L&T Infrastructure Engineering Ltd. Client: The Dhamra Port Company Limited
Project: Comprehensive EIA Study for Revised Master Plan Development of Dhamra Port
Project No.:
C1141302
Title:
Proposed Terms of Reference Document No.:
RP002
Rev.:
0 This document is the property of L&T Infrastructure Engineering Ltd. (formerly known as L&T-Rambøll Consulting Engineers Limited) and must not be passed on to any person or body not authorised by us to receive it nor be copied or otherwise made use of either in full or in part by such person or body without our prior permission in writing.
File path:
l:\ports\2014\c1141302 - ceia for dhamra port expansion\outputs\reports\002-form 1 & tor\ra-form 1 and tor\form 1 and tor 02.01.2016\3. rp002-ra-alj-tor.doc
Notes:
1.
Revision Details:
0 07.01.2016 ALJ BRT
SAP CVS
Rev. Date Details Init. Sign. Init. Sign. Init. Sign.
Prepared Checked Approved
TABLE OF CONTENTS
Comprehensive EIA Study for Revised Master Plan Development of Dhamra Port C1141302 Proposed Terms of Reference RP002 rev. A
Table of Contents Page i
TABLE OF CONTENTS
1 Proposed Terms of Reference (ToR) ............................................................................................1
1.1 Introduction ...............................................................................................................................1 1.2 Location .....................................................................................................................................1 1.3 Details of Project .......................................................................................................................2
1.3.1 Land ................................................................................................................................2 1.4 EIA Methodology .......................................................................................................................3
1.4.1 Baseline Environmental Monitoring ................................................................................3 1.4.2 Establishment of Baseline Environmental Conditions ....................................................6 1.4.3 Anticipated Environmental and Social Impacts and their Mitigation Measures ..............6 1.4.4 Analysis of Alternatives...................................................................................................8 1.4.5 Environmental Monitoring Programme ...........................................................................8 1.4.6 Additional Studies ...........................................................................................................8 1.4.7 Project Benefits ...............................................................................................................9 1.4.8 Environmental Management Plan ..................................................................................9 1.4.9 HTL/LTL, CRZ Demarcation ........................................................................................ 10 1.4.10 Structure of EIA Report................................................................................................ 10
LIST OF FIGURES
Figure FD0101 : Location Map
Figure FD0102 : Study Area Map
Figure FD0103 : Marine Sampling Locations
Figure FD0104 : Ambient Air Monitoring Locations Map
Figure FD0105 : Noise Monitoring Locations Map
Figure FD0106 : Water Sampling Locations Map
Figure FD0107 : Soil Sampling Locations Map
LIST OF TABLES
Table 1-1: Revised Master Plan ...............................................................................................................2 Table 1-2: Cargo Handling Capacity as per Revised Master Plan ...........................................................2
LIST OF ENCLOSURES
Appendix A : Survey Numbers of Revised Master Plan Area
Appendix B : HTL/LTL/CRZ Map with Revised Master Plan
Pre-Feasibility Report is given as a Standalone Document
Proposed Terms of Reference
Comprehensive EIA Study for Revised Master Plan Development of Dhamra Port C1141302 Proposed Terms of Reference RP002 rev. A
1 Proposed Terms of Reference (ToR) Page 1
1 Proposed Terms of Reference (ToR)
1.1 Introduction
Dhamra Port is one of the deepest ports of India located in Bhadrak District of Odisha with a
draught of 18.0 m and can accommodate super cape-size vessels upto 180,000 DWT. The
Dhamra Port Company Limited (DPCL) has implemented Phase I facility with a capacity of
25 MMTPA consisting of handling Coal, Iron Ore and Lime Stone handling facilities and
commenced in May, 2011.
Phase II Expansion of about 71.3 MMTPA of dry bulk, break bulk/clean and liquid/gas cargo
and 1 Million TEUs of container cargo has obtained the necessary Environmental/CRZ
Clearances from statutory authorities i.e., Ministry of Environment, Forests and Climate
Change (MoEF&CC) and Odisha Coastal Zone Management Authority (OCZMA) vide letters
F.No.11-104/2009-IA.III, dated January 01, 2014 and OCZMA-1/2012-13 dated December
20, 2012 respectively. Consent to Establish (CTE) was also obtained from Odhisa State
Pollution Control Board (OSPCB).
At present, DPCL would like to optimize the waterfront area to utilize the maximum marine
development potential and backup area usage to accommodate future cargo projections and
business requirement, therefore, DPCL intends to Revise the Master Plan based on Five
(05) Year and Thirty (30) Year Development Plan. The details of development planned are
given below:
Immediate Development (Part of Phase II Expansion for which Environmental/CRZ
Clearance has been obtained) - In addition to existing 2 berths, 3 additional bulk berths; 2
LNG/LPG/PoL/Crude Oil berths, 1 Container berth and barge facilities along with backup
facilities and independent port craft facilities, conveyor systems, drainage, water supply,
electrical works, internal roads, railway works and other utilities and amenities will be
developed to accommodate dry bulk cargo, multipurpose cargo and LNG / LPG cargo.
Total cargo handling capacity will increase from Existing 25 MMTPA to approximately
99.6 MMTPA.
Revised master plan development (05 years) – In addition to 2 existing operational
berths, additional 14 berths are proposed as part of revised master plan for first five
years. Total cargo handling capacity will be approximately 169.5 MMTPA. For easy
evacuation of cargo, a new rail, road and utilities corridor (12 km x 125 m wide) is
proposed from Northern side development of Dhamra Port.
Revised master plan development (30 years) - Total 35 berths are proposed as part of
revised master plan including 2 existing berths. In addition to that independent port craft
facilities are also proposed. Total cargo handling capacity will be approximately 314
MMTPA.
1.2 Location
The Dhamra port is located between 200 48’N to 200 56’N and Longitude 860 55’E to 870 16’E
on the East Coast of India in Bansada Tehsil, Bhadrak District of Odisha State. It is located
at a distance of 220 km from Bhubaneswar and 360 km from Kolkata. The existing port is
located to the north of Dhamra River mouth. The site provides full and natural protection for a
tranquil harbour where no breakwater is required. The location map showing the project site
is given as Figure FD0101.
Comprehensive EIA Study for Revised Master Plan Development of Dhamra Port C1141302 Proposed Terms of Reference RP002 rev. A
1 Proposed Terms of Reference (ToR) Page 2
1.3 Details of Project
The revised Master Plan (30 years) has been planned to handle 2,50,000 DWT vessels The
average dredge depth at berths will be (-) 20.5 m CD and the dredged depth of the approach
channel and basin area will be (-) 19.0 m CD. However, for revised Master Plan (30 years)
dredged depth of the approach channel and basin area will be (-) 22.0 m CD. The
development of the project will be carried in different phases and the details are given below:
Table 1-1: Revised Master Plan
Facility/ Component Immediate Development (MoEF&CC Approved)
Revised Master Plan (First 5 Years)
Revised Master Plan (30 Years)
Capacity (Cumulative)
99.6 MMTPA 169.5 MMTPA 314 MMTPA
Berths Proposed (Additional)
3 nos. bulk berths + 1 no. container berth + 2 no. LNG/LPG/PoL/Crude Oil berths + 1 no. barge facility + 2 Independent Port Craft facilities
1 no. bulk berth + 3 nos. container berths + 2 nos. multipurpose/liquid berths + 1 no. barge facility
4 nos. bulk berths + 2 nos. container berths + 10 nos. multipurpose/ liquid berths + 2 nos. barge facilities + 1 no. trans-loading facility
Cargo Handling Capacity (Additional)
Bulk Cargo 49 MMTPA 17 MMTPA 68 MMTPA
LNG/ LPG/PoL/Crude Oil
10 MMTPA - -
LNG/LPG/Crude Oil/PoL
2.5 MMTPA 7.5 MMTPA
Container 10.08 MMTPA 33.32 MMTPA 21.70 MMTPA
Multipurpose - 9 MMTPA 45 MMTPA
Barge 3 MMTPA 3 MMTPA 6 MMTPA
Trans-loading - - 3 MMTPA
The cargo handling capacity along with the cargo mix of the revised master plan (30 years) is
given below:
Table 1-2: Cargo Handling Capacity as per Revised Master Plan
S. No. Cargo Type Cargo Mix Cargo Handling
Capacity (MMTPA)
1. Dry bulk cargo Coal / Iron ore / limestone / Mines & Minerals & other dry bulk 159
2. Multipurpose & General Cargo
Fertilizers and raw materials for manufacture of fertilizer / food grains / sugar / clinker / cement / Project cargo / timber & wood / machines/ Iron steel products / Break Bulk etc.
47
3. Container Container (4.66 m TEUs) 66
4. Liquid and Gas
Crude oil / Naphtha / POL / LPG / LNG / Ammonia / Chemicals / Phosphoric Acid / motor spirit / Kerosene / Aviation fuel / High speed diesel / Lubricating oil / Butane / Propane / CNG / Furnace Oil / Low sulphur heavy stock / Edible oil
42
Total 314
1.3.1 Land
Revision of master plan development will be carried in total area of 2013.4 ha. This includes
Phase I (234 ha), Phase II (433 ha) area, proposed reclamation area (1075.7 ha), proposed
applied land (247.7 ha), proposed basin area (23 ha). Revised Master Plan area is falling in
the villages namely Amarnagar, Balisahi, Dosinga, Pt. Nilakanthanagar, Rabindranagar,
Kishoreprasad,Nilambarnagar, Gourprasad and Unsurveyed Area to the east of village
Gourprasad and Hrudayaprasad.
Comprehensive EIA Study for Revised Master Plan Development of Dhamra Port C1141302 Proposed Terms of Reference RP002 rev. A
1 Proposed Terms of Reference (ToR) Page 3
The Surveys Nos Pertaining to Revised Master Plan including Phase I and Phase II is enclosed as Appendix A.
1.4 EIA Methodology
Methodology of the EIA study involved following stages:
Reconnaissance survey and site visit
Review of available literature
Compliance to statutory requirements
Baseline environmental monitoring (terrestrial and marine environments)
Identification and Prediction of Impacts
Risk Analysis and Disaster Management Plan
Environmental Management Plan
1.4.1 Baseline Environmental Monitoring
The baseline environmental studies were carried out for terrestrial and marine environments.
The study was a combination of primary (field surveys) and secondary data collection.
Study Period: Baseline environmental monitoring is carried out by DPCL envisaging the
revised master plan proposal covering Three (03) Seasons (36 weeks or 9 months) and
same data will be utilised for the establishment of baseline conditions for both terrestrial and
marine environment. The terrestrial environment surveys covered the following seasons:
Summer season, 2014
Post monsoon season, 2014
Winter season, 2014-15
The marine environment surveys covered the following seasons:
Summer season, 2014
Post monsoon season, 2014
Winter season, 2014-15
Study Area: As per the Ports and Harbours EIA guidance manual issued by MoEF&CC, an
area within 5 km radius from project boundary for primary data generation and 15 km radius
as a buffer study area for secondary data generation is considered. A map showing the study
area is given as Figure FD0102.
1.4.1.1 Marine Environment
Marine environment in the region was studied through field studies and compilation of
secondary data and literature surveys.
Marine environmental studies were undertaken covering water quality, sediment quality,
biological aspects (planktons and benthos), mangroves, fishing and breeding grounds and
fishery resources. A reputed marine environmental monitoring institute was appointed to
carry out marine monitoring studies. A map showing marine sampling locations is enclosed
as Figure FD0103.
Marine Water Quality
Representative surface and bottom samples were collected using a NISKIN sampler. Some
of the physical parameters such as Temperature, pH, Salinity and Transparency were
observed on-site. Samples were preserved for assessing other physico-chemical and
bacteriological parameters. Methodologies used for collecting, preserving and analysing
Comprehensive EIA Study for Revised Master Plan Development of Dhamra Port C1141302 Proposed Terms of Reference RP002 rev. A
1 Proposed Terms of Reference (ToR) Page 4
water samples were as per standard protocols and procedures defined in standard manuals
and reference materials. Parameters that were assessed are listed below:
Physico-chemical parameters – pH, temperature, salinity, turbidity, conductivity,
suspended solids, total dissolved solids, DO, BOD, COD, chloride, sulphate, sodium,
potassium, silicate, hydrocarbons, oil and grease.
Nutrients – nitrite, nitrate, ammonia, total nitrogen, total phosphates, sulphide
Heavy Metals and Trace metals
Bacteriological parameters – Total Coliforms, Faecal Coliforms
Sediment Quality
Representative sediment samples were collected using a suitable grab sampler (Naturalist’s
Grab/Van Veen Grab). After collection, samples were sieved and subjected to physico-
chemical analysis. Parameters that were assessed include composition, texture, organic
matter and heavy metals.
Biological Aspects
Biological parameters viz., phytoplankton, zooplankton, chlorophyll-a and primary
productivity were assessed. Plankton content in coastal waters was assessed by collection of
water samples using Plankton net of suitable mesh size. All net hauls were fixed in buffered
5% Formaldehyde and stored for analysis in Laboratory. A research microscope was used
for taxonomic identification. Primary Productivity was measured following light and dark
bottle method (Gaarder and Gran, 1927, re-described Subba Rao, 2002).
Benthic Communities
Sediment samples collected for assessing physico-chemical characteristics were used for
enumerating benthic communities. Sediment samples intended for benthic communities
assessment were preserved with Rose Bengal and Formalin Solutions. Analysis of benthic
communities will include meio and macro benthos in the region.
1.4.1.2 Terrestrial Environment
Meteorology
Meteorological parameters such as wind speed, direction, relative humidity, rainfall,
temperature etc., were recorded by using automatic weather monitoring station in the study
area at One (1) location during the study period. In addition, the general meteorological data
from Climatological Tables of Indian Meteorological Department (IMD) will be used to
establish the baseline meteorological conditions of the site. For the purpose of carrying out
the air quality modelling study, site specific meteorological data (pre-processed from MM5)
for the recent year (2014 as available) will be obtained and used.
Ambient Air Quality
The ambient air quality monitoring was carried out as per CPCB/MoEF&CC guidelines. The
locations were identified with regard to the predominant wind direction, topography,
population, sensitive locations and possible impact zones. Representative Ambient Air
Quality (AAQ) was monitored at Eight (08) locations in the study area with twice a week
frequency during the study period. In addition, monitoring was also carried out at exiting
fishing harbour located at Daksin Dharma.
The measurement was carried out for establishing 24-hourly background concentrations for
Particulate Matter size less than 10 microns (PM10) and Particulate Matter size less than 2.5
microns (PM2.5), Sulphur Dioxide (SO2), Nitrogen Dioxide (NO2). For CO and HC, eight hourly
Comprehensive EIA Study for Revised Master Plan Development of Dhamra Port C1141302 Proposed Terms of Reference RP002 rev. A
1 Proposed Terms of Reference (ToR) Page 5
samples were collected on each monitoring day. A map showing air quality monitoring
locations is enclosed as Figure FD0104.
Ambient Noise Levels
Noise levels were measured at Nine (09) locations within the study area. Intensity of the
noise levels (Peak noise and Equivalent noise levels) was measured at hourly intervals for
24 hours once during the study period. Representative noise level measurement was carried
out as per the IS: 4954-1968 as adopted by CPCB, CPCB/IS: 4954-1968 and the CPCB/
OSHA Standards using a precision noise/sound level meter. A map showing noise level
monitoring locations is enclosed as Figure FD0105.
Inland Water Quality
Water samples were collected at the identified sources based on the type of the source, its
relevance, number of upstream and downstream users and the type of the industrial activity
in the vicinity. Water quality was monitored at Ten (10) locations within the study area.
Representative water samples were collected and analysed, once during each season, for
physico-chemical and biological characteristics. Water Quality was monitored adopting
procedures as per IS 3026 and relevant guidelines of MoEF&CC/ CPCB. A map showing
water quality monitoring locations is enclosed as Figure FD0106.
Soil Quality/Land Environment
The soil types in the study area were identified based on the review of the available data
supported with information gathered from reconnaissance survey. Representative soil
samples were collected at Ten (10) locations for various types of soils in the study area. The
collected samples were analysed once during each season for physico-chemical
characteristics. A map showing soil sampling locations is enclosed as Figure FD0107.
Terrestrial Ecology
Vegetation pattern was identified based on literature survey and field investigation. A list of
flora and fauna of terrestrial ecosystem was prepared. Endangered and dominant plant
species area will be identified. Flora and fauna in project area was assessed through field
observations and also information collected from secondary sources.
Flora and Fauna: Flora and fauna in study area was assessed by primary surveys and
collecting secondary information from sources like Forest Department and other agencies
involved in similar studies.
Floral Diversity and Species Inventory
Sampling of vegetation was done using selected samples of 100 m x 10 m belt transects for
tree species, 10 m x 10 m quadrants for shrub species and 1 m x 1 m quadrants for herb
species.
Faunal Diversity and Species Inventory (Vertebrates)
Inventory of animal species was prepared based on following methodology:
Direct observation during field visits
Interviewing local villagers and forest officials
Secondary sources such as published literature on fauna
Bio-diversity index and relative abundance index of different types of flora was established.
Cover of trees in different areas was established. Canopy cover of trees in different areas
Comprehensive EIA Study for Revised Master Plan Development of Dhamra Port C1141302 Proposed Terms of Reference RP002 rev. A
1 Proposed Terms of Reference (ToR) Page 6
was also established. Terrestrial flora and fauna survey was carried out as per standard
practice.
1.4.1.3 Demography and Socio-economics
The socio-economic conditions in study area will be established through collection and
review of available secondary/ published data and socio-economic data. This will include
Demographic structure covering total households, total population, population density, sex ratio, schedule caste and schedule tribe, literacy and employment.
Health Status
Cultural and aesthetic attributes in study area including places of historical and archaeological importance
Inventory of places of historical, cultural and religious importance in the study area.
Details of various economic activities, industries, fishermen details and fishing hamlets if any, will be collected
1.4.2 Establishment of Baseline Environmental Conditions
The information gathered from secondary/published data and primary surveys will be used
for presenting the baseline environmental and social conditions. The baseline levels will be
compared with the existing standards prescribed by the MoEF&CC/CPCB or GPCB. Any
critical issues in the baseline environmental conditions will be identified and adequately
addressed in the EIA report.
1.4.3 Anticipated Environmental and Social Impacts and their Mitigation Measures
Environmental attributes likely to be affected by project activities of the revised master plan
of Dhamra Port will be identified and impacts will be assessed. Project activities of the
revised master plan can be broadly classified into construction and operation phase
activities.
Construction phase activities will include capital dredging, reclamation, cargo berths, cargo
storage areas, intake and outfall, rail /road connectivity, water treatment facilities and
installation of cargo handling equipment, development of internal infrastructure.
Operation phase activities will include maintenance dredging, cargo handling, movement of
ships calling at port, movement of tugs and port crafts, cargo storage and inland cargo
movement. Most appropriate and accepted methods will be used to quantify impacts likely to
arise due to development of Dhamra Port as per the revised master plan.
The mitigation measures proposed to minimise/avoid each of the likely impacts that occur
during construction and operation phases will be discussed in detail.
1.4.3.1 Marine Environment
Impacts on marine ecology will be studied both for construction and operation phases of port
expansion as per the revised master plan. Based on development plan, impacts will be
identified and predicted both for construction and operation phases. Impact on environment
will be studied with respect to following project activities:
Construction Phase
o Dredging and disposal of dredged material
o Marine water quality
o Impact on Nesting areas of Turtles
o Impact on fishing communities
Comprehensive EIA Study for Revised Master Plan Development of Dhamra Port C1141302 Proposed Terms of Reference RP002 rev. A
1 Proposed Terms of Reference (ToR) Page 7
o Reclamation of back-up area
o Construction of cargo berths
o Construction of Sea water intake (for LNG/LPG Regasification)/outfall for Desalination
Plant and LNG/LPG Regasification unit.
Operation Phase (Maintenance Dredging and Disposal; Ship Movement; Cargo Handling, Seawater intake/marine outfall)
o Marine water quality
o Marine ecology
o Fishing communities.
o Impact on Shoreline/Coastline
o Sediment Transport
Appropriate available models will be used to quantify the impacts due to dredge spoil
disposal, various discharges, shoreline, hydrodynamics in and around mangrove areas etc.,
1.4.3.2 Air Environment
Construction phase will involve movement of construction material to project area, site
clearing, vehicular emissions, emissions from construction machinery, etc. which in turn
could influence ambient air quality in the region through build-up of dust levels and gaseous
emission levels.
Impacts on air environment during operation phase are envisaged in terms of fugitive
emissions during Bulk cargo handling/storage and transportation, LNG regasification process
and emissions from ships. These might result in increased levels of PM, CO, NOX and SO2.
Build-up of pollutant levels due to these emissions will be arrived through modelling studies
using Gaussian Dispersion Models (ISCST3/ AERMOD). Mitigation measures will be
accordingly suggested.
1.4.3.3 Noise
Generally, the activities which tend to impact the air environment also equally impact the
noise levels. The impacts on the noise levels during the construction phase could arise from
vehicular traffic, construction machinery, DG sets and transportation of construction material
to the site.
Further, during the operation phase, noise might be generated due to cargo handling
operations, transport through conveyors, DG sets and vehicular traffic and the same will be
felt upon the work personnel operating in the respective areas. Impacts will be evaluated
qualitatively taking into consideration the noise generating sources together with
environmental conditions and the receptors.
1.4.3.4 Water Environment
The impacts on inland water quality would arise from wastewater, floor washings etc. and the
proposed treatment and disposal options. The qualitative impact assessment would cover
impacts on the surface water bodies, if any, in the project region. The runoffs containing
contaminated water during construction and operational phases of the project can affect the
water environment, if not properly controlled. The impacts will be addressed and subsequent
mitigation measures will be accordingly included in the study.
Comprehensive EIA Study for Revised Master Plan Development of Dhamra Port C1141302 Proposed Terms of Reference RP002 rev. A
1 Proposed Terms of Reference (ToR) Page 8
Impacts will also be assessed on water resources of the region due to the proposed project
by carrying out the competing user’s analysis. Water balance diagram will be prepared with
due emphasis on recycling and reuse.
1.4.3.5 Land Environment
The impacts on the land environment during the construction and operation phase will largely
result from reclamation, soil erosion, disposal of construction materials and change in land
use patterns. The impacts on the land environment will be evaluated qualitatively considering
the activities involved in the construction and operation phases.
1.4.4 Analysis of Alternatives
Since, Dhamra port has already been established and operational, for expansion of the port
no other site selection criterion has been considered.
1.4.5 Environmental Monitoring Programme
Environmental Monitoring Programme covering the technical aspects (including
methodology, parameters, frequency, location, etc., and detailed budget) of monitoring to
check the effectiveness of mitigation measures during construction and operation phases will
be prepared.
1.4.6 Additional Studies
1.4.6.1 Public Consultation
In line with the requirements of EIA Notification, 2006 (as amended) for Category A projects,
Public Hearing for Revised master Plan of Dhamra Port will be conducted. For conducting
Public Hearing, the Draft EIA Report will be prepared as per ToR and Executive summaries
in English and Local (Odia) languages will be submitted to Odisha State Pollution Control
Board (OSPCB).
1.4.6.2 Risk Analysis
Risk analysis will be carried out for liquid/gas terminals and storage tanks proposed in the
development plan. Maximum inventory of storage at site will be taken into account. Potential
hazards will be identified through Consequence Analysis and Fire & Explosion hazards.
Hazard Identification
The hazard identification consists of a qualitative review of possible accidents that may
occur. Hazard identification describes the boundaries of a study in terms of materials and
release conditions to be modelled, impact criteria to be used, and identifying and selecting a
list of failure cases that will fully capture the hazard potential of the facilities to be studied.
Consequence Analysis
Consequence analysis evaluates the resulting effects if the accidents occur, and their impact
on people, equipment and structures and environment or business etc. Estimation of
consequences of probable events identified through hazard identification.
Risk Reduction/Mitigation
Risk reduction and mitigation is necessary to bring the risks to acceptable level. Mitigation
measures based on risks evaluated will be suggested.
Comprehensive EIA Study for Revised Master Plan Development of Dhamra Port C1141302 Proposed Terms of Reference RP002 rev. A
1 Proposed Terms of Reference (ToR) Page 9
1.4.6.3 Disaster Management Plan
A broad Disaster Management Plan (DMP) will be prepared in conjunction with and taking
into consideration all technical reviews and suggestions as per acceptable norms. The
measures to be followed during pre-cyclone, during cyclone and post cyclone will be
provided as part of the DMP and a broad Oil Spill Contingency Plan will also be prepared for
the accidental spills, if any.
1.4.6.4 Social Impact Assessment
The social impacts associated during construction phase such as land acquisition, impact on
fishing activities, impact on local infrastructure, etc. will be provided and social impacts
during operation phase in terms of impact on fishing activities, employment generation, etc.
will be addressed.
1.4.6.5 Traffic and Transportation Management Plan
Traffic surveys carried out by DPCL to estimate the present traffic scenario in the project
region and also traffic projections due to the proposed expansion will be presented in EIA
report. A transportation management plan as suggested will be also be included in EIA.
1.4.6.6 Storm water drainage study for project site and surrounding areas
Two to three natural third/fourth order drains are passing through the project site, therefore,
storm water drainage network will be designed by diverting the drains flowing across the
project site. The drain in and around project site area will be designed to safely carry the
runoff generated due to rainfall. Outlets will be developed for the storm water towards natural
sloping which can be used during monsoon and will be connected to existing drainage
network if any. The details of the same shall be studied and covered as a part of EIA studies.
1.4.6.7 Status of Previous Phases EC compliances
Both Phase I and Phase II Environmental/CRZ clearance compliance status will be provided
in the EIA report.
1.4.7 Project Benefits
The project benefits in terms of improvements in the physical infrastructures and social
infrastructure, employment potential and other tangible benefits will be discussed in detail in
EIA report.
1.4.8 Environmental Management Plan
An Environmental Management Plan (EMP) will be formulated for the revised master Plan of
Dhamra port. EMP will address mitigation measures for each area i.e. air, water, soil, water
environment, solid waste, green areas, etc. separately, covering all relevant aspects as per
the recommendations and requirement of MoEF&CC. Based on the identified potential
impacts associated with the project, an EMP will be framed for the construction and
operation phases of the project, which will include:
Pollution abatement and adequacy of control measures
Green belt development plan (suggesting suitable species, width of plantation, spacing,
etc.)
Water recycle and reuse for green belt development and irrigation
Recommendations of measures for noise measurement
Comprehensive EIA Study for Revised Master Plan Development of Dhamra Port C1141302 Proposed Terms of Reference RP002 rev. A
1 Proposed Terms of Reference (ToR) Page 10
Suitable mitigation measures for various potential impact causing activities
Environmental monitoring programme during construction and operation phases
Budgetary estimates for implementation
Institutional mechanism for implementation of EMP
1.4.9 HTL/LTL, CRZ Demarcation
Revised Master Plan superimposed on existing authorized HTL/LTL, CRZ map and same is
enclosed as Appendix B.
1.4.10 Structure of EIA Report
Based on above studies, the EIA report will be compiled and submitted to MoEF&CC for
seeking Environmental and CRZ Clearance. The structure of EIA report will be as per
Appendix III of EIA Notification, 2006 and also EIA Guidance Manual for Ports and Harbours,
2010 released by MoEF&CC.
Chapter-I: Introduction - describes the introduction to project, background of study,
scope and objectives of study and approach adopted to carry out the study.
Chapter-II: Project Description - describes the basic features of project, basis and
considerations, project operations and CRZ compatibility.
Chapter-III: Analysis of Alternatives - describes the alternatives considered in the layout
selection
Chapter-IV: Description of Environment - describes the baseline environmental status
covering both terrestrial and marine environments
Chapter-V: Anticipated Environmental Impacts & Mitigation Measures - describes the
potential impacts due to project activities on environment and their mitigation
measures
Chapter-VI: Environmental Monitoring Programme - describes the technical aspects of
monitoring the effectiveness of mitigation measures (incl. Measurement
methodologies, frequency, location, and detailed budget)
Chapter–VII: Additional Studies - describes Social Impact Assessment, Risk Analysis and
DMP
Chapter–VIII: Project Benefits - describes the project benefits
Chapter – IX: Environmental Management Plan- Describes the administrative aspects of
ensuring the mitigative measures that are going to be implemented
Chapter – X: Summary and Conclusion- Overall justification for implementation of the
project, impact evaluation and mitigation and project benefits including CSR.
Chapter – XI: Disclosure of Consultants Engaged - describes the Consultants engaged
with their brief profile and nature of the Consultancy rendered.
FIGURES
APPENDIX A
1
PLOTS FOR PHASE-I
Village Khata No Plot No Area in Acre
Amarnagar 116 320/382 61.54
Balisahi 92 310 1.54
Balisahi 92 309 1.12
Balisahi 92 321 8.88
Balisahi 92 322 3.96
Balisahi 94 314/454(P) 0.32
Balisahi 94 317 0.04
Dosinga 185 677/907(P) 1.70
Dosinga 185 680/912 15.52
Dosinga 185 680/740 0.46
Dosinga 185 676/905(P) 1.30
Dosinga 185 678/906(P) 1.30
Dosinga 183 684 6.37
Dosinga 183 692 6.81
Dosinga 183 693 7.50
Dosinga 183 696 7.27
Dosinga 183 697 0.05
Dosinga 183 698 2.93
Dosinga 183 699 8.94
Dosinga 5 355/796 2.45
Dosinga 5 355/808 0.38
Dosinga 7 417 0.03
Dosinga 7 418 0.02
Dosinga 7 419 0.31
Dosinga 9 364p 2.6
Dosinga 9 363 0.08
Dosinga 9 358 0.03
Dosinga 9 364/715 1
Dosinga 10 379 0.92
Dosinga 10 381 0.46
Dosinga 10 586 0.47
Dosinga 10 587 0.04
Dosinga 10 379/785 0.48
Dosinga 20 365 1.54
Dosinga 23 375 0.1
Dosinga 27 329 0.73
Dosinga 27 402 0.03
Dosinga 27 403 0.04
2
Dosinga 27 404 0.09
Dosinga 27 405 0.04
Dosinga 27 406 0.1
Dosinga 31 588 0.33
Dosinga 32 391 0.14
Dosinga 32 393 1.58
Dosinga 32 394 1.56
Dosinga 33 299 1.58
Dosinga 33 366 0.03
Dosinga 33 367 5.14
Dosinga 34 370 0.9
Dosinga 34 372 1.15
Dosinga 34 619 0.27
Dosinga 34 620 0.06
Dosinga 34 621 0.03
Dosinga 34 622 0.02
Dosinga 35 395 3.36
Dosinga 35 396 1.04
Dosinga 35 397 0.06
Dosinga 35 398 0.08
Dosinga 35 399 0.01
Dosinga 35 400 0.1
Dosinga 35 401 0.45
Dosinga 36 438 2
Dosinga 37 651 1.11
Dosinga 42 426p 0.21
Dosinga 42 429 0.26
Dosinga 42 437 2.1
Dosinga 43 379/716 0.95
Dosinga 43 292p 0.05
Dosinga 43 295 0.1
Dosinga 43 296 0.22
Dosinga 43 385 1.44
Dosinga 43 386 1.85
Dosinga 43 581 0.2
Dosinga 46 312 4.12
Dosinga 46 313 0.12
Dosinga 46 314 0.06
Dosinga 46 315p 0.43
Dosinga 46 308/712 0.06
Dosinga 47 289p 0.18
3
Dosinga 50 652 0.11
Dosinga 54 663 0.73
Dosinga 54 664 0.12
Dosinga 54 665 0.09
Dosinga 54 666 0.23
Dosinga 55 236p 1.92
Dosinga 56 330/803 0.15
Dosinga 56 336/788 0.35
Dosinga 58 302 1.02
Dosinga 58 328 1.33
Dosinga 58 303 0.06
Dosinga 58 304 0.04
Dosinga 58 305 0.02
Dosinga 58 306 0.16
Dosinga 58 307 0.08
Dosinga 58 308/711 0.12
Dosinga 59 288/710 0.04
Dosinga 64 407 0.03
Dosinga 65 449p 0.2
Dosinga 66 437/720p 1.8
Dosinga 66 438/721 1.95
Dosinga 68 596 0.12
Dosinga 68 608 0.08
Dosinga 69 373 0.72
Dosinga 69 374 3.35
Dosinga 69 597 0.07
Dosinga 69 598 0.1
Dosinga 69 599 0.14
Dosinga 69 600 0.04
Dosinga 69 601 0.06
Dosinga 69 602 0.06
Dosinga 69 603 0.09
Dosinga 69 604 0.02
Dosinga 69 605 0.02
Dosinga 69 606 0.36
Dosinga 69 607 0.38
Dosinga 181/177 355/799p 0.3
Dosinga 75 625 2.68
Dosinga 75 626 0.88
Dosinga 75 636 0.46
Dosinga 75 637 0.09
4
Dosinga 75 638 0.07
Dosinga 75 639 0.09
Dosinga 77 371/784 0.5
Dosinga 82 270 0.08
Dosinga 82 271 0.15
Dosinga 82 272 0.08
Dosinga 82 273 0.21
Dosinga 83 421 0.07
Dosinga 85 613 0.03
Dosinga 85 614 0.06
Dosinga 85 615 0.03
Dosinga 85 616 0.27
Dosinga 85 371/783 1
Dosinga 87 439p 2.85
Dosinga 87 440p 0.45
Dosinga 89 357 1.99
Dosinga 89 772/824 1
Dosinga 98 371 1
Dosinga 100 343 0.04
Dosinga 100 344 4.18
Dosinga 101 381/718 0.89
Dosinga 103 640 0.9
Dosinga 103 651/779 0.06
Dosinga 116 340 0.06
Dosinga 116 341p 5.26
Dosinga 117 378 0.03
Dosinga 117 583 0.06
Dosinga 117 584 0.03
Dosinga 117 585 0.41
Dosinga 117 379/717 0.92
Dosinga 118 586/723 0.07
Dosinga 119 300 0.98
Dosinga 120 377 1.42
Dosinga 120 380 1.35
Dosinga 120 590 0.06
Dosinga 120 591 0.49
Dosinga 120 592 0.12
Dosinga 120 593 0.07
Dosinga 120 379/789 0.57
Dosinga 120 376 0.14
Dosinga 120 594 0.19
5
Dosinga 121 287/795 0.07
Dosinga 126 329/787 0.5
Dosinga 129 640/781 0.63
Dosinga 130 647 0.01
Dosinga 130 648 0.43
Dosinga 130 649 0.13
Dosinga 130 650 0.07
Dosinga 131 562p 0.1
Dosinga 131 563p 0.15
Dosinga 131 564p 1.22
Dosinga 131 565 4.16
Dosinga 131 566 0.06
Dosinga 131 567 0.32
Dosinga 131 568 0.7
Dosinga 131 569 0.22
Dosinga 132 640/780 0.9
Dosinga 133 623 1.02
Dosinga 133 624 2.43
Dosinga 133 627 0.04
Dosinga 133 628 0.06
Dosinga 133 629 0.14
Dosinga 133 630 0.22
Dosinga 133 631 0.02
Dosinga 133 632 0.06
Dosinga 133 633 0.32
Dosinga 135 658 0.28
Dosinga 135 659 0.07
Dosinga 135 660 0.18
Dosinga 135 661 0.16
Dosinga 135 662 1.13
Dosinga 136 388 0.72
Dosinga 136 389 0.18
Dosinga 136 390 0.25
Dosinga 136 392 0.1
Dosinga 136 571 0.22
Dosinga 136 572 0.22
Dosinga 148 297p 8.96
Dosinga 150 408 0.18
Dosinga 150 409 0.18
Dosinga 150 410 0.06
Dosinga 150 411 0.7
6
Dosinga 152 574 0.01
Dosinga 152 576 0.01
Dosinga 153 651/778 1.11
Dosinga 155 448 0.75
Dosinga 158 375 0.08
Dosinga 161 344/772 0.5
Dosinga 161 312/773 1
Dosinga 163 241p 0.28
Dosinga 163 324 1.51
Dosinga 163 325 0.65
Dosinga 165 289/812p 0.32
Dosinga 167 355 0.03
Dosinga 168 332p 3.75
Dosinga 173 383 1.08
Dosinga 173 384 1.12
Dosinga 173 579 0.45
Dosinga 173 580 0.17
Dosinga 173 582 0.07
Dosinga 173 577 0.23
Dosinga 173 578 0.12
Dosinga 173 576/828 0.21
Dosinga 175 308 0.13
Dosinga 175 309 0.2
Dosinga 177 287 0.09
Dosinga 177 311 0.05
Dosinga 178 239p 1.7
Dosinga 178 326p 2.58
Dosinga 178 327 1.38
Dosinga 179 356 0.1
Dosinga 179 355/714 1
Dosinga 179 355/756 0.25
Dosinga 179 355/798 0.4
Dosinga 179 355/713 1.64
Dosinga 181 573 0.22
Dosinga 181/2 595 0.34
Dosinga 181/3 375/805 0.86
Dosinga 181/4 375/806 0.86
Dosinga 181/5 376/807 1.18
Dosinga 181/6 433p 0.73
Dosinga 181/6 434 0.08
Dosinga 181/7 431/967p 0.27
7
Dosinga 181/8 431 0.28
Dosinga 181/8 437/719 1.06
Dosinga 181/8 438/722 1.08
Dosinga 181/8 434/971 0.02
Dosinga 181/8 436 0.06
Dosinga 181/8 435 0.12
Dosinga 181/16 311/819 0.5
Dosinga 181/17 421/496 0.06
Dosinga 181/17 414 0.6
Dosinga 181/17 415 1.23
Dosinga 181/17 416 1.17
Dosinga 181/23 574/825 0.04
Dosinga 181/24 576/827 0.06
Dosinga 181/24 574/826 0.19
Dosinga 181/24 368/831 0.94
Dosinga 181/26 368/830 1
Dosinga 181/34 624/839 0.23
Dosinga 181/35 371/840 0.5
Dosinga 181/36 236/843 0.6
Dosinga 181/36 286/855p 0.21
Dosinga 181/36 287/856 0.08
Dosinga 181/38 420 0.02
Dosinga 181/38 422 0.19
Dosinga 181/40 413 0.8
Dosinga 181/42 355/797 0.6
Dosinga 181/43 355/861 1.34
Dosinga 181/44 324/846p 1.56
Dosinga 181/56 310/860 0.94
Dosinga 181/65 311/859 0.54
Dosinga 181/56 387 1.5
Dosinga 181/63 310 1
Dosinga 181/65 423 0.02
Dosinga 181/65 424 0.03
Dosinga 181/65 425 0.52
Dosinga 181/67 626/871 0.5
Dosinga 181/68 328/872 1.2
Dosinga 181/78 234 0.13
Dosinga 181/87 332/863 3.09
Dosinga 181/88 674 0.18
Dosinga 181/88 675 0.02
Dosinga 181/91 370/888 2
8
Dosinga 181/97 344/895p 0.62
Dosinga 181/98 636/896 0.16
Dosinga 181/99 588/897 0.2
Dosinga 181/101 623/899 0.29
Dosinga 181/102 623/900 0.14
Dosinga 181/103 623/901 0.43
Dosinga 181/103 624/902 0.5
Dosinga 181/104 309/903 1
Dosinga 181/105 301 2.01
Dosinga 181/106 641 0.06
Dosinga 181/106 642 0.17
Dosinga 181/106 644 0.12
Dosinga 181/107 298p 0.82
Dosinga 181/110 781/911 0.24
Dosinga 181/113 342/914 0.45
Dosinga 181/114 372/915 0.25
Dosinga 181/115 370/916 1.02
Dosinga 181/118 382 0.05
Dosinga 181/118 381/920 0.39
Dosinga 181/120 368 0.98
Dosinga 181/120 372/640 0.5
Dosinga 181/122 289/924 0.18
Dosinga 181/126 652/929 0.25
Dosinga 181/127 652/930 0.25
Dosinga 181/128 652/931 0.25
Dosinga 181/129 652/932 0.64
Dosinga 181/129 653 0.04
Dosinga 181/129 654 0.08
Dosinga 181/129 655 0.08
Dosinga 181/129 656 0.32
Dosinga 181/130 331/933 0.99
Dosinga 181/131 309/937 1
Dosinga 181/131 331 0.14
Dosinga 181/131 342/934 0.27
Dosinga 181/137 342 2
Dosinga 181/139 316p 0.01
Dosinga 181/139 318p 0.04
Dosinga 181/140 575/939 0.01
Dosinga 181/142 617 0.21
Dosinga 181/142 618 0.08
Dosinga 181/142 619/942 0.21
9
Dosinga 181/142 372/943 0.04
Dosinga 181/143 308/944 0.01
Dosinga 181/143 309/945 0.2
Dosinga 181/144 412 0.7
Dosinga 181/150 781/958 0.04
Dosinga 181/151 781/910 0.04
Dosinga 181/152 302/959 0.26
Dosinga 181/152 305/960 0.01
Dosinga 181/152 306/961 0.06
Dosinga 181/154 671 0.13
Dosinga 181/154 672 0.1
Dosinga 181/154 673 0.43
Dosinga 181/156 643 0.22
Dosinga 181/157 288 0.36
Dosinga 181/158 416/964 0.2
Dosinga 181/158 416/965 0.13
Dosinga 181/159 386/972 0.5
Dosinga 185 679/727 0.70
Dosinga 185 680/739 1.32
Dosinga 156 685 0.04
Dosinga 156 686 0.07
Dosinga 156 687 0.04
Dosinga 156 688/749 2.85
Dosinga 166 691/751 0.16
Pt. Nilakanthanagar 1 1 6.75
Pt. Nilakanthanagar 2 2 0.73
Pt. Nilakanthanagar 1 3 12.11
Pt. Nilakanthanagar 1 4 10.88
Pt. Nilakanthanagar 1 5 14.03
Pt. Nilakanthanagar 1 6 32.26
Pt. Nilakanthanagar 1 7 24.31
Pt. Nilakanthanagar 1 8 34.49
Pt. Nilakanthanagar 1 9 27.46
Pt. Nilakanthanagar 1 10 36.99
Pt. Nilakanthanagar 1 11 32.82
Pt. Nilakanthanagar 1 12 42.42
Pt. Nilakanthanagar 1 13 40.02
Pt. Nilakanthanagar 1 14 7.25
Pt. Nilakanthanagar 1 15 19.18
Pt. Nilakanthanagar 1 16 17.66
Pt. Nilakanthanagar 1 17 29.11
10
PLOTS FOR PHASE-II
Pt. Nilakanthanagar 1 18 24.31
Pt. Nilakanthanagar 1 19 13.81
Pt. Nilakanthanagar 1 20 18.18
Pt. Nilakanthanagar 1 21 17.11
Pt. Nilakanthanagar 1 22 24.91
Pt. Nilakanthanagar 1 23 34.77
Pt. Nilakanthanagar 1 24 16.61
Pt. Nilakanthanagar 1 25 29.91
Pt. Nilakanthanagar 1 26 29.91
Rabindranagar 78 219 3.90
Rabindranagar 78 225/314 4.90
Village Khata No Plot No Area in Acre
Kishorepradsad 92 246 0.08
Kishorepradsad 90 250 54.10
Kishorepradsad 90 251 16.69
Kishorepradsad 90 252 19.19
Nilambarnagar 1 1 77.32
Nilambarnagar 1 5 68.88
Nilambarnagar 1 7 25.9
Nilambarnagar 1 8 52.01
Nilambarnagar 1 10 52.17
Nilambarnagar 1 14 46.09
Nilambarnagar 1 15 46.96
Nilambarnagar 1 17 24.16
Nilambarnagar 1 18 35.65
Nilambarnagar 1 19 36.42
Nilambarnagar 1 20 25.6
Nilambarnagar 1 21 16.68
Nilambarnagar 1 22 29.01
Nilambarnagar 1 23 35.91
Nilambarnagar 1 24 20.58
Nilambarnagar 1 26 23.07
Nilambarnagar 1 27 24.71
Nilambarnagar 1 28 25.22
Nilambarnagar 1 29 22.44
Nilambarnagar 2 6 1.63
11
PLOTS FOR REVISED MASTER PLAN
Village Khata No
Plot No
Area in Acre
Kishorepradsad 92 222 0.09
Kishorepradsad 90 223 4.00
Kishorepradsad 92 247 0.07
Kishorepradsad 92 248 0.10
Kishorepradsad 92 249 0.15
Gourprasad 87 285 0.17
Gourprasad 87 286 0.28
Gourprasad 85 287 73.26
Gourprasad 85 288 111.30
Gourprasad 85 289 65.12
Unsurveyed Area to the east of village Gourprasad and Hrudayaprasad
Nilambarnagar 2 9 1.58
Nilambarnagar 2 25 4.27
APPENDIX B
6-3-1192/1/1, 5th Floor, Block No.3,
White House, Kundan Bagh, Begumpet, Hyderabad – 500 016
Ph: 91-040-40354444; Fax: 91-040-40354430
L&T Infrastructure Engineering Limited (formerly known as L&T-Ramboll Consulting Engineers Limited)