23
DETERMINING THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015

DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

Embed Size (px)

Citation preview

Page 1: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

DETERMINING THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING

Kory Krueger, PTech

PLC Fire Safety Solutions

18/06/2015

Page 2: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

OBJECTIVES

• Types of Facilities

• Regulatory Requirements

• Decommissioning Planning

• Assessment Methodology

• OPEX

Page 3: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

REGULATORY REQUIREMENTSNON-REACTOR FACILITIES

• NFPA 801

• CSA N393

• Fire Protection Program

• Fire Hazard Assessment (or Analysis)

• Means Of Egress

• Water Supply System

• Sprinklers Systems

• Standpipes

• Fire Detection, Alarm and Notification

• Fire Barriers

• Portable Fire Extinguishers

• Emergency Response

Page 4: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

REGULATORY REQUIREMENTSFACILITIES WITH REACTORS

• CSA N293

• CSA N393

• Mothballing; Encasement; and Dismantling and Removal

• Remove Unnecessary Combustibles

• Control Ignition Sources

• Accessible Areas

• Protection of Operating Units

Page 5: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

DECOMMISSIONING PLANNING

• Cease Commercial Operations

– no or limited revenue

• Required Structures Systems and Components

– storage of spent fuel (25 years)

• Reduction of Hazards

• Change of Use

– warehousing or office space

Page 6: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ASSESSMENT OBJECTIVES

• Minimize the fire protection footprint while continuing to meet the fire protection goals.

• Determine the fire protection support resources required to maintain the facility.

Page 7: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ASSESSMENT METHODOLOGY

DEFINE BLDGSAFE STORAGE STATE

IN-SERVICE PARTIALLY IN-SERVICE

OUT-OF-SERVICE

Page 8: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ASSESSMENT METHODOLOGYIN-SERVICE BUILDINGS

IN-SERVICE

FHA

CHANGES?

NO

YES

FP SYSTEMS FOR SAFE

SHUTDOWN?

RAD MAT.CRITICAL SSC?

DET. NEWFP REQ.

FHA REQ. APPLY

NO

YES

NO

CODE REVIEW

YESCODE REVIEW

AND FHA

DEVIATIONS?YESCONFIRM DEV.

OR JUSTIFY ALT. SOLUTION

NO

STOP

Page 9: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ASSESSMENT METHODOLOGYOUT-OF-SERVICE BUILDINGS

OUT-OF-SERVICE

VACANT BLDG REQ. NO INT.

REQUIREMENTS

TRANS. COMB.?RAD. MATERIALS?

IGN. SOURCES?SECURED ENTRY?

PRESENT

RE-DEF. SAFE STORAGE STATE

REMOVEDPOSSIBLE FIRE

IMPACT ON ADJ. BLDG/AREA

DET. NEWFP REQUIRMENTS

YES

NO

Page 10: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ASSESSMENT METHODOLOGYPARTIALLY IN-SERVICE BUILDINGS

PARTIALLYIN-SERVICE

DEF. AREA STATES

EGRESS ROUTE?

NO

IN-SERVICE OUT-OF-SERVICEDET. EGRESS

FROM IN-SERVICE

YES

OUT-OF-SERVICE

IN-SERVICEIN-SERVICE

Page 11: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ACME NUCLEAR POWER PLANT

Define building Safe Storage States

1) IN-SERVICE

2) OUT–OF–SERVICE

3) PARTIALLY IN-SERVICE

SB

TB

RB

AD

TRA

ILERW

AR

EHO

USE

SG FT

Page 12: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ACME NUCLEAR POWER PLANT

1) IN-SERVICE

2) OUT–OF–SERVICE

3) PARTIALLY IN-SERVICE

AD

SB

TB

RB

TRA

ILERW

AR

EHO

USE

SG FT

Page 13: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ACME NUCLEAR POWER PLANT

1) IN-SERVICE

2) OUT–OF–SERVICE

3) PARTIALLY IN-SERVICE

AD

SB

TB

RB

TRA

ILERW

AR

EHO

USE

SG FT

Page 14: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ACME NUCLEAR POWER PLANT

1) IN-SERVICE

2) OUT–OF–SERVICE

3) PARTIALLY IN-SERVICE

AD

SB

TB

RB

TRA

ILERW

AR

EHO

USE

SG FT

Page 15: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ACME NUCLEAR POWER PLANT

1) IN-SERVICE

2) OUT–OF–SERVICE

3) PARTIALLY IN-SERVICE

AD

SB

TB

RB

TRA

ILERW

AR

EHO

USE

SG FT

Page 16: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ACME NUCLEAR POWER PLANT

3) PARTIALLY IN-SERVICE

SB

TB

RB

SB

TB

RB

Page 17: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ACME NUCLEAR POWER PLANT

3) PARTIALLY IN-SERVICE

SB

TB

RB

Page 18: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ACME NUCLEAR POWER PLANT

3) PARTIALLY IN-SERVICE

SB

TB

RB

Page 19: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ACME NUCLEAR POWER PLANT

Define building Safe Storage States

3) PARTIALLY IN-SERVICE

SB

TB

RB

SB

Page 20: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

ACME NUCLEAR POWER PLANT

1) IN-SERVICE

2) OUT–OF–SERVICE

3) PARTIALLY IN-SERVICE

AD

TB

TRA

ILERW

AR

EHO

USE

SG FTSB

RB

Page 21: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

OPEX • Example Photos Here1. Reactor buildings have become

warehouses for highly contaminated materials and equipment.

2. Life safety systems within Reactor buildings have been overlooked.

3. Turbine Halls and other vacancies have become valuable real-estate.

4. Although areas are classified as Out-of-Service, inspection and maintenance work is required; introducing occupants.

5. The life expectancy of the FP systems, including the water supply loop, may not be as long as the safe storage phase before demolition.

6. Inclusion of Fire Protection Assessments in the planning stage.

Page 22: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

CONCLUSIONS

• There are many types of nuclear facilities that at some point need to be decommissioned.

• Regulatory Standards basically have the same requirements; keep the protection in place until the hazards are removed.

• Decommissioning Planning is a required step to determine area use and required critical structures, systems and components.

• Use the existing fire hazard assessments in conjunction with evaluations of the proposed area use.

Page 23: DETERMINING THE MINIMUM FIRE PROTECTION ... THE MINIMUM FIRE PROTECTION REQUIREMENTS FOR DECOMMISSIONING Kory Krueger, PTech PLC Fire Safety Solutions 18/06/2015 OBJECTIVES •Types

CONTACT

Kory Krueger, PTech

PLC Fire Safety Solutions

P: 1 (800) 675-2755

E: [email protected]