Development and Development and Assessment of Controls Assessment of Controls Session Session Coated Flight Bars & Mist System Coated Flight Bars & Mist System Peter G. Kovalchik Peter G. Kovalchik Mining Hearing Loss Prevention Workshop Mining Hearing Loss Prevention Workshop June 21 June 21 - - 22, 2005 22, 2005 Pittsburgh Research Laboratory Pittsburgh Research Laboratory

Development and Assessment of Controls Session

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Development and Assessment of Controls Session

Development and Development and Assessment of Controls Assessment of Controls

SessionSession

Coated Flight Bars & Mist SystemCoated Flight Bars & Mist System

Peter G. KovalchikPeter G. Kovalchik

Mining Hearing Loss Prevention WorkshopMining Hearing Loss Prevention WorkshopJune 21June 21--22, 200522, 2005

Pittsburgh Research LaboratoryPittsburgh Research Laboratory

Page 2: Development and Assessment of Controls Session

CollaboratorsCollaborators

Page 3: Development and Assessment of Controls Session

Coated Flight BarsCoated Flight Bars

Page 4: Development and Assessment of Controls Session

C.U.E. Inc.11 Leonberg Road

Cranberry Township, Pa. 16066-3601 U.S.A.

Phone 724-772-5225Fax 724-772-5280

Web: www.cue-inc.com

PROPERTIESPROPERTIES•• Polyurethane Material Polyurethane Material -- (PO(PO--650)650)•• Durometer Durometer -- 84A 84A •• Compression Set Compression Set -- 45% max. 45% max. •• Ultimate Tensile Strength Ultimate Tensile Strength -- 6000 psi6000 psi

Polyurethane Coating (PO-650)

• Chain flight bars were coated with a durable polyurethane damping material.

• Objectives:• Minimize impact noise• Minimize scrapping noise

Note: Mention of specific brands does not imply endorsement by NIOSH.

Page 5: Development and Assessment of Controls Session

Reverberation ChamberReverberation Chamber

Joy ChainJoy Chain(uncoated)(uncoated)Sound Power: 118 dB(A)Sound Power: 118 dB(A)

Joy ChainJoy Chain(coated)(coated)Sound Power: 111 dB(A)Sound Power: 111 dB(A)

Sound Power reduction of 7 dB(A)

Page 6: Development and Assessment of Controls Session

UNCOATED CHAIN

01/24/04

ENLOW FORK

Page 7: Development and Assessment of Controls Session

30 INCH UNCOATED FLIGHT BARS ENLOW FORK

Crosscut

01/24/04 dB(A)

Page 8: Development and Assessment of Controls Session

COATED CHAIN

01/24/04

Page 9: Development and Assessment of Controls Session

30 INCH COATED FLIGHT BARS ENLOW FORK

Crosscut

01/24/04 dB(A)

Page 10: Development and Assessment of Controls Session

DIFFERENCE BETWEEN 30 INCH UNCOATED FLIGHT BARS &

COATED FLIGHT BARSENLOW FORK

Crosscut

01/24/04 dB(A)

Page 11: Development and Assessment of Controls Session

.633.481,269.9229.796

.42.642,015.9303.198

.312.32,539.8348.299

.21.744,031.7459.5101

.131.326,400.0606.3103

.08110,159.4800.0105

0.060.8712,800.0919.0106

0.101.158,063.5696.4104

0.161.525,079.7527.8102

0.252.003,200.0400.0100

0.503.031,600.0263.997

0.794.001,007.9200.095

1.004.59800.0174.194

2.006.96400.0114.991

2.528.00317.5100.090

4.0010.56200.075.888

8.0016.00100.050.085

16.0024.2550.033.082

25.4032.0031.525.080

NIOSH NIOSH HoursHours

MSHA MSHA HoursHours

NIOSH NIOSH Dose Dose (%)(%)

MSHA DoseMSHA Dose(%)(%)

Sound Sound Pressure Pressure

Level dB(A)Level dB(A)

UncoatedChain

CoatedChain

Page 12: Development and Assessment of Controls Session

02/09/04The shift production data from 1/24 to 2/09 is ----- shifts with 12,500 tons mined.02/09/04

The shift production data from 1/24 to 2/09 was 22 shifts with 12,500 tons mined.

Page 13: Development and Assessment of Controls Session

The shift production data from 1/24 to 7/16 was 164 shifts with 71,826 tons mined.

98 dB(A) at Tail Roller

7/16/04

Page 14: Development and Assessment of Controls Session
Page 15: Development and Assessment of Controls Session
Page 16: Development and Assessment of Controls Session

SummarySummary•• Sound Power Reduction of 7 dB(A)Sound Power Reduction of 7 dB(A)•• Underground Sound Level Reduction of 4 Underground Sound Level Reduction of 4

dB(A)dB(A)•• Durability Durability -- Minimal Wear after 6 months Minimal Wear after 6 months

(mainly on the tips)(mainly on the tips)•• Longer Chain LifeLonger Chain Life•• Allowable Exposure Time was Increased Allowable Exposure Time was Increased

by 1 Hourby 1 Hour•• Promising noise controls on MSHA Promising noise controls on MSHA

Program Information Bulletin P04Program Information Bulletin P04--1818

Page 17: Development and Assessment of Controls Session

Mist Drilling SystemMist Drilling System

Page 18: Development and Assessment of Controls Session

Mist System SpecificationMist System Specification

•• Air Air –– Flow : 20 cfmFlow : 20 cfm–– Pressure: 110 psiPressure: 110 psi

•• WaterWater–– Flow : 1 gal/minFlow : 1 gal/min–– Pressure: 110 psiPressure: 110 psi–– Water Tank: 180 Water Tank: 180

galgal

•• OperationOperation–– Air & Water Air & Water

pressures drop to pressures drop to 96 psi. 96 psi.

Page 19: Development and Assessment of Controls Session

80ft. X80 ft. 80ft. X80 ft. 80ft. X80 ft. 80ft. X80 ft. 80ft. X80 ft. 80ft. X80 ft.

80ft. X80 ft. 80ft. X80 ft. 80ft. X80 ft. 80ft. X80 ft. 80ft. X80 ft. 80ft. X80 ft.

80ft. X80 ft. 80ft. X80 ft. 80ft. X80 ft. 80ft. X80 ft. 80ft. X80 ft. 80ft. X80 ft.

19 ft.

19 ft.

19 ft. 19 ft. 19 ft. 19 ft.

19 ft. 19 ft. 19 ft. 19 ft.

A B C D E

TILER #1 MINETILER #1 MINEMine Height 4 ft.

Coal Seam 32 to 40 inches

Page 20: Development and Assessment of Controls Session

80ft. X 80 ft.

19 ft.

C

TILER #1 MINETILER #1 MINEDrill PlanDrill PlanMine Height 4 ft.

Coal Seam 32 to 40 inches

80ft. X 80 ft.

X X X X

X = Drill Holes

X X X X

X

X

X X X

X X X

Vacuum DrillingNoise Measurement

Mist DrillingNoise Measurement

Page 21: Development and Assessment of Controls Session

EvaluationEvaluation•• Two Fletcher Roof Ranger IITwo Fletcher Roof Ranger II--13 roof bolting 13 roof bolting

machinesmachines–– One with standard dual boom setup for vacuum One with standard dual boom setup for vacuum

drillingdrilling–– One with standard dual boom setup for wet drilling One with standard dual boom setup for wet drilling

with a Joy mist Systemwith a Joy mist System•• DrillingDrilling

–– Hole depth 5 ftHole depth 5 ft–– 1 in. bits1 in. bits–– 3 ft round drill steel starter, then two 3 ft hex drill 3 ft round drill steel starter, then two 3 ft hex drill

steel to finish.steel to finish.–– Rotation & Thrust Rotation & Thrust –– Max?Max?

Page 22: Development and Assessment of Controls Session

ROOF RANGER II-13Fletcher’s Number one seller

approximately 1,281 sold in last 40 years

Page 23: Development and Assessment of Controls Session

Water Tank 180 gal.

Mist Controller

JOY MIST SYSYEM

Page 24: Development and Assessment of Controls Session

Compressor

JOY MIST SYSYEM

Mist Controller

Page 25: Development and Assessment of Controls Session

Summary Summary -- Underground Sound Underground Sound Pressure MeasurementsPressure Measurements

DrillingDrilling

Mist System Mist System turned on, No turned on, No

drillingdrilling

IdlingIdling

Roof Bolting Roof Bolting Machine Machine

OperationOperation

9999101101

8888NANA

82828282

Standard Standard RRII (Mist RRII (Mist System)System)dB(A)dB(A)

Standard Standard RRII RRII

(Vacuum)(Vacuum)dB(A)dB(A)

Page 26: Development and Assessment of Controls Session

.633.481,269.9229.796

.42.642,015.9303.198

.312.32,539.8348.299

.21.744,031.7459.5101

.131.326,400.0606.3103

.08110,159.4800.0105

0.060.8712,800.0919.0106

0.101.158,063.5696.4104

0.161.525,079.7527.8102

0.252.003,200.0400.0100

0.503.031,600.0263.997

0.794.001,007.9200.095

1.004.59800.0174.194

2.006.96400.0114.991

2.528.00317.5100.090

4.0010.56200.075.888

8.0016.00100.050.085

16.0024.2550.033.082

25.4032.0031.525.080

NIOSH NIOSH HoursHours

MSHA MSHA HoursHours

NIOSH NIOSH Dose Dose (%)(%)

MSHA DoseMSHA Dose(%)(%)

Sound Sound Pressure Pressure

Level dB(A)Level dB(A)

Vacuum

Mist

Page 27: Development and Assessment of Controls Session

Penetration Rate = 1.18 in/secPenetration Rate = 1.18 in/secPenetration Rate = 1.07 in/secPenetration Rate = 1.07 in/sec

Number holes / Allowable Number holes / Allowable Exposure = 162 holesExposure = 162 holes

Number holes / Allowable Number holes / Allowable Exposure = 112 holesExposure = 112 holes

Dose per hole = .6% per holeDose per hole = .6% per holeDose per hole = .9% per holeDose per hole = .9% per hole

Drilling Time = 51 secDrilling Time = 51 secDrilling Time = 56 sec.Drilling Time = 56 sec.

Hole depth = 60 in.Hole depth = 60 in.Hole depth = 60 in.Hole depth = 60 in.

Standard RRII Standard RRII (Mist System)(Mist System)

Standard RRII (Vacuum)Standard RRII (Vacuum)

Page 28: Development and Assessment of Controls Session

MISTWET

Less water than wet drilling

Page 29: Development and Assessment of Controls Session

SummarySummary

•• Promising noise controls on MSHA Promising noise controls on MSHA Program Information Bulletin P04Program Information Bulletin P04--1818

•• Longer bit lifeLonger bit life•• Less waterLess water•• Allowable Exposure Time was Allowable Exposure Time was

IncreasedIncreased

Page 30: Development and Assessment of Controls Session

For more informationFor more information

Peter G. KovalchikPeter G. Kovalchik

Phone: 412Phone: 412--386386--6098 Fax: 4126098 Fax: [email protected]@cdc.gov

www.cdc.gov/niosh/miningwww.cdc.gov/niosh/mining

Pittsburgh Research LaboratoryPittsburgh Research Laboratory