0100
250
500m
Scale:Date: November 2013
1:12,500 @ A4, N.T.S. @ A3
plan 2future urban structure
greenvale central development contributions plan
precinct boundaryarterial roadconnector street
key local access streetsomerton road widening
conventional density residential
medium density residential
potential non-govt. primary school
local convenience centre
unencumbered passive open space
unencumbered active open space
encumbered open space - drainage
encumbered open space - vegetation
encumbered open space - crown land
vegetation retentionscattered treeswetland and retarding basin
future urban areaexisting urban area
non urban area
SOMERTON ROAD
PROVIDENCE ROAD
CARR
OLL
LAN
E
BOND
S LA
NE
SECT
ION
ROAD
FREN
CH R
OAD
BREN
DAN
ROAD
MIC
KLEH
AM R
OAD
HILLVIEW ROAD
GREENVALERECREATIONRESERVE
GREENVALERESERVOIR PARK(MELBOURNE
WATER LAND)
EDUCATION CENTRE
WOODLANDSHISTORIC PARK
GREENVALE CENTRAL
DEVELOPMENT CONTRIBUTIONS PLAN November 2013 (amended February 2017)
CONTENTS
1.0 INTRODUCTION 3
1.1 Purpose 3
1.2 Report Basis 3
1.3 Strategic Basis 5
1.4 Planning and Environment Act 1987 5
1.5 Greenvale Central Precinct Structure Plan 5
1.6 The area to which the Development Contributions Plan applies 7
1.7 Project identification 7
2.0 INFRASTRUCTURE PROJECT JUSTIFICATION 9
2.1 Introduction 9
2.2 Items not included in the Development Contributions Plan 10
2.3 Infrastrucure Projects 11
2.4 Project Timing 18
2.5 Distinction between Development Infrastructure and Community Infrastructure 19
3.0 CALCULATION OF CONTRIBUTIONS 20
3.1 Calculation of Net Developable Area and Demand Units 20
3.2 Calculation of Contributions Charges 24
4.0 DEVELOPMENT CONTRIBUTIONS PLAN ADMINISTRATION 33
4.1 Payment of Contributions Levies and Payment Timing 33
4.2 Funds Administration 36
4.3 Construction and Land Value Costs Indexation 37
4.4 Development Contributions Plan Review Period 37
4.5 Collecting Agency (Agency Responsible for Collecting Infrastructure Levy) 38
4.6 Development Agency (Agency Responsible for Works) 38
5.0 IMPLEMENTATION STRATEGY 39
5.1 Rationale for the Implementation Strategy 39
5.2 Implementation Mechanism 39
14 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
Version Date Incorporated into the planning scheme by amendment Description of changes
1 November 2013 Hume C154 N/A
2 April 2014 Hume C182 Table 10 revised
3 September 2016 Hume C213 Amendments to fix clerical errors
4 February 2017 Hume C219 Amendment to fix clerical errors
1.0 INTRODUCTION
1.1 PurposeThe Greenvale Central Development Contributions Plan has been prepared by the Metropolitan Planning Authority with the assistance of Hume City Council, Government agencies, service authorities and major stakeholders.
The Greenvale Central Development Contributions Plan:
• Outlines projects required to ensure that future residents, visitors and workers within the Greenvale Central area can be provided with timely access to services and transport necessary to support aquality, affordable lifestyle
• Establishes a framework for development proponents to make a financial contribution towards the cost of identified infrastructure projects
• Ensures that the cost of providing new infrastructure and services is shared equitably betweenvarious development proponents and the wider community
• Provides the details of the calculation of financial contributions that must be made by futuredevelopments towards the nominated projects
• Provides developers, investors and local communities with certainty about developmentcontribution requirements and how they will be administered.
1.2 Report BasisThe Development Contributions Plan document comprises three parts:
32 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
TABLES
Table 1: Transport Projects 13
Table 2: Community Projects 15
Table 3: Active Recreation Projects 17
Table 4: Community Infrastructure Levy Projects 19
Table 5: Summary Land Use Budget 23
Table 6: Infrastructure Project Justification 26
Table 7: Calculation of Costs 27
Table 8: Project Costs recovered by the DCP 28
Table 9: Summary of Charges 30
Table 10: Items suitable for delivery of works in kind 32
APPENDICES
Appendix 1 Property Specific Land Budget 40
Appendix 2 Transport Infrastructure Costing Sheets 42
PART 1
PART 2
PART 3
Part 1 explains the strategic basis for the Development Contributions Plan, which includes information about the Greenvale Central Precinct Structure Plan and justification for the various infrastructure projects included in the Development Contributions Plan.
Part 2 sets out how the development contributions are calculated and how costs are apportioned.
Part 3 focuses on administration and implementation of the Development Contributions Plan.
PLANS
Plan 1: Local context 4
Plan 2: Future urban structure 6
Plan 3: DCP and main catchment areas 8
Plan 4: Transport projects 12
Plan 5: Community projects 14
Plan 6: Active recreation projects 16
Plan 7: Land use budget 22
GREENVALE WEST (R3)PSP
SOMERTON STREET
PROVIDENCE ROAD
SWAIN STREET
CARR
OLL
LA
NE
BON
D L
AN
E
SEC
TIO
N R
OA
D
FREN
CH R
OA
D
BREN
DA
N R
OA
D
MIC
KLEH
AM
RO
AD
HILLVIEW ROAD
GREENVALERECREATIONAL
RESERVE
CORPUS CHRISTICOMMUNITY FACILITY
ATTWOOD CREEK RESERVE
GREENVALESHOPPING CENTRE
GREENVALEVILLAGE
BRADFORD AVRESERVE
GREENVALEPRIMARY SCHOOL
AITKENCOLLEGE
LOCALRESERVE
POSSIBLESCHOOL
LOCATION
GREENVALERECREATION
CENTRE
ST.CARLO BORROMEOCATHOLIC PRIMARY
SCHOOL
LOCALRESERVE
GREENVALERESERVOIR
WOODLANDSHISTORIC PARK
GREENVALE SEVENTH
DAY ADVENTISTCOMMUNITY
Scale:Date: November 2013
1:15,000 @ A4, N.T.S. @ A3
0 100 250 500m
plan 1local contextgreenvale central development contributions plan
precinct boundary
arterial road
existing roads
existing schools
existing community facilities
shopping centres
active open space
open space - drainage
future urban area
existing urban area
non urban area
1.3 Strategic BasisThe strategic basis for the Development Contributions Plan is established by the State and Local Planning Policy Framework of the Hume Planning Scheme. Key documents are:
• Growth Corridor Plans
• Municipal Strategic Statement
• Greenvale Central Precinct Structure Plan
• Greenvale Central Precinct Structure Plan supporting documents
These documents set out a broad, long term vision for the sustainable development of the Greenvale Central Development Contributions Plan area and its surrounds.
The Greenvale Central Precinct Structure Plan has been developed following a comprehensive planning process which establishes the future direction of development within the precinct.
1.4 Planning and Environment Act 1987The Development Contributions Plan has been prepared in accordance with Part 3B of the Planning and Environment Act 1987 (the Act) and has been developed in line with the State and Local Planning Policy Framework of the Hume Planning Scheme as well as Victorian Government Guidelines. It is consistent with the Minister for Planning’s Direction on Development Contributions made under section 46M(1) of the Act and has had regard to the Victorian Government’s Development Contribution Plan Guidelines.
The Development Contributions Plan provides for the charging of a Development Infrastructure Levy pursuant to section 46J(a) of the Act towards works, services or facilities. It also provides for the charging of a Community Infrastructure Levy pursuant to section 46J(b) of the Act as some items are classified as community infrastructure under the Act, the Minister’s Direction on Development Contributions and the Development Contributions Plan Guidelines.
The Development Contributions Plan forms part of the Hume Planning Scheme pursuant to section 46I of the Act and is an incorporated document under Clause 81 of the Hume Planning Scheme.
The Development Contributions Plan is implemented in the Hume Planning Scheme through Schedule 6 to the Development Contributions Plan Overlay which applies to the area shown in Plan 3.
1.5 Greenvale Central Precinct Structure PlanThe Greenvale Central Precinct Structure Plan area consists of two separate land areas to the north and west of the existing Greenvale.
The Greenvale Central Precinct Structure Plan is expected to accommodate approximately 7,760 people in approximately 2,522 households.
The Greenvale Central Precinct Structure Plan establishes the future urban structure of the new community which includes a range of networks comprising transport, open space and active recreation, social infrastructure and residential neighbourhoods (refer Plan 2).
The need for the infrastructure set out in this Development Contributions Plan has been determined according to the anticipated development scenario for Greenvale Central as described in the Greenvale Central Precinct Structure Plan. The Development Contributions Plan has a strong relationship to the Precinct Structure Plan, as the Greenvale Central Precinct Structure Plan provides the rationale and justification for infrastructure items that have been included within the Development Contributions
54 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
0 100 250 500m
Scale:Date: November 2013
1:12,500 @ A4, N.T.S. @ A3
plan 2future urban structuregreenvale central development contributions plan
precinct boundary
arterial road
connector street
key local access street
somerton road widening
conventional density residential
medium density residential
potential non-govt. primary school
local convenience centre
unencumbered passive open space
unencumbered active open space
encumbered open space - drainage
encumbered open space - vegetation
encumbered open space - crown land
vegetation retention
scattered trees
wetland and retarding basin
future urban area
existing urban area
non urban area
SOMERTON ROAD
PROVIDENCE ROAD
CARR
OLL
LA
NE
BON
DS
LAN
E
SECT
ION
RO
AD
FREN
CH R
OA
D
BREN
DA
N R
OA
D
MIC
KLEH
AM
RO
AD
HILLVIEW ROAD
GREENVALERECREATION
RESERVE
GREENVALERESERVOIR PARK(MELBOURNE WATER LAND)
EDUCATION CENTRE
WOODLANDSHISTORIC PARK
Plan. Accordingly, the Development Contributions Plan is an implementation based planning tool which identifies the infrastructure items required by the new community and apportions the cost of this infrastructure in an equitable manner across the plan area.
1.6 The area to which the Development Contributions Plan applies In accordance with section 46K(1)(a) of the Act the Greenvale Central Development Contributions Plan applies to land shown on Plan 3. The area is also clearly shown on Development Contributions Plan Overlay (DCPO) Schedule 6 in the Hume Planning Scheme.
The Greenvale Central Development Contributions Plan applies to the same area as the Greenvale Central Precinct Structure Plan. The Development Contributions Plan area is characterised by two Main Catchment Areas (MCAs) separated by the intersection of Mickleham Road and Somerton Road. The MCA defines the main catchment area for various infrastructure projects required with the Greenvale Central Precinct Structure Plan. Each MCA is a geographic area from which a given item of infrastructure will draw most of its use.
In selecting items, consideration has been given to ensure they are not already wholly funded through another contribution mechanism, such as a mandatory infrastructure construction requirement as set out in Table 5 of the Greenvale Central Precinct Structure Plan, an existing local development contributions plan, an agreement under section 173 of the Act, or as a condition on an existing planning permit.
1.7 Project IdentificationThe Development Contributions Plan uses a project identification system of project category and sequential number in its tables and plans.
The project categories are summarised as:
• RD – Roads
• IT – Intersections
• CI – Community
• AR – Active Recreation
76 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
0 100 250 500m
Scale:Date: November 2013
1:12,500 @ A4, N.T.S. @ A3
plan 3DCP and main catchment areasgreenvale central development contributions plan
precinct structure plan boundarydevelopment contributions plan overlay‘area north’ main catchment area (MCA)‘area south’ main catchment area (MCA)existing road networkfuture urban areaexisting urban areanon urban area
SOMERTON ROAD
PROVIDENCE ROAD
CARR
OLL
LA
NE
BON
DS
LAN
E
SEC
TIO
N R
OA
D
FREN
CH R
OA
D
BREN
DA
N R
OA
D
MIC
KLEH
AM
RO
AD
HILLVIEW ROAD
2.0 INFRASTRUCTURE PROJECT JUSTIFICATION
2.1 IntroductionThe need for infrastructure included in the Development Contributions Plan has been determined on the basis of the development scenario as described in the Greenvale Central Precinct Structure Plan and its supporting documents.
Items can be included in a Development Contributions Plan if the proposed development of an area is likely to create the need for infrastructure by its future community. New development does not have to trigger the need for new items in its own right. Furthermore, an item can be included in a Development Contributions Plan regardless of whether it is within or outside the Development Contributions Plan area.
Before inclusion in this Development Contributions Plan, all items have been assessed to ensure they have a relationship or nexus to proposed development in the Greenvale Central Precinct Structure Plan area. The cost apportionment methodology adopted in this Development Contributions Plan relies on the nexus principle. A new development is deemed to have a nexus with an item if it is expected to make use of that item.
A summary of how each item relates to projected growth area development is set out below and individual item use apportionments are identified in Table 6.
The items that have been included in this Development Contributions Plan all have the following characteristics; namely they:
• Are essential to the health, safety and well-being of the community
• Will be used by a broad cross-section of the community
• Reflect the vision and strategic aspirations as expressed in the Greenvale Central Precinct Structure Plan
• Are not recurrent items
• Are the basis for the future development of an integrated network.
98 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
2.2 Items not included in the Development Contributions PlanThe following items are not included in the Development Contributions Plan, as they are considered to be normal to the construction of a development and are not considered to warrant cost sharing arrangements beyond those set out in this Development Contributions Plan; they must be provided by developers as a matter of course and/or pursuant to agreements with servicing agencies in implementing the Greenvale Central Precinct Structure Plan:
• Internal streets and connector streets and associated traffic management measures, including streets on the edge of the Greenvale Central Precinct Structure Plan, except where specified as development contributions plan projects
• Intersections connecting the development to the existing road network, except where specified as development contributions plan projects
• Water, sewerage, underground power, gas, telecommunications services
• Local pathways and connections to the regional and/or district pathway network
• Basic levelling, provision of biodiversity offsets, water tapping and landscaping of local passive open space
• Passive public open space reserve master plans and any agreed associated works required by the Precinct Structure Plan
• Council’s plan checking and supervision costs
• Bus stops.
The items listed above may be further addressed and defined by an agreement under section 173 of the Act and/or conditions in planning permits.
Upgrade of the existing road network to an urban standard will be implemented through subdivision permit conditions as outlined in Section 3.5.1 ‘Local Road Network Implementation’ of the Greenvale Central Precinct Structure Plan to the satisfaction of the Responsible Authority, except where specified as a development contributions plan project.
2.3 Infrastructure ProjectsThe following three types of projects are included in the DCP (refer to Plans 4-6):
• Transport
• Community
• Active Recreation
1110 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
0 100 250 500m
Scale:Date: November 2013
1:12,500 @ A4, N.T.S. @ A3
plan 4transport projectsgreenvale central development contributions plan
precinct boundary
road
intersections
pedestrian crossing
Greenvale Drive Extention:Mickleham Road to Bonds Lane
Carroll Lane: Extension
Bonds Lane: Extension
Section Road: Upgrade
Pedestrian Operated Signals (POS): Mickleham Road
Mickleham Road and Hillview Road: Intersection (Interim)
Somerton Road and Brendan Road: Intersection (Interim)
Somerton Road and Section Road: Intersection (Interim)
Mickleham Road and Greenvale Drive: Intersection (Interim)
MIckleham Road and Providence Road: Intersection (interim)
Bonds Lane: Roundabout
RD01
RD02
RD03
RD04
RD05
IT01
IT02
IT03
IT04
IT05
IT06
IT01
IT03
RD03
RD01
RD02
RD05
RD04
IT04
IT05
IT06
IT02
SOMERTON ROAD
PROVIDENCE ROAD
CARR
OLL
LA
NE
BON
DS
LAN
E
SEC
TIO
N R
OA
D
FREN
CH R
OA
D
BREN
DA
N R
OA
D
MIC
KLEH
AM
RO
AD
HILLVIEW ROAD2.3.1 Transport
The key transport related projects in the Development Contributions Plan are based on the transport network depicted in Plan 4 which is based on the report, Greenvale Central PSP Traffic Analysis Report, Traffix Group (July 2012), and Greenvale Central PSP Traffic Assessment, Cardno (August 2013).
The transport projects in a combination of:
• Road construction
• Construction of major controlled intersections and associated works
• Pedestrian operated signals.
Table 1: Transport Projects
1312 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
DCP PROJECT NUMBER
DESCRIPTIONTOTAL PROJECT
COST $ 2013
RD01
Greenvale Drive Extension Mickleham Road to Bonds Lane Construction of Transitional Connector Street (Figure 3) between Greenvale Drive intersection (DCP: IT04) and Bonds Lane: 25-metre width, 416 metres in length. No land purchase.
$ 1,960,192
RD02Carroll Lane: Extension Construction of Transitional Connector Street (Figure 3) between roundabout (DCP: IT06) and existing Carroll Lane: 25-metre width, 190 metres in length. No land purchase.
$ 895,280
RD03Bonds Lane: Extension Construction of Transitional Connector Street (Figure 3) between roundabout (DCP: IT06) and Section Road: 25-metre width, 220 metres in length. No land purchase.
$ 1,036,640
RD04
Section Road: Upgrade Construction of Reserve Connector Street (Figure 4) between Section Road intersection (DCP: IT03) and western extent of RD03 on Section Road: 20-metre width, 760 metres in length. No land purchase.
$ 3,339,440
RD05 Pedestrian Operated Signals (POS): Mickleham Road Construction of pedestrian operated signals on Mickleham Road near Elphinstone Boulevard. $ 355,950
IT01Mickleham Road and Hillview Road: Intersection (Interim) Construction of four-way signalised intersection (interim layout). Purchase of 0.12 hectares of additional required land (ultimate land take).
$ 4,533,383
IT02Somerton Road and Brendan Road: Intersection (Interim) Construction of four-way signalised intersection (interim layout). Purchase of 0.25 hectares of additional required land (ultimate land take).
$ 4,688,047
IT03Somerton Road and Section Road: Intersection (Interim) Construction of signalised T-intersection (interim layout). Purchase of 0.02 hectares of additional required land (ultimate land take).
$ 2,740,564
IT04Mickleham Road and Greenvale Drive: Intersection (Interim) Construction of four-way signalised intersection (interim layout). Purchase of 0.40 hectares of additional required land (ultimate land take).
$ 2,904,276
IT05Mickleham Road and Providence Road: Intersection (Interim) Construction of signalised T-intersection (interim layout). Purchase of 0.10 hectares of additional required land (ultimate land take).
$ 2,083,819
IT06Bonds Lane: Roundabout Construction of roundabout (ultimate layout). Purchase of 0.27 hectares of additional required land (ultimate land take).
$ 1,668,611
TOTAL $ 26,206,201
0 100 250 500m
Scale:Date: November 2013
1:12,500 @ A4, N.T.S. @ A3
plan 5community projectsgreenvale central development contributions plan
precinct boundary
community
Multi-purpose Community Centre(Greenvale West PSP)CI01
CI01
SOMERTON ROAD
PROVIDENCE ROAD
CARR
OLL
LA
NE
BON
DS
LAN
E
SEC
TIO
N R
OA
D
FREN
CH R
OA
D
BREN
DA
N R
OA
D
MIC
KLEH
AM
RO
AD
HILLVIEW ROAD
2.3.2 CommunityThe needs analysis undertaken by ASR Research and Hume City Council determined the requirement for community facilities to meet the needs of the future community. The project is funded by the Development Contributions Plan, as shown on Plan 5, and includes:
Table 2: Community Projects
1514 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
DCP PROJECT NUMBER
DESCRIPTIONTOTAL PROJECT
COST $ 2013
CI01
Multi-purpose Community Centre (Greenvale West PSP). Expansion of multi-purpose community centre to include 1 addition pre-school room, 1 additional Maternal & Child Health (MCH) room, and additional community meeting space.
$ 2,450,470
TOTAL $ 2,450,470
GREENVALERECREATIONRESERVE
GREENVALERESERVOIR PARK(MELBOURNE WATER LAND)
EDUCATION CENTRE
0 100 250 500m
Scale:Date: November 2013
1:12,500 @ A4, N.T.S. @ A3
plan 6active recreation projectsgreenvale central development contributions plan
Playing Fields (Greenvale Recreation Reserve)
Pavilion 1 (Greenvale Recreation Reserve)
Stadium Extenstion (Greenvale Recreation Centre)
Tennis Courts (Greenvale Recreation Reserve)
Sportsground redevelopment(Bradford Avenue Reserve)
Pavilion 2 (Greenvale Recreation Centre)
AR01
AR02
AR03
AR04
AR05
AR06
precinct boundary
active recreation
AR01AR02
AR03AR06
AR04AR05
SOMERTON ROAD
PROVIDENCE ROAD
CARR
OLL
LA
NE
BON
DS
LAN
E
SEC
TIO
N R
OA
D
FREN
CH R
OA
D
BREN
DA
N R
OA
D
MIC
KLEH
AM
RO
AD
HILLVIEW ROAD
2.3.3 Active RecreationThe needs analysis undertaken by ASR Research and Hume City Council determined a number of facilities required to be built on the various active open space areas to meet the needs of the future community. These projects are funded by the Development Contributions Plan, as shown on Plan 6, and include:
Passive open space contributions are required under Clause 52.01 of the Hume Planning Scheme in the area to which this Development Contributions Plan applies.
Table 3: Active Recreation Projects
1716 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
DCP PROJECT NUMBER
DESCRIPTIONTOTAL PROJECT
COST $ 2013
AR01
Playing Field (Greenvale Recreation Reserve) Construction of 1 playing service (AFL/cricket/soccer), car spaces, landscaping and related infrastructure as described by the draft Greenvale Recreation Reserve Master Plan (Hume City Council).
$ 2,135,700
AR02Pavilion (Greenvale Recreation Reserve) Construction of pavilion (including all buildings works) to serve the playing field as described by the draft Greenvale Recreation Reserve Master Plan (Hume City Council).
$ 711,900
AR03 Stadium Extension (Greenvale Recreation Centre) Extension of stadium at Greenvale Recreation Centre. $ 2,186,550
AR04Tennis Courts (Greenvale Recreation Reserve) Construction of 2 tennis courts at Greenvale Recreation Reserve as described by the draft Greenvale Recreation Reserve Master Plan (Hume City Council)
$ 589,860
AR05 Sportsground redevelopment (Bradford Avenue Reserve) Redevelopment of the sportsground at Bradford Avenue Reserve. $ 1,017,000
AR06Pavilion 2 (Greenvale Recreation Centre) Construction of pavilion (including all buildings works) to serve the playing field at Greenvale Recreation Centre.
$ 1,017,000
TOTAL $ 7,658,010
2.4 Project TimingEach item in the Development Contributions Plan has an assumed indicative provision trigger specified in Table 6. The timing of the provision of the items in this Development Contributions Plan is consistent with information available at the time that the Development Contributions Plan was prepared. Council, as the Development Agency, will monitor and assess the required timing for individual items and have regard to its capital works program, and areas external to the Development Contributions Plan Area and the indicative provision triggers specified in Table 6. The Development Agency may seek an amendment to the Development Contributions Plan to adjust indicative provision triggers as part of the five-year review (or earlier if justified). Any adjustment would also need to be consistent with any implementation agreement entered into under Section 173 of the Act.
The Collecting Agency may consider alternative to the priority delivery of works or land where:
• Infrastructure is to be constructed / provided by development proponents as works or land in kind, as agreed by the Collecting Agency
• Network priorities require the delivery of works or land to facilitate broader road network connections
• Community needs determine the delivery of works or land for community facilities or active open space.
All items in the Development Contributions Plan will be provided as soon as is practicable and as soon as sufficient contributions are available, consistent with Section 4.1 and acknowledging the Development Agency’s capacities to provide the balance of funds not recovered by this Development Contributions Plan.
All items included in the Development Contributions Plan will be provided within 33 years (2046) from the date upon which this Development Contributions Plan was first incorporated with the Hume Planning Scheme.
2.5 Distinction between Development Infrastructure and Community InfrastructureIn accordance with the Act and Ministerial Directions on Development Contributions pursuant to Section 46M of the Act, the Development Contributions Plan makes a distinction between ’development‘ and ‘community’ infrastructure.
The timing of payment of contributions is linked to the type of infrastructure in question.
The community infrastructure levy contributions are to be paid by the home builder at the time of building approval (unless an alternative time is agreed between the Collecting Agency and a development proponent). Community infrastructure levy contributions will be paid for at a ‘per-dwelling’ rate. The Act currently stipulates that the amount that may be contributed under a community infrastructure levy is no more than $900 per dwelling. The Governor in Council may from time to time by Order published in the Government Gazette vary the maximum amount that may be collected by the Community Infrastructure Levy. If in future the Community Infrastructure Levy is amended, the levy applicable to the release of the remaining dwellings may be adjusted in accordance with the revised legislative and regulatory approach as directed by the Minister for Planning.
The projects listed in Table 4 are deemed to be community infrastructure projects:
Table 4: Community Infrastructure Levy Projects
DCP PROJECT NUMBER
DESCRIPTIONTOTAL PROJECT
COST $ 2013
AR02Pavilion (Greenvale Recreation Reserve) Construction of pavilion (including all buildings works) to serve the playing field as described by the draft Greenvale Recreation Reserve Master Plan (Hume City Council).
$ 711,900
AR06Pavilion 2 (Greenvale Recreation Centre) Construction of pavilion (including all buildings works) to serve the playing field at Greenvale Recreation Centre.
$ 1,017,000
TOTAL $ 1,728,900
All other infrastructure projects are classified as development infrastructure projects.
Contributions relating to development infrastructure are to be made by developers at the time of subdivision. If subdivision is not applicable payments must be made prior to construction of buildings and works.
1918 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
3.0 CALCULATION OF CONTRIBUTIONS
The general cost apportionment method includes the following steps:
• Calculation of the Net Developable Area (NDA) and demand units (refer Tables 5 and 6)
• Calculation of project costs (refer Table 6)
• Identification and allowance for external use (refer Table 7)
• Cost apportionment and catchments (refer Table 7)
• Identification of development types required to pay the levy (Refer to Table 7)
• Summary of costs payable for each infrastructure project (refer Table 8)
• The development infrastructure charge per hectare for each development type and the community infrastructure levy per dwelling (refer Table 9).
3.1 Calculation of Net Developable Area and Demand UnitsThe following section sets out how Net Developable Area is calculated and outlines the development projections anticipated in the area.
3.1.1 Net Developable AreaIn this Development Contributions Plan, all development infrastructure contributions are payable on the net developable area of land on any given development site.
For the purposes of this Development Contributions Plan, Net Developable Area is defined as the total amount of land within the area of the Greenvale Central Precinct Structure Plan that is made available for the development of housing and employment buildings, including lots, all connector and local streets. It is the total precinct area minus land for community facilities, schools, educational facilities, open space, encumbered land and arterial roads. Any additional small local parks defined at the subdivision stage are included in the NDA.
The NDA for the Development Contributions Plan has been assessed as set out in Table 5.
This page has been intentionally left blank.
2120 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
1
2
3
45
6
789
10
11
12
131415
16
17
18
19
20
21
22
23
24
25
25a
26 27 28 29
32
31
30
33
34
3536 37
38
39
40
41
42
4344
45
46
47
48
49
50
5152
53
54
5556
57
58
59
60
61
6263
6465
66 676877
78
89
797669
7075
88
8087
90
91
7174
7273
82 83 8485 93 94
9286
81
72a
37a
0 100 250 500m
Scale:Date: November 2013
1:12,500 @ A4, N.T.S. @ A3
plan 7land use budgetgreenvale central development contributions plan
precinct boundary
road widening
conventional density residential
medium density residential
potential non-govt. primary school
unencumbered passive open space
encumbered open space - drainage
encumbered open space - vegetation
encumbered open space - crown land
property number21
SOMERTON ROAD
PROVIDENCE ROAD
CARR
OLL
LA
NE
BON
DS
LAN
E
SEC
TIO
N R
OA
D
FREN
CH R
OA
D
BREN
DA
N R
OA
D
MIC
KLEH
AM
RO
AD
HILLVIEW ROAD
3.1.2 Land Budget and Demand UnitsThe ‘net developable hectare’ is the demand unit for this Development Contributions Plan.
‘Urban development’ is the one development type included in this Development Contributions Plan. Urban development is defined broadly to include all forms of development, including residential subdivision and development within local convenience centres. Urban development also includes any non-residential uses within the residential area such as a place of worship, education centre, retirement village, nursing home, child care centre, medical centre, convenience store or any other approved use. Greenvale Central Development Contributions Plan area contains a total of 168.54 net developable hectares, equal to the Net Developable Area.
3.1.3 Property Specific CalculationsThe Net Developable Area used to calculate the contributions with the Development Contributions Plan has been based on an assessment of individual properties. The NDA for each property is listed in the Property Specific Land Budget (Appendix 1). The property-specific NDA and rates listed in this Development Contributions Plan determine the total contribution for each property.
Table 5: Summary Land Use Budget
2322 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
DESCRIPTIONGREENVALE CENTRAL
HECTARES % OF TOTAL AREA % OF NDA
TOTAL PRECINCT AREA (ha) 207.65 100.0%
TRANSPORT6 Lane Arterial Road/ Widening 2.65 1.28% 1.57%
Local Road 17.14 8.25% 10.17%SUB-TOTAL 19.79 9.53% 11.74%EDUCATIONNon Government School - Primary 2.60 1.25% 1.54%Existing Place of Worship 0.13 0.06% 0.08%SUB-TOTAL 2.73 1.31% 1.62%
OPEN SPACEENCUMBERED LAND AVAILABLE FOR RECREATIONWaterway / Drainage Line / Wetland / Retarding 4.25 2.05% 2.52%Brodies Creek Encumbered Open Space 3.89 1.87% 2.31%Conservation 2.39 1.15% 1.42%Crown Land 1.58 0.76% 0.94%SUB-TOTAL 12.11 5.84% 7.18%
UNENCUMBERED LAND AVAILABLE FOR RECREATIONActive Open Space 0.00 0.0% 0.00%Passive Open Space 4.46 2.1% 2.65%SUB-TOTAL 4.46 2.1% 2.65%TOTALS OPEN SPACE 16.57 8.0% 9.83%
NET DEVELOPABLE AREA (NDA) (ha) 168.56 81.17%
DESCRIPTIONGREENVALE CENTRAL
HECTARES DWELL / NDHA DWELLINGS
RETAIL / EMP & OTHER
Activity Centre (retail/offi ce/mixed use) 0.00
Identifi ed Non Government School 0.00
SUB-TOTAL 0.00
RESIDENTIAL
Residential - Conventional Density Residential 148.24 14 2075
Residential - Medium Density 20.33 22 447
SUB-TOTAL AGAINST NET RESIDENTIAL AREA (NRA) 168.56 14.96 2522
COMBINED RES/ RETAIL / EMP / OTHER NDA (Ha) DWELL / NDHA DWELLINGS
TOTALS RESIDENTIAL YIELD AGAINST NDA 168.56 14.96 2522
3.2 Calculation of Contributions Charges
3.2.1 Calculation of CostsEach infrastructure project has been assigned a land and/or construction cost. These costs are listed in Table 6. The costs are expressed in 2013 dollars and will be adjusted annually in accordance with the method specified in Section 4.3 of this Development Contributions Plan.
Road and intersection construction costs have been determined by Meinhardt Australia (refer to Appendix 2 for transport infrastructure costing sheets).
All active recreation and community construction costs have been determined by ASR Research and the Hume City Council.
3.2.2 Valuation of LandThe area of land to be acquired through the DCP is identified by detailed intersection functional layout plans (Appendix 2) and based on information in the Greenvale Central Precinct Structure Plan. O’Briens Valuers and Property Consultants, as a registered valuer, prepared a Valuation Report which determined the value for each area of land required by the DCP. The average ‘per hectare’ value provided by O’Briens Valuers and Property Consultants is $1,028,189. This value has been used to calculate the cost of the land component for all relevant projects included in this DCP.
3.2.3 Cost ApportionmentThis Development Contributions Plan apportions a charge to new development according to its projected share of use of an identified infrastructure item. Since development contributions charges are levied ‘up-front’, a measure of actual use by individual development sites is not possible. Therefore costs must be shared in accordance with the estimated share of use.
This Development Contributions Plan calculates what each new development should pay towards provision of the identified infrastructure item. This is the total cost of the item (after deducting other funding sources and making allowance for any external demand) divided by total demand units within its Main Catchment Area. To support this approach, a Main Catchment Area has been determined for each item.
The balance of the cost of the items not recovered under this Development Contributions Plan will be funded from alternative sources.
3.2.4 Main Catchment Areas The Main Catchment Area (MCA) is the geographic area from which a given item of infrastructure will draw most of its use. The PSP contains two MCAs covering the entire precinct.
Charge Area North applies to land bound by Aitken College to the north, Greenvale Reservoir Park to the east, Somerton Road to the south and Mickleham Road to the west. Charge Area North contains 64.34 net developable hectares.
Charge Area South applies to land bound by Somerton Road to the north, Mickleham Road to the east, Providence Road (inclusive) to the south and Greenvale Recreation Reserve (Woodlands Historic Park) to the west. Charge Area South contains 121.96 net developable hectares.
It is important to note that the number of net developable hectares (that is the demand units) in each area is based on the land budgets in Table 5 and Appendix 1.
The ’per net developable hectare’ contributions will not and must not be amended to respond to minor changes to land budgets that may result from the subdivision process. In other words, the Development Contributions Plan is permanently linked to the calculation of the Net Developable Area set out in Appendix 1.
For the purposes of this Development Contributions Plan, the Net Developable Area and net developable hectare calculations may only change if the Collecting Agency for any particular item of infrastructure agrees to a variation to the Summary Land Use Budget and associated tables. Appendix 1 should be used to determine the number of developable hectares (for Development Contributions Plan purposes) on individual parcels.
3.2.5 External UseAn allowance has been made for other use external to the MCA for specific projects. That is, use that does not solely emanate from the Greenvale Central Precinct Structure Plan area. Table 7 quantifies any external demand (as a percentage) for each infrastructure project. Where an external demand has been assessed, a percentage discount has been made to the dollar amount that would otherwise be recovered (refer to Table 7, column 7) in relation to the Development Contributions Plan area.
Credit has been attributed to the existing Greenvale community for providing the land component required for community and active recreation projects in calculating external use for this Development Contribution Plan.
3.2.6 Non-Government SchoolsThe development of land for a non-government school is exempt from the requirement to pay a development infrastructure levy and a community infrastructure levy under the Development Contributions Plan.
3.2.7 Schedule of Costs Table 8 calculates the amount of contributions payable by each Main Catchment Area for each infrastructure category.
3.2.8 Summary of Charges per HectareTable 8 shows the quantum of funds to be contributed by each Main Catchment Area toward each infrastructure project. The total adds up to the total amount of funds recoverable under the Development Contributions Plan.
Table 9 sets out a summary of costs for each Main Catchment Area.
2524 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
Tabl
e 6:
Inf
rast
ruct
ure
Proj
ect J
ustifi
catio
n
26
DCP
PR
OJE
CT
NU
MBE
RIN
FRA
STRU
CTU
RE
CATE
GO
RYD
EVEL
OPM
ENT
AG
ENCY
DES
CRIP
TIO
NLA
ND
A
REA
(HA
)ES
TIM
ATED
PRO
JEC
T CO
ST $
201
3IN
DIC
ATIV
E PR
OV
ISIO
N T
RIG
GER
SUIT
ABL
E FO
R IN
-KIN
D
DEL
IVER
YST
RATE
GIC
JU
STIF
ICAT
ION
LAN
DCO
NST
RUC
TIO
NTO
TAL
RD01
Dev
elop
men
tH
ume
City
Co
unci
l
Gre
enva
le D
rive
Exte
nsio
n: M
ickl
eham
Roa
d to
Bon
ds L
ane
Cons
truc
tion
of T
rans
ition
al C
onne
ctor
Str
eet (
Figu
re 3
) bet
wee
n G
reen
vale
Driv
e in
ters
ectio
n (D
CP: I
T04)
and
Bon
ds L
ane:
25-
met
re w
idth
, 416
met
res
in le
ngth
. No
land
pur
chas
e.
0.00
$ -
$ 1
,960
,192
$
1,9
60,1
92
Whe
n IT
04 is
con
stru
cted
(unl
ess
wor
ks d
eliv
ered
in k
ind)
.Ye
s
Gre
enva
le C
entr
al
Prec
inct
Str
uctu
re P
lan
Gre
enva
le C
entr
al T
raffi
c A
naly
sis
Repo
rt (T
raffi
x G
roup
, 201
2)G
reen
vale
Cen
tral
Tra
ffi c
Ass
essm
ent (
Card
no,
2013
)
RD02
Dev
elop
men
tH
ume
City
Co
unci
l
Carr
oll L
ane:
Ext
ensi
onCo
nstr
uctio
n of
Tra
nsiti
onal
Con
nect
or S
tree
t (Fi
gure
3) b
etw
een
roun
dabo
ut
(DCP
: IT0
6) a
nd e
xist
ing
Carr
oll L
ane:
25-
met
re w
idth
, 190
met
res
in le
ngth
. No
land
pur
chas
e.
0.00
$ -
$ 8
95,2
80
$ 8
95,2
80
At t
ime
of s
ubdi
visi
on/ a
cces
s de
man
d.Ye
s
RD03
Dev
elop
men
tH
ume
City
Co
unci
l
Bond
s La
ne: E
xten
sion
Cons
truc
tion
of T
rans
ition
al C
onne
ctor
Str
eet (
Figu
re 3
) bet
wee
n ro
unda
bout
(D
CP: I
T06)
and
Sec
tion
Road
: 25-
met
re w
idth
, 220
met
res
in le
ngth
. No
land
pu
rcha
se.
0.00
$ -
$ 1
,036
,640
$
1,0
36,6
40
At t
ime
of s
ubdi
visi
on/ a
cces
s de
man
d.Ye
s
RD04
Dev
elop
men
tH
ume
City
Co
unci
l
Sect
ion
Road
: Upg
rade
Cons
truc
tion
of R
eser
ve C
onne
ctor
Str
eet (
Figu
re 4
) bet
wee
n Se
ctio
n Ro
ad
inte
rsec
tion
(DCP
: IT0
3) a
nd w
este
rn e
xten
t of R
D03
on
Sect
ion
Road
: 20-
met
re
wid
th, 7
60 m
etre
s in
leng
th. N
o la
nd p
urch
ase.
0.00
$ -
$ 3
,339
,440
$
3,3
39,4
40
Not
bef
ore
RD01
-03
and
IT03
-06
have
be
en c
onst
ruct
ed.
Yes
RD05
Dev
elop
men
tH
ume
City
Co
unci
l
Pede
stria
n O
pera
ted
Sign
als
(PO
S): M
ickl
eham
Roa
dCo
nstr
uctio
n of
ped
estr
ian
oper
ated
sig
nals
on
Mic
kleh
am R
oad
near
Elp
hins
tone
Bo
ulev
ard.
0.00
$ -
$ 3
55,9
50
$ 3
55,9
50
500
occu
pied
dw
ellin
gs in
Are
a So
uth
and/
or n
o ea
rlier
than
fi ve
yea
rs fr
om
com
men
cem
ent o
f dev
elop
men
t.Ye
s
IT01
Dev
elop
men
tH
ume
City
Co
unci
l
Mic
kleh
am R
oad
and
Hill
view
Roa
d: In
ters
ectio
n (In
terim
)Co
nstr
uctio
n of
four
-way
sig
nalis
ed in
ters
ectio
n (in
terim
layo
ut).
Purc
hase
of 0
.12
hect
ares
of a
dditi
onal
requ
ired
land
(ulti
mat
e la
nd ta
ke).
0.12
$ 1
23,3
83
$ 4
,410
,000
$
4,5
33,3
83
At t
ime
of s
ubdi
visi
on/ a
cces
s de
man
d.Ye
sG
reen
vale
Cen
tral
Pr
ecin
ct S
truc
ture
Pla
nG
reen
vale
Cen
tral
Tra
ffi c
Ana
lysi
s Re
port
(Tra
ffi x
Gro
up, 2
012)
IT02
Dev
elop
men
tH
ume
City
Co
unci
l
Som
erto
n Ro
ad a
nd B
rend
an R
oad:
Inte
rsec
tion
(Inte
rim)
Cons
truc
tion
of fo
ur-w
ay s
igna
lised
inte
rsec
tion
(inte
rim la
yout
). Pu
rcha
se o
f 0.2
5 he
ctar
es o
f add
ition
al re
quire
d la
nd (u
ltim
ate
land
take
).0.
25$
257
,047
$
4,4
31,0
00
$ 4
,688
,047
A
t tim
e of
sub
divi
sion
/ acc
ess
dem
and.
Yes
IT03
Dev
elop
men
tH
ume
City
Co
unci
l
Som
erto
n Ro
ad a
nd S
ectio
n Ro
ad: I
nter
sect
ion
(Inte
rim)
Cons
truc
tion
of s
igna
lised
T-in
ters
ectio
n (in
terim
layo
ut).
Purc
hase
of 0
.02
hect
ares
of
add
ition
al re
quire
d la
nd (u
ltim
ate
land
take
).0.
02$
20,
564
$ 2
,720
,000
$
2,7
40,5
64
500
occu
pied
dw
ellin
gs in
Are
a So
uth
and/
or n
o ea
rlier
than
fi ve
yea
rs fr
om
com
men
cem
ent o
f dev
elop
men
t.Ye
sG
reen
vale
Cen
tral
Pr
ecin
ct S
truc
ture
Pla
nG
reen
vale
Cen
tral
Tra
ffi c
Ana
lysi
s Re
port
(Tra
ffi x
Gro
up, 2
012)
Gre
enva
le C
entr
al T
raffi
c A
sses
smen
t (Ca
rdno
, 20
13)
IT04
Dev
elop
men
tH
ume
City
Co
unci
l
Mic
kleh
am R
oad
and
Gre
enva
le D
rive:
Inte
rsec
tion
(Inte
rim)
Cons
truc
tion
of fo
ur-w
ay s
igna
lised
inte
rsec
tion
(inte
rim la
yout
). Pu
rcha
se o
f 0.4
0 he
ctar
es o
f add
ition
al re
quire
d la
nd (u
ltim
ate
land
take
).0.
40$
411
,276
$
2,4
93,0
00
$ 2
,904
,276
50
0 oc
cupi
ed d
wel
lings
in A
rea
Sout
h an
d/or
fi ve
yea
rs o
f com
men
cem
ent
of d
evel
opm
ent.
Yes
IT05
Dev
elop
men
tH
ume
City
Co
unci
l
Mic
kleh
am R
oad
and
Prov
iden
ce R
oad:
Inte
rsec
tion
(Inte
rim)
Cons
truc
tion
of s
igna
lised
T-in
ters
ectio
n (in
terim
layo
ut).
Purc
hase
of 0
.10
hect
ares
of
add
ition
al re
quire
d la
nd (u
ltim
ate
land
take
).0.
10$
102
,819
$
1,9
81,0
00
$ 2
,083
,819
50
0 oc
cupi
ed d
wel
lings
in A
rea
Sout
h an
d/or
fi ve
yea
rs o
f com
men
cem
ent
of d
evel
opm
ent.
Yes
IT06
Dev
elop
men
tH
ume
City
Co
unci
l
Bond
s La
ne: R
ound
abou
tCo
nstr
uctio
n of
roun
dabo
ut (u
ltim
ate
layo
ut).
Purc
hase
of 0
.27
hect
ares
of
addi
tiona
l req
uire
d la
nd (u
ltim
ate
land
take
).0.
27$
277
,611
$
1,3
91,0
00
$ 1
,668
,611
W
hen
RD02
and
RD
03 a
re
cons
truc
ted.
Yes
CI01
Dev
elop
men
tH
ume
City
Co
unci
l
Mul
ti-pu
rpos
e Co
mm
unity
Cen
tre
(Gre
enva
le W
est P
SP).
Expa
nsio
n of
mul
ti-pu
rpos
e co
mm
unity
cen
tre
to in
clud
e 1
addi
tion
pre-
scho
ol ro
om, 1
add
ition
al M
ater
nal &
Chi
ld H
ealth
(MCH
) roo
m, a
nd a
dditi
onal
co
mm
unity
mee
ting
spac
e.
0.00
$ -
$ 2
,450
,470
$
2,4
50,4
70
Faci
lity
to b
e co
nstr
ucte
d w
hen
popu
latio
n gr
owth
cre
ates
the
need
No
Gre
enva
le C
entr
al
Prec
inct
Str
uctu
re P
lan
Gre
enva
le C
entr
al
PSP
Com
mun
ity
Infr
astr
uctu
re
Ass
esse
men
t (A
SR
Rese
arch
)H
ume
City
Cou
ncil
AR0
1D
evel
opm
ent
Hum
e Ci
ty
Coun
cil
Play
ing
Fiel
d (G
reen
vale
Rec
reat
ion
Rese
rve)
. Co
nstr
uctio
n of
1 p
layi
ng s
ervi
ce (A
FL/c
ricke
t/so
ccer
), ca
r spa
ces,
land
scap
ing
and
rela
ted
infr
astr
uctu
re a
s de
scrib
ed b
y th
e dr
aft G
reen
vale
Rec
reat
ion
Rese
rve
Mas
ter P
lan
(Hum
e Ci
ty C
ounc
il).
0.00
$ -
$ 2
,135
,700
$
2,1
35,7
00
Faci
lity
to b
e co
nstr
ucte
d w
hen
popu
latio
n gr
owth
cre
ates
the
need
No
AR0
2Co
mm
unity
Hum
e Ci
ty
Coun
cil
Pavi
lion
(Gre
enva
le R
ecre
atio
n Re
serv
e).
Cons
truc
tion
of p
avili
on (i
nclu
ding
all
build
ings
wor
ks) t
o se
rve
the
play
ing
fi eld
as
des
crib
ed b
y th
e dr
aft G
reen
vale
Rec
reat
ion
Rese
rve
Mas
ter P
lan
(Hum
e Ci
ty
Coun
cil).
0.00
$ -
$ 7
11,9
00
$ 7
11,9
00
Whe
n A
R01
is c
onst
ruct
ed.
No
AR0
3D
evel
opm
ent
Hum
e Ci
ty
Coun
cil
Stad
ium
Ext
ensi
on (G
reen
vale
Rec
reat
ion
Cent
re)
Exte
nsio
n of
sta
dium
at G
reen
vale
Rec
reat
ion
Cent
re.
0.00
$ -
$ 2
,186
,550
$
2,1
86,5
50
Faci
lity
to b
e co
nstr
ucte
d w
hen
popu
latio
n gr
owth
cre
ates
the
need
No
AR0
4D
evel
opm
ent
Hum
e Ci
ty
Coun
cil
Tenn
is C
ourt
s (G
reen
vale
Rec
reat
ion
Rese
rve)
Cons
truc
tion
of 2
tenn
is c
ourt
s at
Gre
enva
le R
ecre
atio
n Re
serv
e as
des
crib
ed b
y th
e dr
aft G
reen
vale
Rec
reat
ion
Rese
rve
Mas
ter P
lan
(Hum
e Ci
ty C
ounc
il).
0.00
$ -
$ 5
89,8
60
$ 5
89,8
60
Faci
lity
to b
e co
nstr
ucte
d w
hen
popu
latio
n gr
owth
cre
ates
the
need
No
AR0
5D
evel
opm
ent
Hum
e Ci
ty
Coun
cil
Spor
tsgr
ound
rede
vlop
men
t (Br
adfo
rd A
venu
e Re
serv
e)Re
deve
lopm
ent o
f the
spo
rtsg
roun
d at
Bra
dfor
d Av
enue
Res
erve
.0.
00$
- $
1,0
17,0
00
$ 1
,017
,000
Fa
cilit
y to
be
cons
truc
ted
whe
n po
pula
tion
grow
th c
reat
es th
e ne
edN
o
AR0
6Co
mm
unity
Hum
e Ci
ty
Coun
cil
Pavi
lion
2 (G
reen
vale
Rec
reat
ion
Cent
re)
Cons
truc
tion
of p
avili
on (i
nclu
ding
all
build
ings
wor
ks) t
o se
rve
the
play
ing
fi eld
at
Gre
enva
le R
ecre
atio
n Ce
ntre
.0.
00$
- $
1,0
17,0
00
$ 1
,017
,000
Fa
cilit
y to
be
cons
truc
ted
whe
n po
pula
tion
grow
th c
reat
es th
e ne
edN
o
TOTA
L1.
16$
1,19
2,69
9 $
35,
121,
982
$ 3
6,31
4,68
1
Tabl
e 6:
INFR
ASTR
UCTU
RE P
ROJE
CT JU
STIF
ICAT
ION
Tabl
e 7:
Cal
cula
tion
of C
osts
28
DCP
PR
OJE
CT
NU
MBE
RIN
FRA
STRU
CTU
RE
CATE
GO
RYD
ESCR
IPTI
ON
ESTI
MAT
ED
LAN
D C
OST
$
2013
ESTI
MAT
ED
CON
STRU
CTI
ON
CO
ST $
201
3
TOTA
L PR
OJE
CT
COST
$
2013
PRO
PORT
ION
O
F CO
ST
ATTR
IBU
TABL
E TO
TH
E M
CA %
TOTA
L CO
ST
ATTR
IBU
TABL
E TO
MA
IN
CATC
HM
ENT
ARE
A $
2013
MA
IN C
ATCH
MEN
T A
REA
ARE
A S
OU
THA
REA
NO
RTH
ARE
A N
ORT
H &
A
REA
SO
UTH
NU
MBE
R O
F N
ET
DEV
ELO
PABL
E H
ECTA
RES
IN
MCA
CON
TRIB
UTI
ON
PE
R N
ET
DEV
ELO
PABL
E H
ECTA
RE $
2013
CON
TRIB
UTI
ON
PE
R D
WEL
LIN
G
$201
3
RD01
Dev
elop
men
tG
reen
vale
Driv
e Ex
tens
ion:
Mic
kleh
am R
oad
to B
onds
Lan
eCo
nstr
uctio
n of
Tran
sitio
nal C
onne
ctor
Stre
et (F
igur
e 3)
bet
wee
n G
reen
vale
Driv
e in
ters
ectio
n (D
CP: IT
04) a
nd B
onds
Lan
e: 2
5-m
etre
wid
th, 4
16 m
etre
s in
leng
th. N
o la
nd p
urch
ase.
$ -
$ 1
,960
,192
$
1,9
60,1
92
100%
$ 1
,960
,192
Ar
ea S
outh
121.
96$
16,
072.
42
$ 1
,071
.49
RD02
Dev
elop
men
tCa
rroll
Lane
: Ext
ensio
nCo
nstr
uctio
n of
Tran
sitio
nal C
onne
ctor
Stre
et (F
igur
e 3)
bet
wee
n ro
unda
bout
(D
CP: IT
06) a
nd
exist
ing
Carro
ll La
ne: 2
5-m
etre
wid
th, 1
90 m
etre
s in
leng
th. N
o la
nd p
urch
ase.
$ -
$ 8
95,2
80
$ 8
95,2
80
100%
$ 8
95,2
80
Area
Sou
th12
1.96
$ 7
,340
.77
$ 4
89.3
8
RD03
Dev
elop
men
tBo
nds L
ane:
Ext
ensio
nCo
nstr
uctio
n of
Tran
sitio
nal C
onne
ctor
Stre
et (F
igur
e 3)
bet
wee
n ro
unda
bout
(DCP
: IT06
) and
Se
ctio
n Ro
ad: 2
5-m
etre
wid
th, 2
20 m
etre
s in
leng
th. N
o la
nd p
urch
ase.
$ -
$ 1
,036
,640
$
1,0
36,6
40
100%
$ 1
,036
,640
Ar
ea S
outh
121.
96$
8,4
99.8
4 $
566
.66
RD04
Dev
elop
men
t
Sect
ion
Road
: Upg
rade
Cons
truc
tion
of R
eser
ve C
onne
ctor
Stre
et (F
igur
e 4)
bet
wee
n Se
ctio
n Ro
ad in
ters
ectio
n (D
CP:
IT03
) and
wes
tern
ext
ent o
f RD
03 o
n Se
ctio
n Ro
ad: 2
0-m
etre
wid
th, 7
60 m
etre
s in
leng
th. N
o la
nd p
urch
ase.
$ -
$ 3
,339
,440
$
3,3
39,4
40
100%
$ 3
,339
,440
Ar
ea S
outh
121.
96$
27,
381.
44
$ 1
,825
.43
RD05
Dev
elop
men
tPe
dest
rian
Ope
rate
d Si
gnal
s (PO
S): M
ickl
eham
Roa
dCo
nstr
uctio
n of
ped
estr
ian
oper
ated
sign
als o
n M
ickl
eham
Roa
d ne
ar E
lphi
nsto
ne B
oule
vard
.$
- $
355
,950
$
355
,950
10
0%$
355
,950
Ar
ea S
outh
121.
96$
2,9
18.5
8 $
194
.57
IT01
Dev
elop
men
tM
ickl
eham
Roa
d an
d H
illvi
ew R
oad:
Inte
rsec
tion
(Inte
rim)
Cons
truc
tion
of fo
ur-w
ay si
gnal
ised
inte
rsec
tion
(inte
rim la
yout
). Pu
rcha
se o
f 0.1
2 he
ctar
es o
f ad
ditio
nal r
equi
red
land
(ulti
mat
e la
nd ta
ke).
$ 1
23,3
83
$ 4
,410
,000
$
4,5
33,3
83
100%
(lan
d)
50%
(c
onst
ruct
ion)
$ 2
,328
,383
Ar
ea N
orth
64.3
4$
35,
229.
89
$ 2
,348
.66
IT02
Dev
elop
men
tSo
mer
ton
Road
and
Bre
ndan
Roa
d: In
ters
ectio
n (In
terim
)Co
nstr
uctio
n of
four
-way
sign
alise
d in
ters
ectio
n (in
terim
layo
ut).
Purc
hase
of 0
.25
hect
ares
of
addi
tiona
l req
uire
d la
nd (u
ltim
ate
land
take
).$
257
,047
$
4,4
31,0
00
$ 4
,688
,047
10
0%$
4,6
88,0
47
Area
Nor
th64
.34
$ 7
2,86
3.65
$
4,8
57.5
8
IT03
Dev
elop
men
tSo
mer
ton
Road
and
Sec
tion
Road
: Inte
rsec
tion
(Inte
rim)
Cons
truc
tion
of si
gnal
ised
T-in
ters
ectio
n (in
terim
layo
ut).
Purc
hase
of 0
.02
hect
ares
of
addi
tiona
l req
uire
d la
nd (u
ltim
ate
land
take
).$
20,
564
$ 2
,720
,000
$
2,7
40,5
64
100%
$ 2
,740
,564
Ar
ea S
outh
121.
96$
22,
471.
01
$ 1
,498
.07
IT04
Dev
elop
men
tM
ickl
eham
Roa
d an
d G
reen
vale
Driv
e: In
ters
ectio
n (In
terim
)Co
nstr
uctio
n of
four
-way
sign
alise
d in
ters
ectio
n (in
terim
layo
ut).
Purc
hase
of 0
.40
hect
ares
of
addi
tiona
l req
uire
d la
nd (u
ltim
ate
land
take
).$
411
,276
$
2,4
93,0
00
$ 2
,904
,276
10
0%$
2,9
04,2
76
Area
Sou
th12
1.96
$ 2
3,81
3.35
$
1,5
87.5
6
IT05
Dev
elop
men
tM
ickl
eham
Roa
d an
d Pr
ovid
ence
Roa
d: In
ters
ectio
n (In
terim
)Co
nstr
uctio
n of
sign
alise
d T-
inte
rsec
tion
(inte
rim la
yout
). Pu
rcha
se o
f 0.1
0 he
ctar
es o
f ad
ditio
nal r
equi
red
land
(ulti
mat
e la
nd ta
ke).
$ 1
02,8
19
$ 1
,981
,000
$
2,0
83,8
19
100%
$ 2
,083
,819
Ar
ea S
outh
121.
96$
17,
086.
08
$ 1
,139
.07
IT06
Dev
elop
men
tBo
nds L
ane:
Rou
ndab
out
Cons
truc
tion
of ro
unda
bout
(ulti
mat
e la
yout
). Pu
rcha
se o
f 0.2
7 he
ctar
es o
f add
ition
al re
quire
d la
nd (u
ltim
ate
land
take
).$
277
,611
$
1,3
91,0
00
$ 1
,668
,611
10
0%$
1,6
68,6
11
Area
Sou
th12
1.96
$ 1
3,68
1.63
$
912
.11
CI01
Dev
elop
men
tM
ulti-
purp
ose
Com
mun
ity C
entre
(Gre
enva
le W
est P
SP).
Expa
nsio
n of
mul
ti-pu
rpos
e co
mm
unity
cen
tre to
incl
ude
1 ad
ditio
n pr
e-sc
hool
room
, 1
addi
tiona
l Mat
erna
l & C
hild
Hea
lth (M
CH) r
oom
, and
add
ition
al c
omm
unity
mee
ting
spac
e.$
- $
2,4
50,4
70
$ 2
,450
,470
10
0%$
2,4
50,4
70
Area
Nor
th &
Ar
ea S
outh
186.
30$
13,
153.
35
$ 8
76.8
9
AR01
Dev
elop
men
t
Play
ing
Fiel
d (G
reen
vale
Rec
reat
ion
Rese
rve)
. Co
nstr
uctio
n of
1 p
layi
ng se
rvic
e (A
FL/c
ricke
t/so
ccer
), ca
r spa
ces,
land
scap
ing
and
rela
ted
infra
stru
ctur
e as
des
crib
ed b
y th
e dr
aft G
reen
vale
Rec
reat
ion
Rese
rve
Mas
ter P
lan
(Hum
e Ci
ty
Coun
cil).
$ -
$ 2
,135
,700
$
2,1
35,7
00
100%
$ 2
,135
,700
Ar
ea N
orth
&
Area
Sou
th18
6.30
$ 1
1,46
3.77
$
764
.25
AR02
Com
mun
ityPa
vilio
n (G
reen
vale
Rec
reat
ion
Rese
rve)
.Co
nstr
uctio
n of
pav
ilion
(inc
ludi
ng a
ll bu
ildin
gs w
orks
) to
serv
e th
e pl
ayin
g fi e
ld a
s des
crib
ed
by th
e dr
aft G
reen
vale
Rec
reat
ion
Rese
rve
Mas
ter P
lan
(Hum
e Ci
ty C
ounc
il).
$ -
$ 7
11,9
00
$ 7
11,9
00
100%
$ 7
11,9
00
Area
Nor
th &
Ar
ea S
outh
186.
30$
3,8
21.2
6 $
254
.75
AR03
Dev
elop
men
tSt
adiu
m E
xten
sion
(Gre
enva
le R
ecre
atio
n Ce
ntre
)Ex
tens
ion
of st
adiu
m a
t Gre
enva
le R
ecre
atio
n Ce
ntre
.$
- $
2,1
86,5
50
$ 2
,186
,550
47
.8%
$ 2
,186
,550
Ar
ea N
orth
&
Area
Sou
th18
6.30
$ 1
1,73
6.71
$
782
.45
AR04
Dev
elop
men
tTe
nnis
Cour
ts (G
reen
vale
Rec
reat
ion
Rese
rve)
Cons
truc
tion
of 2
tenn
is co
urts
at G
reen
vale
Rec
reat
ion
Rese
rve
as d
escr
ibed
by
the
draf
t G
reen
vale
Rec
reat
ion
Rese
rve
Mas
ter P
lan
(Hum
e Ci
ty C
ounc
il).
$ -
$ 5
89,8
60
$ 5
89,8
60
100%
$ 5
89,8
60
Area
Nor
th &
Ar
ea S
outh
186.
30$
3,1
66.1
8 $
211
.08
AR05
Dev
elop
men
tSp
orts
grou
nd re
devl
opm
ent (
Brad
ford
Ave
nue
Rese
rve)
Rede
velo
pmen
t of t
he sp
orts
grou
nd a
t Bra
dfor
d Av
enue
Res
erve
.$
- $
1,0
17,0
00
$ 1
,017
,000
10
0%$
1,0
17,0
00
Area
Nor
th &
Ar
ea S
outh
186.
30$
5,4
58.9
4 $
363
.93
AR06
Com
mun
ityPa
vilio
n 2
(Gre
enva
le R
ecre
atio
n Ce
ntre
)Co
nstr
uctio
n of
pav
ilion
(inc
ludi
ng a
ll bu
ildin
gs w
orks
) to
serv
e th
e pl
ayin
g fi e
ld a
t Gre
enva
le
Recr
eatio
n Ce
ntre
.$
- $
1,0
17,0
00
$ 1
,017
,000
10
0%$
1,0
17,0
00
Area
Nor
th &
Ar
ea S
outh
186.
30$
5,4
58.9
4 $
363
.93
TOTA
L$
1,1
92,6
99 $
35,
121,
982
$36
,314
,681
$
34,1
09,6
82
Tabl
e 7:
CAL
CULA
TIO
N O
F CO
STS
2726 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
Table 8: Project Costs recovered by the DCP
2928 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
DCP PROJECT NUMBER
INFRASTRUCTURE CATEGORY DESCRIPTION
TOTAL PROJECT COST $
2013
TOTAL COST TO BE RECOVERED BY THE DCP $
2013
RD01 Development
Greenvale Drive Extension: Mickleham Road to Bonds Lane Construction of Transitional Connector Street (Figure 3) between Greenvale Drive intersection (DCP: IT04) and Bonds Lane: 25-metre width, 416 metres in length. No land purchase.
$ 1,960,192 $ 1,960,192
RD02 Development
Carroll Lane: Extension Construction of Transitional Connector Street (Figure 3) between roundabout (DCP: IT06) and existing Carroll Lane: 25-metre width, 190 metres in length. No land purchase.
$ 895,280 $ 895,280
RD03 Development
Bonds Lane: Extension Construction of Transitional Connector Street (Figure 3) between roundabout (DCP: IT06) and Section Road: 25-metre width, 220 metres in length. No land purchase.
$ 1,036,640 $ 1,036,640
RD04 Development
Section Road: Upgrade Construction of Reserve Connector Street (Figure 4) between Section Road intersection (DCP: IT03) and western extent of RD03 on Section Road: 20-metre width, 760 metres in length. No land purchase
$ 3,339,440 $ 3,339,440
RD05 DevelopmentPedestrian Operated Signals (POS): Mickleham Road Construction of pedestrian operated signals on Mickleham Road near Elphinstone Boulevard
$ 355,950 $ 355,950
IT01 Development
Mickleham Road and Hillview Road: Intersection (Interim) Construction of four-way signalised intersection (interim layout). Purchase of 0.12 hectares of additional required land (ultimate land take).
$ 4,533,383 $ 2,328,383
IT02 Development
Somerton Road and Brendan Road: Intersection (Interim) Construction of four-way signalised intersection (interim layout). Purchase of 0.25 hectares of additional required land (ultimate land take).
$ 4,688,047 $ 4,688,047
IT03 Development
Somerton Road and Section Road: Intersection (Interim) Construction of signalised T-intersection (interim layout). Purchase of 0.02 hectares of additional required land (ultimate land take).
$ 2,740,564 $ 2,740,564
IT04 Development
Mickleham Road and Greenvale Drive: Intersection (Interim) Construction of four-way signalised intersection (interim layout). Purchase of 0.40 hectares of additional required land (ultimate land take).
$ 2,904,276 $ 2,904,276
IT05 Development
Mickleham Road and Providence Road: Intersection (Interim) Construction of signalised T-intersection (interim layout). Purchase of 0.10 hectares of additional required land (ultimate land take).
$ 2,083,819 $ 2,083,819
IT06 DevelopmentBonds Lane: Roundabout Construction of roundabout (ultimate layout). Purchase of 0.27 hectares of additional required land (ultimate land take).
$ 1,668,611 $ 1,668,611
CI01 Development
Multi-purpose Community Centre (Greenvale West PSP). Expansion of multi-purpose community centre to include 1 addition pre-school room, 1 additional Maternal & Child Health (MCH) room, and additional community meeting space.
$ 2,450,470 $ 2,450,470
AR01 Development
Playing Field (Greenvale Recreation Reserve). Construction of 1 playing service (AFL/cricket/soccer), car spaces, landscaping and related infrastructure as described by the draft Greenvale Recreation Reserve Master Plan (Hume City Council).
$ 2,135,700 $ 2,135,700
DCP PROJECT NUMBER
INFRASTRUCTURE CATEGORY DESCRIPTION
TOTAL PROJECT COST $
2013
TOTAL COST TO BE RECOVERED BY THE DCP $
2013
AR02 Community
Pavilion (Greenvale Recreation Reserve). Construction of pavilion (including all buildings works) to serve the playing field as described by the draft Greenvale Recreation Reserve Master Plan (Hume City Council).
$ 711,900 $ Funded by CIL
AR03 Development Stadium Extension (Greenvale Recreation Centre) Extension of stadium at Greenvale Recreation Centre. $ 2,186,550 $ 2,186,550
AR04 Development
Tennis Courts (Greenvale Recreation Reserve) Construction of 2 tennis courts at Greenvale Recreation Reserve as described by the draft Greenvale Recreation Reserve Master Plan (Hume City Council).
$ 589,860 $ 589,860
AR05 DevelopmentSportsground redevlopment (Bradford Avenue Reserve) Redevelopment of the sportsground at Bradford Avenue Reserve.
$ 1,017,000 $ 1,017,000
AR06 CommunityPavilion 2 (Greenvale Recreation Centre) Construction of pavilion (including all buildings works) to serve the playing field at Greenvale Recreation Centre.
$ 1,017,000 $ Funded by CIL
TOTAL $ 36,314,681 $ 34,109,682
TOTAL WITH $900 CIL LEGISLATIVE CAP APPLIED $ 35,669,993
Percentage Recoverable % 98.5
Tabl
e 9:
Sum
ary
of C
harg
es
3130 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
DCP
PRO
JEC
T N
UM
BER
INFR
AST
RUC
TURE
CA
TEG
ORY
DES
CRIP
TIO
NA
REA
NO
RTH
RE
SID
ENTI
AL
DEV
ELO
PMEN
T IN
FRA
STRU
CTU
RE
LEV
Y PE
R N
ET
DEV
ELO
PABL
E H
ECTA
RE $
201
3
ARE
A S
OU
TH
RESI
DEN
TIA
L D
EVEL
OPM
ENT
INFR
AST
RUC
TURE
LE
VY
PER
NET
D
EVEL
OPA
BLE
HEC
TARE
$ 2
013
COM
MU
NIT
Y IN
FRA
STRU
CTU
RE
LEV
Y PE
R D
WEL
LIN
G
$ 20
13
RD01
Dev
elop
men
tG
reen
vale
Driv
e Ex
tens
ion:
Mic
kleh
am R
oad
to B
onds
Lan
e Co
nstr
uctio
n of
Tra
nsiti
onal
Con
nect
or S
tree
t (Fi
gure
3) b
etw
een
Gre
enva
le D
rive
inte
rsec
tion
(DCP
: IT0
4) a
nd B
onds
Lan
e: 2
5-m
etre
w
idth
, 416
met
res i
n le
ngth
. No
land
pur
chas
e.
$-
$ 1
6,07
2.42
$
-
RD02
Dev
elop
men
tCa
rrol
l Lan
e: E
xten
sion
Co
nstr
uctio
n of
Tra
nsiti
onal
Con
nect
or S
tree
t (Fi
gure
3) b
etw
een
roun
dabo
ut (
DCP
: IT0
6) a
nd e
xist
ing
Carr
oll L
ane:
25-
met
re w
idth
, 190
m
etre
s in
leng
th. N
o la
nd p
urch
ase.
$-
$ 7
,340
.77
$-
RD03
Dev
elop
men
tBo
nds L
ane:
Ext
ensi
on
Cons
truc
tion
of T
rans
ition
al C
onne
ctor
Str
eet (
Figu
re 3
) bet
wee
n ro
unda
bout
(DCP
: IT0
6) a
nd S
ectio
n Ro
ad: 2
5-m
etre
wid
th, 2
20 m
etre
s in
leng
th. N
o la
nd p
urch
ase.
$-
$ 8
,499
.84
$-
RD04
Dev
elop
men
tSe
ctio
n Ro
ad: U
pgra
de
Cons
truc
tion
of R
eser
ve C
onne
ctor
Str
eet (
Figu
re 4
) bet
wee
n Se
ctio
n Ro
ad in
ters
ectio
n (D
CP: I
T03)
and
wes
tern
ext
ent o
f RD
03 o
n Se
ctio
n Ro
ad: 2
0-m
etre
wid
th, 7
60 m
etre
s in
leng
th. N
o la
nd p
urch
ase.
$-
$ 2
7,38
1.44
$
-
RD05
Dev
elop
men
tPe
dest
rian
Ope
rate
d Si
gnal
s (PO
S): M
ickl
eham
Roa
d Co
nstr
uctio
n of
ped
estr
ian
oper
ated
sign
als o
n M
ickl
eham
Roa
d ne
ar
Elph
inst
one
Boul
evar
d.
$-
$ 2
,918
.58
$-
IT01
Dev
elop
men
tM
ickl
eham
Roa
d an
d H
illvi
ew R
oad:
Inte
rsec
tion
(Inte
rim)
Cons
truc
tion
of fo
ur-w
ay si
gnal
ised
inte
rsec
tion
(inte
rim la
yout
). Pu
rcha
se o
f 0.1
2 he
ctar
es o
f add
ition
al re
quire
d la
nd (u
ltim
ate
land
ta
ke).
$ 3
5,22
9.89
$
- $
-
IT02
Dev
elop
men
tSo
mer
ton
Road
and
Bre
ndan
Roa
d: In
ters
ectio
n (In
terim
) Co
nstr
uctio
n of
four
-way
sign
alis
ed in
ters
ectio
n (in
terim
layo
ut).
Purc
hase
of 0
.25
hect
ares
of a
dditi
onal
requ
ired
land
(ulti
mat
e la
nd
take
).
$ 7
2,86
3.65
$
- $
-
IT03
Dev
elop
men
tSo
mer
ton
Road
and
Sec
tion
Road
: Int
erse
ctio
n (In
terim
) Co
nstr
uctio
n of
sign
alis
ed T-
inte
rsec
tion
(inte
rim la
yout
). Pu
rcha
se o
f 0.
02 h
ecta
res o
f add
ition
al re
quire
d la
nd (u
ltim
ate
land
take
).
$ -
$ 2
2,47
1.01
$
-
IT04
Dev
elop
men
tM
ickl
eham
Roa
d an
d G
reen
vale
Driv
e: In
ters
ectio
n (In
terim
) Co
nstr
uctio
n of
four
-way
sign
alis
ed in
ters
ectio
n (in
terim
layo
ut).
Purc
hase
of 0
.40
hect
ares
of a
dditi
onal
requ
ired
land
(ulti
mat
e la
nd
take
).
$ -
$ 2
3,81
3.35
$
-
DCP
PRO
JEC
T N
UM
BER
INFR
AST
RUC
TURE
CA
TEG
ORY
DES
CRIP
TIO
NA
REA
NO
RTH
RE
SID
ENTI
AL
DEV
ELO
PMEN
T IN
FRA
STRU
CTU
RE
LEV
Y PE
R N
ET
DEV
ELO
PABL
E H
ECTA
RE $
201
3
ARE
A S
OU
TH
RESI
DEN
TIA
L D
EVEL
OPM
ENT
INFR
AST
RUC
TURE
LE
VY
PER
NET
D
EVEL
OPA
BLE
HEC
TARE
$ 2
013
COM
MU
NIT
Y IN
FRA
STRU
CTU
RE
LEV
Y PE
R D
WEL
LIN
G
$ 20
13
IT05
Dev
elop
men
tM
ickl
eham
Roa
d an
d Pr
ovid
ence
Roa
d: In
ters
ectio
n (In
terim
) Co
nstr
uctio
n of
sign
alis
ed T-
inte
rsec
tion
(inte
rim la
yout
). Pu
rcha
se o
f 0.
10 h
ecta
res o
f add
ition
al re
quire
d la
nd (u
ltim
ate
land
take
).
$ -
$ 1
7,08
6.08
$
-
IT06
Dev
elop
men
tBo
nds L
ane:
Rou
ndab
out
Cons
truc
tion
of ro
unda
bout
(ulti
mat
e la
yout
). Pu
rcha
se o
f 0.2
7 he
ctar
es o
f add
ition
al re
quire
d la
nd (u
ltim
ate
land
take
).
$ -
$ 1
3,68
1.63
$
-
CI01
Dev
elop
men
tM
ulti-
purp
ose
Com
mun
ity C
entr
e (G
reen
vale
Wes
t PSP
). Ex
pans
ion
of m
ulti-
purp
ose
com
mun
ity c
entr
e to
incl
ude
1 ad
ditio
n pr
e-sc
hool
room
, 1 a
dditi
onal
Mat
erna
l & C
hild
Hea
lth (M
CH) r
oom
, an
d ad
ditio
nal c
omm
unity
mee
ting
spac
e.
$ 1
3,15
3.35
$
13,
153.
35
$ -
AR0
1D
evel
opm
ent
Play
ing
Fiel
d (G
reen
vale
Rec
reat
ion
Rese
rve)
. Co
nstr
uctio
n of
1 p
layi
ng se
rvic
e (A
FL/c
ricke
t/so
ccer
), ca
r spa
ces,
land
scap
ing
and
rela
ted
infra
stru
ctur
e as
des
crib
ed b
y th
e dr
aft
Gre
enva
le R
ecre
atio
n Re
serv
e M
aste
r Pla
n (H
ume
City
Cou
ncil)
.
$ 1
1,46
3.77
$
11,
463.
77
$ -
AR0
2Co
mm
unity
Pavi
lion
(Gre
enva
le R
ecre
atio
n Re
serv
e).
Cons
truc
tion
of p
avili
on (i
nclu
ding
all
build
ings
wor
ks) t
o se
rve
the
play
ing
field
as d
escr
ibed
by
the
draf
t Gre
enva
le R
ecre
atio
n Re
serv
e M
aste
r Pla
n (H
ume
City
Cou
ncil)
.
$Fu
nded
by
CIL
$ F
unde
d by
CIL
$
254
.75
AR0
3D
evel
opm
ent
Stad
ium
Ext
ensi
on (G
reen
vale
Rec
reat
ion
Cent
re)
Exte
nsio
n of
stad
ium
at G
reen
vale
Rec
reat
ion
Cent
re.
$ 1
1,73
6.71
$
11,
736.
71
$ -
AR0
4D
evel
opm
ent
Tenn
is C
ourt
s (G
reen
vale
Rec
reat
ion
Rese
rve)
Co
nstr
uctio
n of
2 te
nnis
cou
rts a
t Gre
enva
le R
ecre
atio
n Re
serv
e as
de
scrib
ed b
y th
e dr
aft G
reen
vale
Rec
reat
ion
Rese
rve
Mas
ter P
lan
(Hum
e Ci
ty C
ounc
il).
$ 3
,166
.18
$ 3
,166
.18
$ -
AR0
5D
evel
opm
ent
Spor
tsgr
ound
rede
vlop
men
t (Br
adfo
rd A
venu
e Re
serv
e)
Rede
velo
pmen
t of t
he sp
orts
grou
nd a
t Bra
dfor
d Av
enue
Res
erve
.$
5,4
58.9
4 $
5,4
58.9
4 $
-
AR0
6Co
mm
unity
Pavi
lion
2 (G
reen
vale
Rec
reat
ion
Cent
re)
Cons
truc
tion
of p
avili
on (i
nclu
ding
all
build
ings
wor
ks) t
o se
rve
the
play
ing
field
at G
reen
vale
Rec
reat
ion
Cent
re.
$ F
unde
d by
CI
L $
Fun
ded
by C
IL
$ 3
63.9
3
Tota
l$
153
,072
.50
$ 1
84,2
44.0
6 $
618
.68
COM
MU
NIT
Y IN
FRA
STRU
CTU
RE L
EVY
AFT
ER L
EGIS
LATI
VE
CAP
OF
$900
IS A
PPLI
ED$
618
.68
Table 10: Items suitable for delivery of works in kind 4.0 DEVELOPMENT CONTRIBUTIONS PLAN ADMINISTRATION
This section sets how the Development Contributions Plan will be administered and includes the timing of payment, provision of works and land in kind and how the Development Contributions Plan fund will be managed in terms of reporting, indexation and review periods.
The Greenvale Central Development Contributions Plan Development Infrastructure Levy applies to subdivision and/or development of land.
The Greenvale Central Development Contributions Plan Community Infrastructure Levy applies to the construction of a dwelling and must be paid prior to the issue of a Building Permit in respect of any dwelling.
Hume City Council will be both the Collecting Agency and the Development Agency for the purposes of this Development Contributions Plan.
4.1 Payment of Contributions Levies and Payment Timing
4.1.1 Development Infrastructure LevyFor subdivision of land
• A development infrastructure levy must be paid to the Collecting Agency for the land within the following specified time, namely after certification of the relevant plan of subdivision but not more than 21 days prior to the issue of a Statement of Compliance in respect of that plan or included in an implementation agreement under section 173 of the Act.
• Where the subdivision is to be developed in stages, the infrastructure levy for the stage to be developed only may be paid to the Collecting Agency within 21 days prior to the issue of a Statement of Compliance in respect of that stage provided that a Schedule of Development Contributions is submitted with each stage of the plan of subdivision. This Schedule must show the amount of the development contributions payable for each stage and value of the contributions in respect of prior stages to the satisfaction of the Collecting Agency or included in an implementation agreement under section 173 of the Act.
If the Collecting Agency agrees to works and/or provision of land in lieu of the payment of the infrastructure levy, the land owner must enter into an agreement under section 173 of the Act in respect of the proposed works and/or provision of land in kind to specific requirements.
For development of land where no subdivision is proposed
Provided an infrastructure levy has not already been paid on subject land, an infrastructure levy must be paid to the Collecting Agency in accordance with the provisions of the approved Development Contributions Plan for each demand unit (Net Developable Hectare) proposed to be developed prior to the commencement of any development (i.e. development includes buildings, car park, access ways landscaping and ancillary components). The Collecting Agency may require that Development Infrastructure Levy contributions be made at either the planning permit or building permit stage.
If the Collecting Agency agrees to works and/or provision of land in lieu of the payment of the infrastructure levy, the land owner must enter into an agreement under section 173 of the Act or other arrangement acceptable to the Collecting Agency proposed in respect of the proposed works and/or land to be provided in kind.
3332 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
DCP PROJECT NUMBER
DESCRIPTIONTOTAL PROJECT
COST $ 2013
RD01
Greenvale Drive Extension Mickleham Road to Bonds Lane Construction of Transitional Connector Street (Figure 3) between Greenvale Drive intersection (DCP: IT04) and Bonds Lane: 25-metre width, 416 metres in length. No land purchase.
$ 1,960,192
RD02Carroll Lane: Extension Construction of Transitional Connector Street (Figure 3) between roundabout (DCP: IT06) and existing Carroll Lane: 25-metre width, 190 metres in length. No land purchase.
$ 895,280
RD03Bonds Lane: Extension Construction of Transitional Connector Street (Figure 3) between roundabout (DCP: IT06) and Section Road: 25-metre width, 220 metres in length. No land purchase.
$ 1,036,640
RD04
Section Road: Upgrade Construction of Reserve Connector Street (Figure 4) between Section Road intersection (DCP: IT03) and western extent of RD03 on Section Road: 20-metre width, 760 metres in length. No land purchase.
$ 3,339,440
RD05 Pedestrian Operated Signals (POS): Mickleham Road Construction of pedestrian operated signals on Mickleham Road near Elphinstone Boulevard. $ 355,950
IT01Mickleham Road and Hillview Road: Intersection (Interim) Construction of four-way signalised intersection (interim layout). Purchase of 0.12 hectares of additional required land (ultimate land take).
$ 4,533,383
IT02Somerton Road and Brendan Road: Intersection (Interim) Construction of four-way signalised intersection (interim layout). Purchase of 0.25 hectares of additional required land (ultimate land take).
$ 4,688,047
IT03Somerton Road and Section Road: Intersection (Interim) Construction of signalised T-intersection (interim layout). Purchase of 0.02 hectares of additional required land (ultimate land take).
$ 2,740,564
IT04Mickleham Road and Greenvale Drive: Intersection (Interim) Construction of four-way signalised intersection (interim layout). Purchase of 0.40 hectares of additional required land (ultimate land take).
$ 2,904,276
IT05Mickleham Road and Providence Road: Intersection (Interim) Construction of signalised T-intersection (interim layout). Purchase of 0.10 hectares of additional required land (ultimate land take).
$ 2,083,819
IT06Bonds Lane: Roundabout Construction of roundabout (ultimate layout). Purchase of 0.27 hectares of additional required land (ultimate land take).
$ 1,668,611
TOTAL $ 26,206,201
Where no planning permit is required
The following requirement applies where no planning permit is required. The land may only be used and developed subject to the following requirements being met:
• Unless some other arrangement has been agreed to by Collecting Agency in a section 173 agreement, prior to the commencement of any development, the Development Infrastructure Levy must be paid to the Collecting Agency in accordance with the provisions of the Development Contribution Plan for the land.
If the Collecting Agency agrees to works and/or provision of land in lieu of the payment of the infrastructure levy, the land owner must enter into an agreement under section 173 of the Act in respect of the proposed works or provision of land which are proposed to be provided in kind.
4.1.2 Community Infrastructure LevyContributions relating to community infrastructure are to be made by the home-builder prior to issue of a building permit. However, development proponents are encouraged to pay the levy prior to the issue of a Statement of Compliance to reduce the administrative burden of collection from individual home builders.
Levies for ‘residential buildings’ will be calculated at the rate for a single dwelling. In all other forms of accommodation, the dwelling is the individual unit (such as each dwelling in a residential village, retirement village, serviced apartments, etc). Corrective institutions are exempt.
The Community Infrastructure Levy is not payable for a dwelling on a lot which was created prior to the date that this Development Contributions Plan was first incorporated into the Hume Planning Scheme.
4.1.3 Works in KindThe Collecting Agency may permit development proponents to undertake works in lieu of cash payments, providing that:
• The works constitute projects funded by the Development Contributions Plan
• The Collecting Agency agrees that the timing of the works would be consistent with priorities in this Development Contributions Plan
• The development proponent complies with appropriate tendering, documentation, supervision and related provisions
• Works must be provided to a standard that generally accords with the Development Contributions Plan, unless an alternative is agreed by the Collecting Agency and the Development Agency
• Detailed design must be approved by the Collecting Agency and the Development Agency and must generally accord with the standards outlined in the Development Contributions Plan unless an alternative is agreed by the Collecting Agency and the Development Agency
• The construction of works must be completed to the satisfaction of the Collecting Agency and the Development Agency
• There should be no negative financial impact on the Development Contributions Plan to the satisfaction of the Collecting Agency
• In particular, the works will only be accepted in lieu of a financial contribution required by the Development Contributions Plan to the extent that they constitute part or all of the design of the infrastructure item and reduce the cost to complete that design, to the satisfaction of the Collecting Agency. Temporary works will not be accepted as works in kind.
Where the Collecting Agency agrees that works are to be provided by a development proponent in lieu of cash contribution (subject to the arrangements specified above):
• The credit for the works provided (unless an alternative approach is agreed with the Collecting Agency) shall equal the final cost of the works up to the maximum identified in the Development Contributions Plan, taking into account the impact of indexation, or to an alternative figure approved by the Collecting Agency
• The value of works provided in accordance with the principle outlined above will be offset against the development contributions liable to be paid by the development proponent
• No further financial contributions will be required until the agreed value of any credits are used.
Infrastructure projects suitable for delivery of works in kind are listed in Table 10.
4.1.4 Credit for Over ProvisionWhere the Collecting Agency agrees that a development proponent can deliver an infrastructure item (either works and/or land), the situation may arise where the developer makes a contribution with a value that exceeds that required by the Development Contributions Plan for the individual project.
In such a case the developer may be entitled to credits against other projects in the Development Contributions Plan to the extent that they ‘over contributed’. Alternatively, a developer may seek an agreement with the Collecting Agency to provide cash reimbursement where a significant over-contribution has been made on a particular project.
4.1.5 Non Government SchoolsWhere land is subdivided or developed for the purpose of a non-government school and the use of that land is subsequently for a purpose other than a non-government school, the owner of that land must pay to the Collecting Agency development contributions in accordance with the provision of this Development Contributions Plan. The Development Infrastructure Levy and, where applicable, the Community Infrastructure Levy must be paid within 28 days of the date of the commencement of the construction of any buildings or works for that alternative use.
4.1.6 Public Open Space ContributionsThis Development Contributions Plan does not provide funding for passive local open space. Passive open space is provided through Clause 52.01 of the Hume Planning Scheme.
3534 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
4.2 Funds AdministrationThe administration of the contributions made under the Development Contributions Plan will be transparent and development contributions charges will be held until required for provision of the items in that class. Details of funds received and expenditures will be held by the Collecting Agency in accordance with the provisions of the Local Government Act 1993 and the Act.
The administration of contributions made under the Development Contributions Plan will be transparent and demonstrate the:
• Amount and timing of funds collected
• Source of the funds collected
• Amount and timing of expenditure on specific projects
• Project on which the expenditure was made
• Account balances for individual project classes
• Details of works-in-kind arrangements for project provision
• Pooling or quarantining of funds to deliver specific projects where applicable.
The Collecting Agency will provide for regular monitoring, reporting and review of the monies received and expended in accordance with this Development Contributions Plan.
The Collecting Agency will establish interest bearing accounts and all monies held in these accounts will be used solely for the provision of infrastructure as itemised in this Development Contributions Plan, as required under Section 46Q(2) of the Act.
Should the Collecting Agency resolve to not proceed with any of the infrastructure projects listed in this Development Contributions Plan, the funds collected for these items will be used for the provision of alternative works in the same infrastructure class as specified in this Development Contributions Plan. Such funds may also be used for the provision of additional works, services or facilities where approved by the Minister responsible for the Act, or will be refunded to owners of land subject to these infrastructure charges.
4.3 Construction and Land Value Costs IndexationCapital costs of all infrastructure items including land are in 2013 dollars and will be adjusted by the Collecting Agency annually for inflation.
In relation to the costs associated with infrastructure items other than land, the cost must be adjusted according to the following method:
• Road and intersections - the capital cost for each infrastructure item will be adjusted by applyingthe Building Price Index, as published in the latest edition of Rawlinson’s Australian ConstructionHandbook
• All other infrastructure items – the capital cost for each infrastructure item will be adjusted byapplying the Building Price Index, as published in the latest edition of Rawlinson’s AustralianConstruction Handbook
Land values will be adjusted on 1 July each year following valuations undertaken by a registered valuer.
Within 14 days of the adjustments being made, the Collecting Agency will publish the amended capital costs for each infrastructure item on the Collecting Agency’s website.
Community Infrastructure Levy projects are indexed but the value of the contribution may not exceed the maximum as set by the Act.
If in future the Community Infrastructure Levy is amended then the levy applicable to the release of any remaining dwellings may be adjusted in accordance with the revised legislative and regulatory approach as directed by the Minister for Planning.
4.4 Development Contributions Plan Review PeriodThis Development Contributions Plan adopts a long-term outlook for development. It takes into account planned future development in Greenvale Central. A ‘full development’ horizon of land within the current Urban Growth Boundary to the year 2046 has been adopted for this Development Contributions Plan.
This Development Contributions Plan commenced on the date when it was first incorporated into the Hume Planning Scheme through Amendment C154.
This Development Contributions Plan will end when development within the Development Contributions Plan area is complete, which is projected to be the year 2046 and when the Development Contributions Plan is removed from the Planning Scheme.
The Development Contributions Plan is expected to be revised and updated every five years (or more frequently if required). This will require an amendment to the Hume Planning Scheme to replace this document with an alternative, revised document. Any review will need to have regard to any arrangements (e.g. section 173 agreements under the Act) for the implementation of this Development Contributions Plan.
3736 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
4.5 Collecting Agency (Agency Responsible for Collecting Infrastructure Levy)Hume City Council is the Collecting Agency pursuant to section 46K(1)(fa) of the Act which means that it is the public authority to whom all levies are payable. As the Collecting Agency, Hume City Council is responsible for the administration of this Development Contributions Plan and also its enforcement pursuant to section 46QC of the Act.
4.6 Development Agency (Agency Responsible for Works)Hume City Council is the Development Agency and is responsible for the provision of the designated infrastructure projects which are funded under the Development Contributions Plan and the timing of all works. In the future the designated Development Agency for several road and intersection infrastructure projects may change from Hume City Council to VicRoads. However, any such transfer of responsibility would be dependent upon written agreement from VicRoads.
5.0 IMPLEMENTATION STRATEGY
This section provides further details regarding how the Collecting Agency intends to implement this Development Contributions Plan. In particular, this section clearly identifies the rationale for the implementation strategy and details the various measures that have been adopted to reduce the risk posed by this Development Contributions Plans to all parties.
5.1 Rationale for the Implementation StrategyThis implementation strategy has been included to provide certainty to both the Collecting Agency and development proponents. The implementation strategy recognises the complexities associated with infrastructure provision and funding and seeks to minimise risk to the Collection Agency, Development Agency, development proponent and future community.
This implementation strategy has been formulated by:
• Assessing the Greenvale Central Precinct Structure Plan
• Having regard to the development context
• Assessing the need for finance requirements – upfront financing and pooling of funds
• Agreeing the land value and indexing it appropriately (where possible)
• Identifying preferred implementation mechanisms to achieve the above outcomes and reducing the risk associated with the Development Contributions Plan to ensure that it will delivered as intended
• Provision of adequate resources to administer the Development Contributions Plan.
5.2 Implementation MechanismUnder Section 46P of the Act, the Collecting Agency may accept (with the consent of the Development Agency where the Collecting Agency is not also the Development Agency) the provision of land, works, services or facilities by the applicant in part or full satisfaction of the amount of levy payment. This can be agreement with the Collection Agency before or after the application for the permit is made or before the development is carried out.
To coordinate the provision of infrastructure, Schedule 6 to the Urban Growth Zone for the Greenvale Central Precinct Structure Plan requires an application for subdivision to be accompanied by an infrastructure plan to the satisfaction of the Responsibility Authority. The Public Infrastructure Plan needs to show the location, type, staging and timing of infrastructure on the land as identified in the Greenvale Central Precinct Structure Plan or reasonably required as a result of the subdivision of the land and address the following:
• Stormwater drainage works
• Road works internal or external to the land consistent with any relevant traffic report or assessment
• The reserving or encumbrance of land for infrastructure, including for public open space andcommunity facilities
• Any infrastructure works which an applicant proposes to provide in lieu of developmentcontributions in accordance with the Greenvale Central Development Contributions Plan
• The effects of the provision of infrastructure on the land or any other land
• Any other relevant matter related to the provision of infrastructure reasonably required by theResponsible Authority.
Through the approval of these agreements, Hume City Council (acting as the Collecting Agency) will consider if and what infrastructure should be provided as works-in-kind under this Development Contributions Plan in accordance with Section 46P of the Act. The agreement must include a list of the Development Contribution Plan infrastructure projects which the Collecting Agency has agreed in writing to allow to be provided as works and/or land in lieu.
3938 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
App
endi
x 1:
Pro
pert
y Sp
ecifi
c La
nd B
udge
t
4140 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
App
endi
x 2:
Tra
nspo
rt In
fras
truc
ture
Cos
ting
Shee
ts
1 -
APPROX. 107m
APPROX. 104m
APPR
OX. 1
46m
APPR
OX. 4
5m
HILL
VIEW
ROA
D
MICKLEHAM ROAD
LIMIT OF WORKS
LIMIT
OF
WOR
KS
LIMIT OF WORKS
LIMIT
OF
WOR
KS
2 -
40mm
DEP
TH S
IZE
20 T
YPE
H / V
ASP
HALT
(C32
0 BIN
DER)
60mm
DEP
TH S
IZE
20 T
YPE
SI A
SPHA
LT (C
320 B
INDE
R)
75mm
DEP
TH S
IZE
20 T
YPE
SF A
SPHA
LT (C
320 B
INDE
R)
150m
m DE
PTH
SIZE
20 C
LASS
2 CE
MENT
TRE
ATED
CRU
SHED
ROC
K
150m
m DE
PTH
SIZE
20 C
LASS
2 FI
NE C
RUSH
ED R
OCK
200m
m DE
PTH
SELE
CT F
ILL O
R ST
ABAL
ISED
CLA
Y CA
PPIN
G LA
YER
FREN
CH &
1.5m
1.4m
2.0m
1.0m
7.0m
2.5m
4.0m
1.1m
2.0m
1.0m 1.5
m
MEDIAN
TRAFFIC
N/STRIP
N/STRIP
N/STRIP
N/STRIP
BICYCLE
BICYCLE
F/PATH
F/PATH
TRAFFIC
25.0m
ROA
D RE
SERV
E
5.1m
2.0m
10.5m
2.5m
7.00m
2.00m
5.00m
34.1m
ROA
D RE
SERV
E
TRAFFIC
N/STRIP
N/STRIP
TRAFFIC
BICYCLE
BICYCLE
MEDIAN
MICK
LEHA
M RO
ADAN
D HI
LLVI
EW R
OAD
INTE
RSEC
TION
(IT0
5)
PHMG
MWAS
SHO
WN
MIE1
05B
APR
ELIM
INAR
Y IS
SUE
MGMW
31.10
.13
MICK
LEHA
M RO
AD A
ND H
ILLVI
EW R
OAD
INTE
RSEC
TION
(IT0
5)
LEGE
NDCO
STED
INTE
RSEC
TION
ARE
A
ROAD
RES
ERVE
EXIS
TING
ROA
D
TYPI
CAL P
AVEM
ENT
DETA
IL W
ITH
KERB
AND
CHA
NNEL
(HIG
H AN
D LO
W S
IDE
SIMI
LAR)
NOT
TO S
CALE
DWG FILE: X:\107912 - Greenvale Central DCP Costings GAA\6BIM\6_3 MHT MIE\6_3_2 MHT INF\107912-00-MIE101-109.dwg - MH PLOT TIME: 07 Nov 2013, 4:58pm
DATE
APP
BYRE
VDE
SCRI
PTIO
N
REV
DESI
GNED
APPR
OVED
TITL
E
DRAW
N
STAT
USPR
OJEC
T No
DRAW
ING
No
SCAL
E @
A1
PROJ
ECT
CLIE
NTNO
RTH
Telep
hone
: (03
) 867
6 120
0
www.
meinh
ardtg
roup
.com
c Co
pyrig
ht
Fax:
(03)
8676
1201
A.C.
N. 05
2 275
635
L12,
501 S
wans
ton S
treet,
Melb
ourn
e,VI
C, A
ustra
lia 30
00
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
METR
OPOL
ITAN
PLA
NNIN
G AU
THOR
ITY
1079
12
SCAL
E-SE
CTIO
N1 -
1:200
SCAL
E-SE
CTIO
N2 -
1:200
COST
ED A
REA
- RES
HEET
ING
ONLY
WAR
NING
BEW
ARE
OF U
NDER
GROU
ND S
ERVI
CES
THE
LOCA
TION
S OF
UND
ERGR
OUND
SER
VICE
SAR
E UN
KNOW
N AN
D TH
EIR
EXAC
T PO
SITI
ONSH
OULD
BE
PROV
EN O
N SI
TE.
INFR
AST
RU
CTU
RE
- OPI
NIO
N O
F C
OST
IT05
- M
ickl
eham
Roa
d &
Hill
view
Roa
d (s
igna
lised
)
Item
Des
crip
tion
Qua
ntity
Uni
tR
ate
($/u
nit)
Sub
Tota
l($
exc
l.G
ST)
1.00
EAR
THW
OR
KS
1.01
Exc
avat
ion
incl
. and
dis
posa
l off
site
9,80
0m
330
.00
294,
000
1.02
Trim
and
pre
pare
sub
grad
e to
rece
ive
sub-
base
10,9
00m
21.
6017
,440
1.03
Spr
ead
and
Com
pact
Fill
Ons
ite98
0m
38.
808,
624
1.04
Test
s (D
ensi
ty e
tc.)
1Ite
m15
,000
.00
15,0
00
2.00
CO
NC
RET
E W
OR
KS
2.01
Ker
b &
Cha
nnel
(SM
1, S
M2
& S
M3)
1,97
0L.
m52
.00
102,
440
2.02
Traf
fic Is
land
s - 2
00m
m th
ick
rein
forc
ed1,
150
m2
80.0
092
,000
2.03
Sha
red
Pat
hway
- 12
5mm
thic
k re
info
rced
1,00
0m
251
.00
51,0
00
3.00
PAVE
MEN
T W
OR
KS
3.01
40m
m T
hick
Asp
halt
(wea
ring
cour
se)
8,20
0m
218
.10
148,
420
3.02
60m
m T
hick
Asp
halt
(inte
rmed
iate
cou
rse)
8,20
0m
231
.70
259,
940
3.03
75m
m T
hick
Asp
halt
(bas
e co
urse
)8,
200
m2
33.9
027
7,98
0
3.04
Asp
halt
resh
eet T
ype
H /
V (C
lass
320
) 60m
m3,
700
m2
38.4
014
2,08
0
3.05
Prim
e10
,900
m2
3.60
39,2
40
3.06
150m
m C
TCR
Bas
e10
,900
m2
13.5
014
7,15
0
3.07
150m
m F
CR
Bas
e10
,900
m2
9.90
107,
910
3.08
200m
m S
elec
t Sub
-bas
e C
ours
e10
,900
m2
6.00
65,4
00
3.09
Sub
grad
e Im
prov
emen
t (al
low
20%
of a
rea)
2,18
0m
213
.40
29,2
12
4.00
DR
AIN
AG
E W
OR
KS
4.01
AG
Dra
in1,
970
Lm31
.50
62,0
55
4.02
Dra
inag
e P
its (6
0m s
paci
ng)
20N
o.2,
750.
0054
,120
4.03
375m
m d
ia R
CP
(cru
shed
rock
bac
kfill
)1,
181
m24
0.00
283,
392
4.04
375m
m d
ia R
CP
(ear
th b
ackf
ill)
0m
200.
000
4.05
Bre
ak-in
and
Con
nect
ion
to E
xist
ing
Dra
inag
e2
Item
1,50
0.00
3,00
0
5.00
SIG
N A
ND
LIN
EMA
RK
ING
5.01
Line
mar
king
(allo
wan
ce)
1Ite
m25
,000
.00
25,0
00
5.02
Reg
ulat
ory
Sig
nage
32N
o.40
0.00
12,8
00
6.00
TRA
FFIC
SIG
NA
L W
OR
KS
6.01
Traf
fic S
igna
ls (i
ncl.
10yr
mai
nten
ance
fee)
1Ite
m38
0,00
0.00
380,
000
6.02
Traf
fic S
igna
l Con
duit
(incl
. allo
wan
ce fo
r pits
)16
0Lm
85.0
013
,600
7.00
ELEC
TRIC
AL
WO
RK
S
7.01
Stre
et L
ight
pol
es @
50m
spa
cing
13N
o.6,
500.
0084
,500
7.02
Stre
et L
ight
ing
cabl
ing
and
cond
uit
650
Lm80
.00
52,0
00
8.00
LAN
DSC
APE
WO
RK
S
8.01
Land
scap
ing
(tops
oil a
nd tu
rf on
ly)
7,50
0m
28.
3062
,250
8.02
Land
scap
ing
(tree
s)26
No.
350.
009,
100
9.00
SER
VIC
E R
ELO
CA
TIO
N /
PRO
TEC
TIO
N
9.01
Allo
wan
ce fo
r rel
ocat
ion
of e
xist
ing
serv
ices
1Ite
m10
0,00
0.00
100,
000
Sub-
tota
l2,
939,
653
Traf
fic M
anag
emen
t 5%
146,
983
Site
Est
ablis
hmen
t 2.5
%73
,491
Sur
vey
and
Des
ign
12.5
%36
7,45
7
Sup
ervi
sion
and
Pro
ject
Man
agem
ent 1
0%29
3,96
5
Con
tinge
ncy
20%
587,
931
Tota
l Est
imat
ed C
ost (
excl
. GST
)4,
410,
000
NO
TES
1. A
ll co
sts
excl
ude
GS
T.
2. C
osts
det
erm
ined
usi
ng ty
pica
l con
stru
ctio
n ra
tes
from
sim
ilar p
roje
cts.
3. N
o al
low
ance
has
bee
n m
ade
for C
omm
unity
Lia
ison
, Cul
tura
l Her
itage
, Flo
ra a
nd F
auna
/ N
et G
ain
Offs
ets.
4. C
ostin
g ba
sed
on T
raffi
x G
1264
3N-0
5 (1
8 O
ct 2
013)
5. P
avem
ent d
esig
n is
indi
cativ
e on
ly, s
ubje
ct to
geo
tech
nica
l inv
estig
atio
n an
d de
sign
.
6. T
he In
ters
ectio
n ha
s be
en c
oste
d fo
r the
inte
rim la
yout
7. W
here
pos
sibl
e ex
istin
g pa
vem
ents
will
be
reta
ined
with
ove
rlay/
re-s
heet
onl
y
BPR
ELIM
INAR
Y IS
SUE
PHMW
07.11
.13
4342 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
2 -
1 -
APPROX. 113m
APPR
OX. 3
47m
SECTION ROAD
SOME
RTON
ROA
D
LIMIT OF WORKS
LIMIT OF WORKS
LIMIT
OF
WOR
KS
40mm
DEP
TH S
IZE
20 T
YPE
H / V
ASP
HALT
(C32
0 BIN
DER)
60mm
DEP
TH S
IZE
20 T
YPE
SI A
SPHA
LT (C
320 B
INDE
R)
75mm
DEP
TH S
IZE
20 T
YPE
SF A
SPHA
LT (C
320 B
INDE
R)
150m
m DE
PTH
SIZE
20 C
LASS
2 CE
MENT
TRE
ATED
CRU
SHED
ROC
K
150m
m DE
PTH
SIZE
20 C
LASS
2 FI
NE C
RUSH
ED R
OCK
200m
m DE
PTH
SELE
CT F
ILL O
R ST
ABAL
ISED
CLA
Y CA
PPIN
G LA
YER
FREN
CH &
1.5m
N/STRIP
4.5m
12.8m
3.2m
1.5m
23.5m
ROA
D RE
SERV
E
N/STRIP
TRAFFIC
F/PATH
F/PATH
1.7m
0.6m
10.5m
1.7m
5.5m
20.0m
ROA
D RE
SERV
E
N/STRIP
N/STRIP
BICYCLE
BICYCLE
TRAFFIC
SOME
RTON
ROA
D AN
D SE
CTIO
N RO
ADIN
TERS
ECTI
ON (I
T03)
PHMG
MWAS
SHO
WN
MIE1
03A
APR
ELIM
INAR
Y IS
SUE
MGMW
31.10
.13
SCAL
E-SE
CTIO
N1 -
1:200
SCAL
E-SE
CTIO
N2 -
1:200
SOME
RTON
ROA
D AN
D SE
CTIO
N RO
AD IN
TERS
ECTI
ON (I
T03)
LEGE
NDCO
STED
INTE
RSEC
TION
ARE
A
ROAD
RES
ERVE
EXIS
TING
ROA
D
TYPI
CAL P
AVEM
ENT
DETA
IL W
ITH
KERB
AND
CHA
NNEL
(HIG
H AN
D LO
W S
IDE
SIMI
LAR)
NOT
TO S
CALE
DWG FILE: X:\107912 - Greenvale Central DCP Costings GAA\6BIM\6_3 MHT MIE\6_3_2 MHT INF\107912-00-MIE101-109.dwg - MH PLOT TIME: 06 Nov 2013, 5:28pm
DATE
APP
BYRE
VDE
SCRI
PTIO
N
REV
DESI
GNED
APPR
OVED
TITL
E
DRAW
N
STAT
USPR
OJEC
T No
DRAW
ING
No
SCAL
E @
A1
PROJ
ECT
CLIE
NTNO
RTH
Telep
hone
: (03
) 867
6 120
0
www.
meinh
ardtg
roup
.com
c Co
pyrig
ht
Fax:
(03)
8676
1201
A.C.
N. 05
2 275
635
L12,
501 S
wans
ton S
treet,
Melb
ourn
e,VI
C, A
ustra
lia 30
00
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
METR
OPOL
ITAN
PLA
NNIN
G AU
THOR
ITY
1079
12CO
STED
ARE
A - R
ESHE
ETIN
G ON
LY
WAR
NING
BEW
ARE
OF U
NDER
GROU
ND S
ERVI
CES
THE
LOCA
TION
S OF
UND
ERGR
OUND
SER
VICE
SAR
E UN
KNOW
N AN
D TH
EIR
EXAC
T PO
SITI
ONSH
OULD
BE
PROV
EN O
N SI
TE.
WAR
NING
BEW
ARE
OF H
IGH
PRES
SURE
OIL
PIPE
LINE
HIGH
PRE
SSUR
E PE
TROL
EUM
PIPE
LINE
WIT
HIN
ROAD
RESE
RVE.
CON
SULT
MOB
IL OI
L AUS
TRAL
IA P
TY LT
D FO
REX
ACT
LOCA
TION
.
INFR
AST
RU
CTU
RE
- OPI
NIO
N O
F C
OST
IT03
- So
mer
ton
Roa
d &
Sec
tion
Roa
d (s
igna
lised
)
Item
Des
crip
tion
Qua
ntity
Uni
tR
ate
($/u
nit)
Sub
Tota
l($
exc
l.G
ST)
1.00
EAR
THW
OR
KS
1.01
Exc
avat
ion
incl
. and
dis
posa
l off
site
4,30
0m
3
3
0.00
1
29,0
00
1.02
Trim
and
pre
pare
sub
grad
e to
rece
ive
sub-
base
4,70
0m
21.
60
7
,520
1.03
Spr
ead
and
Com
pact
Fill
Ons
ite43
0m
38.
80
3
,784
1.04
Test
s (D
ensi
ty e
tc.)
1Ite
m
10
,000
.00
10,0
00
2.00
CO
NC
RET
E W
OR
KS
2.01
Ker
b &
Cha
nnel
(SM
1, S
M2
& S
M3)
530
L.m
52.
00
27
,560
2.02
Traf
fic Is
land
s - 2
00m
m th
ick
rein
forc
ed18
0m
2
8
0.00
14,4
00
2.03
Sha
red
Pat
hway
- 12
5mm
thic
k re
info
rced
700
m2
51.
00
35
,700
3.00
PAVE
MEN
T W
OR
KS
3.01
40m
m T
hick
Asp
halt
(wea
ring
cour
se)
3,20
0m
2
1
8.10
57,9
20
3.02
60m
m T
hick
Asp
halt
(inte
rmed
iate
cou
rse)
3,20
0m
2
3
1.70
1
01,4
40
3.03
75m
m T
hick
Asp
halt
(bas
e co
urse
)3,
200
m2
33.
90
108
,480
3.04
Asp
halt
resh
eet T
ype
H /
V (C
lass
320
) 60m
m1,
000
m2
38.
40
38
,400
3.05
Prim
e4,
700
m2
3.60
16,9
20
3.06
150m
m C
TCR
Bas
e4,
700
m2
13.
50
63
,450
3.07
150m
m F
CR
Bas
e4,
700
m2
9.90
46,5
30
3.08
200m
m S
elec
t Sub
-bas
e C
ours
e4,
700
m2
6.00
28,2
00
3.09
Sub
grad
e Im
prov
emen
t (al
low
20%
of a
rea)
940
m2
13.
40
12
,596
4.00
DR
AIN
AG
E W
OR
KS
4.01
AG
Dra
in53
0Lm
31.
50
16
,695
4.02
Dra
inag
e P
its (6
0m s
paci
ng)
11N
o.
2
,750
.00
30,2
50
4.03
375m
m d
ia R
CP
(cru
shed
rock
bac
kfill
)31
4m
2
40.0
0
75
,456
4.04
375m
m d
ia R
CP
(ear
th b
ackf
ill)
0m
2
00.0
0-
4.05
Bre
ak-in
and
Con
nect
ion
to E
xist
ing
Dra
inag
e2
Item
1,5
00.0
0
3
,000
5.00
SIG
N A
ND
LIN
EMA
RK
ING
5.01
Line
mar
king
(allo
wan
ce)
1Ite
m
20
,000
.00
20,0
00
5.02
Reg
ulat
ory
Sig
nage
16N
o.
400
.00
6,4
00
6.00
TRA
FFIC
SIG
NA
L W
OR
KS
6.01
Traf
fic S
igna
ls (i
ncl.
10yr
mai
nten
ance
fee)
1Ite
m
240
,000
.00
2
40,0
00
6.02
Traf
fic S
igna
l Con
duit
(incl
. allo
wan
ce fo
r pits
)16
0Lm
85.
00
13
,600
7.00
ELEC
TRIC
AL
WO
RK
S
7.01
Stre
et L
ight
pol
es @
50m
spa
cing
10N
o.
6
,500
.00
65,0
00
7.02
Stre
et L
ight
ing
cabl
ing
and
cond
uit
500
Lm
8
0.00
40,0
00
8.00
LAN
DSC
APE
WO
RK
S
8.01
Land
scap
ing
(tops
oil a
nd tu
rf on
ly)
5,30
0m
28.
30
43
,990
8.02
Land
scap
ing
(tree
s)20
No.
3
50.0
0
7
,000
9.00
SER
VIC
E R
ELO
CA
TIO
N /
PRO
TEC
TIO
N
9.01
Allo
wan
ce fo
r rel
ocat
ion
of e
xist
ing
serv
ices
1Ite
m15
0,00
0.00
150,
000
9.02
Allo
wan
ce fo
r pro
tect
ion
of h
igh
pres
sure
petro
leum
pip
elin
e1
Item
400,
000.
0040
0,00
0
Sub-
tota
l $
1
,813
,291
Traf
fic M
anag
emen
t 5%
$
90,6
65
Site
Est
ablis
hmen
t 2.5
% $
45
,332
Sur
vey
and
Des
ign
12.5
% $
226
,661
Sup
ervi
sion
and
Pro
ject
Man
agem
ent 1
0% $
181
,329
Con
tinge
ncy
20%
$
3
62,6
58
Tota
l Est
imat
ed C
ost (
excl
. GST
) $
2
,720
,000
NO
TES
1. A
ll co
sts
excl
ude
GS
T.
2. C
osts
det
erm
ined
usi
ng ty
pica
l con
stru
ctio
n ra
tes
from
sim
ilar p
roje
cts.
3. N
o al
low
ance
has
bee
n m
ade
for C
omm
unity
Lia
ison
, Cul
tura
l Her
itage
, Flo
ra a
nd F
auna
/ N
et G
ain
Offs
ets.
4. C
ostin
g ba
sed
on T
raffi
x G
1264
3N-0
3 (1
5 O
ct 2
013)
5. P
avem
ent d
esig
n is
indi
cativ
e on
ly, s
ubje
ct to
geo
tech
nica
l inv
estig
atio
n an
d de
sign
.
6. T
he In
ters
ectio
n ha
s be
en c
oste
d fo
r the
inte
rim la
yout
7. W
here
pos
sibl
e ex
istin
g pa
vem
ents
will
be
reta
ined
with
ove
rlay/
re-s
heet
onl
y
APPR
OX. 2
70m
APPR
OX. 2
75m
APPROX. 36m
APPROX. 83m
3 -
1 -
2 -
SOME
RTON
ROA
D
BRENDAN ROAD
LIMIT
OF
WOR
KS
LIMIT OF WORKS
LIMIT OF WORKS
LIMIT
OF
WOR
KS
40mm
DEP
TH S
IZE
20 T
YPE
H / V
ASP
HALT
(C32
0 BIN
DER)
60mm
DEP
TH S
IZE
20 T
YPE
SI A
SPHA
LT (C
320 B
INDE
R)
75mm
DEP
TH S
IZE
20 T
YPE
SF A
SPHA
LT (C
320 B
INDE
R)
150m
m DE
PTH
SIZE
20 C
LASS
2 CE
MENT
TRE
ATED
CRU
SHED
ROC
K
150m
m DE
PTH
SIZE
20 C
LASS
2 FI
NE C
RUSH
ED R
OCK
200m
m DE
PTH
SELE
CT F
ILL O
R ST
ABAL
ISED
CLA
Y CA
PPIN
G LA
YER
FREN
CH &
27.5m
ROA
D RE
SERV
E
2.0m
TRAFFIC
10.5m
N/STRIP
0.5m
N/STRIP
1.0m
1.5m F/PATH
F/PATH
1.35m
4.8m
1.0m
2.0m
1.35m
1.5m
BICYCLE
N/STRIP
BICYCLE
N/STRIP
TRAFFIC
MEDIAN
20.2m
ROA
D RE
SERV
E (E
XIST
ING)
TRAFFIC
9.3m N/STRIP
9.3m
1.6m N/STRIP
3.5m
TRAFFIC
7.0m
53m
ROAD
RES
ERVE
3.3m
1.7m
10.5m
MEDIAN
N/STRIP
1.5m F/PATH
7.0m
1.7m
16.9m N/STRIP
TRAFFIC
TRAFFIC
BICYCLE
BICYCLE
SOME
RTON
ROA
D AN
DBR
ENDA
N RO
ADIN
TERS
ECTI
ON (I
T04)
PHMG
MWAS
SHO
WN
MIE1
04B
APR
ELIM
INAR
Y IS
SUE
MGMW
31.10
.13
SOME
RTON
ROA
D AN
D BR
ENDA
N DR
IVE
INTE
RSEC
TION
(IT0
4)
LEGE
NDCO
STED
INTE
RSEC
TION
ARE
A
ROAD
RES
ERVE
EXIS
TING
ROA
D
TYPI
CAL P
AVEM
ENT
DETA
IL W
ITH
KERB
AND
CHA
NNEL
(HIG
H AN
D LO
W S
IDE
SIMI
LAR)
NOT
TO S
CALE
DWG FILE: X:\107912 - Greenvale Central DCP Costings GAA\6BIM\6_3 MHT MIE\6_3_2 MHT INF\107912-00-MIE101-109.dwg - MH PLOT TIME: 07 Nov 2013, 4:39pm
DATE
APP
BYRE
VDE
SCRI
PTIO
N
REV
DESI
GNED
APPR
OVED
TITL
E
DRAW
N
STAT
USPR
OJEC
T No
DRAW
ING
No
SCAL
E @
A1
PROJ
ECT
CLIE
NTNO
RTH
Telep
hone
: (03
) 867
6 120
0
www.
meinh
ardtg
roup
.com
c Co
pyrig
ht
Fax:
(03)
8676
1201
A.C.
N. 05
2 275
635
L12,
501 S
wans
ton S
treet,
Melb
ourn
e,VI
C, A
ustra
lia 30
00
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
METR
OPOL
ITAN
PLA
NNIN
G AU
THOR
ITY
1079
12
SCAL
E-SE
CTIO
N1 -
1:200
SCAL
E-SE
CTIO
N2 -
1:200
COST
ED A
REA
- RES
HEET
ING
ONLY
SCAL
E-SE
CTIO
N3 -
1:200
WAR
NING
BEW
ARE
OF U
NDER
GROU
ND S
ERVI
CES
THE
LOCA
TION
S OF
UND
ERGR
OUND
SER
VICE
SAR
E UN
KNOW
N AN
D TH
EIR
EXAC
T PO
SITI
ONSH
OULD
BE
PROV
EN O
N SI
TE.
WAR
NING
BEW
ARE
OF H
IGH
PRES
SURE
OIL
PIPE
LINE
HIGH
PRE
SSUR
E PE
TROL
EUM
PIPE
LINE
WIT
HIN
ROAD
RESE
RVE.
CON
SULT
MOB
IL OI
L AUS
TRAL
IA P
TY LT
D FO
REX
ACT
LOCA
TION
.
INFR
AST
RU
CTU
RE
- OPI
NIO
N O
F C
OST
IT03
- So
mer
ton
Roa
d &
Bre
ndan
Roa
d / F
leet
woo
d D
rive
(sig
nalis
ed)
Item
Des
crip
tion
Qua
ntity
Uni
tR
ate
($/u
nit)
Sub
Tota
l($
exc
l.G
ST)
1.00
EAR
THW
OR
KS
1.01
Exc
avat
ion
incl
. and
dis
posa
l off
site
10,8
00m
330
.00
324,
000
1.02
Trim
and
pre
pare
sub
grad
e to
rece
ive
sub-
base
12,0
00m
21.
6019
,200
1.03
Spr
ead
and
Com
pact
Fill
Ons
ite1,
080
m3
8.80
9,50
4
1.04
Test
s (D
ensi
ty e
tc.)
1Ite
m1,
500.
001,
500
2.00
CO
NC
RET
E W
OR
KS
2.01
Ker
b &
Cha
nnel
(SM
1, S
M2
& S
M3)
550
L.m
52.0
028
,600
2.02
Traf
fic Is
land
s - 2
00m
m th
ick
rein
forc
ed1,
410
m2
80.0
011
2,80
0
2.03
Sha
red
Pat
hway
- 12
5mm
thic
k re
info
rced
1,20
0m
251
.00
61,2
00
3.00
PAVE
MEN
T W
OR
KS
3.01
40m
m T
hick
Asp
halt
(wea
ring
cour
se)
7,50
0m
218
.10
135,
750
3.02
60m
m T
hick
Asp
halt
(inte
rmed
iate
cou
rse)
7,50
0m
231
.70
237,
750
3.03
75m
m T
hick
Asp
halt
(bas
e co
urse
)7,
500
m2
33.9
025
4,25
0
3.04
Asp
halt
resh
eet T
ype
H /
V (C
lass
320
) 60m
m6,
000
m2
38.4
023
0,40
0
3.05
Prim
e12
,000
m2
3.60
43,2
00
3.06
150m
m C
TCR
Bas
e12
,000
m2
13.5
016
2,00
0
3.07
150m
m F
CR
Bas
e12
,000
m2
9.90
118,
800
3.08
200m
m S
elec
t Sub
-bas
e C
ours
e12
,000
m2
6.00
72,0
00
3.09
Sub
grad
e Im
prov
emen
t (al
low
20%
of a
rea)
2,40
0m
213
.40
32,1
60
4.00
DR
AIN
AG
E W
OR
KS
4.01
AG
Dra
in55
0Lm
31.5
017
,325
4.02
Dra
inag
e P
its (6
0m s
paci
ng)
5N
o.2,
750.
0015
,015
4.03
375m
m d
ia R
CP
(cru
shed
rock
bac
kfill
)24
0m
240.
0057
,600
4.04
375m
m d
ia R
CP
(ear
th b
ackf
ill)
0m
200.
000
4.05
Bre
ak-in
and
Con
nect
ion
to E
xist
ing
Dra
inag
e2
Item
1,50
0.00
3,00
0
5.00
SIG
N A
ND
LIN
EMA
RK
ING
5.01
Line
mar
king
(allo
wan
ce)
1Ite
m25
,000
.00
25,0
00
5.02
Reg
ulat
ory
Sig
nage
28N
o.40
0.00
11,2
00
6.00
TRA
FFIC
SIG
NA
L W
OR
KS
6.01
Traf
fic S
igna
ls (i
ncl.
10yr
mai
nten
ance
fee)
1Ite
m19
0,00
0.00
190,
000
6.02
Traf
fic S
igna
l Con
duit
(incl
. allo
wan
ce fo
r pits
)16
0Lm
85.0
013
,600
7.00
ELEC
TRIC
AL
WO
RK
S
7.01
Stre
et L
ight
pol
es @
50m
spa
cing
15N
o.6,
500.
0097
,500
7.02
Stre
et L
ight
ing
cabl
ing
and
cond
uit
750
Lm80
.00
60,0
00
8.00
LAN
DSC
APE
WO
RK
S
8.01
Land
scap
ing
(tops
oil a
nd tu
rf on
ly)
1,20
0m
28.
309,
960
8.02
Land
scap
ing
(tree
s)30
No.
350.
0010
,500
9.00
SER
VIC
E R
ELO
CA
TIO
N /
PRO
TEC
TIO
N
9.01
Allo
wan
ce fo
r rel
ocat
ion
of e
xist
ing
serv
ices
1Ite
m20
0,00
0.00
200,
000
9.02
Allo
wan
ce fo
r pro
tect
ion
of h
igh
pres
sure
petro
leum
pip
elin
e1
Item
400,
000.
0040
0,00
0
Sub-
tota
l2,
953,
814
Traf
fic M
anag
emen
t 5%
147,
691
Site
Est
ablis
hmen
t 2.5
%73
,845
Sur
vey
and
Des
ign
12.5
%36
9,22
7
Sup
ervi
sion
and
Pro
ject
Man
agem
ent 1
0%29
5,38
1
Con
tinge
ncy
20%
590,
763
Tota
l Est
imat
ed C
ost (
excl
. GST
)4,
431,
000
NO
TES
1. A
ll co
sts
excl
ude
GS
T.
2. C
osts
det
erm
ined
usi
ng ty
pica
l con
stru
ctio
n ra
tes
from
sim
ilar p
roje
cts.
3. N
o al
low
ance
has
bee
n m
ade
for C
omm
unity
Lia
ison
, Cul
tura
l Her
itage
, Flo
ra a
nd F
auna
/ N
et G
ain
Offs
ets.
4. C
ostin
g ba
sed
on T
raffi
x G
1264
3N-0
4 (1
6 O
ct 2
013)
5. P
avem
ent d
esig
n is
indi
cativ
e on
ly, s
ubje
ct to
geo
tech
nica
l inv
estig
atio
n an
d de
sign
.
6. T
he In
ters
ectio
n ha
s be
en c
oste
d fo
r the
inte
rim la
yout
7. W
here
pos
sibl
e ex
istin
g pa
vem
ents
will
be
reta
ined
with
ove
rlay/
re-s
heet
onl
y
BPR
ELIM
INAR
Y IS
SUE
PHMW
07.11
.13
4544 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
2 -
MICKLEHAM ROAD
PROV
IDEN
CE R
OAD
LIMIT
OF
WOR
KS
LIMIT OF WORKS
LIMIT
OF
WOR
KS
1 -
APPR
OX. 1
27m
APPROX. 131m
40mm
DEP
TH S
IZE
20 T
YPE
H / V
ASP
HALT
(C32
0 BIN
DER)
60mm
DEP
TH S
IZE
20 T
YPE
SI A
SPHA
LT (C
320 B
INDE
R)
75mm
DEP
TH S
IZE
20 T
YPE
SF A
SPHA
LT (C
320 B
INDE
R)
150m
m DE
PTH
SIZE
20 C
LASS
2 CE
MENT
TRE
ATED
CRU
SHED
ROC
K
150m
m DE
PTH
SIZE
20 C
LASS
2 FI
NE C
RUSH
ED R
OCK
200m
m DE
PTH
SELE
CT F
ILL O
R ST
ABAL
ISED
CLA
Y CA
PPIN
G LA
YER
FREN
CH &
27.5m
ROA
D RE
SERV
E
TRAFFIC
N/STRIP
F/PATH
N/STRIP
2.5m
1.5m F/PATH
10.50
m2.5
0m5.0
0m3.0
0m1.5
0m1.0
0m
MEDIAN
TRAFFIC
BICYCLE
ROAD
RES
ERVE
VAR
IES
TRAFFIC
N/STRIP
N/STRIP
5.9m
MEDIAN
TRAFFIC
VARI
ES
10.50
m3.5
0m6.6
3m7.0
0m TRAFFIC
MICK
LEHA
M RO
AD A
NDPR
OVID
ENCE
ROA
DIN
TERS
ECTI
ON (I
T06)
PHMG
MWAS
SHO
WN
MIE1
06A
APR
ELIM
INAR
Y IS
SUE
MGMW
31.10
.13
MICK
LEHA
M RO
AD A
ND P
ROVI
DENC
E RO
AD IN
TERS
ECTI
ON (I
T06)
LEGE
NDCO
STED
INTE
RSEC
TION
ARE
A
ROAD
RES
ERVE
EXIS
TING
ROA
D
TYPI
CAL P
AVEM
ENT
DETA
IL W
ITH
KERB
AND
CHA
NNEL
(HIG
H AN
D LO
W S
IDE
SIMI
LAR)
NOT
TO S
CALE
DWG FILE: X:\107912 - Greenvale Central DCP Costings GAA\6BIM\6_3 MHT MIE\6_3_2 MHT INF\107912-00-MIE101-109.dwg - MH PLOT TIME: 06 Nov 2013, 5:43pm
DATE
APP
BYRE
VDE
SCRI
PTIO
N
REV
DESI
GNED
APPR
OVED
TITL
E
DRAW
N
STAT
USPR
OJEC
T No
DRAW
ING
No
SCAL
E @
A1
PROJ
ECT
CLIE
NTNO
RTH
Telep
hone
: (03
) 867
6 120
0
www.
meinh
ardtg
roup
.com
c Co
pyrig
ht
Fax:
(03)
8676
1201
A.C.
N. 05
2 275
635
L12,
501 S
wans
ton S
treet,
Melb
ourn
e,VI
C, A
ustra
lia 30
00
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
METR
OPOL
ITAN
PLA
NNIN
G AU
THOR
ITY
1079
12
SCAL
E-SE
CTIO
N1 -
1:200
SCAL
E-SE
CTIO
N2 -
1:200
COST
ED A
REA
- RES
HEET
ING
ONLY
INFR
AST
RU
CTU
RE
- OPI
NIO
N O
F C
OST
IT06
- M
ickl
eham
Roa
d &
Pro
vide
nce
Roa
d (s
igna
lised
)
Item
Des
crip
tion
Qua
ntity
Uni
tR
ate
($/u
nit)
Sub
Tota
l($
exc
l.G
ST)
1.00
EAR
THW
OR
KS
1.01
Exc
avat
ion
incl
. and
dis
posa
l off
site
3,30
0m
3
3
0.00
99,0
00
1.02
Trim
and
pre
pare
sub
grad
e to
rece
ive
sub-
base
3,60
0m
21.
60
5
,760
1.03
Spr
ead
and
Com
pact
Fill
Ons
ite33
0m
38.
80
2
,904
1.04
Test
s (D
ensi
ty e
tc.)
1Ite
m
15
,000
.00
15,0
00
2.00
CO
NC
RET
E W
OR
KS
2.01
Ker
b &
Cha
nnel
(SM
1, S
M2
& S
M3)
660
L.m
52.
00
34
,320
2.02
Traf
fic Is
land
s - 2
00m
m th
ick
rein
forc
ed30
0m
2
8
0.00
24,0
00
2.03
Sha
red
Pat
hway
- 12
5mm
thic
k re
info
rced
800
m2
51.
00
40
,800
3.00
PAVE
MEN
T W
OR
KS
3.01
40m
m T
hick
Asp
halt
(wea
ring
cour
se)
2,70
0m
2
1
8.10
48,8
70
3.02
60m
m T
hick
Asp
halt
(inte
rmed
iate
cou
rse)
2,70
0m
2
3
1.70
85,5
90
3.03
75m
m T
hick
Asp
halt
(bas
e co
urse
)2,
700
m2
33.
90
91
,530
3.04
Asp
halt
resh
eet T
ype
H /
V (C
lass
320
) 60m
m2,
400
m2
38.
40
92
,160
3.05
Prim
e3,
600
m2
3.60
12,9
60
3.06
150m
m C
TCR
Bas
e3,
600
m2
13.
50
48
,600
3.07
150m
m F
CR
Bas
e3,
600
m2
9.90
35,6
40
3.08
200m
m S
elec
t Sub
-bas
e C
ours
e3,
600
m2
6.00
21,6
00
3.09
Sub
grad
e Im
prov
emen
t (al
low
20%
of a
rea)
720
m2
13.
40
9
,648
4.00
DR
AIN
AG
E W
OR
KS
4.01
AG
Dra
in66
0Lm
31.
50
20
,790
4.02
Dra
inag
e P
its (6
0m s
paci
ng)
8N
o.
2
,750
.00
22,0
00
4.03
375m
m d
ia R
CP
(cru
shed
rock
bac
kfill
)25
0m
2
40.0
0
60
,000
4.04
375m
m d
ia R
CP
(ear
th b
ackf
ill)
0m
2
00.0
0-
4.05
Bre
ak-in
and
Con
nect
ion
to E
xist
ing
Dra
inag
e2
Item
1,5
00.0
0
3
,000
5.00
SIG
N A
ND
LIN
EMA
RK
ING
5.01
Line
mar
king
(allo
wan
ce)
1Ite
m
20
,000
.00
20,0
00
5.02
Reg
ulat
ory
Sig
nage
24N
o.
400
.00
9,6
00
6.00
TRA
FFIC
SIG
NA
L W
OR
KS
6.01
Traf
fic S
igna
ls (i
ncl.
10yr
mai
nten
ance
fee)
1N
o.
260
,000
.00
2
60,0
00
6.02
Traf
fic S
igna
l Con
duit
(incl
. allo
wan
ce fo
r pits
)16
0Lm
85.
00
13
,600
7.00
ELEC
TRIC
AL
WO
RK
S
7.01
Stre
et L
ight
pol
es @
50m
spa
cing
6N
o.
6
,500
.00
39,0
00
7.02
Stre
et L
ight
ing
cabl
ing
and
cond
uit
300
Lm
8
0.00
24,0
00
8.00
LAN
DSC
APE
WO
RK
S
8.01
Land
scap
ing
(tops
oil a
nd tu
rf on
ly)
1,90
0m
28.
30
15
,770
8.02
Land
scap
ing
(tree
s)12
No.
3
50.0
0
4
,200
9.00
SER
VIC
E R
ELO
CA
TIO
N /
PRO
TEC
TIO
N
9.01
Allo
wan
ce fo
r rel
ocat
ion
of e
xist
ing
serv
ices
1Ite
m16
0,00
0.00
160,
000
Sub-
tota
l $
1
,320
,342
Traf
fic M
anag
emen
t 5%
$
66,0
17
Site
Est
ablis
hmen
t 2.5
% $
33
,009
Sur
vey
and
Des
ign
12.5
% $
165
,043
Sup
ervi
sion
and
Pro
ject
Man
agem
ent 1
0% $
132
,034
Con
tinge
ncy
20%
$
2
64,0
68
Tota
l Est
imat
ed C
ost (
excl
. GST
) $
1
,981
,000
NO
TES
1. A
ll co
sts
excl
ude
GS
T.
2. C
osts
det
erm
ined
usi
ng ty
pica
l con
stru
ctio
n ra
tes
from
sim
ilar p
roje
cts.
3. N
o al
low
ance
has
bee
n m
ade
for C
omm
unity
Lia
ison
, Cul
tura
l Her
itage
, Flo
ra a
nd F
auna
/ N
et G
ain
Offs
ets.
4. C
ostin
g ba
sed
on T
raffi
x G
1264
3N-0
6 (1
7 O
ct 2
013)
5. P
avem
ent d
esig
n is
indi
cativ
e on
ly, s
ubje
ct to
geo
tech
nica
l inv
estig
atio
n an
d de
sign
.
6. T
he In
ters
ectio
n ha
s be
en c
oste
d fo
r the
inte
rim la
yout
7. W
here
pos
sibl
e ex
istin
g pa
vem
ents
will
be
reta
ined
with
ove
rlay/
re-s
heet
onl
y
WAR
NING
BEW
ARE
OF U
NDER
GROU
ND S
ERVI
CES
THE
LOCA
TION
S OF
UND
ERGR
OUND
SER
VICE
SAR
E UN
KNOW
N AN
D TH
EIR
EXAC
T PO
SITI
ONSH
OULD
BE
PROV
EN O
N SI
TE.
40mm
DEP
TH S
IZE
20 T
YPE
H / V
ASP
HALT
(C32
0 BIN
DER)
60mm
DEP
TH S
IZE
20 T
YPE
SI A
SPHA
LT (C
320 B
INDE
R)
75mm
DEP
TH S
IZE
20 T
YPE
SF A
SPHA
LT (C
320 B
INDE
R)
150m
m DE
PTH
SIZE
20 C
LASS
2 CE
MENT
TRE
ATED
CRU
SHED
ROC
K
150m
m DE
PTH
SIZE
20 C
LASS
2 FI
NE C
RUSH
ED R
OCK
200m
m DE
PTH
SELE
CT F
ILL O
R ST
ABAL
ISED
CLA
Y CA
PPIN
G LA
YER
FREN
CH &
1.5m
3.00m
1.45m
10.50
m9.3
0m7.0
0m7.0
0m
43.2m
ROA
D RE
SERV
E
3.50m
TRAFFIC
TRAFFIC
N/STRIP
N/STRIP
N/STRIP
F/PATH
TRAFFIC
MEDIAN
1.5m
N/STRIP
0.50m
2.00m
1.00m
5.00m
2.50m
10.50
m3.2
9m2.0
0m3.6
5m1.5
0m
F/PATH
F/PATH
TRAFFIC
MEDIAN
N/STRIP
N/STRIP
TRAFFIC
BICYCLE
33.4m
ROA
D RE
SERV
E
1 -
2 -
APPR
OX. 1
23m
APPROX. 50m
APPROX. 90mAP
PROX
. 83m
GREE
NVAL
E DR
IVE
EXTE
NSIO
NMICKLEHAM ROAD
MICKLEHAM ROAD
GREE
NVAL
E DR
IVE
LIMIT
OF
WOR
KSLIMIT OF WORKS
LIMIT OF WORKS
LIMIT
OF
WOR
KS
MICK
LEHA
M RO
AD A
NDGR
EENV
ALE
DRIV
E EX
TENS
ION
INTE
RSEC
TION
(IT0
2)
PHMG
MWAS
SHO
WN
MIE1
02A
APR
ELIM
INAR
Y IS
SUE
MGMW
31.10
.13MICK
LEHA
M RO
AD A
ND G
REEN
VALE
DRI
VE E
XTEN
SION
- IN
TERS
ECTI
ON (I
T02)
LEGE
NDCO
STED
INTE
RSEC
TION
ARE
A
ROAD
RES
ERVE
EXIS
TING
ROA
D
TYPI
CAL P
AVEM
ENT
DETA
IL W
ITH
KERB
AND
CHA
NNEL
(HIG
H AN
D LO
W S
IDE
SIMI
LAR)
NOT
TO S
CALE
DWG FILE: X:\107912 - Greenvale Central DCP Costings GAA\6BIM\6_3 MHT MIE\6_3_2 MHT INF\107912-00-MIE101-109.dwg - MH PLOT TIME: 06 Nov 2013, 5:27pm
DATE
APP
BYRE
VDE
SCRI
PTIO
N
REV
DESI
GNED
APPR
OVED
TITL
E
DRAW
N
STAT
USPR
OJEC
T No
DRAW
ING
No
SCAL
E @
A1
PROJ
ECT
CLIE
NTNO
RTH
Telep
hone
: (03
) 867
6 120
0
www.
meinh
ardtg
roup
.com
c Co
pyrig
ht
Fax:
(03)
8676
1201
A.C.
N. 05
2 275
635
L12,
501 S
wans
ton S
treet,
Melb
ourn
e,VI
C, A
ustra
lia 30
00
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
METR
OPOL
ITAN
PLA
NNIN
G AU
THOR
ITY
1079
12
SCAL
E-SE
CTIO
N1 -
1:200
SCAL
E-SE
CTIO
N2 -
1:200
COST
ED A
REA
- RES
HEET
ING
ONLY
INFR
AST
RU
CTU
RE
- OPI
NIO
N O
F C
OST
IT02
- M
ickl
eham
Roa
d &
Gre
enva
le D
rive
Exte
nstio
n (s
igna
lised
)
Item
Des
crip
tion
Qua
ntity
Uni
tR
ate
($/u
nit)
Sub
Tota
l($
exc
l.G
ST)
1.00
EAR
THW
OR
KS
1.01
Exc
avat
ion
incl
. and
dis
posa
l off
site
3,10
0m
3
3
0.00
93,0
00
1.02
Trim
and
pre
pare
sub
grad
e to
rece
ive
sub-
base
3,40
0m
21.
60
5
,440
1.03
Spr
ead
and
Com
pact
Fill
Ons
ite31
0m
38.
80
2
,728
1.04
Test
s (D
ensi
ty e
tc.)
1Ite
m
15
,000
.00
15,0
00
2.00
CO
NC
RET
E W
OR
KS
2.01
Ker
b &
Cha
nnel
(SM
1, S
M2
& S
M3)
680
L.m
52.
00
35
,360
2.02
Traf
fic Is
land
s - 2
00m
m th
ick
rein
forc
ed32
0m
2
8
0.00
25,6
00
2.03
Sha
red
Pat
hway
- 12
5mm
thic
k re
info
rced
1,30
0m
2
5
1.00
66,3
00
3.00
PAVE
MEN
T W
OR
KS
3.01
40m
m T
hick
Asp
halt
(wea
ring
cour
se)
2,60
0m
2
1
8.10
47,0
60
3.02
60m
m T
hick
Asp
halt
(inte
rmed
iate
cou
rse)
2,60
0m
2
3
1.70
82,4
20
3.03
75m
m T
hick
Asp
halt
(bas
e co
urse
)2,
600
m2
33.
90
88
,140
3.04
Asp
halt
resh
eet T
ype
H /
V (C
lass
320
) 60m
m6,
200
m2
38.
40
238
,080
3.05
Prim
e3,
400
m2
3.60
12,2
40
3.06
150m
m C
TCR
Bas
e3,
400
m2
13.
50
45
,900
3.07
150m
m F
CR
Bas
e3,
400
m2
9.90
33,6
60
3.08
200m
m S
elec
t Sub
-bas
e C
ours
e3,
400
m2
6.00
20,4
00
3.09
Sub
grad
e Im
prov
emen
t (al
low
20%
of a
rea)
680
m2
13.
40
9
,112
4.00
DR
AIN
AG
E W
OR
KS
4.01
AG
Dra
in68
0Lm
31.
50
21
,420
4.02
Dra
inag
e P
its (6
0m s
paci
ng)
8N
o.
2
,750
.00
22,0
00
4.03
375m
m d
ia R
CP
(cru
shed
rock
bac
kfill
)45
0m
2
40.0
0
108
,000
4.04
375m
m d
ia R
CP
(ear
th b
ackf
ill)
50m
2
00.0
0
10
,000
4.05
Bre
ak-in
and
Con
nect
ion
to E
xist
ing
Dra
inag
e2
Item
1,5
00.0
0
3
,000
5.00
SIG
N A
ND
LIN
EMA
RK
ING
5.01
Line
mar
king
(allo
wan
ce)
1Ite
m
20
,000
.00
20,0
00
5.02
Reg
ulat
ory
Sig
nage
32N
o.
400
.00
12,8
00
6.00
TRA
FFIC
SIG
NA
L W
OR
KS
6.01
Traf
fic S
igna
ls (i
ncl.
10yr
mai
nten
ance
fee)
1Ite
m
380
,000
.00
3
80,0
00
6.02
Traf
fic S
igna
l Con
duit
(incl
. allo
wan
ce fo
r pits
)16
0Lm
85.
00
13
,600
7.00
ELEC
TRIC
AL
WO
RK
S
7.01
Stre
et L
ight
pol
es @
50m
spa
cing
6N
o.
6
,500
.00
39,0
00
7.02
Stre
et L
ight
ing
cabl
ing
and
cond
uit
350
Lm
8
0.00
28,0
00
8.00
LAN
DSC
APE
WO
RK
S
8.01
Land
scap
ing
(tops
oil a
nd tu
rf on
ly)
2,30
0m
28.
30
19
,090
8.02
Land
scap
ing
(tree
s)12
No.
3
50.0
0
4
,200
9.00
SER
VIC
E R
ELO
CA
TIO
N /
PRO
TEC
TIO
N
9.01
Allo
wan
ce fo
r rel
ocat
ion
of e
xist
ing
serv
ices
1Ite
m16
0,00
016
0,00
0
Sub-
tota
l $
1
,661
,550
Traf
fic M
anag
emen
t 5%
$
83,0
78
Site
Est
ablis
hmen
t 2.5
% $
41
,539
Sur
vey
and
Des
ign
12.5
% $
207
,694
Sup
ervi
sion
and
Pro
ject
Man
agem
ent 1
0% $
166
,155
Con
tinge
ncy
20%
$
3
32,3
10
Tota
l Est
imat
ed C
ost (
excl
. GST
) $
2
,493
,000
NO
TES
1. A
ll co
sts
excl
ude
GS
T.
2. C
osts
det
erm
ined
usi
ng ty
pica
l con
stru
ctio
n ra
tes
from
sim
ilar p
roje
cts.
3. N
o al
low
ance
has
bee
n m
ade
for C
omm
unity
Lia
ison
, Cul
tura
l Her
itage
, Flo
ra a
nd F
auna
/ N
et G
ain
Offs
ets.
4. C
ostin
g ba
sed
on T
raffi
x G
1264
3N-0
2 (1
4 O
ct 2
013)
5. P
avem
ent d
esig
n is
indi
cativ
e on
ly, s
ubje
ct to
geo
tech
nica
l inv
estig
atio
n an
d de
sign
.
6. T
he In
ters
ectio
n ha
s be
en c
oste
d fo
r the
inte
rim la
yout
7. W
here
pos
sibl
e ex
istin
g pa
vem
ents
will
be
reta
ined
with
ove
rlay/
re-s
heet
onl
y
WAR
NING
BEW
ARE
OF U
NDER
GROU
ND S
ERVI
CES
THE
LOCA
TION
S OF
UND
ERGR
OUND
SER
VICE
SAR
E UN
KNOW
N AN
D TH
EIR
EXAC
T PO
SITI
ONSH
OULD
BE
PROV
EN O
N SI
TE.
4746 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
40mm
DEP
TH S
IZE
20 T
YPE
H / V
ASP
HALT
(C32
0 BIN
DER)
60mm
DEP
TH S
IZE
20 T
YPE
SI A
SPHA
LT (C
320 B
INDE
R)
75mm
DEP
TH S
IZE
20 T
YPE
SF A
SPHA
LT (C
320 B
INDE
R)
150m
m DE
PTH
SIZE
20 C
LASS
2 CE
MENT
TRE
ATED
CRU
SHED
ROC
K
150m
m DE
PTH
SIZE
20 C
LASS
2 FI
NE C
RUSH
ED R
OCK
200m
m DE
PTH
SELE
CT F
ILL O
R ST
ABAL
ISED
CLA
Y CA
PPIN
G LA
YER
FREN
CH &
1.5m
2.0m
11.6m
25.0m
BICYCLE
F/PATH
TRAFFIC
1.0m
N/STRIP
2.2m N/STRIP
1.5m
2.0m BICYCLE
F/PATH
1.0m N/STRIP
2.2m N/STRIP
1 -
APPROX. 51m
APPR
OX. 5
1m
APPR
OX. 5
3m
APPROX. 49m
EAST
-WES
T CO
NNEC
TOR
STRE
ET
BONDS LANE
EAST
-WES
T CO
NNEC
TOR
STRE
ET
BONDS LANELIMIT OF WORKS
LIMIT OF WORKS
LIMIT
OF
WOR
KS
LIMIT
OF
WOR
KS
BOND
S LA
NE A
NDEA
ST-W
EST
CONN
ECTO
R ST
REET
INTE
RSEC
TION
(IT0
1)
PHMG
MWAS
SHO
WN
MIE1
01A
APR
ELIM
INAR
Y IS
SUE
MGMW
31.10
.13
BOND
S LA
NE A
ND E
AST-
WES
T CO
NNEC
TOR
STRE
ET -
INTE
RSEC
TION
(IT0
1)
LEGE
NDCO
STED
INTE
RSEC
TION
ARE
A
ROAD
RES
ERVE
EXIS
TING
ROA
D
TYPI
CAL P
AVEM
ENT
DETA
IL W
ITH
KERB
AND
CHA
NNEL
(HIG
H AN
D LO
W S
IDE
SIMI
LAR)
NOT
TO S
CALE
DWG FILE: X:\107912 - Greenvale Central DCP Costings GAA\6BIM\6_3 MHT MIE\6_3_2 MHT INF\107912-00-MIE101-109.dwg - MH PLOT TIME: 06 Nov 2013, 5:07pm
DATE
APP
BYRE
VDE
SCRI
PTIO
N
REV
DESI
GNED
APPR
OVED
TITL
E
DRAW
N
STAT
USPR
OJEC
T No
DRAW
ING
No
SCAL
E @
A1
PROJ
ECT
CLIE
NTNO
RTH
Telep
hone
: (03
) 867
6 120
0
www.
meinh
ardtg
roup
.com
c Co
pyrig
ht
Fax:
(03)
8676
1201
A.C.
N. 05
2 275
635
L12,
501 S
wans
ton S
treet,
Melb
ourn
e,VI
C, A
ustra
lia 30
00
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
METR
OPOL
ITAN
PLA
NNIN
G AU
THOR
ITY
1079
12
SCAL
E-SE
CTIO
N1 -
1:200
INFR
AST
RU
CTU
RE
- OPI
NIO
N O
F C
OST
IT01
- B
onds
Lan
e &
Eas
t Wes
t Con
nect
or S
tree
t
Item
Des
crip
tion
Qua
ntity
Uni
tR
ate
($/u
nit)
Sub
Tota
l($
exc
l.G
ST)
1.00
EAR
THW
OR
KS
1.01
Exc
avat
ion
incl
. and
dis
posa
l off
site
3,20
0m
3
3
0.00
96,0
00
1.02
Trim
and
pre
pare
sub
grad
e to
rece
ive
sub-
base
3,50
0m
21.
60
5
,600
1.03
Spr
ead
and
Com
pact
Fill
Ons
ite32
0m
38.
80
2
,816
1.04
Test
s (D
ensi
ty e
tc.)
1Ite
m
5
,000
.00
5,0
00
2.00
CO
NC
RET
E W
OR
KS
2.01
Ker
b &
Cha
nnel
(SM
1, S
M2
& S
M3)
670
L.m
52.
00
34
,840
2.02
Traf
fic Is
land
s - 2
00m
m th
ick
rein
forc
ed60
0m
2
8
0.00
48,0
00
2.03
Sha
red
Pat
hway
- 12
5mm
thic
k re
info
rced
180
m2
51.
00
9
,180
3.00
PAVE
MEN
T W
OR
KS
3.01
40m
m T
hick
Asp
halt
(wea
ring
cour
se)
2,30
0m
2
1
8.10
41,6
30
3.02
60m
m T
hick
Asp
halt
(inte
rmed
iate
cou
rse)
2,30
0m
2
3
1.70
72,9
10
3.03
75m
m T
hick
Asp
halt
(bas
e co
urse
)2,
300
m2
33.
90
77
,970
3.04
Prim
e3,
500
m2
3.60
12,6
00
3.05
150m
m C
TCR
Bas
e3,
500
m2
13.
50
47
,250
3.06
150m
m F
CR
Bas
e3,
500
m2
9.90
34,6
50
3.07
200m
m S
elec
t Sub
-bas
e C
ours
e3,
500
m2
6.00
21,0
00
3.08
Sub
grad
e Im
prov
emen
t (al
low
20%
of a
rea)
700
m2
13.
40
9
,380
4.00
DR
AIN
AG
E W
OR
KS
4.01
AG
Dra
in67
0Lm
31.
50
21
,105
4.02
Dra
inag
e P
its (6
0m s
paci
ng)
4N
o.
2
,750
.00
11,0
00
4.03
375m
m d
ia R
CP
(cru
shed
rock
bac
kfill
)40
0m
2
40.0
0
96
,114
4.04
375m
m d
ia R
CP
(ear
th b
ackf
ill)
0m
2
00.0
0-
4.05
Bre
ak-in
and
Con
nect
ion
to E
xist
ing
Dra
inag
e2
Item
1,5
00.0
0
3
,000
5.00
SIG
N A
ND
LIN
EMA
RK
ING
5.01
Line
mar
king
(allo
wan
ce)
1Ite
m
5
,000
.00
5,0
00
5.02
Reg
ulat
ory
Sig
nage
12N
o.
400
.00
4,8
00
6.00
TRA
FFIC
SIG
NA
L W
OR
KS
6.01
Traf
fic S
igna
ls (i
ncl.
10yr
mai
nten
ance
fee)
0Ite
m
380
,000
.00
-
6.02
Traf
fic S
igna
l Con
duit
(incl
. allo
wan
ce fo
r pits
)0
Lm
8
5.00
-
7.00
ELEC
TRIC
AL
WO
RK
S
7.01
Stre
et L
ight
pol
es @
50m
spa
cing
4N
o.
6
,500
.00
26,0
00
7.02
Stre
et L
ight
ing
cabl
ing
and
cond
uit
250
Lm
8
0.00
20,0
00
8.00
LAN
DSC
APE
WO
RK
S
8.01
Land
scap
ing
(tops
oil a
nd tu
rf on
ly)
2,20
0m
28.
30
18
,260
8.02
Land
scap
ing
(tree
s)8
No.
3
50.0
0
2
,800
9.00
SER
VIC
E R
ELO
CA
TIO
N /
PRO
TEC
TIO
N
9.01
Allo
wan
ce fo
r rel
ocat
ion
of e
xist
ing
serv
ices
1Ite
m
200
,000
.00
2
00,0
00
Sub-
tota
l $
926
,905
Traf
fic M
anag
emen
t 5%
$
46,3
45
Site
Est
ablis
hmen
t 2.5
% $
23
,173
Sur
vey
and
Des
ign
12.5
% $
115
,863
Sup
ervi
sion
and
Pro
ject
Man
agem
ent 1
0% $
92
,691
Con
tinge
ncy
20%
$
1
85,3
81
Tota
l Est
imat
ed C
ost (
excl
. GST
) $
1
,391
,000
NO
TES
1. A
ll co
sts
excl
ude
GS
T.
2. C
osts
det
erm
ined
usi
ng ty
pica
l con
stru
ctio
n ra
tes
from
sim
ilar p
roje
cts.
3. N
o al
low
ance
has
bee
n m
ade
for C
omm
unity
Lia
ison
, Cul
tura
l Her
itage
, Flo
ra a
nd F
auna
/ N
et G
ain
Offs
ets.
4. C
ostin
g ba
sed
on T
raffi
x G
1264
3N-0
1 (1
4 O
ct 2
013)
5. P
avem
ent d
esig
n is
indi
cativ
e on
ly, s
ubje
ct to
geo
tech
nica
l inv
estig
atio
n an
d de
sign
.
6. T
he In
ters
ectio
n ha
s be
en c
oste
d fo
r the
inte
rim la
yout
7. W
here
pos
sibl
e ex
istin
g pa
vem
ents
will
be
reta
ined
with
ove
rlay/
re-s
heet
onl
y
WAR
NING
BEW
ARE
OF U
NDER
GROU
ND S
ERVI
CES
THE
LOCA
TION
S OF
UND
ERGR
OUND
SER
VICE
SAR
E UN
KNOW
N AN
D TH
EIR
EXAC
T PO
SITI
ONSH
OULD
BE
PROV
EN O
N SI
TE.
40mm
DEP
TH S
IZE
20 T
YPE
H / V
ASP
HALT
(C32
0 BIN
DER)
60mm
DEP
TH S
IZE
20 T
YPE
SI A
SPHA
LT (C
320 B
INDE
R)
75mm
DEP
TH S
IZE
20 T
YPE
SF A
SPHA
LT (C
320 B
INDE
R)
150m
m DE
PTH
SIZE
20 C
LASS
2 CE
MENT
TRE
ATED
CRU
SHED
ROC
K
150m
m DE
PTH
SIZE
20 C
LASS
2 FI
NE C
RUSH
ED R
OCK
200m
m DE
PTH
SELE
CT F
ILL O
R ST
ABAL
ISED
CLA
Y CA
PPIN
G LA
YER
FREN
CH &
1.5m
2.0m
25.0m
ROA
D RE
SERV
E
BICYCLE
F/PATH
TRAFFIC
1.0m N/STRIP
2.2m N/STRIP
1.5m
2.0m BICYCLE
F/PATH
1.0m N/STRIP
2.2m N/STRIP
7.0m
2.3m
2.3m
PARKING
PARKING
TYPI
CAL R
OAD
CROS
S SE
CTIO
N25
m 'TR
ANSI
TION
AL' C
ONNE
CTOR
ST
PHMG
MWAS
SHO
WN
MIE1
07A
APR
ELIM
INAR
Y IS
SUE
MGMW
31.10
.13
TYPI
CAL C
ROSS
SEC
TION
- 25
m 'TR
ANSI
TION
AL' C
ONNE
CTOR
STR
EET
TYPI
CAL P
AVEM
ENT
DETA
IL W
ITH
KERB
AND
CHA
NNEL
(HIG
H AN
D LO
W S
IDE
SIMI
LAR)
NOT
TO S
CALE
DWG FILE: X:\107912 - Greenvale Central DCP Costings GAA\6BIM\6_3 MHT MIE\6_3_2 MHT INF\107912-00-MIE101-109.dwg - MH PLOT TIME: 01 Nov 2013, 3:45pm
DATE
APP
BYRE
VDE
SCRI
PTIO
N
REV
DESI
GNED
APPR
OVED
TITL
E
DRAW
N
STAT
USPR
OJEC
T No
DRAW
ING
No
SCAL
E @
A1
PROJ
ECT
CLIE
NTNO
RTH
Telep
hone
: (03
) 867
6 120
0
www.
meinh
ardtg
roup
.com
c Co
pyrig
ht
Fax:
(03)
8676
1201
A.C.
N. 05
2 275
635
L12,
501 S
wans
ton S
treet,
Melb
ourn
e,VI
C, A
ustra
lia 30
00
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
METR
OPOL
ITAN
PLA
NNIN
G AU
THOR
ITY
1079
12
INFR
AST
RU
CTU
RE
- OPI
NIO
N O
F C
OST
25m
'Tra
nsiti
onal
' Con
nect
or S
tree
t - u
ltim
ate
layo
ut
Item
Des
crip
tion
Qua
ntity
Uni
tR
ate
($/u
nit)
Sub
Tota
l($
exc
l.G
ST)
1.00
EAR
THW
OR
KS
1.01
Exc
avat
ion
incl
. and
dis
posa
l off
site
1,40
0m
3
3
0.00
42,0
00
1.02
Trim
and
pre
pare
sub
grad
e to
rece
ive
sub-
base
1,50
0m
21.
60
2
,400
1.03
Spr
ead
and
Com
pact
Fill
Ons
ite14
0m
38.
80
1
,232
1.04
Test
s (D
ensi
ty e
tc.)
3N
o.
220
.00
660
2.00
CO
NC
RET
E W
OR
KS
2.01
Ker
b &
Cha
nnel
(SM
1, S
M2
& S
M3)
200
L.m
52.
00
10
,400
2.02
Traf
fic Is
land
s - 2
00m
m th
ick
rein
forc
ed0
m2
80.
00-
2.03
Sha
red
Pat
hway
- 12
5mm
thic
k re
info
rced
700
m2
51.
00
35
,700
3.00
PAVE
MEN
T W
OR
KS
3.01
40m
m T
hick
Asp
halt
(wea
ring
cour
se)
1,20
0m
2
1
8.10
21,7
20
3.02
60m
m T
hick
Asp
halt
(inte
rmed
iate
cou
rse)
1,20
0m
2
3
1.70
38,0
40
3.03
75m
m T
hick
Asp
halt
(bas
e co
urse
)1,
200
m2
33.
90
40
,680
3.04
Prim
e1,
500
m2
3.60
5,4
00
3.05
150m
m C
TCR
Bas
e1,
500
m2
13.
50
20
,250
3.06
150m
m F
CR
Bas
e1,
500
m2
9.90
14,8
50
3.07
200m
m S
elec
t Sub
-bas
e C
ours
e1,
500
m2
6.00
9,0
00
3.08
Sub
grad
e Im
prov
emen
t (al
low
10%
of a
rea)
150
m2
13.
40
2
,010
4.00
DR
AIN
AG
E W
OR
KS
4.01
AG
Dra
in20
0Lm
31.
50
6
,300
4.02
Dra
inag
e P
its (7
0m s
paci
ng)
2N
o.
2
,750
.00
4,7
14
4.03
375m
m d
ia R
CP
(cru
shed
rock
bac
kfill
)12
0m
2
40.0
0
28
,800
4.04
375m
m d
ia R
CP
(ear
th b
ackf
ill)
0m
2
00.0
0-
4.05
Bre
ak-in
and
Con
nect
ion
to E
xist
ing
Dra
inag
e0
Item
1,5
00.0
0-
5.00
SIG
N A
ND
LIN
EMA
RK
ING
5.01
Line
mar
king
(allo
wan
ce)
1Ite
m
500
.00
500
5.02
Reg
ulat
ory
Sig
nage
1N
o.
400
.00
400
6.00
TRA
FFIC
SIG
NA
L W
OR
KS
6.01
Traf
fic S
igna
ls (i
ncl.
10yr
mai
nten
ance
fee)
0N
o.
380
,000
.00
-
6.02
Traf
fic S
igna
l Con
duit
(incl
. allo
wan
ce fo
r pits
)0
Lm
8
5.00
-
7.00
ELEC
TRIC
AL
WO
RK
S
7.01
Stre
et L
ight
pol
es @
50m
spa
cing
2N
o.
6
,500
.00
13,0
00
7.02
Stre
et L
ight
ing
cabl
ing
and
cond
uit
120
Lm
8
0.00
9,6
00
8.00
LAN
DSC
APE
WO
RK
S
8.01
Land
scap
ing
(tops
oil a
nd tu
rf on
ly)
640
m2
8.30
5,3
12
8.02
Land
scap
ing
(tree
s)3
No.
3
50.0
0
1
,167
9.00
SER
VIC
E R
ELO
CA
TIO
N /
PRO
TEC
TIO
N
9.01
Allo
wan
ce fo
r rel
ocat
ion
of e
xist
ing
serv
ices
0Ite
m
200
,000
.00
-
Sub-
tota
l $
314
,135
Traf
fic M
anag
emen
t 5%
$
15,7
07
Site
Est
ablis
hmen
t 2.5
% $
7
,853
Sur
vey
and
Des
ign
12.5
% $
39
,267
Sup
ervi
sion
and
Pro
ject
Man
agem
ent 1
0% $
31
,413
Con
tinge
ncy
20%
$
62,8
27
Tota
l Est
imat
ed C
ost (
excl
. GST
) $
471
,202
Tota
l Len
gth
of R
oad
Cos
ted
(m)
100
Per m
Rat
e $
4
,712
NO
TES
1. A
ll co
sts
excl
ude
GS
T.
2. C
osts
det
erm
ined
usi
ng ty
pica
l con
stru
ctio
n ra
tes
from
sim
ilar p
roje
cts.
3. N
o al
low
ance
has
bee
n m
ade
for C
omm
unity
Lia
ison
, Cul
tura
l Her
itage
, Flo
ra a
nd F
auna
/ N
et G
ain
Offs
ets.
4. C
ostin
g ba
sed
on G
AA
'Fig
ure
4' 2
0m 't
rans
ition
al' c
onne
ctor
stre
et -
ultim
ate
layo
ut ,c
urre
nt a
t 18-
09-2
013.
5. P
avem
ent d
esig
n is
indi
cativ
e on
ly, s
ubje
ct to
geo
tech
nica
l inv
estig
atio
n an
d de
sign
.
4948 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN
40mm
DEP
TH S
IZE
20 T
YPE
H / V
ASP
HALT
(C32
0 BIN
DER)
60mm
DEP
TH S
IZE
20 T
YPE
SI A
SPHA
LT (C
320 B
INDE
R)
75mm
DEP
TH S
IZE
20 T
YPE
SF A
SPHA
LT (C
320 B
INDE
R)
150m
m DE
PTH
SIZE
20 C
LASS
2 CE
MENT
TRE
ATED
CRU
SHED
ROC
K
150m
m DE
PTH
SIZE
20 C
LASS
2 FI
NE C
RUSH
ED R
OCK
200m
m DE
PTH
SELE
CT F
ILL O
R ST
ABAL
ISED
CLA
Y CA
PPIN
G LA
YER
FREN
CH &
1.5m
20.0m
ROA
D RE
SERV
E
F/PATH
TRAFFIC
2.2m N/STRIP
1.5m F/PATH
3.2m N/STRIP
TRAFFIC
7.0m
2.3m
2.3m
PARKING
PARKING
TYPI
CAL R
OAD
CROS
S SE
CTIO
N20
m 'R
ESER
VE' C
ONNE
CTOR
ST
PHMG
MWAS
SHO
WN
MIE1
08A
APR
ELIM
INAR
Y IS
SUE
MGMW
31.10
.13
TYPI
CAL P
AVEM
ENT
DETA
IL W
ITH
KERB
AND
CHA
NNEL
(HIG
H AN
D LO
W S
IDE
SIMI
LAR)
NOT
TO S
CALE
DWG FILE: X:\107912 - Greenvale Central DCP Costings GAA\6BIM\6_3 MHT MIE\6_3_2 MHT INF\107912-00-MIE101-109.dwg - MH PLOT TIME: 01 Nov 2013, 3:46pm
DATE
APP
BYRE
VDE
SCRI
PTIO
N
REV
DESI
GNED
APPR
OVED
TITL
E
DRAW
N
STAT
USPR
OJEC
T No
DRAW
ING
No
SCAL
E @
A1
PROJ
ECT
CLIE
NTNO
RTH
Telep
hone
: (03
) 867
6 120
0
www.
meinh
ardtg
roup
.com
c Co
pyrig
ht
Fax:
(03)
8676
1201
A.C.
N. 05
2 275
635
L12,
501 S
wans
ton S
treet,
Melb
ourn
e,VI
C, A
ustra
lia 30
00
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
NOT
FOR
CONS
TRUC
TION
PREL
IMIN
ARY
METR
OPOL
ITAN
PLA
NNIN
G AU
THOR
ITY
1079
12
TYPI
CAL C
ROSS
SEC
TION
- 20
m 'R
ESER
VE' C
ONNE
CTOR
STR
EET
INFR
AST
RU
CTU
RE
- OPI
NIO
N O
F C
OST
20m
- 'R
eser
ve' C
onne
ctor
Str
eet
Item
Des
crip
tion
Qua
ntity
Uni
tR
ate
($/u
nit)
Sub
Tota
l($
exc
l.G
ST)
1.00
EAR
THW
OR
KS
1.01
Exc
avat
ion
incl
. and
dis
posa
l off
site
1,40
0m
3
3
0.00
42,0
00
1.02
Trim
and
pre
pare
sub
grad
e to
rece
ive
sub-
base
1,50
0m
21.
60
2
,400
1.03
Spr
ead
and
Com
pact
Fill
Ons
ite14
0m
38.
80
1
,232
1.04
Test
s (D
ensi
ty e
tc.)
3N
o.
220
.00
660
2.00
CO
NC
RET
E W
OR
KS
2.01
Ker
b &
Cha
nnel
(SM
1, S
M2
& S
M3)
200
L.m
52.
00
10
,400
2.02
Traf
fic Is
land
s - 2
00m
m th
ick
rein
forc
ed0
m2
80.
00-
2.03
Sha
red
Pat
hway
- 12
5mm
thic
k re
info
rced
300
m2
51.
00
15
,300
3.00
PAVE
MEN
T W
OR
KS
3.01
40m
m T
hick
Asp
halt
(wea
ring
cour
se)
1,20
0m
2
1
8.10
21,7
20
3.02
60m
m T
hick
Asp
halt
(inte
rmed
iate
cou
rse)
1,20
0m
2
3
1.70
38,0
40
3.03
75m
m T
hick
Asp
halt
(bas
e co
urse
)1,
200
m2
33.
90
40
,680
3.04
Prim
e1,
500
m2
3.60
5,4
00
3.05
150m
m C
TCR
Bas
e1,
500
m2
13.
50
20
,250
3.06
150m
m F
CR
Bas
e1,
500
m2
9.90
14,8
50
3.07
200m
m S
elec
t Sub
-bas
e C
ours
e1,
500
m2
6.00
9,0
00
3.08
Sub
grad
e Im
prov
emen
t (al
low
10%
of a
rea)
150
m2
13.
40
2
,010
4.00
DR
AIN
AG
E W
OR
KS
4.01
AG
Dra
in20
0Lm
31.
50
6
,300
4.02
Dra
inag
e P
its (7
0m s
paci
ng)
2N
o.
2
,750
.00
4,7
14
4.03
375m
m d
ia R
CP
(cru
shed
rock
bac
kfill
)12
0m
2
40.0
0
28
,800
4.04
375m
m d
ia R
CP
(ear
th b
ackf
ill)
0m
2
00.0
0-
4.05
Bre
ak-in
and
Con
nect
ion
to E
xist
ing
Dra
inag
e0
Item
1,5
00.0
0-
5.00
SIG
N A
ND
LIN
EMA
RK
ING
5.01
Line
mar
king
(allo
wan
ce)
1Ite
m
500
.00
500
5.02
Reg
ulat
ory
Sig
nage
1N
o.
400
.00
400
6.00
TRA
FFIC
SIG
NA
L W
OR
KS
6.01
Traf
fic S
igna
ls (i
ncl.
10yr
mai
nten
ance
fee)
0N
o.
380
,000
.00
-
6.02
Traf
fic S
igna
l Con
duit
(incl
. allo
wan
ce fo
r pits
)0
Lm
8
5.00
-
7.00
ELEC
TRIC
AL
WO
RK
S
7.01
Stre
et L
ight
pol
es @
50m
spa
cing
2N
o.
6
,500
.00
13,0
00
7.02
Stre
et L
ight
ing
cabl
ing
and
cond
uit
120
Lm
8
0.00
9,6
00
8.00
LAN
DSC
APE
WO
RK
S
8.01
Land
scap
ing
(tops
oil a
nd tu
rf on
ly)
540
m2
8.30
4,4
82
8.02
Land
scap
ing
(tree
s)3
No.
3
50.0
0
1
,167
9.00
SER
VIC
E R
ELO
CA
TIO
N /
PRO
TEC
TIO
N
9.01
Allo
wan
ce fo
r rel
ocat
ion
of e
xist
ing
serv
ices
0Ite
m
200
,000
.00
-
Sub-
tota
l $
292
,905
Traf
fic M
anag
emen
t 5%
$
14,6
45
Site
Est
ablis
hmen
t 2.5
% $
7
,323
Sur
vey
and
Des
ign
12.5
% $
36
,613
Sup
ervi
sion
and
Pro
ject
Man
agem
ent 1
0% $
29
,290
Con
tinge
ncy
20%
$
58,5
81
Tota
l Est
imat
ed C
ost (
excl
. GST
) $
439
,357
Tota
l Len
gth
of R
oad
Cos
ted
(m)
100
Per m
Rat
e $
4
,394
NO
TES
1. A
ll co
sts
excl
ude
GS
T.
2. C
osts
det
erm
ined
usi
ng ty
pica
l con
stru
ctio
n ra
tes
from
sim
ilar p
roje
cts.
3. N
o al
low
ance
has
bee
n m
ade
for C
omm
unity
Lia
ison
, Cul
tura
l Her
itage
, Flo
ra a
nd F
auna
/ N
et G
ain
Offs
ets.
4. C
ostin
g ba
sed
on G
AA
'Fig
ure
4' 2
0m 'r
eser
ve' c
onne
ctor
stre
et ,c
urre
nt a
t 18-
09-2
013.
5. P
avem
ent d
esig
n is
indi
cativ
e on
ly, s
ubje
ct to
geo
tech
nica
l inv
estig
atio
n an
d de
sign
.
5150 GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN GREENVALE CENTRAL DEVELOPMENT CONTRIBUTIONS PLAN