    No. Risk events Likelihood Consequence

    1 occupational health safety A Almost Certain 5 Catastrophic

    2 project management risk A Almost Certain 5 Catastrophic

    3 limited materials C Moderate 2 Minor

    4 operational risk B Likely 3 Moderate

    5 weather issues C Moderate 2 Minor

    6 environmental issues C Moderate 2 Minor7 economic crisis E Rare 1 Insignificant

    8 delay in project C Moderate 4 Major

    9 exchange rate fluctuations B Likely 3 Moderate

    10 cost increase B Likely 5 Catastrophic

    11 change of scope D Unlikely 4 Major

    12 security B Likely 4 Major

    13 legislative changes E Rare 1 Insignificant

    14 reputatuion of the company E Rare 1 Insignificant

    15 social risks E Rare 1 Insignificant

  • 8/6/2019 Dijo Assignment[1]

    3/13

    Severity

    Extreme

    Extreme

    Moderate

    High

    Moderate

    ModerateLow

    Extreme

    High

    Extreme

    High

    Extreme

    Low

    Low

    Low

  • 8/6/2019 Dijo Assignment[1]

    4/13

    Risk Events

    Note: Risk no. 1 is only the example how we are going to do our work individually an

    No. Risk event Likelihood

    1 C Moderate

    2 Changed orders resulting from legislative changes E rare

    3 Cost overrun resulting from inflation B likely

    4 C Moderate

    5 C Moderate

    6 Requests for contributions to local community E rare

    7 Property or equipment losses owing to theft B Likely

    8 D Unlikely

    9 C Moderate

    10 A lmost Certain

    11 B Likely

    Cost overrun resulting from changed labor safetylaws and regulations

    Suspension of work in adverse weather eventssuch as typhoon or rainstorm

    Schedule or cost overrun owing to sitediscrepancy on geology or topography

    Changed material orders from client's demandchanges

    Schedule delay due to difference between designand actual construction

    Underestimation of construction costs due to lackof information and insufficient detail designs.

    Construction accidents resulting from operatingerrors or carelessness of workers

  • 8/6/2019 Dijo Assignment[1]

    5/13

    12 C Moderate

    13 C Moderate

    14 B Likely

    15 C Moderate

    Swinburne University of Technology, Hawthorn

    Excessive use material of by subcontractor withpoor technique or working habits

    Schedule delay because supplier was unable todeliver materials on schedule

    Schedule delay caused by substandard quality ofmaterial and services.

    Machinery / Equipment breakdowns suspendingconstruction activities

  • 8/6/2019 Dijo Assignment[1]

    6/13

    d calculation changes accordingly, its just rough work.

    Consequence Severity

    3 Moderate High

    1 insignificant Low

    5 Catastrophic Extreme

    2 Minor Moderate

    2 Minor Moderate

    1insignificant Low

    4 Major Extreme

    4 Major High

    4 Major Extreme

    5 Catastrophic Extreme

    3 Moderate High

  • 8/6/2019 Dijo Assignment[1]

    7/13

    2 Minor Moderate

    2 Minor Moderate

    3 Moderate High

    3 Moderate High

  • 8/6/2019 Dijo Assignment[1]

    8/13

    Risk Treatment Likelihood

    C

    E

    C

    C

    D

    E

    D

    E

    C

    C

    C

    The cost estimators must estimate in such a way that the costoutput after the completion of the project must result in profit.

    Project managers must be able to manage to completethe project on time by increasing resources and alsoby proper time management.

    structural engineering before designing mustinvestigate the site properly and then provide designdepending on the practical site condition.

    Proper security in each sections of the project is to beprovided. Also the material stored should be securedprorperly

    Project manager must agree to the client for thechange of scope only if it produces a very little effecton the project else the project manager must be ableto convince the client about the after effects of suchchange.

    Changes due to this must be minimised. Site engineersmust scrutnise everything that effects or delays theproject from a design point of view.

    The client must ensure the cost estimators involved

    are well experienced with such projects and costestimators must inform the project managers if thedesign provided is improper or insufficient.

    Have a safety officer in the site. The safety officermust also ensure that each workers have undergonesafety induction before commencing their work in the

  • 8/6/2019 Dijo Assignment[1]

    9/13

    B

    D

    C

    B

    Site engineer must keep an account of the materialdelivered to the subcontractor for a particular workand the percentage of the work completed. The sub-contractor must be informed for excessive use ofmaterial may result in the decrease in their finalpayment.

    Project manager to make sure that the materials aresourced properly before the project start and alsoshould ensure that there is enough material for the

    Quality manager must be appointed and he must takegood care of the quality of the materials used for theconstruction

    Site engineers must ensure each equipment beforebeing used in the site that it is properly maintained or

    not.

  • 8/6/2019 Dijo Assignment[1]

    10/13

    Consequence Severity

    Moderate 3 Moderate High

    rare 1 insignificant Low

    Moderate 3 Moderate High

    Moderate 1 insignificant Low

    Unlikely 2 Minor Low

    rare 1 insignificant Low

    Unlikely 3 Moderate Moderate

    rare 3 Moderate Moderate

    Moderate 3 Moderate High

    Moderate 3 Moderate High

    Moderate 2 Minor Moderate

  • 8/6/2019 Dijo Assignment[1]

    11/13

    Likely 1 insignificant Moderate

    Unlikely 2 Minor Low

    Moderate 2 Minor Moderate

    Likely 1 insignificant Moderate

  • 8/6/2019 Dijo Assignment[1]

    12/13

    Risk Map before TreatmentInsignificant Minor

    1 2

    Upto $ 150,000 Upto $ 1,500,000

    L A Almost cer 95%

    i

    k B Likely 80%

    e

    l C Moderate 50%

    i 4,5,12,13

    h D Unlikely 20%

    o

    o E Rare 5%

    d 2,6

    Risk Map after Treatment

    Consequence

    Insignificant Minor

    1 2

    Upto $ 150,000 Upto $ 1,500,000

    L A Almost cer95%

    i

    k B Likely 80%

    e 12,15

    l C Moderate 50%

    i 4 11,14

    h D Unlikely 20% 5,13

    o

    o E Rare 5%

    d 2,6

  • 8/6/2019 Dijo Assignment[1]

    13/13

    Consequence

    Moderate Major Catastrophic

    3 4 5

    Upto $ 15,000,000 Upto $ 150,000,000 Over $ 150,000,000

    10

    11,143

    7

    1,159

    8

    Moderate Major Catastrophic

    3 4 5

    Upto $ 15,000,000 Upto $ 150,000,000 Over $ 150,000,000

    1,3,9,10

    7

    8