NOTE: PLEASE DO NOT ADD OR REMOVE ANY WORKSHEETS, CELLS, ROWS OR COLUMNS FROM THE EXCEL RESPONSE SPREADSHEET, OR EDIT ANY FORMULAE WITHIN THE SP RFQ Response Questionnaire for: rfp_961 COLOUR LEGEND Response Optional Response Mandatory No Response Required Questionnaire Information Site 1 Document Envelope 1.1 Acknowledgement Reciept Question Description Response Type Response Guide Response 1.1.1 Reciept Attachment 1.2 Schedule 2 - Tender Bond Question Description Response Type Response Guide Response 1.2.1 Tender Bond Attachment Note Note Details 1.2.2 Tender Bond Please upload the acknowledgement receipt of the hard copy submission as described in stage 2 submission process detailed in Tender Details of the Instructions to Tenderers. Please do not attach any The applicable attachment must be uploaded online Please attach a completed Tender Bond Letter as per template in Tender Schdule 2 The applicable attachment must be uploaded online Please note that the original Tender Bond must be submittied by hand along with original Tender fee deposit slip enclosed in a sealed envelope marked "Tender Ref:[Insert], [Insert Tender Description], Original Tender Bond, Closing Time & Date[Insert], Tenderer Name: [Insert]" and submitted to the Tender Bond Submission Address before the Closing Date and Time

Divisons of Responsibility-Police School (1)

Embed Size (px)

DESCRIPTION

dadags

Citation preview

RESPONSENOTE: PLEASE DO NOT ADD OR REMOVE ANY WORKSHEETS, CELLS, ROWS OR COLUMNS FROM THE EXCEL RESPONSE SPREADSHEET, OR EDIT ANY FORMULAE WITHIN THE SPREADSHEET AS THIS MAY CAUSE THE IMPORT OF THE SPREADSHEET TO FAIL.RFQ Response Questionnaire for: rfp_961COLOUR LEGENDResponse OptionalResponse MandatoryNo Response RequiredQuestionnaire InformationSiteHead Office Business Develop'Head Office EngineeringBranchOffice

EnvelopeName1Document Envelope

ReqSection1.1Acknowledgement RecieptQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseAttachment1.1.1RecieptPlease upload the acknowledgement receipt of the hard copy submission as described in stage 2 submission process detailed in Tender Details of the Instructions to Tenderers. Please do not attach any documents including commercial/prices other than the acknowledgment receipt.AttachmentThe applicable attachment must be uploaded online

ReqSection1.2Schedule 2 - Tender BondQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseAttachment1.2.1Tender Bond Please attach a completed Tender Bond Letter as per template in Tender Schdule 2AttachmentThe applicable attachment must be uploaded onlineNoteHeadingNoteNote DetailsNote1.2.2Tender Bond Please note that the original Tender Bond must be submittied by hand along with original Tender fee deposit slip enclosed in a sealed envelope marked "Tender Ref:[Insert], [Insert Tender Description], Original Tender Bond, Closing Time & Date[Insert], Tenderer Name: [Insert]" and submitted to the Tender Bond Submission Address before the Closing Date and Time

ReqSection1.3Tender Schedule 3 Tenderer's DetailsNoteHeadingNoteNote DetailsNote1.3.1Tenders Details 1The Tenderer shall provide the following details in accordance with Clause 4.6 of the Instruction to TenderersQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseText1.3.2Tenders Details 2Name of Tenderer:TextEnter plain textNumeric1.3.3Tenders Details 3Please enter the number the commercial licence issed by the department of economic development in Abu DhabiNumericEnter a numeric valueDate1.3.4Tenders Details 4Please enter the expiry dat of the commercial licence issed by the department of economic development in Abu DhabiDateEnter a valid DateAttachment1.3.5Tenders Details 5 - AUH Trade LicencePlease attache a valid copy of the commercial licence issed by the department of economic development in Abu DhabiAttachmentThe applicable attachment must be uploaded onlineNumeric1.3.6Tenders Details 6Abu Dhabi Chamber of Commerce Membership Certificate number:NumericEnter a numeric valueDate1.3.7Tenders Details 7Abu Dhabi Chamber of Commerce Membership Certificate expiry date:DateEnter a valid DateAttachment1.3.8Tenders Details 8 - AUH Chamber of CommercePlease attache a valid copy of Abu Dhabi Chamber of Commerce Membership CertificateAttachmentThe applicable attachment must be uploaded onlineAttachment1.3.9Tenders Details 9 - Dubai Trade LicencePlease attache a valid copy of Dubai or other UAE Emirates Trade LicenceAttachmentThe applicable attachment must be uploaded onlineN/AN/AN/AN/AAttachment1.3.10Tenders Details 10 - Dubai Commercial LicencePlease attache a valid copy of Dubai or other UAE Emirates Commercial RegistrationAttachmentThe applicable attachment must be uploaded onlineN/AN/AN/AN/AAttachment1.3.11Tenders Details 11 - Dubai Chamber of CommercePlease attache a valid copy of Dubai or other UAE Emirates Chamber of Commerce and Industry Membership Certificate AttachmentThe applicable attachment must be uploaded onlineN/AN/AN/AN/AText1.3.12Tenders Details 12Owner / Shareholders / Other ShareholdersTextEnter plain textText1.3.13Tenders Details 13Nationality:TextEnter plain textText1.3.14Tenders Details 14Place and Date of Establishment:TextEnter plain textNumeric1.3.15Tenders Details 15Numbers of years experience - in UAENumericEnter a numeric valueText1.3.16Tenders Details 16Registered Office:TextEnter plain textText1.3.17Tenders Details 17Address for service of noticesTextEnter plain textText1.3.18Tenders Details 18Tenderer's bank(s) in UAE:TextEnter plain textText1.3.19Tenders Details 19IBAN NumberTextEnter plain textText1.3.20Tenders Details 20Tenderer's representative:TextEnter plain textText1.3.21Tenders Details 23Mobile Telephone NumberTextEnter plain textText1.3.22Tenders Details 24Email:TextEnter plain textText1.3.23Tenders Details 25Name and place of incorporation of ultimate parent company (if any)TextEnter plain textNoteHeadingNoteNote DetailsNote1.3.24Important NoteApplicable for JV companies onlyN/AN/AN/AN/ANote1.3.25Important NotePlease upload the documents of both the JV partners in relevent areasN/AN/AN/AN/AQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseText1.3.26Tenders Details 26Please provide the Name of the lead JV partnerTextEnter plain textN/AN/AN/AN/AText1.3.27Tenders Details 27Please provide the percentage of participation interest of both the firms in JVTextEnter plain textN/AN/AN/AN/A

ReqSection1.4Tender Schedule 4 Power of AttorneyQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseText1.4.1Authorised SignitoryPlease provide name of authorised signitoryTextEnter plain textAttachment1.4.2Power of AttorneyPlease attach herein Power of Attorney document fo authorised signatoryAttachmentThe applicable attachment must be uploaded onlineAttachment1.4.3Notorised signitureSpecimen signature of the attorney duly notarized by a Notary Public;AttachmentThe applicable attachment must be uploaded onlineAttachment1.4.4Arcticle of IncorporationCompany Article of Incorporation ( )AttachmentThe applicable attachment must be uploaded online

ReqSection1.5Schedule 11 - Financial DataNoteHeadingNoteNote DetailsNote1.5.1NoteThe Tenderer shall, in accordance with Clause 4.13 of the Instructions to Tenderers, provide details of its Financial Data.Note1.5.2Financial DataReferencesQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseAttachment1.5.3reference letterPlease attach copy of the reference letterAttachmentThe applicable attachment must be uploaded onlineAttachment1.5.4Audited reportPlease attach herein Company Audited financial statement for 2013 including income statement, balance sheet statement, cash flow statement, profit and loss account.AttachmentThe applicable attachment must be uploaded onlineAttachment1.5.5Audited reportPlease attach herein Company Audited financial statement for 2012 including income statement, balance sheet statement, cash flow statement, profit and loss account.AttachmentThe applicable attachment must be uploaded onlineAttachment1.5.6Audited reportPlease attach herein Company Audited financial statement for 2011 including income statement, balance sheet statement, cash flow statement, profit and loss account.AttachmentThe applicable attachment must be uploaded online

ReqSection1.6Tender Schedule 15 - Conflicts of InterestNoteHeadingNoteNote DetailsNote1.6.1Conflict of InterestThe Tenderer shall, in accordance with Clause 16 of the Instructions to Tenderers, declare any actual or potential conflicts of interest which may arise in respect of the Services and/or the Project.)QuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseYes/no1.6.2Conflict of InterestDo you have any potential Conflict of Interest?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxNoAttachment1.6.3Conflict of InterestIf Yes, Please attach herein the detailsAttachmentThe applicable attachment must be uploaded onlineN/AN/AN/AN/A

ReqSection1.7Tender Schedule 16 Dispute detailsNoteHeadingNoteNote DetailsNote1.7.1Dispute detailsThe Applicant shall submit a statement in the attached format, providing details of any current contract dispute nd/or arbitral or legal proceeding involving the Applicant and any other subsidiary entity. The statement shall include details of any dispute which has been referred to formal dispute proceedings (mediation or arbitration) or is the subject of litigation in any court in the United Arab Emirates or overseas.QuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseAttachment1.7.2Dispute details This information shall be provided regardless of whether such action has been instigated by the Applicant or a client of the ApplicantAttachmentThe applicable attachment must be uploaded online

EnvelopeName2Technical Envelope

ReqSection2.1Tender Schedule 5 - ProgramQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseAttachment2.1.1ProgramPlease provide the the program of works with sufficient details showing the critical pathAttachmentThe applicable attachment must be uploaded onlineNoteHeadingNoteNote DetailsNote2.1.2ProgramThe Tenderer's proposed schedule demonstrate completeness, soundlogic and activities relationship, appropriate level of detail, knowledge of works and soundness of durations.QuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseAttachment2.1.3ProgramPlease provide the the resources schedule and progress S curvesAttachmentThe applicable attachment must be uploaded online

ReqSection2.2Tender Schedule 6 - Proposed Project TeamQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseAttachment2.2.1Project TeamPlease provide Project Organisation Chart for the project, Leadership structure, and experience;AttachmentThe applicable attachment must be uploaded onlineNoteHeadingNoteNote DetailsNote2.2.2Project TeamAll key personnel must be identified with defined roles and responsibilities; QuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseAttachment2.2.3CVsPlease provide the CVs of key staff proposed for the projectAttachmentThe applicable attachment must be uploaded online

ReqSection2.3Tender Schedule 8 - Capacity and ExperienceQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseAttachment2.3.1Technical MethodologyPlease provide Technical Methodology and Work Plan with well detailed construction methdelogy /method statement and planning breif for excution the projecAttachmentThe applicable attachment must be uploaded onlineNoteHeadingNoteNote DetailsNote2.3.2Technical MethodologyDemonstrate understanding the scope of works-Detailed description of services to be performed /Project Controls and demonstration of the Tenderers understanding of the project unique requirements, challenges and constraints.Note2.3.3Important noteExperienceNote2.3.4Important noteThe relevent experience should be accompanied by engagement letter for all the projects the tenderer states in the listQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseSingleChoice2.3.5Relevant experience (Projects above 200 million)Please select the total number of current and previous projects in UAE (Last 5 Years - value over 200 million)Options ListSelect one of the Options listed in the drop down menu on the bottom right of the response boxAttachment2.3.6Relevant experience (Projects above 200 million)="Please attach the details of current and previous projects in UAE (Last 5 Years - value over 200 million) "AttachmentThe applicable attachment must be uploaded onlineAttachment2.3.7Relevant experience (Projects above 200 million)Please attach the engagement letters for the above listed projects.AttachmentThe applicable attachment must be uploaded onlineNoteHeadingNoteNote DetailsNote2.3.8Important noteFor projects above 130 million value, the projects referred to in 200 million value shall also be consideredQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseSingleChoice2.3.9Relevant experience (Projects above 130 million)Please select the total number of current and previous projects in UAE (Last 5 Years - value over 130 million)Options ListSelect one of the Options listed in the drop down menu on the bottom right of the response boxAttachment2.3.10Relevant experience (Projects above 130 million)="Please attach the details of current and previous projects in UAE (Last 5 Years - value over 130 million) "AttachmentThe applicable attachment must be uploaded onlineAttachment2.3.11Relevant experience (Projects above 130 million)Please attach the engagement letters for the above listed projects.AttachmentThe applicable attachment must be uploaded onlineNoteHeadingNoteNote DetailsNote2.3.12Important noteFor projects above 100 million value, the projects referred to in 130 and 200 million value shall also be consideredQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseSingleChoice2.3.13Relevant experience (Projects above 100 million)Please select the total number of current and previous projects in UAE (Last 5 Years - value over 100 million)Options ListSelect one of the Options listed in the drop down menu on the bottom right of the response boxAttachment2.3.14Relevant experience (Projects above 100 million)="Please attach the details of current and previous projects in UAE (Last 5 Years - value over 100 million) "AttachmentThe applicable attachment must be uploaded onlineAttachment2.3.15Relevant experience (Projects above 100 million)Please attach the engagement letters for the above listed projects.AttachmentThe applicable attachment must be uploaded onlineText2.3.16Cumulative Value of projectCumulative value of projects in last 5 yearsTextEnter plain textNoteHeadingNoteNote DetailsNote2.3.17Cumulative Value of projectProvide full list to show Cumulative value of projects in last 5 yearsQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseSingleChoice2.3.18Design and Build ExperiencePlease select the total number of current and previous design and build projects in UAE (Last 5 Years - value over 100 million)Options ListSelect one of the Options listed in the drop down menu on the bottom right of the response boxAttachment2.3.19Design and Build Experience="Please attach the details of current and previous similar projects (shooting range) in UAE (Last 5 Years - value over 100million) "AttachmentThe applicable attachment must be uploaded onlineAttachment2.3.20Design and Build ExperiencePlease attach the engagement letters for the above listed projects.AttachmentThe applicable attachment must be uploaded onlineAttachment2.3.21EstidamaPlease select the total number of current and previous similar projectswith UPC Esidama (Last 5 years) AttachmentThe applicable attachment must be uploaded onlineAttachment2.3.22EstidamaProjects with UPC Esidama (Last 5 years) AttachmentThe applicable attachment must be uploaded onlineAttachment2.3.23Recoginition lettersPlease attach Client Reference letters/recognition/awards. AttachmentThe applicable attachment must be uploaded online

ReqSection2.4Tender Schedule 9 -Quality Assurance SystemQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseYes/no2.4.11 Quality Assurance SystemDo you have a quality management system which is currently being implemented in your Organization?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.4.21.1 Quality Assurance SystemIf yes, please provide a brief of this QMS (no more than two A4 sheets).AttachmentThe applicable attachment must be uploaded onlineYes/no2.4.32 Quality Assurance SystemIs your quality management system accredited by any of national or international organizations?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.4.42.1 Quality Assurance SystemIf yes, please provide a brief of this QMS (no more than two A4 sheets).AttachmentThe applicable attachment must be uploaded onlineYes/no2.4.53 Quality Assurance SystemDo you have a Quality Policy statement signed by senior management?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.4.63.1 Quality Assurance SystemIf yes, please provide a copy of your Quality Policy statementAttachmentThe applicable attachment must be uploaded onlineYes/no2.4.74 Quality Assurance SystemDo you have updated Quality Management Objectives signed by senior management?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.4.84.1 Quality Assurance SystemIf yes, please provide a copy of your Quality Management ObjectivesAttachmentThe applicable attachment must be uploaded onlineYes/no2.4.95 Quality Assurance SystemDo you generally produce a Project Quality Plan for your new projects?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.4.105.1 Quality Assurance SystemIf yes, please provide a list of typical contents of this plan. Kindly do not provide the whole quality plan.AttachmentThe applicable attachment must be uploaded onlineYes/no2.4.116.1 Quality Assurance SystemDo you have quality procedures to address Internal auditing?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesYes/no2.4.126.2 Quality Assurance SystemDo you have quality procedures to address Training?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesYes/no2.4.136.3 Quality Assurance SystemDo you have quality procedures to address Inspection & Testing (receiving, in-process & final inspections)?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesYes/no2.4.146.4 Quality Assurance SystemDo you have quality procedures to address Control of measuring devices?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesYes/no2.4.156.5 Quality Assurance SystemDo you have quality procedures to address Control of non-conforming product?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesYes/no2.4.166.6 Quality Assurance SystemDo you have quality procedures to address Documents Control?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesYes/no2.4.176.7 Quality Assurance SystemDo you have quality procedures to address Records Control?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.4.186.8 Quality Assurance SystemIf yes, please provide a brief of each procedure (no more than a half sheet for each procedure).AttachmentThe applicable attachment must be uploaded onlineYes/no2.4.197 Quality Assurance SystemDo you have standard operation procedures to address Materials ordering, purchasing & receiving?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesYes/no2.4.207.1 Quality Assurance SystemDo you have standard operation procedures to address Materials storage, issuance & traceability?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesYes/no2.4.217.2 Quality Assurance SystemDo you have standard operation procedures to address Control of subcontractors performance & quality of his provided services?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesYes/no2.4.227.3 Quality Assurance SystemDo you have standard operation procedures to address Protection of works (in progress & after completion)?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesYes/no2.4.237.4 Quality Assurance SystemDo you have standard operation procedures to address Project Closure?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.4.247.5 Quality Assurance SystemIf yes, please provide a brief of each procedure (no more than a half sheet for each procedure).AttachmentThe applicable attachment must be uploaded onlineYes/no2.4.258 Quality Assurance SystemDo you maintain proofs to support your previous experience in maintaining a proper quality management system in your previously executed projects?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.4.268.1 Quality Assurance SystemIf yes, please provide at least 4 sample proofs (Please do not provide full documents. Parts of these documents which bear official approvals & comments will be sufficient).AttachmentThe applicable attachment must be uploaded online

ReqSection2.5Tender Schedule 10 - Health Safety and Environment SystemQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseYes/no2.5.1HSE 1.0Do you have a Health, Safety and/ or Environment Policy statement signed by senior management? Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.2HSE 1.1If yes, please provide a copy. AttachmentThe applicable attachment must be uploaded onlineYes/no2.5.3HSE 2.0Do you have a general management organization structure which allocates duties and delegates responsibility in relation to Health Safety & Environment?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.4HSE 2.1If yes, please provide a copy. AttachmentThe applicable attachment must be uploaded onlineYes/no2.5.5HSE 3.0Does your company / organization hold external HSE certification i.e ISO 9001 / OHSAS 1801 / ISO 1401?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxAttachment2.5.6HSE 3.1If yes, please attach certificates.AttachmentThe applicable attachment must be uploaded onlineYes/no2.5.7HSE 4.0Is your company registered with the Sector Regulatory Authority for building & construction as required under the Abu-Dhabi EHS center regulatory framework?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxN/AAttachment2.5.8HSE 4.1If yes, please attach registration details.AttachmentThe applicable attachment must be uploaded onlineN/AYes/no2.5.9HSE 5.0Is your company associated with any group, body, organization or similar that promotes Health, Safety & Environmental matters in the UAE (i.e. Build Safe UAE, Emirates Safety Group, Emirates Green Building Council). Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxN/AAttachment2.5.10HSE 5.1If yes, please provide details.AttachmentThe applicable attachment must be uploaded onlineN/AYes/no2.5.11HSE 6.0Has your company or any individual employed by your company been prosecuted or had any form of enforcement orders, issued for any Health, Safety or Environmental violation within the UAE in the past 5 years? Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxNoAttachment2.5.12HSE 6.1If yes, please provide details and remedial actions undertaken to prevent reoccurrence.AttachmentThe applicable attachment must be uploaded onlineN/AYes/no2.5.13HSE 7.0Do you maintain detailed annual records of Health Safety and Environmental Statistics (including preventive action records, e.g. training, induction, Audit, inspection)?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.14HSE 7.1If Yes, please attach details for the past 3 yearsAttachmentThe applicable attachment must be uploaded onlineYes/no2.5.15HSE 8.0Do you systematically identify and manage HSE risk, using risk based assessment techniques which involves all employees and which are regularly reviewed?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.16HSE 8.1If yes, please attach recently completed examples.AttachmentThe applicable attachment must be uploaded onlineYes/no2.5.17HSE 9.0Do you have an accident and incident, including near miss reporting procedure and routinely investigate significant incidents / incidents.Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.18HSE 9.1If yes, please provide recent examples.AttachmentThe applicable attachment must be uploaded onlineN/AYes/no2.5.19HSE 10.0Is the information from HSE incidents and near miss reports communicated to all staff?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.20HSE 10.1If yes, please provide details.AttachmentThe applicable attachment must be uploaded onlineN/AYes/no2.5.21HSE 11.0Do have an emergency response plan, including trained personnel and chemical spill provisions.Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.22HSE 11.1If yes, please provide details.AttachmentThe applicable attachment must be uploaded onlineYes/no2.5.23HSE 12.0Do you have procedures for disseminating up-to-date developments on Health Safety & Environmental issues to staff within your organization and other parties?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.24HSE 12.1If yes, please provide details how this is distributed within your company.AttachmentThe applicable attachment must be uploaded onlineYes/no2.5.25HSE 13.0Do you hold workplace HSE meetings for both management and workers, or give consideration to HSE issues on general meeting agendas?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.26HSE 13.1If yes, please provide details and examples of recent meeting minutes.AttachmentThe applicable attachment must be uploaded onlineYes/no2.5.27HSE 14.0Do you have an induction programme for new and transferring employees?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.28HSE 14.1If yes please provide details, including examples from induction registersAttachmentThe applicable attachment must be uploaded onlineYes/no2.5.29HSE 15.0Do you undertake regular HSE training for all employees, including management?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.30HSE 15.1If yes, please attach examples.AttachmentThe applicable attachment must be uploaded onlineYes/no2.5.31HSE 16.0Do you have a nominated competent person(s) responsible for Health, Safety & Environmental matters for the project under tender? Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.32HSE 16.1If yes, please attach CVsAttachmentThe applicable attachment must be uploaded onlineYes/no2.5.33HSE 17.0Do you have documented Health, Safety& Environmental procedures e.g. JSA /risk assessments / method statements for the type of work under consideration? Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.34HSE 17.1If yes, please provide a copy.AttachmentThe applicable attachment must be uploaded onlineYes/no2.5.35HSE 18.0Do all members of your project team receive appropriate training for their work, including the identification and management of risk and the general Health, Safety & Environmental aspects involved in the work being undertaken? Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.36HSE 18.1If yes, please provide details (e.g. training matrix for the current year).AttachmentThe applicable attachment must be uploaded onlineYes/no2.5.37HSE 19.0Do you conduct regular workplace HSE inspections?Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.38HSE 19.1If yes, please attach recently completed examples.AttachmentThe applicable attachment must be uploaded onlineYes/no2.5.39HSE 20.0Do you undertake internal Health Safety & Environment audits to verify the effectiveness of your HSE management system? Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.40HSE 20.1If yes, please provide a recent example.AttachmentThe applicable attachment must be uploaded onlineYes/no2.5.41HSE 21.0Does your organization undertake post-contract reviews of Health Safety & Environmental matters? Yes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxYesAttachment2.5.42HSE 21.1If yes, please provide an example of a completed review.AttachmentThe applicable attachment must be uploaded online

ReqSection2.6Tender Schedule 11 - Financial StatementQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseText2.6.1Financial StatementPlease provide the name of the firm that has conducted the financial audit of the company last yearTextEnter plain text

ReqSection2.7Tender Schdule 13 Company ManpowerQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseText2.7.1Manpower (Admin)Please select the total number of admin staff TextEnter plain textAttachment2.7.2ManpowerPlease attach list of personnel AttachmentThe applicable attachment must be uploaded onlineText2.7.3Manpower (Technical Staff)Please select the total number of permenant technical staffTextEnter plain textAttachment2.7.4ManpowerPlease attach list of personnel AttachmentThe applicable attachment must be uploaded onlineText2.7.5Manpower (Skilled/unskilled labours)Please select the total number of skilled/ unskilled laboursTextEnter plain textAttachment2.7.6ManpowerPlease attach list of personnel AttachmentThe applicable attachment must be uploaded onlineAttachment2.7.7ManpowerPlease attach evidence records attested from Ministry of Labour for Company Manpower AttachmentThe applicable attachment must be uploaded online

ReqSection2.8Tender Schedule 14 - Plant, Equipment and FacilitiesQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseText2.8.1Financial StatementPlease provide details of company owned Plant and equipment and upload PDF copy of requested supporting documents (including evidence of ownershipTextEnter plain text

ReqSection2.9Tender Schedule 17 Addenda to Tender DocumentsQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseAttachment2.9.1Compliance StatementPlease attach herein your signed and stamped copy of theTender Schedule 17 - Addenda to Tender Documents AttachmentThe applicable attachment must be uploaded online

ReqSection2.10Tender Schedule19 Tenderers Compliance StatementQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseYes/no2.10.1Compliance StatementPlease confirm herein that you have read, understood and comply with the information listed in Schedule19 Tenderers Compliance StatementYes/No ValueSelect the applicable response from the drop down menu on the bottom right of the response boxAttachment2.10.2Compliance StatementPlease attach herein your signed and stamped copy of the compliance statement of this Tender as per Tender Schedule 19 in Instruction to TendererAttachmentThe applicable attachment must be uploaded online

ReqSection2.11Additional informationQuestionsHeadingQuestionDescriptionResponse TypeResponse GuideResponseAttachment2.11.1Additional informationPlease attach any information in line with Clause 4.1(b) of Instructions to TenderersAttachmentThe applicable attachment must be uploaded onlineEnvelopeName3Commercial Envelope

Worksheet3.1PART A - EXTENSION OF POLICE MODEL SCHOOLNoteHeadingNoteNote DetailsNote3.1.1NoteAny price inserted as "0" shall be considered as "included". Hence the Tenderers are encouraged to price all items

Worksheet3.2B1 - PRELIMINARIES AND GENERAL REQUIREMENTSNoteHeadingNoteNote DetailsNote3.2.1-Non-Recurring Preliminary Costs ( Mobilization) Incurred at commencement of the WORKSItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.2.2B1 - 1Provision of all necessary offices and facilities for the Consultant, complete with all services, furniture, equipment and fittings as per Specifications.Item10PriceItem3.2.3B1 - 2Provision of all necessary offices, stores and facilities for Contractors site team, complete with all services, furniture, equipment and fittings as per Specifications.Item10PriceItem3.2.4B1 - 3Provision of required sign boards as per approval of the ENGINEER.No.20PriceItem3.2.5B1 - 4Provision of required site hoarding as specified.Item10NoteHeadingNoteNote DetailsNote3.2.6-Recurring Preliminary Costs incurred during the Execution of the WORKS ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.2.7B1 - 5Maintenance of all necessary offices and facilities for the Consultant including all services, furniture , equipment, fixtures, and fittings.Item10PriceItem3.2.8B1 - 6Maintenance of Contractor's site staff office, stores and facilities including all services, furniture, equipment, fixtures and fittings.Item10PriceItem3.2.9B1 - 7Connection and provision of all necessary site power, lighting, water and sanitation for the site establishment and the WORKS.Item10PriceItem3.2.10B1 - 8Provision of site fencing , safety and security requirements during progress of Works including watching , lighting, safety signs, first aid tools and protection barriers/handrails , etc.Item10PriceItem3.2.11B1 - 9Provision of all required progress site reports, photographs, and other documentation as required by the ENGINEER.Item10PriceItem3.2.12B1 - 10Provision of all required shop drawings and samples as specified and required by the ENGINEER.Item10PriceItem3.2.13B1 - 11Provision of all required Quality Assurance and Quality Control during the progress of the WORKS, to ENGINEER requirements and procedures. Item10PriceItem3.2.14B1 - 12Provision of all inspections and testing necessary for the acceptance of the WORKS in accordance with the conditions of Contract.Item10PriceItem3.2.15B1 - 13Maintaining hoarding and sign boards.Item10PriceItem3.2.16B1 - 14Cleaning up and removal of rubbish during the progress of the WORKS to the satisfaction of the Engineer.Item10NoteHeadingNoteNote DetailsNote3.2.17-Non-Recurring Preliminary Costs ( Mobilization) Incurred at commencement of the WORKSItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.2.18B1 - 15Demobilization and removal of all offices and facilities for the Consultant including all services, furniture, equipment, fixtures and fittings.Item10PriceItem3.2.19B1 - 16Demobilization and removal of all offices, stores provided for Contractor's site team including all services, furniture, equipment, fixtures and fittings. Item10PriceItem3.2.20B1 - 17Demobilization and removal of all plant and equipment. Item10PriceItem3.2.21B1 - 18Provision of all required As Built drawings, Operation and Maintenance Manuals and Guarantees and any other documentation required in accordance with the contract to be handed over to Engineer.Item10PriceItem3.2.22B1 - 19Clearing up and making good site establishment after completion of the WORKS and demobilization. This includes re-instating surrounding areas affected by the construction.Item10PriceItem3.2.23B1 - 20Provision for payment of Fees to obtaining clearances, permits etc. from Statutory Authorities.Item10PriceItem3.2.24B1 - 21Allow for preserving/re-routing all existing services complete which falls in the way or in the premises on New Construction and as instructed by the PPC Engineer in Consultation with the respective departments as required, including provision all materials and labor for the concerned works.Item10NoteHeadingNoteNote DetailsNote3.2.25-Limitations of Site (Setting out)ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.2.26B1 - 22The Contractor shall be required to confirm his activities within the boundaries of the site or whatever area allocated by the Authorities and as directed by the EngineerItem10NoteHeadingNoteNote DetailsNote3.2.27-Permanent Electricity, Water and Drainage ConnectionsItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.2.28B1 - 23The Contractor shall arrange for permanent electricity, water and drainage supplies to be made available to the site and shall be responsible for making all payments to local department in this respect and as directed by the EngineerItem10NoteHeadingNoteNote DetailsNote3.2.29-Soil Investigation and Geophysical StudyItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.2.30B1 - 24The Contractor shall carry out a soil investigation to the requirements of the Engineer and specification, and submit chemical analysis and soil report for Engineer's approvalNo.200PriceItem3.2.31B1 - 25The Contractor shall carry out a Geophysical Study to the requirements of the Engineer, and submit Geophysical report for the Engineer and Municipality approvalL.S.10NoteHeadingNoteNote DetailsNote3.2.32-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.2.33B1 - 26The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.3B2/A - OFFICER'S CLUB BUILDING: EXCAVATION AND EARTH WORKSNoteHeadingNoteNote DetailsNote3.3.1-EXCAVATION AND BACKFILLINGItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.3.2B2/A - 1Excavation for Foundation from natural ground level to foundation level according to Elevation and dimention indecated on the foundation drawingm310400PriceItem3.3.3B2/A - 2Backfilling with selected excavates material including compactionm37700PriceItem3.3.4B2/A - 3Remove surplus excavated material from site to a location approved by the Authorized Departmentm32700NoteHeadingNoteNote DetailsNote3.3.5-ANTI -TERMITE TREATMENTItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.3.6B2/A - 4Allow for anti termite treatment for foundation, slab, paving and perimeter area around buildingsm219000NoteHeadingNoteNote DetailsNote3.3.7-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.3.8B2/A - 5The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.4B2/B - OFFICER'S CLUB BUILDING: CONCRETE WORKSNoteHeadingNoteNote DetailsNote3.4.1-IN SITU CONCRETENote3.4.2-Plain concrete grade as per specifications using Moderate Sulphate Resistant Cement as per drawing and specifications.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.4.3B2/B - 1Blinding 50 mm thick for Grade Slabm3650PriceItem3.4.4B2/B - 2Blinding 100 mm thick for Foundation,Tie & Grade Beamsm3700NoteHeadingNoteNote DetailsNote3.4.5-Reinforced concrete grade as per specifications using Moderate Sulphate Resistant Cement and reinforcement steel grade 460 N/mm2 including Corrosion Inhibitor as per drawing and specifications.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.4.6B2/B - 3Footingm33450PriceItem3.4.7B2/B - 4Column neckm3800PriceItem3.4.8B2/B - 5Tie, Ground , plinth Beamsm3550PriceItem3.4.9B2/B - 6Slab on Gradem31300NoteHeadingNoteNote DetailsNote3.4.10-Reinforced concrete grade as per specifications using Ordinary Portland Cement and reinforcement steel grade 460 N/mm2 as per drawing and specifications.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.4.11B2/B - 7Columns & Wallsm33150PriceItem3.4.12B2/B - 8Beamsm32430PriceItem3.4.13B2/B - 9Suspended slab any thicknessm36760PriceItem3.4.14B2/B - 10Stairs and Landingm3150PriceItem3.4.15B2/B - 11200 mm Parapetm3200PriceItem3.4.16B2/B - 12Allow for Post Tension Works for Slabm36260PriceItem3.4.17B2/B - 13Allow for Post Tension Works for Beamsm3370NoteHeadingNoteNote DetailsNote3.4.18-Concrete SundriesNote3.4.19-Lintels including concrete, formwork, reinforcement, accordance to drawings and specificationsItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.4.20B2/B - 14Size 100 x 200 mmm310PriceItem3.4.21B2/B - 15Size 200 x 300 mmm330PriceItem3.4.22B2/B - 16Allow for all joints including isolation, control, expansion and contraction joints or the like as required all in accordance with the drawings and specificationItem10NoteHeadingNoteNote DetailsNote3.4.23-50 mm Cement Sand screed in accordance with specification and drawings ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.4.24B2/B - 17Above the waterproofing of wet areas and foundationm214400PriceItem3.4.25B2/B - 18To recive Epoxy Paintm22600NoteHeadingNoteNote DetailsNote3.4.26-Note:Note3.4.27-All concrete grade to be as per structure drawings and specificationNote3.4.28-The Contractor shall submit a complete shop drawing for the concrete dimensions and bar bending schedules ApprovalNote3.4.29-The Hollow Core slabs shall be detailed by a spcilists and to be submitted for approval of the EngineerNote3.4.30-The Contractor shall submit a complete shop drawing for the Hollow Core slabs showing full detailes for the Approval of the EngineerNote3.4.31-All ducts and openings to be co-ordinated with the Architectural and MEP drawings prior to start the work. No breaking concrete is permitted after finishing for any reasonNote3.4.32-Use 200 kg / m3 of Ordinary Portland Cement for cement / sand screed above waterproofing unless otherwise notedNote3.4.33-The contractor is requested to obtain the Engineer's approval for the location of any construction jointNote3.4.34-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.4.35B2/B - 19The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.5B2/C - OFFICER'S CLUB BUILDING: MASONRY WORKSNoteHeadingNoteNote DetailsNote3.5.1-Fire rated Precast concrete blocks laid with cement sand mortar including all necessary G.I accessories in accordance with Specifications and drawingsItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.5.2B2/C - 1500 mm thick , hollow block wallsm2700PriceItem3.5.3B2/C - 2200 mm thick , hollow block wallsm221000PriceItem3.5.4B2/C - 3100 mm thick , hollow block wallsm25000NoteHeadingNoteNote DetailsNote3.5.5-Note:Note3.5.6-The morter shall be 350 kg cement to one cubic meter sandNote3.5.7-Price includes R.C tie beam 200 mm depth reinforced with 4T16 mm top and bottom located at 2500 mm from F.F.L for wall more than 3000 mm heightNote3.5.8-The contractor shall submit cpmplete shop drawing for the block works perior to stat for the Engineers' approvalNote3.5.9-Masonry SundriesItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.5.10B2/C - 4Allow for joint filling sealant Two part polysulphide sealant Item10PriceItem3.5.11B2/C - 5Allow for isolation and expaintion joint as required by a compressed sheet of wood fibre impregnated with bitumen emulsion.Item10PriceItem3.5.12B2/C - 6Supply and install damp proofing course complete in accordance with specification and drawingm2100NoteHeadingNoteNote DetailsNote3.5.13-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.5.14B2/C - 7The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.6B2/D - OFFICER'S CLUB BUILDING: ROOFING AND WET AREASNoteHeadingNoteNote DetailsNote3.6.1-BELLOW GRADE WATERPROOFINGNote3.6.2-One layer of polythene sheets laid on compacted fillItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.6.3B2/D - 11200 gaugem220000NoteHeadingNoteNote DetailsNote3.6.4-One coat of primer + Two coats of Cold applied, Single Component Emulsified rubber modified bitumen coatingItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.6.5B2/D - 2Laid horizontallym212000PriceItem3.6.6B2/D - 3Laid verticallym214300NoteHeadingNoteNote DetailsNote3.6.7-WATERPROOF FOR WET AREANote3.6.8-Single Component pitch modified polyurethane Elastomeric Waterproofing CoatingItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.6.9B2/D - 4Laid horizontallym22400PriceItem3.6.10B2/D - 5Laid verticallym21300NoteHeadingNoteNote DetailsNote3.6.11-ROOFING WATERPROOFItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.6.12B2/D - 6Sprayed Rigid Polyurethane system 155 mm thickness, sprayed density 55 kg/m3m214400PriceItem3.6.13B2/D - 7Angle filletm2400PriceItem3.6.14B2/D - 8Two coats of Single Component Waterproof coating which shall be durable, flexible with high level of resistance to UV exposure and aggressive weathering agentsm214400PriceItem3.6.15B2/D - 9Ditto, laid verticalm24350PriceItem3.6.16B2/D - 10Geotextile 400g/m2 Separation layerm214400PriceItem3.6.17B2/D - 11Light Weight Concrete 80 mm average thickm214400PriceItem3.6.18B2/D - 12Terrazzo Tile 300 x 300 x 28 mm thickness for areas as per drawing and finishing schedulem214400PriceItem3.6.19B2/D - 13Terrazzo skirting 100 height x 15 mm thickness with chamfered Edge for the areas as per drawing and finishing schedulem2400NoteHeadingNoteNote DetailsNote3.6.20-SundriesItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.6.21B2/D - 14Dress roof finishes around rain water out letL.S.10NoteHeadingNoteNote DetailsNote3.6.22-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.6.23B2/D - 15The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.7B2/E - OFFICER'S CLUB BUILDING: CARPENTRY AND JOINERYNoteHeadingNoteNote DetailsNote3.7.1-The rates for all doors shall include plywood sub-frame, architrave, transoms, stops, glazing, decorations, ironmongery, Crema Marfil thresholds, civil defense approval for fire rated doors etc all in accordance with drawings and specificationNote3.7.2-WOOD DOORS AND FRAMESNote3.7.3-Supply and fix 45mm thickness wooden flush doors with veneered and melamine acrylic coated surface finishItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.7.4B2/E - 1Door type DW1, Size 900 x 2200No.210PriceItem3.7.5B2/E - 2Door type DW2, Size 1000 x 2200 (2hrs) No.10PriceItem3.7.6B2/E - 3Door type DW3, Size 1000 x 2200 (2hrs) No.30PriceItem3.7.7B2/E - 4Door type DW5, Size 900 x 2200 (1hr) No.20PriceItem3.7.8B2/E - 5Door type DW6, Size 1000 x 2200 (2hrs) No.170PriceItem3.7.9B2/E - 6Door type DW7, Size 1000 x 2200 (2hrs) No.40PriceItem3.7.10B2/E - 7Door type DW9, Size 1800 x 2200 (2hrs) No.30NoteHeadingNoteNote DetailsNote3.7.11-CUBICALNote3.7.12-Toilet cubicle partitions in accordance with specification comprising 13 mm thick solid grade compact single core homogeneous laminated Phenolic Resin with polyester powder coated reconstructed stone/aglomeric marble panel partitions complete including all framing, stainless steel suporting system, fixings, accessories and hardwareItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.7.13B2/E - 8For Partitionsm2330NoteHeadingNoteNote DetailsNote3.7.14-Note: Price to include but not limited to all doors, fixing, ironmongary and all accessories. Sample to be approved by the Engineer prior to start the works. Shop drawing to be submitted for the Engineer's approval Note3.7.15-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.7.16B2/E - 11The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.8B2/F - OFFICER'S CLUB BUILDING: METALWORKSNoteHeadingNoteNote DetailsNote3.8.1-Supply and fix Powder coated Aluminum Handrail for Staircaseas as per drawing .ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.8.2B2/F - 1Aluminium Handrail for Staircasem210NoteHeadingNoteNote DetailsNote3.8.3-Supply and fix Powder coated Aluminum Cat ladder as per drawing and specificationItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.8.4B2/F - 2Aluminum Cat ladderNo.20NoteHeadingNoteNote DetailsNote3.8.5-Supply and fix of Sky light system made of Polyster Powder Coated Aluminium including all fitting, accessories, Steel Structure, Aluminium flashing and double skin polycarbonate complete as per drawingsItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.8.6B2/F - 3Sky Lightm22950NoteHeadingNoteNote DetailsNote3.8.7-NoteNote3.8.8-All detailes to be done by specialist Sub-contractor subject to the Engineer's approval. Price to include all required tests. Price to include all necessary materials and works for fixation.Note3.8.9-ALUMINIUM DOORSNote3.8.10-Powder coated Aluminium Doors / Louvers and frames including finishes Ironmongery complete in accordance with the Drawings and SpecificationsItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.8.11B2/F - 4Door type DA1, Size 1000 x 2200 (1hrs) No.10PriceItem3.8.12B2/F - 5Door type DA2, Size 1800 x 2200 (2hrs) No.20PriceItem3.8.13B2/F - 6Door type DA3, Size 1800 x 2500 (2hrs) No.20NoteHeadingNoteNote DetailsNote3.8.14-STEEL DOORSNote3.8.15-Enamiled Coated Steel Doors with Powder Coated frames including finishes Ironmongery complete in accordance with the Drawings and SpecificationsItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.8.16B2/F - 7Door type DS1, Size 1800 x 2500 mmNo.10NoteHeadingNoteNote DetailsNote3.8.17-STAINLESS STEEL FRAMED GLASS DOORSNote3.8.18-Stainless steel Framed Glass Doors and frames including finishes Ironmongery complete in accordance with the Drawing and SpecificationItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.8.19B2/F - 8Door type DG 01, Size 2400 x 2500 mm (1 hrs) No.10NoteHeadingNoteNote DetailsNote3.8.20-ALUMINUM CURTAIN WALLNote3.8.21-Engineer, fabricate, supply and install complete glazed curtain walling system consisting of all anchors, window and spandrel framing members, vision and spandrel glazing, silver fins, sealants, damp proofing and 50mm thickness heat insulated materital, air/vapour barriers and other components, fire isolation as required and Third Party tests as indicated on the drawings and those items listed but not limited to specificationItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.8.22B2/F - 9Curtain Wall type 1No.20PriceItem3.8.23B2/F - 10Curtain Wall type 2No.20PriceItem3.8.24B2/F - 11Curtain Wall type 3No.20PriceItem3.8.25B2/F - 12Curtain Wall type 4No.20PriceItem3.8.26B2/F - 13Curtain Wall type 5No.10PriceItem3.8.27B2/F - 14Curtain Wall type 6No.60PriceItem3.8.28B2/F - 15Curtain Wall type 7No.30PriceItem3.8.29B2/F - 16Curtain Wall type 8No.10PriceItem3.8.30B2/F - 17Curtain Wall type 9No.70PriceItem3.8.31B2/F - 18Curtain Wall type 10No.20PriceItem3.8.32B2/F - 19Curtain Wall type 11No.40PriceItem3.8.33B2/F - 20Curtain Wall type 12No.10NoteHeadingNoteNote DetailsNote3.8.34-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.8.35B2/F - 21The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.9B2/G - OFFICER'S CLUB BUILDING: FLOORS, WALLS & CEILINGNoteHeadingNoteNote DetailsNote3.9.1-PLASTERNote3.9.2-Cement sand plaster 20 mm thick for walls ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.3B2/G - 1To concrete and block wallsm228000PriceItem3.9.4B2/G - 2To concrete and block walls above false ceilingm22300PriceItem3.9.5B2/G - 3To concrete and block walls under ceramic tilesm27200PriceItem3.9.6B2/G - 4To external concrete and block walls, including groovesm22200NoteHeadingNoteNote DetailsNote3.9.7-Cement sand plaster 15 mm thickness for ceiling ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.8B2/G - 5To Soffits and slopped Soffitsm2800NoteHeadingNoteNote DetailsNote3.9.9-NotesNote3.9.10-Plaster should be applied with cement morter of 350 kg OPC to one cubic meter of sandNote3.9.11-Price to include all necessary plastering accessories such as angle beat, metal lath, plaster stopperNote3.9.12-Plaster to should be applied in accordance with B.S 5492Note3.9.13-CERAMICNote3.9.14-Supply & fix of floor tiles for areas as shown on drawings and finishing schedule and as per specificationsItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.15B2/G - 6Porcelain floor tiles, size 600 x 600 x 95 mm type F01m24300PriceItem3.9.16B2/G - 7Ditto, for skirting 70 mm high type SK01m5700PriceItem3.9.17B2/G - 8Porcelain floor tiles, size 600 x 600 x 95 mm type F02m21100PriceItem3.9.18B2/G - 9Ditto, for skirting 70 mm high type SK06m600PriceItem3.9.19B2/G - 10Ceramic floor tiles, size 300 x 300 x 7 mm type F05m2350PriceItem3.9.20B2/G - 11Ditto, for skirting 70 mm high type SK02m300PriceItem3.9.21B2/G - 12Ceramic floor tiles, size 300 x 300 x 7 mm type F07m21500NoteHeadingNoteNote DetailsNote3.9.22-Supply & fix of Wall Ceramic tiles for areas as shown on drawings and finishing schedules and as per specificationItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.23B2/G - 13Ceramic wall tiles size 300 x 300 x 6 mm type W06m2900PriceItem3.9.24B2/G - 14Ceramic wall tiles size 300 x 300 x 6 mm type W07m26300NoteHeadingNoteNote DetailsNote3.9.25-NoteNote3.9.26-All Joints to be finished by grooves and filled with groutNote3.9.27-For Floors Price including Mortar bedding as detailed on drawingsNote3.9.28-For Walls Price including all tiles trim and border lines as required Note3.9.29-Ceramic Wall tiles to be extended 10 cm above suspended ceiling U.O.NNote3.9.30-CUT NATURAL STONENote3.9.31-Supply and fix best quality Granite / Marble Paving thickness, pattern and types shown on the drawingsNote3.9.32-Best quality Marble as shown in drawingsItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.33B2/G - 1530 mm thickness for floor type F03m212500PriceItem3.9.34B2/G - 1620 mm thickness for Wall type W08m2700NoteHeadingNoteNote DetailsNote3.9.35-Best quality Granite for StaircaseItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.36B2/G - 17For landingm2100PriceItem3.9.37B2/G - 18For Treads 40 mm thicknees & 20 mm thickness for Riser as per detailed drawing including Rubber nose type F15m700PriceItem3.9.38B2/G - 1920 mm thickness granite Skirting type SK07m300PriceItem3.9.39B2/G - 20Imperial Pink Granite Vanities to washrooms and toilets granite topped and faced including all necessary supporting framework, anchorage to walls, sealants, splashback, cut-outs for wash basins etc., as detailed on drawings (wash basins measured separately)m100NoteHeadingNoteNote DetailsNote3.9.40-NoteNote3.9.41-Contractor Shall submit samples and shop drawings for the Engineer's approvalNote3.9.42-For Wall Cladding Works, the back side of marble to be protected by Damp proofing Material and cement sand mortar up to 1250 mm from the F.F.LNote3.9.43-SUSPENDED CEILING TILE SYSTEMNote3.9.44-Supply and fix Waterproofing Gypsum Tiles 600 x 600 x 12 mm with 12 mm thikckness Moisture Resestant Gypsum Board including suspension system, supporting, fitting , trims and accessories for areas as per drawings and finishing scheduleItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.45B2/G - 21Ceiling type C03m22300NoteHeadingNoteNote DetailsNote3.9.46-Supply and fix 12 mm thickness Gypsum board including suspension system, supporting, fitting , trims and accessories for areas as per drawings and finishing scheduleItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.47B2/G - 22Ceiling type C01m26300PriceItem3.9.48B2/G - 23Bulkhead height as per drawingsL.S.10NoteHeadingNoteNote DetailsNote3.9.49-Supply and fix 12 mm thickness Decorative Gypsum board including suspension system, supporting, fitting , trims and accessories for areas as per drawings and finishing scheduleItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.50B2/G - 24Ceiling type C14m210500NoteHeadingNoteNote DetailsNote3.9.51-PAINTING AND DECORATIONNote3.9.52-Prepare and apply Washable Emulsion Paint consists of one coat of primer, two coats of stucco and two coats of the approved colourItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.53B2/G - 25To Plastered Soffits type C04m2500PriceItem3.9.54B2/G - 26To Gypsum Soffitsm216800PriceItem3.9.55B2/G - 27For Plastered Walls type W01m221900NoteHeadingNoteNote DetailsNote3.9.56-Prepare and apply Pure Acrylic, Water based, Crack Bridging, Breathable Texture Paint consists of one coat of primer, epoxy based intermediate coats formulated to be applied by spray equipment to achieve a textured surface and two coats of the approved colourItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.57B2/G - 28To External Plastered soffits type C13m21000PriceItem3.9.58B2/G - 29For External Plastered walls type W03m22200NoteHeadingNoteNote DetailsNote3.9.59-Prepare and apply Epoxy Paint of the approved colour for areas as per finishing scheduleItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.60B2/G - 30To Plastered Soffits type C05m21800PriceItem3.9.61B2/G - 31To Plastered Walls type W02m26200PriceItem3.9.62B2/G - 32To Skirting type SK10m2100NoteHeadingNoteNote DetailsNote3.9.63-High performance, self smoothing, solvent free, seamless two component epoxy coating on 50 mm screed (Screed measured separately)ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.64B2/G - 33For floors type F20m21800NoteHeadingNoteNote DetailsNote3.9.65-Supply and apply 3mm Solvent free epoxy resin based floor topping "seamlees or tough as per site condition", chemical resistant, self levelling and Hygienic floor serface, the system to be applied an applicator which is approved by the by manufacture ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.66B2/G - 34For Industrial Kitchen and its annexes type F18m2800NoteHeadingNoteNote DetailsNote3.9.67-Repairing for concrete slabs above false ceiling and painting with Anti-fungus paintItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.68B2/G - 35For soffits and walls above false ceilingm228000NoteHeadingNoteNote DetailsNote3.9.69-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.9.70B2/G - 36The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.10B2/H - THEATER: SPECIALISTSNoteHeadingNoteNote DetailsNote3.10.1-Auditorium SeatsNote3.10.2-Supply and fix Conference seats with fabric upholstery size 670 mm wide x 930 mm height x 600 mm depth manufactured by Emmegi item code (CAPITAL 4CPSF001)ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.10.3B2/G1 - 1Auditorium SeatsNo.00PriceItem3.10.4B2/G1 - 22% Spare seats to be handed over to the Employer's storeNo.00NoteHeadingNoteNote DetailsNote3.10.5-NotesNote3.10.6-The referance code is given for pricing, the Engineer may change the seat specifications as instructed by the EmployerNote3.10.7-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.10.8B2/G1 - 3The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.11B2/H - OFFICER'S CLUB BUILDING: ELEVATOR WORKSItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.11.1B2/H - 1Supply and install Passenger Elevators to be executed by well known specialist company. (See specification). No.20NoteHeadingNoteNote DetailsNote3.11.2-Car land and internal dimension : See Specs; Speed : 1.75m/sec.; Load : 750 Kg. - 10 persons; Travel : As per drawings; Opening : 2 stops, 2 openings, (All in same line) (Ground and First floor)ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.11.3B2/H - 2Supply and install Service Elevators to be executed by well known specialist company. (See specification). No.10NoteHeadingNoteNote DetailsNote3.11.4-Car land and internal dimension : See Specs; Speed : 1.75m/sec.; Load : 1350 Kg; Travel : As per drawings; Opening : 2 stops, 2 openings, (All in same line) (Ground and First floor)Note3.11.5-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.11.6B2/H - 3The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.12B2/J - OFFICER'S CLUB BUILDING: PLUMBING AND SANITARY FIXTURENoteHeadingNoteNote DetailsNote3.12.1-WATER SUPPLYNote3.12.2-Supply, install and maintain the following according to drawings, specifications and AADC regulations.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.12.3B2/J - 1Connection to main incomming lineL.S.10NoteHeadingNoteNote DetailsNote3.12.4-UPVC Class-16 water supply main riser pipes and over flow pipesItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.12.5B2/J - 2 75mm main feeding riserm280PriceItem3.12.6B2/J - 3 90mm over flowm280NoteHeadingNoteNote DetailsNote3.12.7-All internal cold and hot water supply pipes PPR pipesItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.12.8B2/J - 4 20mm (CW)m2490PriceItem3.12.9B2/J - 5 20mm (HW)m1350PriceItem3.12.10B2/J - 6 25mm (CW)m1230PriceItem3.12.11B2/J - 7 25mm (HWS)m660PriceItem3.12.12B2/J - 8 25mm (HWR)m1070PriceItem3.12.13B2/J - 9 32mm (CW)m280PriceItem3.12.14B2/J - 10 32mm (HWS)m660PriceItem3.12.15B2/J - 11 40mm (CW)m400PriceItem3.12.16B2/J - 12 40mm (HWS)m300PriceItem3.12.17B2/J - 13 62mm (CW)m590PriceItem3.12.18B2/J - 14Concealed isolating valves at each toilets, bathrooms and kitchen.No.470PriceItem3.12.19B2/J - 15Supply, install bip tap as shown on the drawingNo.40PriceItem3.12.20B2/J - 16Provision for Kitchen and LaundryL.S.10NoteHeadingNoteNote DetailsNote3.12.21-Supply, install, test, commission and maintain central solar water heaters with the following itemsItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.12.22B2/J - 17Hot water storage tank 500 LtreNo.20PriceItem3.12.23B2/J - 18Solar fluid Circulation pumpSet10PriceItem3.12.24B2/J - 19Solar PanelsNo.80PriceItem3.12.25B2/J - 20Hot water return pumpSet10PriceItem3.12.26B2/J - 21Inter connection piping, valves, wiring, controls,..ectL.S.10NoteHeadingNoteNote DetailsNote3.12.27-GRP section water tank as shown in the drawing and as specified:ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.12.28B2/J - 22 5.5 x 4 x 1mNo.10PriceItem3.12.29B2/J - 23Supply and install 2 Nos. electrical operated booster pump (pressurized pump) to be fixed on the roof with the overhead water tanks as shown on the drawings. Capacity 60gpm at 25m head.Set10PriceItem3.12.30B2/J - 24Testing and commissioning the systemL.S.10PriceItem3.12.31B2/J - 25Provision for shop drawings, submittals, samples, As Built, manuals.L.S.10NoteHeadingNoteNote DetailsNote3.12.32-SANITARY FIXTURESNote3.12.33-Supply and fix of complete sanitary fixtures include but not limited to washbasin, WC, Mixers, Angle valve, Spray hose, Bottle trap. Soap dispenser, Paper towel dispense, Sanitary napkin disposal units, coat hook... etc. ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.12.34B2/J - 26Type 01No.10PriceItem3.12.35B2/J - 27Type 02No.10PriceItem3.12.36B2/J - 28Type 03No.10PriceItem3.12.37B2/J - 29Type 04No.120PriceItem3.12.38B2/J - 30Type 05No.50NoteHeadingNoteNote DetailsNote3.12.39-MirrorsNote3.12.40-Beveled Mirrors to Bathrooms and Toilets 6 mm thick polished plate glass size as shown on the drawings including plywood, backing, metal angle supports.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.12.41B2/J - 31Type 01No.10PriceItem3.12.42B2/J - 32Type 02No.10PriceItem3.12.43B2/J - 33Type 03No.10PriceItem3.12.44B2/J - 34Type 04No.120PriceItem3.12.45B2/J - 35Type 05No.50NoteHeadingNoteNote DetailsNote3.12.46-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.12.47B2/J - 36The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.13B2/K - OFFICER'S CLUB BUILDING: DRAINAGE WORKSNoteHeadingNoteNote DetailsNote3.13.1-Supply and install the following according to drawings, specification and Engineer approval.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.13.2B2/K - 1All outside drainage pipe between MH's shall be of U.P.V.C. class - 16.m1100NoteHeadingNoteNote DetailsNote3.13.3-All internal drainage pipe work including vent., cal stacks, rain water .... etc. ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.13.4B2/K - 2 (waste) 2"m590PriceItem3.13.5B2/K - 3 (waste) 3"m610PriceItem3.13.6B2/K - 4 (waste) 4"m210PriceItem3.13.7B2/K - 5 (soil) 4"m570PriceItem3.13.8B2/K - 6 (vent) 4"m550PriceItem3.13.9B2/K - 7 (Rain water outlet) 4"m180PriceItem3.13.10B2/K - 8 (waste) 6"m920PriceItem3.13.11B2/K - 9 (soil) 6"m930PriceItem3.13.12B2/K - 10 (Rain water pipe) 6"m540PriceItem3.13.13B2/K - 112 U.P.V.C piping and balcony drains for all balconies and flower box as shown in the drawings.No.140PriceItem3.13.14B2/K - 12All necessary work for the inspection opening for ducts.L.S.10NoteHeadingNoteNote DetailsNote3.13.15-Note: Note3.13.16-a- Price includes frame, cover plate from approved material fixed with concealed clips and covered with same ceramic type.Note3.13.17-b- Contractor shall submit complete shop drawings for approval. ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.13.18B2/K - 13Floor traps in each bathroom, toilets, kitchens and service rooms as laid in drawing with all necessary details and ancillary work.No.250PriceItem3.13.19B2/K - 14Man Holes complete with cover as laid in drawings with all necessary connections details and ancillary work, as per the AASSC regulations.No.90PriceItem3.13.20B2/K - 15Gully traps complete with cover as shown in the drawings and as per AASSC regulations.No.50PriceItem3.13.21B2/K - 16Roof drain outlets as shown in the drawings and as specified.No.80PriceItem3.13.22B2/K - 17Provision for connection of condensate drain from each FCU, AHU.L.S.10PriceItem3.13.23B2/K - 18Provision for connection of sewage & storm water system to the main.L.S.10PriceItem3.13.24B2/K - 19Provision for shop drawings, submittals, manuals.L.S.10PriceItem3.13.25B2/K - 20Provision for testing and commissioning.L.S.10NoteHeadingNoteNote DetailsNote3.13.26-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.13.27B2/K - 21The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.14B2/L - OFFICER'S CLUB BUILDING: FIRE PROTECTION WORKSItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.14.1B2/L - 1Supply, install and maintain complete set of fire cabinet including hose reel, landing valveetc., as shown in the drawings.No.30NoteHeadingNoteNote DetailsNote3.14.2-Supply, install complete fire fighting pipes and fittings.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.14.3B2/L - 2 25mmm3130PriceItem3.14.4B2/L - 3 32mmm590PriceItem3.14.5B2/L - 4 40mmm440PriceItem3.14.6B2/L - 5 50mmm310PriceItem3.14.7B2/L - 6 65mmm1530PriceItem3.14.8B2/L - 7 80mmm450PriceItem3.14.9B2/L - 8 100mmm280PriceItem3.14.10B2/L - 9 150mmm230NoteHeadingNoteNote DetailsNote3.14.11-Fire extinguishers at each service room as shown in the drawing.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.14.12B2/L - 10CO2 ExtingusherNo.50PriceItem3.14.13B2/L - 11Dry powder ExtingusherNo.110PriceItem3.14.14B2/L - 12Testing and commissioning the system.L.S.10PriceItem3.14.15B2/L - 13Provision for shop drawing, submittals, samples, manualsetc.L.S.10PriceItem3.14.16B2/L - 14Provision for CDD inspection and approvals.L.S.10NoteHeadingNoteNote DetailsNote3.14.17-Sprinkler heads complete with all necessary accessories as specified and as shown on drawings.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.14.18B2/L - 15 Upright sprinklerNo.40PriceItem3.14.19B2/L - 16 Side Wall Sprinkler sprinklerNo.350PriceItem3.14.20B2/L - 17 Pendent concealed sprinklerNo.1110PriceItem3.14.21B2/L - 18Supply & installation of zone control valves with complete accessories as shown in the drawings.No.20PriceItem3.14.22B2/L - 19Provision for valve box and connection to mainNo.10NoteHeadingNoteNote DetailsNote3.14.23-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.14.24B2/L - 20The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.15B2/M - OFFICER'S CLUB BUILDING: AIR CONDITIONING WORKSNoteHeadingNoteNote DetailsNote3.15.1- Fresh Air Handling UnitNote3.15.2-Supply, install, commissioning as specified complete with chilled water, coil, motor, horse shoe heat pipe, fan drain pan, filters, all protective devices, anti vibration mounting joints to pipe work and duct work and all necessary electrical connection, where applicable.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.3B2/M - 1FAHU-1No.10NoteHeadingNoteNote DetailsNote3.15.4- Air Handling UnitNote3.15.5-Supply, install, commissioning as specified complete with chilled water, coil, motor, fan drain pan, filters, all protective devices, anti vibration mounting joints to pipe work and duct work and all necessary electrical connection, where applicable.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.6B2/M - 2AHU G1No.10PriceItem3.15.7B2/M - 3AHU G2No.10PriceItem3.15.8B2/M - 4AHU F1No.10NoteHeadingNoteNote DetailsNote3.15.9-Supply, install roof mounted (cabinet twin fans) extract fans as shown on the drawings.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.10B2/M - 5TER-2No.10PriceItem3.15.11B2/M - 6TER-3No.10NoteHeadingNoteNote DetailsNote3.15.12-Supply, install roof mounted extract fan as shown on the drawings.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.13B2/M - 7TER1No.10PriceItem3.15.14B2/M - 8TER4No.10PriceItem3.15.15B2/M - 9TER5No.10NoteHeadingNoteNote DetailsNote3.15.16-Supply, install roof mounted centrifugal extract fan as shown on the drawings.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.17B2/M - 10KED1No.10NoteHeadingNoteNote DetailsNote3.15.18-Supply, install inline ducted centrifugal fan as shown on the drawingsItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.19B2/M - 11FAF1No.10NoteHeadingNoteNote DetailsNote3.15.20-Supply and install of FCUs as shown on the drawings and as specified, complete with chilled water coil, motor, fans drain pan, fillers, all protective devices, anti vibration mountings, joints to pipe work and duct work and all necessary electrical connections as specified and as per drawings.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.21B2/M - 12G1No.10PriceItem3.15.22B2/M - 13G2No.10PriceItem3.15.23B2/M - 14G3No.10PriceItem3.15.24B2/M - 15G4No.10PriceItem3.15.25B2/M - 16G5No.10PriceItem3.15.26B2/M - 17G6No.10PriceItem3.15.27B2/M - 18G7No.10PriceItem3.15.28B2/M - 19G8No.10PriceItem3.15.29B2/M - 20G9No.10PriceItem3.15.30B2/M - 21G10No.10PriceItem3.15.31B2/M - 22G11No.10PriceItem3.15.32B2/M - 23G12No.10PriceItem3.15.33B2/M - 24G13No.10PriceItem3.15.34B2/M - 25F1No.10PriceItem3.15.35B2/M - 26F2No.10PriceItem3.15.36B2/M - 27F3No.10PriceItem3.15.37B2/M - 28F4No.10PriceItem3.15.38B2/M - 29F5No.10PriceItem3.15.39B2/M - 30F6No.10PriceItem3.15.40B2/M - 31F7No.10PriceItem3.15.41B2/M - 32F8No.10PriceItem3.15.42B2/M - 33F9No.10PriceItem3.15.43B2/M - 34F10No.10PriceItem3.15.44B2/M - 35F11No.10PriceItem3.15.45B2/M - 36F12No.10PriceItem3.15.46B2/M - 37F13No.10PriceItem3.15.47B2/M - 38F14No.10PriceItem3.15.48B2/M - 39F15No.10PriceItem3.15.49B2/M - 40F16No.10PriceItem3.15.50B2/M - 41F17No.10PriceItem3.15.51B2/M - 42F18No.10PriceItem3.15.52B2/M - 43F19No.10PriceItem3.15.53B2/M - 44F20No.10PriceItem3.15.54B2/M - 45F21No.10PriceItem3.15.55B2/M - 46F22No.10PriceItem3.15.56B2/M - 47F23No.10PriceItem3.15.57B2/M - 48F24No.10NoteHeadingNoteNote DetailsNote3.15.58-Supply and install two port control valve, vent and gate valves, all protective devices drain to waste, joints to pipe work and all necessary electrical connections and remote wall mounted thermostats and controller where applicable for :ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.59B2/M - 49Fan Coil UnitsNo.360PriceItem3.15.60B2/M - 50AHUsNo.30PriceItem3.15.61B2/M - 51FAHUNo.10NoteHeadingNoteNote DetailsNote3.15.62-Supply and install of Chilled water pipe work and fittings as specified complete with rigid sectional insulation and condensate pipe.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.63B2/M - 52 125mmm500PriceItem3.15.64B2/M - 53 100mmm350PriceItem3.15.65B2/M - 54 80mmm1100PriceItem3.15.66B2/M - 55 65mmm600PriceItem3.15.67B2/M - 56 50mmm950PriceItem3.15.68B2/M - 57 40mmm500PriceItem3.15.69B2/M - 58 32mmm550PriceItem3.15.70B2/M - 59 25mmm500PriceItem3.15.71B2/M - 60 20mmm1100PriceItem3.15.72B2/M - 61Double regulating valve at main branch of return chilled water pipesNo.30PriceItem3.15.73B2/M - 62Gate valve at main branch of supply chilled water pipesNo.30PriceItem3.15.74B2/M - 63Air bottle and automatic air vents to risers.No.20PriceItem3.15.75B2/M - 64Dirt. pocket.L.S.10NoteHeadingNoteNote DetailsNote3.15.76-Galvanized sheet rectangular duct work complete with insulation, turning vanes, stiffeners, splitter dampers, supports, test holes, access panels, branch opening etc.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.77B2/M - 65Supply air duct work.m27700PriceItem3.15.78B2/M - 66Exhaust air duct work.m22450PriceItem3.15.79B2/M - 67Fresh air supply duct work.m23650PriceItem3.15.80B2/M - 68Allow for all volume control dampers as required by specification fixed in duct work.Item10NoteHeadingNoteNote DetailsNote3.15.81-Supply and install of Grilles, diffusers and registers as specified and as shown on the drawings (Powder coated finish)Note3.15.82-SUPPLY DIFFUSERItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.83B2/M - 69 300 x 300mmNo.120PriceItem3.15.84B2/M - 70 250 x 250mmNo.30PriceItem3.15.85B2/M - 71 200 x 200mmNo.50PriceItem3.15.86B2/M - 72 150 x 150mmNo.60NoteHeadingNoteNote DetailsNote3.15.87-RETURN DIFFUSERItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.88B2/M - 73 500 x 500mmNo.40PriceItem3.15.89B2/M - 74 450 x 450mmNo.100PriceItem3.15.90B2/M - 75 400 x 400mmNo.30PriceItem3.15.91B2/M - 76 300 x 300mmNo.120PriceItem3.15.92B2/M - 77 250 x 250mmNo.30PriceItem3.15.93B2/M - 78 200 x 200mmNo.40PriceItem3.15.94B2/M - 79 150 x 150mmNo.30NoteHeadingNoteNote DetailsNote3.15.95-EXTRACT DIFFUSERItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.96B2/M - 80 200 x 200mmNo.10PriceItem3.15.97B2/M - 81 150 x 150mmNo.30NoteHeadingNoteNote DetailsNote3.15.98-SUPPLY GRILLEItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.99B2/M - 82 300 x 150mmNo.10PriceItem3.15.100B2/M - 83 250 x 150mmNo.40PriceItem3.15.101B2/M - 84 250 x 100mmNo.10PriceItem3.15.102B2/M - 85 400 x 150mmNo.10PriceItem3.15.103B2/M - 86 350 x 150mmNo.10PriceItem3.15.104B2/M - 87 1000 x 200mmNo.110PriceItem3.15.105B2/M - 88 1100 x 200mmNo.40PriceItem3.15.106B2/M - 89 900 x 200mmNo.30PriceItem3.15.107B2/M - 90 200 x 150mmNo.10NoteHeadingNoteNote DetailsNote3.15.108-RETURN GRILLEItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.109B2/M - 91 300 x 150mmNo.10PriceItem3.15.110B2/M - 92 250 x 150mmNo.40PriceItem3.15.111B2/M - 93 250 x 100mmNo.10PriceItem3.15.112B2/M - 94 400 x 150mmNo.10PriceItem3.15.113B2/M - 95 350 x 150mmNo.10PriceItem3.15.114B2/M - 96 900 x 200mmNo.30PriceItem3.15.115B2/M - 97 200 x 150mmNo.10PriceItem3.15.116B2/M - 98 1000 x 200mmNo.20NoteHeadingNoteNote DetailsNote3.15.117-SUPPLY LINEAR BAR GRILLEItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.118B2/M - 99 4000 x 100mmNo.10PriceItem3.15.119B2/M - 100 2500 x 100mmNo.20PriceItem3.15.120B2/M - 101 2000 x 100mmNo.30PriceItem3.15.121B2/M - 102 3200 x 100mmNo.10PriceItem3.15.122B2/M - 103 1200 x 100mmNo.90PriceItem3.15.123B2/M - 104 3000 x 200mmNo.20PriceItem3.15.124B2/M - 105 7000 x 200mmNo.10PriceItem3.15.125B2/M - 106 3000 x 150mmNo.10PriceItem3.15.126B2/M - 107 2000 x 200mmNo.50NoteHeadingNoteNote DetailsNote3.15.127-RETURN LINEAR BAR GRILLEItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.128B2/M - 108 4000 x 100mmNo.10PriceItem3.15.129B2/M - 109 2500 x 100mmNo.20PriceItem3.15.130B2/M - 110 2000 x 100mmNo.30PriceItem3.15.131B2/M - 111 3200 x 100mmNo.10PriceItem3.15.132B2/M - 112 1200 x 100mmNo.90PriceItem3.15.133B2/M - 113 3000 x 200mmNo.20PriceItem3.15.134B2/M - 114 7000 x 200mmNo.10PriceItem3.15.135B2/M - 115 3000 x 150mmNo.10PriceItem3.15.136B2/M - 116 2000 x 200mmNo.50NoteHeadingNoteNote DetailsNote3.15.137-SUPPLY LINEAR SLOT DIFFUSERItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.138B2/M - 117 3 SLOTm27.50PriceItem3.15.139B2/M - 118 2 SLOTm30NoteHeadingNoteNote DetailsNote3.15.140-RETURN LINEAR SLOT DIFFUSERItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.141B2/M - 119 3 SLOTm27.50PriceItem3.15.142B2/M - 120 2 SLOTm90NoteHeadingNoteNote DetailsNote3.15.143-EXTRACT DISK VALVEItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.144B2/M - 121 100mmNo.260NoteHeadingNoteNote DetailsNote3.15.145-Noise Attenuation.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.146B2/M - 122Allow for sound attenuator, duct liners etc. required for nose reduction as specified.L.S.10NoteHeadingNoteNote DetailsNote3.15.147-Builder's workItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.148B2/M - 123Allow for all builders work in connection with air conditioning installation.L.S.10NoteHeadingNoteNote DetailsNote3.15.149-PaintingItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.150B2/M - 124Allow for all painting and identification to the instation.L.S.10NoteHeadingNoteNote DetailsNote3.15.151-SundriesItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.152B2/M - 125Allow for submittals, samples shop drawings, inspecting, as built drawings and the like.L.S.10PriceItem3.15.153B2/M - 126Allow for testing and commissioning.L.S.10NoteHeadingNoteNote DetailsNote3.15.154-BMSNote3.15.155-Provision for the following equipments BMS connection including complte controls wiring, sensors, etc and connect to the main system.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.156B2/M - 127FAHUsNo.10PriceItem3.15.157B2/M - 128AHUsNo.30PriceItem3.15.158B2/M - 129FCUsNo.360PriceItem3.15.159B2/M - 130Extract FansNo.50PriceItem3.15.160B2/M - 131fresh air fanNo.10PriceItem3.15.161B2/M - 132Water tanksNo.10PriceItem3.15.162B2/M - 133Booster pump setNo.10PriceItem3.15.163B2/M - 134Central solar water heating systemNo.10NoteHeadingNoteNote DetailsNote3.15.164-Any additional items ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.15.165B2/M - 135The Contractor may price here any new items or additional quantity for an existing BOQ item, which are shown in the Drawings or any other Tender/Contract Documents but overlooked or not specifically mentioned herein and is necessary for the satisfactory completion of the Works/this section. Should the Contractor fail to insert any item here, it will be deemed that his lump sum Tender Price includes all such items and no claims for additional items will be entertained.Item10WorksheetEndSection Sub Total0

Worksheet3.16B2/N - OFFICER'S CLUB BUILDING: ELECTRICAL WORKSNoteHeadingNoteNote DetailsNote3.16.1-Supply, install, test, commission and maintain the following as per specification, drawings and according to AADC rules and regulations and Engineer approval.ItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.16.2B2/N - 1SMDB-OC (Form2) 6 ways TPNNo.10NoteHeadingNoteNote DetailsNote3.16.3-Free standing IP 54, electro galvanized sheet steel constructed as to BSEN60439 and local Authority regulationsNote3.16.4-IncomingNote3.16.5-1 x 250A, TP, MCCB , RYB indication lamps, Digital meter for A,V,KW,KVAR,PF interfaced with BMSNote3.16.6-Outgoing:Note3.16.7-1 x 125A, TP, MCCB, 35KA, 400V AC - 50HzNote3.16.8-2 x 100A, TP, MCCB, 35KA, 400V AC - 50HzNote3.16.9-1 x 80A, TP, MCCB, 35KA, 400V AC - 50HzNote3.16.10-1 x 60A, TP, MCCB, 35KA, 400V AC - 50HzNote3.16.11-1 x 40A, TP, MCCB, 35KA, 400V AC - 50HzItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.16.12B2/N - 2E SMDB-OC (form 2) 6 ways TPNNo.10NoteHeadingNoteNote DetailsNote3.16.13-Free standing IP 54, electro galvanized sheet steel constructed as to BSEN60439 and local Authority regulationsNote3.16.14-IncomingNote3.16.15-1 x 125A, TP, MCCB, 35 KA , RYB indication lamps, Digital meter for A,V,KW,KVAR,PF interfaced with BMSNote3.16.16-Outgoing:Note3.16.17-1 x 80A, TP, MCCB, 35KA, 400V AC - 50HzNote3.16.18-5 x 40A, TP, MCCB, 35KA, 400V AC - 50HzItemHeadingItem ReferenceDescriptionUnit of MeasurementQuantityUnit PricePricePriceItem3.16.19B2/N - 3Supply and fix final DB with RCCB for floor, as shown on the drawing and as specified in specification. No.40PriceItem3.16.20B2/N - 4Supply and fix final DB for AC load as shown on the drawing and as specified in specs. No.20NoteHeadingNoteNote DetailsNote3.16.21-* Digital Power Meter (D.P.M) shall be installed for each DB more than 10kw and interfaced with BMS.Note3.16.22-Disconnect SwitchesNote3.16.23-Supply, install, test, commission & maintain disconnect switches including conduits, conduit fittings, wiring, cabling, cable trays, vertical risers, termination, accessories and all necessary ancillary works as speci