DISTRICT POVERTY MONITORING AND ANALYSIS SYSTEM

DPMAS

23 April2013

Page 2: District Poverty Monitoring and Analysis System DPMAS

PRESENTATION OUTLINE Background of DPMAS Why DPMAS ? Components of DPMAS and Its

Guidelines and indicators Institutional Mechanism Issues Way forward

Page 3: District Poverty Monitoring and Analysis System DPMAS

DPMAS

Page 4: District Poverty Monitoring and Analysis System DPMAS

BACKGROUND MDG, SAARC Devt. goal The Three Year Interim Plan (2007/8 –

2009/10), Current Plan which followed the 10th Plan highlighted the importance of MfDR for achieving development results.

Decentralization being significant strategy in TYIP/TYP further stress the importance of data collection and dissemination at the district level for evidence based planning, good governance and equitable development.

Page 5: District Poverty Monitoring and Analysis System DPMAS

BACKGROUND.... Poverty Monitoring and Analysis System

(PMAS) and DPMAS in particular are core elements of MfDR in Nepal requiring additional support for their meaningful operationalization.

Draft guidelines and software were ready in 2005 but was not fully tested and operational.

UNICEF supported to pilot DPMAS in Dang and Jumla in 2008. Experience from piloting exercise contributed to development of national implementation guidelines and software by NPC in 2010.

Page 6: District Poverty Monitoring and Analysis System DPMAS

WHY DPMAS? Compliment central level (PMAS) and Project Performance

Information System (PPIS) - monitoring Periodic Plan, poverty reduction strategy and MDGs, SAARC Development Goals (SDGs) & Results-based M&E strategy.

To monitor inputs, processes, outputs, outcomes and impacts of poverty reduction and development projects at the district level.

LSGA 1999 requires the monitoring and evaluation of programmes and District Periodic Plans (DPPs). DIDCs exist for this purpose and should be strengthened with a system.

LGCDP supports DPMAS to obtain poverty data with disaggregation level.

Page 7: District Poverty Monitoring and Analysis System DPMAS

DPMAS DPMAS builds upon existing systems to improve

horizontal and vertical linkages for information flows, and promote use of data at all levels

Consolidates data and information received from already established sectoral monitoring systems like EMIS, HMIS, line agencies, NGOs

Stores it in a systematic manner; disaggregated by age, sex and ethnicity

Data and indicators will be available at theDDC/ VDC level. Analyze and disseminate to support decentralized

planning and monitoring system Make the data and information easily accessible both at

VDC, district and central level. Highly recognized in current TYP (2067/68-2069/70) as one

of the key monitoring and evaluation system

Page 8: District Poverty Monitoring and Analysis System DPMAS

COMPONENTS

1) Implementation monitoring (Updated every four months)

2) Outcome and impact monitoring (Updated Annually and Five years)

Page 9: District Poverty Monitoring and Analysis System DPMAS

MONITORING SECTORS/INDICATORS

Health (13 Impact level and 12 implementation level)

Water and Sanitation (6 and 9) Primary Education (11and 8) Agriculture, livestock, forestry, tourism and

finance (11 and 18) Capacity building/empowerment of targeted

groups (15 and 4) Rural Infrastructure (6 and 16) Local Development (11)

Page 10: District Poverty Monitoring and Analysis System DPMAS

INFORMATION

EXCHANGE SYSTEM

Page 11: District Poverty Monitoring and Analysis System DPMAS

Datasets submitted districtsAchham RukumTaplejungBajura Kalikot

JhapaBajhang JajarkotDolakhaDadeldhura Kaski

RasuwaChitwan KavreMyagdiKapilvastuUdaypur PyuthanSaptari NawalparasiBankeTanahu Doti KailaliDarchula Sunsari

Page 12: District Poverty Monitoring and Analysis System DPMAS

Issues • Getting information segregated by social groups

(caste and ethnicity) by VDCs is hardly possible in the existing sectoral MIS system.

• District line offices found unaware of their roles & responsibilities on DPMAS implementation & sectoral support.

• Lack of harmonization between DPMAS and Sectoral MIS indicators

• District offices unable to report according to DPMAS format (VDC as well as by social groups) .

• DPMAS needs to demonstrate that it can support planning, review and monitoring as envisioned in results-based M&E guideline.

• Only 84 impact indicators are covered in DPMAS and strengthening the system would be more important than further expansion of indicators.

Page 13: District Poverty Monitoring and Analysis System DPMAS

Way forward• Existing sectoral MIS systems need to be harmonized

with DPMAS information system (segregated by VDC, social groups-caste and ethnicity)

• Line Ministries need to provide clear instructions to its district offices

• Line Ministries could use DPMAS/CFLG information formats in their reporting system

• Operational definition of Indicators (DPMAS/CFLG) as a part of M&E framework need to be developed for uniformity and consistency of the information. There are Indicators in surveys regularly covered by periodic surveys and some could be included in surveys.

• Remaining quantifiable CFLG Indicators should be reviewed for incorporation in DPMAS in consultation with line ministries after DPMAS is well established.

• NPC/MLD should consider mobilizing more NDVSs in districts with human resources constraints.