Upload
bria-keightley
View
217
Download
2
Tags:
Embed Size (px)
Citation preview
Development of Regional Aviation in Russia 2009
Copyright CorganDyer 2009
• Anglo-American design company
• Main offices in London, Dallas and Moscow
• 300 employees
• Fully licensed to trade in Russia
• Full range of architectural and engineering design services provided
Current project locations in Russia .....
Moscow
Nizhny NovgorodCheboksary
SaratovVolgograd
Krasnodar
SochiOmsk
OrelVoronezh Ufa
Perm
Selected Client List
Aer Lingus
Air France
Air India
Alitalia Airlines
American Airlines
Asiana Airlines
British Airways
BAA
Continental Airlines
DFW International Airport
Detroit Metro Int. Airport
Delta Airlines
Egypt Air
We offer a multitude of design servicesthat meet rigorous aviation demands
• Airport Planning
• Terminal Design
• Airport Facilities
• Airline Facilities
Frontier Airlines
Japan Airlines
JFK International Airport
KLM
Korean Air
Miami International Airport
Northwest Airlines
Sabena Airlines
Southwest Airlines
Swiss Air
Turin/Casella Airport
United Airlines
Principles for success in regional airport projects -
• Operational-based, flight schedule driven, briefing
• Adherence to business plan objectives
• Defining, and then meeting, or exceeding customer service standards
• Comprehensive integration of technical systems, including; building services, baggage, security, communications and data systems
• Commitment to development and implementation of effective security systems and processes
• Design excellence
Description: This facility provides 600,000 SF of new construction including 23 new swing gates for Continental Airlines. The new terminal is a three level, dual pier arrangement which provides independent operations at each gate position.
Location: Houston, TexasCompleted Date: July 2004Cost: $200,000,000+
TERMINAL E GEORGE BUSH INTERCONTINENTAL
TERMINAL D DFW INTERNATIONAL AIRPORT
Description: DFW International Airport developed a new 2 Million SF terminal to house all international operations. The terminal includes: Two Ticketing Halls, Concourses, Concession Areas, A Customs Hall, Bag Claim Areas, Airline Clubs, Automated People Mover Stations, and an Integrated 300-Room Hotel.
Location: DFW Airport, TexasCompleted Date: 2005Cost: $753,000,000
MAYNARD H. JACKSON INTERNATIONAL TERMINAL
Description: The new terminal will provide supplemental international passenger processing capability through a 16-gate international terminal served by a new landside terminal roadway system and garage. It will connect with the existing terminal and concourses by way of a people-mover extension and multiple passenger walkways.
Location: Atlanta, GeorgiaCompleted Date: In ProgressCost: $790,000,000
TERMINAL EXPANSIONCHANGSHA, CHINA
Description: This facility provides 1.25 million new SF to China’s Changsha Airport. The terminal expansion includes: 6 additional international and 22 domestic gates with ticketing, bag claim and international passenger processing capacity.
Location: Changsha, China
LOVE FIELD TERMINALMODERNIZATION PROGRAM
Description: The project includes the replacement of the 3 existing concourses with one single new concourse, constructed in a phased manner to preserve active gate count. The existing Terminal building and bag claim hall will be heavily renovated, and the ticketing wing will be replaced. The final Terminal configuration will include approximately 750,000 SF and will accommodate 20 narrow body gates.
Location: Dallas, TexasCompleted Date: In ProgressCost: $500,000,000+
DELTA AIR LINES ATO RENOVATIONHARSTFIELD-JACKSON
Description: A new, open plan for the ticketing hall and ATO support offices improves intuitive way finding and also creates room for ticket queuing. The new layout increases exposure to concessions and improves passenger flow through three additional security checkpoint lanes.
Location: Atlanta, GeorgiaCompleted Date: July 2007Cost: $220,000,000
DFW AIRPORT CONSOLIDATED RENTAL CAR FACILITY
Description: To accommodate the rapid growth of rental companies, the new facility was designed to house 11 companies, with planned expansion on the ground level. The new 24-hour facility includes a two-story, 1.4 M SF parking structure which accommodates 5,000 cars and a 16,000 SF six bay bus maintenance facility. Also there are 11 exclusive use service facilities independent of the main building where each of the rental car companies wash and prepare their vehicles, and perform light maintenance.
Location: Dallas, TexasCompleted Date: 2001Cost: $142,000,000+
AMERICAN AIRLINES AIRCRAFT MAINTENANCE HANGAR
Description: This C-Check Maintenance Hangar built at Alliance Field totals 780,000 SF and is the largest cantilevered hangar in the world. It is capable of simultaneously servicing seven aircraft. Combinations include Boeing 767 and 757, Airbus A300, and McDonnell Douglas MD-11 airframes. The hangar has a 260 foot, clear-span cantilever structure free of interior columns and is designed to accommodate the addition of three future bays.
Location: Fort Worth, TexasCost: $90,000,000
Mixed Use Development, Voronezh
Mixed Use Development Zhukovsky
We can help deliver your vision….
• Masterplanning
• Concept Design
• Proekt Design
• Project Delivery