Design team commitment: Design team commitment: An Architect’s Perspective NASA Net Zero Workshop Rich von Luhrte, FAIA, LEED AP RNL June 5, 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

Design Team Commitment: An Architect's Perspectiveapps1.eere.energy.gov/.../pdfs/rsf/0108_nasa_design_team_commitment... · FdFedera lOffi ce BildiBuilding 222,000 sf ... EnergyDriven

Embed Size (px)

Citation preview

          

            

   

                                               

Design team commitment: Design team commitment: An Architect’s Perspective

NASA Net Zero Workshop

Rich von Luhrte, FAIA, LEED AP

RNL

June 5, 2012

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

         

 

DOE/NREL Research Support Facility

F d l Offi B ildi 222,000 sf Federal Office Building Golden, CO RNL/Haselden DB

2

 

 

   

     

     

       

   

Project Overview

800 staff 800 staff

222,000 Square Feet

2 long narrow wings 2 long, narrow wings

4‐story north, 3‐story south

Thi d Third wiing iin secondd phhase

Energy driven design

3

   

      

            

       

       

       

            

Project Overview Continued

LEED® Platinum Certified: • 58 LEED credits submitted

Energy Goal: 35kBtu/sf/year • Incl. high performance data center

• 50% better than ASHRAE 90.1 2004

Designed to net zero energy

2 years: design and construction

RSF 2 performs 17% better at 10% less cost

4

   

      

     

      

                                                   

                             

        

Nature of contract • Performance based design‐build

Setting the Stage

• Firm fixed price contract

Two‐part Contract • Firm fixed price contract

• An initial concept design phase to prove that theDB team could do what they said they could do—50% of fee at risk in this 6 month period

• Award of a FFP contract following acceptance ofthe conceptual design—remaining 50% of conceptdesign fee paiddesign fee paid

Performance Incentive Program

• Incentive for “supperior pperformance”

5

   

          

   

       

            

   

Unusual Project Requirements

26 proposal objectives • LEED Platinum and ZEB design

600+ substantiation items

Performance specs vs. bridging docs

Firm Fixed Price risk transfer design Firm Fixed Price risk transfer designbuild contract • Design‐build on steroids!

6

         

   

   

     

   

   

$2 Million Owner Incentive Value Offered

Managing owner risksManaging owner risks

Mitigating owner risks

Mgmt reserve vs. incentives

NREL optimized scope NREL optimized scope

Focused Owner involvement

7

     

      

   

   

 

 

 

 

RSF Incentive Program Structure

6 evaluation periods • Preliminary Design: $400,000

• Design Development: $300,000

• Contract Documents: $300,000

• Construction: $500,000

• Closeout: $400,000$400,000Closeout:

• Commissioning/Warranty: $100,000

Incentives rolloverIncentives rollover

8

       

                

                  

       

Public Award Fee Program Continued

Develop written incentive plan

Describe how process will be administered; consistency

Assign board to conduct evaluations Develop evaluation criteria, publish to D‐B team

D‐B team conducts self evaluation

9

     

     

                          

                                      

                           

                              

Designing Before You Win ‐

ThiThiThiThi iiss iiss aa neneww woworrldld fforor arar hithitcchithitececttssldld ff tt

Architects dislike competitive design‐build • proposal costs extreme, risks are very high • undesirable relationship with GC • insulation from owner—difficult to understand their needsdifficult to understand their needsinsulation from owner • Program and requirements may not be clear

Keep end in mind • back end incentive • Once project awarded, DB team can execute effectively and

efficiently • incentivize designer’s up front investment with stipend • Performance incentive is a critical ingredient to make the risk

worthwhile

10

                      

   

DOE/NREL Research Support Facility What is different about creating a NET 0 energy building?What is different about creating a NET 0 energy building?

ENERGY DRIVEN ARCHITECTURE 11

     

             

                

                

                   

                                                  

Energy Driven Architecture

AA llll ttii tt titi d id iAA cocollll bbaabbororaatiti //veve ii/i/innttegregraatitiveve ddesesiigngn prprocessocess

Every discipline drives the design for optimum performance • Energy modeling at every stage

• S t i bl t t i d i th hit t l l tiSustainable strategies drive the architectural solutions • Design Build team must balance design and cost at each step

Ego is put aside ideas can be generated by anyEgo is put aside—ideas can be generated by anymember of the team

Energygy Driven desiggn is a contribution of architecture,, electrical, mechanical, structure, site civil and landscape

12

     

               

                                

                    

                 

                                                                     

Energy Driven Architecture

hhTThh fifiee fifirstrst ddesesiigngn musmus bbtt bbee hhtthhee i hi hrriigghhtt ddesesiigngnd id i d id i

Decisions made early determine solutions in detail later on • Solutions cannot depends on complicated systems • R thRather ththe architectture mustt achihieve passive perfformancehit i • The key is optimization of design, energy performance and cost

• Commitments made early have to stick later on. • Risk must be minimized by lack of change—decisions must bemade and adhered to throughout the detailed design processmade and adhered to throughout the detailed design process

• This requires more detailed performance analysis in everystep of design.

13

                        

DOE/NREL Research Support Facility Energy driven design optimizes where the dollars are spent to achieve resultsEnergy driven design optimizes where the dollars are spent to achieve results

14

DOE/NREL Research Support Facility Any building can be Net 0 if you simply buy enough renewable energy!Any building can be Net 0 if you simply buy enough renewable energy!

15

DOE/NREL Research Support Facility The RSF design was driven on the first day by the most effective cross section for natural The RSF design was driven on the first day by the most effective cross section for natural day‐lighting 

16

DOE/NREL Research Support Facility Natural ventilation provides optimal reflection of the Colorado ClimateNatural ventilation provides optimal reflection of the Colorado Climate

17

DOE/NREL Research Support Facility Operable windows offer occupants the choice to naturally ventilateOperable windows offer occupants the choice to naturally ventilate Night purge of space removes heat and prepares space for the next day

18

                            

DOE/NREL Research Support Facility The “lazy H” floor plan reflects the orientation of the site to optimize daylight The lazy H floor plan reflects the orientation of the site to optimize daylight

Floor Plansn

19

                      

20

DOE/NREL Research Support Facility The interior design reflects the energy strategy of daylight and ventilation The interior design reflects the energy strategy of daylight and ventilation

                  

DOE/NREL Research Support Facility Light louvers reflect daylight deep into the spaceLight louvers reflect daylight deep into the space

21

                      

DOE/NREL Research Support Facility Closed offices are designed without “lid” to allow daylight and ventilation Closed offices are designed without lid to allow daylight and ventilation

22

                  

DOE/NREL Research Support Facility Transpired Solar Collectors capture heat for tempering ventilation airTranspired Solar Collectors capture heat for tempering ventilation air

23

                        

DOE/NREL Research Support Facility A “labrinth” below the building captures and stores air from the collectors A labrinth below the building captures and stores air from the collectors

24

                          

DOE/NREL Research Support Facility Ventilation is in raised floor plenums that distribute air to individual work spaceVentilation is in raised floor plenums that distribute air to individual work space

25

                    

DOE/NREL Research Support Facility All heating is hot water hydrotherm located in the ceiling space All heating is hot water hydrotherm located in the ceiling space

26

                          

DOE/NREL Research Support Facility The Data Center captures heat and adds to heat storage in the labrinth The Data Center captures heat and adds to heat storage in the labrinth

27

                                             

DOE/NREL Research Support Facility A net 0 strategy requires a paradigm shift in the way the user lives with the building dayA net 0 strategy requires a paradigm shift in the way the user lives with the building day in and day out

28

                          

       

DOE/NREL Research Support Facility The building still consumes 35Kbtu/sq ft per year—thus the difference is made up from The building still consumes 35Kbtu/sq ft per year thus the difference is made up from renewable energy—PV, wind, and biomass

29

                            

             

DOE/NREL Research Support Facility The building is already operating Net 0 without all of the PV fully operationalThe building is already operating Net 0 without all of the PV fully operational

First day of Net zero – June 23, 2011 30

   

                                     

Awards and Articles

http://www.nrel.gov/news/rsfnews/ O 29 d f J 2012 Over 29 awards won as of June 2012

Over 100 articles published about the project worldwide

Over 3000 visitors tour the buildingOver 3000 visitors tour the building

31

      

DOE/NREL Research Support Facility Questions?Questions?