CURRICULUM VITAE Davor Goreta First name: Davor Surname: Goreta Born: 23.03.1959, Croatia Nationality: Croatian Educational degree: B. Sc. Civil Eng. graduated in Rijeka, Croatia, 1982. Languages: English, Croatian Marital status: Married, two children Professional experience (major projects): 1982 – 1984 Company: LABIN Constr. Ltd., Labin, Croatia Job title: Site Engineer Projects accomplished: Project Project description Project value (USD) Res. Building KATURE Construction of multi- storey, 48 residential flats building, Labin, Croatia. Complete infrastructure

DG-CV final

Embed Size (px)

Citation preview

Page 1: DG-CV final

CURRICULUM VITAE Davor Goreta

First name: Davor Surname: GoretaBorn: 23.03.1959, CroatiaNationality: CroatianEducational degree: B. Sc. Civil Eng. graduated in Rijeka,

Croatia, 1982.Languages: English, CroatianMarital status: Married, two children

Professional experience (major projects):

1982 – 1984

Company: LABIN Constr. Ltd., Labin, CroatiaJob title: Site Engineer

Projects accomplished:

Project Project description Project value (USD)

Res. Building KATURE

Construction of multi-storey, 48 residential flats building, Labin, Croatia. Complete infrastructure connections (electricity, water supply, sewage systems, access roads and drainage included). 5.95 mil. USD

Turning lathe factory PRVOMAJSKA

Construction of workshop for turning lathe machines overhauling, Raša, Croatia 4.10 mil. USD

Page 2: DG-CV final

1985 – 1987

Company: RIJEKA-GRADNJA Constr. Ltd., Rijeka, CroatiaJob title: Site Engineer

Projects accomplished:

Project Project description Project value (USD)

Thermal power plantPLOMIN 2 (210 MW)

Construction of 3.5 Km access highway 4.45 mil. USD

Thermal power plantPLOMIN 2 (210 MW)

Construction of new infrastructure network for the plant and site facilities:

water supply main sewage system low voltage cable works telephone network outdoor flood lighting internal roads and

plateaux 12.22 mil. USDConsultant: IBE, Ljubljana, Slovenia

1987 – 1992

2

Page 3: DG-CV final

Company: ELECTRICITY CORPORATION OF CROATIA, Zagreb, Croatia

Job title: Project Manager

Projects accomplished:

Project Project description Project value (USD)

Thermal power plantPLOMIN 2 (210 MW)

Construction of the following facilities:

reinforced concrete chimney, 340 m of height

boiler supporting steel structures

turbine and generator building

mean transformers basements

outdoor switchyard

14.12 mil. USD 8.20 mil. USD

14.30 mil. USD 0.45 mil. USD 2.65 mil. USD

Consultant: IBE, Ljubljana, Slovenia

1992 – 1995

3

Page 4: DG-CV final

Company: GtA, Munich, GermanyJob title: Site Engineer

Projects accomplished:

Project Project description Project value (USD)

Rehabilitation and upgrading of the UGANDA Electricity System (UEB Project No. 90-401)

Construction of 21 132/33/11 kV substations at various locations in Uganda (Kampala, Entebbe, Mbale, Tororo, Jinja, Masaka, Mbarara, Nkonge and Kabulasoke) 18.20 mil. USD

Rehabilitation and upgrading of the UGANDA Electricity System

Construction of 132/33/11 kV substation MBARARA North, Uganda

3.90 mil. USDConsultant: LAHMEYER, Frankfurt, Germany

1996 – 1998

Company: GtA, Munich, GermanyJob title: Site Manager

Projects accomplished:

Project Project description Project value (USD)

GHANA National electrification Project, Substation and Subtransmission system development, ECG Project 1/93

Supply, installation and commission of 33 kV underground cable network, at various locations in Ghana (Accra, Tema and Kumasi) 4.10 mil. USD

GHANA National electrification Project, Substation

4

Page 5: DG-CV final

and Subtransmission system development, ECG Project 3/95

Construction of 4 33/11 kV Substations at various locations in Ghana (Kumasi, Takoradi, Tafo and Akwatia) 2.80 mil. USD

Consultant: ESB International, Dublin, Ireland

1998 – 2000

Company: Sol Melia, Palma de Mallorca, SpainJob title: Technical Director Sol Melia Croatia

Projects accomplished:

Project Project description Project value (USD)

Refurbishment and upgrade of hotels in Rovinj, Croatia

Reconstruction and refurbishment of hotels MELIA EDEN, SOL PARK and SOL CLUB ISTRA. Total capacity of 987 double rooms. Completely new accommodation part, kitchens, restaurants and public areas with special attention on safety and security of assets, particularly regarding fire detection and protection systems. New cooling/heating system. New indoor/outdoor children’s playgrounds plus music stages and amphitheatres for adults thematic evenings.

18.30 mil. USD

Refurbishment and upgrade of hotels in Umag, Croatia

Reconstruction and refurbishment of hotel SOL ELITE KORALJ with 254 double rooms and apartments. Completely new accommodation part, kitchens, restaurants and public areas with special attention on safety and

5

Page 6: DG-CV final

security of assets, particularly regarding fire detection and protection systems. New cooling/heating system. New indoor/outdoor children’s playgrounds plus music stages and amphitheatres for adults thematic evenings. Apartments SOL STELLA MARIS refurbishment, capacity of 636 four bed units. New internal decoration, fire detection and protection system, new children’s outdoor playgrounds and mini clubs depending on children ages. Huge adults indoor and outdoor amphitheatres with stages for day and evening shows performed by Sol Melia entertainment teams.

Apartments SOL POLYNESIA refurbishment, capacity of 686 four and six bed units. New internal decoration, fire detection and protection system, new children’s outdoor playgrounds and mini clubs depending on children ages. Huge adults indoor and outdoor amphitheatres with stages for day and evening shows performed by Sol Melia entertainment teams. Construction of huge, lake style outdoor swimming pool. Beach upgrade

26.10 mil. USD

2000 – 2001

6

Page 7: DG-CV final

Company: Sol Melia, Palma de Mallorca, SpainJob title: Technical Director Sol Melia Croatia

Projects accomplished:

Project Project description Project value (USD)

Refurbishment and upgrade of apartment village in Rovinj, Croatia

Reconstruction and refurbishment of apartment village SOL VILLAS RUBIN, capacity 236 four bed units. Complete reconstruction of apartments with new furniture, construction of new infrastructure: water and sewage new network, hot water installation inclusive of existing boiler room reconstruction, fire detection and protection systems, new roads with parking areas inclusive of landscaping. 5.45 mil. USD

Refurbishment and upgrade of apartment villages in Umag, Croatia

Reconstruction and refurbishment of apartment villages SOL SAVUDRIJA and SOL KANEGRA, total capacity of375 four bed units. Complete re-decoration of apartments with new furniture, fire protection and detection system, new reception at the settlement entrance and restaurant with terrace at the beach side. 7.25 mil. USD

2001 – 2002

7

Page 8: DG-CV final

Company: Sol Melia, Palma de Mallorca, SpainJob title: Technical Director Sol Melia Croatia

Projects accomplished:

Project Project description Project value (USD)

Refurbishment and upgrade of hotel Sol Aurora in Umag, Croatia

Reconstruction and renovation of hotel. Completely new accommodation part plus construction of 100 double rooms by adding new floor thus totalling 306 double rooms, kitchens, restaurants and public areas with special attention on safety and security of assets, particularly regarding fire detection and protection systems. New cooling/heating system. New outdoor swimming pools, children’s playgrounds plus music stages and amphitheatres for adults thematic evenings. New landscaping and traffic solutions. 10.45 mil USD

2002 – 2003

Company: Sol Melia, Palma de Mallorca, Spain

8

Page 9: DG-CV final

Job title: Technical Director Sol Melia Croatia

Projects accomplished:

Project Project description Project value (USD)

Refurbishment and upgrade of hotel Sol Umag in Umag, Croatia

Reconstruction and renovation of 121 rooms hotel, upgrade it to 4 star asset, increase capacity by construction of new annex with 96 new rooms, construction of new indoor/outdoor swimming pools, with superb wellness centre. New kitchen, restaurants and lobby area,hotel safety measures with fire detection and protection systems.

12.00mil USD

2003 – 2004

Company: Sol Melia, Palma de Mallorca, SpainJob title: Technical Director Sol Melia Croatia

Projects accomplished:

Project Project description Project value (USD)

Refurbishment and upgrade of hotel Istra’s Pavilions (3 Pavilions) in Umag, Croatia

Reconstruction and renovation of pavilions, increase capacity by adding new storeys totalling 258 new rooms inclusive of cooling systems, fire protection and all safety measures. Landscaping, parking lots and new traffic solutions. 7.00 mil USD

9

Page 10: DG-CV final

2004 – 2005

Company: Sol Melia, Palma de Mallorca, SpainJob title: Technical Director Sol Melia Croatia

Projects accomplished:

Project Project description- Project value (USD)

Refurbishment and upgrade of camping sites in Umag, Croatia

Reconstruction and renovation of ITU camping sites Park Umag, Finida, Sol Stella Maris, Savudrija, and Kanegra with total capacity of approx. 10,000.00 guests. Works included total rehabilitation of all washrooms, water and sewage, electricity network with transformer stations, reconstruction of centre waste liquids treatment plant and landscaping. Construction of huge outdoor swimming pool and thematic children’s pool with terraces, restaurants and bars. 8.5 mil USD

2005 – 2006

Company: Sol Melia, Palma de Mallorca, Spain

10

Page 11: DG-CV final

Job title: Technical Director Sol Melia Croatia

Projects accomplished:

Project Project description Project value (USD)

New hotel Sol garden Istra construction in Umag, Croatia

Tear down existing old hotel Istra and construction of new 283 room/apartment 4* resort. Work included construction of new hotel by strictly following Sol Melia standards for Sol 4* product (accommodation part, reception and huge lobby, 900 seats restaurant with possibility to be separated in case of special events, fire safety, cooling/heating, sprinkler fire protection system in the restaurant). Creation of indoor swimming pool with wellness centre, fitness and massage-therapeutic facilities. Construction of lake style outdoor swimming pool in cascades with water falls, restaurant and bars surrounding pool terraces with entertainment facilities for children and adults. Parking lots, new traffic solutions with new landscaping. 30.00 mil USD

2006 – 2007

Company: Sol Melia, Palma de Mallorca, Spain

11

Page 12: DG-CV final

Job title: Technical Director Sol Melia Croatia

Projects accomplished:

Project Project description Project value (USD)

Melia Istrian Villas, Umag, Croatia

Complete refurbishment of Stella Maris Istrian Villas, 127 units, and upgrade of facilities to Melia Brand. Works included enlargement of the existing structures, new installations, cooling/heating systems, fire detection/protection system with new boiler room.Construction of new outdoor/indoor swimming pool separated by glass panels. 18.50 mil USD

2007 – 2008

Company: Sol Melia, Palma de Mallorca, SpainJob title: Technical Director Sol Melia Croatia

Projects accomplished:

Project Project description Project value (USD)

Hotel Melia Coral, Umag, Croatia

New refurbishment of hotel Sol Koralj and upgrade of facility to product Melia Coral 5*. Complete renovation of rooms with new furniture, reconstruction of indoor swimming pool with new spa area, refurbishment of reception and lobby area. Construction of new outdoor swimming pool, terrace with

12

Page 13: DG-CV final

entertainment stage, new chill out area in the surrounding pine tree forest. Reconstruction of boiler room by replacement of old equipment and increasing power capacity. 16.50 mil USD

2008 – 2010

Company: Sol Melia, Palma de Mallorca, SpainJob title: Technical Director Sol Melia Croatia

Projects accomplished:

Project Project description Project value (USD)

Sol Polynesia app. Refurbishment

Mobile homes in camping site Park Umag installation, Umag, Croatia

Partial refurbishment of 3* app. settlement Sol Polynesia. Replacement of old furniture and installation of cooling system.

Installation of mobile houses lot in camping site Park Umag, inclusive of complete new infrastructure network 4.5 mil USD

2010 – 2011

Company: Sol Melia, Palma de Mallorca, Spain

13

Page 14: DG-CV final

Job title: Technical Director Sol Melia Croatia

Projects accomplished:

Project Project description Project value (USD)

Refurbishment of app. Amfora in Stella Maris resort

New mobile homes lots in camping site Park Umag, Umag, Croatia

Thorough refurbishment of existing apartments Amfora in Stella Maris resort and upgrade premises to Sol 4* level. Works included complete new installations, cooling systems, fire protection network and new equipment and furniture. Landscaping and roads rehabilitation.

Installation of mobile houses lots in camping site Park Umag, inclusive of complete new infrastructure network.

7.6 mil USD

2011 – 2012

Company: Sol Melia, Palma de Mallorca, SpainJob title: Technical Director Sol Melia Croatia

Projects accomplished:

Project Project description Project value (USD)

Refurbishment of app. Stellas and Sirenas in Stella Maris resort

Premium homes in camping site

Thorough refurbishment of existing apartments Stellas and Sirenas in Stella Maris resort and upgrade premises to Sol 4* level.

Installation of premium houses lot (45 units and 7

14

Page 15: DG-CV final

Park Umag installation, Umag, Croatia

swimming pools) in camping site Park Umag, inclusive of complete new infrastructure network 8.7 mil USD

Listed below are some of particular activities performed during the period 1998 – 2012 while working with Sol Melia Croatia:

1. IN THE FIELD OF CONSTRUCTION

Preparation of detailed Project requirements for each project based on Sol Melia technical specifications for each desired brand and compliance with valid urban legislation for each particular area

Carrying out necessary soil investigations in order to find out soil bearing capacity and underground water levels for each site

Supervision of design progress at each stage, i.e. basic design, design for location permit, design for building permit, final design and As Built design

Preparation of Tender Documents, invitation for Bids and Contract award to the most successful Bidder

Supervision of quality and progress of work, verification of Contractor’s Invoices on monthly basis and final balancing

Organisation of final Technical Inspection prior to issue Taking Over Certificates for each structure

2. IN THE FIELD OF MAINTENANCE

Implementation of Sol Melia Technical Manuals:

- Engineering Manual- Preventive Maintenance Manual- Environmental Manual in the fields of sea, water and land

protection, selective waste collection and treatment in liaison with local Town Halls

- Safety Manual

Implementation of FTO (Federation of Tour Operators) preferred code of practice Manual:

15

Page 16: DG-CV final

- Fire Detection and Protection- Swimming pools safety and hygiene- HACCP (Hazard Analysis Critical Control Point) in

kitchens in liaison with local Sanitary Inspectorate and Health Protection Department

Education of Technical personnel in each of the a.m. areas

NOTE: IMPLEMENTATION OF ALL MANUALS WERE SUBJECT TO COMPLIANCE WITH VALID CROATIAN LEGISLATIONS AND AUTHORISED ORGANISATIONS

3. IN THE FIELD OF FURTHER DEVELOPMENT – EXPANSION

Due Diligence study of the Company ISTRATURIST, Umag, in Joint Venture Project with Real Estate Company Downey Day, London

Due Diligence study of the Company ARENATURIST, Pula, Croatia, in Joint Venture with GOLDMAN SACHS, London

Due Diligence study of the Company SUNČANI HVAR, island of Hvar, Croatia, in Joint Venture with CREDIT SWISS/FIRST BOSTON

Due Diligence study of the Company HIT ALPINEA, ski resort in Kranjska Gora, Slovenia

Designs and Asset Management Plan preparation for new 4* tourist resort on Olive Island, Croatia, in joint venture with Company CUBUX LUX, Zadar, Croatia. Project included construction of new hotel with 300 rooms, 250 villas, 3 smaller marinas, beach bars and restaurants

2013

Company: FICHTNER & Co GmbH, Stuttgart, GermanyJob title: Consultant, Resident Manager, Tanzania

16

Page 17: DG-CV final

Projects accomplished:

Project Project description Project value (USD)

TANESCO Project 5413A16, electrification of the Republic of Tanzania

Evaluations of TANESCO (Electricity Company of Tanzania) various Projects in Dar es Salaam, Arusha and Moshi:

Construction of 6 new 132/66/33 kV Substations and reconstruction of 5 33/11 kV Substations in Dar es Salaam, 3 in Arusha and 5 in Moshi (Kilimanjaro)

Construction of approx. 136.00 km of HV overhead lines in Dar es Salaam, Arusha and Moshi

Contract negotiations with Contractors (SINOTEC China, SAE Italy; CONCO; Republic of South Africa):

- Modifications of scope of works

- Kick of Meetings with Contractors

- Handing over construction sites to Contractors

- Determining spots to perform soil investigations (bore holing) in order to define soil bearing capacities prior to start of structural analysis. 98.6 mil USD

17