6
DISCUSSION ON WALT DISNEY ELEMENTARY SCHOOL MODERNIZATION PROJECT NOVEMBER 13, 2018

Discussion on Walt Disney Elementary School …...DISCUSSION ON WALT DISNEY ELEMENTARY SCHOOL MODERNIZATION PROJECT NOVEMBER 13, 2018 BUDGETS •Portable Budget -$3.3M 2015 •Overall

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Discussion on Walt Disney Elementary School …...DISCUSSION ON WALT DISNEY ELEMENTARY SCHOOL MODERNIZATION PROJECT NOVEMBER 13, 2018 BUDGETS •Portable Budget -$3.3M 2015 •Overall

DISCUSSION ON WALT DISNEY ELEMENTARY SCHOOL

MODERNIZATION PROJECTNOVEMBER 13, 2018

Page 2: Discussion on Walt Disney Elementary School …...DISCUSSION ON WALT DISNEY ELEMENTARY SCHOOL MODERNIZATION PROJECT NOVEMBER 13, 2018 BUDGETS •Portable Budget -$3.3M 2015 •Overall

BUDGETS

• Portable Budget - $3.3M• Overall Site Budget - $5.6M2015• Portable Budget - $6.4M• Overall Site Budget - $8.3M2018

The Disney portable budget has been increased by $3.1 since the initial 2015 estimate, even though we still have not received State Matching Funds (current estimate of State matching funds is approximately $1.1M)

Page 3: Discussion on Walt Disney Elementary School …...DISCUSSION ON WALT DISNEY ELEMENTARY SCHOOL MODERNIZATION PROJECT NOVEMBER 13, 2018 BUDGETS •Portable Budget -$3.3M 2015 •Overall

1. - INSTALLATION OF 2 PORTABLES 2. - MODERNIZATION OF 11 ROOMS 3. - MODERNIZATION OF RESTROOMS4. - HVAC REPLACEMENT5. - FIRE ALARM UPGRADE6. - BOGEN PUBLIC ADDRESS

7. - DOORS & HARDWARE8. - RELOCATE HANDBALL COURT9. - SPRINKLERS ALONG ORANGE GROVE10. -ASPHALT RESURFACING11. -HYDRO-SEED PLAYFIELD12. -1-1 DEVICES CHROMEBOOK

1

2

34-78

9

10

11

SCOPE

Page 4: Discussion on Walt Disney Elementary School …...DISCUSSION ON WALT DISNEY ELEMENTARY SCHOOL MODERNIZATION PROJECT NOVEMBER 13, 2018 BUDGETS •Portable Budget -$3.3M 2015 •Overall

PHASE I - COMPLETION AUGUST 1, 2019 PHASE II - COMPLETION SPRING, 2020PHASE III - COMPLETION AUGUST 1, 2020PHASE IV - COMPLETION JANUARY 1, 2021

DURATION

PHASE IPHASE I

PHASE II

PHASE III

PHASE IV

PHASE IV

PHASE III

PHASE III

PHASE III

Page 5: Discussion on Walt Disney Elementary School …...DISCUSSION ON WALT DISNEY ELEMENTARY SCHOOL MODERNIZATION PROJECT NOVEMBER 13, 2018 BUDGETS •Portable Budget -$3.3M 2015 •Overall

Disney Elementary – Measure S PROJECT ANALYSIS

Modernization

PROJECTED COST ‐ $6,360,341

SCOPE: DURATION:1.00 Installation of 2 portable classrooms with sinks. Phase I. Complete by Aug. 1 2019

Building Modernization (Rms. 19‐22)2.00 Modernization of eleven rooms (8, 15‐22, 24 & 25). Main Campus2.10 21st Century HVAC2.20 Teaching wall  Bogen2.30 Tackboard Fire Alarm2.40 Paint Lock Upgrades2.50 New blinds Chromebooks2.60 Flooring2.70 T‐bar ceiling Phase II. Complete by Spring 2020

2 portable classrooms with sinks.3.00 Modernization of building 8 toilet room.

Phase III. Complete by Aug. 1 20204.00 HVAC replacement Building Modernization (Rms. 15‐18, 24,25 & 8)5.00 Fire alarm upgrade Asphalt6.00 Bogen public address system

7.00 Doors and hardware

Phase IV. Complete Winter 20208.00 Relocate existing handball court Playfield & Sprinkler9.00 New sprinklers along Orange Grove Ave.

10.00 Asphalt resurfacing

11.00 Existing playfield hydro seed12.00 1‐1 Devices Chromebooks

Page 6: Discussion on Walt Disney Elementary School …...DISCUSSION ON WALT DISNEY ELEMENTARY SCHOOL MODERNIZATION PROJECT NOVEMBER 13, 2018 BUDGETS •Portable Budget -$3.3M 2015 •Overall

43

21

43

21

AB

DC

AB

DC

AB

DC

AB

DC

LEGEND

CONSTRUCTION KEYNOTES BUILDING AREA ANALYSIS

˜˜˜˜˜˜˜˜˜

˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜

˜˜˜˜˜˜˜˜˜˜˜

˜ ˜ ˜

˜ ˜˜˜˜˜˜˜˜˜

˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜

˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜

˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜˜˜˜˜˜˜˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜

˜

˜˜

PROPOSED SITE PLAN - OPTION 'E'

SAFE DISPERSAL ANALYSIS

GENERAL CONSTRUCTION NOTES

˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜ ˜

˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜˜

˜ ˜ ˜˜˜˜˜˜˜˜˜ ˜

PLUMBING FIXTURE ANALYSIS

˜˜˜˜˜˜˜˜

˜ ˜

DIS

NEY

ELE

MEN

TAR

Y SC

HO

OL

BUR

BAN

K U

NIF

IED

SC

HO

OL

DIS

TRIC

T

BUR

BAK,

CAL

IFO

RN

IA, 9

1506

1900

WES

T O

LIVE

AVE

NU

E

JOB

NO

.:

DRA

WN

BY:

CHE

CKE

D B

Y:N

O.

DA

TEBY

SHEET NO.

REV

ISIO

NBU

RBA

NK,

CAL

IFO

RN

IA 9

1506

1220

W. O

RAN

GE

GR

OVE

AVE

.

RENEWAL DATENOV. 30, 2019

C-33216

JORGE F . PR I ETO

LI C

ENSED ARCH I TECT

STATE OF CAL I FORN I A

DES

IGN

ED B

Y:

DA

TE:

1507

12

03/0

9/20

18SI

TE P

LAN

- O

PTIO

N 'E

' - (2

MO

DU

LAR

CLA

SSR

OO

MS)

AS1.0Modernization

AutoCAD SHX Text
N O P A R K I N G
AutoCAD SHX Text
RELOCATABLE CLASSROOM BUILDING
AutoCAD SHX Text
(E) EXISTING BUILDINGS
AutoCAD SHX Text
1
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
1
AutoCAD SHX Text
AS1.1
AutoCAD SHX Text
2
AutoCAD SHX Text
6B
AutoCAD SHX Text
AS1.2
AutoCAD SHX Text
RELOCATABLE CLASSROOM BUILDING - A# 66341, SERIAL NUMBERS 29972-73 AND 29974-75, A# 66341, SERIAL NUMBERS 29972-73 AND 29974-75, , SERIAL NUMBERS 29972-73 AND 29974-75, REFER TO MANUFACTURER'S DRAWINGS AND: (E) AC PAVING (E) TURF / LANDSCAPE, PROTECT. (E) 20' WIDE x 8' HI. FIRE ACCESS GATE (E) DRINKING FOUNTAIN TO RELOCATE AC PAVING TO FLUSH EXISTING, 2% MAX. SLOPE IN ALL DIRECTIONS, REFER TO: (E) STRIPPING TO REMAIN. (E) ACCESSIBLE CONCRETE RAMP WITH HANDRAILS. PROVIDE KNOX BOX (E) TREE WELL, TYP.
AutoCAD SHX Text
NORTH MARIPOSA STREET
AutoCAD SHX Text
ORANGE GROVE AVENUE
AutoCAD SHX Text
(E) FH
AutoCAD SHX Text
CLARK AVENUE
AutoCAD SHX Text
A# 104606 A# 106268 A# 104842
AutoCAD SHX Text
(E) "CR 6"
AutoCAD SHX Text
(E) LUNCH SHELTER
AutoCAD SHX Text
(E) "CR 2"
AutoCAD SHX Text
A# 11522 A# 63313 A# 104606 A# 104842 A# 106268
AutoCAD SHX Text
(E) "CR 1"
AutoCAD SHX Text
(E) "K 4"
AutoCAD SHX Text
(E) "K 5"
AutoCAD SHX Text
A# 20860 A# 104606
AutoCAD SHX Text
(E) "CREATIVE ARTS BLDG. "3"
AutoCAD SHX Text
(E) "CR 14"
AutoCAD SHX Text
(E) "CR 13"
AutoCAD SHX Text
(E) "CR 12"
AutoCAD SHX Text
(E) "CR 11"
AutoCAD SHX Text
(E) "ADMIN."
AutoCAD SHX Text
(E) "CR 10"
AutoCAD SHX Text
(E) "CR 9"
AutoCAD SHX Text
(E) "CR 8"
AutoCAD SHX Text
(E) "CR 7"
AutoCAD SHX Text
A# 11522 A# 63313 A# 104606 A# 104842 A# 106268
AutoCAD SHX Text
A# 6478 A# 63313 A# 104606 A# 104842 A# 106268
AutoCAD SHX Text
A# 4527 A# 63313 A# 104606 A# 104842 A# 106268
AutoCAD SHX Text
A# 4527 A# 63313 A# 104606 A# 104842 A# 106268
AutoCAD SHX Text
A# 4527 A# 63313 A# 104606 A# 104842 A# 106268
AutoCAD SHX Text
A# 6478 A# 63313 A# 104606 A# 104842 A# 106268
AutoCAD SHX Text
BLDG "4"
AutoCAD SHX Text
BLDG "3"
AutoCAD SHX Text
BLDG "1"
AutoCAD SHX Text
BLDG "A"
AutoCAD SHX Text
BLDG "2"
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
BUILDING CONSTRUCTION TYPE =
AutoCAD SHX Text
BUILDING OCCUPANCY =
AutoCAD SHX Text
VB
AutoCAD SHX Text
E
AutoCAD SHX Text
%%UBUILDINGS AREA:
AutoCAD SHX Text
PROPOSED RELOCATABLES = ( 24' x 40') =1,920 S.F.
AutoCAD SHX Text
TOTAL AREA = 2,400 S.F.
AutoCAD SHX Text
(E) FH
AutoCAD SHX Text
(E) FH
AutoCAD SHX Text
(E) FH
AutoCAD SHX Text
(E) "T"
AutoCAD SHX Text
A# 6478, A# 63313 A# 104606, A# 104842 A# 106268
AutoCAD SHX Text
B
AutoCAD SHX Text
G
AutoCAD SHX Text
5
AutoCAD SHX Text
A.C. PAVING, FLUSH TO EXISTING
AutoCAD SHX Text
6
AutoCAD SHX Text
2
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
3
AutoCAD SHX Text
(E) TURF / PLANTING AREA TO REMAIN
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
7
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
1
AutoCAD SHX Text
1" = 20'-0"
AutoCAD SHX Text
N
AutoCAD SHX Text
OCCUPANTS:
AutoCAD SHX Text
THE EXIT DISCHARGE SHALL PROVIDE A DIRECT AND UNOBSTRUCTED ACCESS TO PUBLIC WAY. (CBC SECT. 1027.5), OR SAFE DISPERSAL AREA SHALL BE PROVIDED AND LOCATED ON THE SAME LOT AT LEAST 50 FEET AWAY FROM ANY BUILDING. THE AREA SHALL BE OF A SIZE TO ACCOMMODATE AT LEAST 5 SQUARE FEET FOR EACH PERSON. (CBC SECT. 1027.5, CFC SECT. 503.5.2)
AutoCAD SHX Text
SAFE DISPERSAL AREA = 480 S.F., BASED ON 5 S.F. PER STUDENT
AutoCAD SHX Text
(960 / 20 = 48 X 2 CLASSROOMS) 96 OCCUPANTS
AutoCAD SHX Text
ALL UNDERGROUND UTILITY TRENCHING AND PATCHING SHALL BE VERIFIED WITH ALL TRADES AND INCLUDED IN THE CONTRACTOR'S BID REGARDLESS IF NOT SHOWN ON PLANS.PATCH TRENCHING TO MATCH EXISTING FINISH MATERIALS. FOR ADDITIONAL INFORMATION, REFER TO:
AutoCAD SHX Text
11.
AutoCAD SHX Text
8
AutoCAD SHX Text
AS1.6
AutoCAD SHX Text
9
AutoCAD SHX Text
AS1.6
AutoCAD SHX Text
GRAB BARS SHALL NOT ROTATE WITHIN THEIR FITTINGS. VERTICAL AND HORIZONTAL FORCE SHALL NOT EXCEED 250 POUNDS WHEN APPLIED AT ANY POINT ON THE GRAB BAR, FASTENER, MOUNTING DEVICE, OR SUPPORTING STRUCTURE.
AutoCAD SHX Text
12.
AutoCAD SHX Text
WHERE EXISTING PAINTED PLAYGROUND STRIPING IS REMOVED DUE TO CONSTRUCTION, REPAINT THE SURFACE W/ PLAYGROUND MARKINGS PER SCHOOL DISTRICT'S DIRECTION. MIN. TWO (2) COATS OF PAINT.
AutoCAD SHX Text
10.
AutoCAD SHX Text
ALL DIMENSIONS SHOWN ON THIS SHEET ARE EXISTING U.N.O. ALL DIMENSIONS ARE TO BE VERIFIED IN FIELD, PRIOR TO PROCEEDING.
AutoCAD SHX Text
FOR ADDITIONAL GENERAL NOTES, REFER TO SHEET T.2 AND SPECS.
AutoCAD SHX Text
PROVIDE DIRECTIONAL SIGNS TO CREATE AN EFFICIENT AND CONVENIENT PATH OF TRAVEL FOR PERSONS WITH DISABILITIES. BACKGROUND CONTRAST AND CHARACTER PROPORTION ARE CRITICAL.
AutoCAD SHX Text
1.
AutoCAD SHX Text
2.
AutoCAD SHX Text
3.
AutoCAD SHX Text
4.
AutoCAD SHX Text
ALL EXTERIOR GATES MAINTAIN ACCESSIBLE MEANS OF EGRESS IDENTIFIED WITH A TRIANGULAR SYMBOL ( ) ON THIS PLAN ARE ACCESSIBLE AND COMPLY WITH CBC 11B-401, INCLUDING: - 32" CLEAR OPENING - REQUIRED STRIKE EDGE CLEARANCE AT PULL SIDE OF GATE (24") - LEVEL LANDINGS (2% SLOPE MAX. ON BOTH SIDES) - ACCESSIBLE HARDWARE, CLOSER, KICK-PLATE
AutoCAD SHX Text
5.
AutoCAD SHX Text
THE P.O.T. IDENTIFIED IN THESE CONSTRUCTION DOCUMENTS IS COMPLIANT WITH THE CURRENT APPLICABLE CALIFORNIA BUILDING CODE ACCESSIBILITY PROVISIONS FOR PATH OF TRAVEL REQUIREMENTS FOR ALTERATIONS, ADDITIONS AND STRUCTURAL REPAIRS. AS PART OF THE DESIGN OF THIS PROJECT, THE POT WAS EXAMINED AND ANY ELEMENTS, COMPONENTS OR PORTIONS OF THE POT THAT WERE DETERMINED TO BE NONCOMPLIANT AND: 1) HAVE BEEN IDENTIFIED AND 2) THE CORRECTIVE WORK NECESSARY TO BRING THEM INTO COMPLIANCE HAS BEEN INCLUDED WITHIN THE SCOPE OF THIS PROJECT'S WORK THROUGH DETAILS, DRAWINGS AND SPECIFICATIONS INCORPORATED INTO THESE CONSTRUCTION DOCUMENTS. ANY NONCOMPLIANT ELEMENTS, COMPONENTS, OR PORTIONS OF THE POT THAT WILL NOT BE CORRECTED BY THIS PROJECT BASED ON VALUATION THRESHOLD LIMITATIONS OR A FINDING OF UNREASONABLE HARDSHIP ARE SO INDICATED IN THESE CONSTRUCTION DOCUMENTS. DURING CONSTRUCTION, IF POT ITEMS WITHIN THE SCOPE OF THE PROJECT REPRESENTED AS CODE COMPLIANT ARE FOUND TO BE NONCONFORMING BEYOND REASONABLE CONSTRUCTION TOLERANCES, THEY SHALL BE BROUGHT INTO COMPLIANCE WITH THE CBC AS A PART OF THIS PROJECT BY MEANS OF A CONSTRUCTION CHANGE DOCUMENT.
AutoCAD SHX Text
DESIGN PROFESSIONAL IN GENERAL RESPONSIBLE CHARGE STATEMENT
AutoCAD SHX Text
ALL GRATINGS ON DRAIN BOXES AT PATH OF TRAVEL (P.O.T.) SHALL HAVE A MAXIMUM SPACING OF 1/2" PERPENDICULAR TO P.O.T. OR DOMINANT PATH OF TRAVEL, OR SHALL BE REPLACED, PROVIDE MFR. CATALOG SHEETS FOR REVIEW.
AutoCAD SHX Text
ARCHITECT TO VERIFY THAT ALL BARRIERS IN THE PATH OF TRAVEL HAVE BEEN REMOVED OR WILL BE REMOVED UNDER THIS PROJECT, AND PATH OF TRAVEL COMPLIES WITH CBC CHAPTER 11B.
AutoCAD SHX Text
6.
AutoCAD SHX Text
7.
AutoCAD SHX Text
ALL (E) VEE GUTTERS THAT TRANSVERSE THE P.O.T. SHALL HAVE A MAX. 4.9% RUNNING SLOPE AND A MAX. 1.9% CROSS SLOPE.
AutoCAD SHX Text
8.
AutoCAD SHX Text
ACCESSIBLE PLAYGROUND EQUIPMENT TO COMPLY WITH FEDERAL GUIDELINES PER HTTP//:WWW.ACCESS-BOARD.GOV/PLAY/FINALRULE.HTM AND 2016 CBC 11B-240 AND 11-1008
AutoCAD SHX Text
9.
AutoCAD SHX Text
PATH OF TRAVEL (P.O.T.) AS VERIFIED BY ARCHITECT IS: * A COMMON BARRIER FREE ACCESSIBLE ROUTE AT LEAST 48" WIDE WITHOUT ANY ABRUPT VERTICAL CHANGES EXCEEDING 1/2". BEVELED AT 1:2 MAX. SLOPE, EXCEPT THAT LEVEL CHANGES DO NOT EXCEED 1/4" VERTICAL. * THE PATH SURFACE IS SLIP RESISTANT, STABLE, FIRM AND SMOOTH. * PASSING SPACES AT LEAST 60" x 60" ARE LOCATED NOT MORE THAN 200' APART. * CONTINUOUS GRADIENTS HAVE 60" LEVEL AREAS NOT MORE THAN 400' APART. CROSS SLOPE DOES NOT EXCEED 2%. * SLOPE IN THE DIRECTION OF TRAVEL IS LESS THAN 5%, UNLESS OTHERWISE INDICATED AS A RAMP. * MAINTAIN P.O.T. FREE OF OVERHANGING OBSTRUCTIONS TO 80" MIN., PROTRUDING OBJECTS GREATER THAN 4" PROJECTION FROM WALL OR EDGE AND 27" ABOVE FINISH GRADE.
AutoCAD SHX Text
(E) PANIC HARDWARE ON (E) ACCESSIBLE GATE(S)
AutoCAD SHX Text
(E) P.H.
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
(E) CHAIN-LINK FENCE / GATE
AutoCAD SHX Text
PANIC HARDWARE ON GATE(S)
AutoCAD SHX Text
P.H.
AutoCAD SHX Text
CONSTRUCTION KEYNOTES, REFER TO THIS SHEET
AutoCAD SHX Text
X
AutoCAD SHX Text
SAFE DISPERSAL AREA: REFER TO SAFE DISPERSAL ANALYSIS (50'-0" CLEAR OF NEAREST BUILDING)
AutoCAD SHX Text
MEN OR WOMEN RESTROOMS
AutoCAD SHX Text
BOYS OR GIRLS RESTROOMS
AutoCAD SHX Text
ALL GENDER RESTROOM
AutoCAD SHX Text
U
AutoCAD SHX Text
B / G
AutoCAD SHX Text
W / M
AutoCAD SHX Text
DENOTES ACCESSIBLE MEANS OF EGRESS BARRIER FREE PATH OF TRAVEL (P.O.T.), BOTH DIRECTIONS. REFER TO GENERAL CONSTRUCTION NOTE #6
AutoCAD SHX Text
ACCESSIBLE ENTRANCE AND/OR EXIT (SEE GENERAL NOTE #4).
AutoCAD SHX Text
CHAIN-LINK FENCE / GATE
AutoCAD SHX Text
STAFF ONLY ROOM
AutoCAD SHX Text
S
AutoCAD SHX Text
F.S.
AutoCAD SHX Text
100.98
AutoCAD SHX Text
PATH OF TRAVEL SPOT ELEVATIONS
AutoCAD SHX Text
DENOTES OUTLINE OF EXISTING BUILDING TO BE DEMOLISHED
AutoCAD SHX Text
(E) TURF / PLANTING AREA TO REMAIN
AutoCAD SHX Text
A# 03-115623
AutoCAD SHX Text
(E) PLAYGROUND
AutoCAD SHX Text
PLAY FIELD (10,172 S.F.)
AutoCAD SHX Text
BURBANK UNIFIED SCHOOL DISTRICT
AutoCAD SHX Text
ONE (4) C.R. RELOCATABLE BUILDING FOR WALT DISNEY ELEMENTARY SCHOOL
AutoCAD SHX Text
1220 W. ORANGE GROVE AVE., BURBANK, CA 91506
AutoCAD SHX Text
NO NEW FIXTURES ADDED
AutoCAD SHX Text
SITE PLAN OPTION E:
AutoCAD SHX Text
(1) MODULAR CLASSROOM
AutoCAD SHX Text
M
AutoCAD SHX Text
W
AutoCAD SHX Text
G
AutoCAD SHX Text
B
AutoCAD SHX Text
(E) "CR 22"
AutoCAD SHX Text
(E) "CR 21"
AutoCAD SHX Text
(E) "CR 20"
AutoCAD SHX Text
(E) "CR 19"
AutoCAD SHX Text
BLDG "L"
AutoCAD SHX Text
A#104606 A#106268 A#104842
AutoCAD SHX Text
A# 104606 A# 106268 A# 104842
AutoCAD SHX Text
(E) "LIBRARY 15"
AutoCAD SHX Text
(E) "CR 18"
AutoCAD SHX Text
(E) "CR 17"
AutoCAD SHX Text
(E) "CR 16"
AutoCAD SHX Text
BLDG "X"
AutoCAD SHX Text
(8)PROPOSED CLASSROOMSPROPOSED CLASSROOMS
AutoCAD SHX Text
TOILET ROOMS = ( 12' x 40') = 480 S.F.
AutoCAD SHX Text
2
AutoCAD SHX Text
(1) MODULAR CLASSROOM
AutoCAD SHX Text
1
AutoCAD SHX Text
A4.1
AutoCAD SHX Text
1
AutoCAD SHX Text
A4.1
AutoCAD SHX Text
2
AutoCAD SHX Text
BY ZIEMBA + PRIETO ARCHITECTS ALL COMMON LAW COPYRIGHT AND OTHER PROPERTY RIGHTS RESERVED. THIS DOCUMENT IS AN ORIGINAL AND UNPUBLISHED WORK PRODUCT OF ZIEMBA + PRIETO ARCHITECTS THIS WORK SHALL NOT BE DUPLICATED, COPIED, DISCLOSED, USED, IN CONNECTION WITH ANY WORK OR PROJECT OTHER THAN THE SPECIFIC PRODUCT FOR WHICH THEY HAVE BEEN PREPARED OR ASSIGNED TO ANY THIRD PARTY WITHOUT FIRST OBTAINING THE EXPRESS WRITTEN CONSENT OF ZIEMBA + PRIETO ARCHITECTS VISUAL CONTACT WITH THIS DOCUMENT SHALL CONSTITUTE CONCLUSIVE EVIDENCE OF ACCEPTANCE OF THESE RESTRICTIONS. CONTRACTORS SHALL VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS AND CONDITIONS ON THE JOB. UPON DISCOVERY OF ANY VARIATION, DISCREPANCY, OR OMISSION, NOTIFY ZIEMBA + PRIETO ARCHITECTS AND PRIOR TO PROCEEDING WITH RELATED WORK OBTAIN WRITTEN RESOLUTION FROM ZIEMBA + PRIETO ARCHITECTS.
AutoCAD SHX Text
C
AutoCAD SHX Text
APP.
AutoCAD SHX Text
IDENTIFICATION STAMP
AutoCAD SHX Text
DIVISION OF THE STATE ARCHITECT
AutoCAD SHX Text
DATE
AutoCAD SHX Text
AC
AutoCAD SHX Text
FLS
AutoCAD SHX Text
SS
AutoCAD SHX Text
FILE