9
J. C. Studios Scale Date Drawn By Checked By Project Number Jennifer Cahill S I N C L A I R C O M M U N I T Y C O L L E G E C I N C I N N A T I , O H S . T .E .M . B U I L D I N G 5/4/2012 4:26:08 PM T100 Title Sheet Sinclair Community College STEM Building Checker 05/03/12 1 SINCLAIR COMMUNITY COLLEGE - STEM BUILDING DESIGN DOCUMENT SET T100 TITLE SHEET ARCHITECTURAL DRAWINGS: A001 LEGENDS & NOTES A100 BASEMENT DIMENSIONED A101 1ST FLOOR DIMENSIONED A102 2ND FLOOR DIMENSIONED A103 3RD FLOOR DIMENSIONED A104 BASEMENT FURNISHED A105 1ST FLOOR FURNISHED A106 2ND FLOOR FURNISHED A107 3RD FLOOR FURNISHED A108 BASEMENT REFLECTED CEILING PLAN A109 1ST FLOOR REFLECTED CEILING PLAN A110 2ND FLOOR REFLECTED CEILING PLAN A111 3RD FLOOR REFLECTED CEILING PLAN A201 BUILDING ELEVATIONS A301 BUILDING SECTIONS A501 WALL DETAILS A601 SCHEDULES A901 3D MODEL VIEWS INDEX OF SHEETS: LANDSCAPE DRAWINGS: L101 SITE PLAN STRUCTURAL DRAWINGS: S101 FOUNDATION PLAN S102 BASEMENT FRAMING PLAN S103 1ST FLOOR FRAMING PLAN S104 2ND FLOOR FRAMING PLAN S105 3RD FLOOR FRAMING PLAN S106 ROOF PLAN MECHANICAL DRAWINGS: M101 BASEMENT DUCTWORK M102 1ST FLOOR DUCTWORK M103 2ND FLOOR DUCTWORK M104 3RD FLOOR DUCTWORK No. Description Date J. C. Studios Scale 1”=200’ Date Drawn By Checked By Project Number Jennifer Cahill S IN C L A IR C O M M U N IT Y C O L L E G E C I N C IN N A T I , O H S . T .E .M . B U IL D I N G 5/4/2012 4:26:08 PM L101 Site Plan Sinclair Community College STEM Building Checker 05/03/12 1 No. Description Date 1” = 200’ 1 Site Plan

Design Document Set

Embed Size (px)

DESCRIPTION

Selected pages from a DD set created for a new community college building in Cincinnati.

Citation preview

Page 1: Design Document Set

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

5/4/

2012

4:2

6:08

PM

T100

Title Sheet

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

SINCLAIR COMMUNITY COLLEGE -STEM BUILDINGDESIGN DOCUMENT SET

T100 TITLE SHEET

ARCHITECTURAL DRAWINGS:

A001 LEGENDS & NOTESA100 BASEMENT DIMENSIONEDA101 1ST FLOOR DIMENSIONEDA102 2ND FLOOR DIMENSIONEDA103 3RD FLOOR DIMENSIONEDA104 BASEMENT FURNISHEDA105 1ST FLOOR FURNISHEDA106 2ND FLOOR FURNISHEDA107 3RD FLOOR FURNISHEDA108 BASEMENT REFLECTED CEILING PLANA109 1ST FLOOR REFLECTED CEILING PLANA110 2ND FLOOR REFLECTED CEILING PLANA111 3RD FLOOR REFLECTED CEILING PLANA201 BUILDING ELEVATIONSA301 BUILDING SECTIONSA501 WALL DETAILSA601 SCHEDULESA901 3D MODEL VIEWS

INDEX OF SHEETS:LANDSCAPE DRAWINGS:

L101 SITE PLAN

STRUCTURAL DRAWINGS:

S101 FOUNDATION PLANS102 BASEMENT FRAMING PLANS103 1ST FLOOR FRAMING PLANS104 2ND FLOOR FRAMING PLANS105 3RD FLOOR FRAMING PLANS106 ROOF PLAN

MECHANICAL DRAWINGS:

M101 BASEMENT DUCTWORKM102 1ST FLOOR DUCTWORKM103 2ND FLOOR DUCTWORKM104 3RD FLOOR DUCTWORK

No. Description Date

J. C. Studios

Scale 1”=200’

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

5/4/

2012

4:2

6:08

PM

L101

Site Plan

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

No. Description Date

1” = 200’1 Site Plan

Page 2: Design Document Set

UP

MECH008

MEN004

CONFERENCEROOM

001

LAB007

CLASSROOM010

CLASSROOM009

BOOKSTORESTORAGE

003

CLASSROOM014

CLASSROOM013

CLASSROOM015

WOMEN006

CLASSROOM002

LAB011

LAB012

19' -

11

7/8"

19' -

11

3/4"

10' -

0"

39' -

11

29/3

2"

97' - 7"

90' -

11

17/3

2"

32' - 2 7/32"

8' - 2 3/16"

28' - 1 13/16"

31' - 4 5/32"

45' - 8 3/16"

44' - 3 13/16"

91' -0"

30' -0"

30' -0"

30' -0"

45' - 8 3/16"

44' - 3 13/16"

6' -0"

6' -0"

11' - 6 3/32"

23' - 0 3/32"

33' - 9 29/32"

36' - 4"

40' -0"

10' -0"

40' -0"

STAIR005

20' - 0"

40' -0"

10' -0"

40' -0"

STAIR010a

46' -0"

10' -0"

29' -4"

16' -8"

30' - 2 3/16"

15' - 0"

6' -0 13/1

6"

6' -0"

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

11:

30:1

0 A

M

A100

BasementDimensions

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

3/32" = 1'-0"1 Basement DimensionedNo. Description Date

DN

LOADING/STORAGE

101

LIBRARYSTACKS

ANDREADING

ROOM

124

CLASSROOM124B

ITSERVICES

124C

BOOKSTORE120

MEN121

WOMEN122

TESTINGCENTER

119

BURSAR111

ADMISSIONSCOUNSELOR

111A

CONFERENCEROOM

110

FINANCIALAID

111C

EXECUTIVEDEAN110B

ADMISSIONSCOUNSELOR

111B

ASSOCIATEDEAN110A

ADMINASSISTANT

107OFFICE

112

ADMINSUPPORT

117

ADVISINGAREA103

DISABILITYSERVICES

104

CAREERSERVICES

105

ACADEMICFILES &

STORAGE106

FACULTYWORKROOM

116

FACULTYCUBICLES

115

SHAREDCONFERENCE

102

OPER.MANAGE.

108OFFICE

114

ADMINSUPPORT

109OFFICE

113

SECURITYSUPPORT

118

5' -6 15/1

6"

80' -0"

5' -6 15/1

6"

90' - 2 15/16"

10' - 0 7/32" 10' - 6" 11' - 6" 15' - 3 1/4"

36' - 0"

8' - 7 15/16"

4' - 6 23/32"

4' - 6 23/32"

4' - 6 23/32"

9' - 1 13/32"

10' - 0 7/32" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 12' - 0" 15' - 3 27/32"

90' - 2 15/16"

11' - 11 5/32"3' - 0"

19' - 2 17/32"14' - 2 7/8"

4' - 8 31/32"4' - 8 31/32"

4' - 8 31/32"9' - 5 29/32"

4' - 6 3/16"

3' - 0"

1' - 11 13/16"

9' - 0"

3' - 0"

9' - 0"

5' - 6"

16' -8 1/1

6"

11' -0 15

/16"

6' -3"

34' -0"

17' -4"

16' -8"

19' -

11

7/8"

19' -

11

3/4"

10' -

0 5

/32"

39' -

11

25/3

2"

RECEPTION/COPY

MACHINE199B

ATRIUM199A

21' -

10

25/3

2"12

' - 0

27/

32"

10' -

0 5

/32"

20' -

0"

14' -

1 1

7/32

"

STAIR123

STAIR124A

Room124D

STAIR100

9' -

0 23

/32"

16' -

5 2

5/32

"11

' - 0

5/3

2"6'

- 0"

9' -

5 27

/32"

16' -

6"

10' -

6 1

5/16

"

7' - 7 15/16" 6' - 0" 12' - 5 5/8" 16' - 10 3/4" 14' - 0 5/8" 16' - 0" 14' - 0" 16' - 0" 12' - 6" 9' - 8"

10' - 7 9/16" 15' - 6" 16' - 10 3/4" 14' - 0 5/8" 16' - 0" 14' - 0" 16' - 0" 12' - 6" 9' - 8"

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

11:

30:1

4 A

M

A101

1st FloorDimensions

Sinclair CommunityCollege

STEM Building

Checker

05/03/121 3/32" = 1'-0"1 Level 1 Dimensioned

No. Description Date

Page 3: Design Document Set

UP

1A301

4A301

3A301

MECH008

MEN004

CONFERENCEROOM

001

LAB007

CLASSROOM010

CLASSROOM009

BOOKSTORESTORAGE

003

CLASSROOM014

CLASSROOM013

CLASSROOM015

WOMEN006

CLASSROOM002

LAB011

LAB012

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

11:

30:2

6 A

M

A104

BasementFurnished

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

3/32" = 1'-0"1 Basement Furnished

No. Description Date

DN

1A301

2A301

A

B

4A301

4A301

3A301

3A301

LOADING/STORAGE

101

LIBRARYSTACKS

ANDREADING

ROOM

124

CLASSROOM124B

ITSERVICES

124C

BOOKSTORE120

MEN121

WOMEN122

TESTINGCENTER

119

BURSAR111

ADMISSIONSCOUNSELOR

111A

CONFERENCEROOM

110

FINANCIALAID

111C

EXECUTIVEDEAN110B

ADMISSIONSCOUNSELOR

111B

ASSOCIATEDEAN110A

RECEPTION/COPY

MACHINE199B

ADMINASSISTANT

107OFFICE

112

ADMINSUPPORT

117

ADVISINGAREA103DISABILITY

SERVICES104

CAREERSERVICES

105

ACADEMICFILES &

STORAGE106

FACULTYWORKROOM

116

FACULTYCUBICLES

115

SHAREDCONFERENCE

102

OPER.MANAGE.

108OFFICE

114

ADMINSUPPORT

109OFFICE

113

SECURITYSUPPORT

118

1

11

11

1

1

11

11

1

1

1 111 1

11 1 1 1 1 1 1 1 1 11 1 11 1 1 J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

11:

30:3

0 A

M

A105

1st Floor Furnished

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

3/32" = 1'-0"1 Level 1 Furnished

No. Description Date

2A301

2A301

Page 4: Design Document Set

UP

MECH008

MEN004

CONFERENCEROOM

001

LAB007

CLASSROOM010

CLASSROOM009

BOOKSTORESTORAGE

003

CLASSROOM014

CLASSROOM013

CLASSROOM015

WOMEN006

CLASSROOM002

LAB011

LAB012

STAIR005

STAIR010a

2x4 RECESSEDFLUORESCENT

RETURN AIRREGISTER

SUPPLY AIRVENT

RECESSED CANLIGHT

DRYWALLCEILING

EXPOSED/OPENCEILING

2x2 DROPCEILING

LEGEND

PENDANTLIGHT

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

11:

30:5

3 A

M

A108

Basement RCP

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

3/32" = 1'-0"1 Basement Reflected Ceiling Plan

No. Description Date

DN

LOADING/STORAGE

101

LIBRARYSTACKS

ANDREADING

ROOM

124

CLASSROOM124B

ITSERVICES

124C

BOOKSTORE120

MEN121

WOMEN122

TESTINGCENTER

119

BURSAR111

ADMISSIONSCOUNSELOR

111A

CONFERENCEROOM

110

FINANCIALAID

111C

ADMISSIONSCOUNSELOR

111B

ASSOCIATEDEAN110A

ADMINASSISTANT

107

OFFICE112

ADMINSUPPORT

117

ADVISINGAREA103

DISABILITYSERVICES

104

CAREERSERVICES

105

ACADEMICFILES &

STORAGE106

FACULTYWORKROOM

116

FACULTYCUBICLES

115

SHAREDCONFERENCE

102

OPER.MANAGE.

108

OFFICE114

ADMINSUPPORT

109

OFFICE113

SECURITYSUPPORT

118

RECEPTION/COPY

MACHINE199B

ATRIUM199A

STAIR123

STAIR124A

Room124D

STAIR100

EXECUTIVEDEAN110B

2x4 RECESSEDFLUORESCENT

RETURN AIRREGISTER

SUPPLY AIRVENT

RECESSED CANLIGHT

DRYWALLCEILING

EXPOSED/OPENCEILING

2x2 DROPCEILING

LEGEND

PENDANTLIGHT

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

11:

30:5

7 A

M

A109

1st Floor RCP

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

3/32" = 1'-0"1 Level 1 Reflected Ceiling Plan

No. Description Date

Page 5: Design Document Set

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

11:

31:1

7 A

M

A201

Elevations

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

3/32" = 1'-0"1 North Elevation

3/32" = 1'-0"2 East Elevation

3/32" = 1'-0"3 South Elevation

3/32" = 1'-0"4 West Elelvation

No. Description Date

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

11:

32:2

2 A

M

A301

Sections

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

No. Description Date

Page 6: Design Document Set

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

5/4/

2012

11:

33:1

7 A

M

A901

3D Model Views

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

1 Aerial View

2 View from NW

3 View from SE

No. Description Date

2' -

5 7/

8"

0' -

3 1/

2"

0' -

1 5/

8"

2' -

3"

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

As indicated

5/4/

2012

11:

32:2

5 A

M

A501

Details

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

1 1/2" = 1'-0"1 Floor Section

1/2" = 1'-0"2 Pilkington Planar Details

1/2" = 1'-0"3 Pilkington Planar Tension Structure

No. Description Date

Page 7: Design Document Set

UP

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

11:

33:1

8 A

M

M101

Basement Ductwork

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

3/32" = 1'-0"1 Basement HVAC No. Description Date

DN

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

11:

33:2

1 A

M

M102

1st Floor Ductwork

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

3/32" = 1'-0"1 Level 1 HVAC

No. Description Date

Page 8: Design Document Set

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

11:

33:3

1 A

M

S102

Basement FramingPlan

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

3/32" = 1'-0"1 Basement Framing

No. Description Date

UP

R 25' - 0"

R50' - 0"

R40' - 0"

R40' - 0"

R 40' - 0"

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

1:3

1:02

PM

S101

Foundation Plan

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

3/32" = 1'-0"1 Foundation

No. Description Date

TOP OF FOOTING: -3’0” TOP OF FOOTING: -13’0”

Page 9: Design Document Set

Level 10' - 0"

Level 212' - 0"

Level 324' - 0"

Top of Footer-3' - 0"

Level 10' - 0"

Level 212' - 0"

Level 324' - 0"

Basement Dimensioned-12' - 0"

Foundation-13' - 0"

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

1/2" = 1'-0"

5/4/

2012

4:1

9:22

PM

A401

Wall Sections

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

No. Description Date

1/2" = 1'-0"1 Wall Section A

1/2" = 1'-0"2 Wall Section B

J. C. Studios

Scale

Date

Drawn By

Checked By

Project Number

Jennifer Cahill

SIN

CLA

IRC

OM

MU

NIT

YC

OL L

E GE

CIN

CIN

NAT

I,O

H

S.T.

E .M

. BU

ILD

ING

3/32" = 1'-0"

5/4/

2012

4:2

6:02

PM

S106

Roof Plan

Sinclair CommunityCollege

STEM Building

Checker

05/03/121

No. Description Date 3/32" = 1'-0"1 Roof Plan

STEEL TRUSS/BATT INSULATION

INSULATION ON METAL DECK

EPDM

K-SERIES BAR JOIST

BRICK FINISH

STEEL TRUSS/BATT INSULATION

INSULATION ON METAL DECK

EPDM

K-SERIES BAR JOIST

S24X121

CURTAIN WALL

AIR SPACE

AIR BARRIER

PLYWOOD SHEATHING

STEEL STUD/BATT INSULATION

MOISTURE BARRIER

GYPSUM WALL BOARD

DOUBLE-PANE WINDOW

CONCRETE SLAB ON GRADE

FOUNDATION WALL

FOOTER

3” LW CONCRETE

2” METAL DECK

3” LW CONCRETE

2” METAL DECK

FOOTER