No. Risk events Likelihood Consequence
1 occupational health safety A Almost Certain 5 Catastrophic
2 project management risk A Almost Certain 5 Catastrophic
3 limited materials C Moderate 2 Minor
4 operational risk B Likely 3 Moderate
5 weather issues C Moderate 2 Minor
6 environmental issues C Moderate 2 Minor7 economic crisis E Rare 1 Insignificant
8 delay in project C Moderate 4 Major
9 exchange rate fluctuations B Likely 3 Moderate
10 cost increase B Likely 5 Catastrophic
11 change of scope D Unlikely 4 Major
12 security B Likely 4 Major
13 legislative changes E Rare 1 Insignificant
14 reputatuion of the company E Rare 1 Insignificant
15 social risks E Rare 1 Insignificant
8/6/2019 Dijo Assignment[1]
3/13
Severity
Extreme
Extreme
Moderate
High
Moderate
ModerateLow
Extreme
High
Extreme
High
Extreme
Low
Low
Low
8/6/2019 Dijo Assignment[1]
4/13
Risk Events
Note: Risk no. 1 is only the example how we are going to do our work individually an
No. Risk event Likelihood
1 C Moderate
2 Changed orders resulting from legislative changes E rare
3 Cost overrun resulting from inflation B likely
4 C Moderate
5 C Moderate
6 Requests for contributions to local community E rare
7 Property or equipment losses owing to theft B Likely
8 D Unlikely
9 C Moderate
10 A lmost Certain
11 B Likely
Cost overrun resulting from changed labor safetylaws and regulations
Suspension of work in adverse weather eventssuch as typhoon or rainstorm
Schedule or cost overrun owing to sitediscrepancy on geology or topography
Changed material orders from client's demandchanges
Schedule delay due to difference between designand actual construction
Underestimation of construction costs due to lackof information and insufficient detail designs.
Construction accidents resulting from operatingerrors or carelessness of workers
8/6/2019 Dijo Assignment[1]
5/13
12 C Moderate
13 C Moderate
14 B Likely
15 C Moderate
Swinburne University of Technology, Hawthorn
Excessive use material of by subcontractor withpoor technique or working habits
Schedule delay because supplier was unable todeliver materials on schedule
Schedule delay caused by substandard quality ofmaterial and services.
Machinery / Equipment breakdowns suspendingconstruction activities
8/6/2019 Dijo Assignment[1]
6/13
d calculation changes accordingly, its just rough work.
Consequence Severity
3 Moderate High
1 insignificant Low
5 Catastrophic Extreme
2 Minor Moderate
2 Minor Moderate
1insignificant Low
4 Major Extreme
4 Major High
4 Major Extreme
5 Catastrophic Extreme
3 Moderate High
8/6/2019 Dijo Assignment[1]
7/13
2 Minor Moderate
2 Minor Moderate
3 Moderate High
3 Moderate High
8/6/2019 Dijo Assignment[1]
8/13
Risk Treatment Likelihood
C
E
C
C
D
E
D
E
C
C
C
The cost estimators must estimate in such a way that the costoutput after the completion of the project must result in profit.
Project managers must be able to manage to completethe project on time by increasing resources and alsoby proper time management.
structural engineering before designing mustinvestigate the site properly and then provide designdepending on the practical site condition.
Proper security in each sections of the project is to beprovided. Also the material stored should be securedprorperly
Project manager must agree to the client for thechange of scope only if it produces a very little effecton the project else the project manager must be ableto convince the client about the after effects of suchchange.
Changes due to this must be minimised. Site engineersmust scrutnise everything that effects or delays theproject from a design point of view.
The client must ensure the cost estimators involved
are well experienced with such projects and costestimators must inform the project managers if thedesign provided is improper or insufficient.
Have a safety officer in the site. The safety officermust also ensure that each workers have undergonesafety induction before commencing their work in the
8/6/2019 Dijo Assignment[1]
9/13
B
D
C
B
Site engineer must keep an account of the materialdelivered to the subcontractor for a particular workand the percentage of the work completed. The sub-contractor must be informed for excessive use ofmaterial may result in the decrease in their finalpayment.
Project manager to make sure that the materials aresourced properly before the project start and alsoshould ensure that there is enough material for the
Quality manager must be appointed and he must takegood care of the quality of the materials used for theconstruction
Site engineers must ensure each equipment beforebeing used in the site that it is properly maintained or
not.
8/6/2019 Dijo Assignment[1]
10/13
Consequence Severity
Moderate 3 Moderate High
rare 1 insignificant Low
Moderate 3 Moderate High
Moderate 1 insignificant Low
Unlikely 2 Minor Low
rare 1 insignificant Low
Unlikely 3 Moderate Moderate
rare 3 Moderate Moderate
Moderate 3 Moderate High
Moderate 3 Moderate High
Moderate 2 Minor Moderate
8/6/2019 Dijo Assignment[1]
11/13
Likely 1 insignificant Moderate
Unlikely 2 Minor Low
Moderate 2 Minor Moderate
Likely 1 insignificant Moderate
8/6/2019 Dijo Assignment[1]
12/13
Risk Map before TreatmentInsignificant Minor
1 2
Upto $ 150,000 Upto $ 1,500,000
L A Almost cer 95%
i
k B Likely 80%
e
l C Moderate 50%
i 4,5,12,13
h D Unlikely 20%
o
o E Rare 5%
d 2,6
Risk Map after Treatment
Consequence
Insignificant Minor
1 2
Upto $ 150,000 Upto $ 1,500,000
L A Almost cer95%
i
k B Likely 80%
e 12,15
l C Moderate 50%
i 4 11,14
h D Unlikely 20% 5,13
o
o E Rare 5%
d 2,6
8/6/2019 Dijo Assignment[1]
13/13
Consequence
Moderate Major Catastrophic
3 4 5
Upto $ 15,000,000 Upto $ 150,000,000 Over $ 150,000,000
10
11,143
7
1,159
8
Moderate Major Catastrophic
3 4 5
Upto $ 15,000,000 Upto $ 150,000,000 Over $ 150,000,000
1,3,9,10
7
8