Presentation date: 24.10.2017Presenter Name: Ralf StetterCompany Name: A+B Solutions GmbHContact Information: [email protected] name: Estrel Hall C5+6Presentation Title: Using Teamcenter for Part Manufacturing in a competitive environment
Ralf StetterManaging DirectorA+B Solutions GmbH
Using Teamcenter for Part Manufacturing in a competitive environment
Restricted © Siemens AG
Page 5 Siemens PLM Software
Ideal World
CAMPart model preparation Tooling and fixture design CNC / RobotsDNC Shop floor program
validation
CMM programming CMM inspection executionResource ManagementShop floor data accessResource LibrariesProcess planning
ProductionPlanning
Part Manufacturing Data- / Resource- & Process-Management
Restricted © Siemens AG
Page 6 Siemens PLM Software
Information Flow Across the Entire Enterprise
ProductionProduct engineering
Manufacturing engineering
Operation Silos with Disconnected Systems
Restricted © Siemens AG
Page 7 Siemens PLM Software
MachineTool
Tool Management
Quality MeasurementDNC
CNC Controller
Order ManagementFixture Design
CAM - NC programming
Work Instructions
Process Planning
ResourceManagement
CAD
Stage Model
Part Manufacturing Solutions- The challenge: Disconnected systems
Do we use right part revision?
Different databases!
Separate niche applications!
Which machine tool is this for ?Where is the tool ?
Is this the right and released Work instruction?
Wrong NC File!
IDC report estimates that information workers spend 13 hours a week with information gathering and analysis. An enterprise employing 1,000 knowledge workers wastes at least $2.5 to $3.5 million per year searching for nonexistent information, failing to find existing information, validating the information or recreating information that can‘ t be found.
Restricted © Siemens AG
Page 8 Siemens PLM Software
• Quality escapes at the shop floor
• Product introduction is delayed & delivery target dates missed
Lack of Integration: The consequences
• Late changes consume time and cost:up to 30-50 hours per change
At the point of production:
Restricted © Siemens AG
Page 9 Siemens PLM Software
Product Assembly
Produkt
CAD FileDrawing
VisualizationDocumentation
Revision/Effectivity
Produkt
CAD FileDrawing
VisualizationDocumentation
Revision/Effectivity
Produkt
CAD FileDrawing
VisualizationDocumentation
Revision/Effectivity
NC
processN
C process
NC
process
NC
progra
m
NC
progra
m
NC
progra
m
ToolingTooling
Tooling
FixturesFixtures
Fixtures
Gages
Gages
Gages
FacilitiesFacilities
Facilities
Machines
Machines
Machines
Capacity
Capacity
Capacity
InspectionInspection
Inspection
Production Engineering
Assy sequenceAssy sequence
Assy sequence
Detail activities
Detail activities
Detail activities
Resources
Resources
Resources
FacilitiesFacilities
Facilities
VisualizationVisualization
Visualization
Machine sim
Machine sim
Machine sim
Ergonomics
Ergonomics
Ergonomics
Line balanceLine balance
Line balance
Process simProcess sim
Process sim
Reports
Reports
Reports
Docum
entsD
ocuments
Docum
ents
MES
MES
MES
Knowledge
Knowledge
Knowledge
Improvem
entIm
provement
Improvem
entAssembly Planning
InstructionsInstructions
Instructions
PlanningPlanning
Planning
VisualizationVisualization
Visualization
ValidationValidation
Validation
Root C
auseR
oot Cause
Root C
ause
Quality
Challenges of Data Volume
The data volume for the production can be a hundred times the development …
Product Assembly
Product
CAD FileDrawing
VisualizationDocumentation
Revision/Effectivity
Product
CAD File
DrawingVisualization
DocumentationRevision/Effectivity
Product
CAD FileDrawing
VisualizationDocumentation
Revision/Effectivity
100 components can easily generate 10.000 production data
Restricted © Siemens AG
Page 11 Siemens PLM Software
PDM/PLM
Engineering
Manufacturing Engineering
ResourceManagement
I-deas Solid Edge
CATIA Pro/E AutoCAD
SolidWorks
NX
Mentor (PCB)
MultiCADI-deasI-deas Solid EdgeSolid Edge
CATIACATIA Pro/EPro/E AutoCADAutoCAD
SolidWorksSolidWorks
NX
Mentor (PCB)Mentor (PCB)
MultiCAD
Real Life
ERPMS Office
SeparateDatabase
NC-Programming
FolderFiles
Shop Floor
Machine FoldersFiles
Restricted © Siemens AG
Page 12 Siemens PLM Software
Conclusion
• Redundant Data
• Unsafe Processes
• Defective
• Big risk of waste production
• Liability / Compliance
• High organizational effort
• Time consuming
• Knowledge in individuals
Restricted © Siemens AG
Page 15 Siemens PLM Software
KMWE
• Reduce lead time
• Improve data management• Regulatory compliance
• Supplier to aerospace, machinery and medical industries
• 86 Million € revenue, 550 employees
Company overview Objectives
Restricted © Siemens AG
Page 16 Siemens PLM Software
Facts
• Overall 12.000 parts to manage
• Low volume high complexity
• Focused on manufacturing
• 8000 different products a year
• 15% of new parts every year
• 20% of changes
• Average 3 NC programs per part
• Over 64 Tooling machines
• Several worldwide production locations
• Need to manage traceability (personalized processes)
Restricted © Siemens AG
Page 17 Siemens PLM Software
Sharepoint
ProjectEngineering
Manufacturing Engineering
ResourceManagement
I-deas Solid Edge
CATIA Pro/E AutoCAD
SolidWorks
NX
Mentor (PCB)
MultiCADI-deasI-deas Solid EdgeSolid Edge
CATIACATIA Pro/EPro/E AutoCADAutoCAD
SolidWorksSolidWorks
NX
Mentor (PCB)Mentor (PCB)
MultiCAD
Prior Situation
SharepointMS Office
TDMSystems
NC-Programming
FolderFiles
Shop Floor
Machine FoldersFiles
Restricted © Siemens AG
Page 18 Siemens PLM Software
Prior Situation
• File and folder based data management
• Manual activities like copy and paste for releasing/unlreleasing and archiving data
• Manual workflows
• Status by emails
• Highly paper based shop floor documentation
• Redundant data
• Lot of different systems who create their own data
Restricted © Siemens AG
Page 19 Siemens PLM Software
Challenges
• High risk of using the wrong data
• Time consuming processes
• Workflows based on experiences and people
• No real change management for manufacturing
• Processes not enforced
• No traceability (who, when, where, why, what,……)
• Rely on a mixture of media (email, paper, files, folder names…….)
• Unmanaged change requests from shop floor
• Different data locations
Restricted © Siemens AG
Page 20 Siemens PLM Software
Challenges
• Hard to find the right data (based on user experiences)
• Low flexibility
• No control for concurrent engineering and manufacturing
• No management of multiple sites
• Folder DNC
Restricted © Siemens AG
Page 21 Siemens PLM Software
Solution
• One single source of data and process management
• Automated processes (workflows)
• Revision and access control
• Manage data dependencies
• Manage customer projects
• Integrate data from customer
• Manage CAM processes and data from EdgeCAM and NX CAM
• Manage Vericut data
• Manage CMM data
• Manage manufacturing work packages (NC programs, SFD, tooling data, TBD,….)
Restricted © Siemens AG
Page 22 Siemens PLM Software
Solution Map
Tool managementTool librariesProcess
planning
ProductionPlanning
Tooling and fixture design CAMPart model
preparation
CAQ CMM inspection execution
DNC
Shop floor data access
Shop floor program validation CNC
Teamcenter Project, Cost, Data & process management
Tool/Product Cost Calculation
ProjectManagement
Restricted © Siemens AG
Page 24 Siemens PLM Software
Actual Process and Solution Landscape
Catia tool DBExcel
Catia tool DBCatalog
Catia Vericut script
Campost tool DBExcel
Campost tool DBCsv
Campost
DNC NC Machine
Vericut tools(TLS file)
Vericut tool DB(TLS files in XML format)
CATV
APT file NC file
DesignFixtureStock
(CATPart files)
VCProjecttemplateVericut tool fileVericut machine
VCProjectVericut tool fileVericut machineNC fileDesign modelFixture modelStock model
CCVBatch execution
VERICUT
DesignFixtureStock
(STL files)
Simulation OK?
DNCADM
Yes
NC file NC file
CATProcess
Catia batch
NC Programming process
Björn Olsson 2016-02-19
MRL?1. User creates the NC program in Catia and
save the CATProcess file.2. User runs CCV which
1. Run Catia and create APT file2. Run Campost and create NC file3. Run Vericur script and create
Vericut tool file and CVProjecttemplate file
4. Start CATV3. User run CATV which creates model files and
start Vericut
Restricted © Siemens AG
Page 25 Siemens PLM Software
ShopfloorMachines
Teamcenter Part Manufacturing Optional - Single Source Manufacturing Landscape ready to connect
CATProcessCatia Batch FileAPT File
Tool master dataTechnology dataTool classification
NC-Workpackages
NC-ProgramsWork instructionsSetup instructionsTooling Sheets / Tool Presetter DataShop DocsVericut Simulationetc.
Manufacturing Resource Library
CATIA CAM
DNC
...
Shop Floor Integration (SFC)
Teamcenter Data and process managementTeamcenter Manufacturing Data-/Resource- & Process-Management
Tools NC-Program
ICAMCAM-Post
ToolsAPT File
ToolsAPT FileNC-Program
VERICUTVericut Project FileSimulation File
OptimizedNC-Programs
CATIA TC Interface
Restricted © Siemens AG
Page 26 Siemens PLM Software
Step 1 CATIA CAM Integration
• Create Manufacturing Operation in TC
• Create/Use Tools in MRL
• Select required tools for Manufacturing
Step in MRL and add to Shopping Card
• Save of Shopping Card
• Automatic creation of shopping card tools
over mapping solution as CATIA Tool
Catalog
• CAM programming with tool catalog and
other resources
• Management of CATIA output files and
reference of used tools in TC Manufacturing Operation Step
MRL TC CatProcessCATIA
1) Add 3D Model Tool from TC/MRL
2) Add Tool from Catalog
Restricted © Siemens AG
Page 27 Siemens PLM Software
MRL 2 Catia
Classified Tool Assembly and - Component Items
• Tool Component contains NX and Catia Dataset• Tool Assembly contains NX and Catia Dataset, • BOM View Master is Catia
Catia Models contains all relevant CAM attributes eg• Cut / No Cut geometry definition• Coordinate Systems• …
Restricted © Siemens AG
Page 29 Siemens PLM Software
Step 2 CAM-Post
• Based on the referenced used tools in the
TC Manufacturing Operation automatic creation
of tool list for CAM-Post over mapping solution
• Start of CAM-Post with tool list and APT file input
• Management of CAM-Post output (NC-Program)
in TC Manufacturing Operation Step
ICAMCAM-Post
Restricted © Siemens AG
Page 30 Siemens PLM Software
Step 3 VERICUT
• Creation an management of Vericut Projects in TC
• Usage of referenced tools from TC Manufacturing
Operation Step
• Output of Vericut Project file with mapped tooling
list and start of Vericut simulation and verification
• Input Management of Vericut simulation file in TC
Manufacturing Opartion Step for later usage
in Shop Floor
First Vericut Teamcenter Interface still released (V8.1) from CGTech
(visit their booth in the partners hall)
VERICUT
Restricted © Siemens AG
Page 32 Siemens PLM Software
Teamcenter as Integration Platform for 3rd party Manufacturing Solutions
• CAM Integrator – Integration of 3’rd party CAM solutions in Teamcenter such as § UNC, OPUS, Exapt, MasterCAM, SurfCAM, EdgeCAM, WorkNC,
Powermill, Hypermill, Vericut…..
• Connection platform for shop floor solutions like:§ Flexible Manufacturing Systems (Soflex, Fastems)§ PCDMIS (Hexagon Metrology, Zeiss,…..)§ Job Shop Management (Siemens)§ Simatic IT MES for Part Production (Siemens)§ Presetter Solutions (Zoller,….)
Ask us if you have requirements to integrate other manufacturing solutions to get data from Teamcenter!
Restricted © Siemens AG
Page 33 Siemens PLM Software
Integrating 3rd party CAM Software
Teamcenter
Shop Floor Connect DNC
3rd Party CAM Data Management in Teamcenter
3rd Party CAM access to TeamcenterMRL
Shop Floor Integrate Resource Mgt
3rd party CAM
Manufacturing Resource Library (MRL)
3rd party CAM
Scalable 3rd party Integration
3rd Party Data Management • Integrates 3rd party Software to Teamcenter• Manages foreign Source File in Teamcenter• Managing 3rd party Data inside Teamcenter using
same data model as NX CAM integration• Store CAM Output (NC Programs, Tool list, Shop
Doc into MENC Item)3rd Party access to MRL• Push Tools from Teamcenter MRL to 3rd party
software • Build / upload tool list (as BOM) to TC
(MENCMachining Item) for Shop Floor usage SFI RM
Both licenses can be used individual or in combination
CAM Data MgtTool Mgt
NC Data Mgt MRL to 3rd party CAM Tool Data Mapping
Restricted © Siemens AG
Page 34 Siemens PLM Software
3rd Party CAM Data Management in Teamcenter
You can
• Integrate data from a 3rd party CAM / Manufacturing System thru a configurable interface into standard Teamcenter data model (MENCMachining Operation/ Item – standard Manufacturing Work Package). Creates Operations, Revisions, Activities and Attachments
• Integrate data from a 3rd party Simulation System
• Use the Teamcenter Manufacturing Resource Library
• Support of the Teamcenter functions like „New“ or “Revise” for new creation of a MENC Machining item structure or „Add“ to attach new datasets to existing MENC Machining Item
• Legacy data import (mass data import)
• Reads the existing data information from the header of NC program, file name, folder structure and even other sources like Excel to create the MENCMachining item structure
• Shop Floor Connect DNC Integration (add-on Module)Data from external system in Teamcenter can also be viewed and the NC / CMM programs can be down- and uploaded to the NC / CMM machines via Shop Floor Connect
Restricted © Siemens AG
Page 35 Siemens PLM Software
Teamcenter Manufacturing integrations we are working on
• Autodesk Powermill (Delcam)
• Tebis
• NCSIMUL Machine
• Vericut
• Hexagon
• Zeiss
• Soflex
Restricted © Siemens AG
Page 36 Siemens PLM Software
Teamcenter for Part ManufacturingThe Ideal World
CAMPart model preparation Tooling and fixture design CNC / RobotsDNC Shop floor program
validation
CMM programming CMM inspection executionResource ManagementShop floor data accessResource LibrariesProcess planning
ProductionPlanning
Teamcenter Data- / Resource- & Process-Management Solution
Restricted © Siemens AG
Page 37 Siemens PLM Software
Thank You!Questions?A+B Solutions GmbH
Lorcher Str. 141/573529 Schwaebisch Gmuend
GermanyTel.: + 49 71 71 / 92 740 – 0
Fax: + 49 71 71 / 92 740 – [email protected]