Page 1 of 2 DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ADDENDUM NO. 1 This addendum will only be distributed via e-mail, but will remain available for viewing on the MSDGC website at www.MSDGC.org on the project-specific web page. No hard copy will follow. NOTE: Please be sure to enter the TOTAL NUMBER of Addenda issued on the ‘Official Bid Form’ contained in the Bid Document prior to submitting your bid. The attention of all bidders is directed to the following additions and/or deletions to the Contract Documents. ADDED ITEMSARE UNDERLINED AND DELETED ITEMS ARE STRUCK THROUGH The Contract Documents for the above referenced project are amended and revised as follows: 2 nd FACILITY TOUR OPPORTUNITY MSDGC will hold one additional guided tour of the DIW facilities on Monday, 10/27/2014 at 10:00 AM ET. Participants should gather in the atrium of 1081 Woodrow Avenue. This tour will be a repeat of the tour given at the Pre-bid meeting on 10/21/2014. Pre-registration is not required. QUESTIONS & ANSWERS Question A: Regarding the replacement of the Fume Hood Sashes and Liner Material, can you provide the name and contact information of the current manufacturer, and what type of liner is currently being used? Since that manufacturer may be adverse to supplying product and material to a competitor, would the Owner or the CM consider providing the material, and the contractor do the installation? If we wait until the Pre-bid Meeting, there may not be enough time to acquire pricing from the current manufacturer. Photo would also be most helpful in determining what needs to be considered in this scope of work. Answer A: The existing laboratory casework was manufactured by BMC National Products, PO Box 4089, Muskegon Heights, MI 49444. (616) 733-1206. The attached file contains the original product data submittal for the existing fume hoods. The attached photo shows FH-23. Question B: You may want to ask for an Alternate to replace the fume hoods, as opposed to replacing the sashes and liners. Newer hoods could be run at lower CFM / FPM, giving the users significant long term energy savings. Answer B: We are unable to change the budget, the scope of the project or the bid items at this time. Question C: I am requesting adding Hanson Lab Furniture to the list of Approved Manufacturers in Spec. Section 115313. 2. 1. A., and Hanson and Wood-Metal Industries be added to the list of manufacturers

DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since

Page 1 of 2

DIW Office and Lab Improvements - Phase 2, Project ID 10240054

Date Issued: October 23, 2014

ADDENDUM NO. 1

This addendum will only be distributed via e-mail, but will remain available for viewing on the MSDGC website at www.MSDGC.org on the project-specific web page. No hard copy will follow. NOTE: Please be sure to enter the TOTAL NUMBER of Addenda issued on the ‘Official Bid Form’ contained in the Bid Document prior to submitting your bid. The attention of all bidders is directed to the following additions and/or deletions to the Contract Documents. ►ADDED ITEMS◄ ARE UNDERLINED AND DELETED ITEMS ARE STRUCK THROUGH The Contract Documents for the above referenced project are amended and revised as follows: 2nd FACILITY TOUR OPPORTUNITY MSDGC will hold one additional guided tour of the DIW facilities on Monday, 10/27/2014 at 10:00 AM ET. Participants should gather in the atrium of 1081 Woodrow Avenue. This tour will be a repeat of the tour given at the Pre-bid meeting on 10/21/2014. Pre-registration is not required. QUESTIONS & ANSWERS Question A: Regarding the replacement of the Fume Hood Sashes and Liner Material, can you provide the name and contact information of the current manufacturer, and what type of liner is currently being used? Since that manufacturer may be adverse to supplying product and material to a competitor, would the Owner or the CM consider providing the material, and the contractor do the installation? If we wait until the Pre-bid Meeting, there may not be enough time to acquire pricing from the current manufacturer. Photo would also be most helpful in determining what needs to be considered in this scope of work. Answer A: The existing laboratory casework was manufactured by BMC National Products, PO Box 4089, Muskegon Heights, MI 49444. (616) 733-1206. The attached file contains the original product data submittal for the existing fume hoods. The attached photo shows FH-23. Question B: You may want to ask for an Alternate to replace the fume hoods, as opposed to replacing the sashes and liners. Newer hoods could be run at lower CFM / FPM, giving the users significant long term energy savings. Answer B: We are unable to change the budget, the scope of the project or the bid items at this time. Question C: I am requesting adding Hanson Lab Furniture to the list of Approved Manufacturers in Spec. Section 115313. 2. 1. A., and Hanson and Wood-Metal Industries be added to the list of manufacturers

Page 2: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since

Page 2 of 2

listed in Spec Section 123533.2.5.A. See attached substitution form, and data regarding Hanson and Wood-Metal Industries. Answer C: Please review the Instructions for Bidders with regard to substitution and or equal requests and follow the described process in resubmitting your request. DETAILED PROVISIONS (VOLUME II):

REVISE Temporary Facilities and Controls, 01 50 00 – 6 as follows: Delete Plywood Packing Crate Boxes Schedule in its entirety and replace with the following schedule. No boxes are needed for Phase 3.

BOXES NEEDED FOR PHASE 2

Width Length Height

40 32 27

24 16 20

30 30 27

44 34 32

48 36 30

64 36 30

64 36 30

24 32 16

48 54 24

Specification Section 11 53 13 Laboratory Fume Hoods. The existing fume hoods were manufactured by BMC National Products, PO Box 4089, Muskegon Heights, MI 49444. (616)-733-1206.

ATTACHMENTS

Fume Hood Original Product Data

Fume Hood Photo

Pre-Bid Meeting Report

Page 3: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since
Page 4: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since
Page 5: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since
Page 6: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since
Page 7: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since
Page 8: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since
Page 9: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since
Page 10: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since
Page 11: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since
Page 12: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since
Page 13: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since
Page 14: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since

312 Plum Street  |  12th Floor  |  Cincinnati, OH 45202  |  513.579.0042  

Pre‐bid Meeting Report 

PRE‐BID MEETING REPORT  MEETING DATE:    October 21, 2014   LOCATION:      MSD Administration Building and DIW Building           PROJECT:  DIW Office and Lab and Improvements Phase 2   PROJECT NO.:      51836   ATTENDEES:      Mike Cappel    WQM         Dave Castellini    MSD         Mark Menkhaus  MSD 

Sohail Saeed    MSD Contractors    (See attached sign‐in sheet) John Kornbluh    B&N Deepen Patel    B&N 

  PREPARED BY:      John Kornbluh    B&N   COPIES TO:      All in attendance         MSD Document Control               

    

Page 15: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since

Pre‐bid Meeting Report October 21, 2014 Page 2

ITEMS DISCUSSED:  The purpose of the Pre‐bid meeting was to review requirements of the DIW Office and Lab Improvements Phase 2 project and to tour the DIW building.  1.0 INTRODUCTION  1.1 A representative of MSD Procurement, Mark Menkhaus, the MSD Project Manager, Sohail Saeed, and the 

Project Architect, John Kornbluh, began the Pre‐bid meeting with a brief introduction to the project.  

1.2 Mark Menkhaus pointed out that the bidders are required to submit various forms with their bid. All of those forms are grouped together in one place in Volume One of the bid booklet. He also described instructions for submitting combined bids. 

 1.3 John Kornbluh briefly described the work of the project and mentioned schedule, phasing, temporary 

facilities and controls, scope of work and other requirements that are described in detail in the documents.  

1.4 All questions concerning the project are to be sent to MSD Procurement at MSD.PROCUREMENT@cincinnati‐oh.gov.  

1.5 Addendum 1 will include minutes from the pre‐bid meeting along with additional information about the existing fume hoods and a change in the Plywood Packing Crate Boxes Schedule in Specification Section 01 50 00. 

 2.0  TOUR OF THE FACILITY  2.1  A tour of the building was conducted. The tour included all areas of the building and mechanical penthouses 

where work is to be done as well as the mechanical and electrical rooms.  2.2  To arrange to tour the building again, contact MSD Procurement at MSD.PROCUREMENT@cincinnati‐oh.gov.   3.0  QUESTIONS AND ANSWERS  3.1  Q. Please identify the location of the data communications rooms.   A. Punch down panels are located in the following rooms: Communications Room 118, Electrical Room 145, 

Electrical Room 206 and Electrical Room 219.    3.2  Q. Are all voice jacks and cabling being retained? Will a Value Engineering item for including replacement of 

voice cabling be considered?   A. Yes, all voice jacks and cabling are being retained. See Keynote 5 on ED101. The project should be bid as 

specified and designed. Substitution requests will be considered after award of contract.   3.3   Q. What are the heights of the existing partition walls that are being removed and the ceiling heights in 

those areas? 

Page 16: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since

Pre‐bid Meeting Report October 21, 2014 Page 3

  A. All walls (new and existing) unless otherwise noted, extend to the underside of the floor or roof deck above. First floor to second floor height is 14’‐0”. Distance from second floor to underside of the roof deck is approximately 15’‐0”. Ceiling heights are indicated in the Room Finish Schedule on A‐701 and in details on A‐501. For additional ceiling heights, see also the Room Finish Schedule on Sheet A2.4 of the Original Construction Drawings which can be accessed through the MSD website. 

 3.4   Q. Is any of the electrical power distribution wiring located in the floor slab?   A. None of the wiring is in the slab.  3.5   Q. Are the existing office systems furniture panels electrified?   A. No, they are not. There is no wiring in the panels.  3.6   Q. Will MSD furnish protective pads for the elevator?   A. Contractor use of the elevator is permitted, as described in Specification Section 01 50 00 Temporary 

Facilities and Controls, paragraph 3.3.C. In this paragraph the contractor is directed to provide protective coverings. 

 3.7   Q. Is the roofing system under warranty?   A. Specification Section 07 01 51 Roofing Protection and Repairs describes the existing roofing system, which 

was installed in 1994, in detail. It also includes requirements for the roofing system manufacturer to approve the materials and details to be used in roofing repairs and new work. There are no requirements to maintain a warranty in effect. 

 3.8   Q. Can the exhaust fans in the penthouses be temporarily taken out of service and moved if needed to 

provide clearance for the work at the air handling units?   A. In general, it is acceptable to temporarily remove the exhaust fans from service since the fans in each 

penthouse most likely serve fume hoods in the same area that is served by the air handling unit.  However, the contractor is to confirm this. Note that each exhaust fan number corresponds to the fume hood served by that fan. For example, exhaust fan F‐23 serves fume hood FH‐23.  

  ATTACHMENT Pre‐bid meeting sign‐in sheet   If the above is not to your understanding, please contact Burgess & Niple, Inc. immediately. 

Page 17: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since
Page 18: DIW Office and Lab Improvements - Phase 2 Project ID 10240054 · 2016. 1. 6. · DIW Office and Lab Improvements - Phase 2, Project ID 10240054 Date Issued: October 23, 2014 ... Since