  • PLACEMENT OF TESTING LOADS FOR RAMP-1,RAMP-2 AND BRIDGE PANEL

    RAMP 1

    Single Footing loads:

    For 1stin +ve X direction : 7.32 t

    For 2nd in +ve X direction : 4.89 t

    For 3rd in +ve X direction : 1.02 t

    Total working load : 53 t

    Total Testing load : 66.25 t (1.25 times of total working load)

    5.05 m

  • RAMP 2

    7.815 m

    Single Footing loads:

    For 1stin +ve X direction : 7.32 t

    For 2nd in +ve X direction : 4.89 t

    For 3rd in +ve X direction : 1.02 t

    Total working load : 26.5 t

    Total Testing load : 33.11 t (1.25 times of total working load)

  • STEEL BRIDGE

    4.225 m

    Single Footing loads:

    For 1stin +ve X direction : 7.32 t

    For 2nd in +ve X direction : 4.89 t

    For 3rd in +ve X direction : 1.02 t

    Total working load : 53 t

    Total Testing load : 66.25 t (1.25 times of total working load)

  • RAMP-1 PADEYE (IWO RAMP & ELEVATED TRACK)

    Zglobal

    Xglobal

    Yglobal

    Xglobal

  • RAMP-2 PADEYE (IWO RAMP & ELEVATED TRACK)

    Zglobal

    Xglobal

    Yglobal

    Xglobal

  • RAMP-2 PADEYE (RAMP LIFTING)

    Yglobal

    Xglobal

    Zglobal

    Xglobal

  • A-FRAME - MAIN PADEYE FOR RAMP RETENTION

    Yglobal

    Xglobal

    Zglobal

    Xglobal