District Disaster Management Plan (DDMP) Peshawar

District Disaster Management Unit (DDMU) Peshawar

March 2017

Page 3: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The
Page 4: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Foreword & Acknowledgement

Peshawar, the capital city of Khyber Pakhtunkhwa is burdened with an alarming and diverse portfolio of

natural and human-induced hazards. The amplified severity and frequency of disasters due to Climate

Change and the prevailing vulnerabilities have augmented the disaster management challenges for

Peshawar. From time to time, millions of refugees and Temporarily Dislocated Persons (TDPs) have

flooded into the district stretching the resources and capacity of the systems beyond its limits and. The

pressure on public service delivery, health, education, livelihoods and governance if combined with

more future shocks may lead to unrest. Disaster Risk Reduction (DRR) is, therefore, absolutely critical

in Peshawar.

To address these enormous challenges and carry out an important responsibility entrusted to DDMU

under National Disaster Management Act 2010 (as amended by Khyber Pakhtunkhwa Amendment Act,

2012) National Disaster Management Plan and the 5 years Road Map for DRM in Khyber Pakhtunkhwa

(2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The plan –

and the implementation of its projects – will be a great help to our district, province and the country in

building systems for preventing disasters and dealing with their fall-out. The extensive participation of

all the stakeholders has already underlined the importance that we all attach to Disaster Risk

Management in Peshawar. The knowledge and lessons learnt from all stakeholders including DDMU

Swat and Nowshera where DDMPs have been earlier developed have been included in this plan.

DDMU Peshawar firmly intends to involve different line departments, particularly those

departments/organizations with extensive experience in DRM, in the implementation of this Plan.

I acknowledge support of all partners who took part in consultations and provided valuable input. CARE

International and Initiative for Development & Empowerment Axis (IDEA) provided technical and

financial support for the development of the Plan. I am grateful to Deputy Commissioner Peshawar, City

District Mayor, Project Steering Committee of ECHO/DP DRR at PDMA, Earth Quack Engineering

Centre University of Engineering Peshawar, CDPM, DRR Forum KP & FATA Chapter for their

valuable suggestions and guidance during the process. I specially thank Mr. Aziz Ur Rehman (Senior

Advisor DRR & Climate Change CARE International), Mr. Suleman Khan (Project Manager ECHO-

DP/DRR), Mr. Najeeb Ullah (Project Coordinator IDEA), Mr. Zakir Hussain (Head of Emergency

Preparedness & Response) and Mr. Shah Nasir Khan (Lead Consultant) for extending exceptional

support in the development of this document. This Plan is a ‘living document’ and shall be regularly

updated. Feedback and comments from readers will be highly appreciated to revise our future versions.

(Altaf Ahmed Shiekh)

Assistant Commissioner/DDMO Peshawar.

Page 5: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Message of Director General PDMA Khyber Pakhtunkhwa:

The Plan has been developed under the powers invested in DDMU in Clause 21 sub clause 1,2 &3,

Chapter IV of National Disaster Management (Khyber Pakhtunkhwa) (Amendment) Act, 2012. The Plan

is prepared by District Disaster Management Unit Peshawar supported by CARE International in

Pakistan after extensive consultation with all stakeholders including Deputy Commissioner, City District

Mayor Peshawar, all Town Nazims of Peshawar, PDMA-KP, Center for Disaster Preparedness &

Management University of Peshawar, Urban Policy Unit, Earthquake Center in University of

Engineering Peshawar, Government Line departments at Provincial and District levels with inputs from

National Humanitarian Network, Project Steering Committee, DRR Forum at Provincial Level, Civil

Society, Private Sector and Cluster Systems of the United Nation.

Major documents consulted while writing this plan includes National Disaster Management Plan,

National Disaster Response Management Framework, NDM (Khyber Pakhtunkhwa amendment) Act

2012, Road Map for DRM in KP. It is to acknowledge that some parts of this plan have been adapted

from these documents for standardization.

Technical guidance was provided by PDMA-KP especially Mr. Wajid Ali Khan (Assistant Director

DRM), CARE International and IDEA with the financial support from European Commission’s

Humanitarian Aid and Civil Protection (ECHO), while the process was led by District Disaster

Management Officer/Assistant Commissioner of District Peshawar Mr. Altaf Ahmed Sheikh who can be

reached at [email protected].

Mr. Amer Afaq

Director General PDMA KP

Civil Secretariate Peshawar

Page 6: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The
Page 7: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Message from Deputy Commissioner Peshawar

It is indeed a matter of great pleasure that the District Disaster Management Unit Peshawar has

managed to identify the priorities of the district in the field of Disaster Risk Management for the coming

five years. District Peshawar is faced with and prone to a number of hazards, both natural and human

induced, and we must work with dedication and commitment to usher in a culture of safety and resilience

to prevent, mitigate and reduce the risks of and prepare for any potential disaster.

I congratulate Mr. Altaf Ahmed Sheikh, AC/DDMO and the DDMU team who dedicatedly worked hard,

carried out various deliberations and came up with this much comprehensive document. The document

can be considered as one of major milestone efforts in bridging the existing gaps among disaster

prevention, mitigation, preparedness, response, recovery and sustainable development.

I also want to reassure that the District Administration resolves to undertake various initiatives, as

outlined in the Road Map for DRM in Khyber Pakhtunkhwa and the District Disaster Management Plan,

to realize our vision of Disaster Resilient and Sustainable Development in District Peshawar.

Riaz Khan Mahsud

Deputy Commissioner

Peshawar

Page 8: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The
Page 9: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Message by City District Nazim District Peshawar

It gives me a great sense of satisfaction that DDMU Peshawar has come up with District Disaster

Management Plan (DDMP). The district is faced with innumerable challenges, not only in terms of

multiplicity of hazards, but also in terms of its diversity, magnitude and frequency of disasters. The

district in the past few years alone faced an earthquake, floods, TDPs influx, tornadoes, torrential rains

and cyclones. These disasters of high proportions have taught us some hard and harsh lessons. The most

important being is to invest in prevention and risk reduction and to mainstream DRR into Development

planning. The DDMP is the first step in this direction and will act as a principle-guiding document to

ensure activities in DRM are synergized to achieve our vision of resilient communities, infrastructure

and disaster resilient development in the district.

The present Provincial and local Government has focused on the development of the capital city where

the plan may be considered a valuable addition to the same efforts to make this development sustainable.

I must acknowledge and appreciate the efforts of Mr. Altaf Ahmed Shiekh, young and brilliant

AC/DDMO for his dedication and unflinching commitment to prepare this document. I also appreciate

all the stakeholders that managed to give their precious time and joined during our consultative

sessions. I also want to thank CARE International in Pakistan for their generous support in making this

process possible. I assure you that we will be reviewing and revising the document yearly with all

stakeholders to keep track of our vision, count on our achievements and identify the gaps and

challenges.

A holistic approach is required and the support of all stakeholders is critical for making the DDMP a

successful initiative. I invite you all to play your active role in making Peshawar a disaster resilient

district.

Muhammad Asim Khan

City District Mayor

Page 10: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

List of Acronyms

AC Assistant Commissioner MHVRA Multi Hazard Vulnerability & Risk

Assessment

ADPC Asian Disaster Preparedness Centre BOR Board of Revenue

CDPM Center of Disaster Preparedness &

Management

NA National Assembly

C & W Communication and Works NDMA National Disaster Management Authority

CBOs Community Based Organizations NDMP National Disaster Management Plan

CO Community Organizations NGO Non-Government Organization

CSOs Civil Societies Organizations PA Provincial Assembly

DC Deputy Commissioner PDMA Provincial Disaster Management

Authority

DDMO District Disaster Management Officer PEOC Provincial Emergency Operation Centre

DCR District Census Report PHED Public Health & Engineering Department

DDMA District Disaster Management Authority PMD Pakistan Meteorological Department

DDMC District Disaster Management Committee PRA Participatory Rural Appraisal

DDMP District Disaster Management Plan PRCS Pakistan Red Crescent Society

DDMU District Disaster Management Unit PTC Parent Teacher Council

DO District Officer PTR Pupil Teacher Ratio

DEOC District Emergency Operation Centre PTDC Pakistan Tourism Development

Corporation

EEC Earthquake Engineering Centre PWD Person With Disability

ECHO European Commission Humanitarian Aid

& Civil Protection

SOPs Standing Operating Procedures

FCC Flood Control Cell SC Steering Committee

GIS Geographical Information System UET University of Engineering & Technology

Ha Hectare VDMC Village Disaster Management Committee

Page 11: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

TDPs Temporarily Dislocated Persons TMA Town/ Tehsil Municipal

Administration

IMR Infant Mortality Rate TDMC Tehsil/Town Disaster Management

Committee

INGO International Non-Government

Organization

TDPs Temporarily Dislocated Persons

IDEA Initiative for Development &

Empowerment Axis

UC Union Council

KP Khyber Pakhtunkhwa UCDMC Union Council Disaster Management

Committee

LGRD Local Government and Rural

Development

UNESCO United Nations Educational, Scientific

& Cultural Organization

MBT Main Boundary Thrust UNFCCC United Nations Framework Convention

on Climate Change

V/ NDMC Village / Neighborhood Disaster

Management Committee

Page 12: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Table of Contents

District Disaster Management Plan (DDMP) Peshawar ....................................................................... 2

District Disaster Management Unit (DDMU)Peshawar ........................................................................ 2

Table of Contents .................................................................................................................................... 10

Foreword & Acknowledgements .................................................. Error! Bookmark not defined.

Message from DC Peshawar ...................................................................................................... 7

Message by City District Nazim District Peshawar ............................................................................... 9

Chapter 1: Introduction to RM in KP, District Disaster Management Unit (DDMU) & District

Disaster Management Plan ................................................................................................................... 18

1. Disaster Management in Pakistan & KP-Historical Perspective ................................................... 18

2. PDMA Khyber Pakhtunkhwa ........................................................................................................ 19

3. NDM (Khyber Pakhtunkhwa) Amendment Act 2012 ................................................................... 19

4. District Disaster Management Unit (DDMU)-composition, powers & functions in the light of

NDM Act ................................................................................................................................... 20

1.4.1 Constitution of District Disaster Management Unit ............................................................. 20

1.4.2. Powers of Chairperson of District Unit: .............................................................................. 20

1.4.3 Powers and functions of District Unit .................................................................................. 20

1.4.4. Additional Powers of District Unit. ...................................................................................... 21

1.4.5 District Plan ............................................................................................................................ 22

5. Key Challenges faced by DDMU ................................................................................................. 22

6. District Plan Peshawar ................................................................................................................... 23

The process of developing of Disaster Management Plan was thus initiated in the light of the

powers and functions as entrusted upon the DDMU. The vision, mission and objectives as below: 23

Vision 23

Mission .............................................................................................................................................. 23

Objectives .......................................................................................................................................... 23

1.7.Process for developing DDMP Peshawar

24

1. Data collected through primary sources ................................................................................ 24

2. Data collected through secondary sources ............................................................................. 24

Chapter 2: Profile of District Peshawar ................................................................................................ 25

2.1. District Peshawar .......................................................................................................................... 25

2.2. Geography of the District ............................................................................................................... 28

Page 13: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

2.3. Weather and Climate ...................................................................................................................... 29

2.4. Environment .................................................................................................................................. 31

2.6. Geology of the District & Landuse planning ................................................................................. 32

2.6. Demographic Profile of the District ............................................................................................... 34

2.7. Governance & Administration ....................................................................................................... 35

2.8. Economic Features ......................................................................................................................... 37

2.8.1. Agriculture .............................................................................................................................. 38

2.8.2. Livestock ................................................................................................................................. 39

2.8.3. Industry ................................................................................................................................... 39

2.8.4. Main Trading, Commercial Areas and Bazars ....................................................................... 41

2.9. Physical Infrastructure ................................................................................................................... 41

2.9.1. Roads & communication ......................................................................................................... 41

2.9.2. Irrigation ................................................................................................................................. 42

2.9.3. Piped water supply .................................................................................................................. 42

2.10. Social Infrastructure ..................................................................................................................... 43

2.10.1. Health facilities ..................................................................................................................... 43

2.10.2. Education .............................................................................................................................. 43

2.11. Urbanization, City Structure and Population .............................................................................. 46

2.11. Social & Poverty Profile ............................................................................................................. 47

2.11. Slum Areas of Peshawar .............................................................................................................. 48

Chapter 3: Hazards, Vulnerability and Risk Profile of District Peshawar ....................................... 51

3.1. Background ................................................................................................................................... 51

3.2. Methodology adopted for hazard and risk assessment ................................................................... 53

3.3. Prevailing major hazards ................................................................................................................ 53

3.3.1. Floods ..................................................................................................................................... 53

3.3.2. Earthquake .............................................................................................................................. 59

3.3.3. Mini-Cyclones/ Tornadoes ...................................................................................................... 63

3.3.4. Fires ........................................................................................................................................ 65

3.3.5. Conflicts/ Terrorism ................................................................................................................ 65

3.3.6. Temporarily Dislocated Persons (TDPs) & Refugees ............................................................ 65

3.3.7. Environmental Risks ............................................................................................................... 67

3.3.8. Epidemics & Endemics .......................................................................................................... 67

Page 14: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

3.4. Exposure, elements at Risk and vulnerability context of the district ............................................. 68

3.5.1. Population ............................................................................................................................... 69

3.5.2. Buildings ................................................................................................................................. 69

3.6. Risk assessment of the district ....................................................................................................... 69

Chapter 4: District Disaster Management Unit’s Organizational Structure .................................... 73

1. Organizational Structure and Members ........................................................................................ 73

2. DDMU Secretariat ......................................................................................................................... 74

3. Function of DDMU ....................................................................................................................... 74

4. Local Disaster Management Committees ...................................................................................... 75

4.4.1 Tehsil/Town Disaster Management Committee (TDMC)1...................................................... 75

4.4.2. Union Council Disaster Management Committee (UCDMC) ............................................... 76

4.4.3. Village/ Neighborhood Disaster Management Committee (VDMC) ...................................... 76

Chapter 5: Key stakeholders and their role in Disaster Management ............................................... 78

1. District Disaster Management Unit (DDMU) ............................................................................... 78

2. Town Municipal Administration .................................................................................................. 81

3. Agriculture Department ................................................................................................................. 82

4. Irrigation Department .................................................................................................................... 83

5. Revenue Department ..................................................................................................................... 84

6. Health Department ......................................................................................................................... 86

7. Education Department ................................................................................................................... 87

8. Finance & Planning Department ................................................................................................... 88

9. Civil Defense Department ............................................................................................................. 89

10. Police Department ......................................................................................................................... 89

11. Social Welfare & Community Development Department ............................................................. 90

12. Communication & Works Department .......................................................................................... 91

13. Public Health Engineering (PHE) .................................................................................................. 92

14. Media ............................................................................................................................................. 92

15. Pakistan Army .............................................................................................................................. 93

16. Private Sector (NGOs, and Pakistan Red Crescent Society, etc.) ................................................. 93

17. Transport Department .................................................................................................................... 94

18. Rescue 1122................................................................................................................................... 95

19. Academia ....................................................................................................................................... 95

Chapter 6: Standard Operating Procedures for Emergency Response ............................................. 97

1. Establishment and functioning of District Emergency Operations Centre .................................... 97

Page 15: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

2. Communication network of DEOCs .............................................................................................. 98

3. Operational staff structure ............................................................................................................. 98

4. Standard Operating Procedure – Activation Procedure for DEOC ............................................... 99

6.4.1. On Receipt of Alert (Standby - Stage 1) .................................................................................. 99

6.4.2. On Receipt of Warning (Stage 2) ............................................................................................ 99

6.4.3. Stand Down Procedure (Stage 3) ............................................................................................ 99

6.4.4. Operationalization of DEOC ............................................................................................... 100

5. Simulations and drills .................................................................................................................. 100

6.5.1. Responsibility for organizing drills ....................................................................................... 100

6.5.2. Schedules for organizing drills ............................................................................................. 100

6.5.3. Resources for organizing drills ............................................................................................. 100

Chapter 7: Priority Disaster Risk Management Strategies (2015-2020) .......................................... 101

Priority Area 8.1: Established the institutional and legal system for disaster management .............. 102

Priority Area 8.2: Prepare disaster management plans at various levels ............................................ 103

Priority Area 8.3: Conduct multi-hazard, vulnerability and risk assessment ..................................... 105

Priority Area 8.4: Establish multi-hazard early warning and evacuation systems ............................. 107

Priority Area 8.5: Promotion of training , education and awareness in relation to disaster

management, risk reduction & Climate change adaptation ............................................................... 110

Priority Area 8.6: Infrastructure development for disaster risk reduction .......................................... 113

Priority Area 8.7: Mainstreaming disaster risk reduction into development ...................................... 116

Priority Area 8.8: Establish emergency response system at District Peshawar .................................. 118

9. Summary of Budget required implementing the DDMP in the District ....................................... 120

List of Annexure .................................................................................................................................... 121

Annexure I: Maps of Peshawar ........................................................................................................... 121

Annexure II : Glimpses from the Consultative Workshops and launching ceremony ....................... 129

Annexure III: Selected basic definition useful in the District Disaster Management Plan1 ............... 130

Page 16: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Planning Authority: District Disaster Management Unit Peshawar Approval of the Plan: Dated December 27, 2016, Peshawar

Review, amending and updating of the Plan:

As per Clause 21 sub clause 3, Chapter IV of National Disaster Management (Khyber Pakhtunkhwa)

(Amendment) Act, 2012, “The District plan shall be reviewed and updated annually”. Accordingly,

tentative timelines for Review through Consultations, review and revision of the Plan are planned as

below. A review committee in DDMU will carry out the said function and can suggest changes as per

requirement. Review plan will be as follows;

Oct 2017 Stakeholders Consultation & Review of the Plan

Oct 2018 Stakeholders Consultation & Review of the Plan

Oct 2019 Stakeholders Consultation & Review of the Plan

Oct 2019 Stakeholders Consultation & Review of the Plan

Oct 2020 Stakeholders Consultation & Review of the Plan

This District Disaster Management Plan (DDMP) is a living document and it will continue to improve

based on stakeholder‟s feedback. The review committee will also be required to update the sections of

plan specifically related to MHVRA (as it is carried out) and priorities in consultation with Academia

and other stakeholders if necessary. More accurate and authenticated sources and data if available will be

utilized for the review and revision. It may not always be possible to publish these profiles/updated plans

in print format; however PDMA and/or DDMO Peshawar will ensure that these updates are made

available on PDMA and District Peshawar official websites. For updated version of following profile,

please visit www.dcpeshawar.gkp.pk and www.pdma.gov.pk

Any questions/comments concerning information presented in this report can be addressed to:

District Disaster Management Officer (DDMO) Peshawar email: [email protected]

Page 17: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Figure 1: Peshawar Snapshot

Page 18: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Chapter 1: Introduction to Risk Management in Khyber Pakhtunkhwa, District Disaster

Management Unit (DDMU) & District Disaster Management Plan

1. Disaster Management in Pakistan & KP-Historical Perspective

The Punjab National Calamities (Prevention and Relief) Act, 1951, Khairpur National Calamities

(Prevention and Relief) Act, 1954, and the West Pakistan National Calamities (Prevention and Relief)

Ordinance were repealed by the 1958 „Calamity Act‟ of Pakistan1. This act was to provide for the

maintenance and restoration of order in areas affected by certain calamities that are described in the act,

and for the prevention and control of and relief against them. Although prevention is stated to be a

priority area under the act, there is little or no evidence within the rest of the document of any prescribed

action or measures to achieve this. Once an area is declared to be a „calamity affected area‟, a Relief

Commissioner is appointed for the province or for part of the affected province. This Relief

Commissioner is responsible for the execution of emergency relief activities and any activities relating to

this, including the restoration of order. Emergency Relief Cells supplemented the various calamity acts

and ordinances in each province, which were characterized by their overlapping roles and

responsibilities. An Emergency Relief Cell was created within the cabinet division in 1971 and was held

responsible for disaster relief at the national level. The role of this Emergency Relief Cell at the Federal

level was to provide funding and resources to the corresponding bodies at provincial levels. 2005 was a

turning point for disaster management in Pakistan. Not only was this the year when Pakistan became a

signatory to the Syndai Framework of Action, indicating a shift toward more comprehensive disaster

management that is proactive as well as being reactive, but also was the year when the country was

struck by a devastating earthquake whereby damage and casualties over an area of 30,000 km2 in Khyber

Pakhtunkhwa (the then N-W.F.P. Province of Pakistan) and parts of Pakistan-administered Kashmir

occurred2. The sheer scale of this disaster highlighted Pakistan‟s vulnerability to disasters and further

enforced the commitment to better DRR practices, resulting in the promulgation of the National Disaster

Management Ordinance (NDMO) in 20063

. The ordinance provided legal and constitutional

arrangements for disaster management at federal, provincial and district levels. The NDMO provided the

National Disaster Management Commission (NDMC) as the apex body for managing disasters, with the

National Disaster Management Authority (NDMA) as its administrative arm. The National Disaster

Management Authority will deal with the „entire spectrum of disaster management in the country‟.

Under consultation with UN agencies and I/NGO‟s, the Government of Pakistan in 2007 established a

national framework for disaster risk management known as the National Disaster Risk Management

Framework (NDRMF) which identified nine priority areas for a five year action plan, ranging from

institutions and legal arrangements to early warning systems and training, as well as identifying

institutions responsible for disaster management in the country. However, due to overlapping roles and

responsibilities of the actors in the disaster management spectrum, disaster management remained

disorganized.

1 National Disaster Management Authority (NDMA). NDMA Annual Report 2010; 2011. www.ndma.gov.pk 2 Dr. A. Naeem, Dr. Qaisar Ali, Muhammad Javed, Zakir Hussain, Amjad Naseer, Syed Muhammad Ali, Irshad

Ahmed, and Muhammad Ashraf. “Pakistan: A Summary Report on the Muzzafarabad Earthquake”, Earthquake

Engineering Center at the Department of Civil Engineering, N-W.F.P. University of Engineering and Technology,

Peshawar, Pakistan 3 Government of Pakistan. National Disaster Management Ordinance 2006. Islamabad, Pakistan; 2006 (Source:

www.ndma.gov.pk )

Page 19: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

In December, 2010, the NDMO was converted into an Act of the Parliament as the National Disaster

Management Act (NDMA) 2010, with retrospective effect from August 2007. The three tier hierarchical

framework sets out the National Disaster Management Commission headed by the Prime Minister as

being at the top of the hierarchy and responsible for national disaster policymaking in the country. The

National Disaster Management Authority is the focal point for the coordination and implementation of

disaster management policies in the country. The second tier consists of the Provincial Disaster

Management Commissions and at the third tier, Provincial Disaster Management Authorities and District

Disaster Management Authorities, which are responsible for drawing up Disaster Management plans at

their administrative level4. 2012 and 2013 was yet another landmark year in the disaster management

arena in Pakistan when National Disaster Management Plan (NDMP) National Disaster Risk Reduction

Policy of Pakistan were formulated to „advocate an approach to disaster management that focuses on

reducing risks‟. PDMA Khyber Pakhtunkhwa, taking a lead among the provinces was the first one to

develop a five years Road Map for DRM in KP (2014-19)5. Although this plan, policy and road map of

KP are thorough and comprehensive, its implementation is still a question mark, especially in its failure

to create institutional synergies and assignment of responsibilities to various layers of governance and

actors in the field. This means that the issue of overlapping duties and responsibilities of departments is

carried forward yet again.

2. PDMA Khyber Pakhtunkhwa:

Provincial Relief Commissioner-ate (PRC) was established under the BOR in 2006 and PDMA, Khyber

Pakhtunkhwa established on 27 October 2008. PRC was abolished w.e.f. 30th June 2010 after the passage

of National Disaster Management Act (NDM Act 2010). Relief, Rehabilitation and Settlement

Department (RRSD) was established on 1st July 2010 whereas the functions of RRSD were notified in

2010 under Rule of Business (RoB), 1985. PDMA KP was declared Attached Authority of Relief,

Rehabilitation and Settlement Department (RRSD) along with Rescue 1122 & Civil Defense, with all

three placed under RRSD.

3. NDM (Khyber Pakhtunkhwa) Amendment Act 2012

NDM Act 2010 was enacted under Article 144, which means that Federation Legislating on behalf of

Provinces & Empowerment by Provincial Legislature Resolutions. The Last clause of the act is referred

to as Disassociation whereby it is possible that any amendment be done by the assembly of the

respective province as deem appropriate. Due to the specific needs of the KP Province in the wake of

protracted conflict and man-made crises, under the Disassociation clause PDMA-KP moved the

legislation of amendment to the Act known as NDM (Khyber Pakhtunkhwa) Amendment Act 2012.

Under the amendment, Sections 2, 13, 14, 15, 18, 30, 38 were amended while the Inserted Sections

includes Section 15 (A), 15 (B), 41(A), and 47 (A) & Section 39 was substituted. District Disaster

Management Authority was renamed as District Disaster Management Unit (DDMU) in Khyber

Pakhtunkhwa6.

4 Zubair Ahmed, Disaster risks and disaster management policies and practices in Pakistan: A critical analysis of

Disaster Management Act 2010 of Pakistan, International Journal of Disaster Risk Reduction, Volume 4, June

2013, Pages 15-20, ISSN 2212-4209, http://dx.doi.org/10.1016/j.ijdrr.2013.03.003. 5 The 5-years Road Map for DRM in KP can be accessed through www.pdma.gov.pk

(http://www.pdma.gov.pk/sites/default/files/drm_road_map_2014-19.pdf) 6 The amended act can be accessed through (http://www.ifrc.org/docs/IDRL/-

%20To%20add/Pakistan%20NDMAAct2010.pdf )

Page 20: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

4. District Disaster Management Unit (DDMU)-composition, powers & functions in the light

of NDM Act

Under Chapter IV of the Act the establishment and notification of the DDMU has been articulated. Few

important points as below:

1.4.1 Constitution of District Disaster Management Unit

The District Unit shall consist of such number of members, as may be prescribed by the Provincial

Government and unless the rules otherwise provide, it shall consist of the following members, namely:-

(a) Head of the local council at the district level (by whatever name called) or the Administrative

Head of the district who shall be Chairperson, ex- officio;

(b) Deputy Commissioner;

(c) District Police Officer, ex-officio;

(c-i) 01 Executive Engineer (Communication and Works);

(c-ii) 02 Executive District Officer (Education);

(d) Executive District Officer, Health; and

(e) Such other district level officers, to be appointed by the District Government.

1.4.2. Powers of Chairperson of District Unit:

The Chairperson of the District Unit shall, in the case of an emergency, have power to exercise

all or any of the powers of the District Unit but the exercise of such powers shall be subject to

ex-post facto approval of the District Unit.

1.4.3 Powers and functions of District Unit

Subject to the provisions of the Act, the District Unit shall be as the district planning, coordinating and

implementing body for disaster management and take all measures for the purposes of disaster

management in the district in accordance with the guidelines laid down by the National Authority and

the Provincial Authority. Without prejudice to the generality of the foregoing provisions, the District

Unit may:

a) Prepare a disaster management plan including district response plan for the district;

Co-ordinate and monitor the implementation of the National Policy, Provincial Policy, National

Plan, Provincial Plan and District Plan;

b) Ensure that the areas in the district vulnerable to disasters are identified and measures for the

prevention of disasters and the mitigation of its effects are undertaken by the departments of the

Government at the district level as well as by the local authorities;

c) Ensure that the guidelines for prevention, mitigation, preparedness and response measures as laid

down by the National Authority and the Provincial Authority are followed by all departments of

the Government at the district level and the local authorities in the district;

Page 21: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

d) Give directions to different authorities at the district level and local authorities to take such other

measures for the prevention or mitigation of disasters as may be necessary;

Lay down guidelines for preparation of disaster management plans by the departments of the

Government at the districts level and local authorities in the district;

e) Monitor the implementation of disaster management plans prepared by the Departments of the

government at the district level;

f) Lay down guidelines to be followed by the departments of the Government at the district level;

g) Organize and co-ordinate specialized training programmes for different levels of officers,

employees and voluntary rescue workers in the district;

h) Facilitate community training and awareness programmes for prevention of disaster or

mitigation with the support of local authorities, governmental and non-governmental

organizations;

i) Set-up, maintain, review and upgrade the mechanism for early warnings and dissemination of

proper information to public;

j) Pprepare, review and update district level response plan and guidelines;

k) Co-ordinate with, and give guidelines to, local authorities in the district to ensure that pre-

disaster and post-disaster management activities in the district are carried out promptly and

effectively;

l) Review development plans prepared by the departments of the Government at the district level,

statutory authorities or local authorities with a view to make necessary provisions therein for

prevention of disaster or mitigation;

m) Identify buildings and places which could, in the event of disaster situation, be used as relief

centers or camps and make arrangements for water supply and sanitation in such buildings or

places;

n) Establish stockpiles of relief and rescue materials or ensure preparedness to make such materials

available at a short notice;

o) Provide information to the Provincial Authority relating to different aspects of disaster

management;

p) Encourage the involvement of non-governmental organizations and voluntary social-welfare

institutions working at the grassroots level in the district for disaster management;

q) Ensure communication systems are in order and disaster management drills are carried out

periodically; and

r) Perform such other functions as the Provincial Government or Provincial authority may assign to

it or as it deems necessary for disaster management in the District.

1.4.4. Additional Powers of District Unit.

For the purpose of assisting, protecting or providing relief to the community, in response to any disaster,

Page 22: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

the District Unit may –

a) Give directions for the release and use of resources available with any department of the

Government and the local authority in the district;

b) Control and restrict vehicular traffic to, from and within, the vulnerable or affected area.

c) Control and restrict the entry of any person into, his movement within and departure from, a

vulnerable or affected area.

d) Remove debris, conduct search and carry out rescue operations;

e) Provide shelter, food, drinking water and essential provisions, healthcare and services;

f) Establish emergency communication systems in the affected area;

g) Make arrangements for the disposal of the unclaimed dead bodies;

h) Direct any department of the Government of the Province or any authority or body under that

Government at the district level to take such measures as are necessary in its opinion.

i) Require experts and consultants in the relevant fields to advise and assist as it may deem

necessary.

j) Procure exclusive or preferential use of amenities from any authority or person;

k) Construct temporary bridges or other necessary structures and demolish structures which may be

hazardous to public or aggravate the effects of the disaster;

l) Ensure that the non-governmental organizations carry out their activities in an equitable and

non-discriminatory manner; and

m) Take such other steps as may be required or warranted to be taken in such a situation.

1.4.5 District Plan7

1. There shall be a plan for disaster management for every district of the Province.

2. The District Plan shall be prepared by the District Unit having regard to the National Plan and

the Provincial Plan.

3. The District plan shall be reviewed and updated annually.

5. Key Challenges faced by DDMU

1. Relief Paradigm with focus on relief and compensation after any calamity and no investment in

disaster risk reduction

2. DDMU not capacitated and fully functionalized with no dedicated staff to work on entire spectrum

of DRM with focus on risk reduction at the district level. District Disaster Management Officer

7 NDM (Khyber Pakhtunkhwa) Amendment Act 2012

Page 23: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

(DDMO) portfolio is carried out as an additional responsibility by Assistant Commissioner of the

District.

3. Lack of financial resources and enough capacities including financial resources to deal with the

disaster/emergencies.

4. No DRM Plan of the province and the district

5. Weak coordination mechanism between PDMA, DDMU to deal with disaster and still need to be

enhanced.

6. Absence of DRM budget heads in annual development plans.

7. Lack of awareness and resources to implement the DRM checklist of planning commission of

Pakistan8.

8. Absence of technical studies especially related to multi hazard, vulnerability and risk assessment

which acts as foundation for the development practices.

9. No mechanism of and awareness regarding contingency planning, emergency response plans,

simulation exercises etc.

6. District Disaster Management Plan Peshawar

The process of developing of Disaster Management Plan was thus initiated in the light of the powers and

functions as entrusted upon the DDMU. The vision, mission and objectives as below:

Vision

Disaster Resilient Peshawar District

Mission

To manage and mitigate disaster risks and climate change impacts through synergized planning efforts

by all stakeholders in order to lessen the vulnerabilities and enhancing the local capacities.

Objectives

In line with the United Nations Sendai Framework for Disaster Risk Reduction 2015-2030; NDMA‟s

National Disaster Management Plan 2012-2022; and PDMA KP‟s Road Map for Disaster Management

2015-2019, the following objectives are listed below:

1. To identify the Multi Hazards, Vulnerabilities, Capacities and Risk Assessment in District

Peshawar in order to build consensus on and to prioritize areas of interventions in the district

2. To functionalize the institutional mechanism for effective disaster management in the district;

3. To ascertain the prioritized disaster risk reduction / Climate change adaptation measures

essential for reduction of disaster risks and its impacts;

4. To chalk out tentative timeframe and potential partners for the implementation of the disaster

risk management plan;

5. To plan for effective preparedness, emergency response and post disaster recovery mechanism

8 The checklist along with circular of Planning Commission dated 23rd Nov 2010 can be downloaded from

http://www.ndma.gov.pk/site/plans/Checklist-of-Planning-Commission2010.pdf

Page 24: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

7. Process for developing DDMP Peshawar

The District Disaster Management Plan (DDMP) has been developed through series of in-house

discussions and consultative meetings with all stakeholders including PDMA, DDMU & LG

Representatives, Consultation and validation workshops and discussion on and formal endorsement of

roles and responsibilities of different stakeholders in the disaster management system in the district.

The Data were collected through various primary and secondary sources while tools like Focus Group

Discussions (FGDs), Key Informant Interviews (KIIs), and Standard Questionnaire forms were utilized.

The results of FGDs of situational analysis of Urban DRM were also utilized which included brief

survey of perceptions of hazards and level of information and preparedness of communities in four

different localities of Peshawar (Karim Pura, Warsak Road, Gulbahar and Hayatabad). The LG-SAT

tool, UNISDR tool kit findings of same study has also been utilized. GIS techniques were used to

prepare required maps. The Earthquake Engineering Centre (EEC) UET Peshawar prepared earthquake

hazard map for Peshawar. Discussions were also held with key stakeholders involved in both districts of

KP (Nowshera and Swat) where the DDMPs have been developed and launched in 2015. Lessons learnt

from both the districts were utilized during the planning and development process for Peshawar DDMP.

1. Data collected through primary sources

Various data collection tools were used in meetings and workshops to consult the stakeholders and to

validate the information collected through various tools. These tools include;

Focus Group Discussions;

Key Informant Interviews in various meetings;

Hazard zonation mapping acquired from various available sources;

Standard questionnaire surveys in few areas of Peshawar.

2. Data collected through secondary sources

Various offices were visited and their update data on their websites along with data and publications of

Bureau of Statistics KP were utilized to collect the relevant information for preparing profile. Data were

collected from the following offices and/ or their websites/ publications;

National Disaster Management Authority (NDMA) Islamabad;

Provincial Disaster Management Authority (PDMA) Khyber Pakhtunkhwa;

Bureau of Statistics KP Peshawar;

Deputy Commissioner Office Peshawar.

Urban Policy Unit P&D KP, Peshawar

Various Departments of Khyber Pakhtunkhwa;

Departments of District Peshawar.

Offices of Town Nazims & LG representatives

2.1. Inception & Consultative meeting with PDMA Project Steering Committee Members

(Government departments and I/NGOs) Meeting

Inception meeting was held at PDMA HQ Peshawar on 21st March 2016 chaired by Deputy Director

(T&A) PDMA and attended by Line Departments to share the findings of Situational Analysis Study of

Urban DRM in Peshawar and to carry out consultation/ brainstorming for DDMP Peshawar. The

Page 25: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

methodology of development of the DDMP and table of contents were shared with participants and the

steering committee approved them in principle.

Series of inception meetings were also organized separately during March 22-31 2016 to orientate the

stakeholders on the process of development of DDMP, identify their existing roles and responsibilities,

identify gaps, availability of resources and acquire some relevant information and data for the DDMP.

2.2. Consultation Session with Local Government / City District Government

representatives on 4th

April 2016 at Peshawar

A consultative workshop was organized on 4th April 2016 at Town-3 Nazim Office Peshawar to discuss

the process for DDMP, get knowledge of the roles and effectiveness of newly established LG system and

to chalk out the way forward for finalization of the roles and responsibilities of different organizations in

the DDMP. Extensive Discussions were carried out to identify, validate and prioritize villages and

neighborhood Councils as per disaster risks. The suggestions were incorporated in the final report.

Workshop was chaired by the Town Nazim Mr. Arbab Muhammad Ali Khan while TMO Mr. Ihsanullah

Khan and representative from different organizations participated in the said workshop

2.3. Consultation workshop with faculty and students of Centre of Disaster Management &

Preparedness (CDPM), University of Peshawar on 4th April 2016 at Peshawar

2.4. A consultative workshop was organized on 4th April 2016 at Centre of Disaster

Management and Preparedness, University of Peshawar to discuss the process for DDMP,

discuss the table of contents and roles and responsibilities of different organizations as well

as SOPs in the DDMP. Wide-ranging discussions were carried out. The suggestions were

incorporated in the final report. Director CDPM, professors & faculty members and around

40 students of PhD, M. Phil, MS and BS participated in the said workshop.Roles &

Responsibilities shared with all relevant Stakeholders by DDMU for comments and

concurrence on Disaster Risk Management

The draft roles and responsibilities of every stakeholder were shared with Line Departments by DDMU

through formal letters. Ample time was provided to respond on if any amendments were required.

Final Consultation workshop with district government departments, Academia and I/NGOs on 26th

August 2016 at Peshawar

Before formal launching ceremony of the DDMP, draft plan shared with the Deputy Commissioner,

DDMO and other key stakeholders and discussion continued over the key interventions specified in the

document and make necessary correction and updating.

Besides these meetings and workshops, series of in-house meetings were conducted at PDMA KP,

District Nazim Office, DC Office, DDMU, CARE International/IDEA offices. Based on continued

discussion and in-house consultation, the DDMP was revised to incorporate suggestions given by the

stakeholders and above organizations.

Chapter 2: Profile of District Peshawar

2.1. District Peshawar

Peshawar, the capital of Khyber Pakhtunkhwa (KP) province, is located at the north-west end of

Pakistan, about 160 km west of federal capital Islamabad. Peshawar has a geo-strategically important

location and an enriched history. This city has seen the rise and fall of many civilizations. It was once the

center of Gandhara civilization and has subsequently been ruled by Persians, Greeks, Buddhists,

Page 26: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Kushans, Afghans, Mughals, Sikhs and the British, up to the independence of Pakistan in 1947. Under

the latest revision of Pakistan's administrative structure, promulgated in 2001, Peshawar was given the

status of a city district.

The history of Peshawar can be traced back to the Persian rulers, the Alchaemenians and Sassanians. In

the Alchaemenian text, it indicates a region on the North West frontier of India. From the west, Peshawar

was the first to meet on the way to India and hence, the name is derivable from the Persian “Pesh

Awardan” (the one that comes first). This region remained under the Persian control until it was

conquered by Alexander the Great in 326-7 B.C2.

Later on, the region was ruled by Chandra Gupta Maurya, who defeated the Greeks. The Mughal

emperor Babar came to Peshawar in 1530 A.D. He used the name as “Parashawar”. He also used the

name Baghram for Peshawar. His grandson Akbar formally gave the name Peshawar that means „The

Place of the Frontier‟9. In 1818, Ranjit Singh, the Sikh ruler of Punjab, conquered Peshawar. The British

succeeded the Sikhs and occupied Peshawar in 1849, but as much as Sikh rule had been hated, its British

replacement aroused little enthusiasm. More or less continuous warfare between the British and the

Pashtuns necessitated a huge British garrison on the west side of the city. The British ruled the region

from 1849 to 1947, when it became part of Pakistan.

9 Khan, Shah Nazar (2004), Ancient Peshawar (An Analysis of the History and Archeology), Ph.D Thesis, Area

Study Center, University of Peshawar

Page 27: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Figure 2: Map of District

Page 28: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

From its inception some 2000 years ago and up to the 16th and 17

th Centuries, the area now referred to as

the “Old City” was the core commercial and residential area of Peshawar. At the beginning of the last

century (1900-1915), the Cantonment area to the west of the railway line was developed to provide

housing for the military personnel stationed there at the time. This has since been extended to provide

housing for Government employees. Since the mid 1950‟s, this Old City area has become overcrowded,

congested and polluted and the urban sprawl had extended to the areas immediately south and east as

well as across the rail line to the north into the then farming area.

During the 1960‟s, the University Town developed to the west while to the east, ongoing developments

occurred to the north of the railway line at Sikandar Pura, Nishtarabad and Gulbahar and the Dabgari

Gardens to the west. These evolved with minimal influence of formal town planning input. In the 1980‟s

the new town of Hayatabad adjacent to the western edge of University town was developed by the

Peshawar Development Authority. Since then, informal settlement has continued to the west as far as the

boundary of the tribal area bordering Afghanistan. More recently, the Regi Model Town development to

the north of Hayatabad is being developed by the Peshawar Development Authority to cater for demand

from residents in the medium to poor category. Similarly, Defense Housing Authority (DHA) is under

development in the same area. These all developed on the basis of both the east west international rail

line and GT Road serving the trade route to Kabul. It is essentially this influence, which created the basis

of the east west linear form Peshawar displays today.

2.2. Geography of the District

District Peshawar is bounded by tribal agencies on its three borders. It is situated near the eastern end of

the Khyber Pass. The total area of this district is 1,257 square km. Peshawar lies between 33° 44 and 34°

15 north latitude and 71° 22 and 71° 42 east longitude.

The City District Government Peshawar has been divided into four Towns namely Town-I, Town-II,

Town-III and Town-IV. In addition to that, the city‟s urban areas include the Cantonment and new

housing schemes of City District Municipal Department (CDMD) such as Hayatabad and Regi Lalmah.

Town-I and Town-III are mostly composed of city/urban area, while Town-II and Town-IV primarily

consist of rural suburbs. Peshawar is an urban district in nature and 48.5 percent of the total population

resides in urban areas. The city district is composed of 130 neighborhood councils and 216 village

councils.

District Peshawar is bounded by tribal agencies on its three borders with Khyber Agency and Mohmand

Agency towards west, District Nowshera towards east, District Charsadda towards north and Khyber

Agency towards south. The Afghan border is approximately 40 Km to the West. The district comprised

of 92 union councils.

Page 29: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Figure 3: District Peshawar in context of Peshawar Valley and KP

2.3. Weather and Climate

The climate of District Peshawar is sub-tropical, semi-arid and sub-mountain with winter and monsoon

rainy season, because of which Peshawar experiences considerable precipitation during winter and

summer.

Generally, four seasons prevail in the area, which may climatologically be divided as:

i. Winter: December-March

ii. Pre-monsoon: April-June

iii. Monsoon: July-September

iv. Post-monsoon: October-November

During winter season, the western disturbances pass over the region and cause rainfall. If there is a

strong trough, the air mass may get moisture supply from the Arabian Sea. Sometimes the path of

western disturbance slightly moves to lower latitudes (middle part of the country) resulting in increasing

number of rainy days. During the month of March which is the ending of winter season tracks of western

disturbance lie more towards southern Pakistan. The western disturbance normally enters through Quetta

and moves towards Peshawar.

Page 30: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Pre-monsoon season is a transition period from the winter circulation to the monsoon circulation in the

region. During this season, westerly waves shift northwards and relatively the frequency of western

disturbances become less. It remains active over the northern parts of the region with the decreasing

frequency of occurrence as compared to the peak winter months. Sometimes, due to intense solar

heating, mesoscale convective systems dominate over the plains and mountainous areas. As a result,

heavy downpour associated with hailstorm and thunderstorms occur. Southwest monsoon rains start

from the month of July and last till September. These rains are quite heavy and can cause significant

flooding, even severe flooding if they interact with the waves of western disturbance in the upper parts of

the country. Post-monsoon Season is transition period from the monsoon seasons to the winter season in

the region. In this season the rainfall activity is very less and the temperatures become lower.

Precipitation is relatively high in winter and monsoon seasons. The area receives more rain during winter

season than in summer ranging from about 20 to 76 mm. Maximum average monthly temperature is in

the months May-June ranges from 37-40⁰C. Low temperature occurs during November to March with

minimum value of 18.6⁰C in January. Wind is influenced by a wide range of factors, from large scale

pressure patterns, to the time of day and the nature of surrounding terrain. The mean surface wind speeds

vary during the year from 2 to 6 knots and the direction is usually variable. The average humidity is not

high over the region. Under the influence of western disturbances and monsoon rainfall it rises locally.

The mean relative humidity ranges from 42 to 69 percent during the year. The surface wind speed varies

during the year from 2 to 6 knots, and the direction is usually variable.

Figure 4: Increasing trend in mean max temp in Peshawar Source: Climate Change Cell, Environment

Department KP)

27.0

28.0

29.0

30.0

31.0

32.0

1979

1981

1983

1985

1987

1989

1991

1993

1995

1997

1999

2001

2003

2005

2007

ME

AN

MA

X T

EM

P

YEARS

Peshawar Mean Max 1979 - 2008

Page 31: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Figure 5. Rainfall in Peshawar (1979-2008), Source: PMD Peshawar

2.4. Environment

Peshawar has numerous environmental problems like other metropolitan cities of the world. Issues of

environmental pollution particularly with physico-chemical parameters of waters, air and noise pollution

are predominant. The relative measurements of various parameters, the spot values of pollution

indicators, its comparison with the permissible standards set by International Agencies and various

studies indicate that the water quality of Peshawar metropolis is threatened due to heavy discharge of

toxic industrial and domestic effluent. The untreated municipal and industrial effluents are finally

disposed in the natural water drains including Budni Nullah, Bara River leading to Kabul River.

The other identified sources of pollution entering the Kabul River system are untreated industrial effluent

from sugar mills, paper and board mills, tanneries, textile mills, ghee and chemicals factories scattered

all across the river bank.

As per study carried out by Pakistan Council of Research in Water Resources (PCRWR)10

in year 2008

for Water Quality Assessment Survey of Clean Drinking Water, the status of ten union councils of

Peshawar is witnessed here. The survey indicated that out of ten samples one sample indicates higher

value of hardness and the other shows higher value of nitrates comparing with the WHO standards. The

two major causes of non-safe drinking water were bacteriological contaminants and iron.

Bara River, Budni Nullah received untreated sewage and wastewater from the eastern and central part of

Peshawar and ultimately fall into Kabul River after passing through several residential and agricultural

areas.

10 http://www.pcrwr.gov.pk/waterqlty.html

0.0

22.5

45.0

67.5

90.0

112.5

1979

1981

1983

1985

1987

1989

1991

1993

1995

1997

1999

2001

2003

2005

2007

To

tal R

ain

fall

years

Peshawar Rainfall 1979-2008

Total Rainfall

Page 32: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

The untreated Industrial effluent is not only dangerous to human and aquatic life but is also producing

obnoxious smell along its route, which causes adverse impacts on the associated environment. The water

of these seepage drains and River Kabul gets heavily polluted due to discharge of untreated municipal

and industrial effluents. The water of drains and river in downstream is used for cattle drinking, washing

and bathing purposes which spreads water borne diseases. Owing to extensive retentions of sewage in

the drains, aerobic process starts, with obnoxious smell increasing the nitrous and sulphatecordes. This

creates an environmental disaster for the habitat.

In Peshawar, the increased number of vehicles without proper testing, factories established without

proper planning, smoke and dust on the roads has created an atmosphere which is neither acceptable to

human life nor climate friendly. The industrial units are scattered over a vast area with greater

concentration in and around the city. Industrial emissions from chimneys are also a source of air

pollution in these areas. The increased number of brick kilns situated in the province particularly in

Peshawar has almost doubled the level of air pollution mainly due to the use of large amount of

unauthorized fuel. Massive burning of solid waste and domestic activities are also contributing air

pollution.

As per Peshawar Foundation report “Peshawar is the most polluted city of Khyber Pakhtunkhwa (KP)

Province with carbon dioxide emission reaching up to 23 particles per million (ppm) against the World

Health Organization guidelines of 10ppm,” owing to emissions from vehicles, industries and brick kilns;

massive burning of solid waste/refuse, domestic burnings and use of ill-maintained vehicles.

As per World Health Organization (WHO) Standards, the level of sound generated by an activity, object

or person etc. is the sound that exceeds the maximum permissible level i.e. 85 dB and may likely to

annoy, distract or even harm others.

Although recent database is not available on noise pollution yet some historical studies on Peshawar are

available and may be considered as reference. Noise survey was conducted at the main traffic junctions

and it was observed that the average noise level in Peshawar City was above 90dBin all the cases as

compared to the WHO limits of 85 dB (decibel).

2.6. Geology of the District & Land-use planning

District Peshawar is underlain by recent river, stream and flood plain deposits, which belong to the

Pleistocene age group. Such deposits constitute about 80% of the District area. These are classed into

three types i.e. Stream beds, Fan deposits and Alluvium. Apart from these, about 20% of the area of the

Peshawar district is covered by other rock types. These rocks are typically revealed in the outcrops to the

west, southwest and south of the district. These include Tertiary Rocks, Jurassic Rocks, Paleozoic Rocks

and Precambrian Rocks.

About 80% of District Peshawar adjacent to Khyber Agency is covered by Landi kotal slate and Manki

formation in Khyber area slate with subordinate argillaceous limestone intruded by dolorite dykes.

Manki formation consists of dark gray, black thin bedded argillite sericite bearing slate, phyllite and

subordinate lenses of limestone, gravel sand and silt which has a bearing capacity in the range of 7-8 ton

per sqft for gravel and 0.2-0.3 ton per sqft for clay soil with low water table. Therefore, as far as geology

is concerned, the District area is suitable for urbanization, provided other factors permit.

Page 33: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Regarding seismicity in the District, Peshawar lies in zone 2b of minor damage zone corresponding to

PGA (Peak Ground Acceleration) value of 0.0667g to 0.1g. There have been several earthquakes in late

19th century generated by faults in District Peshawar. Due to the Hindukush ranges seismically active

since few years, Peshawar districts has had several earthquake jolts recently, the most notable among

them was the 26th October 2015 earthquake, which caused damages in Peshawar.

Land use planning has not been a central feature of the long term development of the city. As a

consequence, those areas that reflect a well-structured and planned urban form are to the west of the rail

line as it crosses GT Road. For much of this planned area, the road network, the residences and the

general urban streetscape are significantly better than that of eastern areas11. But as with many other

Pakistani cities, Peshawar‟s expansion has largely been unplanned and unregulated, with development

taking place mainly along the major roads and routes leading to other regional centers. The Urban Policy

Unit P&DD KP is however working on a land use/ Development plan for Peshawar.

Figure 6: and-use plan (Source: UPM P&D KP)

11 ADB/CDIA Interim Report, March 2014 CDIA: Urban Transport Pre-Feasibility Study in Peshawar, Pakistan 21

Page 34: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

2.6. Demographic Profile of the District

The total population of Peshawar as per 1998 Census was 2,026,851. Population of district Peshawar has

an estimated inter-censual growth rate of 3.58% per annum, which means that the population doubled

itself in 19.36 years from 1998. A total of 46.07 per cent of the population as per 1998 census was

below 15 years of age and 2.55 per cent was 65 years or above. The estimated population for 2015 is

3,685,634 showing an 81.84% increase in 17 years from 1998.

The male population is 1,936,942 (52.6%) and female population is 1,748692 (47.4%). The average

household size is 8.5 with 48.5 % urban and 51.5 % rural population.

Figure 7: Growth pattern Peshawar (Source: KP BOS)

Figure 8: Male-female population in Peshawar

2026851. 2099412. 2174571. 2252420. 2333057. 2416581. 2503094.

2592705. 2685524. 2781666. 2881249. 2984398. 3091239.

3201906. 3316534.

'-

850,000

1,700,000

2,550,000

3,400,000

4,250,000

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

POPULATION GROWTH PATTERN

Page 35: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Dependent population, in the case of Peshawar district, is 48.62% of the total population. The working

population of the district is 51.38%, which shows that dependency ratio12

in the district is 95%.

Population forecast for Peshawar as estimated by Urban Policy Unit (UPU) is around 6.2 million by

2033 (the two closer estimates, i.e. about 5.3 million under regression model, and 4.9 million under

cohort survival have been averaged to achieve more accuracy). The estimates under the three forecasting

models and the recommended population for different years are graphically illustrated as below in figure

10.

Figure 9: Peshawar population forecast

It is estimated that 57% of the population is under 20 years of age. The additional population during the

period 2013-2018 is estimated to be around 410,160 while that in the subsequent 15 years (2018-2033),

the additional population will be about 1,336,942. The housing demand in these two time periods will

accordingly be 68,360 and 222,824 respectively, or in aggregate, 291,184 plots. This is based on the

assumption that each family of 6 will have one house.

Current Housing backlog in the district is around 189,475 houses. The caseload of the millions of

displaced/ refugee population has not been taken into account while calculating the backlog.

Population (2013) Houses Required Existing Stock Current Backlog

3,360,393 560,066 370,591 189,475

Table 1: Current Backlog of Housing in Peshawar

2.7. Governance & Administration

As per the Khyber Pakhtunkhwa District Government Rules of Business, 201513

the executive authority

of the district government is vested in the City District Nazim while the Deputy Commissioner is the

12 KP Development Statistics 2014 13 http://lgkp.gov.pk/the-khyber-pakhtunkhwa-district-government-rules-of-business-2015/

2.9353 3.3604

3.7706 4.2016

4.6468 5.1075

2.50

3.50

4.50

5.50

6.50

2008 2013 2018 2023 2028 2033

Po

pu

lati

on

in

millio

ns

Years

Population Forecasts by Different Models District Peshawar

Extrapolation Regression Cohort Survival Recommended

Page 36: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

administrative head of all the district line departments while each department has their own head in the

district as District Officer DO (1st tier administration).

With the changing Governments and resultantly the changing policies there has been to and from

movements of change of names and local government structures and set ups in Peshawar. The revival

and abolishment of the designations of Administrator, Mayors and Nazims since 1959 has been a regular

and well known practice.

In accordance with the 2001 Local Government Ordinance, Peshawar was given the status of a city

district and subdivided into four towns. Each town consists of a group of Union Councils, with 92

councils in all. In addition to the four towns, urban areas also include the Cantonment and new housing

schemes under the City District Municipal Department (CDMD), such as Hayatabad and Regi Lalmah.

The abolishment of Peshawar Municipal Corporation (PMC) in 2001 led to the devolution of

responsibility for urban planning and development to different towns under the various Town Municipal

Authorities (TMAs). In Peshawar, seven TMAs for each the four towns, the Cantonment and rural/semi

urban areas were set up. Additionally, the Peshawar Development Authority (PDA) which is a separate,

semi-private entity that generates its own funds, was made responsible for Hayatabad and other large

housing schemes on the outskirts of the city.

In May 2012 the KP Local Government Act was passed, abolishing the TMAs and reviving the

Peshawar Municipal Corporation, with overall jurisdiction over the four towns of Peshawar. However,

with the passage of the Khyber Pakhtunkhwa Local Government Act No. XXVIII of 2013 the Municipal

Corporation and the post of Administrator was abolished. As per the act the local Government was re

constituted as City District Government for Peshawar, four Town Municipal Administration (TMA) and

neighbour hood councils. The Local bodies elections were held in May 2015 and the District Nazim took

the charge of his office on 1st November 2015.

Figure 10: KP Local Government System as per LG Act 2013(Source: UNDP Pakistan. An amendment:

In Peshawar its City District Government and Town Municipal Administrations & ROBs have been

notified in Oct 2015)

With the creation of new entity like the Water and Sanitation Services Peshawar, which absorbed a

considerable staff of the TMAs, the responsibilities related to water & sanitation municipal functions

have some-how been reduced for TMAs in Peshawar, the responsibility of the urban planning, building

Page 37: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

control, and disaster risk reduction still lies with it. It can be safely believed that while the city District

Government and the TMAs has a lot of mismanagement issues, lack of resources, under-utilized staff it

still has the space and the mandate to be utilized for enhancing the urban resilience in Peshawar. The

approval and enforcement of by laws and regulations is one of them. The City District Council has the

powers to approve the macro municipal plans for the City.

The Khyber Pakhtunkhwa District Government Rules of Business, 201514

have also been notified under

which the executive authority of the district government would be vested in the Nazim. He shall exercise

his powers and perform functions as provided in Sections 11, 12, 13, 14, 15 and 16 of the Local

Government Act within the policy framework of the government. The Nazim would be the approving

authority for expenditure within prescribed sphere of responsibilities. However, he shall not be the co-

signatory of the cheques with the drawing and disbursing officers at the district concerned. The Nazim

shall be a non-voting co-opted member of district development advisory committee in the respective

district to participate in the meetings for avoiding duplication and overlapping of development schemes

being executed under different funding arrangements.

The Deputy Commissioner, on the other hand, would be coordinating head of the secretariat to facilitate

day-to-day working of the district government. He would ensure expeditious disposal of the business for

convenience of the people, issue standing orders specifying the cases or class of cases which may be

disposed of by an officer subordinate to him within time period prescribed by the government or district

government.

The Deputy Commissioner would coordinate and supervise activities of district offices for evidence and

need-based robust planning, equitable and systematic development, effective and efficient functioning,

and ensure that the business of all the group of offices in the district government is carried out in

accordance with law and rules and the human and material resources placed at his disposal are optimally

utilized to improve governance.

The District is represented by eleven elected Members in the provincial assembly of KP and four elected

Members of National Assembly (MNAs) in the National Assembly of Pakistan.

District Tehsil Towns Neighborhood

Councils

Village

Councils

Cantonments

Peshawar 01- Peshawar 04 & 1 PDA as a

separate entity

130 216 01

2.8. Economic Features

Historically Peshawar being a gateway to Central Asia was a route for traders and tourists. Most of the

exports and imports to central Asia from the region were through Khyber Pass. In 1975, Peshawar had

largest number of hotels and restaurants in Pakistan. As a result, the city enjoys a commercial sector

typified by a blend of modern, historical and cultural perspectives. The commerce and trade in Peshawar

is a major income and employment-generating sector, and a large proportion

The inhabitants of rural areas of Peshawar depends on natural resource base as cultivation of food grains

vegetables and orchards both as cash crops as well as cereal crops also along with the livestock rearing

and fishing of subsistence value. Some of the population depends on paying their services as a vocational

14 http://lgkp.gov.pk/the-khyber-pakhtunkhwa-district-government-rules-of-business-2015/

Page 38: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

base. Some portion of the economy contributed from the micro entrepreneurship of hoteling and tourism

industries. On the other hand, a noticeable proportion of population has emigrated to Middle East, UK

and Europe and even USA in search of better income prospects. Consequently, foreign capital

remittances also hold a vital share in household income accumulation; the estimated household per

capital income stands between PKR 11,000- 15,000/household. The population living below poverty line

i.e. percentage of population consuming less than income required to satisfy their basic needs is 24% of

the population. The district has 55.3 % of kachha houses. The Infant Mortality Rate (IMR) is 4 deaths

per 1,000 live birth. The district comes under food insecure category with 54.2% food insecure

population.15

2.8.1. Agriculture

Agriculture and small scale industries in Peshawar are relatively developed. According to a report of

Agricultural Census organization, Government of Pakistan, agriculture is the main as source of

employment; however, it stands true about the rural suburbs. The report also states that the share of

services and personal business combined is more than the agriculture. Still agriculture is extremely

important for district Peshawar‟s economy and the land here, due to its topography and climatic

conditions, is suitable for raising multiple food crops. Out of total area of the district 79,014 hectares are

cultivated and 47,647 hectares are un-cultivated. The district possesses vast potential for growing many

types of crops i.e. Sugarcane, Wheat, Sugar beat, Tobacco and vegetables as well as fruits. The area has

potential to increase it‟s per acre yield by adoption of improved methods of crop production technology.

Below table shows variety of crops being produced in district.

Type Crop Area Sown in

2007-08

(000 Hectares)

Production in

2007-08

(000 Tonnes)

Area Sown in

2008-09

(000 Hectares)

Production in

2008-09 (000

Tonnes)

Food Wheat 34.5 78 35.3 83.6

Rice 0.3 0.7 0.3 0.7

Maize 16.6 29.4 16.9 29.8

Cash Sugarcane 11.9 0.613 11.5 0.598

Table 2: crops in District & production (Bureau of Statistics KP)

Wheat is the major crop grown in this District. The corresponding index shows that the trend in area and

production has been similar over the last 28 years. Area and production decreased significantly in 1990

due to the separation of Nowshera and Charssadda districts from district Peshawar. Though production

has increased slightly more than increase in the area, during 2000- 08, the relative change in the area and

15Pakistan Social And Living Standards Measurement Survey (Pslm) 2012-13, Pakistan Bauru of Statistics, Islamabad

Page 39: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

production remained the same in district Peshawar. Maize is the major crop of Kharif season in this

district. Due to the nature of soil and irrigation, maize cultivation is preferred over rice cultivation. The

figure shows the trends in area and production of maize. After the secession of Charssadda and

Nowshera, both area and production drastically decreased in 1989-90, as shown in the corresponding

graph. Otherwise, both area and production has shown consistency in the following years. Sugarcane is

the only significant cash crop of district Peshawar. The area and production of this crop has shown

consistent decrease over time. Comparing the trends of wheat and maize with sugarcane, it can be

ascertained that, area and production of sugarcane follows similar trend as other crops mentioned above

due to the secession of Nowshera and Charssadda. Area and production of

this crop has consistently decreased over time even after the secession. This declining trend may be

attributed to the topographic nature of the land, which is more suitable for the food crops.

2.8.2. Livestock

Livestock plays an important role in the economy as it provides job opportunities to a sizeable number of

the rural population. Khyber Pakhtunkhwa provides 23% of the total livestock production of Pakistan.

Asses, buffaloes, cattle, goats, horses, mules and sheep along with several poultry farms are found in the

district. Livestock in District Peshawar in 2006 were estimated to be as 143,481 Buffaloes, 67,204

Sheep, 265,272 Goats, 684 Camel, 6,205 Horses, 35,262 Asses, 473 Mules and 1,936,581 Poultry16

.

2.8.3. Industry

The modern industrialization process in the city was commenced in early seventies when specific

governmental sector institutions i.e. Sarhad Development Authority & Small Industries Development

Board etc. were set up. These institutions took multifarious measures to initiate and promote small and

medium level industries in the city. It included setting up of industrial estates and training programmes,

advisory services and loaning facilities for development of small and medium scale industries in private

sector. In addition, the provincial and federal governments announced certain incentive and subsidies for

the industries. As a result of these efforts, chain of industries came up. Despite all these measures

Peshawar could not flourish as an industrial city due to tough challenges of the illegal trades, smuggling

and dearth of the required climate to promote industrial base. Moreover, Peshawar has another

disadvantage that it is located at distance from the sea port i.e. from main market and sources of

necessary raw material. Because of the city‟s relative remoteness, limited local market and

underdeveloped resource base, a significant proportion of raw materials as well as manufactured goods

have to be imported. Transportation costs are substantial and as such represent a major cost disadvantage

suffered by industries in Peshawar. Already worsened situation of Peshawar city has further deteriorated

due to regional political scenario, war in Afghanistan, influx of refugees and prevailing extremism and

terrorism.

There are around 550 industrial units in the district. The list varies from food, beverages, tobacco, rubber

and plastic goods to minerals and metals products. Industrial activity provides employment for

approximately 14, 600 workers. At present, there are a total of 550 registered industrial units in

Peshawar. Of these, 122 are closed and 428 are operational. The principal employee enterprises are

Sugar & Distillery, employing a total of 525 persons, Paper & Paper Board and Match manufacturing

16 Source: Directorate of Livestock & Dairy Development Department, NWFP KP, Peshawar, year?????

Page 40: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

with a total of 2,232 employees. Sugar mill and a number of small industrial units are functioning, which

are manufacturing hosiery, small arms, leather and foot wear, garments, ghee, soap, etc. Match factories,

flour mills and steel re-rolling units are also operating in the district. The total Investment of all these

industries amounts to Rs. 5009.902 million17

. The city has three industrial estates; two have been set up

for small industries and one for medium industries. One small industries estate is located at Kohat Road

and the other is located on Jamrud Road adjacent to the medium industries estate.

From a broader perspective, the economy of the city appears to be dominated by the commercial/retail

sector, which exists primarily to serve the local customer base - as distinct from a more interprovincial or

international perspective. The exception to this of course is the growing influence of the transport and

logistics sector. On the basis of this initial scan, there are a number of economic challenges emerging for

Peshawar.

S.no Nature of Industry Total No. of Units

1 Food, Beverages & Tobacco 128

2 Textile, Wearing Apparel & Leather Products 37

3 Wood & Wood Products 38

4 Paper & Paper Products 39

5 Chemical, Petroleum, Rubber & Plastic Good 126

6 Mineral Products 71

7 Metal & Metal Products 86

8 Other Manufacturing Industries 25

Total 550

Table 3: List of Industries in Peshawar18

S.No Particular Number of Units

1 Total No. of Units in Industrial Estate Jamrud Road 329

2 Total No. of Units in Small Industrial Estate Kohat Road 85

3 Total No. of Units Out Side Industrial Estates 136

Total 550

17 Directory of Industrial Establishments 2007 (www.khyberpkahtunkhuwa.gov.pk) 18 Ibid

Page 41: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Table 4: Industrial Units (Area wise & number)19

2.8.4. Main Trading, Commercial Areas and Bazars

The City‟s commercial/shopping areas are to be found in six precincts. These are Saddar Road, Qissa

Khani, Pippal Mandi, Khyber Bazaar, the Jamrud Road corridor and Karkhano Bazaar. The level of

commercial activity varies with the area. Peshawar has an inner city area, which is enclosed within a city

wall and which had sixteen gates, of which only few remain. Within the walled city consumers‟ activity

and some trading takes place.

Karkhano Market and Bara bazar being a famous shopping centres offering a comprehensive range of

services. Bara Market is a commercial center situated at a corner of Khyber Agency. These two markets

having Pakistani as well as foreign made commodities, smuggled through Afghan Transit system. The

Bara market was damaged by militancy and is presently closed, however, its master planning by FATA

administration is in process.

2.9. Physical Infrastructure

2.9.1. Roads & communication

Total Roads in Peshawar district are 420.50 km20

out of which 380 km are black topped, 40.50 km

shingled roads. Roads per km of area is estimated to be 0.3321

. The total rail network is 30.90 km22

.

The city reflects the basic road network which has existed for centuries. Commercial enterprises and

trading is a common feature along all principal corridors. Even with the recent addition of the southern

ring road, the preference for this trend continues. Figure 3.1 shows this linear arrangement.

Within the core urban area, Peshawar city has three distinct categories of residential areas. These are (i)

within the walled city, (ii) surrounding the walled city and the area to the north of the rail line as urban

development extended into the previous farming areas now served by the road network supporting the

Charsadda and Dilazak Road arterials, and (iii) the formal residential areas to the west of the rail line to

accommodate the needs of the military (Cantonment) and that of the expanding population base of the

city at Hayatabad and University towns.

The City‟s commercial/shopping areas found in six precincts are Saddar Road, Qissa Khani, Pippal

Mandi, Khyber Bazaar, the Jamrud Road corridor and Karkhano Bazaar. All generate substantial demand

for travel with all suffering from excess traffic congestion at various times of the day. The commerce and

trade sector collectively provide employment for approximately 36,000 workers while the figure for the

services sector is closer to 50,000. The overall length of the road system in Peshawar has remained

essentially unchanged since 1999. In contrast the number of annual vehicle registrations has increased

consistently during this period. As a result, for much of the primary and secondary road network, severe

congestion occurs at specific pinch points during much of the day. GT Road between the Ring road and

the railway and the Sunheri Masjid Road- Khyber Road route through Saddar is particularly congested.

19 Directory of Industrial Establishments 2007, Page 109-125 20 Socio economic indicators of KP 2015-Buereaue of Statistics (http://kpbos.gov.pk/files/1433314107.pdf) 21 Chief Engineer, C & W Deptt: Khyber Pakhtunkhwa 22 Pakistan Railways, Divisional Office, Peshawar

Page 42: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Most of the primary and secondary roads; irrespective of right of way width are dual carriageways. The

emphasis in the past has always been to provide the maximum carriageway widths as the basis for

addressing capacity issues. Within the network, many intersections are well laid out but the ongoing

preoccupation with providing the maximum carriageway space for motorized traffic has resulted in

minimal available space for non-motorized modes. As the cantonment road network is laid in a grid

pattern, the opportunity exists for a relatively easy upgrading to an adaptive control system for

improving network capacity and overall mobility in the area. Previously signalized junctions on G T

Road and Jamrud Road under the control of Peshawar Development Authority (PDA) have now been

replaced with U Turns. These together with costly grade separations, fly overs at T junctions and long

detours for T junctions has simply shifted the traffic issue from one point on the network to another –

rather than curing the problem. This reflects the previously held misguided view that the solution lies in

providing more lane space rather than better management of the existing lanes.

Having regard to this continued growth, and with the likely future urban footprint, the need for a mass

transit system becomes not just a pipedream but also an absolute necessity.

2.9.2. Irrigation

Khyber Pakhtunkhwa province lies between river Indus and the Sulaiman hills that form the western

barrier of Pakistan. Its canals are insignificant as compared with the great irrigation works of the Punjab.

The only ones of any importance are in the Peshawar valley. These draw their supplies from the Kabul,

Bara, and Swat rivers, but the first two rivers irrigate small portion of cultivated area of the district.

Agriculture in Peshawar is largely dependent on Canals. Moreover, tube wells irrigation is also available

in some places. The irrigated land in district Peshawar constitutes a large percentage as compared to

other districts of Khyber Pakhtunkhwa. 73% of the rural mouzas are irrigated by Canals while 15-20 %

are irrigated by other sources including river, Tube-wells, ravine, and spring stream etc23

.

2.9.3. Piped water supply

Public Health & Engineering Department (PHED) and Department of Local Government and Rural

Development (LGRD) are responsible for water supply in the district. The tehsils wise details of public

pipeline/water supplies supervised by district PHE departments are given in Table 2.324

.

Water Delivery System

Tap Water Hand Pump Motor Pump Dug Well Other

Total 59 18 17 6 0

Urban 79 5 15 1 0

23 Data provided by Irrigation Department KP, 2015 24 Data provided by District Public Health and Engineering Department, Peshawar, 2014

Page 43: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Rural 36 33 19 11 1

Table 5 Percentage distribution of Households (HH) by source of drinking water

2.10. Social Infrastructure

2.10.1. Health facilities

There are 32 Civil Dispensaries, 47 Basic Health Units , 03 RHCs, 0D 04 Category D Hospitals, 05

MCH Centers, 03 Teaching Hospitals, in addition to this there are 05 other hospitals Molvi Amee Shah

Hospital, GT Road Peshawar, Naseer Ullah Baber Hospital GT Road Peshawar, Children ID Hospital

Old haji Camp Peshawar, Maternity Hospital Peshawar, Services Police Hospital, Peshawar, Wapda

Hospital –Wapda House Shami Rd Peshawar, Shaukat Khanum Peshawar Hayatabad Phase 5 Peshawar,

RMI Hospital Phase 5 Peshawar, IRNUM. The total beds strength of government teaching hospital is

about 3,460 beds. However, it may be noted that the 3 teaching hospitals not only cater for patients from

throughout the province, but FATA and even Afghanistan.

The under construction Hospital in Peshawar are Peshawar Institute of Cardiology, Hayatabad Peshawar,

Fountain House Hayatabad Peshawar, Children Hospital Hayatabad and Indus Hospital Peshawar. The

Provincial Government has notified not construct any more Basic Health Units in future. There is also

Provincial Health Services Academy in Peshawar to train Health Service Managers and service

Providers. (Source: Health Planning Cell Civil Secretariat Peshawar,)

District/

Tehsil

Hospitals Dispensaries R.H

Centers

B.H Units T.B

Clinics

S.H

Centers

M.C.H

Centers

No

.

Beds No. Beds No

.

Bed

s

No

.

Bed

s

No

.

Bed

s

No. No.

Peshawar 16 4,090 53 16 3 29 49 - 4 52 0 4

Table 6: Number of health institutions in Peshawar25

2.10.2. Education

According to UNESCO Education Policy Analysis Report 2009, literacy rate of district Peshawar is 47%

(68% male literacy while 24% female literacy) as compared to 57% of national average of Pakistan.

According to the 2012 estimate of the Ministry of Education and Training, Government of Pakistan the

gender parity index (girls/boys enrolment ratio) for district Peshawar is 0.8, enough well from the

province average with a good survival rate of 96% to grade five. The Pupil Teacher Ratio (PTR) was 52

for the primary level of the rural areas of the district while the same was 40 for the urban areas of the

district. The Pupil Class Room (PCR) Ratio was 52 in primary schools of rural areas while the same was

78 of urban areas of the district. The schools statistics of the district is given in the table 2.5

Boys

Primary

Girls

Primary

Boys

Middle

Girls

Middle

Boys

High

Girls

High

Boys Higher

Secondary

Girls Higher

Secondary

604 456 81 74 85 55 19 11

25 http://www.khyberPakhtunkhwa.gov.pk/Departments/BOS/nwfpdev-statis-health-tab-107.php

Page 44: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Total primary=1060

(4.6 % of province)

Total middle=155 (5.8

% of province)

Total High=140

(6.6 % of

province)

Total H. Sec= 30 ( 7.4 % of

province)

Table 7: Government schools statistics of Peshawar26

Education is a substantial component of the urban activity in Peshawar as over. Over 2,300 educational

institutions were recorded in Peshawar in 2009. Although these are located throughout the city, their

concentration is on Warsak Road to the north and in the University Town area to the west.

The estimated 2013 population of the study area is 2.8 million. This is likely to grow to nearly 4.5

million during the life of the Public Transport Strategy and Roadmap. Table 2.1 presents the details.

In district Peshawar, the literacy rate for population 10 years and above (2010-2011) was 54 percent

(Males: 68%, Females: 38%). Which increased to 59% in 2013. For the urban rural comparison, the

urban literacy rate is higher than the rural, which is 62 per cent. Among urban community, literacy ratio

for male is 75 and for female it is 47%27

. In district Peshawar, the total numbers of primary level schools,

are 1,063 and on an average, each primary school has an enrolment of 225 students with a teaching staff

of 5 28

. There are a total of 150 middle schools and on an average, each middle school has an enrolment

of 427 students with a teaching staff of 6. The secondary schools are 118 with an average enrolment of

210 students with a teaching staff of 13. Moreover, there are 52 higher secondary schools in the district

and an average enrolment of 133 students with a teaching staff of 33 in each school. Majority of the

schools are built prior to 2005 and with no seismic provisions or DRR measures applied during

designing stage.

Table 8: Gross & Net Enrolment Rates by Gender and Locality at different levels

Adult literacy rate (> 15 years) is 51 percent. Gross Enrollment Rate (GER), at the primary level, is 93%

(Male: 101%, Female: 85%). Net Enrollment Rate (NER), at the primary level, is 56% (Male: 59%,

Female: 52%). Gross and Net Enrolment Rates by Rural and Urban Gender at different levels

The total enrollment of students in government schools in district Peshawar is 300,013 (Boys: 182,735,

Girls: 117,296). Out of a total of 8,914 teachers 5,540 are male and 3,374 are female teachers. This

illustrates that, on an average, one teacher is teaching 34 students. Total educational facilities are 1,337;

out of which 815 are boys‟ and 522 are girls‟. This means that, on an average, every facility has an

enrolment of 224 students and a teaching staff of around 529

.

Urban/ Rural/ Gender Gross Enrolment Rates Net Enrolment Rates

Primary

Group (5-

9)

Middle

Group (10-

Matric

Group (13-

Primary

Group (5-

Middle

Group (10-

Matric

Group (13-

26 Source: E&SE Department data and website ( http://www.kpese.gov.pk as accessed on May 8th 2016) 27 Pakistan Social and Living Standard Measurement Survey 2012-13

28 KP Development Statistics 2014 29 Khyber Pakhtunkhwa Development Statistics 2007-08

Page 45: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

13) 14) 9) 12) 14)

Urban Male 104% 91% 68% 62% 26% 7%

Female 90% 60% 55% 58% 21% 12%

Total 97% 76% 62% 60% 24% 9%

Rural Male 98% 67% 45% 57% 13% 4%

Female 79% 35% 42% 41% 8% 4%

Total 90% 51% 44% 51% 10% 4%

Total Male 101% 80% 57% 59% 20% 6%

Female 85% 48% 48% 52% 15% 8%

Total 93% 64% 53% 56% 17% 7%

Level No. of Schools Enrolment Teachers

Boys Girl

s

Total Boys Girls Total Male Femal

e

Total

Primary 604 456 1060 122,605 81,529 204,134 3,274 2,118 5,392

Middle 81 74 155 36,418 20,457 56,875 559 386 945

High 85 55 140 16,371 9,714 26,085 921 465 1386

Higher Secondary 19 11 30 1,422 1,922 3,326 567 256 823

Inter/ Degree College 5 4 9 5,919 3,674 9,593 219 149 368

Page 46: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Total 815 522 1337 182,735 117,296 300,013 5,540 3,374 8,914

Table 9: Schools, Enrolment & teachers

Primary: In district Peshawar, the total number of primary level schools, that is reported, is 1,056 (Boys:

641, Girls: 415). The total enrollment, at the primary level is 204,134 (Boys: 122,605, Girls: 81,529).

Total number of teachers, at the primary level, is 5,392, out of which 3,274 are male and 2,118 are

female teachers. Thus, on an average, each primary school has an enrolment of 193 students with a

teaching staff of 5.

Middle: There are a total of 150 middle schools reported. The total enrollment at the middle level is

56,875 (Boys: 36,418, Girls: 20,457). The total number of teachers at the middle level is 945, out of

which 559 are male teachers, while 386 are female teachers. Thus, on an average, each middle school

has an enrolment of 379 students with a teaching staff of 6.

Matric: There are a total of 97 secondary schools in the district. The total enrollment at the secondary

level is 26,085 (Boys: 16,371, Girls: 9,714). The total number of teachers at the secondary level is

11,386, out of which male teachers are 921 and female teachers are 465. Thus, on an average, each

Secondary level school has an enrolment of 269 students with a teaching staff of 14.

Higher Secondary: There are a total of 52 higher secondary schools in the district. Total enrollment, at

the higher secondary level, is 3,326 (Boys: 1,422, Girls: 1,922). The total number of teachers at the

higher secondary level is 823, out of which 567 are male teachers and 256 female teachers. Thus, on an

average, each higher secondary school has an enrolment of 133 students with a teaching staff of 33.

Pupil teacher ratio is 34, which is quite high as compared to the global average of 1830

. In terms of 3rd

MDG “Promoting Gender Equality and Women Empowerment”, district‟s Gender Parity Index 0.70 is

less than that of country‟s average of 0.84 for 2008-0931

2.11. Urbanization, City Structure and Population

Since the 1960‟s there have been several failed attempts to develop a city master plan3. The consequence

of this is that, with the exception of the University and Hayatabad developments, the continued urban

development and sprawl of the city has continued during the past half century with minimal influence of

comprehensive urban policies. The streetscapes and often chaotic commercial and traffic activities along

many corridors reflect this Hazard (3 Source, Study on Slums in Peshawar. Cynosure Consultants (Pvt)

Ltd. 2013). More recently, the city has experienced a steady increase in population for the past two

decades. This has been the consequence of natural population increases, the familiar rural-urban drift as

citizens relocate to the city for improved employment, education or social reasons, and the security

factor where refuge is sought by refugees, displaced persons. As a result, the current urban area accounts

for an estimated 45% of the total stock of dwellings in the Peshawar District. With the boundary to the

west now having been reached, urbanization to the north and south has seen the familiar ribbon

development along Warsak, Charssadda and Dilazak Roads to the north and along Bara Road, Indus

Highway (to a lesser extent) and Phandu Road to the south. Although no specific confirmation data is

available, it is felt that these roads are a natural draw card for residents from rural area of the broader

30 http://huebler.blogspot.com/2008/11/ptr.html 31 Khyber Pakhtunkhwa Millennium Development Goals Report 2011

Page 47: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

district who (for a range of social and security reasons), seek a life closer to Peshawar. They provide

ready access to the broader city area and also maintain a ready corridor of access back to their broader

family members in the rural towns and villages throughout the broader District of Peshawar. Thus over

the next 20 years the urban footprint will likely cast a shadow, similar to that cast by the body and

tentacles of an octopus. This has obvious implications for a future mass transport system network design.

(ADB/CDIA Interim Report, March 2014 CDIA: Urban Transport Pre-Feasibility Study in Peshawar,

Pakistan).

2.12. Social & Poverty Profile

The population of Peshawar has roughly doubled since 1998 to about 3.3 million people, becoming one

of the largest recipient cities for refugees and IDPs in South Asia. It is also one of the poorest: an

estimated 29% of KP‟s population lives in poverty (UNDP, 2012). Today, approximately 0.8 million

registered Afghan refugees live in or around Peshawar, half of them - illegal. In addition to this, an

estimated one million unregistered Afghan refugees reside in Peshawar‟s urban areas. In addition, a

significant proportion of the Pakistanis displaced since 2008 from internal strife in Swat and FATA now

live in Peshawar. According to UNOCHA, as of September 2013, 463,000 IDPs live in Peshawar.

The distribution of the various socioeconomic groupings across the city is the key issue as it identifies

where those with the (likely) highest rates of private vehicle ownership are, and as is the norm, will have

the highest quality public infrastructure. It also identifies where those in the middle to poor

socioeconomic groupings live and who have both a lower level of private vehicle ownership as well as

generally poorer standards of public infrastructure. When this spatial distribution is understood, the

priority areas as far as improvements in personal mobility are concerned become readily apparent.

There is a basic east west divide between the middle –upper and lower-poor communities. From an

urban transport and a non motorised transport perspective, those communities in the lower-poor areas

suffer from poor infrastructure. This will be a target for the MRT as corridor upgrades in the form of

complementary measures are a proven way of improving conditions for non motorised transport modes

(NMT).

This situation analysis draws heavily on secondary sources for key information on poverty in the

province of KPK and the city of Peshawar. Most notably, “The Study on Slums in Peshawar”

commissioned by UN-Habitat (2012). There is strong evidence to suggest a correlation between social

inclusion, infrastructure development and economic growth. Nowhere is this, more true than in the

public transport sector. The urban poor, their economic potential could be harnessed to put Peshawar on

a competitive footing. Failure to do this could mean the loss of significant revenue potential for the

provincial and city authorities.

The population of Peshawar has roughly doubled since 1998 to about 3.3 million people, becoming one

of the largest recipient cities for refugees and IDPs in South Asia. It is also one of the poorest: an

estimated 29% of KP‟s population lives in poverty (UNDP, 2012). Today, approximately 0.8 million

registered Afghan refugees live in or around Peshawar, half of them - illegal. In addition to this, an

estimated one million unregistered Afghan refugees reside in Peshawar‟s urban areas. In addition, a

significant proportion of the Pakistanis displaced since 2008 from internal strife in Swat and FATA now

Page 48: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

live in Peshawar32

. The situation, however, seems to improve as the refugees repatriation and FATA

TDPs return has gained pace recently.

2.11. Slum Areas of Peshawar

UN-Habitat in association with UPU has a conducted a poverty study of slums in Peshawar city. The

study has identified 18 slum areas which are poorest areas of the city. These areas are located in 10

Union Councils of the city. The details of urban slums are shown in Table 3. Total population of the

slum areas is comprised of 27,450 HHs, whereas their average HH size is 11. (This estimate is based on

the detailed study of four slum areas). Based on this data base, total population of slum areas is around

250,000. It is nearly 15 % of the whole city population.

The household size of these poor areas is quite large if compared with the national HH average of 6.4.

Average income of these households is Rs. 52.62 per capita per day. It is 53% of USD 2 or Pak

Rs.107.10 set as the international poverty line. In these slums 97% houses are signal story and 70%

houses are made from mud and clay or wood/thatch. Mostly Afghan refugees and IDP are living in these

areas. 74% people reported occurrences of various diseases (during the period July- September, 2013).

Only 22 % houses have gas facility. Within the dwellings, most of the roads and streets are unpaved.

Link road are in a very bad conditions. The educational institutions are located at an average distance of

3.5 KMs and 42% school aged boys and 22% girls attend schools.

32 ADB/CDIA Interim Report, March 2014 CDIA: Urban Transport Pre-Feasibility Study in Peshawar, Pakistan

Page 49: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Sr. # Slum Area Sr. # Slum Area Sr. # Slum Area

1 Akhun Abad 7 Hassan Garhi 13 Shah Dand

2 Afghan Colony 8 Hazar Khani 14 Sufaid Dheri

3 Chamkani (rural) 9 Kashkal 15 Taj Abad

4 Garhi Rajkot 10 Mohallah Pir Hidayat ullah 16 Shaheed Abad

(Tehkal Payan)

5 Ghareeb Abad/ Changar Abad 11 Nasir Bagh Road (some

areas)

17 Wazirabad

6 Haidar Colony 12 Mohallah Rahimabad 18 Gujjar Camp

Table 10: Slum Areas (Source UNHABITAT, Urban Policy Unit Study)

Page 50: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The
Page 51: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Chapter 3: Hazards, Vulnerability and Risk Profile of District Peshawar

3.1. Background

Peshawar is a disaster prone district and vulnerable to a number of both natural and human induced

hazards. As per the severity index of the NDMP 2012-22 it ranks at 26 among the 145 districts of the

country with a scoring key of 19 and categorized as at “very high Risk”33

. The index highlight that

Peshawar is at the highest level of risk for earthquake and floods. However, a critical analysis of the

index calculation reveals some flaws especially in case of cyclone; the risk of which has been

categorized as low. This was proved wrong recently in August 2014 and April 2015 when very strong

winds caused a huge amount of destruction in Peshawar. Moreover, it can be safely argued that Peshawar

would have fallen in the category of top three vulnerable districts if human induced hazards like refugees

& displaced persons influx, terrorism, fires would have been considered while calculating these risk

indices for NDMP. The list of hazards thus confronting the district in general and the city in specific is a

diverse and alarming one. Some of the noteworthy natural disaster events in Peshawar are shown in

Table 12 below.

33 Analysis by JICA Study Team P30-32 Main Volume NDMP 2012-22 (www.ndma.gov.pk)

Page 52: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Table 11: Relative Severity Index of Districts in KP (NDMP)

Scoring Key Very High High Medium Low Very Low Non Hazard

Relative Severity of Various Risks per district of KP

Rank

No No Province District

Flo

od

Ris

k

Lan

d

slid

e

Ear

th-

quak

e

Tsu

na

mi

Cycl

on

e Dro

ug

h

t Aval

an

che

GL

OF

s

PD

MA

Poli

cy

Tota

l

Ris

k

1 K18 KP Nowshera 5 5 5 2 3 4 1 5 24

2 K5 KP Charssadda 5 3 5 2 3 5 1 5 23

3 K20 KP Swat 5 5 4 2 2 5 5 5 23

4 K21 KP Shangla 5 4 5 2 4 5 5 3 23

5 K16 KP Mansehra 4 5 4 2 1 5 5 5 21

6 K4 KP Buner 5 4 4 2 4 4 1 1 20

7 K17 KP Mardan 5 5 5 2 1 5 1 1 19

8 K19 KP Peshawar 5 3 5 2 3 4 1 1 19

9 k1 KP Abbottabad 3 5 5 2 2 5 1 1 18

10 K2 KP Bannu 4 2 5 2 4 1 1 1 18

11 K22 KP Swabi 5 3 5 2 2 5 1 1 18

12 K24 KP Upper Dir 4 5 4 2 2 4 5 1 18

Page 53: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

According to a country wide study done by Dr. Sarosh Lodhi of NED University Karachi34

by

combining the EMS technology for risk assessment coupled with extensive research and field work and

using the building inventory record from 2005 to produce intensity based fragility curves, the building

stock of Peshawar will face significant amount of damages in case of any strong shaking of earthquake.

Multi Hazard Vulnerability & Risk Assessment (MHVRA) plays important role as a planning tool for

DRM and especially in the context of diversified nature of human induced and natural hazards in District

Peshawar. At district, town, union council and village/neighborhoods council level, MHVRA can be a

planning base for all DRR interventions. Experiences, available data and hazard mapping exercise

conducted by government officials from district line departments, I/NGOs representatives and workers

identified the hazards and scenarios as the most likely to effect the people of Peshawar and need to

consider as planning basis for prevention, mitigation, effective response and early recovery for decision

makers and administration. The hazards prioritized are floods, earthquake, cyclones/ strong winds/

windstorms, urban flooding, epidemics, fires, terrorist attacks.

3.2. Methodology adopted for Hazard and Risk Assessment

As a limitation of this plan, both in terms of resources and time, it was not possible to conduct a

comprehensive MHVRA of District Peshawar in DDMP. A detailed MHVRA in line with NDMA

guidelines35

and in close collaborations with Academia and urban Policy Unit Peshawar for the urban

areas in specific is one of the strategic priority area as identified in the plan. The MHRVA as soon as

conducted will be made part of the revised plan as per the revision timelines. For the sake of

understanding and prioritization a broad hazard and risk profile has been compiled. The tools utilized for

this includes a review of past and ongoing studies and activities related to various hazards in the

categories of hydrological, meteorological, and geological phenomena. Mostly, cost weighted approach

has been applied for probabilistic multi hazards assessment. Exposure, vulnerability and risk assessments

were considered in the dimensions of population, buildings, crops, transport and infrastructure.

Primarily, two major hazards floods and earthquake were focused; the hazard mapping for earthquake

carried out by Earthquake Engineering Centre UET Peshawar was utilized while the flood inundation

maps of floods 2010 were mainly used for flood risk zonation.

Data gaps, alternative sources, verification of hazard assessments, elements of vulnerability estimation

have been completed through, hazard mapping, focus group discussions and Key Informant Interview

etc. Questionnaires and hazard assessment forms were also developed for various KIIs and FGDs.

3.3. Prevailing major hazards

3.3.1. Floods

Distribution of rainfall in District Peshawar generally occurs during two different seasons: winters

rainfall continues during December to March while summers rainfall which falls during June to

September. Normally monsoon arrives in first or second week of June but major floods occur in late

summer i.e. July to September. During recent years, it has been commonly observed that the distribution

of rainfall is very disturbed due to climatic changes and the District receives heavy rainfall in the form of

erratic and cloud burst normally occurs especially during the monsoon season.

34 Lodhi et. Al (2013) 35 Consultations were on-going during the development of this report to finalize the MHVRA guidelines by NDMA

Pakistan

Page 54: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

NDMP categorize Peshawar as one of the top few cities in terms of flood risk. The PDMA KP has also

listed Peshawar as highly vulnerable to floods in the last three consecutive Monsoons Floods

Contingency Plans36

. The flood Plains/zones falls between Kabul River and Budni Nala from Warsak in

the Northwest towards Southeast in the upper Northern half of the district. The district was also one of

the worst affected district in floods 2010 when river Kabul and Budni Nala devastated most parts of the

district affecting 16 UCs, destroying 33,867 houses with 46 dead and 68 injured37

.

Similarly, in 2012, three precious lives were lost while seven injured and a total of 217 houses were

damaged38

. In 2014, 13 drowned, 54 injured. The same went on for 2015 when 224 houses were partially

damaged, 19 fully collapsed and 7 persons lost their lives due to heavy rains and flash floods39

.

Urban flooding is a well-known and usual phenomenon, which has intensified since few years in

Peshawar. Poor drainage system in urban areas, which the newly established Water and Sanitation

system calls “almost completely clogged drainage system” is one of the reason for increased urban

flooding. Apart from the old city, Warsak road, Gul Bahar, Cantonment area the planned township

Hayatabad faces severe urban flooding with around 4 feet of water levels were recorded in 2013, 14 and

15. The District administration however claims that the most important reason of urban flooding is

heavily encroached Budni Nala. The reason being that almost all the drainage from Peshawar has its

outfall into the same Nala which eventually run into the Kabul River. An anti-encroachment drive to

clear the nullah is in progress as per the directions of the provincial Government. A technical study for

Budani Nullah has been proposed in the five year Road map for DRM. PDMA officials seems assertive

that the recently approved Federal flood commission‟s Flood protection plan if implemented and the

anti-encroachment drive will bear fruits in near future. A detailed analysis of the Peshawar part of the

inventory of Flood Works in KP40

on the Federal Flood commission website and interviews with the

department of Irrigation reveals that flood works are mostly done without any technical assessments,

with very less DRR measures while designing and implementation and sites usually identified by the

concerned MPA or Minister. Due to these issues the funds to flood protection works have usually very

less impact and sometimes detrimental to reducing the risk in a holistic context of urban areas like

Peshawar. Some residents of the Andar Shehr (city area) recalled the old days when the drainage system

of Shahi Kata in the city used to work amazingly well and urban flooding was a rare occurrence. The

rapid urbanization and without planning was considered by many interviewed as the major cause of

increased urban flooding. It was also identified that appropriate actions are lacking in the land use, and,

therefore, growth of vulnerable developments in flood plain areas continue unabated. The climate change

and the westward movement of monsoon rainfall patterns pose serious hazards to Peshawar.

While it is very difficult to make a direct co-relation between climate change and a particular flood our

knowledge about climate change science including in the South Asian Region, particularly based on

recent IPCC studies is making it increasingly clear that climate variability in this region is going to be (a)

high (b) is likely to increase the incidence of extreme climate events particularly those dealing with

water in the South Asian Region. While our ability to predict particular events at particular places or

36 www. pdma.gov.pk/publications 37 Source: http://www.pdma.gov.pk/Flood_2010/situation.php 38 NDMA Losses and Damages Details floods 2012 39 PDMA PEOC report; Damages due to rain from 01-7-2015 to 20.08.2015. 40 http://www.ffc.gov.pk/Inventory%20Reports.aspx

Page 55: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

particular times remained highly uncertain, our general understanding of global climate model is making

it clear that more such events are likely to happen with greater frequency as we move to the future.

It is important to understand that the key issue based by climate change lies in the increasing variability

of climate patterns. These patterns are already very difficult to project or predict even in the best cases

and the scientific consensus that it is going to become increasingly difficult to project and predict

because of the new levels of variability added by climate change.

The precipitation pattern has changed in Pakistan over the last century. The amount of precipitation has

increased significantly in the northern part of Pakistan. In addition, a study by PMD found that there has

been a shift of precipitation toward the west by about 60-80 km. The hazard for Peshawar valley has thus

increased with this shift.

Figure 12: Westward shift of precipitation

Moreover, Western Peshawar basin is endangered by both riverine floods as well as flash floods.

Riverine floods are caused by high discharge in 07 streams, which include Jindai and Khiali (Swat

River), Sardaryab, Naguman and Shah Alam (Kabul River). Other notable rivers include Kalapani

from north of Mardan and Bara from south of Peshawar. Except for Kalapani and Jindai rivers, rest of

these distributaries converge into main Kabul river within an area of 5 km2 immediately upstream the

Kabul river bridge on M1 Motorway. Bara River joins the Kabul river immediately past M1 Kabul

river bridge while Jindai and Kalapani join the Kabul River further downstream near Nowshera.

Page 56: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Figure 12:Major Rivers in Khyber Pakhtunkhwa (Source: Irrigation Department)

Considering the warning time available when Swat River floods at Khwaza khela and Amandara can

be comparatively much safer as compared to when Kabul River floods due to rains in Afghanistan

and FATA where no rain water gauges and telemetry stations available.

S.# Location Distance (km) Time Lag (hrs)

1 Swat River from Khawaza Khela to Amandara 65 12 hours

2 Swat River from Amandara to Munda 55 9 hours

3 Swat River from Munda to Charsadda Road 40 6.5 hours

4 Kabul River from Charsadda Road to Nowshera 35 6 hours

5 Kabul River from Warsak to Nowshera 60 10 hours

Table 12: Time Lag of Rivers in KP (Source: Irrigation Department)

Page 57: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Figure 13: District Peshawar Roads and Canals

Page 58: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Figure 14: Peshawar 2010 floods inundation

Page 59: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Figure 15: Classification of areas by degree of flooding

3.3.2. Earthquake

Most of Peshawar, as per the building codes of Pakistan, lies in seismic zone 2B except for small area in

the north west of district adjoining to Mohmand and Khyber Agency which falls in seismic zone 3. The

relative severity of risk index of NDMP by JICA puts Peshawar into the very high category in terms of

earthquake risk. Peshawar lies in the zone, which consists of southern part of Eurasian plate and northern

part of Indo-Australian plate. Highly Seismic Hindu Kush region is approximately 200 km North West

of Peshawar. Most of the earthquakes felt at Peshawar have their origin in the Hindu Kush region of

Page 60: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Afghanistan or Northern areas of Pakistan41

. A recent unpublished study by Earthquake Engineering

Centre (EEC), University of Engineering & Technology which has been funded by the Provincial

Government on the recommendations of PDMA KP records the historical seismicity of Peshawar and

reflects the high intensity of earthquakes in 1865, 1868, 1869, 1878, 1879 and 1883 with intensities of as

high as level VIII. EEC experts also feel that with such a record of historical seismicity, possibility of a

huge earthquake in Peshawar in the near future cannot be ruled out.

Figure 16: Historical Earthquakes of Khyber Pakhtunkhwa (Source: Dr. Naveed et al. , EEC UET,

2015)

Enforcement of building codes is conspicuous by its absence. Interview with P&DD & C&W revealed

that after 2005 earthquake the Pakistan building codes Seismic provisions of 2007 are being followed by

the Government departments for the public buildings and infrastructure. However, for the private

buildings no codes enforcement regime in Peshawar is in prospect. PDA with its administrative authority

over Hayatabad and Regi Lalma in theory is carrying out the checks to implement the safety standards in

private construction; in practice it seems to be not enforced except few open space regulations. The most

recent building regulations available for Peshawar date from 1985 and apply to the “urban areas of the

41 Dr. Q. Ali, A. Naeem: A critical review of the seismic risk zoning and development of Design spectra for

Peshawar and adjoining areas

Page 61: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

North-West Frontier Province” (PUDB, 1985). These bylaws have essentially no requirements for either

structural or earthquake design.

A recently conducted seismic hazard mapping study for Peshawar by a postgraduate research team at the

Earthquake Engineering Center of UET Peshawar42

has produced most up-to-date earthquake catalogue

data obtained from various national and international sources (Ambrasey and Douglas, Ambrasey, ISC,

Global-CMT, NGDC, USGS) and including both the shallow (< 50m depth) and deep earthquakes (<

50m depth). Additionally, a set of recent global ground motion prediction equations (GMPEs) were

systematically tested and selected for ground motion modeling. Region specific seismicity (G-R) models

were developed and incorporated in CRISIS softwares for PSHA analysis (on a grid size of 0.050 i.e.

5km x 5km) and derivation of hazard maps for various return periods.

It has been observed that for 475 years return period that the northern parts of Peshawar are in Zone 3

and the southern parts are in Zone 2B. However, the building code of Pakistan BCP-2007 places

Peshawar in Zone 2B.

(Homogenized Catalogue)

(De-Clustered Catalogue)

Figure 17: Earthquake Catalogue used in Seismic Microzonation of Peshawar

42 Seismic Microzonation of District Peshawar by Dr. Naveed Ahmad, Earthquake Engineering Center, UET

Peshawar, 2016.

Page 62: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

(Low: 0.08g – 0.16g)

(Low: 0.08g – 0.16g)

(Low: 0.16g – 0.24g)

(Medium: 0.16g – 0.24g and High: 0.24g –

0.32g)

Page 63: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

(Very High: > 0.32g)

Figure 18: Seismic Hazard Maps for Peshawar

3.3.3. Mini-Cyclones/ Tornadoes

Strong winds and windstorms is a recurring hazard in Peshawar. The damages due to these winds are

increasing due to unsafe urban planning practices such as unsafe and buildings, as well as the use of

unstable billboards throughout the city. In 2012 there were 4 deaths and 25 casualties during a wind

storm in the city. However, the mini-cyclone that ripped through Peshawar division on 26th April, 2015

was an unusual phenomenon. The Pakistan Meteorological Department stated that this mini-tornado was

the third forceful whirlwind in the recorded history of Pakistan and termed it as an “unusual and extreme

weather event”. The mini-tornado was accompanied by strong winds with a speed of 110km per hour

and 60mm rainfall. The analytical report of the PMD stated that warm moist winds from the south and

cool heavy air coming from the west and north collided over central KP, resulting in formation of the

powerful whirlwind. Due to this event at least 31 people were killed more than 203 injured43

.

PMD in its press release issued on the next day accepted their inability to forecast such weather patterns.

PDMA in its report44

stated that no operational weather radars have been installed in the province despite

of a scheme approved at the Federal level in 2007. Apart of inadequate weather forecasting installations

the report also highlighted the non observance of building codes, improper drainage system, unplanned

urbanization, unchecked cabling and wiring

The report also noted that in most of the damages it was observed that houses were built in narrow

streets where collapse of a boundary wall or roof resulted in the collapse of adjacent houses or boundary

walls, thus creating a chain reaction of infrastructure collapse. The report moved forward to suggest that

“regulatory mechanisms for the concerned authorities need to be chalked out and effectively

43 http://www.pdma.gov.pk/recent_updates/Special_Situation_Report.pdf 44 Ibid.

Page 64: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

implemented so as to safeguard against such happenings in future”. However, despite attempts no

correspondence on the issue was obtained for the report, where the concerned authorities were either

identified or directed for further actions.

Figure 19: Comparison of Deaths/injured in Cyclone of 26th April 2015 (Source: PDMA KP

45)

Figure 20: Post Cyclone (26th April 2015) Number of Death compensations ( Source: PDMA KP

46)

45 PDMA Khyber Pakhtunkhwa: Overview of Natural Disasters 2015

(http://www.pdma.gov.pk/sites/default/files/Overview%20of%20natural%20disasters%202015_7_0.pdf) 46 Ibid

Page 65: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

3.3.4. Fires

Fire is one of the important hazard the urban areas of Peshawar are faced with. The recent past is full of

instances of fires eruptions in houses, industrial units, markets, hospitals and schools (especially the

privately owned ones). Around sixteen students of a school suffered burn injuries when a fire erupted

inside a school building in Nothia, one of the most overcrowded area of the city47

in 2013. In January

2014 , more than hundred shops caught fire in Khara Market48

. The blaze lasted for more than eight

hours and caused a loss worth millions. Usually the fires are attributed to electric short circuits as no

detailed investigations are in vogue. The mushrooming of CNG stations and LPG cylinders at number of

shops in every vicinity is a great hazard and there have been number of accidents of fire due to that.

Moreover, there have been several fire eruptions after the bomb blasts in Peshawar city causing huge

damages to the buildings and markets, sometime more than the blast itself.

Fire brigades are on standby for any sort of rescue operations and are housed within the city in at least

eight stations. Around 220 fire fighters are available with Fire Brigade Peshawar. Rescue 1122 have also

got fire vehicles, around 200 fire-fighters and are trained for fire emergencies. However, it did not have

heave machines like snorkels to rescue stranded people and extinguish fire at seven and the above floors.

3.3.5. Conflicts/ Terrorism

Between 2006 and 2012, the province was subject to 166 suicide attacks, with 1,930 killed and 4,502

injured. In 2011 there were 120 terrorist attacks in Peshawar alone – an average of ten a month (Khwani,

2012). In 2012 there was a 5% increase in attacks on the police, targeted strikes on politicians and other

influential people rose by 17% and the year saw the highest number of suicide attacks since 2006 (Gul,

2012). While the threat of explosions, targeted killings and kidnapping is not limited to particular parts

of the city, the outskirts of Town IV, where most of the urban poor reside, experience considerably more

attacks than other areas. The most gory and unforgettable for the residents of Peshawar and for all

Pakistan was the recent one in December 2014 when 141 students of Army public School were martyred.

With the launch of a full fledges military operation Zarb e Azb against the militants that have enfeebled

their prowess, the peace returning to FATA as a result of the military operation and the return of

Temporarily Dislocated Persons (TDPS) of their homes security situation seems to improve, however,

the risk still remains high for Peshawar due to its geographical location and proximity to Afghanistan.

3.3.6. Temporarily Dislocated Persons (TDPs) & Refugees

Approximately 42% of registered Temporarily DPs reside in Peshawar district (UNHCR, 2012c). As per

the FATA Secretariat developed “ FATA Sustainable return & rehabilitation Strategy” document the

figures of those from five agencies of FATA as of March 2015 is 310,729 families49

and around 2

million individuals. Many came to Peshawar after military operations in malakand in 2008 and

subsequent operations in FATA‟s Bajaur, Mohmand, Khyber and South Waziristan agencies. While

many originating from Swat and Dir have gone home, significant numbers remain from Bajaur,

Mohmand and South Waziristan even though their areas of origin may have been officially „de-notified‟.

While they were expected to return and have in many cases been de-registered, many remain due to

47 http://tribune.com.pk/story/498652/fire-hazard-school-inferno-injures-16-students/ 48 http://dunyanews.tv/en/Pakistan/208836-More-than-100-shops-gutted-in-Peshawar-market-blaz 49 http://fata.gov.pk/cp/uploads/news/1429099729552e5296e0770.pdf

Page 66: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

security or economic concerns or because they are still waiting for government assistance to rebuild their

houses before returning.

More acute is the issue of refugees from Afghanistan. Since late 1970s Afghan refugees have been

pouring in to Peshawar. As of 2015, approximately 80% of Pakistan‟s 1.7m registered Afghan refugees

live in KP and 60% of these live in or around the Peshawar valley50

. The Commissionerate Afghan

refugees (CAR) Ministry of States and Frontier Regions set the figures of those in camps in Peshawar at

52,017 families which make 42.2 % of the total in-camp refugees in Pakistan. These refugees are

estimated at 40-50% of the city population51

; and the presence of whom have compounded the level of

urban poverty in Peshawar which is already significant and serious. A report by Environmental

Protection Agency notes that the influx of Afghan refugees exerts immense pressure on the fragile

resource-based ecology and nascent infrastructure of the province and triggering ecological demands

including air and water pollution, solid waste problems, deforestation, soil erosion, growing scarcity of

water, overuse of rangelands and wasteful energy consumption.

The presence of large numbers of refugees and TDPs in Peshawar as put immense pressure on housing

and land. Most displaced people rent properties rather than buying, given exorbitant land prices and legal

constraints preventing Afghans from owning land or „immovable property‟. Many Afghans from Kabul

who were part of the ruling elite or business class have been able to settle in wealthier districts of

Peshawar, such as Hayatabad, whereas others settled in camps before moving on to informal settlements

or renting property. Other refugees, especially those from rural areas in Afghanistan and those with

fewer resources, have settled on the outskirts of town in informal and unplanned areas. Although

officially not allowed to buy land, many have managed to acquire CNIC cards illegally or have bought

property in the name of Pakistani friends. The housing conditions are often very poor and crowded and

the expansions of slums have grown considerably with this trend52

. The refugee problems have led to a

proliferation of informal settlements in and around the city and the deterioration of urban infrastructure

and services in the city.

The massive population movement of Afghan refugees has neither been uniform nor unidirectional. It is

marked by the back and forth movements between Afghanistan and Peshawar as the conflict seemed

near resolution, reignited or mutated. Indeed, since 1979, the conflict has metamorphosed continuously

as the resolution of each chapter led to the surfacing of more dissentions and dispute. Afghans have been

living in Peshawar for 36 years now. Many of the younger generation have never even seen Afghanistan.

A clear majority) lives outside the camps, which signifies that they themselves have since long begun to

look after themselves and for long-term strategies inside Peshawar. In addition to the ongoing fighting

and economic insecurity in Afghanistan, the waning support by foreign donors and the progressive

closing of camps have in the long run favored their entrenchment deeper in society of Peshawar, forcing

them to develop their own coping strategies, rather than encouraging them to go back. Any DRM or

urban planning strategies for Peshawar must also take into the consideration this additional population of

refugees.

50 Sanctuary in the City, HPG working paper by Irina Morsel and Ashley Jakson (2013) 51 http://www.citiesalliance.org/sites/citiesalliance.org/files/CAFiles/Projects/Pakistan_1.htm 52 Collective for Social Science Research. 2006, January. Afghans in Peshawar: Migration, Settlements and Social

Networks. Afghanistan Research and Evaluation Unit (AREU) Case Study Series.

Page 67: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

3.3.7. Environmental Risks

Environmental disasters are also imminent in Peshawar. Almost 50 percent of the vehicles in the

province are in Peshawar alone. Other than rampant air and noise pollution from vehicles, Peshawar is

also home to industries such as cement, ghee, soap and marble. Effluents from these industries which

have been proven to be higher than permissible levels are discharged into the Bara and Kabul rivers,

where they not only contaminate drinking water but also percolate into the soil and contaminate

groundwater aquifers.

As per Peshawar Foundation report “Peshawar is the most polluted city of Khyber Pakhtunkhwa (KPK)

Province with carbon dioxide emission reaching up to 23 particles per million (ppm) against the World

Health Organization guidelines of 10ppm,” owing to emissions from vehicles, industries and brick kilns;

massive burning of solid waste/refuse, domestic burnings and use of ill-maintained vehicles. The noise

pollution is also an issue as well as the solid waste especially the use of plastic bags which usually clog

the drainage and sewage system increasing risks of urban flooding.

3.3.8. Epidemics & Endemics

The World Health Organization (WHO) in January 2014 declared Peshawar as the world‟s “largest

reservoir” of endemic polio with 90 per cent (83 out of the 91 polio cases) in Pakistan were genetically

linked to Peshawar city. Moreover, 12 out of 13 cases reported in Afghanistan were also linked to it53

.

Moreover, the outbreak of Dengue is also an hazard as there have been several cases reported in past few

years.

Moreover, it was found from a very important study54

that most of the drinking water is contaminated

before reaching households. The study concluded that about 84% of the samples collected from

households in Peshawar were found feacally contaminated with coliform bacteria and could not be

considered safe for human consumption. 31.2% of the samples collected directly from tube wells also

showed suspicious results. Faulty distribution and storage infrastructure and their lack of maintenance

are concluded main reasons behind drinking water contamination in Peshawar.

Another study by Pakistan Council for Scientific and Industrial Research (PCSIR) revealed that most of

the population of the provincial capital drinks contaminated water. The World Health Organisation

(WHO) standard limit of Magnesium content in water is 150 parts per million (PPM) but water samples

taken from residential areas in Peshawar showed presence of Magnesium up to 250 PPM. The study

further indicated that seepage from surroundings including sewerage pipes contaminates the water when

it is supplied to housing units and even water from the wells dug by residents at their houses is not safe

for drinking as it is close to surface, just 50-60 ft deep, and is contaminated. The Public Health

Engineering department and the Water & Sanitation Services Peshawar officials also admitted that water

distribution pipes were more than four decades old and main cause of the problem. However, they said

that a project of revamping of water supply pipes in urban areas of Peshawar, worth millions, is in

progress.

53 http://www.dawn.com/news/1080926 54 InamUllah, E. and a. alam, 2014. assessment of drinking water quality in Peshawar, Pakistan. Bulg. J. Agric.

Sci., 20: 595-600 (http://www.agrojournal.org/20/03-14.pdf)

Page 68: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

3.4. Exposure, elements at Risk and vulnerability context of the district

Elements at risk refer to Population, property, systems, or other elements present in hazard zones, which

are subject to potential losses. Measures of exposure can include the number of people or types of assets

in an area. These can be combined with the specific vulnerability of the exposed elements to a particular

hazard to estimate the quantitative risks associated with that hazard in the area of interest55

.

55Disaster Terminology by UNISDR

Page 69: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

3.4.1. Population

There is considerable variation among the social groups or age groups in the range and severity of

hazards. Within the household different age groups exposed to the hazard also play a role in its effect.

Consideration of different age groups are more important in this analysis as known from the lesson

learned of Oct 2005 earthquake which showed that gender and age perspective made difference in the

death toll and injuries; children, women and old age people were comparatively more severely affected.

The demographic data of the district for 2014, projected from 1998 census showing different age pattern

shown in table 13.

Figure 21: Population density Peshawar (Source: IMMAP 2015)

3.4.2. Buildings

After people, the most important dimension is the housing found in an area. In any disaster, the loss of

housing is considered the most crucial loss after human loss. In assessing the natural hazard risk to

housing units, the structural condition of units had to be collected. The grouping of housing units into

broad categories with available information was considered to possible extent for the risk zonation. The

housing census of Pakistan done during 1998 provided details about housing conditions in the form of

categorization into three groups given i.e Katcha, Semi pacca, Pacca units.

3.5. Risk assessment of the district

By overlying the compost hazards layers with the composite exposure and vulnerability layer, risk map

was generated in GIS environment. In which the vulnerability/exposure or fragility are characterized as

low, moderate and high through intersection overlay techniques, as shown in figure 20.

Page 70: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Figure 22: Risk Assessment CAPRA technique (Source: World Bank Group)

The results were validated with data collected during consultation workshop through stakeholder‟s

consensus. After validation, final Risk map has been created based on the results from this map the risk

indexing has been done for the union councils of the district as shown in table 14.

UC Name Risk Indexing UC Name Risk Indexing

Achini Bala Very High Risk Budhni Moderate Risk

Mera Surizai Paya Very High Risk Mera Kichori Moderate Risk

Shahi Bala Very High Risk Kankola Moderate Risk

Panam Dehri Very High Risk Adezai Moderate Risk

Khatki Very High Risk Azakhel Moderate Risk

Urmer Bala Very High Risk Shaheen Town Moderate Risk

Takhatabad Very High Risk Nauthia Jadeed Moderate Risk

Mathra Very High Risk Sheikhan Moderate Risk

Gulbela Very High Risk Hayatabad Moderate Risk

Page 71: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Khazana Very High Risk Gul Bahar Moderate Risk

Lahori Very High Risk Hasan Garhi Moderate Risk

Karimpura Very High Risk Chaghar Mati Moderate Risk

Ander Sher Very High Risk Faqir Abad Moderate Risk

Asia Very High Risk Shiekh Juanid Abad Moderate Risk

Jehangirpura Very High Risk Shiekh Muslim Moderate Risk

Ganj Very High Risk Maha Terai Moderate Risk

Palosi High Risk Khalisa Moderate Risk

Malkandhair High Risk Yaka Toot Moderate Risk

Regi High Risk Kakshal Moderate Risk

Lala High Risk Akhoon Abad Moderate Risk

Kafoor Dehri High Risk Wazir Bagh Moderate Risk

Musazai High Risk Shahi Bagh Moderate Risk

Haryana Payan High Risk Garhi Sher Dad Moderate Risk

Wadpaga High Risk Larhama Moderate Risk

Nahaqi High Risk Shiekh Muhamadi Moderate Risk

Jogani Moderate Risk Urmar Moderate Risk

Chaghar Matti Moderate Risk Mattani Moderate Risk

Chamkani Moderate Risk Akhoon Abad Moderate Risk

Nauthia Moderate Risk

Table 14: Union Council wise Risk Indexing

Page 72: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Figure 23: Critical facilities in hazardous areas (Source: IMMAP)

Page 73: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Figure 24: Flood safe site location

Chapter 4: District Disaster Management Unit’s Organizational Structure

1. Organizational Structure and Members

Under the Khyber Pakhtunkhwa Province amended National Disaster Management Act 2012, District

Disaster Management Authorities (DDMAs) are named as District Disaster Management Units

(DDMUs). The Provincial government has notified DDMUs in all the districts of Khyber Pakhtunkhwa

Province. Efforts are being made to equip DDMUs with all the necessary facilities and capacities to

further decentralize the DRM system in the Province. The DDMUs shall consist of such number of

members, as may be prescribed by the Provincial Government and unless the rules otherwise provide, it

shall consist of the following members, namely56

;

56

Khyber Pakhtunkhwa amended NDM act 2012 chapter IV

Page 74: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

a. Head of the local council at the district level (by whatever name called) or the Administrative

Head of the district who shall be Chairperson, ex-officio;

b. The District Co-ordination Officer/Deputy Commissioner;

c. The District Police Officer, ex-officio;

d. The Executive Engineer (Communication and Works);

e. The Executive District Officer (Education);

f. The Executive District Officer, Health; and such other district level officers, to be appointed by

the District Government.

District Disaster Management Officer will be appointed who will provide administrative support to the

DDMU.

2. DDMU Secretariat

A secretariat will be established to support the DDMU in its day to day activities. In district Peshawar,

the DDMO will be delegated to perform the tasks of secretariat for the DDMU. The secretariat will be

composed of the District Nazim, who will serve as chairperson, a DDMO as executive officer and a

minimum of three staff members who will be incharge of the three tasks namely Technical Support

(Training and Education), Operation Group and Finance and Admn support. The number of staff,

procedures and TORs of the secretariat will be developed by the DDMU57

.

Figure 24: Organizational Structure of DDMU (Source: Amended NDM Act 2012)

3. Function of DDMU

Powers of Chairperson of DDMU: The Chairperson of the District Unit shall, in the case of an

emergency, have power to exercise all or any of the powers of the District Unit but the exercise of such

powers shall be subject to ex-post facto approval of the District Disaster Management Unit.

Powers and functions of District Unit: Subject to the provisions of this Act, the District Disaster

Management Unit shall be as the district planning, coordinating and implementing body for disaster

management and take all measures for the purposes of disaster management in the district in accordance

with the guidelines laid down by the NDMA and the PDMA.

Following powers and functions of DDMUs has been defined in the NDMA‟s NDRMF 2007;

→ Formulate District Disaster Management Plan, based upon local risk assessment, and coordinate

its implementation,

→ Review development plans of government departments and provide guidance on mainstreaming

disaster risk reduction measures in these plans,

57 National Disaster Risk Management Framework, NDMA 2007 Page 53-54

Chairperson

District DM Officer (DDMO)

EDO (Education)

Ex.Engineer C&W Deptt

District Police Officer

EDO (Health)

Other Dist.level officer appointed by Dist.Govt

Page 75: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

→ Continuously monitor hazards, risks and vulnerable conditions within the district, municipality,

or cantonment areas,

→ Prepare guidelines and standards for local stakeholders on disaster risk reduction,

→ Conduct education, training and public awareness programmes for local officials, stakeholders

and communities,

→ Encourage involvement of community groups in disaster risk reduction and response by

providing them necessary financial and technical assistance for implementing community level

initiatives,

→ Examine construction in the area and if hazard safety standards have not been followed, direct

the relevant entities to secure compliance of such standards,

→ Invest in specific capabilities according the requirement to manage all types of threats peculiar to

local area,

→ Undertake appropriate preparedness measures at district level; e.g. maintain an early warning

system, identify buildings to be used as evacuation sites, stockpile relief and rescue materials

and identify alternative means for emergency communications,

→ In the event of a disaster, organize emergency response through the District Emergency

Operations Centre (DEOC),

→ Maintain linkages with the Provincial Disaster Management Authority and the Relief

Department,

→ Perform such other functions as the Provincial Authority may assign to it.

4. Local Disaster Management Committees

Subject to the directions of the DDMU, a local disaster management committee shall58

;

→ Ensure that their officers and employees are trained for disaster management.

→ Ensure that resources relating to disaster management are so maintained as to be readily

available for use in the event of any threatening disaster situation or disaster.

→ Ensure that all construction projects under it or within its jurisdiction conform to the standards

and specifications laid down for prevention of disasters and mitigation by the National

Authority, Provincial Authority and the District Unit.

→ Carry out relief, rehabilitation and reconstruction activities in the affected area in accordance

with the Provincial Plan and the District Plan.

The local authority may take such other measures as may be necessary for the disaster management.

4.4.1 Tehsil/Town Disaster Management Committee (TDMC)1

Committees at this level are the frontline of disaster risk reduction and response. For many departments,

this is the lowest level of administration where the committee directly interfaces with communities;

agriculture, education, health, police, revenue and others. Extension workers of above departments could

play a significant role in promoting risk reduction. For example agriculture extension workers could

promote awareness of drought, flood or cyclone resistant crops. Health workers could raise people‟s

awareness about potential diseases that may occur after a flood or drought and how to prepare for them.

Education officials could work on school disaster preparedness. Similarly Tehsil DM committee have an

important role in organizing emergency response and relief; e.g. damage and loss assessment and

58

National Disaster Management Act (amended Khyber Pakhtunkhwa, 2012) chapter VI, page 16 and

National Disaster Risk Management Framework, NDMA, 2007 page 54

Page 76: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

recovery needs assessment. Tehsil and town chairpersons will lead the risk reduction and response

operations with the help of Tehsil or Town Municipal Officer in consultation with the DDMU59

.

Figure 25: Organization Structure of TDMC

4.4.2. Union Council Disaster Management Committee (UCDMC)60

At Union Council level, Disaster Management Committee called as UCDMC will be established

responsible for the coordination and implementation of the disaster management activities. Head of the

local council or administration shall be the chairperson of the UCDMC. Below organogram describe the

possible members of the UCDMC.

Figure 26: UCDMC Organizational Structure

4.4.3. Village/ Neighborhood Disaster Management Committee (VDMC)61

The lower tier of the DM committee can be called as Village/ Neighborhood Disaster Management

Committee (VDMC). The committee will play a pivotal role as the committee members are at the

forefront line against disasters. Therefore, the more strong and organized committees are, more effective

response can be guaranteed.

Following Terms of Reference (TORs) can be adopted to select the VDMC members/volunteers.

1. Members should be permanent resident of the selected villages

59 National Disaster Risk Management Framework 2007

61 Adapted from DDMP Swat and DDMP Nowshera being approved plans

Chairperson(Head of Local council at Town level or Admin.head of Town)

Chairperson(Head of Local council at UC level or Secretary UC

All elected members (male & female)

All elected members (male & female)

Respetive Town Officers

Respetive Patwaris

Revenue Department Rep at Town level

Police rep at UC level (SHO)

UC DM Commitee (two from each commitee)

Rep form other departments at UC level

Religious leader

Religious leader

DDMU

Village/ neigbourhood DM committe rep

Town Disaster Managment Commitee

Page 77: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

2. They should be capable to read and write Urdu and/ or local language,

3. Selected trainees should be within age of 18-40 years and should have commitment to be part of the village level DM committee on longer

term basis,

4. They should be willing to take active part incapacity building initiatives and relief work,

5. Notables, elders and educated residents of the villages, preferably members of any existing Community Based Organizations (CBOs) could

be preferred.

Figure 27: Organizational Structure at Village level

Chair Person Selected by Communities

Medical First Aid team

Search & Rescue Team

Early warning team

Safe evacuation team

Communication & PIC team

Shelter Team Equipment handling team

Town/UC DRM Committee

Page 78: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Chapter 5: Key stakeholders and their role in Disaster Management62

This section of the DM Plan provides a brief description of the key disaster management activities that

the line departments, local government institutions and other stakeholder in Peshawar district are

expected to perform at three commonly known stages as pre, during and post disaster management.

Although, some federal level departments/institutions (Army, PMD, SUARCO, GSP etc.) are also

working at the local level, however, the focus is given to identifying disaster specific roles and

responsibilities of each district line department.

Generally, the government departments should integrate the following set of common DRM activities

into their routine process of functioning:

1. Ensure active participation in disaster-related activities and meetings led and coordinated by the

DDMU. Nomination of a department focal person for coordinating DM activities may prove to

be very useful

2. Make sure that the departmental strategies and annual development plans have disaster risk

reduction mainstreaming component integrated or they can use the disaster management

checklist for PC-1s issued by Planning Commission. It will allow proposing some amount to be

allocated under the annual budget for disaster related activities,

3. Map available technical & material resources of your department that can be used/deployed

during disaster preparedness, response or recovery and rehabilitation phases,

4. Map NGOs , develop and strengthen partnerships with non-governmental organizations to have

their support for DM. They can be effective in training and mobilizing hazard prone

communities as well as providing institutional support to your department,

5. Prepare/update department specific contingency plan regularly.

In addition to common DM activities, each department/organization will focus on undertaking the

following specific DM activities within their respective broad mandate;

1. District Disaster Management Unit (DDMU)

Before Disaster

Prepare a Disaster Management Plan including district response and contingency plan for the whole

district.

Ensure District Emergency Operation Centre (DEOC) is notified and key stakeholders are aware of

it. DEOC has been equipped with all necessary gadgets and operationalized.

Coordinate, ensure and monitor the implementation of National and Provincial level policies,

National, Provincial and District level plans.

Ensure that the multi hazard, vulnerabilities and risk assessment have been done and maps have been

developed , provided to the relevant people, emergency information/ guidelines displayed and

prioritized risk prone areas in the district are identified.

Disaster risk reduction measures are undertaken by the government departments, local authorities

and general public. Ensure proposed DRR measures are focused on highly vulnerable and social

excluded groups. (like women , Children, old, disabled , minorities, far off areas low income people,

transgender , refugees, non-locals/settlers etc.)

62 Roles and responsibilities were derived from the NDMA’s NDRMF 2007, NDMP 2012-2022, DDMP of Swat and Peshawar and further validated

through consultation meetings and formal letters sent out to all concerned from DDMU for comments and concurrence.

Page 79: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Provide guidelines, prepare, review and update district level response and contingency plans at least

annually.

Ensure that the guidelines/PC-1 checklists for prevention, mitigation, preparedness and response

measures as lay down by the Planning Commission, NDMA and the PDMA are followed by all

government departments and the local authorities. The guidelines should also propose measures for

highly vulnerable and socially excluded groups.

Give directions to different department/authorities at the district and local level to take such other

DRR measures for the prevention or mitigation of disasters as may be necessary.

Lay down guidelines for preparation of disaster management plans by the government departments

at the districts level and local authorities.

Monitor implementation of the disaster management plans prepared by the government departments

and local authorities. Ensure that disaster management plan have also suggested and implement

structural adjustments in construction for socially excluded group.

Organize and coordinate specialized DRR related training programs for different levels of officers,

employees, Students and voluntary rescue workers in the district.

Facilitate community level DRR trainings and awareness programs for prevention of disaster or

mitigation with the support of local authorities, government and non-government organizations.

Set up, maintain, review and upgrade the mechanism for multi hazard early warnings, dissemination

and education of proper information to public.

Co-ordinate with, and give guidelines to, local authorities in the district to ensure that post-disaster

management activities in the district are carried out promptly and effectively.

Review development plans prepared by the government departments, statutory or local authorities

with a view that DRR has been integrated into the development activities and projects of the plan.

Identify buildings and places which could, in the event of disaster situation, be used as relief centres

or camps and make arrangements for water, sanitation and hygiene in such buildings or places.

Establish stockpiles of relief and rescue materials or ensure preparedness to make such materials

available at a short notice during any emergency or disaster.

Encourage the involvement of Pakistan Red Crescent Societies, non-governmental organizations and

voluntary social welfare institutions working at the grass roots level for disaster management.

Develop pool of Master Trainers and Community Trainers in Community Based DRR in order to

develop pool of trained volunteers for effective emergency response with the support of Civil

Defence, R1122, PRCS and non-governmental organizations working at the grassroots level for

disaster management.

Take support of the Civil Defence, PRCS and non-governmental organizations to establish

neighborhood and Village level DRR Committees and ensure that they are properly trained and

selection criteria for the committees are in place.

Develop pool of volunteers and their database for effective emergency response with the support of

PRCS, non-governmental organizations and voluntary social welfare institutions working at the

grassroots level for disaster management.

Ensure communication systems are in order and disaster management drills are carried out

periodically.

Page 80: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Give directions for the functionality and maintenance of the resources available with any department

of the Government and the local authority in the district e.g water hydrants are installed/functional in

congested neighborhood, regular maintained of de-watering pumps, suction pumps, cranes are

available, First aid boxes are available etc.

Arrange (round the year) commemoration days of important past disasters events and use public

gathering platform like sports, cultural, recreational festivals, fairs and shows.

Establish stockpiles of relief and rescue materials or ensure preparedness to make such materials

available at a short notice during any emergency or disaster.

Hire the services of experts and consultants in the relevant fields to advise and assist as it may deem

necessary.

Ensure that the non-governmental organizations carry out their activities in an equitable and non-

discriminatory manner.

Identify health facilities as Points of Dispensations (PODs) which can be activated in case of

direahea, dengue , skin diseases and/or other health epidemics ,

During Disaster

Activate the District Emergency Operating Centre (DEOC) as early as possible after a disaster

occurs.

Carryout rapid damage and need assessment and develop flash report for assistance and report to

PDMA and other relevant stakeholders.

Close liaison with the Provincial Emergency Operating Centre (PEOC) and update with damage and

needs.

Mobilize neighborhood councils, village level DM Committees, PRCS, non-governmental

organizations and voluntary social-welfare institutions for effective response. Extreme care to

evacuate or take care of the highly vulnerable and socially excluded groups.

Provide shelter(identify camping sites etc), food, drinking water and essential provisions, healthcare,

Temporary education and services establish emergency communication systems in the affected area

and at evacuation/shelter places established by the Revenue Department.

Control and restrict vehicular traffic to, from and within, the vulnerable or affected area.

Control and restrict the entry of any person into, his movement within and departure from, a

vulnerable or affected area.

Remove debris, conduct search and carry out rescue operations. Make arrangements for the disposal

of the unclaimed dead bodies.

Direct any department of the Government of the Province or any authority or body under that

government at the district level to take such measures as are necessary in its opinion.

Construct temporary bridges or other necessary structures and demolish structures which may be

hazardous to public or aggravate the effects of the disaster.

Ensure that the non-governmental organizations carry out their activities in an equitable and non-

discriminatory manner.

Take such other steps as may be required or warranted to be taken in such a situation.

After Disaster

Support PDMA for carrying out detail damage and need assessment and develop detail report.

Page 81: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Close liaison with the PEOC and UN clusters for need assessment and effective response.

Continue and monitor early recovery and rehabilitation activities with the support of I/NGOs, UN

Clusters and other stakeholders.

Facilitate/cooperate in specialized and technical trainings of the government stakeholders and

I/NGOs for reconstruction and recovery process.

Build the capacities by providing trainings to masons, carpenters etc for the reconstruction and

recovery of the physical infrastructures.

Review and update development plans prepared by the departments of the government at the district

level, statutory authorities or local authorities with a view to make necessary provisions therein for

prevention of disaster or mitigation.

Hire the services of experts and consultants in the relevant fields of recovery and rehabilitation to

advise and assist as it may deem necessary.

Review the DDMP and Contingency Plans in light of lesson learn and improve the response

mechanism.

2. Town Municipal Administration

Before Disaster

Give technical inputs and approve bylaws related to disaster resilience practices in local context

through Town councils.

Suggest, prioritize and approved budgetary requirements for disaster mitigation practices.

Integrate DRR in short and long term development planes with in the municipality/Town with

focus on embedding proper planning code and suggesting DRR measures for the highly

vulnerable and socially excluded groups.

Ensure that the multi hazard, vulnerabilities and risk assessment have been done and maps have

been developed/available with relevant people and prioritized risk prone areas in the

municipality/Town are identified.

Land use planning and zoning within the municipality by preparing master planes while keeping

the multi hazard context of the municipality and Town in mind.

Ensure the implementation of bylaws related to encroachment at hazardous places, building

codes, land use planning and zonation etc.

Ensure the implementation of fines and penalties in place, related to DRR in the

municipality/Town.

Identify evacuation/shelter places to face any disaster/emergency.

Arrange commemoration days of important past disasters events and use public gathering

platform like sports, cultural, recreational festivals, fairs and shows.

Prepare contingency plan for the TMA and organize regular drills/simulation exercises.

Establish stockpiles of relief and rescue materials or ensure preparedness to make such materials

available at a short notice during any emergency or disaster.

Identified the frequent traffic congestion sites, disrupted sites of sewerages, water supply and

sanitation and hence highlighted for durable solution

During Disaster

Page 82: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Coordinate with the village and neighborhood councils in case of emergency in order to get

quick information about the severity and extent of a disaster impact and report it to the DDMU,

PDMA and higher district and provincial level authorities.

Dissolve disputes related to private properties for public use like footpaths, tracks, streets and

roads, originating from the disruption due to disaster. In a way grounds should be made to run

the response and relief activities smoothly.

Make arrangements for sanitation, cleanliness, disposal of garbage and carcasses, drainage and

sewerage system caused and disrupted by a disastrous event

Continue search and rescue activities and removal of debris.

Ensure health facilities are operationalized and roads are open to have access to health services

during the disaster.

Facilitate formation of voluntary organizations for assistance and help of the victims alongside

of the international and national humanitarian agencies.

Conduct rapid damages and needs assessment of the survivors in order to start relief activities

accordingly. Prepare flash appeal and report to DDMU and PDMA and other relevant higher

level authorities.

Report cases of handicapped, destitute and socially excluded groups to district government and

higher authorities in order to streamline their special needs in relief and response operation

After Disaster

Mobilize community for maintaining public ways, public streets, culverts, bridges and public

buildings, de-silting of canals and other development activities

Facilitate the formation of co-operatives for improving economic returns and reduction of

poverty and vulnerability

Dispose of debris from street and houses and promote cleanliness and encourage plantation of

trees in public places

Support in providing accurate and detail information useful for preparing detail damages and

needs assessment reports by the DDMU/PDMA etc.

3. Agriculture Department

Before Disaster

Keeping in mind the most significant hazards in the district, undertake a field exercise of risk

assessment to identify vulnerabilities and risks vis-à-vis food security, agriculture activities such as

cropping patterns in the face of climate change, and the livestock/dairy/poultry. This exercise should

also look into the possibility of likely damages / losses which might occur in the wake of any

disaster to all the sub-sectors of the Agriculture department. The outcome of the exercise will be an

informed and practical DRR plan of the department.

Establish and maintain farmers‟ groups to raise their level of awareness with regards to issues falling

under the overall mandate of the department. The farmers‟ group may also be trained on basic

disaster preparedness and response skills. They can potentially become extremely useful during

disaster situations in their respective areas.

Prepare departmental contingency plan and organize regular drills/simulation exercises.

Page 83: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Maintain emergency stock of vaccination, fodder and seeds etc.

Creating community seed banks at the Union Council level is a very viable option to support the

small farmers with minimum seeds requirements after any disaster to enable them to resume and

regenerate agriculture based livelihood activities.

Mass awareness regarding epidemics and diseases to livestock, poultry and crops. Regular

vaccination is an effective tool to prevent diseases.

Regular surveillance of water sources, which may be damaged or cause flooding in monsoon.

Close coordinating with Pakistan Meteorological Department and media to ensure that early warning

messages are appropriately relayed / disseminated to hazard prone communities. It will help people

to plan for sowing/planting and harvesting crops accordingly.

Arrange different trainings on impact of global warming and climate change and adoptability of

agriculture crops and enhance the productivity for the formers

Promote adoption of flood and drought resilient crops through research and dissemination to farmers

with the help of agriculture extension workers.

During Disaster

Immediately, start interacting with DDMU/DC office for coordinating emergency response

activities.

Make available all the technical and material resources to be made part of relief efforts.

Carryout agriculture sectors damages/losses and needs assessment and prepares flash report for

response.

Help other relevant departments in establishing relief camps in safe places.

Arrange feed and fodder for surviving livestock.

After Disaster

Prepare detail report of agriculture sector damages/losses and needs and submit it to DDMU/DCO

office for onwards transmission to PDMA/NDMA.

Repair and rehabilitation of water sources to ensure that agriculture activities are resumed as early as

possible.

Livestock vaccination.

Ensure foods and fodders availability.

Provision of seeds, fertilizers and other agri-inputs/implements to farmers as disaster early recovery

support.

Document lessons learnt and revise the departmental contingency and DRR plan accordingly.

4. Irrigation Department

Before disaster

Equip irrigation department to mitigate floods and droughts with technical & managerial capacity

and modern gadgetry and practices.

Ensure development & maintenance of flood protection systems in the pre-flood season.

Inspect and ensure the proper functioning of all the irrigation installations in the district.

Page 84: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Identify the most vulnerable points of irrigation canals & headworks‟s in the district and take

corrective measures.

Forge inter and intra departmental coordination mechanism, including coordination close with

DCO, DDMA, NGOs and PMD district Office and share the information/updates about emergency

with all the stakeholders.

Demonstrate/assist & train local communities facing localized or regional droughts on cheaper rain

water harvesting and storages techniques.

Educate and train the drought effected communities on water use efficiency techniques/good

irrigation practices.

To establish a mechanism of early warning transmission, up and downstream across communities

and establish special flood warning centres at Town level, with support of district administration and

CSOs.

Develop and regularly review the district level plans on water management.

Prepare departmental contingency plan and circulate it among stakeholders before onset of

Monsoon.

Identify and discourage encroachment(s)of various water ways, with the help of other district

authorities.

Closely monitor discharge rates in the major water bodies, passing through the district and for this

purpose and optimize functionality of the installed gauges.

Arrange protection material such as sand-bags, stones, machinery, human resources and other

material to be used at the time of need especially before the onset of moon soon.

During disaster

Ensure establishment and operationalization of Flood Control Cell (FCC) in proper order.

Keep liaison with field staff, Provincial Irrigation Department and district authorities

Institutionalize regular patrolling of vulnerable points/ irrigation canals and breach sites to warn the

potential victims on time.

Create and disseminate flood situation reports among the stakeholders.

After Disaster

Do stocktaking exercise of disaster affected areas and examines all the existing flood protection

systems like protection walls, spurs studs and head works of the irrigation canals.

Estimate and collect damages data and do need assessment in terms of repair/maintenance; and

disseminate the information to the relevant stakeholders for securing needed resources.

Coordinate repair work of the damaged irrigation infrastructures.

Prepare a sectorial specific recovery plan.

5. Revenue Department

Before Disaster

Being one of the key district departments, Revenue has to do a lot with disaster mitigation,

preparedness and response. Keeping this in mind, carryout a detailed multi hazards vulnerabilities,

capacity and risk assessment. It will help in identifying and prioritizing the most vulnerable or

Page 85: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

hazard prone areas for concerted efforts. Risk profiling of highly vulnerable and socially excluded

groups should be given priority.

Prepare a consolidated Departmental Contingency / DRM Plan based on the review of department

specific plans.

Inform the office of the DC and DDMU about the available financial resources against the

Contingency / DRM Plan and present a clear picture of gaps to be filled in either by the district

government‟s own funds or by the provincial funds through respective PDMA.

Prepare and regularly update the contact list of Patwaris (revenue officials) to ensure that they are

contacted and deployed in any looming emergency.

Capacity building of the revenue official in DRR and formal training on damages and needs

assessment would make them a very useful resource for accurate data collection for the district.

Regular liaison with the neighborhood and village level DM committees and volunteers in order to

take their help during any emergency.

During Disaster

Wherever and whenever required, establish the evacuation/shelter places in coordination with other

line departments, NGOs and philanthropists and evacuate the affected people with priority to the

highly vulnerable and socially excluded groups.

Keep track of in-coming relief support, develop a relief distribution mechanism, and start providing

assistance to disaster affected population.

Coordinate with the District Finance & Planning department to ensure timely release of required

funds through the DC/DCO‟s office.

Collect, verify and disseminate information about relief assistance being provided by the government

and non-governmental actors.

Assess relief needs on daily basis and prioritize them to meet the most urgent needs of the affected

people. It is of vital importance to prepare a sheet of required assistance on weekly basis and

gradually make it a fortnightly and then monthly exercise.

Assess the overall situation and determine the likely timeframe of the evacuation/shelter places

population return to their homes.

After Disaster

Start carrying out detail damages and losses and support DC and DDMU offices for detail report.

This can be done in two ways: a) revenue officials make field visits and find out physically the exact

nature and extent of damages and losses by filling in templates designed specifically for this very

purpose; b) collect and collate department-specific information on damages and losses.

Before the Early Recovery and Rehabilitation activities take place, identify and prioritize areas of

interventions by the government, non-governmental actors and community based organizations.

Inform national and international NGOs and the UN agencies about the district priorities and

facilitate their work.

Regularly monitor and supervise Early Recovery and Rehabilitation activities.

Prepare and provide progress update to the district administration and other relevant stakeholders

including local media.

Prepare budgetary estimates for reconstruction activities if the damages are massive.

Page 86: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

6. Health Department

Before Disaster

Develop a Health Risk Management Plan for the whole district to prevent or mitigate communicable

diseases, injuries following mass causality accidents and disasters with relation to department‟s

mandate and assets.

Undertake multi hazard, vulnerability and risk assessment for health facilities and services and

surroundings and propose allocation of funds in the annual development budget. Also, conduct

hazard and risk based mapping of all health care facilities, including vulnerability assessment

(infrastructure and organizational setup) and integrate hazard resilience measures.

During the construction of new health facility, proper designing keeping in view the need of People

With Disabilities (PWD) should be incorporated in the structure.

Integrate disaster preparedness and response capacities into all existing and future health programs at

district level.

Devise strategies for community involvement in all aspects of emergency preparedness, response

and recovery with regards to health sector. A pool of Community Health Workers (CHWs) should be

established or strengthen and can be linked to the neighborhood and Village level DM Committees.

Health related data should be maintained and updated on priority basis along with data of at risk

communities and elements are available digitally.

Identify safe evacuation place in the health facilities and conduct regular emergency response and

evacuation drills with all health officials.

With the support of DDMU, CHWs along with TDMC and VDMC can be engaged to collect at risk

population data especially marginalized and socially excluded groups can be identified.

During Disaster

Establish District Emergency Health Operation Centre to ensure better coordination and

mobilization in a disaster situation.

Set-up medical camps and mobilize emergency health teams including mobile hospitals, to be

deployed in the event of a disaster and start providing immediate emergency medical assistance.

Mobilize all available health resources and possible assets for emergency interventions.

Inform the DC and DDMU if external support is needed in terms of doctors, paramedics or

medicines/surgical equipments from other districts or from the provincial government.

Provide daily update on health response and highlight gaps/needs accordingly.

Keep the disaster-hit communities posted about any likelihood of epidemics and the precautionary

measures. CHWs can be mobilized to gather data and report. This is very important to prevent the

secondary wave of death in affected areas.

Guide and facilitate the non-governmental organizations in addressing the priority health needs in

most vulnerable areas.

Rapid damages/ losses and needs assessment of the health sector and prepare flash report.

After Disaster

Carrying out detail damages and losses assessment in the health sector.

Page 87: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Regular and vigilant health risks monitoring is immensely important to deal with post-disaster

diseases / epidemics.

With available resources, start repairing or retrofitting of the damaged health infrastructure in order

to cater health needs of the affected population during early recovery and rehabilitation stages.

It is important for the health officials to make sure that the drinking water is not contaminated.

Similarly, proper dumping of hospital waste is necessary to be taken care of.

Regularly monitor and supervise early recovery and rehabilitation activities in the health sector.

7. Education Department

Before Disaster

Conduct MHVRA for all education facilities, map all the educational facilities and identify structural

vulnerabilities such as hazard-prone location, dilapidated condition, risks involved, and other

secondary threats that may cause severe problems to educational facilities in case of a disaster.

During the construction of new school buildings or any other education facility, proper designing

keeping in view the need of People With Disabilities (PWD) should be incorporated in the structure.

Information about the existing hazards and risks in the district and the mitigation measures can be

compiled in simple language, and share it with teachers and students at all levels (primary &

secondary schools, colleges). The ultimate objective should be to incorporate inclusive DRR into

school curriculum.

Prepare Emergency Response Plan and DRR Plan for Education Facilities and arrange regular drills

and exercises during non disaster phase.

Gather information about I/NGOs working in the district in the education sector and make sure they

mainstream DRR aspect into their project activities.

Identify educational facilities that can be used as temporary evacuation centres for displaced

population during or after any disaster. It is important that the identified facilities have water, proper

sanitation and latrines facilities.

Engage active student through Girls Guide, Scout Teams, Parent Teacher Council (PTC) and

conduct regular trainings on emergency response management for students, teachers and parents.

Identify safe evacuation place in the school and in collaboration with other actors such as PTC, Civil

Defense and I/NGOs, organize regular emergency response and evacuation drills with students and

teachers.

Promote the spirit of volunteerism amongst students through awareness raising and training sessions

so that they become a useful resource for local communities in times of disasters.

Build capacities of teachers in a way that they are able to prepare and implement disaster response

plan for their respective educational facility.

Educational facilities related data should be maintained and updated on regular basis along with data

about those who are more vulnerable that include children under age of 10 and special persons.

Teachers can be used for mass awareness and capacity building of the vulnerable groups through

education & trainings and can disseminate massages by using students as a medium.

During Disaster

Mobilize teachers and student volunteers to assist in the search & rescue operations to be followed

by setting-up emergency evacuation and relief camps at already identified educational facilities.

Page 88: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

In case of flood, inform teachers of those schools where the water can probably hit the school

building and cause damages. This information will help teachers to take any emergency

preparedness measures with support from local communities.

Conduct preliminary damages and needs assessment and submit flash reports to higher authorities,

DDMU and DC office.

Temporary shelters in the form of school‟s buildings can be provided for displace population during

disaster, having water supply and latrine facilities available mostly in the buildings. Teachers can be

used as valuable working force for smoothly running of the emergency operating centres established

at evacuation sites.

After Disaster

Undertake a detailed assessment of damages inflicted by disaster to the educational facilities. On the

basis of this report, determine short, medium and long-term needs of the education sector in the

district.

Plan and provide provisional assistance on education after a disaster to ensure continuity of learning.

Rehabilitation and restoration of damaged educational facilities should be given high priority. PTC

can be an effective bridge or communication channel for long term rehabilitation and reconstruction

activities.

Non structural activities including preparedness, trainings, drills, awareness campaign and

celebration of commemoration day in the schools should be continued.

8. Finance & Planning Department

Before Disaster

Assess available resources and suggest proportionate allocation of funds to each district department

for DRM-related activities.

Advise departments about resource mobilization for their proposed DRM activities.

In line with the district contingency plan, prepare budget estimates that the each department may

require in a disaster situation.

If the required amount of funds exceeds the available resources, prepare budget estimates for the

provincial government so that it provides the requested funds. Such request may be forwarded to the

PDMA through DC‟s office.

During Disaster

Gather statistical data regarding damages to different sectors and the needs vis-à-vis response, early

recovery, rehabilitation and reconstruction.

Explore multiple options for required resources to meet the needs to a reasonable extent.

Ensure timely allocation of fund to the affected area, if additional funds are required, can be

arranged through proper channel.

Develop a detailed budget plan for disaster recovery, rehabilitation and reconstruction activities.

After Disaster

Provide requisite financial resources to district departments for the implementation of their

department-specific post disaster activities.

Monitor and evaluate utilization of funds by relevant departments on disaster risk management.

Page 89: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

9. Civil Defense Department

Before Disaster

Render First Aid, fire safety and rescue trainings to communities, individuals and organizations in

peacetime.

Develop and emergency evacuation plan and conduct regular drills and exercises.

Create community awareness on public safety.

Recruit/induct operational staff for search and rescue teams with required specialized skills and

equipments.

Ensure provision of trained rescue workers / Razakars and First Aid staff;

Educate and train volunteers on DRR, emergency response management including first aid, Search

and rescue, emergency evacuations and protection procedures against poisonous gases,

chemical/biological/radiological explosions or attack.

Participate in emergency drills with other stakeholders.

National assembly has passed a resolution about the inclusion of civil defense training for the

students for 9th & 10

th class. The trainings can be added as compulsory for the student securing 10

Marks as additional to their normal marks.

During Disaster

Undertake search & rescue activities immediately after a disaster. To do it in more efficient manners,

coordinate with other district departments in order to reach to the needy and more appropriate place.

Render first aid to injured persons and transport them to nearest hospitals/dispensaries.

Ensure evacuation from damaged buildings/structures including demolition of damaged structures to

avoid further loss of life and properties;

Assist in debris clearance and restoration of essential services to the affected buildings;

Search and defuse unexploded bombs in the affected areas;

Work with the Fire Brigade in rescue and first aid operations related to fire and other rescue

incidents.

After Disaster

On the basis of the response activities that performed, make a detailed assessment of the capacities

of the department and identify gaps and requirements.

Prepare a plan of action for the department and start resource mobilization accordingly.

10. Police Department

Before Disaster

Prepare details of inventory available at each police station that may be used during any disaster or

emergency.

Prepare and update regularly the contact information of your staff, and always make sure that the

main phone exchange and the wireless system works properly.

Prepare Contingency and DRR plan for the department.

Page 90: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Working with the Pakistan Meteorological Department and DC office, support in dissemination of

warning to the affected communities.

Support District Government Authorities in the process of evacuation to safer places.

During Disaster

Ensure law and order during any disaster situation in the affected areas.

Ensure security measures at evacuation points, in evacuated areas, at relief centers and godowns.

Provide assistance in emergency warning, rescue, relief and evacuation operation.

Ensure that over-loaded trucks are not coming/going to disaster affected areas.

Divert traffic where necessary to keep the emergency relief operations going smoothly.

Ensure security of humanitarian workers who perform duties after any disaster.

Prevent harassment of women and children during any emergency.

After Disaster

Keep order and prevent obstruction on public places.

Aid and cooperate with other agencies for the prevention of destruction of public property by

violence, fire or natural calamities.

Provide assistance to victims of road accidents.

Protect life and property of citizens.

Preserve and promote public peace.

11. Social Welfare & Community Development Department

Before Disaster

Maintain updated list of Organizations of good repute and proven track record

Develop disaster risk management plan and Contingency Plan with regards to the mandate of the

department.

Raise awareness of staff of the department about special vulnerabilities and capacities of women and

children with relation to disasters.

Encourage involvement of women and PWDs in disaster risk management activities.

Promote awareness amongst women and PWDs in hazard-prone areas about disaster risks and

disaster preparedness.

Develop capacities of women‟s, PWDs and Children focused organizations on disaster risk and

emergency management.

Ensure that needs of children, women survivors are addressed in post disaster situations during the

relief rehabilitation and reconstruction phases.

Properly plan and provide shelter to the affected women, beggars at Darul Kafala, Drug

rehabilitation, special education, blind institute, disable registration, child protector and other

socially excluded groups.

Promote awareness regarding the children protection and child rights.

During Disaster

Page 91: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Facilitate participation of women, minorities and PWDs in the management of relief, rehabilitation

and reconstruction activities.

Use of emergency phone number 1121 as helpline for Child protection during disaster.

Provide shelter provision to affected women, support in damages and needs assessment of the

affected area, service provision through reformal, shelter provision to missing unaccompanied

children‟s.

After Disaster

Support post-disaster rehabilitation of livelihoods of women survivors, which is mostly in the

informal sector and is ignored many times.

Support the district government and PDMA for re-unification of missing unaccompanied children,

women, PWDs, rehabilitation of families, psychosocial support provision

12. Communication & Works Department

Before Disaster

Develop district guidelines for safer construction of government buildings and infrastructure in

hazard-prone areas multi hazard approach.

Ensure DRR checklist of PC-1 has been seriously implemented in all new schemes.

During the construction of any new buildings, proper designing keeping in view the need of People

With Disabilities (PWD) should be incorporated in the structure.

Develop sample designs of government buildings, high-rise buildings and infrastructure (bridges,

roads) for safer construction in hazard-prone areas.

Ensure environment impact assessment studies has been conducted for all new schemes

Conduct training of builders, contractors and masons on safer construction methods and provide

guidance on adopting inclusive DRR measures during the construction.

Monitor construction of government buildings and infrastructure in hazard prone areas to ensure that

safer construction techniques are followed.

Incorporate disaster risk assessment in the planning process for construction of new roads and

bridges.

Construct, maintain and repair district and rural roads, bridges, tunnels and causeway etc.

Prepare a disaster risk management plan and contingency plan with relation to departments programs

and mandate.

Develop guidelines on conduct of damage and loss assessment to infrastructure and government

buildings in the wake of a disaster, and conduct assessments after disasters.

During Disaster

Send information to other district departments on road conditions especially regarding blocked or

impassable roads after a disaster.

Ensure draining the flood water from roads and remove debris from under the bridges for smooth

flow of water.

Monitor disaster situation (in case of flood and landslide) with regard to roads and coordinate with

other district departments for transporting relief items to affected areas.

Page 92: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

After Disaster

Undertake a detailed assessment of damages of government buildings, roads infrastructure including

bridges, culverts, etc.

Prepare a report of damages to be shared with the district and provincial authorities along with

budget requirements for the rehabilitation and reconstruction of damaged / destroyed infrastructure.

13. Public Health Engineering (PHE)

Before Disaster

Repair and maintenance of the structure in command areas.

Prepare contingency plan highlighting resources available with the organization.

During Disaster

Collect damages data and prepare report for onward submission.

After Disaster

Rehabilitation of the damaged infrastructure, including protection walls, retaining walls, check

dams, water ponds, surface water tanks, land leveling, field terracing, small dams, spurs etc.

14. Media

Before Disaster

Develop understanding with the subject of DRM with help from literature produced by different

technical government and non-governmental agencies. To further enhance their capacities, try to find

out training and orientation opportunities for media person vis-à-vis DRM.

Look into DRM capacities of the district departments and NGOs operating in the district. It will be

very helpful if to identify gaps (preparedness & response) and inform concerned authorities and

hazard prone communities about them.

Keep a close eye on development schemes and assess them with help from technical experts as to

what extent such schemes are going to be beneficial for hazard prone communities.

Inform communities about any impeding hazard on the basis of information that you may have

received from the Met department. This is called early warning dissemination. Correct early warning

and its timely dissemination can save lives and property of the hazard prone communities.

Help avoid false rumors and alarms among public. Exercise caution in reporting medical

emergencies, coverage of injured/dead bodies, coverage of women, children and GBV

victims/survivors.

Maintain a close liaison with Information Department and state media (PTV, radio Pakhtunkhwa)

During Disaster

Monitor emergency relief activities and identify gaps and the required needs of the most vulnerable

people (elderly, women, children, religious minorities, etc.)

Keep track of the in-coming external relief assistance and play a role of a watchdog so that the aid is

spent judiciously on disaster victims.

Try to compile success stories of disaster survivors and share their courageous efforts through your

newspaper, radio or TV channel.

Page 93: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Beside identifying gaps and objectively criticizing the response efforts, it is always useful to

acknowledge and appreciate the good work of government and non-governmental actors involved in

emergency response.

After Disaster

After any disaster, the most significant part that a media person can play is to gather as much

information as possible about damages and losses and the response efforts. It helps the government

authorities and other stakeholders to prepare more informed action plans for early recovery and

rehabilitation.

Don‟t forget the disaster survivors after the emergency response phase and continue monitoring

early recovery and rehabilitation activities.

15. Pakistan Army

Before Disaster

In consultation with NDMA, PDMA and other line department, identify areas that are most likely to

be impacted in case of a disaster.

Prepare a Disaster Response plan and conduct regular drills and exercises.

Accordingly, prepare and upgrade necessary equipments, manpower and other necessary material to

be used / deployed immediately after a disaster.

Conduct regular capacity building programs for soldiers so that they are able to carry out emergency

relief activities effectively.

Evacuate people to safer areas and designated evacuation centres before and after a disaster.

During Disaster

Provide search and rescue services where needed.

Evacuate people to safer areas and evacuation centres

Close liaison with the District Government and Disaster Management Authorities and if required

establish emergency relief centres and provide disaster victims with life saving food, shelter and

health facilities.

Install temporary bridges where appropriate to ensure mobility of affected population and smooth

transportation of relief items.

Provide logistic back-up in terms of trucks, boats, helicopters etc. to the civil administration, if need

be.

After Disaster

Supplement early recovery efforts of civilian administration and the humanitarian community.

Reconstruct / repair roads and bridges at important locations.

16. Private Sector (NGOs, and Pakistan Red Crescent Society, etc.)

Before Disaster

Conduct MHVRA at the Town/UC/village levels according to the standard procedure set by the

PDMA/NDMA under the supervision and with close coordination with the DDMU.

Develop DM Plans at all level and share with the DDMU for coordination and implementation.

Page 94: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Mobilize communities and develop local level capacities for early warning, disaster preparedness

and response.

Support DDMU in establishing the Tehsi/UC/Village level DM Committees according to the set

criteria of the PDMA KP.

Provide all necessary trainings, conduct drills/exercises and provide necessary equipment to the

DRR committees with the close coordination of the DDMU.

Participate in disaster risk management activities such as training, public education, damage

assessment, rehabilitation and construction projects in hazard prone areas.

Implement programmes for community vulnerability reduction; e.g. strengthening livelihoods, safer

construction practices, drought mitigation, etc.

The Pakistan Red Crescent Society is to assists the district government in crises, emergencies and

disasters. The main activities of the Society are relief work during and after conflict, disaster relief

and supplementary health and welfare services, which include a wide range of activities for the less

privileged and marginalized people in both urban and rural areas. The Society provides ambulance

and search and rescue service at times of emergencies in addition to capacity building of volunteers,

CBOs, and district government officials.

During Disaster

Facilitate local authorities in emergency relief operations (sear & rescue, establishment of

evacuation/relief camps, food distribution to displaced, provision of health services, etc.)

Establish information management centres at evacuation/relief camps with close coordination of the

DC office and the DDMU.

After Disaster

Mobilize disaster affected communities for early recovery and rehabilitation efforts.

With the support of DRR committees, assess Town/UC/Village level damages/losses and needs and

contribute it to the district government‟s data.

Prepare village level early recovery and rehabilitation plans and mobilize resources for their

implementation.

Provide emergency livelihood support to communities in terms of providing agriculture inputs,

conditional cash grants, etc.

Work on promoting community based disaster risk management.

17. Transport Department

Pre-Disaster

To carry out traffic counts and identify points of Congestions

To guide PTAs, RTA, assist the local government, PDA & Cantonment board in carrying out

assessments for relocations of car bargains, shadihalls (Marriage halls), Fuel Pumps, Transport

Terminals(Bus, taxi, motor rikshaw vehicle) education instructions, hand carts , street vendors etc from

vulnerable areas.

To assist DDMO office on life saving legal instruments like National Highway Safety Ordinance and

other relevant transport legal instruments.

During Disaster

Page 95: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Provide Technical Assistance regarding transport issues as Motor Vehicle Ordinance 1965 and/or other

prevailing and related administrative instruments.

Post Disaster

Provide guidance on long term hazard free regular development of Transport Initiatives/studies and

implementation to logical conclusion.

18. Rescue 1122

Before Disaster

Conduct basic DRM, First Aid, Search and Rescue, firefighting trainings in Departments,

communities

Support DDMU in preparations of emergency management plans in various parts of districts and in

critical facilities like hospitals, Govt buildings, schools etc.

Support DDMU in various simulation exercises in communities

During Disaster

Facilitate local authorities in emergency relief operations (search & rescue, fire fighting, first aid,

etc) with emergency rescue teams

Provision of pre hospital medical services with help of Rescue Ambulances which are fabricated

with standard medical equipment with trained Emergency Medical Technicians (EMTs)

19. Academia

Before Disaster

Conduct research in various fields of disaster management and climate change adaptation(CCA)

with a view to utilize the same for development planning

Conduct MHVRA studies according to the standard procedure set by the PDMA/NDMA under the

supervision and with close coordination with the DDMU.

Support DDMU to Develop DM Plans at all level

Render recommendations for various steps to be taken by DDMU/PDMA for DRR/CCA

Mobilize communities and develop local level capacities for early warning, disaster preparedness

and response through one day trainings camps .

Participate in disaster risk management activities such as training, public education, damage

assessment, rehabilitation and construction projects in hazard prone areas.

Prepare database of volunteers from academia and students and share their details with DDMU in

order to utilize their expertise during and after disasters

During Disaster

Provision of data and mobilize volunteers to Facilitate local authorities in emergency relief

operations (sear & rescue, establishment of evacuation/relief camps, food distribution to displaced,

provision of health services, etc.)

Advise and support DDMU and PDMA on various technical issues of S&R

After Disaster

Page 96: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Help DDMU in carrying out damages and needs assessment after disasters

Support DDMU in preparations of Post Disaster Recovery and rehabilitation plans

Support communities in marking of safe buildings and identification of hazardous buildings after

disaster

With the help of volunteers mobilize disaster-affected communities for early recovery and

rehabilitation efforts with Build Back better approach.

Page 97: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Chapter 6: Standard Operating Procedures for Emergency Response

1. Establishment and functioning of District Emergency Operations Centre

District Emergency Operation Centre63

(DEOC) coordinates the flow of information with respect to

activities associated with relief operations and thus plays an important role in any emergency. DEOC is

also utilized for decision-making. It also helps to streamline the flow of information horizontally and

vertically to the respected departments for efficient and effective relief operations. In the event of a

disaster, the DDMU will activate the DEOC and take operational lead for the district government

response. The DEOC will also act as a centre for coordination of the recovery efforts in support of field

operations. It will be physically located within the premises of the chairperson‟s office and will be

looked after by the DDMO.

During the normal times, DEOC will maintains a systematic database of the resources available,

important phone numbers, names and addresses of important government and non-government officials,

international bodies, NGOs, CBOs, VOs and other Civil Societies Organizations. The same shall be

updated on quarterly basis.

The DEOC would require following facilities to function properly;

Central operation area

Planning Area

Work stations for liaison personnel

Display boards to allow for the display of current information

Display boards for maps and charts

Effective communication

Emergency power supply

Conference/media room

Support facilities (Rest area, kitchen, security)

For effective and efficient response, the DEOC should be fully equipped with the communication

gadgets include;

Satellite Phones

Phone Units connected to WAN

Hot Line communication line with National/Provincial EOCs

Wireless/VHF central unit

Handsets (walkie-talkie)

Television Set

H.F. Radio Set

Video conference unit (to be compatible with the NEOC/PEOC video conferencing

network)

Inverter for Power back up

Portable Generator set

Overhead Projector/LCD Panel/Projector Screen

GPS Unit (Hand held)

Camera both still and movie

Desktop, with attached Printer, Scanner, fax (Multi utility machine)

The DEOC shall perform following functions;

63 In order to keep it standardized, parts of the chapter have been adapted from DDMP Swat and DDMP Nowshera

Page 98: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Collecting information about the vulnerable and risky areas

Monitor emergency operations and developing secondary threats

Carrying out assessment of damages and needs in disaster prone areas

Control and manage district level emergency operations. Coordination for preparation,

mitigation and response with all the district level stakeholders

Coordinate resources for Tehsil/Towns/UC and village level emergency functions

Receive and process disaster alerts and warnings from nodal agencies and other sources and

communicate the same to all designated authorities and stakeholders

Ensure that the government and the communities are alert and are kept informed of evolving

situation

Requisitioning additional resources during the disaster phase

Policy making and planning

Access of information and communication to general public and media

2. Communication network of DEOCs

The DEOC of District Peshawar should be directly connected with the PEOC PDMA. Down

at the district level, DEOC will further connected to the Tehsil/Town/UC level DM set-up

for quick access to information and response.

DEOC will function on 24 x 7 basis and will be functional round the year.

3. Operational staff structure64

During peace times, the DEOC shall function with the minimal staffing, however, in case of impending

threat or shortly after the disaster has struck the structure may expand to have representation of other

departments as well. The proposed structure in disaster situation is as under;

Coordinator DEOC: Coordinates and manages emergency operations in accordance with

directions from the DC and with Standing Operating Procedures (SOPs).

Administrative, Logistics and Security Officer (ALSO): The Administrative, Logistics and

Security Officer will be responsible for effective and smooth functioning of the DEOC in

administration and procurement related matters. S/he will manage procurement and

organize/facilitate meetings, seminar and workshops. Post holder will also plan and schedule all

field travel, vehicle maintenance and repair schedules. S/he will ensure that all drivers are licensed

and trained. Maintain up-to-date vehicle inventory. Prepare monthly vehicle use reports, including:

repair and maintenance and costs, fuel and oil use, costs of personal use if any, and inventory status

reports.

Public Relations Officer: The Public Information Officer will devise communication strategy for

the media and public. Provide support to Coordinator DEOC and DDMU to organize media

briefings, hold conferences, assist in preparing press releases, maintain contact with media etc.

Collect information from affected tehsil and UCs and prepare updates for Chairperson DDMU.

Telecommunication Officer: Responsible for maintenance and keep fully functional all the

equipments for ensuring smooth and effective transformation of information.

64 National Disaster Response Plan 2010, page 99-101, NDMA Islamabad

Page 99: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Operations assistants: From one to three positions to provide date entry and maintain displays.

They will also provide the coordination function for planning and logistics.

4. Standard Operating Procedure – Activation Procedure for DEOC65

6.4.1. On Receipt of Alert (Standby - Stage 1)

DEOC Coordinator receives information and regular update on potential disaster from tehsil/town/UCs

administration about the situation. Advises Chairperson DDMU to seek alert/activation approval, who

advises the Chairperson DDMU about the alert phase and seeks approval for it. Approval of alert phase

is notified to the key departments at district and below district level, PEOC and NEOC. SOPs to be

followed for this stage are;

Closely coordinate and gets information on the situation from tehsil/town and UCs

administration.

Monitor the situation.

Update Chairperson DDMU.

Alert the DEOC staff.

Put everything ready and functional in the DEOC.

Coordinate with key departments and humanitarian organizations.

Update different stakeholders about the situation.

Closely coordinate and consult with PEOC.

6.4.2. On Receipt of Warning (Stage 2)

Notification for full activation is issued and DEOC remains fully operational at 24/7 basis. The

Secretary/Chairperson DDMU will inform concerned departments at district level, PEOC and NEOC.

SOPs to be followed for this stage are;

Notification for full activation of the DEOC.

Place DEOC fully operational at 24/7 basis.

The Chairperson DDMU will inform concerned departments, PEOC, NEOC, humanitarian

organizations, UN, I/NGOs, and Media etc

6.4.3. Stand Down Procedure (Stage 3)

After reviewing situation and consultation with tehsil/town and UCs administration, coordinator DEOC

will advice the Chairperson DDMU for stand down. After getting approval, Chairperson DDMU will

approve the stand down. DEOC/DDMU will notify to the key departments at all level, PDMA KP and

NDMA etc. SOPs to be followed for this stage are;

Coordinator DEOC will debrief Chairperson DDMU about stand down.

Chairperson DDMU will approve it and issues notification.

Chairperson disseminates notification to the relevant departments and other stakeholders.

Final report on the emergency operations will be circulated to key stakeholders.

Inform PEOC and NEOC for stand down.

65 National Disaster Response Plan 2010, page 46-48, NDMA Islamabad

Page 100: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

6.4.4. Operationalization of DEOC

In case of full activation of DEOC, Coordinator DEOC will be responsible to fully equip the DEOC and

provides all facilities to the representatives of departments who will be present in DEOC during disaster

time. Stock of emergency food, office supplies, satellite phone sets, generators, logs, status boards,

maps, and other material and necessary equipment must be available. It is to be ensured that briefing

room is equipped with all maps, screens and multimedia projectors and other necessary material.

5. Simulations and drills

6.5.1. Responsibility for organizing drills

Periodically the DDMU will plan exercises or drills on various scenarios to assess the procedures in this

document and those from contingency plans for districts and departments. Agencies and departments

shall also conduct drills based on the hazard scenarios, sectoral response plans.

The following are proposed table top exercises that can be undertaken in drills;

A major earthquake in District Peshawar (area to be identified)

A major flooding caused by monsoon depression (areas to be identified)

Urban flooding (areas to be identified)

A fire incident

A terrorist attack

6.5.2. Schedules for organizing drills

There should be at least one/two drills in a year lead by DMU which shall combine and coordinate the

sectoral and contingency response regions. Lesson learned from the drills and those from the previous

and ongoing disasters should be incorporated into this DM Plan as appropriate. Each department may

organize their sectoral drills at realistic and convenient schedule. It is further suggested that simulation

organized on the eve of commemoration day of past prominent disaster will leave better impact.

6.5.3. Resources for organizing drills

The DDMU is to contribute partly to the exercises or drills. Each participating agency is advised to set

aside funds for sectoral or contingency exercises both for coordinated DDMU drills and individual

departmental drills. Besides, an indicative budget has also been identified in chapter 07 of this plan.

Page 101: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Chapter 7: Priority Disaster Risk Management Strategies (2015-2020)

This chapter of the plan presents priority strategies for disaster risk management to be implemented

during 2015-2020 in District Peshawar aligned with NDMP and Road Map for DRM in KP. The

proposed strategies are framed into eight different priority areas based on the logical connectivity and as

per strategic areas identified in the NDMP. The strategic priorities described in the plan are66

;

Priority Area 7.1: Established the institutional and legal system for disaster management

Priority Area 7.2: Prepare disaster management plans at various levels

Priority Area 7.3: Conduct multi-hazard, vulnerability and risk assessment

Priority Area 7.4: Establish multi-hazard early warning and evacuation systems

Priority Area 7.5: Promotion of training, education and awareness in relation to disaster

management, risk reduction & Climate change adaptation

Priority Area 7.6: Infrastructure development for disaster risk reduction

Priority Area 7.7: Mainstreaming disaster risk reduction into development

Priority Area 7.8: Establish district emergency response system

Various interventions have been proposed along with indicative budget and potential partners for

accomplishing the interventions.

66 Priority areas defined as per NDMP 2012-2022 of the NDMA Pakistan

Page 102: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Priority Area 8.1: Established the institutional and legal system for disaster management

Justification

DDMU at district level need to be completely functionalize and dedicated staff to be recruited to work

for the disaster risk reduction at the district level. It has been observed that ad-hoc arrangement to

appoint District Disaster Management Officers at DDMUs is normal practice in all districts. DDMOs

normally have DM portfolio as some additional responsibilities besides of their own prime

responsibilities.

Key target set for the priority area 8.1

DDMU is fully functionalized and their capacities have been built-up.

Better coordination in place to strengthen the DRM system

The revision of DDMP as per the plan is carried out and progress review carried out to identify

issues associated with institutional strengthening

Detail hazard and risk mapping available as planning tools

CSO are fully involved to support in enhancing the capacities in establishing the DRM system

UC and Village level disaster management committees are formed in 10 UCs as pilot case

Sub committees are formed to clarify roles and distribute the responsibilities

DM Committee members are very well equipped and professionally trained

The functional linkages between PDMA, DDMU, Urban policy Unit, Academia and

Departments are strengthened

Page 103: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Priority Area 8.1:

Established the institutional and legal

System for disaster management

Indicative Budget

(m Rs) 2016 2017 2018 2019 2020

Potential partner

(bold with lead

partner)

1. Functionalize DDMU at District Level

15.0 X X X

DDMU, City District

Govt., DCO, PDMA,

and RR&SD

2. Conduct regular monthly, quarterly and

need based meetings among DDMU

Peshawar, line departments for

establishing effective coordination

mechanism with civil societies &

Academia. Notification and conducting

meetings of Technical Working Group

on Urban DRR in Peshawar City

2.0 X X X X X

DDMU, DCO, PDMA,

All concerned

departments and CSO

working in the district

3. Formation of Disaster Management

Committees at Town & UC level as well

as communities level in the district start

with pilot case of 10 Selected Union

Council (to be augmented in phases)

5.0 X X X X X

DDMUs, LGAs,

PDMA and other

stakeholders

TOTAL BUDGET REQUIRED 22

Priority Area 8.2: Prepare disaster management plans at various levels

Justification

Page 104: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

According to the NDM Act 2010, each department will develop their own disaster management and response plan, although not serious attempt has

been made so for by the concerned organization to develop a department disaster management plan, mainly due to lack of awareness, knowledge,

resources and technical know-how.

Under this component, the preparedness and response interventions recommended range from district level initiatives to community level activities,

tackling such issues as preparing for response and building the capacities of response service providers with shared resources from government and

non-government agencies.

Key target set for the priority area 8.2

Line department have their own DM Plan

Disaster Management Plans are aligned with the Department Contingency plan, DDMP and NDMP

Disaster Management Plans exists at all level include Tehsil/UC and Village level plan

CSO are fully involved in the development and implementation of the plan

Web based & if possible GIS enabled system available with DDMU for planning and management for DRM related activities

Trained staff is available for updating the system regularly

Priority Area 8.2:

Prepare Disaster Management Plans at Various

Levels

Indicative Budget

(m Rs) 2016 2017 2018 2019 2020

Potential partner

(bold with lead partner)

1. Develop Various Department Disaster

Management Plan

5.0

X X

Various Line Depts and

DDMU and PDMA,

Academia

Page 105: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

2. Develop Town level Disaster Management

Plans

1.5 X X X X X

TMAs, I/NGOs, DDMU,

and Town level DMCs

3. Develop UC level Disaster Management

Plans

10.0

X X X X X

I/NGOs, UCDMCs,

DDMU, Town DMCs and

VDMCs

4. Develop Village/ Neighborhood Disaster

Management Plans

25.0

X X X X X

I/NGOs, VCDMC,

UCDMCs, DDMU, and

Town DMCs

5. Design a web based system for planning and

management for DRM related activities

5.0

X X X X X

DDMU, DCO, PDMA and

Computer Science

Department, Geography,

CDPM, Peshawar

University

TOTAL BUDGET REQUIRED 46.5

Priority Area 8.3: Conduct multi-hazard, vulnerability and risk assessment

Justification

Any effective disaster risk management planning and implementation requires specific, accurate and up-to-date information on hazard, existing

vulnerabilities and the potential risks associated with the communities, infrastructure and livelihood etc.

The geo-spatial database development will support in developing hazard/risk maps and prioritized index list which shall help the planner, civil

engineer and development practitioners to avoid development in the high risk areas and if deemed necessary, DRR should fully be integrated into

development practices. This component aims to prepare hazard specific risk cataloguing and maps, using latest scientific methodologies for whole

district and selected cities as pilot case.

Page 106: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Key target set for the priority area 8.3

District and UCs level map atlas including classified hazard/risk maps exist with the District Government

Field Surveys carried out to understand the regional building typologies and infrastructures for vulnerability assessment.

Studies on the site specific geology and site soil conditions. Data collections from the relevant deptt. or further bore hole studies conducted.

Risk profile indicating risky areas are identified including Social vulnerability assessment, those factors of community that can increase or

decrease community vulnerability and risk.

Meta data available for future analysis and modeling

PRA and advance tools are embedded in the mapping exercises and practices

Detailed urban flood risk assessment data available for warsak road areas on high resolution for planning and implementation of development

practices

Detailed Fire and Cyclone risk assessment data of pilot areas in Peshawar city

Village level hazard and risk maps exists with VDMCs and UCDMCs

Priority Area 8.3:

Conduct multi-hazard, vulnerability and

risk assessment

Indicative

Budget (m

Rs)

2016 2017 2018 2019 2020 Potential partner

(bold with lead partner)

8.3. Conduct multi-hazard, vulnerability

and risk assessment for District

Peshawar at a appropriate scale of

1:100,000 or as per requirements

20.0 X X X

DDMU, CSO, Planning

and Finance, Irrigation

and PDMA, UET,

Academia

Page 107: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

8.3. Conduct UC levels multi-hazard,

vulnerability and risk assessment in

five selected disaster prone UCs at

appropriate scale of 1:10,000 or as

per requirements (Use of PRA and

advance risk assessment tools)

60.0 X X X

DDMU, CSO, Planning

and Finance, Irrigation

and PDMA, UET

8.3. Flood risk assessment and modeling

for Jala Bela and Warsak road area

at a scale of 1:5,000 or as per

requirements (Use of PRA and

advance assessment tools)

20.0 X X X

DDMU, Municipal

Committee, Planning and

Finance, Irrigation and

PDMA , UET

8.3. Develop village level/

neighborhood level hazard and risk

maps and develop risk profile of

villages

10.0 X X X X

CSO, V/NCDMC,

UCDMCs, TDMC,

Irrigation and

DDMU,UET

TOTAL BUDGET

REQUIRED 110.0

Priority Area 8.4: Establish multi-hazard early warning and evacuation systems

Justification

The multi-hazard early warning consists of collection, consolidation, analysis and dissemination of impending hazard and risk. The early warning

information is crucial in making informed and timely choices around evacuation and issuing public warnings and alerts which offers immense

potential to contribute in mitigating disaster impact.

A comprehensive early warning system usually consists of four key elements: (1) prior knowledge of the risks, (2) presence of a monitoring and

warning service, (3) multi-layer information dissemination system, and (4) capacity to take timely actions. If one part fails, the entire system can

collapse, resulting in innumerable damages. If one of the elements fails, the whole system can be failed and losses will be encountered.

Page 108: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Due to difficult mountainous terrains and scattered population in the upper areas of District Peshawar, hazard monitoring and institutional

arrangements are either weak or ill-equipped to deliver timely and reliable information. However recent technological advancement in monitoring

hazard, cheaper modes of communication and availability of mobile technology in remote areas made it possible to monitor hazard and take

appropriate action by evacuating public to safer areas.

Key target set for the priority area 8.4

Standard operating Procedure exists to operationalize the EWS during any emergency

The EWS has been designed with Multi-hazard approach and guidelines

EWS are fully aligned with the PMD, Police department and other stakeholders at district level

Equipment are installed and fully operationalized

CSO are fully involved in creating awareness and wide dissemination of the EWS

Communities at up and down stream have understanding on cooperation and exchange of information

EWS committees exist at village level and are linked with the PMD, DDMU and other stakeholders

Identification of safe evacuation places by involving the UC/VDMCs. Evacuation sites has capacity to absorb number of people as per

requirement of the affected population

Priority Area 8.4:

Establish multi-hazard early warning and

evacuation systems

Indicativ

e Budget 2016 2017 2018 2019 2020

Potential partner

(bold with lead partner)

1. Develop clear SOPs for community based

multi hazard early warning system 0.5

DDMU, PMD PDMA, Police

and Revenue Department

2. Maintain and upgrade equipment and

instruments for early warning like river

gauges installation, fire alarms etc

20.0 X X X X X

PMD, I/NGOs, DDMU, PDMA,

Police and Revenue Department

Page 109: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

3. Launch awareness campaigns related to early

warning through IEC material and engaging

electronic and print media

2.0

X X X

PMD, I/NGOs, DDMU, PDMA,

Civil Defence, Police and

Revenue Department

4. Develop linkages between upper and

downstream communities and with

government departments for effective EWS

0.5 X X X X X

PMD, I/NGOs, PRCS, DDMU,

Police and Irrigation Department

5. Formulate community level sub committees

for early warning system 0.5

X X X X X

I/NGOs, VDMCs, UCMDCs,

PRCS, DDMU, Police and

Irrigation Department

6. Identification, risk assessment and

construction/upgrading of safer evacuation

centres in five selected UCs 1.0 X X X X X

DDMU, I/NGOs, PRCS,

Planning and Finance, and

Revenue Department

TOTAL BUDGET REQUIRED 24.5

Page 110: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Priority Area 8.5: Promotion of training, education and awareness in relation to Disaster Management, Risk Reduction & Climate change

adaptation

Justification

Training, education and awareness are important non-structural component which can create significant changes in behavior of the disaster affected

communities and among other stakeholders. Recent natural and human induced disasters highlight the importance of public awareness, and stress the

need of enhancing capacities through awareness, training and education in disaster risk management.

Since 2005, many I/NGOs, UN organizations and CSOs are actively engaged in creating awareness through imparting trainings and education in

disaster risk management to change the mindset of the people. However, still more need to be done to reach at each village and UCs that are prone to

high risk and vulnerabilities.

Key target set for the priority area 8.5

Capacity enhanced of the university faculty to DRR, climate change and conflict management

Scientific research opportunities and stipends available for DRR, Climate change and Conflict Management for MSc/M.Phil./Ph.D. research

scholars.

Proper Training Need Assessment has been carried out and training need identified.

Develop pool of volunteers and potential trainers for community level trainings and awareness.

Celebrating the commemoration day on each of 8th October through active involvement of the schools, CSOs and government department

Media involvement are encouraged and trained on playing active role, before during and after the disasters

Specialized tailor made training courses have been arranged for PWDs and marginalized communities with inclusive DRR approach has been

highlighted in the workshop

CBDRM pilot projects carried out with the support of I/NGOs and CSO segment of the communities

Community are fully involved in the process with focus on disaster resilient communities

Different drills are organized by CSOs and Tourism Department on safer evacuation

Safe evacuation routes and sites are identified in case of any emergency

Inclusive DRR approach is adopted during drills/exercises on safer evacuation

Media is involved for wide dissemination and publicity of the campaign

Page 111: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Priority Area 8.5:

Promotion of training , education and awareness in

relation to disaster management

Indicative

Budget 2016 2017 2018 2019 2020

Potential partner

(bold with lead partner)

1. Develop Curricula and induct disaster management,

climate change and conflict management subjects in

different department at Peshawar University

5.0 X

Peshawar University, DDMU,

HEC, PDMA and NIDM, UET

2. Conduct events on Climate Change and DRR in

Academia with focus on urban vulnerability in

Peshawar

15.0

X

Peshawar University, DDMU,

HEC, PDMA and NIDM,UET,

Agriculture University

3. Scientific Research topics on Climate Change,

Urban Food Security and DRR 20.0

X X X

Peshawar University, DDMU,

HEC, PDMA and NIDM,

Environment Department,

4. Training programme for Government officials on

DRR/ CCA 5.0

X

DDMU, Civil Defence, other line

department, I/NGOs, PDMA and

NIDM

5. Conduct TOTs on PDMA standardized CBDRM

Manual and develop pool of master

trainers/volunteers

10.0

X X

I/NGOs, PRCS, DDMU, PDMA,

NDMA and NIDM

6. Celebrate Earthquake safety day and Cyclone

Safety Day for five consecutive years in

commemoration of 8th Oct 2005 earthquake and

10.0

X X X X X

I/NGOs, DDMU, PRCS, line

department, PDMA and media

Page 112: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

7. Awareness campaigns through engaging print and

electronic media 5.0

X X X X X

Press Information & Civil

Defence department, Electronic

and print media and DDMU

8. Training and awareness programme on safety at

work in industrial areas/ small & medium industries 2.0

X X

Industries Department & Civil

Defense, I/NGOs, CSO, DDMU

9. Training and awareness programme through health

practitioners including involvement of community

health workers against epidemics

2.0

X X X

Health department, I/NGOs,

CSO, DDMU and respective health

facilities

8.5.10. Implement CBDRM intervention through different

I/NGOs (including structural and non-structural

interventions)

15.0 X X X X X

I/NGOs, CSOs, social welfare

department and DDMU

8.5.11. Conduct simulation/drills in City Areas (Andhar

Shehar) 10.0

X X X X X

DDMU, TDMCs, NDMCs, R1122,

and CSO, electronic and print

media

TOTAL BUDGET REQUIRED 99

Page 113: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Priority Area 8.6: Infrastructure development for disaster risk reduction

Justification

With vast experience of build back better after the devastating earthquake during 2005, the ERRA model need to be adopted and replicated for safer

infrastructure development. Detail risk assessment of existing and new infrastructure will play important role. Risk Assessment will highlight the

preferred mode of construction, retrofitting of the schools and health facilities. Besides it can ensure to implement the DRR checklist approved in PC1

by the planning commission of Pakistan.

Key target set for the priority area 8.6

Structural interventions are in place with the community involvement in ten model villages.

Retrofitting and necessary structural adjustment are carried out in five pilot phase Union Councils, schools, hospitals and other health facilities.

Internal and external risk assessment conducted and dilapidated health and school facilities are identified with proper survey.

Detailed landuse maps are available with TMAs for future planning and management.

Page 114: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Priority Area 8.6:

Infrastructure development for

disaster risk reduction

Indicative

Budget 2016 2017 2018 2019 2020

Potential partner

(bold with lead partner)

8.6. Develop 05 model disaster

resilient villages in five

selected UCs

100.0

X X X X

CSO, DDMU, Local government

authorities

8.6. Risk assessment and

retrofitting of five selected

schools in five UCs (Phase I)

20.0

X X X X

Civil Engineering Department of

UET, C&W and Education

Department, PDMA, and DDMU

8.6. Risk Assessment and

retrofitting of five selected

health facilities (Phase I)

20.0

X X X X X Civil Engineering Department of

UET, C&W and Health

Department, PDMA, and DDMU

8.6. Vulnerability Assessment of

Infrastructure, Government

Buildings and Housing

100.0

X X X X X Civil Engineering Department of

UET, C&W , TMA, DDMU, PDMA

and line department

8.6. Advocacy and planning for

Enforcing Building Codes in

Buildings

20.0

DDMU, Cantonment Board, TMA,

PDMA

8.6. Assessment of Vulnerable

points on River Kabul, Jindi

and Budani and Construction

of Flood Protection walls,

dykes

5,000.00

Civil Engineering Department of

UET, Irrigation, C&W, PDMA, and

DDMU

TOTAL BUDGET

REQUIRED

5260.00

Page 115: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The
Page 116: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Priority Area 8.7: Mainstreaming disaster risk reduction into development

Justification

In District Peshawar, the need for mainstreaming can be felt mainly due to gradual upward rise in reported disaster losses during recent decade,

primarily due to the increasing vulnerability to natural and human induced hazard events of economic and social assets and the wellbeing and

livelihoods of populations in urban context.

Key target set for the priority area 8.7

Engineers and other technical teams is orientated on how to integrate DRR into development planning and implementation

Utmost care for PWD while designing new development plans. Engineers, Development practitioners and planners are aware on designing plans

for PWDs and vulnerable segments

Allocate funding for the pilot studies for physical infrastructure

Apply building codes as per PC1 and DRR checklist. Ensure new construction are seismic and climate resistant

Page 117: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Priority Area 8.7:

Mainstreaming disaster risk reduction into

development

Indicative

Budget 2016 2017 2018 2019 2020

Potential partner

(bold with lead

partner)

Conduct regular trainings of the government

department LGs on integrating DRR into

sectorial annual development plans & District

Budgets

6.0

X X X X

UET, PDMA, DDMU,

and C&W Department

Adaptation of DRR checklist circulated by

Planning Commission of Pakistan and ensure its

implementation. Regular trainings & refreshers

on Checklist

2.0

X X X X X

Planning and Finance

Department, DDMU

and C&W and PHE

Department

Capacity building and Technical support to

DDMU/City District Govt/TMAs for

enforcement of building codes in structures

especially in Urban areas

10.0

X X

Planning and Finance

Department, DDMU

and C&W and PHE

Department, TMA,

Academia

TOTAL BUDGET REQUIRED 18.0

Page 118: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Priority Area 8.8: Establish emergency response system at District Peshawar

Justification

The purpose of the emergency response system is to enhance the district authorities and DDMU capacities to manage local level disasters using a

comprehensive national response approach. To achieve this, the DDMU will incorporate all disaster management activities from preparedness to

response. The DDMU should devise a framework for emergency response at different levels in the district; identifies the roles and responsibilities of

various stakeholders; and lays down coordination mechanism for activities with the UN, I/NGOs, civil society, the news media, public and private

sector, and local philanthropists to bring together a full range of local capabilities to manage any disaster.

Key target set for the priority area 8.8

Prepare Earthquake, Cyclone and Fire Contingency Plans.

Revise/update contingency plan by each department. The contingency plans are aligned with the DM plan of the District Peshawar as well as

departmental DM plan.

Utmost care to choose places accessible in all climatic condition and warehouse construction ensures proper building codes

UCDMC are fully equipped with necessary life saving items to be used during any emergencies. DM Communities are properly trained in

equipments utilized during emergencies

DEOC are fully functionalize and have the human resource capacity to work 24/7 during emergencies

Training workshops are organized on Damage and Needs Assessment. Conduct regular drills and exercises to fill format before disasters

Pool of emergency responders are available and are professionally trained at local level

Page 119: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Priority Area 8.8:

Establish emergency response system at

district level

Indicative Budget 2016 2017 2018 2019 2020

Potential partner

(bold with lead

partner)

Develop/Revise the Contingency Plans 5.0 X X

Line Department and

DDMU

Stockpiling and necessary equipment supply to

the DMCs start with pilot case of 05 Selected

UCs (Phase I)

25.0

X

INGOs, UCDMC,

Tehsil DMC and

DDMU,

Establish and equip DEOC at district level 15.0 X

DDMU, DCO and

PDMA

Conduct training for sector specific government

officers on DANA and conduct exercises and

drills

2.0

X

DDMU, Revenue,

other line department

and PDMA

Developing pool of emergency

responders/volunteers at UC/Village level

50.0 X X X X X

Civil Defense, PRCS,

CSO and DDMU

Develop linkages with private sector for public

private partnership for DRR related activities

2.0

X X X X X

DDMU, DCO, CSO,

Commerce and

Industry, Banks etc

TOTAL BUDGET REQUIRED 99.0

Page 120: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

9. Summary of Budget required implementing the DDMP in the District

Key Component Required

Indicative

Budget in

million PKR

Priority Area 8.1: Established the institutional and legal system for disaster management 22

Priority Area 8.2: Prepare disaster management plans at various levels 46.5

Priority Area 8.3: Conduct multi-hazard, vulnerability and risk assessment 110

Priority Area 8.4: Establish multi-hazard early warning and evacuation systems 24.5

Priority Area 8.5: Promotion of training , education and awareness in relation to disaster management 99

Priority Area 8.6: Infrastructure development for disaster risk reduction 5,260

Priority Area 8.7: Mainstreaming disaster risk reduction into development 18

Priority Area 8.8: Establish national emergency response system 99

TOTAL REQUIRED BUDGET 5,679

Page 121: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

List of Annexure

Annexure I: Maps of Peshawar

Page 122: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The
Page 123: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The
Page 124: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The
Page 125: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The
Page 126: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Annexure II: Glimpses from the Consultative Workshops and launching ceremony

Page 127: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Annexure III: Selected basic definition useful in the District Disaster Management Plan1

Terms Definition

Building codes A set of ordinances or regulations and associated standards intended to control aspects of the design, construction, materials,

alteration and occupancy of structures that are necessary to ensure human safety and welfare, including resistance to collapse

and damage.

Capacity The combination of all the strengths, attributes and resources available within a community, society or organization that can

be used to achieve agreed goals.

Climate change The United Nations Framework Convention on Climate Change (UNFCCC) defines climate change as “a change of climate

which is attributed directly or indirectly to human activity that alters the composition of the global atmosphere and which is in

addition to natural climate variability observed over comparable time periods”.

Contingency

planning

A management process that analyses specific potential events or emerging situations that might threaten society or the

environment and establishes arrangements in advance to enable timely, effective and appropriate responses to such events and

situations.

Disaster A serious disruption of the functioning of a community or a society involving widespread human, material, economic or

environmental losses and impacts, which exceeds the ability of the affected community or society to cope using its own

resources.

Disaster risk

management

The systematic process of using administrative directives, organizations, and operational skills and capacities to implement

strategies, policies and improved coping capacities in order to lessen the adverse impacts of hazards and the possibility of

disaster.

Disaster risk

management plan

A document prepared by an authority, sector, organization or enterprise that sets out goals and specific objectives for reducing

disaster risks together with related actions to accomplish these objectives

Page 128: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Disaster risk The potential disaster losses, in lives, health status, livelihoods, assets and services, which could occur to a particular

community or a society over some specified future time period.

Disaster A serious disruption of the functioning of a community or a society involving widespread human, material, economic or

environmental losses and impacts, which exceeds the ability of the affected community or society to cope using its own

resources.

Early warning

system

The set of capacities needed to generate and disseminate timely and meaningful warning information to enable individuals,

communities and organizations threatened by a hazard to prepare and to act appropriately and in sufficient time to reduce the

possibility of harm or loss.

Emergency

management

The organization and management of resources and responsibilities for addressing all aspects of emergencies, in particular

preparedness, response and initial recovery steps.

Emergency

services

The set of specialized agencies that have specific responsibilities and objectives in serving and protecting people and

property in emergency situations.

Exposure People, property, systems, or other elements present in hazard zones that are thereby subject to potential losses.

Hazard A dangerous phenomenon, substance, human activity or condition that may cause loss of life, injury or other health impacts,

property damage, loss of livelihoods and services, social and economic disruption, or environmental damage.

Land-use

planning

The process undertaken by public authorities to identify, evaluate and decide on different options for the use of land,

including consideration of long term economic, social and environmental objectives and the implications for different

communities and interest groups, and the subsequent formulation and promulgation of plans that describe the permitted or

acceptable uses.

Page 129: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Mitigation The lessening or limitation of the adverse impacts of hazards and related disasters.

Preparedness The knowledge and capacities developed by governments, professional response and recovery organizations, communities

and individuals to effectively anticipate, respond to, and recover from, the impacts of likely, imminent or current hazard

events or conditions.

Prevention The outright avoidance of adverse impacts of hazards and related disasters.

Recovery The restoration, and improvement where appropriate, of facilities, livelihoods and living conditions of disaster-affected

communities, including efforts to reduce disaster risk factors.

Response The provision of emergency services and public assistance during or immediately after a disaster in order to save lives,

reduces health impacts, ensure public safety and meet the basic subsistence needs of the people affected.

Retrofitting Reinforcement or upgrading of existing structures to become more resistant and resilient to the damaging effects of hazards.

Risk assessment

A methodology to determine the nature and extent of risk by analyzing potential hazards and evaluating existing conditions

of vulnerability that together could potentially harm exposed people, property, services, livelihoods and the environment on

which they depend.

Risk management The systematic approach and practice of managing uncertainty to minimize potential harm and loss.

Risk transfer The process of formally or informally shifting the financial consequences of particular risks from one party to another

whereby a household, community, enterprise or state authority will obtain resources from the other party after a disaster

occurs, in exchange for ongoing or compensatory social or financial benefits provided to that other party.

Risk The combination of the probability of an event and its negative consequences.

Page 130: District Disaster Management Plan (DDMP) Peshawarkp.gov.pk/uploads/2018/08/DDM_Plan.pdf · (2014-19), DDMU developed the District Disaster Management Plan for District Peshawar. The

Structural and

non-structural

measures

Structural measures: Any physical construction to reduce or avoid possible impacts of hazards, or application of engineering

techniques to achieve hazard resistance and resilience in structures or systems.

Vulnerability The characteristics and circumstances of a community, system or asset that make it susceptible to the damaging effects of a

hazard.