Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
DOCUMENT RESUME
ED 352 464 CE 062 554
AUTHOR Mann, Sandra; And OthersTITLE JOBS. A Partnership between Education and
Industry.INSTITUTION Central Alabama Community Coll., Alexander City.;
Robinson Foundry, Inc., Alexander City, AL.SPONS AGENCY Office of Vocational and Adult Education (ED),
Washington, DC. National Workplace LiteracyProgram.
PUB DATE 92CONTRACT V198A10120NOTE 496p.; For a related report, see CE 062 552.PUB TYPE Guides Classroom Use Instructional Materials (For
Learner) (051)
EDRS PRICE MF02/PC20 Plus Postage.DESCRIPTORS Adult Basic Education; Assembly (Manufacturing);
*Basic Skills; Cooperative Programs; *Foundries;*Learning Activities; Lesson Plans; Machine Tools;Metal Industry; *Metal Working; *On the Job Training;Pretests Posttests; Semiskilled Occupations; *SkillDevelopment
IDENTIFIERS *Workplace Literacy
ABSTRACT
This packet contains 15 lessons developed in aworkplace basic skills project for the metal casting industryestablished jointly by Central Alabama Community College and RobinsonFoundry, Inc. The lessons cover the following topics: (1) green sandschedule; (2) the core room; (3) the core roc. (continued); (4)figuring time; (5) the cleaning room; (6) the EPS (EvaporatedPolystyrene System) process; (7) green sand; (8) EPS-1; (9) EPS-2;(10) grinding production sheet; (11) building and grounds; (12)molding production sheet; (13) forms; (14) grinding production sheet;and (15) vocabulary. Lessons contain information sheets, vocabulary(in some cases), technical information particular to the RobinsonFoundry, pretests/posttests with answers, and learning activities foreach of the factory processes covered in the lessons. (KC)
***********************************************************************Reproductions supplied by EDRS are the best that can be made
from the original document.***********************************************************************
JOBS
A PARTNERSHIP BETWEEN EDUCATION AND INDUSTRY
Central Alabama Community College
Robinson Foundry, Inc.
1992
BEST COPY AVAILABLE
JOBSA National Workplace Literacy Project
P.O. Box 699Alexander City, AL 35010
U.S. DEPARTMENT OF EDUCATION97tOM e of Educational Research and ImprovementE CATIONAL RESOURCES INFORMATION
CENTER (ERIC)
This document has been reproduced asreceived from the person or organuatton04matmg4
C Minor changes have been rna0 at.trnprovereoroductron qualtty ..PorntS 01 view or opinionS slated tn this (woomeet do not necessargy represent officialOERI posthon or policy
JOB
S
A P
AR
TN
ER
SH
IPB
ET
WE
EN
ED
UC
AT
ION
AN
DIN
DU
ST
RY
CENTRAL ALABAMACOMMUNITY COLLEGE& ROBINSON FOUNDRY,
INC.
1992
Researched by
Sandra Mann,
Instructor /Counselor
Beth Maxwell,
Instructor
3
Robert E. Stone,
Project Director
LESSON I
GREEN SANDSCHEDULE
Prepared by
Bonnie Rasmussen:,
Curriculum Consultant
JOBS: 205 329 13481ext. 81
CAM: 205 2346346
4
In th
e fo
llow
ing
less
on o
n th
e G
reen
San
d S
ched
ule
you
will
lear
n ho
w to
rea
d an
dun
ders
tand
the
sche
dule
of j
ob o
rder
s us
ed th
roug
hout
the
Fou
ndry
.
Firs
t, ta
ke th
e qu
iz o
n th
e ne
xt 2
pag
es to
see
wha
t you
alre
ady
know
.
56
2. QUIZ 1
Using the schedule on p. 3,
3. W
hat i
s th
e fla
sk s
ize.
for
6. H
ow d
o yo
u kn
ow th
at a
job
is a
circle the answers you think
the
1st j
ob o
n F
loor
9&
10?
Hot
Job
?are correct.
The first one is done for you.
1. H
ow m
anyjobs
are
sche
dule
dfo
r F
loor
36,
4?
b. 2
0c.
2
a.25x30
b.
22x2
2c.
30x30
a. th
e ,q
uare
has
an
x th
roug
h it
b. th
e sq
uare
has
a s
tarX
in it
c. th
e sq
uare
is fi
rst o
n th
e ch
art
4. W
hat i
s th
e cl
ass
of ir
on fo
r7.
How
man
y jo
bs a
re s
ched
uled
the
1st j
ob o
n F
loor
5&
6?fo
r th
e H
UN
TE
R?
a. 2
0-s
b. 2
5c.
90
2.
How
man
y m
olds
sho
uld
be m
ade
for
the
1st j
ob o
n F
loor
9&10?
5.
Wha
t is
the
cast
ing
num
ber
for
the
1st j
ob o
n th
e H
unte
r?a.
25
b.
184
c.
95
7
a.121-0035
b. 3
00c.
20-
s
a.8
b. 2
5C
. 31
8
DA
Y:
-al_
editi
_Jc-
izz
iTD
AT
E .5
"- L
S- 9
/3.
SHIF
T:
U N T E R
,5;./
.3
,,
0(1
10_
0.Z
ip 5 co
, , (C-1
/2 /-
4()?
S-
-.._
:0_
coo,
, [C4
, eve
-71-
9-
S i
ZS
,z_
u),
ICJ
',04-
s-os
-
,.,
,I
1
/,s--
-,?s
i V a
/
er,,,
,-I
)
//c/K
(V_-
AY
PF-
ZS co
60) IC
J
cii.s
-51
- (,,.5
_- ,D
ii
I)
E-t
c-?-
e,)
Dt6
,,
I1
5/19
70,
B P
A/
46p
4e-
-"5
e12
13
404,
.01
[
4411
'IC
-1
.,,-,
[1
I)
S' /0
,2d7
t70
1[
II
C -
/4o
Z5-
--
he,)
[[
II
Z1S
---. er
), , I
1
2 02
.9s/
oft*-
-
''''--
""I
1
I),
I
M.- ei
t II
'6°1
' II
,, 2
1103
off
, 1_
CD
,,
1 & 2
1,
L2
.g-1
C-4
1.14
6ce
,_2(
.c.jx
27,..
..16
g---
-02,
Of- I"
1516
OI
19
[1
511
1
yo2 (6
°)"
gc)
xrA
oej
--_-
3e0
.f-'
I)
I[
.
C.)
I--
11
i 16
1
II
ie...
)":
Od
Ag/
77/2
V
apt )
s-IC
A1(
.si
fV
i1
5-iF
6 'V
.3 Y
Zgi
-oot
o-JD
et & 10
i"e
t tz-2
.1,9
31,i
(31"
:", '
t.s-- 43
1,1
)
x 2.
, x 4
z[
)
los 0,
95,,i
)
mot
to.)
__-
WI
.,.N
.---
x..-
!z)
7,-t
...x
er--
-)op
t )zt
5IC
I
7m
omIC
IZ
r-x
___7
_30
-)--
..v-y
E(
1_ I1
1)
I)
7,.'
...A
z))
#-&
I1
.;0
-
l )-
I)
/0 F
--lo
pon
/2/-
-e,o
z _.
6Y
K3f
e-52
.31
( , 4
-'ss-
&
2-
vl4
ail
'7.S
314
.-
21
(' 460I
),..
....0
0)1
7:0
x-Ic
-I
,:;..5
9(-
1
i
,7.
-x
3,C
ICI]
...?
ci /0
.5_1
,-ti9
010
1,)
5.x
.5a
'(---
.1-
62,?
7.0
)Ae .ir
iiv
zdfl
kar
ED
11-
,t,0
I1
50 0
ici
121-
4/.1
0 2-
-
cot
0)
I
zs-x
zc--
Ed
A"
--4S
- x3
6le
l
0 9.
1/:-
/ Z e
/,..
?-3/
0
(
...r.
rx t3
GIe
-I
-7
5'
--.
,7
Gz
&--
2324
25 -5 & b
,..
t1.-
1,2
'-,
in,
3ee
--.
OF
.3:4
(1-
/0r
l
7.-_
,0,9
I1
,-. ab
i)
'"'2"
""(
Ix,
5,3
Zs
ig
mil
I-w
I2-1
Z1-
. ),.-
57a[
) I1[
i 1
7,S
ej)
I]
30 x
36]
2 6
Zol
co V
CIO
I1
0I
1
30 x
!I
3o x
3oI
I
6 Z
6' 0
-3 N
g-5
3q.
,0 3
7
zI
1
IIg
6,-f
?_-
4/(/
/..,
:_l
- i &
___4
,,-
) 7
MO
TE
S:
I//
YoG
Che
m/
4/4?
)I B
ES
T C
OP
Y A
VA
ILA
BLE
10
5.
Mos
t tra
inee
s do
n't k
now
611
the
answ
ers
to th
e qu
iz y
ou'v
e ju
st ta
ken,
but
afte
r you
wor
k th
roug
h th
e le
sson
on
the
follo
win
g pa
ges,
you
'll k
now
a lo
t mor
e ab
out t
he G
reen
San
d S
ched
ule.
At t
he e
nd o
f the
less
on y
ou'll
take
the
quiz
aga
in, a
nd s
eeyo
ur s
core
s fo
r bo
th ti
mes
.
1112
6. LES
SO
N
On
the
oppo
site
pag
e is
a G
reen
San
d S
ched
ule
for
the
1st a
nd 2
nd s
hifts
, Mon
day,
May
6,
1991
. Stu
dy th
e gr
een
area
s.
In '5
/6/9
1" th
e '5
' mea
ns th
e fif
th m
onth
, or
May
.T
he '6
' mea
ns th
e 6t
h da
y, o
r M
ay.
And
the
last
par
t of '
5/6/
91' m
eans
the
year
199
1.
13
14
DA
Y:
/17
DA
TE
: 6 -
G -
7.
SHIF
T: /
.f-
H T E R
12
34
56
78
910
I1
1[
[1
)[
I1
[1
[1
[1
1112
13
[ [
1 [
r- )
1 [
i I
1I
--
[ [
[ 1
) 1
--
1 [
-[
--
[1
11
-[
[
[[
1f
1
1 2
1-14
1516
1[
1[
II
I1
[1
)[
1[
I1
___
-4
34
56
717
1819
1 1
1 1
1 1
1 11
I
--
1 1
f
1I
1I
f1
f1
6
21
11
1[
1I
[[
I1
[I
II
II
9 to
34
56
723
2425
3I
1f
11
1
_1
I_
1[
11
1I
1
NO
TE
S:
8. Eac
h da
y N
ancy
Sew
ell,
Pro
duct
ion
Man
ager
at R
obin
son,
fills
in th
e w
ork
for
that
day
.C
usto
mer
s se
nd th
eir
orde
rs o
n en
OP
OS
(O
pen
Pur
chas
e O
rder
Sta
tus)
, and
Nan
cy s
tudi
esth
e or
ders
and
then
fills
in th
e G
reen
San
d S
ched
ule.
1718
DA
Y:
DA
TE
: 5 -
9.
SKR
':n-
L.2
f
N T E R
1 2.5.
s/
23
.4
56
78
910
I 1
I
1 1
I 1
I1
I l
i1
I l
I1
1175
1I
[1
I 1
I
ii
I1
f 1
I1
-;.
)
) 70
5--
-/I
1
B P
12
34
56
711
1213
I [
1 1
I1
C--
-)E
)I
1C
D[
1
I1
1 1
I1 1
I1 1
I1
I1
I
1 & 2
12
34
56
714
1516
I /I
I 1
1I
I1
-CD
ii
x1
[I- C
) 1 I
1
C--
-) ] I
1
- CD
E i
x1
1_
I1
4
12
34
56
717
1819
I1
[1
1''.
..1
1I
1x
I1
I1
_
6
12
34
56
720
21\
22
I1
I1
1 1
O[
1 I/
II
CD
I 1
11
1 1
I1
I
I]
xx
1I
1I
1
& io
12
34
56
723
2425
[/
I1
1C
DI I
1C
DI I
1
1 1
I1 1
I1
I1
I1
I1
I
NO
TE
S:
10.
Cop
ies
of th
e da
y's
sche
dule
go
to th
e fo
llow
ing
depa
rtm
ents
:
2221
Cor
e R
oom
Pat
tern
Set
-up
Pal
let L
ine
Cle
anin
g R
oom
Qua
lity
Con
trol
2.4
23
12.
The
sch
edul
e is
a c
hart
that
sho
ws
ell t
he w
ork
to b
eru
n, to
geth
er w
ith w
here
jobs
will
be r
un.
2526
DA
Y:
( I
3.s.
"D
AT
E:
/5--
-/
13.
SHIF
T:
H1
7221
21_2
,,
k V
ZS
i:-...
11r_
-::P
t. lc
.5';'
-1-3
10U
2./6
3...
c404
1.I
)7.
1/4"
-'7
7-3-
--.
4111
10 1
1el
io S
ol/0
11
Mb
1)
dAlb
tol
61
1
ED
E-
T EICI
lc)
[ea
tr(
)I
i--
67--
-t
)w
". le
.iR
/2 /-
-(Y
)'?-r
-/7
16/6
i2P
90/5
0S-
',/97
.0.
ks-3
571/
4) /
i (lK
if, _
.2.7
9&,.s
-.
[)
te-L
s3-6
.[
1E
DI
_,I)
4. 2
-s-
._..L
z46
4e
-.-
517
otte
r 1z
13.
MA
tvw
[)
)1)
70I
)O
D[
lde
b! I
dilib
iid1
1;al
tf )
CD
[fe
-1-'
I1
11
11`''
''''-''
' 11
w11
,I
-"""
"'"
11
I
I
00 3
; -,Y
/ 120
767
-///
,c
2 e)
/je
,,272
).42
IFO
Sailf
A..1
-2
.74'
013i6
r5,1
4,5
Cbr
it,-,
1()
)14
1516
1IL
/7//'
,---
,t
&1
)
Qs
" (,
-)"
75,-
15A
co--
-E I
,---
L?:
_),
E)
r---
Th,
CD
;2
[GI
-!C
I_.
2._
cii
le)
,x
.5)
I1
5c, x
.?."
45""
j3
L-
x V
/ej
i)
.---
- --
-'(7,
10e)
.
A5/
."'
e)
:.-5'
-?-7
__ /-
o-C
-L2-
Itor
,,1
/2
Ct
LSI..
.-.
./0
6
1
ID
07./
tIPC
6..;
5._
i/1
OW
)/5
5/i
)its
---
I)
z/5-
-I
]43
110
15e)
17.
z_.x
r-zi
)-.
'
I M
I .a
).2
ao 6
4-)_
---x
,?oz
.1L
.-.4
....x
ft-1
6zo
- o
ICJ
7s-x
..301
C-1
3/6
41,c
y-;
---2
--V
i ) 11
x
Z6
7
11
&PA
t"
1
1 18
I)
Aii.
-*-'"
I)
-.41
":".
1log
.
19
[C
5[
I
--7'
; j2
, .4.
"--
vl4
MI
)61-
:.q
5121
12
3Z
os' 7
5--
S_N
---
.
&I
]C
OI
I0
Ii
,s,I
)C
OI
)10
1)a
tj4i
1I
1r
;111
-go
16zs
-xac
-id
*--,
----
).36
[el
z-c-
x ic
I...1
7.0
x?4/
IC
I Ik
7-7.
-x3f
-lel
c2 x
.53
re-L
'gm
.1(
24I
1."
----
-1
./Z/-
(w
o 3-
09.5
ci 2
0 /
3,9-
3/o
205
)'7
ti?2
<20
0O
S,C
??0
af A
i
I1/,
2,,t3
_0E
1 s
-eC
'7 ,-
S_.-
--23
..425
----
74A
-Z
.S
cyop
i1-
-os
oiI ,,
,,i
13=
14c,
,1
)/0
III]
ii
,-2.
.1
1I
11
1
-
x 3
4)
-3o
i1
oor
),..
.:,,
[1
,0
II
a)[
I[
[
)0 V
,---
LX
...6d
.Z...
... )
5-2_
.26
Z61
4'00
.51
06-1
0.4,
1 g
-531
.o-5
7g
-J-J
?-c
si /
-(/
A!
_151
4/,'1
NO
TE
S:_
2z,e
.,(90
A5-
z7,1
=-
9/9/
0 v
ellf
el/
/.
a7ca
l -he
1444
7)B
EST
copy
AvA
lika
25
14.
Onc
e yo
u kn
ow h
ow to
use
it, a
gla
nce
at th
e sc
hedu
le w
illte
ll yo
u w
hat j
obs
have
to b
edo
ne th
at d
ay, a
nd in
wha
t ord
er.
2930
.
.1D
AY
:-1
e2e
, , I as
DA
TE
: .5-
- /5
---*
/15.
SHIF
T:
H U T E R
1
/2.2
z /2
kV3z
s--
I-
..:P
at:
02;-
-73/
..371
-13
10
2:.(
1.-1
,-,
i,--
)7
z.5-
- K.,
,[
[
I1
ICJ
/ 2 /-
--/Y
) 3
-C
0,-
ICI
ICJ
`0/..
.50,
s"
3z.4
6 p
. ' " I 1
,,/7o
4e
,....-
ot, '
'' I
1I
1
/X /
(!--
,,f?_
"26T
'
1___
_
aft(5
0)'u
m' I
CJ
9e A
NO
Y7
i)
</c
9/6,
2 P
/,s.,.
?s-1
-7 V
o /
5--
..z,
E-1
(3-6
.
BN
.kii
SIla
4,.
Dek
0112
13
2i70
II
2.7c
--.
ZIS
CO
I i
.2.9
_
ce
*Ed
i,ef
tI
I
- 0
0 3s
s
II
,S' /
2D7
2-3
17e°
her
Y/
d -
- /4
0 /op
1
c4
7/,r
27.3
.._
____
. r6
,-...
._6
.2 8
0.3a
-g /9
II
.1 & 2
AD
-3rq
-(3
-e-
1516
(26
4I
I5s
1)
0'
>o
tal
x yf
f]16
4611
)150
1f.
L )
11
e2_.
..yr-
II
[GI
ix
627
I)
gip
.3
td.-
-x V
/1
f1
II
rTh[
I\.-
---
"15c
, )0.
'a--
"iI
-...
-,-
,.. .
,...
.-m
o
q- & 10
1
a21
,6...
.1;3
:1)
,,,,,l
i-.,-
r-B
05 )
(i
jzs.
, X t
7.-1
6
4C
.C:..
.:57
.c...
....
.91
,..la
19
r.,s
---
de--
- -
75-- 41
630
II
I C
..1Z
5C
PI 1
gy,..
.xt-
z-(
)Q
,95i
I25
x2,0
IC'l
Oft
IS
o 1
w41
1' I
N7
c-X
30
I)
I1
I'
I1
Oft
I1
I1
I1
II
-A
liw-&
.,...,
,,f;
...,
AO
F-7
"Pr;
()i./
-ooz
. 6s
1 fV
fe-5
2._g
/(, 4
1St'
g,..i
-___
7-
3 & If
.--r
:2:2
_,.
2,..-
3vi
-4
,---
'5
--,)
q---
-
fjC
.)a
1/.?
1_x
Je_-
-
22-5
1,_
.C.
{-f.
.....z
-le
5Z
so
L);
A--
-zs-
x36-
--'
3,2-
3 le
--)
4/I
1C
IO t
i
go16
zs-x
zc-i
ds
I)
(sot
)/0
1,
r\--
x!S
.-6
ICJ
..z-p
x 7
1C-1
.
7 -
x..3
,LY
2-]
'16.0 tq
lI
id
c11
iZA
llt)O
2-,_
0 f-
V::/
Z 0
/3
7 (,
,,,4-
3 4
.-zs
lio.1
Q.. sg
7oig
&--
-' 5 & b
..o.5
).
'z._
tit-1
/22
.
\r:
le76
23e,
c 4
(Ws
-C
C 6
2425
"A'
4110
11
Jo1
1
30I
i?o
x30(
1
z1
1/0
I*1
-1
1
Zs
11
MI
II
,c/w
ilzir
...3
I1
II
Zi-
-414
11),
-;°1
_I-i
_G-3
,-, -
1
11
II
(i
II
=.0
x3
Li
II
I
26 3
0 i"
ooc
/ 6_Z
S0.3
f g
.- 3
1 .
(Ir
NO
TE
S: 0 7,
I/
ge11
5 "
loe
way
,.
3
16.
The
day
is M
onda
y.T
he d
ate
is J
une
5, 1
991.
The
shi
fts a
re 1
st a
nd 2
nd.
Wha
t doe
s th
e nu
mbe
r '1
26' m
ean?
Itm
eans
that
it is
the
one-
hund
red-
-tw
enty
-six
thda
yof
the
year
.
3433
DA
Y:
Mex
idttz
rD
AT
E"9
I17
.
SHIF
T: /
"Er
,2H T E R
12
34
S6
78
aio
I1
11
I1
11
11
11
11
11
11
1112
13
I1
I1
I1
II
I1
II
3I
11
I3
2
3 -4 -
5 -6 -
7 -14
1516
11
x___
_I
E
I1
EE
I1
EI
f1
E1
I3
IE
I1
EE
-E
-E
E
1I
I1
II
1_
___
4x
1718
19
1I
II
I
f1
I1
II
1_
I4:
I1
f1
I1
_X_
....._
5 6
-_
f1
21
I1
I1
I1
f1
I1
I1
II
1I
I__
____
____
__-
10
34
____
_
56
723
2425
1 1
1 1
1)
11
11
I3
II
I1
I1
fI
1-
xI
1f
1_
NO
TE
S:
18.
On
Janu
ary
8th
of n
tlxt1
T.n
r, th
e to
p lin
e w
ill r
ead
diffe
rent
ly.
The
day
is F
riday
.T
he d
ate
is J
anua
ry 8
, 199
3.It
is th
e 8t
hth
day
of th
e ye
ar.
The
shi
fts a
re 1
st a
nd 2
nd.
3738
t;
:S31.0N
f 1
1 1
_ I 1
1 1
1
ot V 6
f 1
I 1
_ f 1 ( 1
I I _
_ x ___ f 1
_ I 1
_ f 1
I 1
_ ( 1
f 1
I 1
f 1
_ f 1
I 1
SZ tZ CZ _ - I 1
( 1
I 1
I 1
_ I 1
( 1
_ 9 it s
( 1
( 1
_ f 1 f 1
( I _ I
t I _
X- _ f 1
I 1 ___J f 1
_ ( 1
I I
f 1
1
zz tz _ f 1
[ 1
- f 1
f 1
1 I _ _ ir V E
i /
f 1
_ [ 1
( 1
_ _ [ 1
I 1
1 1
_ [ I
( 1
_ [ 1
( 1
[ 1
f 1
[ /
I I
iSl
.
fill LL _ [ I 1 I
f 1
_ I 1 - a
v 1.
1 1
_ ( 1
I 1 - - ( 1 I 1
_ I 1
f 1
( 1
_ I 1
( 1
f 1
f 1
( 1
f 1
f 1
f 1
9l SL SI. _ _ [ 1 [ 1
I 1
f 1
1 1
I 1
f 1
_ f 1
f 1
f 1
( I
f 1
f 1
( 1
_ f 1
f 1
_ I 1
I 1
_ f 1
( 1
_ El _ --- Zl IL
[ 1 [ 1 I 1
I 1
_ _ ( 1
t 1
I 1
I 1
f 1
f 1
Li 3 1 N n H
I 1
_____ [ l
6
I 1
[ 1
I 1
f 1
_ 9
f 1
I 1
I 1
f 1
OL @i L _ _ _ _ 7.0 .4.,/ LlIHS ' Lig/
'61
g-it4 - I aiva :Ava
20.
Cas
tings
pou
red
on J
anua
ry 8
will
hav
e th
e nu
mbe
r '8
' on
them
, alo
ngsi
de th
e pa
ttern
num
ber.
(Eve
ry c
astin
g po
ured
on
June
6 h
ad th
e nu
mbe
r '1
26' p
ut a
long
side
the
patte
rn n
umbe
r.)
42
tr,
:SaLO
N
I'
(1
I
L9
2
[ofV6
X
110_(1
X
1
trz
II
(I
II
II
II
1I
(I
z
II
II
sz*
lez
9
([11C
DII
1ZL
99
II
9V9
II1
[[
I)O_[
I\.....
[I
II
1II
a
(I
I1
ZZ
*I
OZ
C
[i
[ iC) _
i[
1
91L
99
[[
tve
x
C)
x
11
F -I
x-[
]x
[I
[1
x
(
[]
II
61*
1LI.
£z
(1/-----N
IK
,...
L9
II
1
3II
I___
C )
(I IC
Df
I
II
II
I
(I
I1
C --) --
_)91
Sl
S*
Pl.
ez
I 1NI
I
I
L9
(I
1
II
9_
II
I
II
Cl
Zl
5P
111
9Z
11/-----\
IN
,._.) _
II
II
el
I
z
II
II
(I
H3J.NnH
I
II
II
II
II
1I
II
II
1--01
95
ti1
9e
z
:LA
IHS
10-11E
6e/.iz
:31VO
22.
Nan
cy S
ewel
l wri
tes
the
day,
dat
e, a
nd s
hift
info
rmat
ion
on th
e sc
hedu
le f
orm
. She
doe
si '
,t ha
ve to
fill
in th
e m
oldi
ng m
achi
nes
and
sect
ions
of
the
the
Palle
t Lin
e. T
hat
info
rmat
ion
is p
rint
ed o
n th
e bl
ank
sche
dule
, mak
ing
a co
lurt
li do
wn
the
left
hand
sid
e.
4645
SP
:S31ON
If
9
otV6
11
I1
I1
Z
II
[1
I1
11
11
I1
I1
z9
1,E
tsz
reez
[
11
II
9
Vs11
X1 X1
11
X
z
X
[1
I1
[I
zzL
s1----
ct
tzoz
I[
9
Fx-[[
xi
x)
x[
x
a
[[
x
[
I[
I1
[1
et9t
Lt
LS
pe
t
II
Sl9
air1I
Z
II
[1
II
[t
9tL
S1,
Ct
t[I
[I
Zt
11
Z
[[IED
d01
1
[1
Itet
L9
S1,
Ct
II
[I
e
[1
I1
[I IC)
11
9
[I
Z
H3.11.
NnH
[I____L
S1,
Cl
01a
:JAIH
S
czaiva
:AV
C1
24.
The
wor
k fo
r P
alle
t Lin
es 9
&10
is in
the
botto
m r
ow o
f box
es.
4950
DA
Y: /
721-
ride
Ar
DA
TE
: 5G
9/
25.
/RG
SHIF
T: /
0--7
4 21
2?H U N T E R
12
34
56
78
910
C)
I1
I1
C)I
1 11
-1 I
I1
I)
- ED
I-
-OI [
- CM
I I
.---
----
t1
*---
1 1
B P
12
34
56
711
.12
13
1
-DI
1
I
I
OI
II
Cf1
-
1 & 2
12
34
56
714
1516
i I
i I
1 I
[1
11
rTh
rI
`---
----
----
11
1
3 & 4
12
34
56
717
1819
I I
I I
I I
II- C
DI
1I
II
II
1
&
12
34
56
720
2122
1)
II
I-
M1
I
1
_51 40
1
Aft
2 321
44/A
3
Dith
i243
411,
Ada
5 6 '
/LL
_6
4 '5
. A.
7 '
2324
25
2a.
iI
11
CA
0I
I
lc]
al_
x X
L9
yogi
,
Jo/
i)
1 al
a_ x
AL
2011
"".
3 0
0,P
tE)
I 11
4gE
t [1
.2x
_I-
11
So
I1
a.1
630
ii
211
(Di ) 1
1
)
atxp
.S..
6314
q30
1_43
'5.2
1
ota
9230
Ao&
00/4
0,9
NO
TE
S:
26.
The
job
squa
res
for
Pal
let L
ines
3&
4 ar
e fil
led
inon
this
sch
edul
e.
The
jo jo
b fa
rthe
st to
the
left
-- n
umbe
r 1
-- w
ill b
edo
ne fi
rst,
then
the
othe
rs, i
nor
der.
The
Gre
en S
and
Sch
edul
e ha
s 7
job
squa
res
for
Pal
let L
ines
3&
4, b
ut o
nly
4 jo
bs a
refil
led
in h
ere.
5453
DA
Y:
DA
TE
: 5 4
9/
27.
/24
SHIF
T: /
f 2
H U T E R
12
34
56
78
910
1I
11
11
11
11
1I
I1
11
I
12
34
56 -
711
1213
[1
[1
[1
[1
[1"
---
[1
[ 1
1 1
11
1 1
-1 1
1 1
--[
1
[1
----
--
[1
[1
----
-
[)
1 & 2
12
34
56 -
7
.
[1
11
1415
16
[/
II
[1-
11
] 1
[)
I1
1 1
____
-1 1
1 1
-[
]
II
-[ 1
-[
1
-I
1
_3 & 4
_C E
.04
s PI
4 da
4S/
L5
1718
19
25 -
-- 36 [
)
c.1
®I
)..? 6
-[
)--
1I
[1
11
) 1
[ )
11
[i
6 6
I1
ica
x301
CI
55 I
.- .
4130
1 I
ICJ
I)
I1
[ 1x3
oala
' 'F
042
.4.
.34
II
32a
a i 0
---
- )
.1
-.-
21
[1
11
[1
I1
[]
11
[1
11
1 1
'.---
/ 1
11
11
-[ I
I1
11
11
I1
_x _
_.._
9 10
12
34
56
7
1]
2324
25
11
11
1I
1I
11
1
.x
I1
11
1_
NO
TE
S:
J54.
)Ct)
56
28.
The
HU
NT
ER
can
do
up to
25
jobs
, so
all t
he la
st th
ree
colu
mns
are
use
d fo
r H
unte
r jo
bs.
Thi
rtee
n of
the
Hun
ter's
job
squa
res
are
fille
d in
on th
is d
ay.
58
DA
Y:
DA
TE
:
29.
CL
JIL
-T.
--
i- &
sr"1
1" '-
H N 7 E R
/ '2`
iI
1
/6 la
6 ,..._
&IQ
4
i
I1
6
5S
/7.
286
,6.
E6u
AIL
%_2
540
0 [
I
I1
r,, /7
044
(poP
y2_
2-PO
3
3
go [
125
I1
4/50
ti
4fir
.4)[
09'7
0/6
,:2
66 `L.-
-
q 05
136
...4
I
IC1
9 3
09E
atO
oq48
5503
WA
t7
6'0
I)
(1
.25
5 a
[i
I1
CO
I l
ED
I )
MO
/ 63/
990/
0I1
116i
12
IC.1
3 y
0/2. I 3
6
I1
y74,
04n
3c
67__
__
I1
I1
II
I1
I
[[-
II
1
I1
I1
a5(5
0)1
1
.5s-
oI
1
II
o9E
PISo
ci15
Cry
1 IC 1
s 54
4%2
7'2
.6
f1
I1
[Ca
3 I/
0 °a
.14
1 & 2
12 "-
- ____
34
56
[)
11[
]
I1
--[
iI
1
[[
11[
i11
1)
I1
---
[)--
-,_
___
[1
I1
'----
[I
I1
xI
1I
1__
___
3 &
12
34
56
1718
19
I1
I
I 1 I1
I1
I1
I1
I1
II
I1
I1
I1
[[
I1
I1
[l
II
I1
I1
x1
____
x_I
1_
___
5 & 6
21
I 1 1/
11 II
11 I1
I 1 I1
IIIl I
1
11 I1
f1
1I
I1
II
I1
I1
x__
__
& 10
12
____
34
56
724
25
I1
i1
[i
I1
I1
I1
[[
I1
I1
I1
[[
I1
I1
1I
1
I1
II
I1
xx_
x_I
1I
1_a
.
NO
TE
S:
GO
30.
If yo
u ch
eck
the
Gre
en S
end
Sch
edul
e on
ce in
aw
hile
thro
ugho
ut y
our
shift
, you
'll n
otic
ew
hen
jobs
are
mov
ed a
head
.
On
this
sch
edul
e a
job
has
been
mov
ed. N
ow it
is to
be
done
bef
ore
the
jobs
in s
quar
es '4
'an
d '5
'. 6162
DA
Y:
7 35
DA
TE
:6
/ 5 -
q /
3 1
.
SHIF
T: /
5ri
"4"
H U N T E R
12
34
56
78
910
CD
" I11 )
) )
I [
I1
I1
I I
) j
I I
I I
I I
I1
[J
12
34
.5
67
...11
1213
C) 1
1
[ [
) )
1 1
[1
11
1 [
[)
I)
1 [1 I
[ [[ 1
&
12
34
56
714
1516
))
[[
)
[
/[
iI
[-
--
-3 & 4
#4
sg.k
.in
6*-
W--
--6 _§
. (M)1
I
gl_x
3e[r
j..3
2-.4
1/0
717
1819
1 )
I) )
I1
[
_wt.,
-
El
305
iI
25 x
3)
1
.Mt#
I [**
asx
3442
0 X
.21!
30 X
.3..<
1V
-405
2 7b
[[
1
323/
03
Qo
a 3
3a /3
4
5 & 6
12
34
56
720
2122
I)
I1
[1
11
1 1
11 1
11
11
I1
I)
I1
I1
)
1
I
11
I
& 10
12
34
56
723
2425
--r-
m[
,'..
11
1 1
1 1
1 1
[1
11
11
11
,1
I1
I1
11
I1
1
x"...
1I
1
NO
TE
S:
C4
32.
A s
tarr
ed?j
ob is
a H
OT
JO
B a
nd h
os to
be
done
as
quic
kly
as p
ossi
ble.
6566
DA
Y:
-1e,
2_,Z
;itt_
fliz
1
ri/
qD
AT
E:
/33
.
N T E R
(0:)
[ i)
/,,c"
Rs-
7c/.0
/
6-
- -
---
- -
X:S
1
910
_
13
Oi
-
g_i_
05
Eno
r iC: I
//_
.-()
(),.?
S-
clip
( I-
4105
.1IC
)le
.)
/7/6
/6(7
/996
1/50
,c-
trio
( ).
i)
. c4-
/-7.
0 4
i1
/ //(
1', _
11(2
--
472)
601
5-__
_,[
)
c), ,
-IC
)I
)i
)
9(V
.Y7
P--/
c3-
6
B P
V4i
252
el.:0
lc)
' °a
3-S3
;--
s /
')37
,5--
47-
e5
./-,-
---.
'5/
i t()
tic.,"
12
1l
icIA
0,2d
7
-46
--I
l
(?-/
/54
II
C'
-46B
4-''''
'I
1
2 o2
.5/
7 ,-
-- alb
15z,
iw
11
If 1
',.27
3
[).
aft(
)1
'Iwo"
()
610.
5G-1
/1(-
---.
), f1
,_/
..c:/.
1_,,I
c...
..,61
.
D' '
fil'
7 ...
.,5,.,
Il.!
--1
. .-
,I...
__L-
C2.
1.,..
,6' '
400[
)-
6IC
A.5
(.vi
V.,1
1
-...-
Ay.
-ool
-
643
01')1
i;)
iI
- -
2,S-
----
le0 (5
6'i
'
,,-.0
'C--
)
.C:2
2,3
EL
L
CSP
'-0:.-
11
3 z-
x V
/fej
()
...ge
-J6/
/c--
-
[)
f1
& 0
1e(
2
I-P
.ry
-;;:
-".-
5.5
il6
7,
1819 22
Mb-
I3
""w
a"P
" I
]x2
..x.4
z/0
P7)
/rin
MSgi
n [
)do
p4 [
]-4
1;d"
'"I
e-.1
-"w
ild"'
""1
e)2)
___
xzp_
_7
x et
-1.
2/-o
oz 6
45/f
vfe-
cz
azIC
J'`8
111"
" IC
J0,
33/
(,4/
SY
.C.-
- /0']
LC
ic 3
oIC
)
9-1-
-..1
-{
[)
11
,-1
[i
&.,,
,t,..1
]
1)
w#
I1
____
_
.,,,f
',7,0
5,
-[
i
f1
21
3 s. If 5
I2
cr.,-
26:_
Tiii
----
--0-
c--f
.i.5
1.
s.,
2s4)
-5a)
f1
4110
11
[)
3016
z-s-
xZC
Id k
--4s
- x3
6 i e
)-
i0
- c/
Z 0
/3,
-.3/
40
-b"
Sfr
)
.z.r
x 2,
6le
i.3
7()
,).-
-
i)..0(1
0 [
)
7...
y._
Ic.1
o_5'
/-,7
4
_s--
/ 01
1
7._:
x3I
C'j
_g2
vio
0 . -
.,)i '
p (2
.fc,
x -
rIC
J'
osge
-5
,)1*
elI 11
,5 f
1
it 1
ICA
-5/9
/, o
Ii
[[
ti.-1
2ic
...3
z-4
0,-5
e.--
.G
,..--
'.7
---
,
221
25
C%
i2.
.._0
x 3_
6_.
2C, Z
oio0
5/
..W-
hs--
f1
je1
1
I1
30).
30"
(.)2
3'.0
-;,1
31
-nq.
o:3-
7-
z1
1
11
-)(:
-.J:
57
.3;d
:1-
/01
1
I1
:75'
0 7
,,-rs
z .
:_z_
N r., )
ii
°1
1
7_ .3
,7(/
/:
i,s-- O
ff)
r)
2:11
--)d
iaP
/2_6
,-71
r1
[[
[i
I1
NO
TE
S: 7
44:2
7-?
4L--
0-Z
1///
/.."i
r',t-
t2:1
-C
975.
1if
1 I
rrE
(E-2 .
.r
..
/O
kmrp
-4B
EST
CO
PY A
VA
ILA
BL
E
es
34.
You can tell the CLASS OF IRON to be poured for all the jobs.
20-s
softest iron
25
regular iron
30-A
25 class plus 10 lbs steel
30-8 (35)..
.....
...strongest iron
The HUNTER's first job uses regular iron, while the thirdjob for Pallet Line 1&2 uses the
strongest iron.
6970
PAY
:D
AT
E-
3 5
.
SHIF
T: /
ti N T R
lz--
ILJZ
CA
ii
S2/1
76/4
Cel
cIk
L41z
g.a
.c.c
.15,
_z-1
)./
7...
.-"I
z.,
?-1
0I
2/ 4
/3--
--r,0
1i
I2/
2d/4
1360
3)1
6/1
1_2,
20
got ) I
]
W7,
-,./
Z.-
5 , le,i
9,05
(gf.
?
75-
01
3
I]
657_
cify
s-d-
7)
70?
11
I]
,,,24
,6--
,02
i.c
MO
11
I C
i
,A49
/2--
MI I
ci7/
6-zo
ii..5
,5,
4_*
-4.
aeI l 1;-
.:),L
) 4
r 3
car1
3
/
14 I 17
CD
(1
)1
[3
i)
1 1
iO
r 1
3
'I
]
6 9
'41:
ze'
11.5
._1
)10
1 )
ICJ
I
35./(
70?.
69&
"---
,/_s
e a
ary
) C3
-n--
-4,4
? 7,
?--
& 2
..121
3li
(Er
515
1415
116
[)
x1
1
3 1
) 3
) )
'----C
! l-
13
1)
13
070
()
It)
7.4.
46d-
.
4110
[1
IC 3
ellp
[5-
)1
32Q
x 30
.
L10
69Z
S
Apo
Ixi
C)E
c )
q/)
.357
zs x
3f2
(401
.23
as_
x312
_..3
1q60
09
et io
71N
IB
F7
1716
1
,,to
I).
..YA
Qgo
I)
1,5
[3
zi5[
l(1
1 3T
I
Ls1
.141
1,[
3SD
1i
c xi
s!3
za x
2Z`
'
1,5
2603
3,6,
-19L
R23
65]-
--]
i ii
)
1)
13
1)
5 x3
12!c
)s
fc)
97 0
(40
72x
le10
E-P
( f-
On
x
3 & if
)369
i-7S
-If
4zC
.T.,
AC
-A...
..ZO
C 2
.09,
s/7J
-.0
L6
121
:
cp, I
x
-
,-c-
_,,,-
c-_-
,,,-,
,,l
Il
Il
I1
.2L
7al
l1,
5E
V)
-C
OI
),
,,,-.
.in/..
.25
x3C
-,2
Li 00
51-4
,3,
--qn
f.,
ZS
Ie)
r.x
32-z
-ia
,---
--y
,I
1X
0B
e (3
fiE
T54
47
'24
I
I 1
IE
DI
IC
D1
)1--
1I
xI
1)
11
11
_.A
Z
°17
)4°
1[
)' A
P0
30
izs-
,Z 0
[)
___,
g x
aL[
c)C
OO
)to
x 5
c24
33)/
g-
15I
)
I1
VE
P 1-
71-
flop
iFi
k1(.
,n--
)
1-1
S5
-2I
-I N
11.7
-aq-
1 -
Lav
-t1
4,
36.
The
CU
ST
OM
ER
NA
ME
is a
bbre
viat
ed. F
or in
stan
ce,
'VU
L* is
sho
rt fo
r V
ulca
n, a
nd 'S
I' is
an
abbr
evia
tion
for
Sie
men
s.
Bel
dour
Ele
ctric
Co.
BE
Lid
le G
iant
Pum
p C
o.LG
PB
row
n M
achi
neB
MLo
uis
Alli
sLA
BT
R P
reci
sion
Die
Cas
ting
BT
RM
&H
Val
veM
&H
Cat
erpi
llar
Inc.
CA
TM
uelle
r C
o.M
UE
LLC
entu
ry, I
nc.
CE
Pne
umot
ive
PN
EU
Clo
w V
alve
Co.
CLO
WR
elia
nce
Ele
ctric
RE
Clo
yes
Gea
rC
loy
Rop
er P
ump
Co.
RP
Con
ine
Man
ufac
turin
g C
o.C
ON
Sie
men
sS
ID
elav
an P
rodu
cts
DE
LT
oshi
ba In
tern
atio
nal
TO
SH
Del
co P
rodu
cts
Div
sion
, GM
CD
ELC
OT
exst
eem
Pro
duct
sT
XT
Dup
age
Pre
cisi
on P
rodu
cts
DU
PA
GE
Uni
on F
ound
ryO
FF
airb
anks
Mor
se P
ump
Cor
p.F
MP
US
Ele
ctric
al M
otor
sU
SE
MF
ord
Met
er B
ox C
o., I
nc.
FM
BV
ulca
n E
ngin
eerin
gV
uG
&E
Mac
hine
Wor
ks, I
nc.
G&
EW
ilton
Cor
p.W
ILG
ener
al E
lect
ric. -
DC
M&
GG
EW
atts
/Mue
sco
Wat
tsG
enic
om C
orp.
GE
NT
Gra
vely
Cor
p.G
RA
VG
rinne
ll C
orp
GR
INH
arve
y E
ngin
eerin
g &
Mfg
.H
AR
Hen
ness
y In
d., I
nc.
Hen
nJ&
6 In
dust
rial S
ervi
ces
J&B
John
Dee
re D
ubuq
ue W
orks
JDK
enne
dy V
alve
KV
7374
37.
DA
TE
-SH
IFT
: iz-
r-j .
2/1Q
4,..
.. 4 T R
l I L
O i
ff-2
42,..
41-
1151
,s__
_(1
.6'
MO
I3
[)
,---
-/e/
S
2)_J
X*5
.--b
eZ.C
.{1
L.,
,6
5 /
,_
_7
.a
9--
-'5
41/
'11.
f--4
41Sp
I I(-
17/O
-Lo ce
2-ow
) Ic4
if/9
"-11
5.
2.3
al.
22,6
Z'S
----
c
I)
ICA
9`07
_39-
7
731)
7I
3
6 9e
e/s-
0-7)
5,i
)
I1
-;_,
447-
cz:W
,12c
5,--
ifZ
fa I
1 I)
.S2/
6)/4
-zo
0[
3
2/20
/4 e
I)
I1
6 gL
.2,4
,1.1
2
col ) I
3
6 W
97/)
/-
I
2
(-D
i ,,
7
1(-
---T
hT,_
____
,,,
15,-
-'51
4
E,
,c.,
.?_5
71?
70-
,,
, ), , ,,
,,
,,c
,,,
,,
9'--
e-a
:3 4
)6,
.2-
ED
1
, 'D
I 1
)46
9&--
-19/
3 G
D
i . 2
.
1i
.1.1
c, 1
3L
E-4
51R
,00)
,)
--'
)x
3 0
R0
4 35
7
,,
1)
x
141
-
1.,6
,,
[3
25,,,
, ,[
t.Z
Sx3
06/
01(0
23
,,,,,_
I1.
Z:-
-41
° IC
)Z
_S_
x 3/
)6.
3196
00
.-2c
2 x
3o1
.1
14 0
59Z
S
3--C
DI
3 rT
hI 3
3--
----
--' f
l
I3
I3
q 10
1
UZ
j3:-
.lir
aLli
617
18
119
5al
r[
.?5
x 30
4!1(
.3-f
3oL
lI
11i
3
iligo
t)
ZS
x 3D
x.15
j6
x 25
304N
-30
(031
9q3c
1 1,
5 25
OS3
.5c4
-1
-af
)
SD{
22 x
2.2
b L
1. 9
(-1
5323
0
3)
E-g
x 00
1DE
P1f-
Dr)
I rT
h[ )
I3
3 & if
/224
42c.
67
.21
E )
-1
,[
[1
i
1_
- (---
-)E
1E
DI
]c--
-)I
31
3f
_.-
h-1
E5
65ri
)--
lc]
- C
z.
aio-
--25
3c,
[c]
coT
-G
ot )
.../1
-:-,
2.s-
-[e.
--]
is-
x[6
=3
022
-zia
12
6.-
_..
3iiE
p1
56
.24
7
rC
DI
)C
D1r
II
II
11
II
x
viol
) fI
0lk
%ac
400
i0
3of
)
I C
i) I
,zo
I1
I cl
Z x
3_6
.s
(73c
,
4101
I 3
Le,
x g
o
3311
.P-
I3
[i
II
II
1r_1
4
VO
TE
S:1-
) ()
59
- 13
14N
)1,7
-z4i
-11
pkR
;11.
0tvp
.75
38.
The
gre
en p
art o
f the
sch
edul
eth
is ti
me
show
s th
NU
MB
ER
OF
MO
LDto
be
pour
ed. T
hebi
gges
t job
is th
e fi.
st o
ne fo
r th
e H
UN
TE
R.
78
77
C
ty, P VI -g. LA) tos -A? J to Is -4 -ow 33m-1z.cX
V V __C 2
--D I4
. (P a C)
IS' x .ii
, (-7
...." 110 J f.Y. .0 V LkiA 4.
1 %,t 1-1' 4 L,.
-..x 21)x ,:z. 44 04 w
1
\\I '-
13- 0 --E 0 UN \) CN
_ __ m
_ .1S, icn
_ t.A) - ,4; ftl .)\10 6, N
6N 1 J1 "C\ 41
0,3 `,- x N k\s) x0)) (,
c:+5 -.I c\
I fsp 0 A N --C.
lix 0 NI N
1 i 1
I I Q1
b Ix clili%4 0 Al 1\t,
1
Ix x x x ICY
,. .., vNd
o q.4
'' '. 1
r., 0 . '.
I \J .. :
/16
.....
1 . '. 6...
-- IA 1 (3\4 6
40.
If you see a 'c' in the bottom bracket
EcI
the casting requires a CORE to be placed
inside the mold.
If there is nola
the costing does not require a CORE.
Si82
cr. FOU'l p.-P4 p 0, --c) 1%3 p - ..o al xi M-4Z.CI
V - ...1) V -4) I IN V\-:-. -. --
()O
r' N DIN
-c, 4 ." I 0 Ic < , IF- x 9,)
-.....1 'i -c. 0 Nk) c'.1
t K 1,, . ,-..... ---
14 u1/4.7 is) :"W'' NS
11\k (1 '''..
-1) x (5- x ' '
( vi \ ,A.1
h r\ V .--. \ LA (\1
.Z. 116
0.v Ix,
i ' k. Iv -....
-t) tr. IV, 3,1
(--i-4
c, .5-'
I VA tJ) k) FNIC) '' 6 ...."
IN N cr- ,--s
i x I . iti'
I4 P [-'N , ---- -..s'
ND. (.-1, .4,..,\) ... I
g _ I ,J11,<> ,,:::)tAlcA o lui ....
1/41) VI ° 1
'C'k 11'
Z'Ail5
- 8
-r. I
......._, I " I " Fr- r 1
I
IZ\ I -SIN
(j) - ,
I '. 'kN
..e x (-..., :\ Ci 1\) \--1 I - I iN) 'CN)
---"-'1
I I \ r
I -7.,C
___ '-'
*14 I \
ix Ix x x k..
..... .,. ..... .-..
1 \j._
I
I's i NI sj
. I I n, ,41, ,
kl
x . v _
,./ 1
__, . _ ....... -.-
I
0 1
n a b
1 =
. _
"' 1 g I g tw,;, \\-1 4'
01 NOr,
le,
'-- '-' _l___
_L_ vs. _
__ I
' (N
...?
8 I I (1\4 6 '
,csi A.-. 0
1
01 0 ^._(
0 ri.1
42.
The
se n
umbe
rs te
ll yo
u w
hat F
LAS
K S
IZE
to u
se to
mol
d th
is c
astin
g.
(The
HU
NT
ER
mol
ds o
nly
the
FLA
SK
SIZ
E th
at is
bui
lt in
to it
.)
85
V a 1-1
P
D
wq,
., .)
........, i -t7
tr Pig I '''1;* V3 I 0 40 NM-" 1103 3311142.Ci
" la 4 V
,D M
J, 3 0 -
i N -
,
I
*
x 1.3 IS' z.
N td-
TE _ i
%
lg
i'itr
.J! 6-.),
Iii.b,
I
_ iww N
&:1
c--
.r.
SVU 14 ,c1
(A 11
ovik, GIN
,3-.P
g_.
Ni
.
, 0.0 w
I I. %
.
Ir
-
P
It h
.
, F N
47._ I
. c) c
7--,'
w
A
w
._.......
(--\
i
L
, I
1 (A
r
1
I
I
1
...,N
V
_ J1
.
....._
P I P
.
)
x
I(- 1
x I
- - - - -
- 1
_
_
0 1
_ __.1
I
_ _
I
_1
c,,,
1,3
%
.....
--:__,
i(c)1
_
N
.
''
-
6
___L
- -
v
I
).J
O
44.
Eac
h sq
uare
sho
ws
the
PA
TT
ER
N N
UM
BE
R.
90
8)1
AY
:D
AT
E
45.
SHIF
T:
:i INI T E R
a/
/:N,./
A-
11,..
-6
g'A
AL
A,
-lc('
--'
p.: f
t-
0I
)
,,
2/44
/5.-
-
c".
4
00,, ®tI
4y7,
0/4
Z-3
'51
<I
3
I C
A
96'f5
3
I57
)I
t> 5
7e,/5
77)
21
)
.?4.
6-rd
.Arn
i20
Z5-
--- 40
1 ) )03
iy0
/7-
i
Cro
p)I
crZ
-75/
6-4,
0
'Zs
(Do
1 1
I)
F/16
/4
13z r
-zG
eDI ,
,
.212
0 A
----
I )
6_6/
9 4/
e'
I7
y
I [I/
611
5,4
'.3
0.6
i)[)
1)[) 1
)4i
pPai
Aii-
I' -z
-e,
Zs
[ )(
5---
6)[
)lc
)-
1)
3slo
o 2-
6 9-
-,Z
.S6
Z
rC)E
)--
cipc
D))
-(--
-)))
-CD
,'-[)
D).
311)
4
aft
-ir.
=-1
0i57
,al.
7y-
& 2
1I
.1.1
C.C
?,
(2. Z
5)1
]-
]z_
s_x3
,2_
6314
6 00
S
3C
-I4
5114
15
116
..3.8
eilV
s) I3
312x
3o
.
i-1
06 9
Z
135f
i10
0 [
1
ofc
)q
_37
I)
1)
[ 1 11
)I
)
1-
I1
3
I)
25,,,
,L
. .20
Ii
It)zs
x3n
.q0
1(02
341 & 10
LI
toI
l
Icl
LaW
3ild
to4
D...
.12i
617
161
30,4
C30
1 I
L,5
1)
fcl
Il
L.5.
_x 3
.2_
zg_
.5_
C,3
1 i'
Ll3
q 1
...t.a
2.6.
75)1
)25
_ x
zs[
]
l,520
13.3
1521
.1so
i1
22..
x 22
.I)
bt-1
61q5
323
0...1
5[
1
7....
2xoa
fl
127E
-P12
01)
,-
-CD
)C
--r
1)
I)
13
II
x30
410c
4
3 it
,3t5
141-
301
(L--
/-r
445
.21
IM-E
l-7s
--.-
lla
s[V
iz40
1 )
egit
)-03
01ir
. )-[
l'-cD
irc)
)___
_-1
7x
I)
x1
)c--
--)-
--ar
r)1
1
)I
1--
---
II
3ax
it")
2s x
r..,1
`)_1
.11-
x25-
fe--
42.
q n
651-
3,-4q
ndof
,spz
2n2
zr x
616)
.?2_
,z72
7__
_I
.r5
i24
25.co
1I
...31
2.
114
lop
i
,z0
[)
2 x.
.3fc
1s
6'3n
--)
2 .S
.-
vs-" -c
am[
)
t4x.
.5.0
)_I
1
.31/
.P.
CD
"__
___)
:I
3
I)-
ED
1)1
-I
11
Il
C)I
1I
l
4a,
,
020
I1
I
MO
TE
S:L
i59
5-
1314
N11
'7 -
zii-
I-C
ileck
-r1.
Das
i-f
45.
If the top brackets have 'SO' written inthem
[SO)
that means 'SPECIAL ORDER'. Look
below at the notes section of the scheduleto see how the order is special.
9433
DA
Y:
DA
TE
: 5-
-q72
47.
SHIF
T: /
2:/1
H N.
T E R
/.."
$1(
a
6 F
: 3zs-
--IA
A l_
..4
.A
1,7c
ols
-2),
-24
,.5/
--G
e-9
S41
Is41
._7
5-57
I3
I)
6 9e
7915
-6-7
)l'e
"7r
Tht
)`-
.I
1
..?g4
)-m
341i
.2c 11
2
_Z-5
-- della
ti
w Ic
-1-
_,,-
W,2
owei
w I
.
e7c4
z,.D 0.
4
z
.,,r
),[
][
]
g'in
142/
4 l c
,, []
z/zo
ll A
9/1
----
-730
.13
(9,_
,,, f]
6_6_
19'1
10
.,, tir-311I
1
6W
-7/
,,,,
,'-'
"le
,i
9cs!
31.'
23
---1
4- (
-)31
--
(--T
hE
)1
I1
----
---
I1
,%
.54
kip
PA I
3I
)A
i"' I
1le
l' --
z---
ei35
/(20
,-14
25-- pal
p I
3
I1
6e-
--,/_
S G
re,
15
Z13
) ,
-F5;
4?7.
--I
6
i]
f1
'Intl)
4
I)
I)
/C
))
`---
---
1
i)
I1
1 & 2
I.;I
1)°
ICO
=--
-1..8
CH
451
56
3I 1
x3
I1
:-1
CD
' 1 I1
3 3
s:%
11
/ 0 0
[)
IC3
x.,3
c)q
0-5
57
I 1
[1
I1
--02
0 [)
.Eth
4111
0 [
)
zsxa
cliC
)63
(960
0$
ep [
5'7)
_lax
3o1
.11-
1069
ZZ
Sx3
c2k)
cf01
X23
et JD
11:3
DA
C.
40:
la5
06
(3F
717
1611
3E
DE
l1
I1
1C
)I 1
3
I1
142
°1 )
25 - 8
5:ti
SOi
Za
22.
9-
912:5
5i
lx
2zP
I AA
Z-5
-
1
e-°
lc)
Z.5
..x.3
2.L
9 7
o (4
325
"g°
Icl
25 Oqi
0
30,4
L5
I2x
la ',-1
-I
3 Lt
42.
_I
l__
___1
231
52s
--s
4120
flr
OW
Ie3
(---
--),
r(-
-Th
r,>
,' -
' I
1I
1'--
----
I1
'`---
----
-' I
)x
x
65[V
]41
30 i
i
._,,l
lc3
25 x
3(,
v-in
c51-
c-7-
3,_
14 n
j...
,-Ic
A.2
0 2
N2f
."6,
9s/7
4032
-.24
z,1
4-E
Se-
I16
'7
24
----
-rI
)(-
--T
hi)
c--)
)r-r
-ThE
1
I1
` -
- -
I1
I1
'----
---'
I)
2S--
-j5
Gi,-
----
) 3
)
...x.
50)
3,3
/ 1.2
-
(D)
)-rm
i 3-
I1
`---
----
--I
1x
x
Ora
I3
op41
'1
1I
)0
x la
,, o
13
zad
c)-
-
____
___
__.
.3f,
7i
Hir
nt. 6
:301
°MS:
tin
SR 2
5- N
O11
7 -
- C
hea
l4i,r
Lar
rft
f' 1
48.
Thi
s sc
hedu
le s
how
s a
num
ber
of S
PE
CIA
L O
RD
ER
S. T
he n
otes
can
be
mat
ched
tojo
bsq
uare
s by
mat
chin
g up
pat
tern
num
bers
.
9798
.D
AY
:--
662,
1ter
1./e
/1
/ 5S
DA
TE
: .5-
-./2
5--
/49
..S
HIF
T:
IH U N T R
11re
i:-11
rzi_
_,6
-5 (300
ICI
/.21(
)(73
S-
2t
k g
3zs
i-
.D'i
:Pa:
e
/0I
1
II
c3s/
V0
/
6
qi-,
----
77s-
-Z
dtup
1i
1111
17°'
1I
1*y.
).,7
a..P
eq
La
..57,
-13
10_
EI
.2-L
4 4E01
) IC)
f;16
/ 4P
ft01
50)
IC.)
901.
5-0s
"
.4,
tT*I-`
II
(/97
o,
avid I c
_J
9 o/
7)Y
,
Z.5
z5-0
II
P--/
c?-6
I)
B P
1142
s/3z
1_6
P4
(--
5:5
/7.
1
Dtk
O4-
12
C) II
11
13/2
/tut
cli
-c,
3,3
,5:
LsI
)
II
,c,/L
0,2
7
-1--
-
70I
) Ila.
.///,
.
2, c
---- Q
ed)
I)
II,3
c
CO
II
ap li
d11
1
.1 o
2.91
,7/
,?,,7
,4
1
)1
MI
I1
w I
1
6216
3(Pf
9
1.
2&
1 t .
2:/I
lf°
...--
...._
.=.-
----
--,=
.7.-
----
----
.:7",
...,,-
--c-
.-k
14
Cg.
1°;7
(7-1
65-1
Y7
151
6
OI
Ll.
-71r
-1
f1
4a ..2.
<//
ICI
04...
1 -
16.1
13A
C)I
I 1
-71
-)1
1
7.,_
)..5
.-,.
ie..]
11
a . ola
l,-
,,,, x
::.-
0[
I(6
_2)1
I
5c. )
:,?.-
.0°-
--)
ls'''
I
3 E
..,-
x T
[.
I
q & IQ
Z4
LI.
,-le
,C
r;-5
°1
- .
-18
1
r,c
410(
g Z
. x L
Z.I
1
/6 F
Y/g
oo
Lo6
/8I
I41
601
)IG
-i7,
e,x
rzi
Ii.
/2/-
,00z
6fK
.)2-
57,
®I
I
0L5-
CJ
3/64
1SY
7c(/
0))
II
1
C,.(
2.0
7 c-
--x
3o
y,i-
-..v
-7-
iI
I1
II
xI
1
.Le.
i I
,39
d
ii
II
-
3 & if
'r.
..12.
..2
A1
3--
-L
i4
'.21
zz_
MI
4--
-(4
51Z
7.5
MI
I.3
0'0
l'i/Z
/-4t
Y22
--
_.'
2 s
741
100
)1z,
sxzc
-ici
Ae-
z-s.
"-x6
ICI
07.4
-c/
323
0
s-2
S--
Sfr,
I3
tin0
I3
[---
,0,
,
z..\-
-)ci
Gil
.tv)7
Vie
l.-t7
:-x3
(-1(
247e
-P?-
o.S1
/.311
1?
51/0
G--
,....,
.....:
,,,.,;
,x-i..
-c, l
C--
1-
QS,
AO t,,
,, lea
- 5
/ 94/
0>'e
tI
5
,--
,7
IL-1
,2\
067-
-5
(/7.
..b-
67
g ...
.--.
--,
2324
25.
.414
--.1
7-
%--
-,I
iim
p--
.... I
1
ji, ..
.)f
1
))
,i
)=
))
22,:_
, >,-
32,_
-..,0
,.30
).5
-02.
614.
00.6
'31
......
..3.
:A-
s-I
1
z.-a
ie--
Ir_
z%/0
)I
I
30, ,
.....7
,0i
I
..,:.f
o2j
)
,.,..)
,5,
I1
fTW
,./7-
TF
Tsf
oosi
'A,
'
zsG
o I
1
.2:.,
_.),
-3(.
,ai
i0-1
[1
ii
f1
iI
Z6
,-,
0-.3
7
NO
TE
S:77
f.:2_
7-7
e. .4 /(
=. ;
11-.
91)/
..-//
/,
4/0,
..!-/
/.5ek
'1
I. 0
50.
The
Gre
en S
and
Sch
edul
e w
ill k
eep
you
on to
p of
wha
t wor
k is
to b
e do
ne w
hen.
The
follo
win
g qu
estio
ns w
ill h
elp
you
revi
ew w
hat w
e've
cov
ered
so
far.
101
52.
Dire
ctio
ns: C
hoos
e th
e co
rrec
t ans
wer
.W
rite
the
lette
r of
you
r an
swer
inth
e bl
ank.
The
firs
t one
is d
one
for
you.
1. T
his
is a
e.
a. g
reen
san
d sc
hedu
leb.
lost
foam
sch
edul
ec.
SP
C c
hart
2. T
he n
umbe
r '2
0' w
ill b
e pr
inte
dal
ongs
ide
the
patte
rn n
umbe
r on
o. c
astin
gs p
oure
d on
mol
ding
mac
hine
num
ber
20b.
cas
tings
pou
red
on J
anua
ry 2
0c.
cas
tings
pou
red
from
the
softe
st ir
on
3. H
UN
TE
R jo
bs a
re fi
lled
in o
n th
eof
the
Gre
en S
and
Sch
edul
e.
a. b
otto
m li
neb.
top
line
c. m
iddl
e lin
e
1o3
4. A
n ar
row
dra
wn
from
one
squ
are
to in
in fr
ont o
f oth
er s
quar
es m
eans
that
a. th
e jo
b Is
exp
lain
ed o
n th
e O
PO
Sb.
the
job
is a
spe
cial
ord
erc.
the
job
is to
be
done
ear
lier
than
it w
assc
hedu
led.
5. T
he s
peci
al o
rder
not
e fo
r th
e jo
b sq
uare
with
pat
tern
num
ber
7182
73
a.is
exp
lain
ed in
the
note
for
4061
15b.
is e
xpla
ined
in th
e no
te fo
r 71
8273
c.Is
exp
lain
ed in
the
note
for
9015
05
6. T
he c
usto
mer
abb
revi
aito
n 'F
MB
' mea
nsth
e jo
b is
for
a. F
ord
Met
er B
ox C
ompa
nyb.
Sie
men
sc.
Bal
dour
Ele
ctric
Co.
The
cor
rect
ans
wer
s ar
e on
the
next
two
page
s.
104
r.
C" 01 -- R, W LI G. -41 ra la. -, %l c7 .. mrri--izcx
N
<Nru Y
(-- v\ -.
1
, 0 . .-t
,:s
...
x
t.1
..t
. ''.
ir.,1
. .
IC,---1,
L f
-^'
() LIJ
%
)1/ I C
.
1":-
',.. ''.
"
-.'
(1 (-
tsA - _
q 4 10
%
C_ N ' .-.
_
(.:1
V \ . .* ".
& '-...
c -...
%
c) _
I / ts,,-
" \ ' ),
.
pz IJ
; t
4 ,...
N
. ,
) N
\4
i N u IN
(I*
'xi ."--', '"'
.1
*-
-,,
--.1-
it ''C
1
1 , )
0 0
I
I
Ni\
V. rie.
,, t .. . ._
,..
.
Is-
v
-N.
Q.
r:
N
i
x
(.t 1
-- I
_ E 4.!
,,__4,
N\
.-.
!
-..t1
_ Lt '-\--.0
,1A
1. V rSy\
4
C
N c, k..) k
z,o, c-\-, a . .50164-9. 1s.
\ .1
..) -C
c . 0
f. ...
'
"t*Ster
)
C
1
.........r.s-....
IN Oh
4, Ni ' 0 ill
s.........1...=....
0 0
0 Io
1
Ut . La
54.
AN
SW
ER
S
1.a.
Thi
s is
the
corr
ect a
nsw
er.
b.T
here
is a
Los
t Foa
m S
ched
ule,
and
a D
ISA
Sch
edul
e, b
ut th
ey a
redi
ffere
nt fr
om th
is o
ne.
c.S
PC
(S
tatis
tical
Pro
cess
Con
trol
) ch
arts
are
use
d at
Rob
inso
n, b
utth
is is
the
Gre
en S
and
Sch
edul
e.
2.b.
Thi
s is
the
corr
ect a
nsw
er.
a.T
he '2
0' m
eans
the
20th
day
of t
he y
ear.
c.T
he '2
0' m
eans
the
20th
day
of t
he y
ear.
3.b.
Thi
s is
the
corr
ect a
nsw
er.
a.R
ead
the
colu
mn
alon
g th
e le
ft ha
nd s
ide
of th
e pa
per
to s
ee w
hich
mac
hine
or
palle
t lin
es th
e jo
bs m
atch
up
with
.c.
Rea
d th
e co
lum
n al
ong
the
left
hand
sid
e of
the
pape
r to
see
whi
chm
achi
ne o
r pa
llet l
ines
the
jobs
mat
ch u
p w
ith.
108
107
55.
4.c.
Thi
s is
the
corr
ect a
nsw
er.
a.A
ll jo
bs a
re e
xpla
ined
on
the
OP
OS
(O
pen
Pur
chas
e O
rder
Sta
tus)
, but
that
has
not
hing
to d
o w
ith th
e ar
row
and
sta
r.b.
Spe
cial
Ord
er jo
bs a
re s
how
n by
'SO
' writ
ten
in th
e br
acke
ts, b
ut th
atha
s no
thin
g to
do
with
the
arro
w a
nd s
tar.
5.b.
Thi
s is
the
corr
ect a
nsw
er.
a.M
atch
the
patte
rn n
umbe
r (7
1827
3) to
the
num
ber
next
to th
e no
te.
c.M
atch
the
patte
rn n
umbe
r (7
1827
3) to
the
num
ber
next
to th
e no
te.
6.a.
Thi
s is
the
corr
ect a
nsw
er.
bT
he a
bbre
viat
ion
for
Sie
men
s is
'Si'.
c.T
he a
bbre
viat
ion
for
Bal
dour
Ele
ctric
is 'B
E'
7.b.
Thi
s is
the
corr
ect a
nsw
er.
a.T
he c
usto
mer
nam
e ap
pear
s in
abb
revi
ated
form
in th
e up
per
right
hand
cor
ner
of e
ach
job
squa
re.
c.T
he n
umbe
r of
mol
ding
s ap
pear
s in
the
cent
er o
val o
n ea
ch jo
bsq
uare
.
re 9
'1
i0
i
56.
Foc
us o
n a
sing
le jo
b sq
uare
Now
let's
look
clo
sely
at a
sin
gle
job
squa
re,
and
revi
ew w
hat e
ach
part
tells
us.
Firs
t,
we
know
that
this
is th
efir
st jo
b fo
r P
alle
t Lin
es 3
&4
on W
edne
sday
,M
ay 1
5, 1
991.
111
112
, DA
Y:
-661
,.1Z
ite1c
tiz
,I
11_
5.5-
DA
TE
:...
/5--
/57
.S
HIF
T:
H U N T E R
_---
/11
2k
V3
-.I
4c/
',.,
I*L
.-P
elt:C
..
r4,
-1
i
1)
7c,,?
1-p/
40/
5...
57t1
-39
CD
E]
1)
12
10-
13 -
.,2.-
-_-A
!ti. E
NO
ICI
/2 i--(1(,-?_S
r")
dfro
- i
i
--"1
"6"1
...-
1C )
i,Jcw
-.P.
/.9
Z,S
---- da
bC
l`1
11.6
7'.'-
IC
J
9L?/
s-
_
740
I)
w4.
"1
)
.,V9-
7c, ,
,,
7 \-
- '111
674P
.1
)
11(/
(..
P 1'
.'7 -
--
Zf)
)42
° id
cY.v
sy
ZS 2:
5--
OI
1
11
P--/
c.?-
6
B P
/S-
1-3i
5---
46; p
4
e_e:
-77
5.--
-
Ad
[[ 1
31i/
5Z
)/--
----
/7
1
Pr.
k0
.,1
)
ICJ
a ' °
3 -
----
5
f)
11
c)/ <
),2d
72
/'-'
'4)
(70
I)
1I
K?
-//c
73
i':.
'
-E
NO
f1
El
)7D
-7 9
/
4150
- 111
1
111
alib
i'4
11M
IP'
(a 2
go
so-i
f q
0"i
1
:Dr,
, " .
4. '.7
/427
3.'
b:,
D(7
1:ie
.-I-
b"
116
_I1 & 2
-'''''.
-LA
L.1
)
(CA
ZI:
;,e)
9(//'
/5--
(1
[C...
.'.1
.c.)
>0
i_06
41-b
- I
)
MI
3(. x
V/ (
---
-
.,:i i
h-
4130
15e1
x 3-
0"
,a.,.
.,
6°"
ffe_
-, x
'4/
--')
OSP
:.---
-
3 z_
x v/
i
I IC
-E ] [
i
ct & 10
1A
2.
ortli
.,N
rSN
IP1
..
-0e
19
zo 6
CO
, 141
/01
,z.
xz.z
i)
z)--
...?e
,I
e".-
3(D
ip;
7.f.
..- x
z' c
.--
Mr
,.Z
0IC
J
3/(,
4i,c
y
7C--
--- 41
10,0
,?c
ic3,
1
y -,
--...
-
i)
11
[)
___.
xI
1
i ) 11
/./"
/-oo
z. 6
V y
K5e
e-5"
.
3 if 5
12
"--
4
'7_5
-'3(
11
0'
e-,
2 r/
21_
c-,.
tiM
IV
---:
'C
DIf
1
14..,
5
4/co
1I
/--
-\1
j
''''C
TIc
Jgo
0'
Zs-
--x-
z(/Z
/ -
.)
9.5
0 /
2$
.2 s
"0
I1
.1
1d1
B0
11
i/0
11
k-i-
-6-)
.56
lei
z_s:
x a
6IC
-1ry
>;"
IC 1
e(7.
" x
3.(
.1(2
1:5
,3 0
2).
1.0.
C)/
.-3
tiI
. -?,
2 V
/0
2
''''))
9`2
5c2
x .'f
bIC
IS
01,
71c4
23
dar
or5
CC
6/
7i p
---
224
25
f1
11
1i
f1
__Z
---
----
-al-
I1
2.0
x3 /."
2 6
zoio
o 5.
-/
324
4116
10 1
)Jo
f1
30 x
11
''.o
xo[
1
1. 5
?-'-V
AI
-sla
4 ./
.;
_ 76--
11
/0i
1
,) x
_.1
11
-,
[I
.331
e--T
f
_LN
01
1
,, x3
.0[
)
(//
:
Z,s
flip
t I2_
1:-.
),-
5.,
2-1
/44
-,,)
i
NO
TE
S:
72:1
2:7,
.?,1
.7.,L
,,42
67;:1
7C,<
7),/
c7)
1/*/
dC
l7ee
k IO
r 14
.4 I
21/1
/I
131
i 4
58.
We know that the class of iron is 20-S
The company is TOSH.
There is a core [c] in the mold.
4
DA
Y:
11
/3D
AT
E:
6"-
Lc-
9 /
59.
SHIF
T:
T E A
---
AO
)I--
'''[
[
7,s-
,-,?
s--/
e/0
/
i,
[i
OI
ED
) lc]
//-
-/).
-?-5
-
-
Ojk
lc]
i/e/e
.-.-
2P
40I
ei
9/.5
-0,s
'
,*V
P'
A[
I
,1/9
77(,
,
[[
1/(/
(1-7
_,-,
c7-1
,L-T
-
. 5/
dab
)
'111
1.1.
1 ej
9,4)
/51
7
1.
[[
[[
P-/<
-?-
6.11
[Mu)
13 P
,.....
,...)
.:1
.,;,I
3..
A6;
04
e-..-
5--
-4.
---
12
0' ' 1
1
13_
,[
1
146'
IC-1
' ° 3
3: S
---1
1-
I]
I)
,C7A
2 7
e.
z[
)
I)
(? -
//f/ i
.7-
hd[
i
11,3
.5-9
S(/
4
01)
[i
11I
n J.
9 s/
C
2 j-
- 40 1
3je
b7,2
73
ZIS
-5)
1
2 10
.56.
11 q
I
&
.-, A
_71-
r-71
',2
/,.1
,(.
4,p
6/:)
; ...-
'",te
)--,
--L
e-14
151
Of
;. -1
, .1
/. r
-3.
(075
" ki
d/5
/77,
i - >
V
egl i,r
AI
)
7kilP
ic.1
7.5-
-7.-
N-7
7
.--(
..sI
i
x vi
ulZ
AI-
ooze
-i
i
x60
3)15
'1x:
)"
-,s
0.6 tr
ei&
<:':
_ffc
., x.
?.-4
ej3
I--
x 7/
lea
.5..,
-., -
//
IE
DI
11
I
& Jo
1
ze3
2
-7:;#
3
:Prii
i14
OC
;5
..51
."-z
---3
.5.0
6/ 44
0:I
.5,
30-
1819 22
t,s--
- GO
' ',z
xiz(
3
/0 F
-Yi_
gric
)
Los
CIO
' ' It:1
z,..,
7,9_
/.2 /-
aoz
6
A,3
4-C
o' ' 1
ej7-
c.x
rt-
45-1
5/K
.s?
-CZ
CD
' '_
ic.)
Z-,
5
, ?/(
, /c7
7(--
- 410m
IN7
c"--
x 3o
-)--
-7-{
-1 )
X
--[
I
[[
X[
i, ,
_[
i.
21
4
c -;
2I)
t-4L
-41-
-I
16::,
_7.
__\
145
)A
O eV)
ii4,
CD
[1'
[i
70_5
CO
I1
*.0
lc]
/Z-/
-4//0
2-._
,is-
11
zs--
ac-E
a()
Y.
? 0
/
7 s' Q
0i
.71-
--z-
s-).
.56
tel
3.3/
61
2 3-
-'2
,"r
SI
Itip
( i
/01
i--'
,,.tp
,0
7 -,
a6I')
7-!)
X74
Z IC
1.[A
2'.7
3-(
3 C
IC?-
1.*
2 x
x--;
0le
-I"i
7(' 7
./.2
).c2
9 (
,/I
-?,,
via
Fos-
oof
iltig
at2
2425
_-
VI-
.1../
2a.i
C.,.
0(1
-5
.eg
-6
,---
'0_
,4""
P&"
I1
11
11
11
qo13
--1
1
22_
x 3
62
6 z
,o/
co V
1141
1/1"
1)
-30
).. ;
-4,9
(2. $
c- .1
V,i7
.3_,
je,
II...
,05
O1
1
-3 /6
-n
-,4
76-1
1/0
II
.7).
...:k
)1
1
..5,0
11
- ,
-6n
517
,___
.'.S
--
01
1op
ii
jd1
1
z___
)a (
y..1
.-5
(!/-
-vxs
i.m
od Z
,,,,-
, 1
No-
TE
S:7-
-/45
.127
,7
.s.7
/ /
L2_
11//2
i(e,
/15
alee
kor
dil,
tri)
2
1.s
60.
The
flas
k si
ze is
30
x 30
.T
he p
atte
rn n
umbe
r is
121
-000
2.T
he o
rder
is to
mak
:CC
I old
s.
120
rry/.77.
c ))v?ppct,2
c//.;%.74
( 2 /w,
7 .C7
:S3101\1
sz
t1
(1
(1
I1
_/., (;;;./.7(A
r-r-----y-Svc/pYr-
-'-c:',------cz1-0
Ainni,
( imp
Pix /721(
1
or(
i
./-/C0-975.,C
.75-
I1
[i
0/
,3c(,-;/<,-
1
17s-...(7( k- 4-
21- ,1.-Moc2C
--f
1
a,(
12-
4.77-T4_ ,f'/54,2,9
c'Y'. 1 oc.-
(lA
erm,
I 1MIP
'77M:C
c
/ 027Y ..(
n1[1 412,
2
0-oz
7e,75,-..--(
1
06(
1
V_ay
,
0l8 st7,4
r:411.72:07=5
jr7L1
% 2
:_:,)----'
9
0/ 15 z k-*
ipliEx7 \;__[017.,2;-0,L
1C-C
;Dili(-
i, -c.
.tz
_YE
)9
p ,-- 45
1
-
-90,
e (.,2 t
i_90.2,4_.--C2
11
..'561'
)c
0/S.rE10)9gx_37.,,y.1
I°
1-1 ll..
CS
Ip)
19O
E
I1 lai)
, A-
It..
_.2"-*
A°
.
NW
(IA
W,A
ik1W
1116.-
Ii
IIC,- - S
./C:21,---------=
-5c9ITC
PZ
tz
_____
6L
.((
__J
y(
1
(1
(I
(1
,-J4T:
o----. x_s eI'd! A
limpA
,Ic, IM
P5/
4.5. )-<
-2-27 x"T
2-Z
-7177C2:2-
6.-
PlAim
pP1
07.,1-'21,02,026.
11 W
ilIP(
l's.,_.---"/ )
(llraM
P<
7__.-
.767 ir712f
(1
Ai)
01-bZ
IL
9
0.5L---:-1--"
C'...(.7.-.
r-a(--1
(1 L
_Q--1
kic.--
9 ,.-- ,,i,1772t
5ozc
z.if
_57'
'
(--)1("j.:( "c2:
t
i1
_
([
(1
(1
_S / /fir/li x".--2P
rD I A
illeakk
Wit"
/7'0:: X
TV
rI
W5i010
3 -O
-'- ./ 2,-7
'
--)fiS X
' 2c:1 L
I 11V
1°
<
( S9:(
1 \::-(1 C
P- 902.-
cl°'' ----------'.
.c-7 7771
10-ft
Ic79 11MP
.
FrYi
,ti--i/---117.:,
ca,RE
IE
E l
([ic)blrff.O
.gf
1 Apiam
,I M
ON
if1
(1
-,
/ C. / (2//t
ki0:5(
1opI
1
,c,,,,I
1[
Ivi
`Z
'1:1(2'21,//' .t.-2Z
(26 'WS
I1
(1
0gi
1(
1
,c.:Y..2a0,7-
rale
(1
e
7.1gra11
(25'4.-ibP 1
ityiPO
W/
2
/-eie V.)/-,
t1
11 111190
,.c
/ ojit-ci---'--7[
[
t1
0/i
-.-d_S
t,c1')-(2 ii./.:,/5 '
[i
gE.
[1
r
E
5-257426
lcc:<-)4 c..'
___ IS--
2
G-/e)//z>
(1 M.
1Pil...s--2,/--I
i(
1
CiT
,f
aNnH-
0 I I1 .-[
._?---..../--e'[
1
cl_r2t
1.
._.--C2
fit(L
--:"Id(71r., 4-'1
'-:-.
./-I
.--
sz,,.
/ \ -tZ
// - (7t
-IH
19/ 6 -.57 5 :avia
,Sg1
/
?7./7)
Ay
62.
In th
is c
ase,
the
job
is a
ltHot
Job
. Pal
let L
ines
38,
4 ha
ve to
do
this
job.
123
124
a-f.1/.c,°77-7F
))7(//1 23
(2-, )
I - 6- '
- ? W i l
4 . 5 - ' 0' // ) F -eFx
11
ofr
r
sz
- - - - -- 7-7 7 7A
r75 T
.:I
1
rI
cv_
.g z ( 1 . 7 )i k0.--:-.(
(1
5 . ---,
( - 2 k .2-i( koc.x 0..
(1®mop,
4f i - ; . 2 S 2 V
,,(.?
(1
r e./ o 2 9 Z
sz
rr
t1
togH
-Tex at
rr(9
---9iivofvZv
Lcle,,1N
-c-'<-7-cz
f'DA
imik
1germ
v::
__tf7- -
i
02SSO..
1-010--;-x T
h-c:
'641"'" °jjr.7
54)---
94
0//52k.1
roi:57.: x.771.41
1
_Y-J
5
P i:/e5(-2-77F/ t --i):2
11
°er.3)
,IP"c--5:7
-''C(2/..'
rvi9 2 v..-V
T[v1
7x :C1,t.
(.;1
10
11
A
tz
/ 02/J5:4 0p
i_NZ
x-Cz
11
-5/f
171i
---Cit,-/-21
pi0 °E
11 a5-t,
pa
zz
11
11
all 0/, 6 7k1-01
..--,,r1 W
V..--iz
- 7l
-M
. - -5 4.--C
CE
L.
la--5.Z
.
V/ti-/ /
--W".. X --
'?,
[[
/4/907
t -`*"
uPtti_. o/27X
72I
1co[
,
c_c 6O
g x-----57[rd 1
,Aiglink
is gap,519
,
_iO
[
6t
.
1
[[
;
1%
A[ ... .
,'
y[
1
[[
X
[1
[[
4-s-A ')/Z
_92P1
Agrogik
[[ %
op
''z- 2.5W /5
'-1 ..-2 gX
-7726.co
[[
-r--l
Z9'
,...'.2t)v)/ ..V
:C
el Ca
ZV
l
--_,[[
9l
IC)
,
Ii--1["
,--V00/)
e'.65
r--dico(-a
a.; ( .7:--bi x-T
PI
I629
____SC-V
/r(
0..: X T
r--1
.
°ST 4110
.,,.,--, 5'I
i----
q(- (12 00-W t L
-75, .),,,- Sy / .(,.Z/...--./
'1146 x '7.
[ VI
(C
-
01(7
--1/41II/
/,''. s 9..t
1---___.
t1
'
5,/(
I 5/A
/ ..)6,G
L9'9
t4:7
Vc'''
4-;o
-.7.,97f.:"
risve-tr:
z-tf,
____
Et
( [1C)
birffo/61 '1--'---c-------1-?2/1-1/
=1
43)[
1
.
EPA
a
c,,a rI
1
f1 tia72
_.
([1
"/71
c 2 G. 0/ S
L.-- - ,,_:E
0,7
I
1
21
1
I1
Q2
(1
(-01(
1e 40
Z L
C>
110-P
LI
-// C
-=
7.,7s ..-
p
_s.2-
k ,,--77.
c, .`)-7.cr:-
-z114
-of
[[
[[
g -1- ) /--a,7c_c-v.yo
[1
ID1A
ii_O
SZ[
i___[01V
arg- .
_2,6 , zc).),,,,/,[
1
[ lail./ A
/...s..,:,_%,--/
Ii
[I
0/
,-,i(7.zz-,,,
[1A
ggrak[[ .,w
5 es-7,6C
D/ A
ravih,,t<
nciraw
,,,,,1.1co(
i
,,,,,, ,_ /It D
I 40C7f..)
2z
n
fltr5227T
'--/
.-pc--"C
.....5
Ic
/1, iio/
-___--.i
H
:I_JIHS
£96 -5t- (-7
:J..va5g/
r77,:z.W
1V-
:Ay a
64.
The
cla
ss o
f iro
n is
25.
The
com
pany
is S
I.T
here
is a
cor
e in
the
mol
d.
127
.1
DA
Y:
-,..<
.e.2
1//)
t.e...
./c--
ft.t.
::1--
.
UH T E R Ct. I0
6 5
.
13S
DA
TE
:L
.5 7
/
3Zs-
--r
Dc-
4
II II
i'/Y
70 4
I/O
6
[C-1
1C-1
II
7.<
Se)
ZS
L
1o6
7
ap1,
1:/
(.)1
)/6
r.0)
ICJ
91)/
.501
1
SHIF
T:
[ [ Chi
co 1
2
)
6210
30.1
19
10
CD
E13
I1 I
15
-c3 ;,1
.0
/.Z/-
A02
--
I1
x
5'SZ
LI
/ lc)?
11
xa
2 zo
oo
I1
I1
:50
).30
I)
47
18
x
32 4
s--y
4 4
r?1
10_1
a6_
.7
I1
I
yL
Lx
c-If
2)
5eb
67 rs
9rt.s
-e4)
/al
eek
cd.if
f_
n/.C
-7)
'
7.7r
129
16 19 22 25
66.
The
ord
er is
to m
ake(
12an
olds
.T
he fl
ask
size
is 2
5 x
36.
The
pat
tern
num
ber
is 3
2410
.
131
132
u-,17P(ii -.- ROA -6 1$ 41 ........
t.*" MOD xrr1-4ZCI
U IN.1
lb
13 6 '.'
..&"L"\
Cs
AIL W
ii,
`).),.
143' x N
\3
Pst,
1 1!NI
N:i l''' \\
I
. ,-.
-4)
,;. re..\I
D
....., /.).j,
*"
L.
0 (i.i
,
gib NV .I. , .....,_, s, , 1
I 1\1 '''
..
....
'
a_
NI
?,.. tk,
N.
. N '
I
Ngi tIF
S._
(`'' N'
k'..,3
s
...: 0 ny
1 ',
1c
N
3r-c,
QI
`-'4
..)
!-- IN (A)
.11cel \ 1
(Al I 1, 1 '3,
's '.
N JA
IN ..%
-- .C-7-_A%
1 .
'
4
Z-C-=\ \ `---
'N
G..
Ci
ruN '
ic I')
- ic\--ei, P
N
a
'. t
'
,
\-1
oliY \
, ,.
w
-,
,...
, . ,
IF kj
Is
1, k`'
... Q.
. --
N.* 1Z. "'0 I
U"1 .-r ,:,.....d.\$_.....c.]
() a i I ' _
.
N. , -- --
^-1,1 :N
; .,
. %
M
I
, ..tci 1 /NY'
i'l
1
I
I
i
. , 1 '''
A..,.:,
;1 , f F( .. IV
'.',. b-I a'
fk--
s 1J ^-1"'S
61
. .S4
\-'
j;; i -4
, 0180. a ....
. c'
c,..., ,
I
1(r,
A 1
Cr
"P... V 5.
We Ai fr k* t .%
; ---..
t ."
-
.. (1 .. .. ''
\
,. '...
1
_ J
Ca/
The
follo
win
g qu
estio
ns w
ill h
elp
you
revi
ew th
e in
form
atio
n ab
out j
ob s
quar
es.
70.
Que
stio
ns a
bout
job
squa
res.
Dire
ctio
ns
Look
at t
he e
nlar
ged
job
squa
re o
n th
eop
posi
te p
age_
Cho
ose
the
corr
ect
answ
er. W
rite
the
lette
r of
you
r an
swer
in th
e bl
ank_
The
firs
t one
is d
one
for
you.
1.T
he c
lass
of i
ron
isa
.5.
The
pat
tern
num
ber
is
a.30
-Aa.
b.b.
c.63
1977
87c.
2.T
he c
ompa
ny is
a.Ic
)b.
TO
SH
c.D
ELC
O
3.is
ther
e a
core
in th
e m
old?
a.ye
sb.
noc.
can'
t tel
l
i 3 7
6319
7787
1%,
30-A
6.T
he o
rder
is to
mak
e
a.ol
dsb.
25 x
30
mol
dsc.
6319
7787
mol
ds
10
,..)
71.
e/co
3011
[1
L2.
S\
[c]
c).5
X#(
)
63/
77g7
Whe
n yo
u ha
ve fi
nish
ed, c
heck
your
ans
wer
s w
ith th
ose
on th
e ne
xt tw
o pa
ges.
72.
AN
SW
ER
SQ
uest
ions
abo
ut jo
b sq
uare
s
1.a.
Thi
s is
the
corr
ect a
nsw
er.
bol
ds a
re to
be
pour
ed.
c. 6
3197
767
is th
e pa
ttern
num
ber.
2.c.
Thi
s is
the
corr
ect a
nsw
er.
a. Id
mea
ns th
ere
is a
cor
e in
the
mol
d.b.
TO
SH
is th
e ab
brev
iatio
n of
Tos
hiba
Inte
rnat
iona
l Cor
p.
3.a.
Thi
s is
the
corr
ect a
nsw
er.
b. Ic
l mea
ns th
ere
is a
cor
e in
the
mol
d.c.
Icl m
eans
ther
e is
a c
ore
in th
e m
old.
4.b.
Thi
s is
the
corr
ect a
nsw
er.
a m
olds
are
to b
e m
ade.
c. 6
3197
787
is th
e pa
ttern
num
ber.
141
5.a.
Thi
s, is
the
corr
ect a
nsw
er.
b. in
iold
s ar
e to
be
mad
e.c.
30-
A is
the
clas
s of
iron
.
6.a.
Thi
s is
the
corr
ect a
nsw
er.
b. 2
5x30
is th
e fla
sk s
ize.
c. 6
3197
787
is th
e pa
ttern
num
ber.
1.42
L8LLZ
°-)
t/off'
'EL
a pip1-o
9
DT
M71
titu A
dj-py
14 0 !_re
04.S
5.tA
A
d.0
Jacrmyw
U 0 .41
il05s
oi
s
-9L
77:
You
hav
e co
mpl
eted
the
less
on.
Go
on to
the
next
pag
e to
ret
ake
the
quiz
you
sta
rted
this
boo
klet
with
, or
go b
ack
and
revi
ew th
e le
sson
bef
ore
reta
king
the
quiz
.
147
78.
QU
IZ 2
Usi
ng th
e sc
hedu
le o
n p.
79,
3. W
hat i
s th
e fla
sk s
ize
for
6. H
ow d
o yo
u kn
ow th
at a
job
is a
circ
le th
e an
swer
s yo
u th
ink
the
1st j
ob o
n F
loor
9&
10?
Hot
Job
?ar
e co
rrec
t.
The
firs
t one
is d
one
for
you.
1. H
ow m
any
jobs
are
sch
edul
edfo
r F
loor
3&
4?
6. 7
-)
b. 2
0c.
2
a. 2
5x30
b. 2
2x22
c. 3
0x30
a. th
e sq
uare
has
an
x th
roug
h it
b. th
e sq
uare
has
a s
tar-
A' i
n it
c. th
e sq
uare
is fi
rst o
n th
e ch
art
4. W
hat i
s th
e cl
ass
of ir
on fo
r7.
How
man
y jo
bs a
re s
ched
uled
the
1st j
ob o
n F
loor
5&
6?fo
r th
e H
UN
TE
R?
a. 2
0-s
b. 2
5c.
90
2. H
ow m
any
mol
ds s
houl
d be
mad
efo
r th
e 1s
t job
on
Flo
or 9
& 1
0?5.
Wha
t is
the
cast
ing
num
ber
for
the
1st j
ob o
n th
e H
unte
r?a.
25b.
184
c.95
a. 1
21-0
035
b. 3
00c.
20-
s
a.8
b.25
c.31
150
SZ6L9t
112
IIC)
EL
tZ
CZ
Li
I11
1
t1
OL
tI
(I
X
QL
q7-bi
a9)
1
dirt.,A
ct ry,2113
g-S-Vv/Pk
/-A()77T
eczC
.<
1II(
01
I
0/I
I
I1
CZ
CT
(I
-17--;
0//5 Z-''
Ipk1/2.50
c
(plIgx7/ A(ftpit
2.'(-7?"'
[i(L
7,)_1(1
hc,--s--2. ---'2,
(I(I
O
X
gt)bir9iog
---Y
-Xcr/Z
r
CI)17a
1-Pt --I
I
It
1I
1
7f2..swo
_61(
Ioss2
P 1
Fitc
6 L
(III
I
(09 4109 2 x.:5-2-
44,
(1
t1
111L.
PIII
SZ,
k
410
/'1/
///,Q
S /U
fa/
e
-11471777)-lz-
/v--P-
ocx
c Or
//--S.E
..W
[I
tlcr:
I1
t1
45k'
00/
101f
0
0Z
C
/P.?
plyb_s zI
1
/025/02 90
I77
07
(171CO
L?? z/
PI
CO
/1) xit/1St/I1
0.zbA,s'es7o6
tvi
(
9<
CI
PCN
37.
(-21cDI
-r-1/7-
I
C'
c;fr
it=1"
d
1-.D1
83
I4a)---
CU
T?
nt
H
*---Ar7V
1-72j--7 ;WO
4610
/A-5/-5 aIN
G5g1
81.
Check the next page for the correct answers to the quiz.
82.
AN
SW
ER
S
1. H
ow m
any
jobs
are
sch
edul
edfo
r F
loor
3&
4?
a.7
b. 2
0c.
2
4. W
hat i
s th
e cl
ass
of ir
on fo
r th
e7.
How
man
y jo
bs o
re s
ched
uled
1st j
ob o
n F
loor
5&
6?fo
r th
e H
UN
TE
R?
a. 2
0-s
b. 2
5c.
90
2. H
ow m
any
mol
ds s
houl
d be
mad
e5.
Wha
t is
the
cast
ing
num
ber
for
for
the
1st j
ob o
n F
loor
9&
10?
the
let j
ob o
n th
e H
unte
r?
a.25
b. 1
84c: 3.
Wha
t is
the
flask
siz
e fo
r th
e1s
t job
on
Flo
or 1
82?
a., 2
5x30
b. -
22-R
22c.
30x
30
a. 1
21-0
035
b. 3
00c.
20-
s
6. H
ow d
o yo
u kn
ow th
at a
job
is a
Hot
Job
?
a. th
e sq
uare
has
an
X th
roug
h it
(-b.
._ th
e sq
uare
has
a s
tarf
rfifi
tc.
the
squa
re is
firs
t on
the
char
t
(a.
8b.
25
c. 3
1
156
155
JOBS
A PARTNERSHIP BETWEEN EDUCATION AND INDUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON FOUNDRY, INC.1992
LESSON 2THE CORE ROOM
ROBERT E. STONE WRITTEN BY:PROJECT DIRECTOR SANDRA MANN,205 234 6346 INSTRUCTOR/COUNSELOR
205 329 6481 EXT. 81
In the following lesson on the CORE ROOM you will learn about thetwo kinds of cores used at Robinson Foundry.
First, take the quiz on the next page to see what you already know.
CORE ROOM QUIZ 1
DIRECTIONS
Circle the answer you think is correct.
The first one is done for you.
1. How is sand made into a core?
a. It is sifted and packed into a core box.b. It is rammed and packed into a core box.(c.) It is chemically bonded and packed into a core box.
2. Why are cores put in castings?
a. To make the surface finish good.b. To make the outside dimensions accurate.c. To make a hollow space inside the casting.
3. How are Airset cores made?
a. They are made with chemically bonded sand whichhardens when air hits it.
b. They are made with chemically bonded sand whichhardens when the heat of a cast iron core boxactivates the resin.
4. How can you tell if a Shell core is strong?
a. Weigh itb. Look at the color.c. Measure it.
5. How can you tell Airset and Shell cores apart by color?
a. Airset is yellow and brown; Shell is off-white.b. Airset is off-white; Shell is yellow and brown.
6. If you needed cores that were good for detail and dimensionalaccuracy, which would you pick?
a. Airsetb. Shell
159
Most trainees don't know all the answers to the quiz you've justtaken, but after you read the passages and answer the questions onthe following pages, you'll know a lot more about the CORE ROOM.
At the end of the lesson you'll take a quiz and see your scores forboth times.
10
CORE ROOM
The Core Room makes the cores needed for Green Sand castings.Sand is chemically bonded together and packed into a core box toform a shape. The shape, or core, is placed inside the green sandmold. When molten iron is poured into the mold, the sand part doesnot fill up. Instead, there is a hollow shape inside the castingin the exact shape of the core.
There are two processes used in the production of packed sandcores. One process makes an Airset core. The other process makesa Shell core.
**ANSWER THE FOLLOWING QUESTIONS**
DIRECTIONS
Chose the correct answer. Circle the letter of your answer.
1. What is the passage mostly about?
a. How cores are made.b. Core set-up for Green Sand Castings.c. Airset cores.
2. What are the two types of cores made in the core room?
a. Bonded and Packed.b. Airset and Shell.c. Molten and Hollow.
3. Why are cores needed in casting?
a. To make a hollow space inside a casting.b. To make gating for Green Sand molds.c. To chemically bond sand.
CHECK YOUR ANSWERS ON THE NEXT PAGE.
161
ANSWERS
1. a. This answer is correct.
b. This is not mentioned in the passage.c. Airset is mentioned; however, the passage
talks about more information than justairset cores.
2. b. This answer is correct.
a. Bonded and packed are words describing howcores are made. They do not name thetwo types of cores.
c. Molten is a word which is used to describeiron. It is not about cores.
Hollow is used to tell the shape of the insideof a shell core. It is not the type of core.
3. a. This answer is correct.
b. This is not mentioned in the passage.c. To chemically bond sand is how cores are made,
not why they are needed in castings.
1C2
Airset
Airset cores harden when air hits them. They are make fromchemicals and sand grains mixed together and heated in the mixingmachines.
Airset sand is mixed in two different-sized mixing machines.The 150 mixer prepares sand for the smaller cores. The chemicalbalance and temperature help the sand mixture harden quickly.
The 300 mixer prepares sand for larger cores. The sand fromthe 300 machine sets slower because the cores ara so much bigger.
Airset cores are solid. They are generally made in bodieswhich are glued together at the glue-up table. The glue seams aresealed to keep the hot iron from melting the glue seam.
Airset cores are off-white in color. They are generally notdesigned for use in castings that need a good surface finish or ahigh degree of dimensional accuracy. They tend to swell as theyset up. The swelling can make the dimensions of the castings bewrong and can cause defects.
Shell Core
Shell cores are made of resin coated sand. Heat bonds thegrains of sand. The sand comes to Robinson with the resin areadyadded.
Shell cores are made in machines which have cast iron coreboxes. An operator fills the core box with sand. The heat of thecore box activates the resin and bonds the sand to make a core.
Shell cores can be solid or hollow. If the core is not heatedlong enough, there will be a hole in the bottom. Any un-bondedsand will drain out and leave a hollow core.
The color of the Shell core is an indicator of its quality.The darker the Shell core is "cooked" without burning it black, thestronger the core will be. The strongest core is a dark brown.
Shell cores are good for castings requiring detail anddimensional accuracy.
1C3
**ANSWER THE FOLLOWING QUESTIONS**
DIRECTIONS
Choose the correct answer. Circle the letter of your answer.
1. After reading the passage about Airset and Shell cores, youshould be able to the difference between the cores by lookingat the...
a. sizeb. colorc. shape
2. If you needed cores that were good for detail and dimensionalaccuracy, you would pick...
a.b.
Airset coresShell cores
3. If you needed a very strong Shell core, which would you pick?
a. A light yellow oneb. An off-white onec. A dark brown one
4. Casting Number 9804 needs a hollow core. Which would you sendto the Green Sand Pallet line?
a. Airsetb. Shell
5. Core Number 405926 is a very large Airset core. Which sandmixer would you use to make this core?
a. 150b. 300
6. If you put resin-coated sand in a heated cast iron core box,what would you get?
a. An Airset coreb. A Shell core
7. After reading the lesson about the Core Room you should knowthat cores are...
a. only mixed in the 300 machine.b. made from chemically bonded sand.c. always solid.
CHECK YOUR ANSWERS ON THE NEXT PAGE.
164
Answers
1. b. This answer is correct.
a. The passage does not mention the size of the cores.b. The passage does not mention the shape of the cores.
2. b. This answer is correct.
a. Read the last paragraph about Airset Cores. You willlearn why airset cores are good for detail anddimensional accuracy.
3. c. This answer is correct.
a. Read the passage about Shell cores. It explains thatthe strongest Shell cores are dark brown.
b. Airset cores are off-white.
4. b. This answer is correct.
a. Airset cores are solid.
5. b. This answer is correct.
a. The 150 machine makes small cores.
6. b. This answer is correct.
a. Airset sand does not have resin. Airset sand is heatedand mixed in a mixing coaching, not a core box.
7. b. This answer is correct.
a. The 300 machine is only for large Airset, not allcores.
c. Airset cores are solid, but Shell cores are hollow.
105
FOCUS ON VOCABULARY
As you were reading the lesson, did you find words you didn't know?You could have gone to the dictionary to find the meaning of thestrange word OR you could have guessed the word by looking atthe other words around it.
This is called "looking at the CONTEXT of a word".
CONTEXT is the rest of the sentence or paragraph.
Let's look at a sentence from the lesson and see if you can figureout the meaning of an underlined word by looking at the rest of thesentence.
"When molten iron is poured into the mold, the sandpart does not fill up."
In the sentence, molten is in front of iron.what kind of iron is being used.
The next part of the sentence tells you thatthe mold.
You should ask yourself, "What form doeshave to pour it?"
Your answer should be, "A liquid!"
You have figured out that molten means liquid iron. You did thatby looking at the rest of the sentence and asking yourselfquestions.
It is telling you
iron is poured into
iron have to be if you
Now, try your new skill with the questions on the next page!
16
DIRECTIONS
Choose the correct answer. Circle the letter of your answer.
1. What is the meaning of generally in the sentence below?
Airset cores are generally not used in castings that need ahigh degree of dimensional accuracy.
a. most of the timeb. having high rankc. belonging to all persons
2. What is the meaning of bonded in the sentence below?
Sand is chemically bonded together and packed into a corebox to form a shape.
a. a written agreementb. stuck togetherc. a note of debt that is due
3. What is the meaning of activates in the sentence below?
The heat of the core box activates the resin and bonds thesand to make a core.
a. to place on active military dutyb. to cause something to start working
4. What is the meaning of indicator in the sentence below?
The color of a Shell core is an indicator of its quality.
a. a pointer on an instrumentb. something that points out or makes knownc. a by-product
5. What is the meaning of process in the sentence below?
One process makes an Airset core.
a. court summonsb. lines of things moving alongc. a way of doing something
CHECK YOUR ANSWERS ON THE NEXT PAGE.
/
I CS
ANSWERS
1. a. This answer is correct.
b. Rank has nothing to do with castings or dimensionalaccuracy.
c. The sentence is not about people or ownership.
2. b. This is the correct answer.
a. A bond can be a written agreement; however, in thesentence bonded is before the word together. Theword is not used to talk about an agreement.
b. A bond can be a debt that is due; however, in thesentence bonded is not used to talk about debt.It is used to show how sand is put together to makea core.
3. b. This answer is correct.
A. The word activates is used to show what the heat of thecore box does. Military duty is not discussed in thesentence.
4. b. This is the correct answer.
a. An indicator can be a pointer on an instrument;however, the sentence does not discuss instruments.
b. The color of a Shell core shows how good it is. Thecolor is not a by-product.
5. c. This answer is correct.
a. A court summons can be processed; however, it hasnothing to do with making Airset cores.
b. A line of things moving along has nothing to do withmaking Airset cores.
You have completed the lesson.
Go on to the next page to retake the quiz you started this bookletwith, or go back and review the lesson before taking the quiz.
170
CORE ROOM QUIZ 2
DIRECTIONS
Circle the answer you think is correct.
The first one is done for you.
1. How is sand made into a core?
a. It is sifted and packed into a core box.b. It is rammed and packed into a core box.(c.) It is chemically bonded and packed into a core box.
2. Why are cores put in castings?
a. To make the surface finish good.b. To make the outside dimensions accurate.c. To make a hollow space inside the casting.
3. How are Airset cores made?
a. They are made with chemically bonded sand whichhardens when air hits it.
b. They are made with chemically bonded sand whichhardens when the heat of a cast iron core boxactivates the resin.
4. How can you tell if a Shell core is strong?
a. Weigh itb. Look at the color.c. Measure it.
5. How can you tell Airset and Shell cores apart by color?
a. Airset is yellow and brown; Shell is off-white.b. Airset is off-white; Shell is yellow and brown.
6. If you needed cores that were good for detail and dimensionalaccuracy, which would you pick?
a. Airsetb. Shell
171
;
Check the next page for the correct answers to the quiz.
1 '7 e,1 I 4
ANSWERS
1. This one is done for you.
2. c. This answer is correct.
a. Airset cores are not used in castings that need a goodsurface finish; therefore, this cannot be the correctanswer.
b. The reading passage does not mention outside dimensions.
3. a. This answer is correct.
b. This is how Shel4 cores are made.
4.. b. This is the correct answer.
a. The passage does not mention weighing castings.b. The passage does not mention measuring castings.
5. b. This answer is corect.
a. Read the parts of the passage which tells about thecolor of each shell.
6. b. This is the correct answer.
a. Read the passage about Airset cores. They swell asthey set up. This can make a casting have a defect.
JOBS
A PARTNERSHIP BETWEEN EDUCATION AND INDUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON FOUNDRY, INC.1992
LESSON 3
THE CORE ROOM
ROBERT E. STONE, WRITTEN BY:PROJECT DIRECTOR BETH MAXWELL,205 234 6346 INSTRUCTOR
205 329 8481 EXT. 81
WORD LIST
I. CORE
2. MOLD
3. FLASK
4. SAND
5. CASTING
6. GREEN SAND
7. EPS
8. FINS
CORE ROOM
1 7F)
CORE ROOM
Willie works in the core room. He helps make cores to go
inside a mold. The molds are placed in a flask. The sand in the
mold makes the form of the casting. The casting comes from
Green Sand or EPS process. Fins are found on some castings.
Circle the following words in the passage:
1. core
2. mold
3. flask
4. sand
5. casting
6. Green Sand
7. EPS
8. fins
ft)
CORE ROOM
Willie works in the room. He helps make to go
inside a . The are placed in a . The
in the makes the form of the . The
comes from or process. are found
on some
Word List:
1. core
2. mold
3. flask
4. sand
5. casting
6. Green Sand
7. EPS
8. fins
1P,: ...e
i I
"C'e
leiNP
O;)Is/ V
7-1.)-7.6.7
491)."' V 7 1,C;S
'
SV
OV
s1.7"c"."
S -4?.9.7" V 7'
core care core cure coremold mold mill mild mildscrap scrape scrap script scrapsand sand send sand sunfin fan fin find finblast blend blast blow blastslag slag sling slag slightsafety safe safety sift safetyEPS EPS EPC EPS EPTcasting case casting cast castingdefect defect defeat defeact deflateflask flake flask fact flaskaccident accident accurate accident occurepattern path pattern petals pattern
Words -- circle the matching words.
1.
',REACTIVITY FOR A to Z
st2. b d
3. j k4. x z
5. m n
6. f g7. o p8. h j9. p r10. v w
11. a b12. j k13. d f14. x y15. g h16. s u
17. n p
18. e f19. h I.
20. t u
.1 `,..... 0
PREACTIVITY FOR ALPHABETICAL ORDER
1. FLASK
2. ACCIDENT
3. CORE
4. SAND
5. PATTERN
1. MOLD
2. SLAG
3. FIN
4. EPS
5. CASTING
1. DEFECT
2. SCRAP
3. BP
4. SAFETY
5. HAMMER
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
1E1
FIND THE DEPARTMENTS ON THE MAP
1. Personnel and Lab
2. Supply
3. Cleaning Room
4. Shipping
5. Pattern Shop
6. Iron Melting
7. EPS
8. Green Sand
9. Disa
10. Core Room
11. Storage
12. Storage
13. Maintenance
14. Security
I
W 002J0
(i\Pur
"Pk,f+L
iflj
JOBS
A PARTNERSHIP BETWEEN EDUCATION AND INDUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON FOUNDRY, INC.1992
LESSON 4FIGURING TIME
ROBERT E. STONE WRITTEN BY:PROJECT DIRECTOR SANDRA MANN,205 234 6346 INSTRUCTOR/COUNSELOR
205 329 8481 EXT. 81
In the following lesson on Figuring Time you will learn how to workwith time problems.
First, take the quiz on the next page to see what you already know.
L.
TIME PROBLEMS-QUIZ 1
1. Jessie Tolison's shell core machine broke down for 44 minutesand was out of sand for 10 minutes. The power was off for 17minutes. What is his total DOWN TIME for that day?
a. 1 hour and 5 minutesb. 1 hour and 11 minutesc. 75 minutesd. none of the above
2. Derrick Spivey worked 2 hours and 37 minutes overtime onMonday and 1 hour 53 minutes overtime on Tuesday. Howmuch is his OVER TIME for both days?
a. 4 hours and 30 minutesb. 3 hours and 87 minutesc. 3 hours and 60 minutesd. None of the above
3. At 6:51 the Melt Deck ran out of iron. James McCoy needed topour castings but he has to wait for iron. It's 8:10 before hegot any iron. How long did he wait?
a. 1 hour and 45 minutesb. 2 hoursc. 1 hour and 19 minutesd. none of the above
4. Celso Cruz works from 10:35 pm to 6:15 am every day. How manyhours is he at work?
a. 7 hours and 40 minutesb. 6 hours and 35 minutesc. 8 hours and 10 minutesd. none of the above
5. Howard Marcantel goes to work at 4:40 am and gets off at1:15 pm. He takes 45 minutes for lunch and takes two 10minute GatorAde breaks. How many hours a day does heactually work?
a. 7 hours and 50 minutesb. 8 hoursc. 7 hours and 30 minutesd. none of the above
6. Jay Edmondson goes to work at 4:10 am and works 9 hours and15 minutes. What is his quitting time?
a. 1:45 pmb. 2:30 pmc. 1:25 pmd. none of the above
1L7
TIME PROBLEMS AT ROBINSON FOUNDRY
An important job skill is to be able to fill out theoccupational forms used in your department. Many occupationalforms are used to record the amount of work which has been done ina certain amount of time.
These forms are called PRODUCTION FORMS. In order tocorrectly fill out productions forms, you must be able to writeclock time.
If your work is stopped for some reason, you have to write theamount of DOWN TIME. This means you must be able to add andsubtract time.
This booklet will show you quick and easy ways to figure timeproblems in your work.
ADDING TINE
Here is an example of writing DOWN TIME on a Robinsonproduction form:
Suppose your molding machine broke down for 15 minutes. Thenthe power went off for 12 minutes. Next, you took a break for10 minutes.
What will you write for your total DOWN TIME?
Add the minutes together like this
15 minutes12 minutes10 minutes <
37 minutes
NOW TRY THIS ONE!
It takes you 40 minutes to eat lunch. You take two 10 minutebreaks. You are out of iron for 35 minutes.
What will you write for TOTAL DOWN TIME?
Add the minutes like this:
40 minutes10 11
10+ 35
95 minutes
95 minutes is the right answer---however---you must writeDOWNTIME in hours and minutes.
Look below to see how to do this:
Divide the minutes by 60 (minutes in an hour).
1 > number of hours
60 I 95- 60
35 > number of minutes
You would write 1 hour and 35 minutes for DOWN TIME.
Change these minutes into hours and minutes:
a.b.c.d.e.
857692
14765
CHECK YOUR ANSWERS ON THE NEXT PAGE
n.4- al ti
ANSWERS
a. 1 hour and 25 minutesb. 1 hour and 16 minutesc. 1 hour and 32 minutesd. 2 hour and 27 minutese. 1 hour and 5 minutes
If you do not understand why these answers are correct,ask your teacher for help.
MORE ADDING PROBLEMS
Suppose you worked overtime 3 afternoons this week. You worked1 hour and 25 minutes on Monday. You worked 2 hours and 10minutes on Tuesday. You worked 1 hour and 15 minutes onWednesday.
How can you find out the total amount of overtime you haveworked this week?
DO IT LIKE THIS
1:252:10
+ 1:15
4:50
**You worked 4 hours and 50 minutes**
1b2
LET'S TRY ANOTHER PROBLEM
Suppose you worked 1 hour and 45 minutes overtime on Monday.Then you worked 1 hour and 45 minutes overtime on Tuesday.
How much time did you have in overtime pay?
* * * If you add your time like this
1:45+ 1:45 <
2:90
* * *
Your answer is correct,but it just doesn't look right!
Your minutes have added up to more then an hour.WHAT DO YOU DO NOW?
Divide the minutes by 60 (minutes in an hour)
1 > 1 hour and 30 minutes
60 190-60
30 <
Now add Thour and 30 minutes to 2:00
2:00+ 1:30
3:30
*** You have 3 hours and 30 minutes in overtime pay! ***
SUBTRACTING TIME
Let's do problems with subtracting time.
The Muller breaks down at 10:47 am. You can't run your moldingmachine without sand. The Muller isn't fixed until 11:15 am.
How much DOWN TIME should you write on the Molding productiosheet?
*** You could write the problem like this
11:15- 10:47
But that won't work!You can't subtract 47 from 15.
* * *
Look at the problem worked like this:
Borrow an hour11:15
- 1:00
10:15
Change the hour to 60 minutes and add back to 10:15
10:15+ :60
10:75
NON you can subtract 10:47 and find the DOWN TIME.
10:75- 10:47
:28
*** You will write 28 minutes as your DOWN TIME. ***
154
Let's do a few more of these problems
1. You work in the cleaning room at a grinding booth. TodayRoy Watts sent you a pallet of castings with the number63196008. You start grinding at 2:43. By 5:06 you only had 5castings ground.
How long did it take you to do that work?
a. 3 hours and 5 minutesb. 2 hours and 23 minutesc. 1 hour and 47 minutesd. none of the above
(Did you remember to "borrow" 60 minutes?)
2. You work in EPS Assembly. Rick Johnson brings you a box offoam patterns to assemble. You begin at 7:00 am. Normally,you get through with this box by 7:50 am. Today you work until8:23 am.
How much extra time did you spend working on this box?
a. 45 minutesb. 1 hour and 23 minutesc. 33 minutesd. none of the above
CHECK YOUR ANSWERES ON THE NEXT PAGE
ANSWERS
1. The correct answer is b. Work the problem like this:
Step 1. 5:06 You can't subtract this problem.-2:43
Step 2. You have to borrow an hour from 5:06.
5:06-1:004:06
Step 3. Change the hour to 60 minutes and add it backto 4:06
4:06+ :604:66
Step 4. NOW you can subtract 2:43 from 4:66 and findthe time.
4:66- 2:43
2:23
Step 5. Write the answer as 2 hours and 23 minutes.
2. The correct answer is c. Work the problem like this:
Step 1. 'et up the problem.
8:23- 7:50
Step 2. Change 8:23 by borrowing an hour and adding itback as 60 minutes.
8:23- 1:00
7:23
7:23Then do this: + :60
7:83
Step 3. NOW you can subtract and find the extra time.
7:83 new finishing time- 7:50 normal finishing time
33 minutes extra time spent of the box.
Let's look at another problem involving SUBTRACTING TIME.
Suppose you work from 6:15 am to 2:00 pm.
How long are you at work?
* * * You could write the problem like this.
2:00 pm- 6:15 am----
* * *
But that won't work!You can't subtract a large number from a smaller number.
TRY THIS
Change your quitting time to a number that is large enough toallow you to subtract your starting time. You can do that byadding your quitting time to 12:00 noon...just like this.
12:00 noon+ 2:00 pm (quitting time) <
14:00 pm (NEW quitting time)
*** NOW write the problem like this ***
14:00 pm = (don't forget to borrow) = 13:60 pm- 6:15 am - 6:15 am
Olw7:45
You are at work 7 hours and 45 minutes!
TRY IT AGAIN!
1. You go to work in EPS at 8:05 am. You get off early at1:15 pm.
How many hours did you work today?
a. 5 hours and 10 minutesb. 5 hours and 20 minutes=. 4 hours and 55 minutesD. none of the above
2. You start work in the Core Room at 4:43 am and quit work at1:25.
How long did you work today?
a. 9 hours and 10 minutesb. 8 hours and 42 minutesc. 8 hours and 18 minutesd. none of the above
3. You are working overtime at the Cleaning Room. You start workat 4:10 am and you regulary get off at 12:15 pm. However,today you work until 2:23 pm. Answer the following questionsabout your time at work:
(a) How many hours did you work today?(b) How many hours do you work without overtime?(c) How much overtime did you work today?
CHECK YOUR ANSWERS ON THE NEXT PAGE
128
ANSWERS
1. The correct answer is a.
2. The correct answer is b.
3. The correct answer is:
a. 10 hours and 13 minutesb. 8 hours and 5 minutesc. 2 hours and 8 minutes
If you do not understand why these answers arecorrect, ask your teacher for help.
0 C._a_ ti
OTHER TIME PROBLEMS
Let's look at another type of time problem.Sam Huntley came to work at 7:10 am. He hid behind the CoreRoom and took 35 minutes to eat 2 steak biscuits. He watchedRobert Angle rake leaves for 30 minutes. He hid in Annette'soffice for 15 minutes and drank a cup of coffee. He went homeat 2:45 pm.
How many hours did Sam actually work today?
DO IT LIKE THIS
Add the "goof-off" time----> 35 minutes30 "
+ 15 "
80 I I
Chan 80 minutes to hours and minutes----> 1 hour and 20 minutes
Find how how long Sam was at Robinson--->
(1) 2:45 (quitting time)+ 12:00 noon
14:45 (new quitting time)
(2) 14:45 (new quitting time)- 7:10 (starting time)
7:35 Hours at Robinson
Subtract the DOWNTIME (the "goof-off" time) from the hours he wasat Robinson
7:35 (hours he was at Robinson)- 1:20 ("goofing-off" time)
6:15
Sam actually worked 6 hours and 15 minutes!
,
Let's look at another TIME PROBLEM.
1. If you go to work at 6:10 am and work 8 hours, what will beyour quitting time?
DO IT LIKE THIS:
step 1. 6:10 am (starting time)+ 8:00 (hours at work)
14:10 pm (quitting time)
stlp 2. 14:10 pm-12:00 noon
2:10 pm (quitting time in clock time)
Your quitting time is 2:10!
TRY THIS ONE!
You come into EPS at 5:30 and start work. Joe Clark comes byand tells you that you have to work 10 hours and 45 minutestoday.
This if fine with you because you need the extra overtime;however, you carry riders in your car. They only have to work8 hours today.
1. What time will you L.0 11 your riders that you will be leavingwork?
a. 3:76 pmb. 2:45 pmc. 4:15 pm
2. If your riders went to work at 5:30 and worked 8 hours, howlong will they have to wait for you after they get off work?
a. 2 hours and 45 minutesb. 3 hoursc. 4 hours and 15 minutes
CHECK YOUR ANSWERS ON THE NEXT PAGE
Ao°04r-'
ANSWERS
1. The correct answer is b.
2. The correct answer is a.
If you do not understand why these answers arecorrect, ask your teacher for help.
You have completed the lesson.
Go to the next page to take a practice quiz to see how well youhave learned to figure time.
Check your answers to see if you need to review the lesson beforeyou take the last quiz.
2C 4
TIME PROBLEMS Practice Quiz
1. James Baggett's molding machine broke down for 27 minutes. TheMuller stopped for 35 minutes and he couldn't get sand. Apattern change took 25 minutes.
What is his total DOWNTIME for the day?
a. 1 hour and 10 minutesb. 1 hour and 27 minutesc. 1 hourd. none of the above
2. Charles Mather worked 1 hour and 53 minutes overtime onWednesday and 2 hours and 43 minutes overtime on Thursday.
How much is his overtime for both days?
a. 4 hours and 36 minutesb. 4 hours and 15 minutesc. 3 hours and 67 minutesd. none of the above
3. Harry Brown runs the Hunter molding machine. He had towait from 6:54 am to 8:17 for sand.
How long did he wait?
a. 2 hours and 3 minutesb. 1 hour and 23 minutesc. 2 hoursd. none of the above
4. Rose Ware works from 4:40 am to 1:13 pm.
How many hours a day is she at work?
a. 9 hours and 13 minutesb. 7 hours and 45 minutesc. 8 hours and 33 minutesd. none of the above
205
5. Wayne Browning goes to work at 5:48 am and gets off at 2:10 pm.He takes 35 minutes for lunch anu takes two 15 minute breaks.
How many hours a day does he actually work?
a. 6 hours and 13 minutesb. 7 hours and 17 minutesc. 8 hours and 22 minutesd. none of the above
6. Tommy Green goes to work at 4:17 am and works 10 hours and 35minutes.
What is his quitting time?
a. 3:10 pmb. 2:52 pmc. 2:18 pmd. none of the above
**CHECK YOUR ANSWERS ON THE NEXT PAGE**
2C6
ANSWERS
1. The correct answer is b.
2. The correct answer is T.
3. The correct answer is b.
4. The correct answer is c.
5. The correct answer is b.
6. The correct answer is b.
If you missed many of these questions, ask your teacher tohelp you find the places in the lesson you need to review.
If you are ready, go the the next page and retake the quizyou took when you started this booklet.
TIME PROBLEMS-QUIZ 2
1. Jessie Tolison's shell core machine broke down for 44 minutesand was out of sand for 10 minutes. The power was off for 17minutes. What is his total DOWN TIME for that day?
a. 1 hour and 5 minutesb. 1 hour and 11 minutesc. 75 minutesd. none of the above
2. Derrick Spivey worked 2 hours and 37 minutes overtime onMonday and 1 hour 53 minutes overtime on Tuesday. Howmuch is his OVER TIME for both days?
a. 4 hours and 30 minutesb. 3 hours and 87 minutesc. 3 hours and 60 minutesd. None of the above
3. At 6:51 the Melt Deck ran out of iron. James McCoy needed topour castings but he has to wait for iron. It's 8:10 before hecot any iron. How long did he wait?
a. 1 hour and 45 minutesb. 2 hoursc. 1 hour c..nd 19 minutesd. none of the above
4. Celso Cruz works from 10:35 pm to 6:15 am every day.hours is he at work?
a. 7 hours and 40 minutesb. 6 hours and 35 minutesc. 8 hours and 10 minutesd. none of the above
How many
5. Howard Marcantel goes to work at 4:40 am and gets off at1:15 pm. He takes 45 minutes for lunch and takesminute GatorAde breaks. How many hours a day does
twohe
10
actually work?
a. 7 hours and 50 minutesb. 8 hoursc. 7 hours and 30 minutesd. none of the above
6. Jay Edmondson goes to work at 4:10 am and works 9 hours and15 minutes. What is his quitting time?
a. 1:45 pmb. 2:30 pmc. 1:25 pmd. none of the above
2CS
1. The correct answer is b.
2. The correct answer is a.
3. The correct answer is c.
4. The correct answer is a.
5. The correct answer is c.
6. The correct ahswer is c.
ANSWERS
r) r Q4 I.- .7
JOBS
A PARTNERSHIP BETWEEN EDUCATION AND INDUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON FOUNDRY, INC.1992
LESSON 5
THE CLEANING ROOM
ROBERT E. STONE, WRITTEN BY:PROJECT DIRECTOR BETH MAXWELL,205 234 6346 INSTRUCTOR
205 329 8461 EXT. 812 :
WORD LIST:
i. Cleaning Room
2. grind
3. casting
4. core
5. sand
6. mold
7. fins
8. Green Sand
9. EPS
10. defects
11. scrap
12. safety
13. Jessie
CLEANING ROOM
211
CLEANING ROOM READING
Jessie works in the cleaning room in the foundry His job
is to grind castings to finish casting for shipping. The core and
sand have already been removed from mold of casting. Jessie must
be very careful with fins on castings. They can easily break off.
The cleaning room puts finishing touches on castings from Green
Sand as well as EPS. In the cleaning room Jessie must notice
castings to make sure there is no defects. Defects on castingsmeans the castings must be considered scrap and must be remelted.
safety is very important in the cleaning room. There is blowing
particles from large blowers in the cleaning room. There is a
great deal of noise in the cleaning room. A worker in the cleaning
room must wear safety glasses, earplugs, and steel toed shoes.
Circle the words in the reading above:
1. cleaning room2. grind3. casting4. core5. sand6. mold7. fins8. Green Sand9. EPS10. defects11. scrap12. safety13. Jessie
4,14,;Th
Cleaning Room Reading
Fill in missing words:
Jessie works in the room in the
foundry. His job is to
to finish for shipping. The
and have already been removed from of
. Jessie must be careful with
on . They can easily break off. The
room puts finishing touches on
from as well as
. In the room Jessie must notice
to make sure there is no
on means they must be
considered and must be remelted.
is very important in the room. There is
blowing particles from large blowers in the
room. There is a great deal of noise in the
room. A worker in the cleaning room must
wear glasses, earplugs, and steel toed shoes.
Fill in missing:
an r in s d
cl ni g o m s ncenn ro nd
ani om salaigom an
nd
gri
m 1
ld
ato
m d
ol
ting
c t g f n
csigt g in
cas
c r
re
co
c e
o e
or
Gr n S n
G nSdGenSn
en Sa
Gre d
21 4
1. st2. b d
3. j k
4. x z
5. m n
6. f g
7. o p
8. h j
9. p r
10. v w
11. a b
12. j k
13. d f
14. x y
15. g h
16. s u
17. n p
18. 0 f
19. h i
20. t u
fn:Beth\alpha
PREACTIVITY FOR A to 2
0140.11.4.)
PREACTIVITY FOR ALPHABETICAL ORDER
1. FLASK 1.
2. ACCIDENT 2.
3. CORE 3.
4. SAND 4.
5. PATTERN 5.
1. MOLD 1.
2. SLAG 2.
3. FIN 3.
4. EPS 4.
5. CASTING 5.
1. DEFECT 1.
2. SCRAP 2.
3. BP 3.
4. SAFETY 4.
5. HAMMER 5.
FN:BETH\ALPHA2
2
FIND THE DEPARTMENTS ON THE MAP
1. Personnel and Lab
2. Supply
3. Cleaning Room
4. Shipping
5. Pattern Shop
6. Iron Melting
7. EPS
8. Green Sand
9. Disa
10. Core Room
11. Storage
12. Storage
13. Maintenance
14. Security
and
Col
or2r
ec,i1
-1
Pa4-
4n
Sloe eD
.RV
I)1,
S
S
Sam
ci
Cor
e (Roo
m
Ro6
inSo
nFo
tkcl
-ni
2
JOBS
A PARTNERSHIP BETWEEN EDUCATION AND INDUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON FOUNDRY, INC.1992
LESSON 6
THE EPS PROCESS
ROBERT E. STONE WRITTEN BY:PROJECT DIRECTOR SANDRA MANN,205 234 6346 INSTRUCTOR/COUNSELOR
205 329 0481 EXT. 81
In the following lesson on The EPS Process you will learnhow EPS castings are made.
First, take the quiz on the next 2 pages to see what youalready know.
221
EPS - -Quiz 1
DIRECTIONS
Circle the answer you think is correct. The first one is done foryou.
1. What does EPS mean?
a. Exothermic Polystyrene Styrofoamb. Expandable Process Styrofoam{c.} Evaporated Polystyrene System
2. How old is the "lost foam" process?
a. over 3000 years oldb. over 300 years oldc. over 30 years old
3. What are EPS patterns made of?
a. excess styrofoamb. expandable polystyrene beadsc. iron, aluminum, plastic, or wood.
4. Which of the following is an important part of the foamassembler's job?
a. Making a strong glue seam between the pattern andthe gating.
b. Making sure the pattern is completly covered bythe coating.
c. Setting the sprue correctly.
5. Why are EPS patterns dipped in a coating?
a. To keep the styrofoam from melting.b. To eliminate mold wall movement.c. To keep the iron from touching the sand when the
iron is poured.
222
6. Why is EPS called "Lost Foam"?
a. Because EPS castings have fewer defects and have"lost" the need for grinding.
b. Because the pattern evaporates when the molteniron hits it.
c. Because EPS castings have "lost" the extra metalsuch as the parting line.
7. Why are EPS castings better than Green Sand castings?
a. Tolerance bands are higher.b. Better dimensional accuracyc. Sand binders eliminate gas defects.
Most trainees do not know all the answers to the quiz you'vejust taken, but after you read the passage and answer thequestions on the following pages, you'll know a lot more aboutthe EPS process.
At the end of the lesson you'll take a quiz and see yourscores for both times.
flAC44
r-,. i,
EPS...The "Lost Foam" Process
EPS stands for Evaporated Polystern System. This new way ofmaking castings was invented by H. F. Shroyer in 1958. Castingsare made by pouring molten metal into styrofoam patterns.
This is a new way of making castings. The Green Sand way ofmaking castings is thousands of years old.
Robinson began making EPS castings in 1984. The process isstill new, and Robinson is still making improvements,
***ANSWER THESE QUESTIONS***
DIRECTIONS
Circle the letter of your answer choice.
1. What is the passage mainly about?
a. EPS is a new way of making castings.b. H.F. Shroyer invented EPS in 1958c. EPS castings are made out of styrofoam.
2. When did Robinson start making EPS Castings?
a. 1958b. 1984c. 1989
CHECK YOUR ANSWERS ON THE NEXT PAGE
ANSWERS
1. a. This is the correct answer.
b. While this is true, other information is discussed in thepassage.c. While this is true, other information is discussed in thepassage.
2. b. This is the correct answer.
a. G.F. Shroyer invented EPS in 1958. Robinson did notbegin making EPS castings until 1984.
c. This is an incorrect date.
226
OUTLINE OF THE EPS PROCESS
EPS patterns are made from expandable polystyrene beads. Thebeads are heated and injected into a mold. The heat makes thebeads puff up and stick together. This process makes foam patternpieces in the shape of castings.
Robinson does not make EPS patterns. They buy them fromdifferent companies. When the pieces come to EPS. Receiving andInspection, the Robinson worker weighs them. The patterns are sentto Foam Assembly.
The workers in Foam Assembly must first check the patternpieces for defects. Next, the workers must glue together patternpieces and attach the gating. The glue is a 'hot melt adhesive".The glue seam between the pattern piece and the gating must be verystrong. To make a good seam, the glue must be between 260-290degrees in temperature.
Next the patterns go to the Dipping Area. The patterns aredipped in a refractroy coating. The coating will keep the ironfrom touching the sand when the casting is poured. The coatedpatterns are put in a dryer. Each piece is weighed after dippingand after drying.
The patterns go to the Cluster Table. The patterns are gluedtogether into groups called clusters.
The patterns clusters are moved to Molding. The clusters areput into a special flask and covered with unbonded sand.
Next, the flasks move around to the Pouring Station. Molteniron is poured into the flasks. The hot iron hits the foam patternand evaporates, or melts, it. This is why the EPS process iscalled "lost foam. The foam is "lost" when the iron hits it. Themetal then fills the hole left by the pattern.
After pouring, the flasks move to Shakeout. The castings areremoved from the sand and sent to the Cleaning Room. The sand incooled for reuse in the process.
***ANSWER THE QUESTIONS ON THE FOLLOWING PAGE***
1
DIRECTIONS
Circle the answer you think is correct. The first on is done foryou.
1. How are EPS patterns made?
{a}
b.c.
Expandable polystyrene beadsa mold.
Wood masters are cut on theThe bead collapse is filled
are heated and injected into
lathe in the pattern shop.into the mold.
2. According to the passage, if you worked in Receiving, whatwould be your job responsibility?
a. gluing the gatingb. assembling the patternsc. weighing the patterns
3. After reading this passage, you should know that an importantpart of an Assembler's job is to
a. weigh the pattern piecesb. keep the glue temperature within specificationc. sand the gating edges
4. According to the passage, why is the coating important?
a. It keeps the gating from melting.b. It keeps the from touching the sand.c. It keeps the glue seam from melting.
5. According the passage, if you worked in Dipping, which of thefollowing skills would you need?
a. To be able to fill out a time sheet.b. To be able to read a weighing scale.c. To be able to read a Zahn scale.
6. After reading the passage, you should know that a cluster isthe
a. gating glued on correctlyb. patterns glued togetherc. refractory coating
2 2
7. Which sand is used in EPS flasks?
a. bondedb. unbonded
8. Why is EPS called "Lost Foam"?
a. The hot iron evaporates,b. The castings have "lost"
as the parting line.c. The castings have "lost"
or melts, the foam.the extra metal such
the need for grinding.
9. According to the passage, which of the following tellshow iron makes an EPS casting?
a. It melts the refractory coating.b. It fills the hole left by the evaporated pattern.c. It moves thru the gating and then through the sprue.
CHECK YOUR ANSWERS ON THE NEXT PAGE
2Z9
ANSWERS
1.
2.
a.
c.
This answer is correct.
b. This is the way Green Sand patterns are made. Thisis not mentioned in the passage.
c. This is false information.
This answer is correct.
a. This is the job of the Assembly Room.b. This is the job of the Assemlby Room.
3. b. This answer is correct. The assembler must make a goodglue seam. A good glue seam requires glue that is keptwithing the temperature specifications.
a. Workers in Receiving do this job.b. This was not mentioned in the passage.
4. b. This answer is correct.
a. This was not mentioned in the passage.b. This was not mentioned in the passage.
5. b. This answer is correct. The worker must weigh the patternsafter dipping and after drying; therefore, the workermust be able to read weighing scales.
a. This was not mentioned.b. The Zahn cup measures paint thickness. It was not
mentioned in class.
6. b. This answer is correct.
a. This is incorrect.b. This is incorrect.
7. b. This answer is correct.
a. Green Sand molds use bonded sand.
8. a. This answer is correct.
b. Even though the EPS castings have lost extra metal,this is not why they are called "lost foam".
c. Some EPS castings have to be ground; therefore, thisanswer is incorrect.
9. b. This answer is correct.
a. This is false information.c. This is not mentioned in the passage.
230
WHY EPS CASTINGS ARE BETTER
EPS castings have a very good surface finish. EPS castingshave cleaner surfaces and cleaner inside spaces.
EPS casting have better detail and dimensional accuracy.Dimensions are the measurements of length, width, and thickness ofa casting. EPS casting dimensions are easier to control than GreenSand.
EPS castings have fewer defects than Green Sand. Because EPSsand does not have binders and the patterns do not have cores, EPScastings do not have gas porosity defects. The unbonded sand keepsthe EPS casting from having shrinkage defects.
EPS casting have a lower finishing cost. The castings do nothave extra metal on them that has to be ground off. The castingsdo not require as much machining es Green Sand castings.
THE FUTURE OF EPS
Today Robinson is a leader in the EPS process. They make moregrey iron castings by lost foam than any other independent foundryin the world. Foundry owners from 22 different countries have cometo Alex. City to see the EPS process. The future looks bright.
***ANSWER THESE QUESTIONS***
DIRECTIONS
Fill in the blanks with words from the passage.
The first one is done for you.
1. EPS castings generally have better surface finishand have cleaner spaces.
2. Castings measurements of length, width, and thickness arecalled
3. Cleaning roow cost are with EPS because extradoesn't have to be ground off.
4. EPS castings don't havedefectsbecause the sand doesn't have binders.
231
5. Because EPS castings don't have cores, the castings do not havegas porosity
6. Because EPS sand is , EPS castings do not haveshrinkage defects.
7. EPS casting are easier to control than GreenSand.
8. Robinscql makes more "lost foam" castings than any otherircial.:-ident foundry in the
:.-:.MATCH THE WORDS TO THEIR MEANING***
DIRECTIONS
Put the amber of the word in front of the correct meaning.
1. gape Holds the cluster for the iron pouring
2. eimension Keeps iron from touching the sand
3. Receiving another name for EPS
4. Lost Foam groups of EPS patterns glued together
5. coating Evaporated Polystryene System
6. EPS hot melt adhesive
7. EPS pattern length, width, thickness of a casting
8. Robinson They weigh EPS patterns
9. flask Makes more EPS castings than anyone else
10. cluster Made out of Expandable Polystyrene Beads
CHECK YOUR ANSWER ON THE NEXT PAGE
232
FILL IN THE BLANKS
1. surface, inside
2. dimensions
3. lower, metal
4. gas porosity
5. defects
6. unbonded
7. dimensions
8. world
MATCHING
9
54
1061
2
3
87
ANSWERS
2 3 3'
You have completed the lesson.
Go on to the next page to retake the quiz you started thisbooklet, or go back and review the lesson before taking thequiz.
234
EPS - -Quiz 2
DIRECTIONS
Circle the answer you think is correct.
1. What does EPS mean?
a. Exothermic Polystyrene Styrofoamb. Expandable Process Styrofoamc. Evaporated Polystyrene System
2. How old is the "lost foam" process?
a. over 3000 years oldb. over 300 years oldc. over 30 years old
3. What are EPS patterns made of?
a. excess styrofoamb. expandable polystyrene beadsc. iron, aluminum, plastic, or wood.
4. Which of the following is an important part of the foamassembler's job?
a. Making a strong glue seam between the pattern andthe gating.
b. Making sure the pattern is completly covered bythe coating.
c. Setting the sprue correctly.
5. Why are EPS patterns dipped in a coating?
a. To keep the styrofoam from melting.b. To eliminate mold wall movement.c. To keep the iron from touching the sand when the
iron is poured.
2'
6. Why is EPS called "Lost Foam"?
a. Because EPS castings have fewer defects and have"lost" the need for grinding.
b. Because the pattern evaporates when the molteniron hits it.
c. Because EPS castings have "lost" the extra natalsuch as the parting line.
7. Why are EPS castings better than Green Sand?
a. Tolerance bands are higher.b. Better dimensional accuracyc. Sand binders eliminate gas defects.
CHECK THE NEXT PAGE FOR THE CORRECT ANSWER TO THE QUIZ
ANSWERS
1. c
2. c
3. b
4. a
5. c
6. b
7. b
JOBS
A PARTNERSHIP BETWEEN EDUCATION AND INDUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON FOUNDRY, INC.1992
LESSON 7GREEN SAND
ROBERT E. STONE WRITTEN BY:PROJECT DIRECTOR, BETH MAXWELL,205 234 6346 EXT.6217 INSTRUCTOR
c-,-- ,, 205 329 8481 EXT.814....,;.)
WORD LIST
1. Pallet line
2. Shake-out
3. Castings
4. Sand
5. Core
6. Mold
7. Green Sand
8. EPS
9. Fins
10. Product
PALLET LINE
2
PALLET LINE READING
Frank works in the Pallet Line or green sand process. He
works on shake-out line. All the castings come out of shake-
out machine for Frand to remove excess sand. The core of
castings also comes out of the machine. The sand holds
together to form mold of casting. The green sand process is
done through pallet line. The process uses sand other than foam
like in EPS. Fins must be added to castings for finished product.
The product must be done completely to be taken by the customer.
Circle the following words in the reading:
1. Pallet line2. shake-out3. castings4. sand5. core6. mold7. Green Sand8. EPS9., fins
10. product
2-'110
Fill in missing words:
Frank works in the -- He
works on - . All the
come out of - machine for Frank to remove
excess . The of also
comes out of machine. The __ __ __ __ holds together to form
of . The
process is done through
The process uses other than foam as in .
must be checked on. The
must be done completely to be taken by the
customer.
24i
A__ _1_ t i e c r
pall e re
p le_ 1 co
pal 1_ c e
let ne o epall t 1 ne or
sh k - u
s a e- ut
sha - t
sh e- ut
sha -ou
m -1
Id
mo
m d
ting E
c t g E S
c s i g S
ting p ____
of
cas P S
s n F N
nd
sa
SAN
2 4
IN
1. at2. b d
3. j k
4. x z
5. a n
6. f g
7. o p
8. h j
9. p r
10. v w
11. a b
12. j k
13. d f
14. x y
15. g h
16. s u
17. n p
18. e f
19. h i
20. t u
fn:Beth\alpha
PREACTIVITY FOR A to 8
el 4 ..N
4.. , Ta
1. FLASK
2. ACCIDENT
3. CORE
4. SAND
5. PATTERN
1. MOLD
2. SLAG
3. FIN
4. EPS
5. CASTING
1. DEFECT
2. SCRAP
3. BP
4. SAFETY
5. HAMMER
FN:BETH\ALPHA2
PREACTIVITY FOR AIHABETICAL ORDER
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
FIND THE DEPARTMENTS ON THE MAP
1. Personnel and Lab
2. Supply
3. Cleaning Room
4. Shipping
5. Pattern Shop
6. Iron Melting
7. EPS
8. Green Sand
9. Disa
10. Core Room
11. Storage
12. Storage
13. Maintenance
14. Security
Furx?...1cioclibt50
aJ (rD
(7,
Le9.);
c'D
JOBS
A PARTNERSHIP BETAEEN EDUCATION AND INDUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON FOUNDRY, INC.1992
LESSON 8EPS-1
ROBERT E. STONE, WRITTEN BY:PROJECT DIRECTOR BETH MAXWELL,205 234 6346 EXT 6217 INSTRUCTOR
205 329 8481 EXT 81C) ,
-1 .3
1. EPS
2. PROCESS
3. FOUNDRY
4. CASTING
5. FOAM
6. POURED
7. SAND
8. FLASK
9. IRON
10. DUMP
EPS WORD LIST
249
EPS READING
Quinton works in EPS at Robinson Foundry. EPS is
the process in the Foundry that uses styrofoam to make
castings. The foam is placed inside the flask. The sand
is poured over the foam from an automatic sand dump. After the
dump packs the sand, then the iron is poured through a sprue
into the foam. The foam evaporates when iron is poured
into the flask.
Circle these words in the reading:
1. EPS2. process3. Foundry4. casting5. foam6. poured7. sand8. flask9. iron
10. Quinton11. dump
EPS READING
works in is the
in thethat uses styrofoam
to make The is placedinside the
over the
The is
from an automatic dump. Afterthe packs the then the is
through a sprue into the. The
frame exaporates when the is
into the
Fill in the following words:
1. EPS2. process3. Foundry4. casting5. foam6. poured7. sand8. flask9. iron
10. Quinton11. dump
2
EPS
Fill in the missing letters:
P c stnP S c t g
S s i
E a t n- -F ud y
F d
o n r
_ n d
d
ca _ _ _____ ____ g
o r d
r
P__ __ __ __ d
p u e
p____ r
c is r
252
s
PREACTIVITY FOR A to Z
1. st2. b
3. j k4. x
5. m n
6. f g7. o p8. h
9. p
10. v w
11. a b12. j k13. d14. x y15. g h16. s17. n18. e f19. h i20. t u
PREACTIVITY FOR ALPHABETICAL ORDER
1. FLASK 1.
2. ACCIDENT 2.
3. CORE 3.
4. SAND 4.
5. PATTERN 5.
1. MOLD 1.
2. SLAG 2.
3. FIN 3.
4. EPS 4.
5. CASTING 5.
1. DEFECT 1.
2. SCRAP 2.
3. BP 3.
4. SAFETY 4.
5. HAMMER 5.
0 '1 'Y4-4p
Qj
Qti
Cf
1
I r,
JOBS
A PARTNERSHIP BETAEEN EDUCATION AND I OUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON FOUNDRY, INC.1992
LESSON 9EPS-2
ROBERT E. STONE, WRITTEN BY:PROJECT DIRECTOR BETH MAXWELL,205 234 6346 EXT 6217 INSTRUCTOR
205 329 8481 EXT 81rl "-.1
"-e v 1
EPS READING-2 WORD LIST
1. EPS
2. foam
3. department
4. pattern
5. sprue
6. sand
7. iron
8. cluster
9. flask
10. assembly
EPS READING-2
In EPS the styrofoam patterns are ordered from othercompanies. The patterns are delivered to assembly at
Robinson Foundry. In assembly the pieces are glued togetherand then sent up to EPS department. In the department the foamis dipped in a mixture to keep the sand and foam separate.
Then the foam is put in a cluster to place in the flask. Acone shaped foam piece called a sprue is glued to the
cluster. The sprue is attached to the cluster before
sand is dumped in the flask. After the sand is packed, thenthe iron is poured into the sprue aad runs into the foam. Thefoam evaporates as soon as the hot iron hits it. The castingis formed by the pattern made in the sand.
Circle the following words in reading:
1. EPS2. foam3. department4. pattern5. sprue6. sand7. f.ron8. cluster9. flask
10. assembly
EPS READING-2
In the styrofoam areordered from other companies. The aredelivered to at Robinson Foundry. In
the pieces are glued together and then
sent -.Ap to. In the
the is dipped in a
mixture to keep the and separate. Thenthe is put in a to place in the
. A cone shaped piece called a
is glued to the. The
is attached to the before
is dumped in the. After the
is packed then the is poured into the
and runs into the. . The
evaporates as soon as the hot hits it. The
casting is formed by the made in the
EPS-2
Fill it the missing letters:
E s r e
P s u__
r
E P
S
p u
o _ m s n
f o a d
.__am n d
f_a s a
f m s d
u
e a t e t a e m -- -- --
d p r m n asebyo
a n t e 1
a sml__ __ p __ __ t n t seby
t n
t r n
c 1 tu t
p t e n 1 s e
p t cut rt t n t
2tic i
1. st2. b
3. j k4. x
5. m n
6. f g7. o p8. h
9. p
10. v w
11. a b12. j k13. d14. x y15. g h16. s17. n18. e f19. h i20. t u
PREACTIVITY FOR A to Z
riU
1. FLASK
2. ACCIDENT
3. CORE
4. SAND
5. PATTERN
1. MOLD
2. SLAG
3. FIN
4. EPS
5. CASTING
1. DEFECT
2. SCRAP
3. BP
4. SAFETY
5. HAMMER
1
PREACTIVITY FOR ALPHABETICAL ORDER
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
pa)p
4--f
_A-
gLY
1
I"ou
hdvy
JOBS
A PARTNERSHIP BETWEE\ EDUCATION AND INDUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON rOUNDRY, INC.1992
LESSON 10GRINDING PRODUCTION SHEET
ROBERT E. STONE,PROJECT DIRECTOR205 234 6346 EXT 6217
c") r- ki i )
WRITTEN BY:SANDRA MANN,INSTRUCTOR/COUNSELOR205 329 8481 EXT 81
1
The GRINDING PRODUCTION SHEET is used in the
Cleaning Room.
Grinders fill out this form to report the
number of castings they have cleaned. The
completed forms go to the office where the
information is put into the computer.
Read the following pages to learn how to
read and fill out a GRINDING PRODUCTION SHEET.
Ask your teacher for a blank GRINDING PRODUCTION
SHEET to use while learning about this form.
Answer any questions on your paper.
DO NOT WRITE IN THIS BOOKLET
267
The orange lines tell information about the employee
doing the work.
It is very important for the employee to write his
or her full name so the office can put the information
in the computer.
2CS
GRINDING PRODUCTION
DATE: SHIFT: WORK CENTER:
GRINDER(S):
CASTING PRODUCTION TIME TIMENUMBER TOT. GROUND I TOT. SCRAP START STOP
PM4/PROD0009/061191
The GRINDING PRODUCTION SHEET is different from other
productions sheets. It has only column headings. There
are no row headings down the side.
Look at the column heading in pink. When a pallet full
of castings is placed in front of a grinding station, the
worker writes the casting number here.
1,
GRINDING PRODUCTION
DATE: SHIFT: WORK CENTER:GRINDER(S):
CASTINGNUMBER
PRODUCTIONTOT. GROUND I TOT. SCRAP
TIME TIMESTART. STOP
PM4/PROD0009;061191
271
Look at TOT. GROUND in blue. TOT. stands for total.
This column shows how many good castings on each
pallet are cleaned, ground, and sent to the Finishing
Department.
Look at TOT. SCRAP in grson. TOT. stands for total.
This column shows how many defects were found and
set aside for Quality Control to inspect.
2 1 4,
GRINDING PRODUCTION
DATE: SHIFT: WORK CENTER:
GRINDER(S):
CASTING PRODUCTIONNUMBER TOT. GROUND TOT. SCRAP
TIMESTART
TIMESTOP
r4, 1 t)
PM4/P RO D0009.05 1 1 91
The last two columns show how long it took the worker
to grind each pallet of castings.
Look at TIME START in yellow. The worker writes the time
he begins work on the pallet.
Look at TIME STOP in pink. The worker writes the time he
finishes the pallet.
DATE:
GRINDING PRODUCTION
SHIFT: WORK CENTER:GRINDER(S):
CASTINGNUMBER
PRODUCTIONTOT. GROUND TOT. SCRAP
TIMESTART
TIMESTOP
PM4/PROD0009:061191
Do the exercises on the following pages
to see how much you have learned about
the GRINDING PRODUCTION SHEET.
276
GRINDING PRODUCTION SHEET
DIRECTIONS: Answer the following questions about the GRINDINGPRODUCTION SHEET on the next page. Write your answers on yourpaper.
1. How many pallets did the worker complete for this day?
2. Which pallet had less than 5 castings ground?
3. Which pallet had the most scrap?
4. Which pallet had the least scrap?
5. Which pallet took the most time to grind?
6. Which pallet took the least time to grind?
CHECK YOUR ANSWERS ON THE NEXT PAGE.
4,
DATE:
GRINDING PRODUCTION
9D, SHIFT: 1 WORK CENTER:
GRINDER(S): + e r- Rc-c-SSed
CASTING PRODUCTION TIMESTART
TIMESTOPNUMBER TOT. GROUND TOT. SCRAP
3(i-60 35) /5 3 Co: to 17:c1S1
1 R I- 0 o&S .:2,A 2: lb q..5.2)1061- io -JO 5 0 10:05 JOH
4 36 0 3( I Ja:td 1 a.:-.-4?
0113- D.- (0 1:10 /:5'5)
PM 4,131:10 D0009,061 1 91
27
ANSWERS
1. 5 pallets
2. 32007-10-10
3. 121-0028
4. 32007-10-10
5. 09193-10-0
6. 436038
279
GRINDING PRODUCTION EXERCISE
DIRECTIONS: Fill out a GRINDING PRODUCTION SHEET for the followingwork.
The TOT SCRAP is not shown. You figure this by subtracting thenumber ground from the number on the pallet.
1. Beginning at 6:00, you work on 346038. You have 18 castings onyour pallet. You grind 15 castings and finish at 6:48.
2. At 6:50, you work on 905866. You have 3 on your pallet. Youget 3 ground by 7:14.
3. You begin work on 905978 at 7:30. You have 4 castings on yourpallet. You get 4 done by 7:54.
4. Work on 095F1201 begins at 8:00. There are 13 castings on yourpallet. 11 castings are ground. The castings are finished at8:54.
5. At 9:10, you begin work on 122 castings of SD-6065. Yougrind 110 and finish at 10:00.
6. At 11:00, you begin on 121-0028. There are 31 castings on thepallet. You grind 22 castings and you finish the pallet at12:42.
7. You begin work on 09234-10-0 at 12:45. There are 69 castingson your pallet. You grind 65 castings. This takes you until2:03, the end of your shift.
DID YOU REMEMBER TO SUBTRACT TO FIND THE SCRAP TOTALS?
CHECK YOUR ANSWERS ON THE NEXT PAGE
2L0
DATE:
A- 115 wcr-
GRINDING PRODUCTION
SHIFT: WORK CENTER:GRINDER(S):
CASTING PRODUCTION TIMESTART
TIMESTOP
NUMBER TOT. GROUND I TOT. SCRAP
L( (2 0 3$ 15 G:oo 6:ciS9 05 3 C6 3 6 rs-b t-7: I ci
9 6 5 q -7171- .d "7:3o "7: 5 q
( : ) ° / SF 1 20 / I 1 (2 y,.ob 545I -60G5 ( (0 I q;16 ID:10
I.1 -005? c22, 9 I(6.00 ):(tc),oq (#_. to.° 65 LA:c15- a :03
PM4/PROD0009/06 1 1 91
CONGRATULATIONS!
You have learned how to read and fill out a GRINDING PRODUCTION
SHEET.
If you have any questions, ask your teacher for help.
9 cL.44
JOBS
A PARTNERSHIP BETWEEN EDUCATION AND wUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON FOUNDRY, INC.1992
ROBERT E. STONE,PROJECT DIRECTOR205 234 6346 EXT 6217
LESSON 11BUILDING AND GROUNDS
WRITTEN BY:BETH MAXWELL,INSTRUCTOR205 329 8481 EXT 81
BUILDING AND GROUNDS WORD LIST
1. Building
2. Grounds
3. Foundry
4. Trash
5. Cleans
6. Safety
7. Departments
8. Pallet Line
9. Core
10. EPS
11. Cleaning
12. Materials
BUILDING AND GROUNDS-READING
Robert works on Building and Grounds at Robinson
Foundry. He emptys trash and cleans departments. He must
be careful and watch safety signs. He must do many tasks.
He reports to his supervisor, Sam Huntley, who gives him orders
for the day. He works in all departments, Pallet Line, Melt Deck,
Core Room, Cleaning Room and EPS. He sometimes must go to
special places in the Foundry to clean or put materials
away.
Circle these words in the reading:
1. Building2. Grounds3. Foundry4. trash5. cleans6. safety7. departments8. Pallet Line9. Core
10. EPS11. Cleaning12. materials
2c-5L,_
BUILDING AND GROUNDS-READING
Fill in the missing letters:
Robert works on B i and ndsat Robinson F d . He emptys and
departments. He must be careful and watch
signs. He must do many tasks. He reports to his
supervisor, Sam Huntley, who gives him orders for the day. He
works in allP
Line, Core Room, Cl Room and __ Hesometimes must go to special places in the
to of put away.
WORD LIST:1. Buildings2. Grounds3. Foundry4. trash5. cleans6. safety7. departments8. Pallet Line9. Cleaning10. EPS11. materials
E 6
BUILDING AND GROUNDS-MISSING LETTERS
FILL IN THE MISSING LETTERS:
B g
B i d c e nB d g ans
ld ng cl ns
ans
g ons s f ty
und saf__ __ __ __ -r u __ d __ - -et__
gr d a ety
gro s y
F d
Fouments
n ry ar __ m s
F u d y art isart __ __ ___
r
ndry dep a is
P t Line
P 1
a le Li
thr 11
Pal Li
r-,
BUILDING AND GROUNDS-READING
Fill in the missing letters:
c r
c re
c e
E
P
PS
EP
er 1ae r 1 s
mat ials
in is
1.
2. b
3. j k4. x
5. m n
6. f g7. o pa. h
9. p
10. v w
11. a b12. j k13. d14. x y15. g h16. s17. n18. e f19. h i20. t u
st
PREACTIVITY FOR A to Z
r.
1. FLASK
2. ACCIDENT
3. CORE
4. SAND
5. PATTERN
1. MOLD
2. SLAG
3. FIN
4. EPS
5. CASTING
1. DEFECT
2. SCRAP
3. BP
4. SAFETY
5. HAMMER
PREACTIVITY FOR ALPHABETICAL ORDER
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
2 tr 30
FIND THE DEPARTMENTS ON THE MAP
1. Personnel and Lab
2. Supply
3. Cleaning Room
4. Shipping
5. Pattern Shop
6. Iron Melting
7. EPS
8. Green Sand
9. Disa
10. Core Room
11. Storage
12. Storage
13. Maintenance
14. Security
JOBS
A PARTNERSHIP BETWEENEDUCATION AND INDUSTRY
CENTRAL ALABAMA COMMUNITY
COLLEGE & ROBINSON
FOUNDRY, INC.
1992
LESSON 12
MOLDING PRODUCTION
SHEET
ROBERT E. STONE,
PROJECT DIRECTOR
205 234 6346 EXT 6217
292
WRITTEN BY:
SANDRA MAXWELL,
INSTRUCTOR/COUNSELOR
205 329 8481 EXT
81
The MOLDING PRODUCTION SEEET is used in Green Sand
and in EPS.
Read the following pages to learn how to read and
fill out the MOLDING PRODUCTION SHEET.
The green boxes tell when the worker starts
work and
stops work in each hour.
The yellow boxes show the hours of the shift from the
1st hour to the 9th hour.
?RO
BIN
SO
NM
OLD
ING
PR
OD
UC
TIO
ND
AT
ES
HIF
T
Nam
mim
im.
. w' MOLD
ER
DO
WN
TIM
E
TIM
ES
TA
RT
TIM
ES
TO
PT
OT
AL
TIM
EM
AC
HIN
EC
AS
TIN
GN
UM
BE
RIM
P.
MO
LDS
CLA
SS
DE
PT
HT
IME
FR
OM
TIM
ET
OT
OT
AL
TIM
E
(,,,,
,, v
.'a's
'' X/-
'
CO
MM
EN
TS
GO
OD
PO
IRO
N O
F C
HIL
LN
aY
onIn
n Sp
asIS
AM
Hot
Wel
Faun
1st
Hou
rx x
2nd
Hou
rx x
3rd
Hou
r\
4th
Hou
r
5th
Hou
r
6th
Hou
r
7th
Hou
r
eth
Hou
r
4
9th
Hou
rx x
TO
TT
OT
y___
__lip
° C
AU
SEsu
Per
usaR
s co
ovE
sas
S R
Eou
RE
D c
oRR
EC
TN
E A
CT
ION
9''
,,i
. )it
E-1
-M7,
'PR
JO.:i
53S
r
*rA
.74,
:[-
C P
OS
TE
iD
OT
HE
R
The pink box tells the machine being used.
3 if
RO
BIN
SO
N'
MO
LDIN
G P
RO
DU
CT
ION
DA
TE
SH
IFT
imm
inim
ps'
'''''
-M
OLD
ER
DO
WN
'TIM
E
TIM
ES
TA
RT
TIM
ES
TO
PT
OT
AL
TIM
EM
AC
HIN
EC
AS
TIN
GN
UM
BE
R-
IMP
.M
OLD
SI C
LAS
SD
EP
TH
CH
ILL
TIM
EF
RO
MT
IME
TO
TO
TA
LT
IME
112
,.1
:5,'
.:
CO
MM
EN
TS
GO
OD
PO
IRO
N IO
FN
o 'Y
onbo
n S
onH
atM
edi S
tdol
Wit
Fau
nO
tter
1st
Hou
rX x
2nd
Hou
rx
3rd
Hou
rx
4th
Hou
r
5th
Hou
rx
6th
Hou
rx
7th
Hou
rx
8th
Hou
r
9th
Hou
rx x
TO
TT
OT
*P
O C
AU
SE
SU
0ER
VIS
DR
S C
OW
,:."':
A R
EO
V.R
ED
CO
WLE
CM
AC
TIO
NA
. SA
ND
4,44
48
F.-
-C
DO
ThE
RE
PP
. T./P
000,
:25
3S1
The blue box shows which casting number is molded in
each hour.
/I
;
RO
BIN
SbfI
MO
LDIN
G P
RO
DU
CT
ION
DA
TE
SH
IFT
wiff
iani
mai
aM
OLD
ER
DO
WN
'TIM
E
TIM
ET
IME
ST
AR
TS
TO
P1
TO
TA
LT
IME
MA
CH
INE
CA
ST
ING
4
....
_ "A
BE
R _
.--
IMP
.M
OLD
SC
LAS
SD
EP
TH
CH
ILL
TIM
EF
RO
MT
IME
TO
TO
TA
LT
IME
Yn.
i.:,1
.'4,-
.;,,
,;;;'
.-";
3r,,,
;.,...
1:,.
4..:
,'.:1
,..,
'-.0.
3%
/.1,
''.:.
CO
MM
EN
TS
GO
OD
I P
OIR
ON
rO
Fit.
. Is.
.ease
,1
1st
Hou
rx
2nd
Hou
r
x x
3rd
Hou
rx
4th
Hou
rx
Sth
Hou
rx
6th
Hou
r
x x
7th
Hou
rx
eth
Hou
rx
1
9th
Hou
r
x x x
.
TO
T
V
TO
T
* PO
CA
USE
%M
ER
V:S
OPS
CO
W/E
CM
& R
ED
U.k
i CO
RPE
CT
1VE
AC
TO
ON
LA
SA
.4°
iler7
77 4
rO
TH
EFT
-17P
Foo
c;,s
391
The orange box shows how many impressions are on the pattern.
RO
Bla
SO
NM
OLD
ING
PR
OD
UC
TIO
ND
AT
ES
HIF
T
MO
LDE
RD
OW
N T
IME
TIM
ES
TA
RT
TIM
ES
TO
PT
OT
AL
TIM
EM
AC
HIN
EC
AS
TIN
GN
UM
BE
RIM
P.
MO
LDS
CLA
SS
DE
PT
HT
IME
FR
OM
TIM
ET
OT
OT
AL
TIM
E
,z,
77:7
/. .'
''.-
V, .
...11
%!
k%
CO
MM
EN
TS
GO
OD
I P
OIR
ON
[OF
CH
ILL
re. I
ors
.1
bon
Spe
cIs
scs
'1/4
4I W
.''.S
W F
oam
1st
Hou
rx
2nd
Hou
rx
3rd
Hou
rx
4th
Hou
r
iI
5th
Hou
r
6th
Hou
r
x x
7th
Hou
rx
8th
Hou
rx
9th
How
x x
TO
T
ALP
OC
AU
SE
A S
AN
D
D O
TK
R
TO
T
S,IP
ER
4SO
AS
CO
mP
EN
TS
S R
EO
LeR
ED
CD
R...
L*1A
S A
CT
iON
L..m
..nA
30:4
.5
The green box shows how many GOOD molds were made in each hour.
RO
BIN
SO
NF
OU
ND
RY
, IN
C.
MO
LDE
R
MO
LDIN
G P
RO
DU
CT
ION
DA
TE
SH
IFT
DO
WN
TIM
E
TIM
ES
TA
RT
TIM
ES
TO
PT
OT
AL
MA
CH
INE
TIM
EC
AS
TIN
GN
UM
BE
RIM
P.
MO
LDS
0000
PO
CLA
SS
DE
PT
HIR
ON
CH
ILL
TIM
EF
RO
MT
IME
TO
TO
TA
LT
IME
//,,A
//AP
iaic
eM
etic
e S
pic
Wad
i Sin
div
ttF
oie
CO
MM
EN
TS
tst
Hou
r
2nd
Hou
rx
3rd
Hou
rx x
4th
Hou
r
5th
Hou
r
6th
Hou
r
7th
Hou
r
5th
Hou
r
9th
Hou
r
TO
TT
OT
*P
O C
AU
SE
SU
PE
RV
ISO
RS
CO
MM
EN
TS
A R
EQ
UIR
ED
CO
RR
EC
TIV
E A
CT
ON
A. S
AN
De
SA
AC
MM
EC
. PA
TT
ER
ND
CA
RE
RL
I.7
1E
/PM
6/P
R00
025
1,91
The yellow box tells how many "PLUG-OFFS"
or bad molds were made in
each hour.
The
*shows the reason for the plug-off.
The pink box shows the plug-off
reason and the supervisor comments.
'RO
BIN
SO
NF
OU
ND
RY
. IN
C.
moi
nuaz
ina
MO
LDE
R
MO
LDIN
G P
RO
DU
CT
ION
DA
TE
SH
IFT
TIM
ES
TA
RT
TIM
ES
TO
PT
OT
AL
TIM
EM
AC
HIN
EC
AS
TIN
GN
UM
BE
RIM
P.
MO
OS
CLA
SS
DE
PT
H
GO
OD
PO
*IR
ON
OF
CH
ILL
TIM
EF
RO
M
1st
Hou
r
x
DO
WN
TIM
E
.
tioIr
anH
at%
itIr
onS
cala
ch S
ahel
Faw
nO
ar,
CO
MM
EN
TS
x
2nd
Hou
r
x x
3rd
Hou
r
4th
Hou
rx
Sth
Hou
r
6th
Hou
r
7th
Hou
rx
8th
Hou
rx
9th
Hou
r
TO
TT
OT
PO
GIB
ES
uPE
R03
00P
S C
CA
AN
EW
PS
aPE
OU
RE
D C
OR
K O
WE
AC
TO
N
AS
AS
°I.
sAA
OH
NE
cP
AT
TE
RN
O O
TP
EO
ILp
m ,p
fon:
25
The blue box shows the class of iron poured for each casting number. 0 I
loth
riso
fiM
OL
DIN
G P
RO
DU
CT
ION
DA
TE
SH
IFT
` vv
''..'
....
`M
OLD
ER
DO
WN
11M
E
TIM
ES
TA
RT
TIM
ES
TO
PT
OT
AL
TIM
EM
AC
HIN
EC
AS
TIN
GN
UM
BE
RIM
P.
MO
LDS
CLA
SS
IRO
ND
EP
TH
F C
HIL
LT
IME
FR
OM
TIM
ET
OT
OT
AL
TIM
E
'.,
CO
MM
EN
TS
GO
OD
IP
ON
oIr
anIr
on S
ync
1"d
Hen
I w
dS
AM
'Foa
mO
Mrr
1St
Hou
r
x x
2nd
Hou
rx x
3rd
Hou
rx x
4th
Hou
rx
Sth
Hou
rx
6th
Hou
rx x
7th
Hou
rx x
8th
Hou
rx x
9th
Hou
rx
.
x x1
TO
TT
OT
.
1FP
0 C
AU
SE
1A S
AN
D13
FC
PA
TT
ER
ND
OT
HE
R
SU
PE
RV
ISO
RS
D.',
..ME
NT
S &
RS
OU
RE
D C
OR
RE
CT
IVE
AC
TIO
N
E 'E
rr3S
1
TOTAL CASTING NUMBER
The orange box is the total castings made from the 1st hour through
the 4th hour.
The worker found this number by multiplying the nt.ra..:_r of
impressions (the green number) times tht number of .00d molds (the
yellow number).
The worker added the totals for the first 4 hours of work and put
the answer in the orange box.
RO
BIN
SO
N`
MO
LDIN
G P
RO
DU
CT
ION
DA
TE
SH
IFT
I"%
.,,Iv
n0
amm
iNgi
oM
OLD
ER
DO
WN
TIM
E
TIM
ET
IME
ST
AR
TS
TO
PT
OT
AL
TIM
EM
AC
HIN
EC
AS
TIN
GN
UM
BE
RIM
P.
MO
LDS
CLA
SS
DE
P H
TIM
EF
RO
MM
ET
IME
TO
TO
TA
LT
IME
,'
.1,f4
;'/A
0k ;
CO
MM
EN
TS
GO
OD
PO
*IR
ON
OF
CH
ILL
No
Iron
Iron
*MC
Hot
I W
etM
oth
+S
and
:Foa
m
f.114
/X
.1...
nd,2
-,X
30H
our
x
3rd
..x46
Hou
r
4th
I'I
c2C
)H
our
:.x x
i / Y
&'
15t
h-I
our
x
6th
Hou
rx
7th
Hou
r
x x
eth
Hou
r..,
x
9th
Hou
rx x x
TO
TT
OT
VC
..*
PO
CA
US
ES
JPE
RV
ISC
PS
CO
NV
EN
TS
I R
E O
u R
ED
CO
RR
EC
TN
E A
CT
ION
,.. 1
)A
SA
ND
e M
AC
k N
EC
PA
TT
ER
N
' srt
- ,
LOz.
!DIN
ER
L'O
NT
A-R
D0c
2S 1
51
1
The pink box is the total castings made from the 5th hour through
the 9th hour.
The worker found this number by multiplying the number of
impressions (the blue number) times the good molds (the orange
number).
The worker added the totals and put the answer in the pink box.
,
RO
BIN
SO
NM
OLD
ING
PR
OD
UC
TIO
NS
HIF
T
FO
UN
DR
Y, I
NC
.M
OLD
ER
DO
WN
TIM
ET
IME
ST
AR
TT
IME
ST
OP
TO
TA
LT
IME
MA
CH
INE
CA
ST
ING
NU
MB
ER
IMP
.M
OLD
SC
LAS
SD
EP
TH
F C
HIL
TIM
EF
RO
MT
IME
TO
TO
TA
LT
IME
AA
4,4
No
um.
Hat
Yon
Bee
c 61
.46
'-via
,A.,,
AW
etF
ern
.,..
05w
CO
MM
EN
TS
GO
OD
PO
IRO
N*
tat
Hou
rx x
I2n
dH
our
xII
xI
3rd
xH
our
x
4th
H o
ur
5th
Hou
r
6th
Hou
r
x x
i x
x
i x
cRO
NM
I I I I
111
1
1
7th
Hou
r35
"x
8th
5xH
our
Illili
9th
H o
ur11
111
xE
rT
OT
TO
T
* P
O C
AU
SE
SU
PE
RV
ISO
RS
031
HA
EN
TS
I R
EO
UIR
EO
CO
AR
EC
TW
E A
CT
ON
cl r
)4
b )
j I
[Aw
e /P
F03
0175
Mit
A S
AN
OI
,t o
Xo/
.....o
utC
PA
TT
ER
N0
OM
ER
The green box shows the total number of castings made for the
The worker added the totals for the 4th hour (inorange) and for
the 9th hours (in pink).
He put the answer in the pink box.
RO
BIN
SO
NM
OLD
ING
PR
OD
UC
TIO
ND
AT
ES
HIF
T
rya/
law
n.'
MN
..M
OLD
ER
DO
WN
TIM
EIm
o....
TIM
EF
RO
MT
IME
TO
TO
TA
LT
IME
,.,-
li'...
CO
MM
EN
TS
TIM
ES
TA
RT
TIM
ES
TO
PT
OT
AL
TIM
EM
AC
HIN
EC
AS
TIN
G
I IM
P.
NU
MB
ER
MO
LDS
CLA
SS
IIR
ON
DE
PT
HF
CH
ILL
GO
OD
PO
*N
oM
on S
pc A
.thH
otI
WM
San
d F
oam
1st
Hou
rx
2nd
Hou
r
3rd
Hou
r
Alth
Hou
r/ /
3-'.
5th
Hou
rx x
6th
Hou
r
x x
7th
How
x
eh Hou
rx x
9th
Hou
rx
.3oD
xY
ii -
TO
TT
OT
c- r
",,
t:0
i
Y--
-*P
O C
AU
SE
SoP
EF
IVIS
OP
S C
ON
VE
NT
S to
RE
OJA
E 0
CO
RR
EC
T v
E A
CT
ION
..
.I
Es,
. s,9
AJO
C7!
35,1
A S
AV
O0.
,,,L,
1S
E
C P
AIT
ES
N0
OT
FE
RI
DOWN TIME
The yellow box shows the time a worker stops work.
The orange box shows the time a worker starts back to work.
The pink box shows the number of minutes the w'rker was not at work.
337
'RO
BIN
SO
NF
OU
ND
RY
. IN
C.
MO
LDE
R
MO
LDIN
G P
RO
DU
CT
ION
DA
TE
SH
IFT
DO
WN
TIM
E
TIM
ET
IME
ST
AR
TS
TO
PT
OT
AL
TIM
EM
AC
HIN
EC
AS
TIN
GN
UM
BE
R
MO
LDS
GO
OD
PO
CLA
SS
IRO
ND
EP
TH
OF
CH
ILL
TIM
EF
RO
MT
IME
TO
TO
TA
LT
IME
4/4,
A,4
/,N
obo
nbo
ner
onH
otS
eed
Wet
Fow
l
CO
MM
EN
TS
1st
Hou
r
2nd
Hou
r
3rd
Hou
rx
4th
Hou
r
5th
Hou
r
6th
Hou
r
7th
Hou
r
inn
Hou
r
9th
Hou
r
TO
T.
.
TO
T
*PO
CA
US
ES
UP
ER
AS
OR
S C
OY
NE
NT
S a
RE
Oui
FIE
D C
OR
RE
CT
IVE
AC
TO
NA
SA
NO
5.*A
AO
.INE
C P
AT
TE
RN
D O
TH
ER
rt
ER
NA
/PR
:330
2S 1
9
The blue boxes show the reason for each of the down times.
OB
INS
ON I h
i r
MO
LDIN
G P
RO
DU
CT
ION
DA
TE
SH
IFT
MO
LDE
RD
OW
N T
IME
TIM
ES
TA
RT
TIM
ES
TO
PT
OT
AL
TIM
EM
AC
HIN
EC
AS
TIN
GN
UM
BE
RIM
P.
MO
LDS
CLA
SS
IID
EP
TH
F C
HIL
LT
IME
FR
OM
TIM
ET
OT
OT
AL
TIM
EN
sO
w
,,,, Im
oIIp
Ic
///7
AM
tS
oul
/ Mt
Raw
,///
A,
CO
MM
EN
TS
GO
OD
PO
IRO
NII
Cik
ir
1st
Hou
rx
2nd
Hou
rx
3rd
Hou
rx
4th
Hou
r
x x
5th
Hou
r
x x
6th
Hou
rx
7th
Hou
rx
8th
Hou
rx
9th
Hou
r
x x x
TO
TT
OT
f PO
CA
US
E
IA-S
AN
DE
IM
AC
.INE
C P
AT
TE
RN
I
ID.O
TH
ER
I
SO
PE
RA
SO
RS
CO
MM
EN
TS
L R
EO
uRE
DC
OR
sIE
CT
IVE
AC
TIO
N
41
,A.7
072.
!S
AS
The green box is a place for the worker to write a reason for any
down time that is not listed in the blue boxes.
RO
BIN
SO
NF
OU
ND
RY
. IN
C.
MO
LDE
R
MO
WIN
G P
RO
DU
CT
ION
DA
TE
SH
IFT
DO
WN
TIM
E
TIM
ES
TA
RT
TIM
ES
TO
PT
OT
AL
TIM
EM
AC
HIN
EC
AS
TIN
GN
UM
BE
RIM
P.
MO
LDS
GO
OD
PO
CLA
SS
IRO
ND
EP
TH
OF
CH
ILL
TIM
EF
RO
MT
IME
TO
TA
LT
IME
No
byn
11P
w
ire
Sm
dW
etP
ow
CO
MM
EN
TS
1st
Hou
r
2nd
Hou
r
3rd
Hou
r
4th
Hou
r
x
5th
Hou
r
6th
Hou
r
7th
Hou
r
Ert
h
Hou
r
9th
Hou
r
TO
T LrI
TO
T
*P
O C
AU
SE
SuP
ER
NA
SO
RS
CO
MM
EN
TS
a R
EO
utR
ED
CO
RR
EC
TIV
E A
CT
ON
A S
AN
DS
MA
DK
NE
C P
AT
TE
RN
0 O
TR
ER
r: .1
L.3'
1
EA
RA
4/54
1300
75 3
91
Do the exercise on the next 2 pages to see how
well you have learned to read the MOLDING
PRODUCTION SHEET.
Write your answers on your paper.
Do not
write in this booklet.
MOLDING PRODUCTION SHEET
DIRECTIONS:
Answer the following questions about the MOLDING PRODUCTION SHEET filled out by
George Smith on 5-15-91.
1.
Which CASTING NUMBER has the most IMPRESSIONS on the pattern plate?
2.
Which CASTING NUMBERS have the least IMPRESSIONS
c the pattern plate?
3.
In which hour were the most MOLDS made?
How many castings were made in this hour?
4.
In which hour were the least amount of MOLDS made? How many castings
were made in this
hour?
5.
Which hour had the most PO?
What was the cause?
6.
Why was the work stopped at the following times?
4:30
7:05
10:13
11:05
7.
What was the total DOWN TIME?
8.
How many castings were made during the following
hours?
1st Hour
2nd Hour
3rd Hour
5th Hour
6th Hour
7th Hour
TURN THE PAGE AND CHECK YOUR ANSWERS
RO
BIN
SON
MO
LD
ING
PR
OD
UC
TIO
ND
AT
E 5
---
.- /
6...
-q/
si-
orr
/ -5-
t-F
OU
ND
RY
, IN
C.
Oeo
reM
OLD
ER
Sfi-
) / -
I-J-
,D
OW
N T
IME
TIM
ES
TA
RT
TIM
ES
TO
PT
OT
AL
TIM
EM
A C
HIN
EC
AS
TIN
GN
UM
BE
RIM
P.
MO
LDS
CLA
SS
DE
PT
HO
F C
HI
TIM
EF
RO
MT
IME
TO
TO
TA
LT
IME
"1);
Ara
li7
7IF
CO
MM
EN
TS
GO
OD
PO
rrIR
ON
No
bon
km SpA
clia
6hM
OSo
ulV
ON
Rom
OO
r
1St
Hou
r
I :b
6.1
1.i)
(11-
1,ic
,-R
- 1
5 q
Ax
J04
'1;1
2zi
.aa,
4fL
ab r
unni
no11
c:::
0 ,-
.),
x24
;30
5 . 6
5
7.0
LI:q
55
.1
b
'7 (
5
'2 5 s
1)k_
,
a +
-1-r
r I
-1=
no n
e,pr
,-4-
ferr
\C
h 6
00
2nd
Hou
r.D
U:6
163
19 '
7 1
7l x
.25
?A
I I
3rd
%6
Vq
0 I
lo z
4I
xI
oo5
D1,
R, 0
533
' :e.
..-,9
4H
our
x:T
Oq:
,.),/
4) 0
4 +
^ r
,c
i ,aL
rE
-1,-
c .1
-r ir
F u
11
d n
u) 1
14t
h7
/ID
.,
-3 0
0,z
, 5.3
.q
I6,
ii)
jo:1
3io
:a5
qH
our
11 0
511
t5O
4.N
.A.1
0 r
k,st
nH
our
1tr
uC
l: lib
I1
3 x
1 0
,,1)
:6'o
)a-o
o10
J
x1
6th
;IT
)/0
, 0'
( , ;
....1
cfG
002
2x
9G
Ci
Hou
rx
7th
0; o
-b,
n: a
blI.
x?
P
Hou
rx
eft,
Hou
rI
OD
/2. A
l,,
`",ix
_15
7c
0
x
9th
Hou
rx
Fra3
(ax
I
.
TO
TT
OT
5L
.1ti
* PO
C.A
USE
1A
SA
ND
I
IC)
P A
ZE
RR
AI
SuPE
AM
SOR
S C
OM
ME
NT
S I
RE
OU
PEO
CO
PPE
CT
IVE
AC
TO
N.
&PA
. T P
RD
X:f
..39
1
1.
2.
3.
4. 5.
300333
63197787
The 3rd hour;
The 1st hour;
The 2nd hour;
ANSWERS
100
14
A (sand)
6.
4:30
no iron
7:04
pattern
change
10:13
Electric
Bull down
11:05
working
on pattern
7.
54
8.
1st
2nd
3rd
5th
6th
7th
hour:
14
hour:
25
hour:
100
hour:
30
hour:
192
hour:
172
,
Now that you know how to read a MOLDING
PRODUCTION FORM, do the exercise on the
next 2 pages.
Ask your teacher for a blank MOLDING
PRODUCTION FORM to use for the exercise.
Check your answers by the answer key at
the end of the book.
THE MOLDING PRODUCTION SHEET
DIRECTIONS:
Fill in a production sheet with the following information about each job.
Use your own name, your shift, and today's date.
THE FIRST JOB
You start work at 4:00.
You work on the Hunter today.
The first job is on CASTING NUMBER
901504.
This casting has 2 impressions.
This casting is made with 25 CLASS IRON.
Fill in the rest of the sheet using the following information:
1st
hour:
GOOD
MOLDS:
25
P0:
0PO
CAUSE:
0
2nd
hour:
GOOD
MOLDS:
30
P0:
0PO
CAUSE:
0
3rd
hour:
GOOD
MOLDS:
10
PO:
15
PO
CAUSE:
A
THE SECOND JOB
You start work on the second job at 7:00.
This job is on CASTING NUMBER 40162P.
This
casting has 5 impressions.
This casting is poured with 30-A CLASS IRON.
Fill in the rest of the sheet using the following information:
4th hour:
GOOD MOLDS:
55
PO:
0PO CAUSE:
0
5th hour:
LUNCH
6th hour:
GOOD MOLDS:
25
PO:
13
PO CAUSE:
B
THE THIRD JOB
You start work on the third job at 12:00 noon.
This job is on CASTING NUMBER R-153-E.
This
casting has 1 impression.
This casting is poured with 25 CLASS IRON.
Fill in the rest of the sheet using the following information:
7th hour:
GOOD MOLDS:
85
P0:
0PO
CAUSE:
0
8th hour:
GOOD MOLDS:
95
PO:
0PO
CAUSE:
09th hour:
GOOD MOLDS:
75
PO:
22
PO
CAUSE:
C
TOTALS
Add up the total molds through the 4th hour.
Add up the total molds from the 6th hour
through the 9th hour. Add up the total for the day's production.
DOWN TIME
DIRECTIONS:
Fill out the DOWN TIME side with the following information:
5:05
to
5:22
NO IRON
6:15
to
6:45
DRY SAND
10:36
to
10:55
ELECTRIC BULL DOWN
11:11
to
11:35
WORKING ON PATTERN TOTALS
Add up the TOTAL TIME for each DOWN TIME.
4,
RO
BIN
SO
NM
OLD
ING
PR
OD
UC
TIO
ND
AT
ES
HIF
T
FO
UN
DR
Y. I
NC
.11
1/11
0.1.
1111
1111
1M
OLD
ER
TIM
E
TIM
ES
TA
RT
TIM
ES
TO
PT
OT
AL
TIM
EM
AC
HIN
EC
AS
TIN
GN
UM
BE
RIM
P.
MO
LDS
CLA
SS
DE
PT
HF
CH
ILL
TIM
EF
RO
MT
IME
TO
....
TO
TA
LT
IME
, A.
No
Pon
/ ,eZ
",';,
%/jr
; ;H
oN
otV
ON
epos
Sor
el P
orn
1,;,:
' 4.
Ohr
CO
MM
EN
TS
GO
OD
PO
IRO
N*
fff
1St
Hou
r14
011
5.00
Pun
t?,
Cl0
I S
0 44
g x
a5a5
5;05
:,?1
l'7.
xG
!15-
& :
ys3o
,...)
0 re
A S
a he
,12n
dH
our5'
tr)
6-,60
it2
.30
..10
:34
to:
Iq.Y
G-1
?1c-
f-rc
.8,
4_,(
1 D
own
.11
:11
11:3
5=
Z4
\Ai (
)tr.
k i
11)
onrn
3rd
6- c
u'1
. CD
IIx
1015
AI'
faif
cH
our
x
4th
Hou
r7:
6-0
g: a
lgo
t l, ,
2,F
Ex
SG30
41x
OS
JE
5th
Hou
rS2
co
cl:s
t.1x
_ _
x
6th
Hou
r1
: CO
ID: a
)t
5 x
P 5
13E
"
x
7th
Hou
rto
j+.)
I I, 6
1)R
-15
3-
E1
x35
e95
x
8th
Hou
r/1
:61)
IA :c
sDI,
Ix
9'5
/I
x
9th
Hou
r1,
,):6
-0i?
,.. D
UII
Ix
75C
.
x13
86/
x x7.
- 1-
'7 '5
1T
OT
TO
T
go
fr P
O C
AU
SE
SO
PE
n .1
SC
AP
S C
OM
ME
NT
S I
RE
OV
AE
D C
OR
RE
CT
IVE
AC
TO
N
A. S
AN
DiL
ieSC
,tg--
-C
PA
TT
ER
ND
OT
NE
P-
UU
CIP
AP
Ir.R
D7
s
CONGRATULATIONS!
You have learned how to read and fill out the MOLDING PRODUCTION SHEET.
If you have any questions, ask your teacher for help.
JOBS
A PARTNERSHIP BETWEEN EDUCATION AND INDUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON FOUNDRY,
INC.
1992
LESSON 13
FORMS
ROBERT E. STONE,
PROJECT DIRECTOR
205 234 6346 EXT, 6217
WRITTEN BY:
SANDRA MANN,
INSTRUCTOR/COUNSELOR
205 329 8481 EXT 81
A, 1
OCCUPATIONAL FORMS USED AT
ROBINSON.
To be a successful worker,
you need to know how to read and
understand occupational forms
such as charts, graphs,
tables, and
forms.
Robinson Foundry uses
many different kinds of occupational
forms every day.
Charts, graphs, tables, andforms are used to
record and store information
about the work Robinson
employees do
each day.
It is important for
you to know how to read and understand
any
occupational form that is used in
your department.
You also need
to know how to write information
on these forms.
Many occupational forms used at Robinson are in the form of a CHART.
A CHART is a way to show facts and figures
so that you can see the
information easily.
Look at the CHARTS on the next 6
pages to learn how to read occupational
charts.
371
0-1
The blue boxes tell what is
written in the boxes down below
them.
SH
ELL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hift:
Nam
e:M
achi
ne N
o.:
Tim
e.:::
...F
rOm
-T
o::
;,N
o.C
ore
Des
c-ip
tiOn"
:C
ore:
:W
eigh
t,,rim
pf ::
Box
:`C
yice
itM
achi
ne: ::7
-Mad
eP
iece
sP
iece
sS
crap
Dow
nT
ime
1st
Hou
r
2nd
Hou
r
3rd
Hou
r
4th
Hou
r
5th
Hou
r
6th
Hou
r
7th
Hou
r
I-
8th
Hou
r
9th
Hou
r
37 4
PM
4/P
R00
0005
01.
1 'I.
.-
The pink boxes tell what is written in the rows
across to the right.
0.1
1..)
1I
SH
ELL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hift:
Nam
e:M
achi
ne N
o.:
Tim
eF
rom
- T
oC
ore
I.D. N
o.C
ore
Des
crip
tion
Cor
eW
eigh
tIm
p/B
oxsc
Mac
hine
Cyl
ces
Pie
ces
-Mad
eP
iece
sS
crap
Dow
nT
ime
1st
How ur
Sqi.
tith
PIO
N._
......
373
PM
4/P
RO
D00
05
el r
i
Look at the
orange box where the two lines meet.
This shows howmany pieces were made in the 5th hour.
Dat
e:S
hift:
SHE
LL
CO
RE
PR
OD
UC
TIO
N
Nam
e:M
achi
ne N
o.:
Tim
eF
rom
- T
oC
ore
I.D. N
o.C
ore
Des
crip
tion
Cor
eW
eigh
tIm
p/x
Box
Mac
hine
Cyl
ces
Pie
ces
= ft
/Ode
Pie
ces
Scr
apD
own
Tim
e1s
tH
our
2nd
Hou
r
3rd
Hou
r
4th
Hou
r
;;.H 6t
hH
our
7th
Hou
r
8th
Hou
r
9th
Hou
r
0r)
PM
4/P
RO
D00
05
0 0
fla.
/ 0 j.
)
Now that you know how to read a CHART, do the exercises on the next two
pages.
Write your answers on
your paper.
Do not write in this booklet.
"4 00O n r- ti
SHELL CORE PRODUCTION SHEET
Look at the SHELL CORE
PRODUCTION SHEET on the next page.
Answer the
questions about that sheet.
Write the answers on
your paper.
1.
What is the CORE I.D. NO. for the work
done in the 5th hour?
2.
How many PIECES were made in the 8th hour?
3.
How many PIECES SCRAP were made in the 7th
hour?
4.
Jack went to lunch in the
hour.
5.
The machine broke down in the
hour.
6.
What is the CORE DESCRIPTION for the 1st hour?
7.
What is the CORE WEIGHT for the 4th hour?
8.
Core I.D. No. 1202963 has
IMPRESSIONS.
9.
How many MACHINE CYCLES were run in the 2nd hour?
SH
ELL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hift:
Nam
e:M
achi
ne N
o.:
Tim
eF
rom
- T
oC
ore
I.D. N
o.C
ore
Des
crip
tion
Cor
eW
eigh
tIm
p/B
ox 2
(M
achi
neC
y Ic
esP
iece
s=
Mad
eP
iece
sS
crap
.ow
nT
ime
Hou
r4.
11)
-S; R
I5,
),(0
0&0
Su1/
4),,,
PO
-I-
n 16
i3
02n
dH
our'
Lau
ii
1,(1
/3
7.-
,,,,
,)0
3rd
Hou
r67
ro
_ri
. di,
0"
/1I
3]35
010
ryl.,
-,
73(c
-41k
4th
Hou
rii; '
(p 3
1A
\ q./
v)E
icc,
)5,
alb
sI
14..:
<()
\0
5th
Hou
r.)
.4:
9' "
4t:
1t
I1
liD
1,;
)1,
,_.
. k.
-.,
rn ,
,-,
Luv
\ct,
6th
Hou
r'
'I1'
I1
i4/
1 i
li6
7th
Hou
r1°
: iji)
f:I
DN
O -
,),9
6A
C.'(
.1 0
-P)
oclc
ii'_
)-1
1-)5
2,'..
; 67
8th
Hou
r11
,. 0
- jA
:si
iii 1
112
31
1(0
)
-,,
:Do
01/0
f okA
6ocu
il:;-
\le,
9th
Hou
rJa
z& :
i : li
b),
i to
1
23
61,
'17es
) ,T
hcJu
3 05
PM4/
PRO
D00
05
Now that you know how to read a
CHART, let's learn how to fill out to
a SHELL CORE PRODUCTION SHEET.
Get a blank SHELL CORE PRODUCTION SHEET from
your teacher.
Turn the page to see how
you fill out this form.
301
Look at the IIII lines.
This is the place for the DATE, the
SHIFT, the
FULL NAME, and the Shell Core MACHINE NUMBER.
If you do not put your FULL NAME
on the line,
the computer will not give
you credit for your work.
Fill in your practice sheet with the following:
DATE:
put today's date
SHIFT:
1ST
NAME:
write your own name
MACHINE NO.:
400
SHE
LL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hith
amm
Nam
eim
mum
nsia
mem
Mac
hine
No
Tim
eF
rom
- T
oC
ore
I.D. N
o.C
ore
Des
crip
tion
Cor
eW
eigh
tIm
p/B
oxx
Mac
hine
Cyl
ces
Pie
ces
=M
ade
Pie
ces
Scr
apD
own
Tim
e1s
tH
our
2nd
Hou
r
3rd
Hou
r
4th
Hou
r
5th
Hou
r
6th
Hou
r
7th
Hou
r
8th
Hou
r
9th
Hou
r
PM
4/P
RO
D00
05
Look at the blue box.
This shows the time work begins andends for each
hour.
The numbers show how this column should be filled
in for the
first shift.
Copy the numbers on your practice sheet.
SH
ELL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hift:
Nam
e:M
achi
ne N
o.:
Tim
eF
rom
- T
oC
ore
I.D. N
o.C
ore
Des
crip
tion
Cor
eW
eigh
tIm
p/B
ox74
Mac
hine
Cy
Ices
Pie
ces
-1
Mad
eP
iece
sS
crap
Dow
nT
ime
1st
Hou
r11
;(71
.) -
5! 4
1)
2nd
Hou
r,..
.--
-'' J
-3 -
(0. 6
1)
3rd
Hou
r6:
J6 -
/-16
4th
Hou
r76
1,(.
.6,1
-1
5th
Hou
r8:
" -
1:61
3
6th
Hou
rc.
'l " -
I °*
au
7th
Hou
r1J
: i4
-1 I
ta)
8th
Hou
r1
1.#0
LI u
v.,
9th
Hou
rID
;efu
-i:06
PM
4/P
RO
D00
05
3C8
The orange numbers are the CORE I.D.
NO.
The green words are the CORE DESCRIPTIONS.
These numbers and words are
always filled in by the leadman.
Copy them on your practice sheet.
A is
0L
' IV40
1
SH
ELL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hift:
Nam
e:M
achi
ne N
o.:
Tim
eF
rom
- T
oC
ore
I.D. N
o.
R '''::
CO
re''.
..,'
Des
crip
tion
"
Cor
eW
eigh
tIm
p/B
oxz
Mac
hine
Cy
Ices
Pie
ces
=M
ade
Pie
ces
Scr
apD
own
Tim
e
ist
Hou
r5
5'1
'6)9
(-[
Gl
(-le
- I
v-)
2nd
Hou
r.
/i1
3rd
Hou
r
4th
Hou
r1ar
t ,35
'75
1
_i__
__.)
:-sc
ci
5th
Hou
r)%
.1
6th
Hou
r
,
(
.
7th
Hou
rR
-",,
3fio
),...
_)--
1-1c
K8t
hH
our
1i
1t
9th
Hou
r.
k/,
402
PM
4/P
RO
D00
05
403
The yellow box shows the COREWEIGHT.
The worker weighs the firstcore he makes and writes the amount in this
column.
Put these core weights on
your practice sheet:
1st
hour:
9.5
lbs.
2nd
hour:
11
3rd
hour:
11
4th
5th
hour:
hour:
1.5
lbs.
6th
hour:
7th
8th
hour:
hour:
3 lbs.
9th hour:
L.0
4.1
) ' ljj
Dat
e:S
hift:
SH
ELL
CO
RE
PR
OD
UC
TIO
N
Nam
e:M
achi
ne N
o.:
Tim
eF
rom
- T
oC
ore
I.D. N
o.C
ore
Des
crip
tion
Cor
eW
eigh
tIm
p/B
oxx
Mac
hine
Cyl
ces
Pie
ces
=M
ade
Pie
ces
Scr
apD
own
Tim
e
1st
Hou
r
2nd
Hou
r
3rd
Hou
r
4th
Hou
r
5th
Hou
r
6th
Hou
r
7th
Hou
r
8th
Hou
r
9th
Hou
r
L7.0
PM4/
PRO
D00
05
(10
The pink box shows the number
of IMPRESSIONS in the
core box.
Put these IMPRESSIONS
on your practice sheet:
n 8
1st hour:
12nd hour:
13rd hour:
14th hour:
2
5th hour:
2
6th hour:
2
7th hour:
18th nour:
1
9th hour:
1
40
SH
ELL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hift:
Nam
e:M
achi
ne N
o.:
Tim
eF
rom
- T
oC
ore
I.D. N
o.C
ore
Des
crip
tion
Cor
eW
eigh
tM
achi
neC
y Ic
esP
iece
s- M
ade
Pie
ces
Scr
apD
own
Tim
e
1st
Hou
r
2nd
Hou
r
3rd
Hou
r
4th
Hou
r
5th
Hou
r
6th
Hou
r
7th
Hou
r
8th
Hou
r
9th
Hou
r
4 I
0P
M4/
PR
OD
0005
The blue box shows the number
of MACHINE CYCLES.
The worker writes howmany times he runs his machine
a full cycle
and makes one or more
cores.
Put these MACHINE CYCLES
on your practice sheet:
1st hour:
35
2nd hour:
34
3rd hour:
32
4th hour:
67
5th hour:
34
6th hour:
60
7th hour:
25
8th hour:
35
9th hour:
31
SH
ELL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hift:
Nam
e:M
achi
ne N
o.:
Tim
eF
rom
- T
oC
ore
I.D. N
o.C
ore
Des
crip
tion
Cor
eW
eigh
tIm
p/B
ox x
Mac
hine
Cy
Ices
Pie
ces
= M
ade
Pie
ces
Scr
apD
own
Tim
e
1st
Hou
r
2nd
Hou
r
3rd
Hou
r
4th
Hou
r
5th
Hou
r
6th
Hou
r
7th
Hou
r
8th
Hou
r
9th
Hou
r
4 4
4:15
PM
4/P
RO
D00
05
The green box shows the number
of PIECES MADE in each hour.
The worker multiplies the
orange numbers under IMP/BOX times the blue
numbers under MACHINE CYCLES.
He writes the answer in the
yellow box
under PIECES MADE.
The 1st hour hour and the 4th hour
are filled in to
show you how to do this.
Fill in the rest of the PIECES
MADE column on your practice sheet.
Lt i
I
SH
ELL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hift:
Nam
e:M
achi
ne N
o.:
Tim
eF
rom
- T
oC
ore
I.D. N
o.C
ore
Des
crip
tion
Cor
eW
eigh
tIm
p/B
ox74
Mac
hine
Cyl
ces
'Pis
ces
:11
'0W
e'P
iece
sS
crap
Dow
nT
ime
1st
Hou
rI
353-
--2n
dH
our
3rd
Hou
r
4th
Hou
rc-
-,(0
71
3Li-
5th
Hou
r,
6th
Hou
r
7th
Hou
r
8th
Hou
r
9th
Hou
r
(-1
L,
0L
1.19
PM4/
PRO
D00
05
The pink box shows the number of PIECES
SCRAP.
At the end of each hour the worker writes thenumber of scrap pieces he
made.
Put these SCRAP numbers on
your practice sheet:
1st hour:
02nd hour:
13rd hour:
3
4th hour:
10
5th hour:
46th hour:
67th hour:
08th hour:
09th hour:
0
H2O
4112
1
SHE
LL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hift:
Nam
e:M
achi
ne N
o.:
Tim
eF
rom
- T
oC
ore
I.D. N
o.C
ore
Des
crip
tion
Cor
eW
eigh
tIm
p/B
oxx
Mac
hine
Cyl
ces
Pie
ces
- Mad
e
---
Pla
get.
Scr
ap=
"D
own
Tim
e1s
tH
our
2nd
Hot
.-
3rd
Hou
r
4tn
Hou
r
5th
Hou
r
6th
Hou
r
7th
Hou
r
8th
Hou
r
9th
Hou
r
PM
4 /P
RQ
D00
05
2 2
The blue box shows the DOWN TIMES.
The worker writes in the amount of time he is not running hismachine.
He also writes the reason for the DOWN TIME.
The first DOWN TIME is
filled in to show you how to do this.
Put these DOWN TIMES
5th hour:
7th hour:
on your practice sheet:
30 min lunch
15 min power off
TURN THE PAGE TO SEE IF YOUR PRACTICE SHEET IS CORRECT.
2 4
2 5
SH
ELL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hift:
Nam
e:M
achi
ne N
o.:
Tim
eF
rom
- T
oC
ore
E.D
. No.
Cor
eD
escr
iptio
nC
ore
Wei
ght
Imp/
Box
xM
achi
neC
ylce
sP
iece
s=
Mad
eP
iece
sS
crap
Dow
nT
ime
1st
Hou
r
2nd
Hou
r
3rd
Hou
r0
PP
Mre
-0-4
(
4th
Hou
r
5th
Hou
r
6th
Hou
r
7th
Hou
r
8th
Hou
r
9th
Hou
r
PM
4/P
R00
0005
SHE
LL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hift:
r S
k"N
ame:
Mac
hine
No.
:o
o
Tim
eF
rom
- T
oC
ore
I.D. N
o.C
ore
Des
crip
tion
Cor
eW
eigh
tIm
p/B
oxM
achi
neC
ylce
sP
iece
sM
ade
Pie
ces
Scr
apD
own
Tim
e
ist
Hou
r41
-.'4
50'S
:/-
--, 5
/ C
, q 7
i..tit
dT
r)'3
..5 lb
s./
3535
02n
dH
our
5'. .
a). 4
: w11
..
iI
I )
I34
c5 4
i
3rd
Hou
r..
"yr:
fu-4
6'
't,
tIII
/3D
.3
JO m
in,
-Brc
a..k
.
4th
Hou
rV
:1
.7 3
'... 2
5;(x
t)1
3,2
,,6
7I
3 q
IL
5th
Hou
r4:
ol)
4:i
it
4
3 4
&,5
'4
30 (
)lin
i_ch
hd61
6th
Hou
rG
:64.
...io
.'n)
. /)-
--6
0/ D
.0
7th
Hou
r1
: AI -
it:4
56=
'--
Da
c, "
slci
z.5-
tic.
,3
Ihr
(5.
c.25
-o
15iri
-)p
0 W
e rs
o-f-
-P
8th
Hou
rIv
o., 1
2.:(
14I.
44I
3535
9th
Hou
r/2
;4.0
.- /:
ivi 4
404
to
13
13
10
z 2
9PL
44/P
RO
D00
05
Get another blank Shell Core Production Sheet.
Turn the page and read about another day ill the career of Jack Doss.
Fill in your blank sheet with Jack's work.
If you need to, look
back in the booklet for help in doing this exercise.
1st Hour through 3rd Hour
START WITH THE 1ST HOUR AND PUTTHESE NUMBERS ON THE SHE1.2:
Jack starts
work at 5:00 on a 400 machine.
The first job is Core I.D. No.
5267997.
The leadman tells Jack towrite "Body" under the description.
The core
weighs 4.02 pounds.
The core box has 1 impression.
1st hour:
2nd hour:
3rd hour:
Machine cycles:
22
Scrap:
1
Machine cycles:
23
Scrap:
0
Machine cycles:
23
Scrap:
0
4t-1 Hour through 6th Hour
START WITH THE 4TH HOUR AND PUT
THESE NUMBERS ON THE SHEET:
The 4th
hour starts with a "body" core
with the I.D. No. of 1273574/01.
The
core box has 2
impressions.
It weighs 1.5 pounds.
4th hour:
5th hour:
6th hour:
Machine cycles:
67
Scrap:
0
Machine cycles:
65
Scrap:
4
Machine cycles:
25
Scrap:
5
7th Hour through 9th Hour
START WITH THE 7TH HOUR
AND PUT THESE NUMBERS ON THE
SHEFr:
The 7th
hour starts with a Body core
with the I.D. No. 5253741/01.
The core
weights 30 pounds.
There is 1 impression in the core
box.
7th hour:
8th hour:
9th hour:
e 0
0
Machine cycles:
16
Scrap:
0
Machine cycles:
21
Scrap:
3
Machine cycles:
18
Scrap:
5
r").
DID YOU REMEMBER TO MULTIPLY
THE IMPRESSIONS TIMES THE CYCLES TO
FIND THE NUMBER OF PIECES MADE?
Down Time
Jack had the following Down Times.
7:15 to
7:25...10
10:00 to 10:30...30
12:07 to 12:23...16
Put these times on the sheet.
minute break
minute lunch
minute power off
LOOK AT THE NEXT PAGE AND SEE IF
YOUR SHEET IS CORRECT!
3 4
4 3
5
SH
ELL
CO
RE
PR
OD
UC
TIO
N
Dat
e:S
hift:
Nam
e:C
Mac
hine
No.
:.2
1 o
0
Tim
eF
rom
- T
oC
ore
I.D. N
o.C
ore
Des
crip
tion
Cor
eW
eigh
tIm
p/B
ox2(
Mac
hine
Cyl
ces
Pie
ces
=M
ade
Pie
ces
Scr
apD
own
Tim
e
H1
sotu
r-.
6(' 4
CY
°S
6 7
q q
rlo
Bdi
L L1.0
-,A
cI
D..
)
2nd
Hou
r6
lib-1
1; in
)i
1li
1,
(5
:-;-
; 30
3rd
Hou
rFf
0_,
,i.
ou -
63
vn
ij>
>
1
c:-.
)3
30
)0ry
.. r\
Err
ak4t
hH
our
(3 :
du -
ci:L
iuI D
il57
3/41
130,
-1(,
)1
S 11
);,
71
345t
hH
our
(1 a
) -
I °. '
`i1
i,i.
26
5-13
0L
i (
6th
Hou
rI
D' I
N1
I. tb
I1
ItI
ka
0) 5
..6
.- _'.c
.1
, ,. /
\
L u
oc
67t
hH
our
1i :
_ r)
. . 0
E (
*,( L
i30
(L
sI
1 (0
i(-
0
8th
Hou
r-li
b/..
50
iI
111
s)I
Ji)
n),
, ,
-a9t
hH
our
i : if
b-
D: 6
1),
,ii
,k
1 3
i5 4,37
PM4/
PRO
D00
05
CONGRATULATIONS!
You have learned how to read and fill out one of the OCCUPATIONAL FORMS
used at Robinson Foundry.
If you have any further questions, ask your teacher.
r) r
")c1
. J c
3zr
., 3
JOBS
. A PARTNERSHIP BETWEEN EDUCATION AND INDUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON FOUNDRY, INC.1992
ROBERT E. STONE,PROJECT DIRECTOR205 234 6346 EXT 6217
LESSON 14GRINDING PRODUCTION SHEET
WRITTEN BY:BETH MAXWELL,INSTRUCTOR205 329 8481 EXT 81
GRINDING PRODUCTION SHEET
The grinding production sheet is used in the cleaning
room to keep a count of pieces ground. It is important to the
worker to keep up with each number every hour.
In this booklet we are going to attempt to learn to
find the parts of a grinding production sheet. The worker
will learn to find the part by first coloring the part,
next he will learn to fill in the part of the sheet.
Turn to the next page to learn about the first part
of the grinding production sheet.
The Date is placed at the top of the grinding
production sheet. Color Date blue.
4 42
GRINDING PRODUCTION
DATE: SHIFT: WORK CENTER:
GRINDER(S):
CASTINGNUMBER
PRODUCTIONTOT. GROUND TOT. SCRAP
TIMESTART
TIMESTOP
.443
PM4/PR000300/061191
Fill in the date on each of the following sheets:
1. Date: 3/13/92
2. Date: 1/11/92
3. Date: 2/10/92
4. Date 1/17/92
GRINDING PRODUCTION
DATE: SHIFT: WORK CENTER:
GRINDER(S): .-
CASTINGNUMBER
. PRODUCTION TIMESTART
TIMESTOP
-
-_
TOT. GROUND TOT. SCRAP
. . . :I
.
-
,
..
.
.
I t: . .It
1
.. .
.
.
..
' .. , .
.
.
-.
. . .
..
.
. .
..
. . .. .
.
.
.
.
.
.
1.
. .
.
-. - -
. .
....,
. . ...-
:
. : .
..
.. -
.
. .
.. .
' .
.. .
.
..,
.
-. .
445 -
PIA4/PRO000391061 tat
The shift is placed at the top of each sheet.
Color the shift red:
e .1 el.
DATE:
GRINDING PRODUCTION
SHIFT: WORK CENTER:
GRINDER(S):
CASTINGNUMBER
PRODUCTION TIMESTART
TIMESTOP .
TOT. GROUND TOT. SCRAP
. .
.
. .
:tic
t.
.
.
.
.. . .
_
...
. .
-. . .
.
.
.,
.
.
.
.
..
.. .
.
.
.
.
1.
. . . .
..
_ .
. - .
-
.
. .
._...
.
.
.
.
.
-. .
.
.
'-
.
.
..
. .
..
_.
.
447rm4/pR00000gi06l 101
Fill the shift in for each sheet:
1. Shift: 1st
2. Shift: 2nd
3. Shift: 3rd
4. Shift: 2nd
x
DATE:
GRINDER(S):
GRINDING PRODUCTION
SHIFT: WORK CENTER:
CASTINGNUMBER
PRODUCTIONTOT. GROUND I TOT. SCRAP
TIMESTART
TIMESTOP
t
ti
44:-) PA44/PR000000/001191
In the cleaning room there are different areas for each
grinders. These are called work centers. Color work center on the
sheets-yellow.
t: 7 r)
GRINDING PRODUCTION
DATE: SHIFT: WORK CENTER:. .
GRINDERS):
CASTINGNUMBER
PRODUCTION#
TIMESTART
TIMESTOPTOT. GROUND TOT. SCRAP
I
i.
..i.1
r
.
.
- ...
.. 4..
.
. 451PL14/PR000009/061 a f
Also in the cleaning room there are many different kinds
of grinders. Look at the top of the sheet and color the
word grinders-purple.
I
. . .
GRINDING PRODUCTION
DATE: SHIFT: WORK CENTER:
GRINDER(S):
CASTINGNUMBER
PRODUCTIONTOT. GROUND
TIME TIMETOT. SCRAP START STOP
453pm4fpFl00000010e1 191
. p
In working with castings, all castings have a number.
The numbers are marked somewhere on the casting. Color column
marked casting number-black.
Now fill in the following casting numbers on the other sheet:
1. 56044
2. 40424
3. 24816
4. 06F141000
GRINDING PRODUCTION
DATE: SHIFT: WORK CENTER:
GRINDER(S):
CASTINGNUMBER
PRODUCTIONTOT. GROUND TOT. SCRAP
TIME TIMESTART STOP
PM 4/10 RO 00039/061 1 1
4 rr
ToT. ground means
grinder grinds. Color
the total number of castings that
ToT. ground' on your sheet-green.
Z. 7"-0
4
GRINDING PRODUCTION
DATE: SHIFT: WORK CENTER:
GRINDER(S):
PRODUCTION TIME
TOT. GROUND TOT. SCRAP START
'57 PM4/PROD:030/01111111
On each line under ToT. ground the grinder
writes the number ground of that casting number. Please
fill in on each line each of the following numbers
ground:
1. 525
2. 200
3. 100
4. 225
//
4
GRINDING PRODUCTION.
DATE: SHIFT: WORK CENTER:
GRINDER(S):
CASTINGNUMBER
. PRODUCTION TIMESTART
TIME -
STOPTOT. GROUND TOT. SCRAP
. . .
.
.. . .
. . i,.
.
.
. ...
.
. ..
. .. ... : .
.
..
.-
.
. .
..
.
. .
.
.
.
.
. .
-1.
..
..
. ..
.
-
.
.
.
.
.
. .
...
.
.
. .
. .
.
.
. . .. .
*-.
. ..
459PIA4(PRO00009/091191
Tot. scrap means number that was no good in
Tot. ground. These must be remelted. Color Tot. scrap column on
the following sheet-orange.
GRINDING PRODUCTION
DATE: SHIFT: WORK CENTER:
GRINDER(S):
CASTINGNUMBER
PRODUCTIONTOT. GROUND TOT. SCRAP
TIMESTART
TIMESTOP
t
PIA4/PRO03000/061 19$
4 61
On each line under Tot. scrap are filled in the number
of scrap the grinder finds each casting number. PLease fill in
each number on each line under Tot. scrap:
1. 10
2. 25
3. 40
4. 60
Ccd..-1
DATE:
GRINDING PRODUCTION
SHIFT:
GRINDER(S):
WORK CENTER:
CASTINGNUMBER
PRODUCTION . TIMESTART
TIMESTOPTOT. GROUND TOT. SCRAP
. :.
.
%
..
..
.. .. ...
. ...
.
. .
.. .
. .
.
*-1.
. . .
..
.
.
...
. .
......
.
...
. .
.
.
.
. .
.
.
. -.
. . . . -,
..
..
463 P144/PROCC00010111 191
All time on sheets must be kept, Time start means
the time you begin to work on each casting. Color Time start
column-pink.
GRINDING PRODUCTION
DATE: SHIFT: WORK CENTER:
GRINDER(S):
. 465PM4/PR000000/061 tat
. . . . . .
On each line under Time start the grinder is to place
the time he begins to work on each casting. On each line
under Time start please fill in the following times:
1. 4:00 A.M.
2. 5:00 A.M.
3. 6:00 A.M.
4. 8:00 A.M.
DATE:
.
GRINDING PRODUCTION
SHIFT: WORK CENTER:
GRINDER(S):
CASTINGNUMBER
PRODUCTION TIMESTART
TIMESTOPTOT. GROUND TOT. SCRAP
. .
.
..
. . ..
.
..
. : .. ,
.
. . ..
. .
. ..
.
.
. .
.
... .
I..
.
.
.
.
.' .
. . .
..,.
. .
.0..
. .
.
. .
. .
.
. s.
.'.
. .,
I
PM4/PR000030/061121
Time stop means the time the grinder stops has grinding
on a certain casting number. Color time stop column-brown.
GRINDING PRODUCTION
DATE: SHIFT: WORK CENTER:
GRINDER(S):. :
CASTING . PRODUCTION
NUMBER TOT. GROUND TOT. SCRAP
TIME TIMESTART STOP
PA44/PR0000002/061 I i 5
On each line under Time stop each grinder must
place the time he stops. Please fill in the following times
on each line:
1. 5:00 A.M.
2. 6:00 A.M.
3. 7:00 A.M.
4. 9:30 A.M.
wt a
DATE:
GRINDING PRODUCTION.
SHIFT:
GRINDER(S)::
WORK CENTER:
CASTINGNUMBER
PRODUCTION TIMESTART
TIMESTOP
TOT. GROUND TOT. SCRAP
.
..
. . . . . .
.
.
. .. .
. ... ..
.
..
..
. ...
.
.
1.
.
_
. .
.
...
.
. .
. ._
.
.
.
.
.
' .
. ..
.
.
.
...
4 71PM4/PRO0:009/0d1 191
Now let's try filling out all the material on the grinding
production sheet. Fill in the following items on the sheet:
1. For casting number 09SF1112, fill in total amount
ground 85 with total scrap of 18. The grinder started grinding
at 5:00 A.M. and stopped at 6:15 A.M. Fill in the grinding
production sheet.
2. Casting number 08EG2233 was started at 9:00. A.M. and
stopped at 10:15 A.M. There were 35 ground and 8 scraped.
Fill in the grinding production sheet.
GRINDING PRODUCTION.
DATE:SHIFT: WORK CENTER:
GRINDER(S):
ICASTINGNUMBER
PRODUCTIONTIME
STARTTIMESTOP
TOT. GROUND TOT. SCRAP
:1
.
.
. Ia
.
.
.....,
,.(,
.
- -
. .
- .
. %
PM4/1MOD3C091091 191
f
JOBS
A PARTNERSHIP BETWEEN EDUCATION AND INDUSTRY
CENTRAL ALABAMA COMMUNITY COLLEGE & ROBINSON FOUNDRY, INC.1992
ROBERT E. STONE,PROJECT DIRECTOR205 234 6346 EXT 6217
LESSON 15RF VOCABULARY
474
WRITTEN BY:BONNIE RASMUSSEN,CURRICULUM CONSULTANT205 329 8481 EXT 81
Contents in this Learning Package
RF Vocabulary (for early readers)
1. Pretest
Trainee is given list of pairs of words. Instructor reads one wordof each pair, which the trainee is to circle.
2. Hear-and-see exercise
Trainee listens to an audio tape which reads the list of vocabularywords, and then reads sentences using the vocabulary words.Trainee 'reads along' on with cards.
(Trainee is given list of vocabualry words to take home.)
3. Alphabetizing exercise (trainee can refer to master list ofvocabulary words)
Trainee draws lines to show correct alphabetical order of a printedlist of vocabulary words.
4. Matching exercises
a. Trainee draws line from each vocabulary word to itsmatch, choosing from a pair of words in each case.
b. Same as 4a, but more difficult because of similarity ofpaired words.
5. Underlining exercises
a. Trainee underlines the vocabulary words in familiarsentences.
b. Same as 5a, but more difficult because sentences aremixed up.
6. Fill-in-the-blank exercises
a. Trainee fills in vocabulary words which have been leftout of familiar sentences.
b. Same as 6a, but more difficult because sentences aremixed up.
4'11--41)
7. Narrative exercises (after listening to audio tape)
a. Trainee finds and circles vocabulary words in narrative
paragraphs.
b. Trainee fills in vocabulary words in cloze exercise.
c. Trainee answers multiple choice questions based.
8. Post test (same as pre test)
4' 6
Pre test and Post test
ant1.
Alex City
2.
3.
4.
5.
6.
7.
8.
9.
boy
BP Machine
Coca Cola
core
Dadeville
DANGER
EPS
elephant
foundty
football
green
green sand
heat
Hardee's
IRS
iron
July10.
January
CI 7'7"
11.K -Mart
Kentucky Fried Chicken
lost12.
lost foam
13.McDonald's
mold
No Smoking Area14.
N Street
OK15.
October
.
pay check16.
pattern
quality control17.
quiet zone
18.
19.
Robinson - Bodine
Robinson Foundry
STOP
Saturday
telephone20.
taxes
478
21.
22.
23.
24.
B Street
U Street
V-8 engine
vegetables
Wal-Mart
wildcats
x-ray
x-rated movie
you25.
yes
26.
.
zebra'
zero
C2. Vocabulary List
A Alex CityB BP machineC core 3
D DANGER VE EPSF foundry
G green sand IH heat S
1 iron f
J July I°
K Kentucky Fried 0Chicken
L lost foam /2-
M McDonald-s 13N No Smoking Area itO OK 15
P patternQ quality control I/R Robinson Foundry 6
S STOP //
T taxes 2,0
II u Street 21
2V-8 engiAe 2W Wal-Mart -1
X x-ray z I'
Y you 2SZ zero 2,4-
Co
2. Sentences Using Vocabulary Words
I live in Alex City.I work on the BP Machine.Run a core on this job.
The sign says 'Danger'.I work in the EPS Department.I work in a foundry.
I iork on the Green Sand line.We heat the iron.We heat the iron.
We eat fried chicken on July 4th.We eat Kentucky Fried Chicken on July 4th.I work on the lost foam process.
We eat at McDonald's.McDonald's has a No Smoking Area.It's CK to smoke in the parking lot.
The pattern number is 346036.I work in the Ouality Control Department.I work at Robinson Foundry.
The sign says 'STOP'.You can't stop taxes.The sign says 'U Street'.
That Ford has a V-8 encine.That Ford is parked outside Wal-Mart.Get an x-ray at the Alex City Hospital.
You can't stop taxes.Five, four, three, two one, zero.
/ °I
e
C.
3. Alphabetizing exercise
Alex CitycoreBP machine
EPSfoundryDANGER
heatgraen sandiroa
Kentucky Fried Chickenlost-foamJuly
McDonald'sOKNo Smoking Area
Robinson Foundryquality controlpattern
STOPV Streettaxes
V-8 enginex-rayWal-Mart
zeroyou
L7, ric_s
4a. Matching
ant1. Alex City
Alex City
boy2. BP Machine
BP Machine
Coca Cola3. core
core
Dadeville4. DANGER
DANGER
EPS5. EPS
elephant
foundry6. foundry
football
green7. green sand
green sand
heat8. heat
Hardee's
IRS9. iron
iron
July10. July
January
K -Mart11. Kentucky Fried Chicken
Chicken Kentucky Fried Chicken
12. lost foaia
13. mold
14. .No Smoking Area
15. OK
16. pay check
17. quality control
18. Robinson -Bodine
19. STOP
20. taxes
lost
lost foam
McDonald's
mold
No Smoking Area
N Street
OK
October
pay check
pattern
quality control
quiet zone
Robinson - Bodine
Robinson Foundry
STOP
Saturday
telephone
taxes
n4
B Street21. U Street
U Street
V-8 engine22. V-8 engine
vegetables
Wal-Mart23. Wal-Mart
wildcats
x-ray24. ..x -ray
x -rated
you25. you
gun
zebra26. zero
zero
4b. Matching
apple pie1. Alex City
Alex City
Coke machine2. BP Machine
BP Machine
care3. core
core
dogwood4. DANSER
DANGER
EPS5. EPS
IBM
foundry6. foundry
family
gray sand7. green sand
green sand
heat8. heat
he
wine9. iron
iron
July10. July
June
406
K -Mart11. Kentucky Fried Chicken
Kentucky Fried Chicken
time12. lost foam
lost foam
McDonald's13. McDonald's
McDougall's
No Smoking Area14. No Smoking Area
No Parking Zone
OK15. OK
oh
pay check16. pattern
pattern
quality control17. quality control
high quality
Robinson family18. Robinson -Bodine
Robinson Foundry
STOP19. STOP
Start
taxis20. taxes
taxes
D Street21. U Street
U Street
V-8 engine22. V-8 engine
V-6 engine
Wal-Mart23. Wal-Mart
wishing well
x-ray24. x -ray
x-rays
you25. you
yes
ZOO
26. zero .
zero
42 SI 8
5a. Underlining
I live in Alex City.I work on the BP Machine.Run a core on this job.
The sign says 'Danger'.I work in the EPS Department.I work in a foundry.
I work on the Green Sand line.We heat the iron.We heat the iron.
We eat fried chicken on July 4th.We eat Kentucky Fried Chicken on July 4th.I work on the lost foam process.
We eat at McDonald's.McDonald's has a No Smoking Area.It's OK to smoke in the parking lot.
The pattern number is 346036.I work in the Quality Control Department.I work at Robinson Foundry.
The sign says 'STOP'.You can't stop taxes.The sign says 'U Street'.
That Ford has a V-8 engine.That Ford is parked outside Wal-Mart.Get an x-ray at the Alex City Hospital.
You can't stop taxes.Five, four, three, two one, zero.
4
5b. Underlining
We eat at McDonald's.We heat the iron.I work on the BP Machine.
The sign says 'Danger'.I live in Alex City.I work in a foundry.
The pattern number is 346036.We heat the iron.That Ford is parked outside Wal-Mart.
I work in the Quality Control Department.I work in the EPS Department.We eat fried chicken on July 4th.
You 'can't stop taxes.Five, four, three, two one, zero.I work on the Green Sand line.
McDonald's has a No Smoking Area.It's OK to smoke in the parking lot.
That Ford has a V-8 engine.
I work'at Robinson Foundry.I work on 'the lost foam process.The sign says 'STOP'.
The sign says 'U Street'.You can't stop taxes.Get an x-ray at the Alex City Hospital.
We eat Kentucky Fried Chicken on July 4th.Run a core on this job.
490
6a. Fill-in-the-blank
I live inI work on theRun a on this job.
The sign saysI work in the Department.I work in a
I work on the line.We the iron.We heat the
We eat fried chicken on 4th.
We eat on July 4th.I work on the process.
We eat atMcDonald's has aIt's to smoke in the parking lot.
The number is 346036.I work in the Department.I work at
The sign saysYou can't stopThe sign says
That Ford has aThat Ford is parked outsideGet an at the Alex City Hospital.
can't stop taxes.Five, four, three, two one,
6b. Pill-in-the-blank
We heat theI live inI work in the Department.
We eat atThe sign saysI work in a
You can't stopWe the iron.It's to smoke in the parking lot.
I work on theWe eat fried chicken on 4th.I work in the Department.
I work on the process.That Ford is parked outsideGet an at the Alex City Hospital.
McDonald's has aRun a on this job.The number is 346036.
el- I work at .
..,_ I work on the line.The sign says
The sign saysWe eat on July 4th.That Ford has a
can't stop taxes.Five, four, three, two one,
7a. Narrative
1.
I live in Alex City and work at a foundry. Some of the departments
at Robinson Foundry are the Green Sand line, EPS, and Quality
Control. A sign says 'DANGER" near where we heat the iron.
The first job for the BP Machine today had a core in the mold.
That job's pattern number was 346036.
2.
Five, four, three, two, one, zero.
3.
I live in Alex City on U Street. I drive a V-8 Ford. I work at
Wal-Mart and eat at McDonald's and Kentucky Fried Chicken. Both
places are OK to eat at.
I can read signs. The sign at the end of the street says 'STOP'.
Signs at the Alex City hospital say 'No Smoking Area', and 'X-ray'
machine..
4.
The year has these months in it: January, February, March, April,
May, June, July, August, September, October, November, December. In
January I file my taxes with the IRS. Then I have zero dollars
left.
7.b Narrative fill-in-the-blank
1.
I live in City anddepartments at RobinsonQuality Control. A sign says
work at a foundry. Some of theare the Green line, EPS, and
near where we heat the iron.
The first job for the BP
job's number was 346036.
2.
today had a core in the mold. That
Five, four, three, two, one,
3.
I live in Alex City on U . I drive a Ford. I work at
Wal- and eat at McDonald's and Fried Chicken. Both
places are to eat at.
I can signs. The at the end of the street says 'STOP'.
Signs at the Alex hospital say 'No Area', and 'X-ray'
machine.
4.
The year has these months in it: January, February, , April,
May, June, , August, September, October, November, December.
In January I file my with the IRS. Then I have dollars
left.
7c. Narrative Multiple Choice
I
1. I live
a.b.
in Alex City.in Robinson Foundry.
2. I work
a.b.
3. EPS
a.b.
at Alex City Hospital.at Robinson Foundry.
is a department.is where we heat the iron.
4. The job's pattern number
a.b.
II
was 346222.was 346036
1. Five,' four
a. threeb. zero
2. one + three =
a. fiveb. four
III
1. I live
a.b.
in Alex City.in the machine.
2. I eat at
a. Wal-Martb. McDonald's
3. The sign at U Street says
a.b.
'STOP''x-ray machine'
4. The sign at Alex City Hospital says
a.b.
IV
'DANGER''x-ray machine'
1. January, February
a. Julyb. March
2. I file my taxes with
_a. the IBM.b. the IRS.
3. .October, November
a. Juneb. December
r.)