    Pakistan International Airlines

    Sameer MirjatZain Zaman

    Sameer RizwanRizwan MemonMohsin AhsanLabesh Kumar

  • 8/3/2019 Design+Measure+Analyze Phase

    2/33

    Define Phase

  • 8/3/2019 Design+Measure+Analyze Phase

    3/33

    Background Information about the Project

    Pakistan International Airlines

    Vision:

    PIAs vision is to be a world class airline meeting customer expectationsthrough excellent services, on-time performance, innovative products andabsolute safety.

    Mission:Employee teams will contribute towards making PIA a global airline of choice

    through: Offering quality customer services and innovative products Using state-of-the-art technologies Ensuring cost-effective measures in procurement and operations Developing Safety Culture.

  • 8/3/2019 Design+Measure+Analyze Phase

    4/33

    Karachi Departures Domestic: 38 Departures International: 20 Arrivals Domestic: 45 Arrivals International: 17

    Islamabad Departures Domestic: 17

    Departures International: 15 Arrivals Domestic: 19 Arrivals International: 12

    Lahore Departures Domestic: 1 Departures International: 7 Arrivals Domestic: 12 Arrivals International: 9

    Other Flights 11

    Total Flights per week 1525

    Total Flights per month 6100

    Flight Schedule(according to major national airports)

  • 8/3/2019 Design+Measure+Analyze Phase

    5/33

    Define - Context

    Customer Dissatisfaction due to delays in aircraft maintenance and flight schedules Current Issue

    PIA has been receiving numerous complaints about the flight delays, in-flight problems andflight safety issues for almost two decades now. These delays in flights as well as flightsafety issues are directly related to the aircraft maintenance and flight schedule issues.

    These on-ground maintenance issues are to be taken care of in order to achieve customersatisfaction through meeting customer expectations from the national flag bearingairline. Also, the schedule of flights have to be made by the marketing departments insuch a manner that it puts less burden on the maintenance department.

    Given the above condition, we have decided to do the improvement process, using DMAIC,focusing on the effectiveness and timely delivery of aircrafts on the runway. This willhelp us resolve 90% of the national carriers problems.

    Tools in Define Stage:Tools that we used in our project are: CTQ Specifications Project Charter Process Map Stakeholders Analysis

  • 8/3/2019 Design+Measure+Analyze Phase

    6/33

    Voice of theCustomer (VOC)

    CTQ CTQ Measure/Metric Current State Target

    1Unsafe travelling dueto less maintainedaircrafts

    Ensure every air-craftwill get ground time

    of 150 hours permonth (5 hours/day)

    MIS Ground Support,Base Management System,Quality Control System

    Each air-craft reachesthe base after 4consecutive days

    100% safe

    travelling

    2Excessive bookings onoccasion-based flights

    Ensure flight bookingsnot more than 100%

    available capacity

    Quality Control System,Marketing Information

    System

    Flight bookings are morethan the capacity on

    occasion-based flights

    At least 15%reduction of

    extra costs

    3

    Too much of customerdisgust created by thequality of flight

    experience

    Ensure less-strict salestarget by reducingtarget percentage by

    at least 25%

    Quality Control System,Marketing InformationSystem

    Tickets are sold withouttaking care of currentsupply

    100% qualityof flightexperience

    Critical To Quality Specifications

  • 8/3/2019 Design+Measure+Analyze Phase

    7/33

    Voice of theCustomer (VOC)

    CTQ CTQ Measure/Metric Current State Target

    4Unsafe travelling due toold fleet and ill-

    repaired air crafts

    Ensure 100% positive

    output

    Quality Control System

    Out of 39 aircrafts,31 aircrafts are in

    working condition(79.84% output)

    Ensure 100%output of

    current air fleet

    Critical To Quality Specifications

    5Flight Cancellations anddelays

    Ensure 100% flightoperations

    Quality Control System,Marketing InformationSystem

    Flights are cancelledif there are lesscustomers than10% of the totalcapacity

    Ensure 100%operationsregardless of thecustomer-fill

  • 8/3/2019 Design+Measure+Analyze Phase

    8/33

    In scopeQuality Line Maintenance Services Include ( Pre-flight Inspectionbefore every Departure, post flight checks after arrival of everyflight) and decreased revenue targets through adequate numberof flight schedules by the Marketing department in order to meetthe maintenance demands of the aircrafts.

    Out of ScopeOur scope excludes Central Control / Fuelling / GroundEngineering Staff / Crew Staff / Human Resources

    The key problem faced are: Delays in Flight Less Ground time for Aircraft Maintenance Communication Gap between the Departments Passenger Missing Information Excessive flight limits burdening the aircraft runtimes

    Problem Statement

    Project Scope

    To provide and further develop Safe, Efficient, Adequate,Economical and Properly Coordinated domestic as well asInternational air transport System. To repair, overhaul, Reconstruct assemble or recondition aircraft,Vehicles or other machine parts, accessories owned by thecorporation or by any other person. Increase in customer satisfaction by controlled flight Operations.

    Adequate number of monthly flights in order to meetmaintenance requirements.

    Customer:CTQ: 99% High quality Airline service and flight operationsaccording to the customer expectations.Convenience , Care , Affordability and Safety.100% information sharing within departments and withPassengers.Business: Eliminate the Following: Insufficient resources for development. Non-conducive working atmosphere. Integrated Stockrooms. Improper work attitude / Organizational culture.

    Increase revenue by providing service to the third partycustomers.

    Business Case

    Goal Statement (Measurable)

    Project Title: Customer Dissatisfaction due to delays in aircraftmaintenance and flight schedules

    Business: Pakistan International Airlines

  • 8/3/2019 Design+Measure+Analyze Phase

    9/33

    Customer: Improve customer satisfaction (currently approx. 40%)

    Business: Improve maintenance services to commercial aircraft,

    offering maintenance, overhaul, repair, replacement, modification,testing and inspection of aircraft and/or its components in PakistanImprove marginal revenue by 5%.

    Quality Departments, Flight Operations, External agencies(vendor) and Compliance, Airport management(CAA).

    Define 26 th Sep - 2 nd Oct 2011Measure 3 rd Oct - 9 th Oct 2011Analyze 10 th Oct - 14 th Oct 2011Improve 18 th Oct - 23 rd Oct 2011Control 24 th Oct - 30 th Oct 2011

    Project Plan/ Milestones / DeliverablesName Role % of time spentSameer Mirjat Project Manager 16.6%Zain Zaman Team Member 16.6%Mohsin Ahsan Team Member 16.6%Sameer Rizwan Team Member 16.6%Rizwan Memon Team Member 16.6%Labesh Kumar Team Member 16.6%

    Projected Benefits Barriers/ Support required

    Roles of Team Members

    Project Title: Customer Dissatisfaction due to delays in aircraftmaintenance and flight schedules

    Business: Pakistan International Airlines

  • 8/3/2019 Design+Measure+Analyze Phase

    10/33

    SnagRectification

    TechnicalLog Book

    Refuelling&

    Cleaning

    CentralControl

    CaptainsClearance

    Boardingof People

    Verificationof Fuel

    NeedsFuel Indent Signing Fuelling/Refuelling

    Cabin Cleaning

    Fuel verificationsigning by Aviation

    Engineer

    Catering

    FlightDispatcher

    Briefing

    Load Check Crew Passenger ListFuel Check

    Level 1: Core Process

    Level 2: Sub Process

    Luggage Loading

    Level 3: Sub Process

    Level 4: Sub Process

    Process MapMarketing

    DepartmentCustomer

  • 8/3/2019 Design+Measure+Analyze Phase

    11/33

    Our best estimate of the stakeholder's attitude, from supportive to opposed.

    List of Stakeholders

    by dept /Individual

    names(can list in orderof importance)

    StronglySupportive

    ModeratelySupportive Neutral

    StronglyAgainst/Opposed

    ModeratelyAgainst/Opposed

    Reason forResistance

    Level of Resistance(High, Med,

    Low) Actions

    MaqsoodAhmed

    (DirectorEngineering)

    x

    Stronglyagrees thatcomplaintsshould behandled

    accordinglyso low

    resistance tochange

    Low

    Since there are too many

    flights on very few planes,the repair and maintanencearent done ccordingly and

    he strongly supportsupgrading the fleet or

    decreasing the number of destinations

    Sameen Naqvi(Chief Engineer

    LineMaintenance)

    x VerySupportive

    towardsquality

    maintanence

    Low

    Recent groundings infrance and discovery of 40

    snags are condemed by himas he says it is a result of Pakistan refusing to let afrench aircraft enter itsairspace for 45 minutes

    resulting in frenchauthoritiesexacting

    revenge.

    Project Charter

  • 8/3/2019 Design+Measure+Analyze Phase

    12/33

    GM Marketing x

    His majorconcern is lack

    of partsavailable due

    to non-availability of

    funds

    med

    Concerns relating to lack of parts has grounded too

    many aircrafts leading tosnags and overworking of existing aircrafts, strong

    check and balance neededwith 100 percent delivery of

    parts

    GM HumanResources x

    Supportive of routine

    quality checksand balances

    to maintainstandards and

    reach forfurther

    efficiency

    Low

    Construct a detailedprocedure to be followed for

    quality maintenancethroughout different

    departments

    Your best estimate of the stakeholder's attitude, from supportive to opposed.

    List of Stakeholders

    by dept /Individual

    names(can list in orderof importance)

    StronglySupportive

    ModeratelySupportive

    NeutralStronglyAgainst/Opposed

    ModeratelyAgainst/Opposed

    Reason forResistance

    Level of Resistance(High, Med,

    Low)

    Actions

    Project Charter

  • 8/3/2019 Design+Measure+Analyze Phase

    13/33

    Measure Phase

  • 8/3/2019 Design+Measure+Analyze Phase

    14/33

    In measure phase analysis current performance level and identify goals wehope to achieve. It integrates visuals presenting flowcharts, process Map,sample Data sets, summary statistics and run charts.

    Keen and accurate observation is very important in the initial part for thephase - if we can observe an event (or even its effects) we can measure

    it. If we can measure it, we can improve it.Getting our measures right the first time is very critical.

    Tools in Measure Phase:

    Tools that we used in our project are:Performance standardDetailed As-is process MAPBar Charts

    Measure - Context

  • 8/3/2019 Design+Measure+Analyze Phase

    15/33

    PerformanceMeasure

    OperationalDefinition

    Data Sourceand Location

    SampleSize

    Who willcollect the

    data

    When willdata be

    collected

    How willdata be

    collected

    Other Datathat shouldbe collectedat the same

    time

    GROUND TIME The time everyaircraft gets forrepair andmaintenance perday

    Reports givenby MIS Groundsystem

    Last 1year

    Flight dispatcher,GroundEngineering staff

    This datawill getcollectedMonthly"

    MIS fromGroundEngineeringStaff and thereportsgenerated bythis system.

    -

    Data Collection Plan

  • 8/3/2019 Design+Measure+Analyze Phase

    16/33

    PerformanceMeasure

    OperationalDefinition

    Data Sourceand Location

    SampleSize

    Who will collectthe data

    Whenwill data

    becollecte

    d

    Howwill

    data becollecte

    d

    Other Datathat shouldbe collectedat the same

    timeFLIGHTSCHEDULES

    A metricdescribing thepercentage of passengerstravelling in anaircraft

    1. Tickets sold byMarketingDepartment2.Report given byFlight Dispatcher

    Last 1 year MarketingDepartment, FlightDispatcher

    At theend of every"WEEK"i.e.Saturdays

    Sales of thetickets

    -

    Data Collection Plan

  • 8/3/2019 Design+Measure+Analyze Phase

    17/33

    Time Volume of ComplaintsOctober 2238

    November 2784December 3047

    January 1110February 1615

    March 1045April 1334May 2276June 2991

    July 3560August 2656

    September 1916Total 26572

    2238 2784 30471110 1615 1045 1334

    2276 29913560 2656 1916

    26572

    0

    5000

    10000

    15000

    20000

    25000

    30000

    October November December January February March April May June July August September Total

    Volume of Complaints

    4th Qtr (Last year)Trend First Qtr Trend 2nd Qtr Trend 3rdQtr Trend

    Bar Chart 1 Volume of Complaints

  • 8/3/2019 Design+Measure+Analyze Phase

    18/33

    Bar Chart 2 Department-wise Complaints

    Month Line Maintenance Marketing Total

    October 1054 1184 2238

    November 1589 1195 2784

    December 2014 1033 3047

    January 423 687 1110February 864 751 1615

    March 465 580 1045

    April 905 429 1334

    May 1745 531 2276

    June 2156 835 2991July 2232 1328 3560

    August 1264 1392 2656

    September 1145 771 1916

  • 8/3/2019 Design+Measure+Analyze Phase

    19/33

    Bar Chart 2 Department-wise Complaints

    1054

    1589

    2014

    423

    864

    465

    905

    1745

    21562232

    1264 11451184 11951033

    687751

    580429

    531

    835

    13281392

    771

    2238

    2784

    3047

    1110

    1615

    1045

    1334

    2276

    2991

    3560

    2656

    1916

    0

    500

    1000

    1500

    2000

    2500

    3000

    3500

    4000

    October November December January February March April May June July August September

    Line Maintenance

    Marketing

    Total

  • 8/3/2019 Design+Measure+Analyze Phase

    20/33

    Bar Chart 3 Type of Complaints

    Month Flight Delays/Cancellations Unsafe Travelling Total

    October 1415 823 2238

    November 1830 954 2784

    December 1683 1364 3047

    January 679 431 1110

    February 963 652 1615

    March 640 405 1045

    April 732 602 1334

    May 1430 846 2276

    June 1726 1265 2991

    July 2025 1535 3560

    August 1811 845 2656

    September 1290 626 1916

    Total 16224 10348 26572

  • 8/3/2019 Design+Measure+Analyze Phase

    21/33

    Bar Chart 3 Type of Complaints

    OctoberNovem

    berDecem

    berJanuary

    February

    March April May June July AugustSeptem

    berTotal

    Flight Delays/Cancellations 1415 1830 1683 679 963 640 732 1430 1726 2025 1811 1290 16224

    Unsafe Travelling 823 954 1364 431 652 405 602 846 1265 1535 845 626 10348

    Total 2238 2784 3047 1110 1615 1045 1334 2276 2991 3560 2656 1916 26572

    0

    5000

    10000

    15000

    20000

    25000

    30000

  • 8/3/2019 Design+Measure+Analyze Phase

    22/33

    Detailed Process As-Is Map

  • 8/3/2019 Design+Measure+Analyze Phase

    23/33

    Obtaining data from customer services department due to privacyrestrictions.Coordination between departments as everyone is mostly non-responsiveand resistant to listen.Data bias as all the departments are busy playing the interdepartmental

    blame game and no one wants to take responsibility for their mistakes.The shortage of time also was a hindrance in approaching the company on anofficial level.Understanding the process was also difficult because it was an engineeringrelated issue in the company and we as business students found it difficult to

    understand.

    Key Challenges

  • 8/3/2019 Design+Measure+Analyze Phase

    24/33

    Employee Turnover rate is too high as most qualified employees leave for more lucrative

    offers from overseas airlines.A very vital finding is that there are too many flights and too few aircrafts leading to snagsand problems as there are too many scheduled flights. This is mainly the fault of themarketing department as they are given revenue targets and they dont take into accountthe repair and maintenance time. Leading to snags being carried forward and moreproblems due to grounded aircrafts resulting from poor maintenance due to lack of

    aircrafts available for overbooked flights.Ground Time: The time every aircraft gets for repair and maintenance per day, is too lessas there are too many flights and not that many aircrafts. The management process isundisciplined and there is no check and balance in the system.There is a lot of miscommunication within the departments at PIA.Each departments work for its own benefit and does not look to help other departments.

    There are not many employees in the technical department.All the management processes of the company are inefficient because they are very timeconsuming.The number of employees in the whole company are so many that PIA is unable tomanage them and use their finance in other areas except for the employee salaries.

    The company does not have enough finance to fix its damaged airplanes.

    Key Findings

  • 8/3/2019 Design+Measure+Analyze Phase

    25/33

    Analyze Phase

  • 8/3/2019 Design+Measure+Analyze Phase

    26/33

    The problem in Pakistan was that a major number of customers were not satisfiedwith PIAs service . After gathering and analyzing more information, we found out thatAircrafts were delayed from the line maintenance department due to which flightsdelayed , which is their basic expectation from an airline from which they have totravel. Our goal was to meet the expectations of the customers from the national flagbearing carrier. For this reason, we decided to resolve this problem by studying theentire process of aircraft delivery from the maintenance department.

    After analyzing the entire process flow, two main areas were identified:

    a. Late and ill repairs (Line Maintenance Department)b. Heavy flight load (Marketing Department)c. Maintenance Agreement not followed.

    Tools in Analyze Phase:Tools that we used in our project are:

    HistogramFishbone Diagram (Cause and Effect)Pareto Chart

    Analyze - Context

  • 8/3/2019 Design+Measure+Analyze Phase

    27/33

    Problem Type Counts PercentageCumulativePercentage

    Flight Delays 10348 38.94 38.94%

    Unsafe Travelling 6250 23.52 62.46%

    Inaccurate/DelayedInformation given to

    customers 3868 14.56 77.02%Miscellaneous 3440 12.95 89.97%

    Less Number of trainedStaff 2666 10.03 100.00%

    26572

    38.94%

    62.46%

    77.02%

    89.97%

    100.00%

    0

    2000

    4000

    6000

    8000

    10000

    12000

    0.00%

    20.00%

    40.00%

    60.00%

    80.00%

    100.00%

    120.00%

    Flight Delays Unsafe Travelling Inaccurate/Delayed

    Information given tocustomers

    Miscellaneous Less Number of

    trained Staff

    Counts

    Series2Cumulativepercentage

    Pareto Chart

  • 8/3/2019 Design+Measure+Analyze Phase

    28/33

    Environment People Process

    Measurement Machine Material

    Aircraft maintenanceissues

    Non-ConductiveWorking Atmosphere

    No trainingprogram forstaff

    InsufficientResources forDevelopment

    Labor unioninvolvement

    Low employeeengagement

    Less groundtime for Aircraftmaintenance

    NoRechecking

    Maintenancestandards notFollowed byEmployees

    Lack of coordinationb/w the departments

    No Standards forProcurement of items

    Frequent changes in TopManagement

    Old AircraftReference numbernot allotted toAircraft Items

    No safe handling of materials/ Waste

    Less Control on AlternateMaterial

    No coordination withsupplier forreplacement

    No Quality Audit of Organization procedure

    No Inspection

    No proper trackingsystems

    No proper Quality Policy andObjective

    Storage of AircraftComponents

    Safety Issues

    Impropermachine toolsand workingbenches

    High employeeturnover

    Fishbone Structure(Cause and Effect)

  • 8/3/2019 Design+Measure+Analyze Phase

    29/33

    Data Analysis Summary

    Based on the Histogram and Fishbone Diagram and also conducted brainstormingsessions, we have confirmed that the root causes of the problems are :

    Delays in Flight Labor Union Involvement Less Ground time for Aircraft Maintenance Loss of manpower (High Turnover) Communication Gap between the Departments No standards of procurement and Quality policy

    Current TAT for Complaint Resolution

    Average current TAT = 1 Week (General Customer Complain)Average current TAT = 5 hours of Ground Time (Internal Complain of Aircraft maintenance)

    Data Analysis Summary

  • 8/3/2019 Design+Measure+Analyze Phase

    30/33

    Create a plan for improvement:

    Generating creative solutions ideasAnalyzing the solution options and selecting the best alternative (s)Developing implementation planLearning from the pilot test and implementing the solutions full-

    scale

    Plan for Improvement

  • 8/3/2019 Design+Measure+Analyze Phase

    31/33

    In order to expedite the process, we propose to have a Effective StrategicPlanning and Quality Management, through which PIA Engineering canachieve a satisfactory progress towards the targeted benchmarks in the AirlineIndustry.

    The department will be closely monitoring the entire process flow i.e.:

    Infrastructure Improvement Process Introduction of internal Quality audit Set up of continuation training Improvement in work area and office Conducive regulatory requirements Product Audits Procurement Quality Monitoring by middle management Quality Awareness Program Understanding & Changing organization culture

    Proposal for better resolution of the issue

  • 8/3/2019 Design+Measure+Analyze Phase

    32/33

    Improve Phase

  • 8/3/2019 Design+Measure+Analyze Phase

    33/33

    To Be Process FlowAircraft Maintenance Process Flow

    M a r k e

    t i n g

    D e p a r t m e n

    t

    C u s

    t o m e r

    F l i g h t

    D i s p a

    t c h e r

    &

    C a p

    t a i n s

    C l e a r a n c e

    F u e

    l l i n g

    &

    C l e a n

    i n g

    B o a r d

    i n g o

    f

    P e o p

    l e

    C e n

    t r a

    l

    C o n

    t r o

    l

    L i n e

    M a

    i n t e n a n c e

    Start

    SnagRectification

    Technical LogBook

    Verificationof fuelneeds

    FuellingFuel

    VerificationSigning

    Coordinatingwith FlightDispatcher

    Cabin Clearing Luggage Loading Catering

    Fuel Check Load CheckCrew/

    PassengerList

    Boarding of People(customers) Stop

    Yes

    Ticketing andFlight

    Schedule

    Fuel IndentSigning

    No

    OK to board

    No

    Yes