.. _. _ . _ ._ . . _ . _ _ ._ ___ .. ., OPERATLNG DATA REPORT DOCKET NO. - DATE 2-4-7 COMPLETED BY K Krh TELEPHONE (914) 3 -5155 OPER ATING STATUS Indian Point Unit No. 2 Notes 1. Unit Name: January 1987 2. Reporting Period: 3. Licensed Thermal Pow er (MWt): 2758 1013 4. Nameplate Rating (Gross MWe): 5. Design Electrical Rating (het MWe): 873 6. Masimum Dependable Capacity (Gross MWe): 900 _, 864 7. Maximum Dependable Capacity (Net MWe): . 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons: + 9. Power Lesel To which Restricted,If Any (Net MWe): 10. Reasons For Restrictions,if Any: This Month Yr..to-Date Cumulatise 744 744 110353 11. Hours In Reporting Period 12. Number Of Hours Reactor Was Critical 718.04 718.04 74989.97_ 25.93 25.93 3715 13. Reactor Reserve Shutdown Hours 71 .07 718.07 72781.76 14. Hours Generator On Line 15. Unit Resene Shutdown Hours o n n 16. Gross Thermal Energy Generated (MWH) 1877814 1877814 189595390 - 4 . 17. Gross Electrical Energy Generated (MWH) 594500 594500 58851266 572562 572562 56163144 18. Net Electrical Energy Generated (MWH) 96.5 96.5 66.0 19. Unit Senice Factor 96.5 96.5 66.0 20. Unit Availability Factor i 59.3 21. Unit Capacity Factor (Using MDC Net) R4 1 R0 1 22. Unit Capacity Factor (Using DER Net) 88 2 RR ? 9R 1 23. Unit Forced Outage Rate 0 0 9.1 24. Shutdowns Scheduled Oser Next 6 Months (Type, Date.and Duration of Each): 25. If Shut Down At End Of Report Period, Estimated Date of Startup: -~ 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed . INITIA L CRITICALITY INITIA L ELECTRICITY .A. COMMERCIAL OPER ATION 8702260383 870131 PDR ADOCK 05000247 R PDR ("/77)

DOCKET NO. DATE 2-4-7 COMPLETED BY K Krh TELEPHONE …

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

..

_. _ . _ ._ . . _ . _ _ ._ ___

.. .,

OPERATLNG DATA REPORT

DOCKET NO.-

DATE 2-4-7COMPLETED BY K Krh

TELEPHONE (914) 3 -5155:

OPER ATING STATUS

Indian Point Unit No. 2 Notes1. Unit Name:

January 19872. Reporting Period:

3. Licensed Thermal Pow er (MWt): 275810134. Nameplate Rating (Gross MWe):

5. Design Electrical Rating (het MWe): 8736. Masimum Dependable Capacity (Gross MWe): 900 _,

8647. Maximum Dependable Capacity (Net MWe):. 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

+

9. Power Lesel To which Restricted,If Any (Net MWe):10. Reasons For Restrictions,if Any:

This Month Yr..to-Date Cumulatise

744 744 11035311. Hours In Reporting Period12. Number Of Hours Reactor Was Critical 718.04 718.04 74989.97_

25.93 25.93 371513. Reactor Reserve Shutdown Hours71 .07 718.07 72781.76

14. Hours Generator On Line

15. Unit Resene Shutdown Hours o n n

16. Gross Thermal Energy Generated (MWH) 1877814 1877814 189595390 - 4

. 17. Gross Electrical Energy Generated (MWH) 594500 594500 58851266572562 572562 5616314418. Net Electrical Energy Generated (MWH)96.5 96.5 66.019. Unit Senice Factor96.5 96.5 66.020. Unit Availability Factor

i

59.321. Unit Capacity Factor (Using MDC Net) R4 1 R0 1

22. Unit Capacity Factor (Using DER Net) 88 2 RR ? 9R 1

23. Unit Forced Outage Rate 0 0 9.124. Shutdowns Scheduled Oser Next 6 Months (Type, Date.and Duration of Each):

25. If Shut Down At End Of Report Period, Estimated Date of Startup:-~

26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed

.

INITIA L CRITICALITYINITIA L ELECTRICITY

.A.COMMERCIAL OPER ATION

8702260383 870131PDR ADOCK 05000247R PDR ("/77)

_-

.

>

AVER AGE DAILY UNIT POWER LEVEL* **

DOCKET NO.50-247

I.P. Unit No. 2UNIT

DATE--

*

COMPLETED BY

(914) 526-5155TELEPHONE

.

January 1987MONTH

DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL(MWe-Net) (MWe-Net)

i 27 62817

2 837 807g

812 8083 ,

8184 20 804

816719# 21

838 7896 - - - 22833

7 '

834813g

24

9 829 80925

826 80710 26815g, 27 805

12 818 80728

819 69413 29796

14 0 683773

0II 33

16 819

.

INSTRUCTIONS

On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute tothe nearest whole rnegawatt.

(9/77)

- - - - - - ---- - --- ___,. __ _ _ _ .

b*

. ktr

50-247 ||-

DOCKET NO.I.P. Unir Mn. 2- )1

,

UNIT SifUTDOWNS ANI)I-OWER REDUCTIONS UNIT N AME _87 .;

,

D g I E ._2. ' :";K. Krieger

January 1987 COMPLETED HYREPORT MONTII TELFPIIONE (914) 526-51_s s g

:1;-

I5j.

. 4a. .. Cause & C .: receive I-.

-, E'E F 6 .s_,. 4 Licemcc ,E-r, 8.ic

[f.~ Attion to

! '!%.. D.ne y, 5g ( ig5 Event s7g$ E E

3 $! {Report # Jiu Present Reet rrence

}.* v- pO li

_

.-

' [. ..N/A 1-17-8 S 0 B 4 None IIB Valvex Turbine Stop Valve Test [;,

F 1:

IN/A 1-29-87 F 0 D 4 87-02 EC Battry 21 Battery Bank Temperature too low I.

U.I 1-30-87 S 25.93 II 1 None | IIA Genera ~ Scheduled Outage to Inspect Generatc r

'

D '

t*

9$

6

.

.

I 2 3 4Methani: Exhibit G -Instsucti.ms

f E.. reed Reason:5 Sthediated A Equipment Failure (Explain) l Manual for Prep.n.itnin of Data

H Maintenance or Test 2-Manual Scram. Entr> Sheets for luensee [3 Automatic Scram. Event Repois (LI RlI ile int 8RI G- ..

C-Refueling '

D Rei;ulainry Restriction 4-Oiher (INplain) 0161)'

I -Operator Trainmg & License Examination5 ,

I -Administrative Exlubit I Same Source -.

G Operational Error (Explain)I'8I77 ) llother (Lsplain t

I

e,

, .

MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE

MWO SYSTEM COMPONENT DATE WORK PERFORMED

26048 HVAC 24 FCU Mtr 12-08-86 Replaced Motor

26665 CCW 22 CC Pump 12-08-86 Replaced Seal

28326 WDS 21 WG Comp 12-18-86 Replaced Seal

28346 EDG 21 EDG 12-19-86 Rep Air Start Comp

26386 CVCS 22 CHG Pump 12-10-86 Welded Nipple

27792 CVCS 21 Seal Inj Filter 12-19-86 Replaced "O" Rings

27454 CVCS 21 BATP 12-11-86 Rebuilt Seal

21117 CVCS 23 CHG Pump 12-30-86 Replaced RV237

26254 CVCS 26 CHG Pump 12-10-86 Renewed Packing

26707 CCW 21 CC Pump 12-04-86 Replaced Seal

26959 MS MS 55C 12-08-86 Renewed Stem Nut

24936 RHR 22 RHR Pump 12-18-86 Replaced Seal

23373 CRD 23 CRD Fan 12-08-86 Replaced Motor

26667 RHR 21 RHR Punp 12-26-86 Replaced Seal

26864 CVCS 21 BATP 12-19-86 Renewed Seal

.

. , *

4 '

SUMMARY OF OPERATING EXPERIENCE

January 1987

Unit 2 was operated at approximately 97% reactor power throughout the monthof January with load being adjusted as necessary to limit generator endturn vibration.

On January 21, at 1030 hours, a load reduction was initiated due to concernover operability of the service water flow control . valves, which provideflow controls for cooling the lubricating oil and jacket water of thediesel generators. Subsequent measurements and analysis concluded thevalves were operable. Reduction was terminated at 60% reactor power andthe unit was returned to 96% reactor power at 1800_ hours.

On January 29, while at 97% reactor power and 835 MWe, load was reduced to300 MWe due to a declaration of inoperability of #21 battery bank.Freezing outdoor ambient temperatures had resulted in cooler than normalair being drawn into the battery rooms and an Engineering analysis de-termined that the battery's ability to perform its Technical Specificationintended function could not be assured. As a result, plant shutdowncommenced at 1620 hours. Portable heaters were utilized and theventilation ducts on the north wall of the cable spreading room weresealed. By 2145 hours, temperatures had returned to acceptable levels andthe portable heaters were removed. Unit power escalation commenced from300 MWe. The unit was returned to full power on January 30 at 0200 hours.

The unit was shut down for a planned inspection of the main electricgenerator on January 30.

i

!;

|

!

i's

i

I

f

f

a

.

-

Murray SelmanVc2 Preser.t

.. a

Consohdated Edison Company of New York, Inc.Indian Point StationBroadway & Bleakley Avenue

Buchanan. NY 10511Telephone (914) 737-8116

February 15, 1987

Re: Indian Point Unit No. 2Docket No. 50-247

Director, Office of Managementand Program Analysis

U.S. Nuclear Regulatory CommissionWashington, DC 20555

Dear Sir:

Enclosed are twelve copies of the Monthly Operating Report for Indian PointUnit No. 2 for the month of January 1987.

Very truly yours,

#h-

19.251. 11.3Enclosure

cc: Dr. Thomas E. MurleyRegional Administrator - Region IU.S. Nuclear Regulatory Commission631 Park AvenueKing of Prussia, PA 19406

Senior Resident InspectorU.S. Nuclear Regulatory CommissionP.O. Box 38Buchanan, NY 10511

.