DIKE REPAIRS AT LES CÈDRES GENERATING STATION
INFORMATION BULLETIN
FALL 2016
Les Cèdres generating station was built in 1913 and 1914. An embankment dike was also built upstream of the powerhouse to create a headrace canal that would direct water from the Fleuve Saint-Laurent into the powerhouse.
A number of studies and inspections of this dike conducted by Hydro-Québec show water infiltration and seepage from the headrace canal. As a result, to ensure the long-term operability of the facilities, Hydro-Québec must repair the fill of the embankment dike of the Les Cèdres headrace canal.
The purpose of this project is to improve the watertightness and stability of the dike and to minimize the risk of erosion of its foundation.
2
!
Vaudreuil-Dorion,V Notre-Dame-de-l'Île-Perrot,
V
Saint-Clet,M
TNO aquatiquede la MRC de
Vaudreuil-Soulanges,NO
LesCèdres,M
Beauharnois,V
Coteau-du-Lac,V
Pointe-des-Cascades,VL
Salaberry-de-Valleyfield, V
Saint-Étienne-de-Beauharnois, M
TNO aquatique de la MRC deBeauharnois-Salaberry,NO
Saint-Stanislas-de-Kostka, M
Beauharnois-Salaberry
(MRC)
Vaudreuil-Soulanges
(MRC)
20
30
30
530
338
201
338
132
Boulevard Gérard-Cadieux
Boulevard P
ie XII
Chem
in Saint-Dom
inique
Rang Sainte-Marie Est
Chemin du Fleuve
Chemin du
Canal O
uest
Chem
in Saint-Féréol
Chem
in du Golf
Chem
in Sainrt-Emm
anuel
Rang Sainte-Marie Ouest
Chem
inS
aint-Antoine
Saint-Timothéedam
l'Île-Juillet-2dam
Pointe-du-Buissondam
Les Cèdresdike
l'Île-Juillet-1dam
Les Cèdrespowerhouse
Les Cèdres
Saint-Timothée sector
Salaberry-de-Valleyfield
Pointe-des-Cascades
Coteau-du-Lac
Île de Salaberry
Canal de
Beauharnois
Rivière
ÎleBienville
Île desCascadesÎle De
Joybert
Île auxChats
ÎleJuillet
Barrage de Beauharnois
Îled'Aloigny
Saint-Charles
FleuveSaint-Laurent
Rivière desOutaouais
Le Petit
Canal
Cours d'eau Leboeuf-Léger
Rivière à la G
raisse
Saint-Grégoire
L'Ancien Canal
Canal
de S
oulan
ges
Canal de Soulanges
Ruisseau Chamberry
Ruisseau
A
74°0'
74°0'
74°4'
74°4'
74°8'
74°8'
73°56'
45°2
0'45
°18'
45°1
6'45
°14'
73°5
6'
45°20'45°18'
45°16'45°14'
Les Cèdres dam
Gravity dam
Spillway(decommissioned)
Inverted filter
Inverted filter Inverted filter
Sealing work
Slope stabilizationSlope stabilization
Île auxVaches
A
!!(
Zone 2
Île à l'Ail
Zone 1
!!(
!!(Zone 2
A
Les Cèdres
Saint-Timothée basin(winter low water)
Fleuve Saint-LaurentLes Cèdres headrace canal
île Saveuse
Les Cèdres dike
%
Zone 3
Les Cèdrespowerhouse
Pointe-du-Buissonbasin
120
kV 1
263-
1470
120
kV 1
434-
1435
(P)735 kV 7042
!!A
!!A
0 1 2 km
MTM, Zone 8, NAD83 (CSRS)
0002c_buc1_tet_014_projet_161018.mxd
Infrastructure
Hydropower generating station
Dam
Highway
Provincial highway
Secondary highway
Local road
30
132
338
BoundaryRegional countymunicipality (RCM)Municipality
Document for information purposes only. For any other use, please contact Géomatique, Hydro-Québec Équipement et services partagés.
0 75 150 m
MTM, Zone 8, NAD83 (CSRS)
Planned structure
Above water
Under water (not visible)
Direction of flow
Bike path!!(
A
PROJECT DESCRIPTIONNorth side of the dikeHydro-Québec will perform sealing work over a distance of about 350 m (zone 1) to reduce water infiltration into the embankment dike. This involves partially excavating the slope of the dike and adding more than 100,000 m3 of a mix of till, granular material and rock.
The water level in the Les Cèdres headrace canal will be maintained at its usual level throughout the work. A containment curtain will be installed in the headrace canal to confine particles suspended during placement of the new material.
South side of the dikeHydro-Québec will add an inverted filter over a distance of about 1,190 m in the Saint-Timothée basin (zone 2) and about 120 m in the Pointe- du-Buisson basin (zone 3). Composed of several layers of granular fill, the inverted filter is designed to prevent particulate matter from migrating outside the embankment in case of infiltration and thus prevent erosion of the foundation of the dike. Building the inverted filter will involve preparing the foundation and adding about 70,000 m3 of granular material and rock.
Hydro-Québec also plans to stabilize the slope over a distance of about 175 m in the Saint-Timothée basin (zone 2) and about 125 m in the Pointe-du-Buisson basin (zone 3). This will involve dumping about 10,000 m3 of granular material and rock on the side of the dike.
The work on the south side of the dike will be performed when water levels are lowest in the Saint-Timothée and Pointe-du-Buisson basins , that is, between November and April.
Vegetation controlHydro-Québec has to cut down some of the trees on the dike to get to the work areas. Since trees can weaken a dike, compromising its stability, Hydro-Québec will determine if other trees on the dike, outside the work area, also need to be felled.
3
!
Vaudreuil-Dorion,V Notre-Dame-de-l'Île-Perrot,
V
Saint-Clet,M
TNO aquatiquede la MRC de
Vaudreuil-Soulanges,NO
LesCèdres,M
Beauharnois,V
Coteau-du-Lac,V
Pointe-des-Cascades,VL
Salaberry-de-Valleyfield, V
Saint-Étienne-de-Beauharnois, M
TNO aquatique de la MRC deBeauharnois-Salaberry,NO
Saint-Stanislas-de-Kostka, M
Beauharnois-Salaberry
(MRC)
Vaudreuil-Soulanges
(MRC)
20
30
30
530
338
201
338
132
Boulevard Gérard-Cadieux
Boulevard P
ie XII
Chem
in Saint-Dom
inique
Rang Sainte-Marie Est
Chemin du Fleuve
Chemin du
Canal O
uest
Chem
in Saint-Féréol
Chem
in du Golf
Chem
in Sainrt-Emm
anuel
Rang Sainte-Marie Ouest
Chem
inS
aint-Antoine
Saint-Timothéedam
l'Île-Juillet-2dam
Pointe-du-Buissondam
Les Cèdresdike
l'Île-Juillet-1dam
Les Cèdrespowerhouse
Les Cèdres
Saint-Timothée sector
Salaberry-de-Valleyfield
Pointe-des-Cascades
Coteau-du-Lac
Île de Salaberry
Canal de
Beauharnois
Rivière
ÎleBienville
Île desCascadesÎle De
Joybert
Île auxChats
ÎleJuillet
Barrage de Beauharnois
Îled'Aloigny
Saint-Charles
FleuveSaint-Laurent
Rivière desOutaouais
Le Petit
Canal
Cours d'eau Leboeuf-Léger
Rivière à la G
raisse
Saint-Grégoire
L'Ancien Canal
Canal
de S
oulan
ges
Canal de Soulanges
Ruisseau Chamberry
Ruisseau
A
74°0'
74°0'
74°4'
74°4'
74°8'
74°8'
73°56'
45°2
0'45
°18'
45°1
6'45
°14'
73°5
6'
45°20'45°18'
45°16'45°14'
Les Cèdres dam
Gravity dam
Spillway(decommissioned)
Inverted filter
Inverted filter Inverted filter
Sealing work
Slope stabilizationSlope stabilization
Île auxVaches
A
!!(
Zone 2
Île à l'Ail
Zone 1
!!(
!!(Zone 2
A
Les Cèdres
Saint-Timothée basin(winter low water)
Fleuve Saint-LaurentLes Cèdres headrace canal
île Saveuse
Les Cèdres dike
%
Zone 3
Les Cèdrespowerhouse
Pointe-du-Buissonbasin
120
kV 1
263-
1470
120
kV 1
434-
1435
(P)735 kV 7042
!!A
!!A
0 1 2 km
MTM, Zone 8, NAD83 (CSRS)
0002c_buc1_tet_014_projet_161018.mxd
Infrastructure
Hydropower generating station
Dam
Highway
Provincial highway
Secondary highway
Local road
30
132
338
BoundaryRegional countymunicipality (RCM)Municipality
Document for information purposes only. For any other use, please contact Géomatique, Hydro-Québec Équipement et services partagés.
0 75 150 m
MTM, Zone 8, NAD83 (CSRS)
Planned structure
Above water
Under water (not visible)
Direction of flow
Bike path!!(
A
!
Vaudreuil-Dorion,V Notre-Dame-de-l'Île-Perrot,
V
Saint-Clet,M
TNO aquatiquede la MRC de
Vaudreuil-Soulanges,NO
LesCèdres,M
Beauharnois,V
Coteau-du-Lac,V
Pointe-des-Cascades,VL
Salaberry-de-Valleyfield, V
Saint-Étienne-de-Beauharnois, M
TNO aquatique de la MRC deBeauharnois-Salaberry,NO
Saint-Stanislas-de-Kostka, M
Beauharnois-Salaberry
(MRC)
Vaudreuil-Soulanges
(MRC)
20
30
30
530
338
201
338
132
Boulevard Gérard-Cadieux
Boulevard P
ie XII
Chem
in Saint-Dom
inique
Rang Sainte-Marie Est
Chemin du Fleuve
Chemin du
Canal O
uest
Chem
in Saint-Féréol
Chem
in du Golf
Chem
in Sainrt-Emm
anuel
Rang Sainte-Marie Ouest
Chem
inS
aint-Antoine
Saint-Timothéedam
l'Île-Juillet-2dam
Pointe-du-Buissondam
Les Cèdresdike
l'Île-Juillet-1dam
Les Cèdrespowerhouse
Les Cèdres
Saint-Timothée sector
Salaberry-de-Valleyfield
Pointe-des-Cascades
Coteau-du-Lac
Île de Salaberry
Canal de
Beauharnois
Rivière
ÎleBienville
Île desCascadesÎle De
Joybert
Île auxChats
ÎleJuillet
Barrage de Beauharnois
Îled'Aloigny
Saint-Charles
FleuveSaint-Laurent
Rivière desOutaouais
Le Petit
Canal
Cours d'eau Leboeuf-Léger
Rivière à la G
raisse
Saint-Grégoire
L'Ancien Canal
Canal
de S
oulan
ges
Canal de Soulanges
Ruisseau Chamberry
Ruisseau
A
74°0'
74°0'
74°4'
74°4'
74°8'
74°8'
73°56'45
°20'
45°1
8'
45°1
6'45
°14'
73°5
6'
45°20'45°18'
45°16'45°14'
Les Cèdres dam
Gravity dam
Spillway(decommissioned)
Inverted filter
Inverted filter Inverted filter
Sealing work
Slope stabilizationSlope stabilization
Île auxVaches
A
!!(
Zone 2
Île à l'Ail
Zone 1
!!(
!!(Zone 2
A
Les Cèdres
Saint-Timothée basin(winter low water)
Fleuve Saint-LaurentLes Cèdres headrace canal
île Saveuse
Les Cèdres dike
%
Zone 3
Les Cèdrespowerhouse
Pointe-du-Buissonbasin
120
kV 1
263-
1470
120
kV 1
434-
1435
(P)735 kV 7042
!!A
!!A
0 1 2 km
MTM, Zone 8, NAD83 (CSRS)
0002c_buc1_tet_014_projet_161018.mxd
Infrastructure
Hydropower generating station
Dam
Highway
Provincial highway
Secondary highway
Local road
30
132
338
BoundaryRegional countymunicipality (RCM)Municipality
Document for information purposes only. For any other use, please contact Géomatique, Hydro-Québec Équipement et services partagés.
0 75 150 m
MTM, Zone 8, NAD83 (CSRS)
Planned structure
Above water
Under water (not visible)
Direction of flow
Bike path!!(
A
2016E1249-A
100 %
MAIN IMPACTS ANTICIPATED DURING THE WORKIncrease in trafficDuring the work, traffic will increase along route 132 at Salaberry-de-Valleyfield, between exit 9 of highway 530 and Saint-Timothée dam. About 20 trucks per hour will travel this road during the day during normal working hours to transport the required material.
Hydro-Québec will take all necessary measures to ensure public safety. For example, flaggers will be employed, in particular near École Marie-Rose.
Closure of portions of the bicycle network of the Îles-de-Saint-Timothée regional parkDuring certain work periods, Hydro-Québec will have to close part of the bike path on Saint-Timothée dam and on the dike. Hydro-Québec will communicate regularly with park managers to let them know when the bike path will be closed.
The work will not affect activities at Saint-Timothée beach.
Natural habitatsThe work will affect aquatic habitats at the foot of the dike. Measures will be taken to minimize habitat loss, for certain fish species in particular.
PUBLIC PARTICIPATIONIn cooperation with the host community, Hydro-Québec will implement a public participation process as part of the studies for the project. This will make it possible for the expectations and concerns expressed by the public and by key community stakeholders to be taken into account so the project can be adapted to local realities.
ENVIRONMENTAs this project is subject to section 31.1 of the Environment Quality Act, Hydro-Québec will file an environmental impact statement with the Ministère du Développement durable, de l’Environnement et de la Lutte contre les changements climatiques. A public hearing may be held by the Bureau d’audiences publiques sur l’environnement (BAPE).
TIME TABLE
Public information meetings Fall 2016 – Winter 2016-2017
Permitting Winter 2016-2017 – Summer 2018
Construction Fall 2018 – Spring 2020
FOR MORE INFORMATION
INFO-PROJECT Line 1 8 7 7 6 5 3-1 1 3 9JONATHAN PETIT Advisor – Community Relations – Richelieu Direction – Affaires régionales et collectivités 705, boul. Clairevue Ouest, 1er étage Saint-Bruno-de-Montarville (Québec) J3V 6B6