Overview
• Why a Corporate Strategy
• Open Architecture
• Notional Road Ahead
Defense Science Board“Observations”
• Interoperability is limited, and the flexibility to use each other’s test range resources is absent.
• One can envision the gradual introduction of common control elements that would eventually provide us with the ability to “shoot any target on any range.”
• This approach will yield operations cost savings over time, since today’s one-of-a-kind systems will become increasingly difficult to service, maintain, and upgrade.
• Target interoperability will also facilitate better joint testing and training.
• Past attempts at common control have failed. • The Task Force believes another attempt is worthwhile if
service “buy-in” can be achieved
Why a corporate strategy now!
• Air Force - Incorporating Army UHF Targets into the AF TCS• Army - Integration of Air Force BQM-167 into Army Test Ranges• Army - High Compression UHF Data Link• Army - MSTCS L-Band Transponder for Sub-Scale Targets• Army - Navy BQM-74 GRDCS Frequency Integration• Army - Object Oriented Navigation, Guidance and Control (NGC) Software• Navy – Proprietary Info • Navy - Cooperative Adaptive Control of Target Systems
FY08 Proposed TMI Target Control projects
They all have merit but do not lead us to a corporate solution
Today’s Situation• Army
– DFCS: Capable but may be replaced– TTCS: Capable, limited, Army owns data rights– WSTCS: Derivative of MSTCS
• Air Force– GRDCS: System of Systems Approach, Unique, Old
• Navy– ITCS: Only one site operational– SNTC: Serves training and maybe testing……May upgrade to
FAS or a new architecture.
• OSD– NGTCS: Terminated– MSTCS: Early success’s– SRTG Control System: Open architecture approach for mobile
ground targets
Current Target Control Issues
System specific issues• Frequency Authorization Differences• Bandwidth• Hardware & Software Maintenance & Upgrades
Oversight perspective• Duplication of efforts• Lack of data rights• Lack of interoperability amongst targets and ranges.• Limits test and training• AST will be required to fly on tri-service ranges
Current Target Control Related TMI Projects
• Message Format Study – – Army lead thru 5D Systems, Inc.
• Common Interface Demonstration– Navy lead thru MSI
Target Control System Open Architecture
A multi-faceted strategy providing a framework for developing a joint interoperable control system architecture that adapt and exploit open-system
design principles and architectures
• Modular design with full design disclosure• Identify key interfaces with open standards• Reuseable software application• Life cycle affordability• Encourage collaboration and competition.• Certify conformance
TargetControlSystem
= interfaces
= key interface
= uses open standards
=subsystem component
Key Interface Open Key Interface
Closed Interface
Notional System Block Architecture
Road Ahead(Notional Roadmap)
• Identify a common target control architecture– Hardware– Software
• Identify key interfaces• Identify associated standards• Identify interim “wrappers”• Develop software modules
– Experiments, test and evaluation
• Establish Conformance and Maintenance
Fund in FY08 projects that comply with architecture