Detritiation System Acquisition

Christopher Grant-Wilson

Remote ITER Business Meeting

7 & 8 April 2021

Tritium Plant

Disclaimer: The views and opinions expressed herein do not necessarily reflect those of the ITER Organization

Page 2: Detritiation System Acquisition - ITER Conference Tool

© 2021, ITER Organization

Torus

D+T -> n + He

~1% of feed burns

Torus Vacuum

Tokamak Exhaust

Processing

Isotope

Separation

System

Storage and

Delivery System

Fueling

and other

Detritiation

System

Water Detritiation

System

Stack

Vacuum

Roughing

Neutral Beam

Vacuum

Rooms, enclosures

and process

HD

HT

D2, H2

T2, D2

Other

DT

Other

Other

DT

T2, D2

DT

Other

D2, HD

Other

HTO

H2, HD

Other

H2, D2 T2

H2O

Analytical System

H2O

Detritiation

System

(Hot Cells)

HTO

Other

Rooms, enclosures

and process

Other

Disruption

Mitigation

H2, D2

Ar

Pellets: T2

Gas: D2,other

Glow

Discharge

Cleaning

Radiological and

Environmental

MonitoringPellets: H2, D2, Ar

ITER Fuel Cycle

Detritiation Systems

Page 3: Detritiation System Acquisition - ITER Conference Tool

© 2021, ITER Organization

DS Overview and Safety Functions

DS functions:

• Detritiation before gas release to environment

• Pressure Depression for dynamic confinement

• Filtration of radioactive particulates

Normal DS1Train A

Normal DS2Train B

Stand-By DS1Train A

Stand-By DS2Train B

VV loss of vacuum (extract; inert or air with flammable)

VV or NB Cell detritiation (recycle/extract; inert or air)

Room atmosphere following tritium spill (extract; air)

Stack

DS

DISTRIBUTED

DS

CLIENTS

Line Normally used

Line Not Normally used

Port Cell purge (extract; air)

Room atmosphere (3 rooms) (extract; air)

Process/enclosure gas (evacuate; air or inert or flammable)

Process effluent (extract; inert with flammable)

Glovebox purge (extract; N2)

DS

CORE

DS

DISTRIBUTED

Component and glovebox maint. (extract with PED; air)

VV maintenance purge/vent (extract; inert or air)

Glovebox and process reliable vent (extract; inert)

Process effluent (extract; O2)

Enclosure purge (extract; air or N2)

LegendNB = Neutral BeamPED = Portable Extraction DuctVV = Vacuum Vessel

VV and NB Cell

Processes and Enclosures with inert and flammables

Processes, enclosures and rooms with inert and air

Room tritium release

M0

M1

M2

Tokamak Complex DS (Hot Cell DS not shown)

Page 4: Detritiation System Acquisition - ITER Conference Tool

© 2021, ITER Organization

Recombiner Blower

ScrubberColumn

H2O

Stack

Q2O

AirInertQ2O

Filter

WDS

Detritiated Gas

P

TM

TM

DetritiationFiltration

Pressure Depression

Clients

Air

Inert

Q2

Water

Hydrocarbons

DS Overview and Safety Functions

Page 5: Detritiation System Acquisition - ITER Conference Tool

© 2021, ITER Organization

Tokamak Complex DS (all 8 modules)

Scrubber columns, 8 each (11 m tall)

Page 6: Detritiation System Acquisition - ITER Conference Tool

© 2021, ITER Organization

DS Status

• DS core

– At early final design

• DS piping network

– Captive pipe installation begins 2021

• DS Qualification

– Technologies validated

– Beginning system qualification tests in 2021

Page 7: Detritiation System Acquisition - ITER Conference Tool

© 2021, ITER Organization

Industrial Opportunities – TC-DS DS Design & Fabricate

• Scope

– Tokamak Complex Detritiation System (TC-DS) Core

• Total 8 modules (2 for normal operation; 6 standby for accident conditions)

• Planned contract for final design and procurement/fabrication of TC-DS Core

• Call for tender to be launched in 2021

• Final Design: 2022 - 2024

• Initial manufacturing and testing first components: 2024 – 2027

• Full manufacturing: 2025-2027

Page 8: Detritiation System Acquisition - ITER Conference Tool

© 2021, ITER Organization

Industrial Opportunities – Other planned DS contracts

Other design & fabricate contracts planned as separate contracts:

• TC-DS Piping network (2023 – 2025)

– Approximately 8 km piping network connects clients to TC-DS Core

• Component Nuclear Qualification (2023 – 2025)

• Hot Cell Facility Detritiation System (HCF-DS)

– HCF-DS Core: 6 modules, similar arrangement to TC-DS

– HCF piping network similar scale to TC-DS piping network

– Will follow later according to Hot Cell Facility schedule