21
1 Last updated on 22 August 2015 DISTRIBUTED MULTINODAL ATFM THAILAND NODE WEEKLY OPERATIONAL TRIAL PLAN (STAGE 1) Overview 1. Conduct test according to weekly Trial Plan 2. Generate weekly report on: Test results Challenges Hazards (if any) and follow up actions 3. Weekly endoftest review with all AFTMUs on Fridays over the existing core group teleconference arrangements Safety Measure for the Operational Trial Should any safety concern be raised by stakeholders during the trial, respective Node Leaders shall be responsible to initiate and coordinate the suspension of the test and subsequently, coordinate to resume.

DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

  • Upload
    vandang

  • View
    235

  • Download
    2

Embed Size (px)

Citation preview

Page 1: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

1  Last  updated  on  22  August  2015  

DISTRIBUTED  MULTI-­NODAL  ATFM  

THAILAND  NODE  

WEEKLY  OPERATIONAL  TRIAL  PLAN  (STAGE  1)  

 

Overview  

1.   Conduct  test  according  to  weekly  Trial  Plan    

2.   Generate  weekly  report  on:  •   Test  results  •   Challenges  •   Hazards  (if  any)  and  follow  up  actions    

3.   Weekly  end-­of-­test  review  with  all  AFTMUs  on  Fridays  over  the  existing  core  group  teleconference  arrangements  

 

Safety  Measure  for  the  Operational  Trial  

Should  any  safety  concern  be  raised  by  stakeholders  during  the  trial,  respective  Node  Leaders  shall  be  responsible  to  initiate  and  coordinate  the  suspension  of  the  test  and  subsequently,  coordinate  to  resume.  

 

   

Page 2: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

2  Last  updated  on  22  August  2015  

Week  1  (29  June  15  –  3  Jul  15)  

Objectives      

Testing  of  communications  and  conferencing  framework  

 

Pre-­requisite    

Directory  of  contact  information  for  ATFM  Nodes  and  ATFM  Node  Members  

Directory  shall  include  the  following  information:  

1.   Organization  name  2.   Point  of  contact  name  3.   ATFM  Node  4.   Role  5.   Email  address  6.   Mobile  phone  number  7.   Office  phone  number  8.   AFTN  address  9.   Facsimile  Number  

 

Test  Message  Template  

Applies  to:   Email      Prefix:     ATFM  OPS  TRIAL  -­  TEST  TEST  TEST  –  BANGKOK  ATFMU  Message:   Initiation  

ATFM  Measures  will  be  initiated  for  arrivals  into  VTBS  on  date  from  start  time  to  end  time  due  to  constraints.    Refer  to  the  following  website:  URL  for  Calculated  Takeoff  Time  (CTOT)  information.    Revision  Revision  on  the  ATFM  Measures  for  arrivals  into  VTBS  on  date  from  start  time  to  end  time.  Refer  to  the  following  website:  URL  for  revised  CTOT  information.    Cancellation  ATFM  Measure  for  arrivals  into  VTBS  on  date  from  start  time  to  end  time  has  been  cancelled.        

Page 3: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

3  Last  updated  on  22  August  2015  

CDM  Web  Conference  Request  Click  on  the  following  link:  URL  to  join  the  CDM  Web  Conference  at  date  and  time.    This  is  a  test  message  for  the  ATFM  Operational  Trial.      Action  required:  •   Reply  the  email  to  acknowledge  the  receipt  of  this  message  •   Join  the  CDM  Web  Conference  at  the  indicated  date  and  time  

 

Test  Item:   Email    

Send  messages  to  all  stakeholders  (level  2  and  3)  on  ATFM  Measures  (initiation/revision/cancellation)  

 

Test  Item:     Facsimile  

Fax  test  message  to  members  within  Local  Nodes  and  between  Node  Leaders  

 

Test  Item:   Telephone  Call  

Line  test  to  members  within  Local  Nodes  and  between  Node  Leaders  

 

Test  Item:   Web  Conference  (GoToMeeting)  

1.   Conduct  web-­based  voice  conference  meeting  for:  a.   Local  Node  members  b.   Other  ATFMUs  

2.   Audio  and  video  test  3.   Desktop  sharing  test  4.   Test  on  the  additional  features  provided  by  the  Web  Conference  provider  

(Optional)    

Test  Item:   LINE  /  WhatsApp  Group  (Project  POCs)  

1.   Create  LINE  /  WhatsApp  Group  for:  a.   Local  Node  members    

2.   Send  test  messages  to  the  respective  LINE  /  WhatsApp  Groups  

   

Page 4: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

4  Last  updated  on  22  August  2015  

Test  Timetable  

Time  (UTC)   Item   Action  By  

0100  -­  0200  

Send  test  message  through  Email  to:  •   Local  Node  –  AUs,  AOT  •   Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

Bangkok  ATFMU    

0200  -­  0300  Send  test  message  through  Fax  to:  •   Local  Node  –  AUs,  AOT  •   Other  ATFMUs  

Bangkok  ATFMU  

0200  -­  0430   Reply  email  to  acknowledge  the  receipt  of  test  message   All  email  Recipients  

0530  -­  0600  

Telephone  call  test  to:  •   Local  Node  –  AUs  ,  AOT  •   Other  Nodes  –  ATFMUs    

Bangkok  ATFMU  

Acknowledgment  of  Fax  test  to  Bangkok  ATFMU  

AUs,  AOT  Other  Nodes  –  ATFMUs  

0620  -­  0640  Initiate  web-­based  voice  conferencing  within  Local  Node  –  AUs,  AOT   Bangkok  ATFMU  

Join  web-­based  voice  conference   Local  Node  –  AUs  ,  AOT  

0640  -­  0700  Conducting  of  web-­based  voice  conferencing  between  other  ATFMUs   Bangkok  ATFMU  

Join  web-­based  voice  conference   Other  ATFMUs  

0730  -­  0800  

Create  group  and  send  message  on  LINE  /  WhatsApp  for  Project  POCs:  •   Local  Node  members    •   Between  all  Node  Leaders  

Project  POCs  in  Bangkok  Node  –  ATFMUs/AUs/AO  

 

   

Page 5: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

5  Last  updated  on  22  August  2015  

Week  2  (06  Jul  15  –  10  Jul  15)    Objectives  

1.   Familiarization  of  the  web-­portal  log-­in  process  and  web  portal  information  2.   Viewing  of  CTOT  information  in  web  portal  

Pre-­requisite  

1.   Awareness  Document  with  annotated  PowerPoint  screen  captures  containing  log-­in  instructions  and  information  on  the  utilization  of  the  web-­portal  shall  be  made  available  to  all  stakeholders.  

2.   ATFMU  to  provide  log-­in  information  (User  ID  and  password)  to  all  stakeholders.  3.   Awareness  Document  shall  include  essential  functions  and  information  that  is  of  

relevance  to  respective  stakeholders.  

 Test  Timetable  

Time  (UTC)   Items   Action  By  

0100  -­  0200   Implement  ATFM  Measure  using  ATFM  system  to  generate  CTOT   Bangkok  ATFMU  

0200  -­  0300   Access  web  portal  e-­mail  notification  from  Bangkok  AFTMU’s  ATFM  system  

Local  Node  –  AUs,  AOT  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0300  -­  0400   Inform  Bangkok  ATFMU  of  log-­in  issues  via  email  

Local  Node  –  AUs,  AOT  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0500  -­  0700  

Familiarize  with  web  portal  information  with  reference  the  Awareness  Package  (e.g.  Selecting  of  Airline  or  Aerodromes  to  view,  sorting  of  information,  etc.)  Access  CTOT  information  

Local  Node  –  AUs,  AOT  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0700  -­  0900   Inform  Bangkok  ATFMU  of  any  other  issues  pertaining  to  the  web  portal  via  email  

Local  Node  –  AUs,  AOT  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

   

 

   

Page 6: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

6  Last  updated  on  22  August  2015  

Week  3  (13  Jul  15  –  17  Jul  15)    

Objectives    Implementation  of  Flight-­plan  (FPL)  submission  requirement  and  ICAO  Message  Handling    

Pre-­requisite    Aeronautical  Information  Circular  (AIC)  pertaining  to  the  operational  trial  shall  be  published  prior  to  the  trial.  

 Test  Timetable  

Day   Items   Actions  By  

Day  1  -­  4    

Submission  of  FPL  3  hours  prior  to  EOBT  AUs  Sending  of  Change/Delay/Cancel  (CHG/DLA/CNL)  

messages  

Ensure  ATD  and  ATA  are  captured   ATC  Units  (Tower)  /  ATFMUs  

Receipt  of  FPL  3  hours  prior  to  EOBT   Departure  and  Arrival  ATFMUs  Change/Delay/Cancel  (CHG/DLA/CNL)  messages  

Receipt  of  ATD  and  ATA  messages  Monitor  observance  of:  

•   Flight  plan  submission  •   Change/Delay/Cancel  (CHG/DLA/CNL)  messages  

•   ATD  and  ATA  

Bangkok  ATFMU  

Day  5    

Compile  test  report  for  the  week  and  inform  AUs  through  their  respective  ATFMU   Bangkok  ATFMU  

 

 

   

Page 7: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

7  Last  updated  on  22  August  2015  

Week  4  (20  Jul  15  –  24  Jul  15)    Objectives  

Monitor  effectiveness  of  demand  prediction    Pre-­requisite    Aeronautical  Information  Circular  (AIC)  or  Notice  to  Airmen  (NOTAM)  pertaining  to  the  operational  trial  shall  be  published  prior  to  the  trial.  

 Test  Timetable  

Day   Items   Actions  By  

Day  1  -­  4    

Submission  of  FPL  3  hours  prior  to  EOBT  AUs  Sending  of  Change/Delay/Cancel  (CHG/DLA/CNL)  

messages  

Ensure  ATD  and  ATA  are  captured   ATC  (Tower)  /  ATFMUs  

Receipt  of  FPL  3  hours  prior  to  EOBT  Departure  and  Arrival  ATFMUs  Change/Delay/Cancel  (CHG/DLA/CNL)  messages  

Receipt  of  ATD  and  ATA  messages  Monitor  observance  of:  

•   Flight  plan  submission  •   Change/Delay/Cancel  (CHG/DLA/CNL)  messages  

•   ATD  and  ATA   Bangkok  ATFMU  

Compare  the  number  of  predicted  arrivals  by  the  ATFM  tool  against  the  actual  arrival  data  in  the  ATM  system  between  selected  timeframes  

Day  5    

Compile  test  report  for  the  week  and  inform  AUs  through  their  respective  ATFMUs   Bangkok  ATFMU  

 

 

 

   

Page 8: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

8  Last  updated  on  22  August  2015  

Week  5  (27  Jul  15  –  31  Jul  15)  -­  Operational  Trial  Mid-­Term  review  

Objectives  

1.   Review  all  test  results    2.   Re-­testing  of  Trial  Items  (If  required)  3.   CTOT  Delivery  Test  via  AFTN  

Pre-­requisite  :  CTOT  Delivery  Test  via  AFTN  

1.   Directory  of  contact  information  for  ATFM  Nodes  and  ATFM  Node  Members  with  AFTN  address  for  receiving  CTOT  

2.   Indication  from  ATFM  Node  Members  whether  to  participate  in  CTOT  Delivery  via  AFTN  based  on  EUROCONTROL  format  (ADEXP  Slot  Allocation  Message)  

Test  AFTN  Message  Template  

Message:   Slot  Allocation  Message  (SAM)  GG <AFTN address from Contact List e.g. WMKKZFZX> 200353 VTBBZDZX -TITLE SAM -ARCID <ICAO Call Sign e.g. THA416> -ADEP <ICAO Location Designator e.g. WMKK> -EOBD <Date in yymmdd format e.g. 150721 for 21 Jul 2015> -EOBT <UTC Time in hhmm format e.g. 0520 for 0520UTC> -ADES <ICAO Location Designator e.g. VTBS> -CTOT <UTC Time in hhmm format e.g. 0535 for 0535UTC> -REGUL VTBS20150727M -COMMENT <Free Text comment> -TAXITIME <Taxi Time in hhmm format e.g. 0015 for 15 minutes> -REGCAUSE WA 89  

Test  Timetable  

Time  (UTC)   Items   Action  By  

0100  

Send  e-­mail  to  Operational  Point  of  Contacts  to  inform  of  CTOT  delivery  test  without  affecting  actual  flight  operations  using  e-­mail  template  from  Week  2  

Bangkok  ATFMU  

0100  -­  0200   Implement  ATFM  Measure  using  ATFM  system  to  generate  CTOT   Bangkok  ATFMU  

0200  -­  0300   Receive  AFTN  message  containing  CTOT  Local  Node  –  AUs,  AOT  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0300  -­  0400  Inform  Bangkok  ATFMU  of  any  issues  receiving  CTOT  through  AFTN  message  as  well  as  any  other  issues  via  E-­Mail  

Local  Node  –  AUs,  AOT  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

   

Page 9: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

9  Last  updated  on  22  August  2015  

Week  6  (3  Aug  15  –  7  Aug  15)  

Objectives  

1.   Determine  Airport  Acceptance  Rate  (AAR)  2.   Capacity  adjustment  based  on  Stakeholders  Input  

Pre-­requisite  

ATFM  Daily  Plan  (ADP)  Template  to  be  confirmed  prior  to  the  operational  trial  

ATFM  Daily  Plan   THAILAND  DATE  and  TIME  of  ISSUE   1  JULY  15,  0100UTC  STATUS   NEW  /  REVISION  

           CAPACITY  and  CONSTRAINTS  

Location   APPLICABLE  PERIOD  (UTC)   AAR   CONSTRAINT  /  REMARK  

VTBS   1  JUL  15   0500   0700   26   Thunderstorm  

VTBS   1  JUL  15   0700   0900   28   Runway  Maintenance  

 VTSP   1  JUL  15   0800   1000   8   Thunderstorm  

   

       ATFM  MEASURES  Location   APPLICABLE  PERIOD  (UTC)   MEASURE  /  REMARK  VTBS   1  JUL  15   0500   0900   CTOT  DEST  VTBS    VTSP   1  JUL  15   0800    1000   CTOT  DEST  VTSP                    

   

       POSSIBLE/DEVELOPING  ISSUES  Location   APPLICABLE  PERIOD  (UTC)   MEASURE  /  REMARK  VTBS   1  JUL  15   0700   UFN   CTOT  DEST  VTBS  VTSP     1  JUL  15   1000   UFN   CTOT  DEST  VTSP                

   

            Other  Information  

     

   

Page 10: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

10  Last  updated  on  22  August  2015  

Test  Timetable  

Day  1  -­  4:     Test  Day  5:     Review  (Local  and  Other  ATFMUs)  

ATFMU  shall  determine  AAR  based  on  inputs  from  local  stakeholders.  

Time  (UTC)   Items   Action  by    

0000  -­  0130  Assess  the  existing  information  on  operational  conditions,  airspace  restrictions  and  meteorological  conditions  to  determine  AAR  

Bangkok  ATFMU  Thailand  ATC  Units  

0130  -­  0330  

Generate  ADP  and  email  stakeholders:  •   Thailand  Node  –  AUs  /  AOT  /  MET  /  ATC  Units  Indicate  time  and  attach  web  link  for  web  conference  in  the  email  

Bangkok  ATFMU  Thailand  Node  –  AUs  /  AOT  /  MET  /  ATC  Units  

0330  -­  0430  

Conduct  Local  Node  web  conference  with  local  node  members  to  review  potential  factors  affecting  AAR  

Bangkok  ATFMU  

Participate  in  the  web  conference  for  CDM     Thailand  ATC  Units  /  AO  /  AUs  /  MET  

Provide  information  airport  capacity  (gate  constraints),  if  any  

AOT  (Suvarnabhumi  &  Phuket)  

Provide  information  on  operation  constraints  (e.g.  Pilot  strikes,  grounded  fleet,  etc.),  if  any   Thailand  AUs  

Provide  information  on  MET  conditions  (e.g.  TAF,  SIGMET,  AD,  etc.),  if  any   Thailand  MET  

0430  -­  0500   Adjust  AAR  based  on  CDM  processes   Bangkok  ATFMU        

Page 11: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

11  Last  updated  on  22  August  2015  

Week  7  (10  Aug  15  –  14  Aug  15)    

Objectives  

1.   Generate,  transmit  and  receive  ADPs  and  revision  in  ADPs  2.   Conduct  daily  and  ad-­hoc  web-­based  video  conference  between  Internal  and  

External  stakeholders  

Actions  required  

1.   Local  Stakeholders  to  participate  in  the  scheduled  web-­based  video  conference  on  a  daily  basis  

2.   Send  email  notification  for  the  conduct  of  ad-­hoc  cross  border  web  based  video  conference  between  all  regional  ATFMUs    

Test  Timetable  

Time  (UTC)   Items   Action  by    

1230  -­  1400  (9  Aug  15)  

Assess  the  existing  information  on  operational  constraints,  airspace  restrictions  and  meteorological  conditions  to  determine  AAR  

Bangkok  ATFMU  Thailand  ATC  Units  

1400  -­  1500  (9  Aug  15)  

Generate  ADP  and  email  stakeholders  •   Thailand  Node  –  AUs  /  AO  /  MET  /  ATC  Units  •   Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

Indicate  time  and  attach  web  link  for  web  conference  in  the  email  

Bangkok  ATFMU  Thailand  Node  –  AUs  /  AO  /  MET  /  ATC  Units  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0200  -­  0230  

Conduct  Local  Node  web  conference  with  AUs,  AOs  and  MET  to  review  potential  factors  affecting  AAR  

Bangkok  ATFMU  

Participate  in  the  web  conference  for  CDM   Thailand  ATC  Units  /  AO  /  AUs  /  MET  

Provide  information  airport  capacity  (gate  constraints),  if  any  

AOT  (Suvarnabhumi  &  Phuket)  

Provide  information  on  operation  constraints  (e.g.  Pilot  strikes,  grounded  fleet,  etc.),  if  any   Thailand  AUs  

Provide  information  on  meteorological  conditions  (TAF,  SIGMET,  AD,  etc.),  if  any   Thailand  MET  

0230  -­  0300   Adjust  AAR  based  on  CDM  processes   Bangkok  ATFMU  

Page 12: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

12  Last  updated  on  22  August  2015  

Time  (UTC)   Items   Action  by    

0300  -­  0330  

Revise  ADP  to  all  stakeholders  via  email.  Email  shall  include  scheduled  time  of  web-­based  video  conference  to:  Thailand  Node  –  AUs  /  AO  /  MET  /  ATC  Units  Other  ATFMUs  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

Bangkok  ATFMU  

0330  -­  0400   Conduct  External  cross-­border  web-­based  video  conference  Bangkok  ATFMU  Other  ATFMUs  

 

   

Page 13: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

13  Last  updated  on  22  August  2015  

Week  8  (17  Aug  15  –  21  Aug  15)    Objectives  

1.   Usage  of  ATFM  Tool  to  perform  Demand-­Capacity  Balancing  and  Modelling  2.   Transmit  and  receive  CTOT  

Actions  Required  

Bangkok  ATFMU  

1.   Demand-­Capacity  modelling  2.   Put  in  place  a  ATFM  Measure  to  generate  CTOTs  3.   Alert  all  stakeholders  (level  2  and  3)  through  email  on  ATFM  Measure  and  refer  to  

web-­portal  for  CTOT  information.  

   

Page 14: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

14  Last  updated  on  22  August  2015  

Test  Scenario  

Reduced  Capacity  at  Suvarnabhumi  Airport  (VTBS)  

This  test  aims  at  demonstrating  the  dissemination  of  CTOT  information  through  web-­portal  by  simulating  an  operational  scenario  of  “Reduced  Capacity  at  Suvarnabhumi  Airport  (VTBS)”  

At  0000  UTC,  Thailand  MET  called  Bangkok  ATFMU  to  inform  of  large  weather  cell  forecasted  overhead  VTBS  at  around  0500  UTC.  The  weather  was  estimated  to  last  for  about  2  hours  till  0700  UTC.  Nominal  AAR  for  VTBS  is  34  arrivals  an  hour.  Due  to  this  weather  condition,  ATFMU  reduce  the  AAR  for  the  period  of  0500  –  0700  UTC  to  24,  and  subsequently  from  0700  UTC  onward,  adjust  the  AAR  gradually  back  to  34.  Based  on  the  demand-­capacity  modelling  done,  the  ATFMU  concluded  that  an  ATFM  Measure  needs  to  be  in  effect  between  0500UTC  –  0900UTC.  

Web  conferences  were  conducted  with  internal  Node  members  and  other  ATFMUs  for  Collaborative  Decision  Making  (CDM).  Thereafter,  ATFMU  runs  an  ATFM  Measure  for  all  arrivals  into  VTBS  between  0500UTC  to  0900UTC.  Email  notifications  were  sent  to  all  stakeholders  to  inform  them  of  the  implementation  of  the  ATFM  Measure  and  dissemination  of  CTOT  information  through  web  portal.  

Reduced  Capacity  at  Phuket  International  Airport  (VTSP)  

This  test  aims  at  demonstrating  the  dissemination  of  CTOT  information  through  web-­portal  by  simulating  an  operational  scenario  of  “Reduced  Capacity  at  Phuket  International  Airport  (VTSP)”  

At  0600  UTC,  Thailand  MET  called  Bangkok  ATFMU  to  inform  of  large  weather  cell  forecasted  overhead  VTSP  at  around  1000  UTC.  The  weather  was  estimated  to  last  for  about  2  hours  till  1200  UTC.  Nominal  AAR  for  VTSP  is  10  arrivals  an  hour.  Due  to  this  weather  condition,  ATFMU  reduce  the  AAR  for  the  period  of  1000  –  1200  UTC  to  8,  and  subsequently  from  1200  UTC  onward,  adjust  the  AAR  gradually  back  to  10.  Based  on  the  demand-­capacity  modelling  done,  the  ATFMU  concluded  that  an  ATFM  Measure  needs  to  be  in  effect  between  1000UTC  –  1400UTC.  

Web  conferences  were  conducted  with  internal  Node  members  and  other  ATFMUs  for  Collaborative  Decision  Making  (CDM).  Thereafter,  ATFMU  runs  an  ATFM  Measure  for  all  arrivals  into  VTSP  between  1000UTC  to  1400UTC.  Email  notifications  were  sent  to  all  stakeholders  to  inform  them  of  the  implementation  of  the  ATFM  Measure  and  dissemination  of  CTOT  information  through  web  portal.  

   

Page 15: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

15  Last  updated  on  22  August  2015  

Test  Timetable  

Time  (UTC)   Items   Action  by    

0000  Thailand  MET  informed  of  a  high  potential  of  large  weather  cell  overhead  VTBS  at  around  0500  UTC  

Thailand  MET  Bangkok  ATFMU  

0000  -­  0015  Assess  the  existing  information  on  operational  constraints  and  meteorological  conditions  to  determine  AAR  

Bangkok  ATFMU  VTBS  APP/TWR  

0015  -­  0025  Model  ATFM  Measures  based  on  AAR  and  known  parameters  (time,  scope  and  range)  based  on  Thailand  MET  update  

Bangkok  ATFMU  

0025  -­  0040  

Generate  ADP  (indicating  potential  ATFM  Measures)  and  email  stakeholders:  •   Local  Node  –  AUs  /  AO  /  MET  /  ATC  Units  •   Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

Indicate  time  and  attach  web  link  for  web  conference  in  the  email  

Bangkok  ATFMU  

0040  -­  0100   All  stakeholders  to  access  ADP  through  email  and  note  the  indicated  time  for  web  conference  

Thailand  Node  –  AUs  /  AOT  /  MET  /  ATC  Units  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0100  -­  0120  

Conduct  Local  Node  web-­based  video  conference  with  local  node  members  to  review  potential  factors  affecting  AAR  and  inform  of  potential  ATFM  Measures  (0500-­0900  UTC)  

Bangkok  ATFMU  

Participate  in  the  web-­based  voice  conference  for  CDM  

Thailand  ATC  Units  /  AOT  /  AUs  /  MET  

Provide  information  airport  capacity  (e.g.  gate  constraints),  if  any  

AOT  (Suvarnabhumi  &  Phuket)  

Provide  information  on  operation  constraints  (e.g.  Pilot  strikes,  grounded  fleet,  etc.),  if  any   Thailand  AUs  

Provide  information  on  meteorological  conditions  (TAF,  SIGMET,  AD,  etc.)   Thailand  MET  

0120  -­  0130   Adjust  AAR  based  on  CDM  processes  and  review  ATFM  Measures  parameters   Bangkok  ATFMU  

0130  -­  0145  

Revise  ADP  to  all  stakeholders  via  email  Email  shall  include  scheduled  time  of  web  conference  to:  Thailand  Node  –  AUs  /  AO  /  ATC  Units  Other  ATFMUs  

Bangkok  ATFMU  

Page 16: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

16  Last  updated  on  22  August  2015  

Time  (UTC)   Items   Action  by    

0145  -­  0205  Conduct  cross-­border  web  conference  with  other  ATFMUs  to  provide  information  on  constraints  and  inform  of  ATFM  Measures  (0500-­0900  UTC)  

Bangkok  ATFMU  Other  ATFMUs  

0205  -­0220  Review  parameters  and  modelled  ATFM  Measure  Implement  ATFM  Measure  and  generate  CTOTs  

Bangkok  ATFMU  

0220  -­  0240  

Email  alert  to  stakeholders  of  ATFM  Measures,  constraints  and  publish  of  CTOT  on  web  portal  •   Local  Node  –  AUs  /  AO  /  ATC  Units  •   Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

Bangkok  ATFMU  

0240  -­  0600   Access  web  portal  to  view  CTOT  information  

Local  Node  –  AUs  /  AO  /  ATC  Units  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0240  -­  0600   Inform  respective  ATFMUs  on  successful  access  of  web-­portal  to  retrieve  CTOT  information  

Local  Node  –  AUs  /  AO  /  ATC  Units  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0240  -­  0700   Collate  test  results  within  their  respective  nodes  and  inform  Bangkok  ATFMU  via  email   Other  ATFMUs  

0600  Thailand  MET  informed  of  a  high  potential  of  large  weather  cell  overhead  VTSP  at  around  1000  UTC  

Thailand  MET  Bangkok  ATFMU  

0600  -­  0615  Assess  the  existing  information  on  operational  constraints  and  meteorological  conditions  to  determine  AAR  

Bangkok  ATFMU  VTSP  APP/TWR  

0615  -­  0625  Model  ATFM  Measures  based  on  AAR  and  known  parameters  (time,  scope  and  range)  based  on  Thailand  MET  update  

Bangkok  ATFMU  

0625  -­  0640  

Generate  ADP  (indicating  potential  ATFM  Measures)  and  email  stakeholders:  •   Local  Node  –  AUs  /  AO  /  MET  /  ATC  Units  •   Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

Indicate  time  and  attach  web  link  for  web  conference  in  the  email  

Bangkok  ATFMU  

0640  -­  0700   All  stakeholders  to  access  ADP  through  email  and  note  the  indicated  time  for  web  conference  

Thailand  Node  –  AUs  /  AOT  /  MET  /  ATC  Units  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

Page 17: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

17  Last  updated  on  22  August  2015  

Time  (UTC)   Items   Action  by    

0700  -­  0720  

Conduct  Local  Node  web-­based  video  conference  with  local  node  members  to  review  potential  factors  affecting  AAR  and  inform  of  potential  ATFM  Measures  (1000-­1200  UTC)  

Bangkok  ATFMU  

Participate  in  the  web-­based  voice  conference  for  CDM  

Thailand  ATC  Units  /  AOT  /  AUs  /  MET  

Provide  information  airport  capacity  (e.g.  gate  constraints),  if  any  

AOT  (Suvarnabhumi  &  Phuket)  

Provide  information  on  operation  constraints  (e.g.  Pilot  strikes,  grounded  fleet,  etc.),  if  any   Thailand  AUs  

Provide  information  on  meteorological  conditions  (TAF,  SIGMET,  AD,  etc.)   Thailand  MET  

0720  -­  0730   Adjust  AAR  based  on  CDM  processes  and  review  ATFM  Measures  parameters   Bangkok  ATFMU  

0730  -­  0745  

Revise  ADP  to  all  stakeholders  via  email  Email  shall  include  scheduled  time  of  web  conference  to:  Thailand  Node  –  AUs  /  AO  /  ATC  Units  Other  ATFMUs  

Bangkok  ATFMU  

0745  -­  0805  Conduct  cross-­border  web  conference  with  other  ATFMUs  to  provide  information  on  constraints  and  inform  of  ATFM  Measures  (1000-­1400  UTC)  

Bangkok  ATFMU  Other  ATFMUs  

0805  -­0820  Review  parameters  and  modelled  ATFM  Measure  Implement  ATFM  Measure  and  generate  CTOTs  

Bangkok  ATFMU  

0820  -­  0840  

Email  alert  to  stakeholders  of  ATFM  Measures,  constraints  and  publish  of  CTOT  on  web  portal  •   Local  Node  –  AUs  /  AO  /  ATC  Units  •   Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

Bangkok  ATFMU  

0840  -­  1000   Access  web  portal  to  view  CTOT  information  

Local  Node  –  AUs  /  AO  /  ATC  Units  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0840  -­  1000   Inform  respective  ATFMUs  on  successful  access  of  web-­portal  to  retrieve  CTOT  information  

Local  Node  –  AUs  /  AO  /  ATC  Units  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0840  -­  1000   Collate  test  results  within  their  respective  nodes  and  inform  Bangkok  ATFMU  via  email   Other  ATFMUs  

   

Page 18: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

18  Last  updated  on  22  August  2015  

Week  9  (24  Aug  15  –  28  Aug  15)    Objectives  

Simulate  multiple  ATFM  Measures  from  various  Nodes  based  on  previous  week’s  scenarios,  scripts  and  actions.  

Concurrent  ATFM  Measures  by  2  or  more  ATFMUs  

Day   ATFMUs  

24  Aug  2015   Hong  Kong  and  Singapore  

25  Aug  2015   Thailand  and  Hong  Kong  

26  Aug  2015   China,  Hong  Kong,  and  Thailand  

 

Test  Scenario  

Reduced  Capacity  at  Suvarnabhumi  Airport  (VTBS)  

This  test  aims  at  demonstrating  the  dissemination  of  CTOT  information  by  several  ATFM  Nodes  at  once.  For  the  part  of  Thailand  ATFM  Node,  an  operational  scenario  of  “Reduced  Capacity  at  Suvarnabhumi  Airport   (VTBS)”   similar   to   that  of  Week  8  will   be  used.  Both  Days  2  and  3  of  the  week  will  follow  the  same  scenario  and  script  as  follow:  

At   0000   UTC,   Thailand   MET   called   Bangkok   ATFMU   to   inform   of   large   weather   cell  forecasted  overhead  VTBS  at  around  0600  UTC.  The  weather  was  estimated  to   last   for  about  2  hours   till  0800  UTC.  Nominal  AAR  for  VTBS   is  34  arrivals  an  hour.  Due   to   this  weather  condition,  ATFMU  reduce  the  AAR  for  the  period  of  0600  –  0800  UTC  to  24,  and  subsequently  from  0800  UTC  onward,  adjust  the  AAR  gradually  back  to  34.  Based  on  the  demand-­capacity  modelling  done,   the  ATFMU  concluded   that  an  ATFM  Measure  needs  to   be   in   effect   between   0600UTC   –   1000UTC.   This   information   was   disseminated   via  ADP  early  in  the  day.  

A  web   conference  was   conducted  with   internal   Node  members   and   other   ATFMUs   for  Collaborative  Decision  Making  (CDM).  Thereafter,  ATFMU  ran  an  ATFM  Measure  for  all  arrivals   into   VTBS   between   0600UTC   to   1000UTC.   CTOTs   were   disseminated   to   all  stakeholders  via  email  and  AFTN  messages,  with  a  web-­portal  accessibility  provided.    

 

Page 19: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

19  Last  updated  on  22  August  2015  

Test  Timetable  

Time  (UTC)   Items   Action  by    

0000  Thailand  MET  informed  of  a  high  potential  of  large  weather  cell  overhead  VTBS  at  around  0600  UTC  

Thailand  MET  Bangkok  ATFMU  

0000  -­  0015  Assess  the  existing  information  on  operational  constraints  and  meteorological  conditions  to  determine  AAR  

Bangkok  ATFMU  VTBS  APP/TWR  

0015  -­  0025  Model  ATFM  Measures  based  on  AAR  and  known  parameters  (time,  scope  and  range)  based  on  Thailand  MET  update  

Bangkok  ATFMU  

0025  -­  0040  

Generate  ADP  (indicating  potential  ATFM  Measures)  and  email  stakeholders:  •   Local  Node  –  AUs  /  AO  /  MET  /  ATC  Units  •   Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

Indicate  time  and  attach  web  link  for  web  conference  in  the  email  

Bangkok  ATFMU  

0040  -­  0145   All  stakeholders  to  access  ADP  through  email  and  note  the  indicated  time  for  web  conference  

Thailand  Node  –  AUs  /  AOT  /  MET  /  ATC  Units  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0145  -­  0245  

Conduct  cross-­border  web-­conference  to  provide  information  on  constraints  and  inform  of  ATFM  Measures  (0600-­1000  UTC)  

Bangkok  ATFMU  

Co-­facilitate  the  cross-­border  web-­conference  to  share  constraints  and  ATFM  Measures  information  

Other  “Active”  ATFMUs  

Participate  in  the  web-­conference  for  CDM  and  for  information  

Thailand  Node  –  AUs  /  AOT  /  MET  /  ATC  Units  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0245  -­  0300   Review  parameters  and  model  ATFM  Measure  Implement  ATFM  Measure  and  generate  CTOTs   Bangkok  ATFMU  

0300  -­  0320  

Publish  CTOTs  on  web  portal  and  also  distribute  via  emails  and  AFTN  •   Local  Node  –  AUs  /  AO  /  ATC  Units  •   Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

Bangkok  ATFMU  

Page 20: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

20  Last  updated  on  22  August  2015  

Time  (UTC)   Items   Action  by    

0320  -­  0600   Access  web  portal  to  view  CTOT  information  

Local  Node  –  AUs  /  AO  /  ATC  Units  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0600  -­  0700   Inform  respective  ATFMUs  on  successful  access  of  web-­portal  to  retrieve  CTOT  information  

Local  Node  –  AUs  /  AO  /  ATC  Units  Other  Nodes  –  ATFMUs  /  AUs  /  AOs  /  ATC  Units  

0600  -­  0700   Collate  test  results  within  their  respective  nodes  and  inform  Bangkok  ATFMU  via  email   Other  ATFMUs  

   

Page 21: DISTRIBUTED)MULTI,NODALATFM) THAILAND)NODE ... · last"updated"on"22"august"2015" ... multi,nodalatfm) thailand)node) weeklyoperational)trial)plan)(stage1))) ... #vtsp# 1#jul#15#

21  Last  updated  on  22  August  2015  

Week  10  (31  Aug  15  –  4  Sep  15)  –  Operational  Trial  End-­of-­Stage  1  Review    

1.   Review  all  test  results  and  compliance  check  2.   Re-­testing  of  Trial  Items  (If  required)  

 

Week  11  (7  Sep  15  –  11  Sep  15)  

1.   Propose  Weekly  Operational  Trial  Plan  (Stage  2)  2.   Internal  training  preparation  for  Stage  2  

 

Week  12  (14  Sep  15  –  18  Sep  15)  

1.   Review  of  Propose  Weekly  Operational  Trial  Plan  (Stage  2)  2.   Finalise  and  disseminate  Weekly  Operational  Trial  Plan  (Stage  2)  3.   Internal  training  preparation  for  Stage  2  

 

Week  13  (21  Sep  15  –  25  Sep  15)      

1.   Preparation  for  Stage  2