIGHTINGRTU PANEL
HEAT TRACE
EUH-1
20
1841000
1000
------
--
--
20 A20 A20 A
30 A
30 A
111111
PP1-1PP1-3
PP1-2PP1-4PP1-6PP1-8PP1-10PP1-12
12.4 kVA
PP1-5PP1-7PP1-9PP1-11
22502250
P2
22,000
PP1-14PP1-13PP1-16PP1-15PP1-18PP1-17
EUH-2111
20 A20 A SPARE
22502250SPARE -- 20 A 1
SPARE -- 20 A 1SPARE -- 20 A 1
SPARE
PROVIDE INTEGRALSURGE SUPPRESSION
GFEP - GROUND FAULT EQUIPMENT PROTECTION (100mA)
HANDRAIL POST EXTENSION(N.I.C.)
15"Ø 1/4" THICK STEEL PLATE. PRE-DRILLPLATE TO MATCH BOLTING PATTERN OFBEACON LIGHT AS REQUIRED (N.I.C.)
1/4"TYP.
RIGID CONDUIT
CONDUIT MOUNTING BRACKET
TRANSITION FROM RIGID TO FLEXCONDUIT
FLEX CONDUIT
HANDRAILING TOPRAIL (N.I.C.)
BEACON LIGHT
RELOCATEDRTU PANEL
LT SHIELDED TWISTEDPAIR IN 3/4" E.C.
.
120V
EXISTING EATON ELPRO905U-1 WIRELESS I/ORADIO, POWER SUPPLY,SURGE ARRESTORS INNEMA 3R ENCLOSURE
NOTES 1, 2, 3, 4
NOTES:
1. RELOCATE EXISTING EATON 905U-1 WIRELESS MULTI-I/O RADIO (RTU) TO TRANSMIT NEW ELEVATED TANKLEVEL TO THE EXISTING BUILDING 50 POWER HOUSEAND WATER SOFTENER PLANT.
2. CONTRACTOR SHALL RE-PROGRAM EXISTING PLC'S ATEXISTING BUILDING 50 POWER HOUSE (GE FANUCVERSAMAX) AND WATER SOFTENER PLANT (GE FANUCVERSAMAX)TO PROVIDE TANK LEVEL FROM THE NEWELEVATED TANK.
3. RE-PROGRAM EXISTING PLC AT BUILDING 50 POWERHOUSE (GE FANUC VERSAMAX) AND WATER SOFTENERPLANT (GE FANUC VERSAMAX) TO INCORPORATE NEWELEVATED TANK LEVEL SIGNAL. PROVIDE ALL WIRINGAND ACCESSORIES AS REQUIRED.
4. RE-PROGRAM EXISTING GUI'S (MODEL NO. FPC1500-P-RSA BY NORTECH ENGINEERING,INC.) AT BUILDING 50POWER HOUSE AND WATER SOFTENER PLANT TODISPLAY NEW ELEVATED TANK LEVEL. INCORPORATENEW TANK LEVEL WITH EXISTING START/STOP WELLCONTROL.
5. RELOCATE EXISTING OMNI ANTENNA FROM EXISTINGTANK TO NEW TANK. MOUNT ANTENNA 30' - 0' ABOVEFINISHED GRADE PROVIDE NEW STAINLESS STEELMOUNTING HARDWARE. BEFORE PERMANENTLYMOUNTING, TEST AND CONFIRM COMMUNICATIONBETWEEN RADIOS TO CONFIRM RADIO PATH IS CLEAR.
50' CONTROL CABLE IN 1"E.C., AS PERMANUFACTURER'SREQUIREMENTS
NOTE 5
TO HEAT TRACECONTROLLER(HEAT TRACEALARM/FAILURE)
4 #12 AWG IN3/4" E.C.
6. CONTRACTOR SHALL PROVIDE A NEW SHIELDEDTWISTED PAIR CABLE IN 1/2" PVC E.C. FROM THEEXISTING LEVEL TRANSMITTER LOCATED IN THEVAULT BELOW THE EXISTING ELEVATED TANK WITHTHE PLC WITHIN THE SOFTENER PLANT. TERMINATEWIRING TO LEVEL TRANSMITTER AND PLC I/O CARDSARE REQUIRED TO ENSURE COMMUNICATION OF TANKLEVEL TO THE SYSTEM. THIS WILL PROVIDE THEELEVATED TANK LEVEL SIGNAL TO THE SOFTENERPLC WHILE THE EXISTING TANK RADIO I/O EQUIPMENTIS BEING RELOCATED TO THE NEW ELEVATED TANK.PROVIDE ALL TEMPORARY PROGRAMMING ANDPROTECTION OF TEMPORARY CABLING AS REQUIRED.COORDINATE ALL SERVICE INTERRUPTIONS WITHFACILITIES PRIOR TO PERFORMING ANY WORK.
DESIGN & CONSTRUCTION
FOR A LANDSCAPE ARCHITECT, IS A VIOLATION OF THENEW YORK STATE EDUCATION LAW AND/OR REGULATIONS
ENGINEER FOR AN ENGINEER OR LANDSCAPE ARCHITECT
UNLESS DONE UNDER THE DIRECTION OF A COMPARABLE
AND IS A CLASS 'A' MISDEMEANOR.
PROFESSIONAL, I.E. ARCHITECT FOR AN ARCHITECT,
THE ALTERATION OF THIS MATERIAL IN ANY WAY,
WARNING:
CONTRACT:
TITLE:
LOCATION:
SHEET TITLE:
DESIGNED BY:
PROJECT
DRAWN BY:
DRAWING NUMBER:
FIELD CHECK:
APPROVED:
SHEET OF
CONSULTANT
NUMBER:
Melville, NY • White Plains, NY • New City, NY • Albany, NY • Parsippany, NJ • Howell, NJ
architects+
engineers
CLIENT:
41859-E
ELECTRICAL
1 10/19/2017 BID DOCUMENT3 11/30/2017 ADDENDUM NO. 3
REVISED DRAWING11/30/2017
C:\U
sers
\am
anfre
di\D
eskt
op\R
evit
Loca
ls\O
GS
T120
2_C
entra
l15_
P_a
man
fredi
BR
6CB
.rvt
11/3
0/20
17 3
:29:
03 P
M
DEPARTMENT OF CORRECTIONS ANDCOMMUNITY SUPERVISION
FCC
AMT
REPLACE WATER TOWER ANDWATER SOFTENING SYSTEM
EASTERNCORRECTIONAL FACILITYNAPANOCH, NEW YORK
ELECTRICAL DETAILS
E-106
29 29
SCALE: NO SCALE3 Tank Mixer Penetration Detail
SCALE: NO SCALE1 Single Line Diagram
SCALE: NO SCALE4 Feeder ScheduleSCALE: NO SCALE5 Tank Beacon Light Wiring Detail
SCALE: NO SCALE6 RTU and Electrical Panel Mounting Detail
SCALE: NO SCALE2 PP1 Panel Schedule
SCALE: 1 1/2" = 1'-0"7 Beacon Light Mounting Post DetailSCALE: NO SCALE8 Tank Level Radio Transmission Detail
MARK DATE DESCRIPTION