Upload
ramilartates
View
305
Download
15
Embed Size (px)
DESCRIPTION
SCHOOL BLDG
Citation preview
5/19/2018 Dpwh 1 Classroom
1/22
STANDARD ONE-STOREY
VARIOUS DPWH PROPOSED PROJECTS(DETAILED ENGINEERING DESIGN AND/OR SPECIAL STUDIES)
SCHOOL BUILDING(1 - CLASSROOM)
JOINT VENTURE OF
5/19/2018 Dpwh 1 Classroom
2/22
GENERAL
5/19/2018 Dpwh 1 Classroom
3/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISG-1BOD 1
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EET )
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWHPROPOSED PROJECTS
BILLOF QUANTITIES
OIC,BUILDING DIVISION
I.
BILL OF QUANTITIES WITH-OUT SHEAR WALL
ONE-CLASSROOM
Mobilization / Demobilization
A.
II. Temporary Facilities and Billboard
III. Safety and Health
IV. Earthworks
V. Termite Control Works
V I. C on cr et e Wo rk s
VII. Masonry Works
VIII. Fabricated Materi als and Hardwares
IX. Finishing Works
X. Carpentry Works
XI. Roof and Framing Works
XII. Painting Works
XIII. Electrical Works
5/19/2018 Dpwh 1 Classroom
4/22
ARCHITECTURAL
5/19/2018 Dpwh 1 Classroom
5/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISA-1BOD 2
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EET )
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWHPROPOSED PROJECTS
OIC,BUILDING DIVISION
T A B L E O F C O N T E N T S
ARCHITECTURAL
STRUCTURAL PLUMBING ELECTRICAL MECHANICAL
PERSPECTIVE
PERSPECTIVE,
TABLE OF CONTENTS
GENERAL
G - 1 BILL OF QUANTITIES
A - 1 PERSPECTIVE VIEW, TABLE OF CONTENTS
A - 2 GROUND FLOOR PLAN, FRONT AND REAR ELEVATION, TYPICAL
SIDE ELEVATION AND SCHEDULE OF FLOOR FINISHES
A - 3 ROOF PLAN, REFLECTED CEILING PLAN, LONGITUDINAL SECTION,
CROSS SECTION SCHEDULE OF DOORS AND WINDOWS
A - 4 CEILING PLAN, SECTION, PERSPECTIVE, TYPICAL CEILING VENT PLAN AND VENT SECTION DETAIL
A - 5 DETAILED CROSS SECTION, DETAIL SECTION OF EAVES FRONT,
DETAIL SECTION OF RAMP & CORRIDOR, DETAIL SECTION OF
CORRIDOR & SPOT DETAIL OF RAMP FLOORING
A - 6 BLACKBOARD DETAIL, CONNECTION SECTION DETAIL, SECTION,
SPOT DETAIL SECTION EDGE FRAMING, CHALK DUST BOX DETAIL
S - 1 GENERAL NOTES, BEAM CONSTRUCTION JOINT, TYPICAL REINFORCEMENT DETAIL, CONTROL
JOINTS FOR SLAB-ON-FILL
S - 2 STANDARD DETAILS
S - 3 STANDARD DETAILS
S - 4 FOUNDATION PLAN, DETAIL OF F-1/C-1,COLUMN
ELEVATION, DETAIL OF STIFFENER, DETAIL OF
FOOTING TIE BEAM, DETAIL SECTION OF RAMP & CORRIDOR, DETAIL SECTION OF CORRIDOR
S - 5 ROOF FRAMING PLAN, DETAIL OF ROOF BEAM
RB-1 & RB-2, DETAIL SECTION OF LRB-1 & PC-1,
ELEVATION OF END WALL FRAME, CONNECTION OF PURLINS TO LRB-1
S - 6 TRUSS DETAILS
S - 7 DETAIL SECTION AT EAVES, CONNECTION OF G.I. SHEET ROOFING TO PURLIN, TRUSS SUPPORT
CONNECTION DETAIL, SPOT DETAIL, DETAIL
CONNECTION OF CROSS BRACING, PURLIN SPLICE, ROOFING FIXER, DETAIL PLAN
CONNECTION OF PURLIN & SAG ROD
EE - 1 POWER AND LIGHTNING LAYOUT, ELECTRICAL SYMBOLS, GENERAL NOTES, ELECTRICAL
RISER DIAGRAM, SCHEDULE OF LIGHTNING
FIXTURES AND LAMPS, SCHEDULE OF LOADS
AND COMPUTATION
NOTE :
5/19/2018 Dpwh 1 Classroom
6/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISA-2BOD 3
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T)
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWH
PROPOSEDPROJECTSGROUNDFLOORPLAN,FRONT ELEVATION,
REARELEVATION,
TYPICAL SIDEELEVATIONANDSCHEDULEOF FLOOR FINISHESOIC,BUILDING DIVISION
GROUND FLOOR PLAN
FRONT ELEVATION
REAR ELEVATION
TYPICAL SIDE ELEVATION
NOTE :
SCHEDULE OF FLOOR FINISHES :
5/19/2018 Dpwh 1 Classroom
7/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISA-3BOD 4
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T)
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWH
PROPOSEDPROJECTSROOFPLAN,REFLECTED CEILINGPLAN,
LONGITUDINAL SECTION,
CROSS SECTION ANDSCHEDULEOF DOORS AND WINDOWS
ROOF PLAN
REFLECTED CEILING PLAN
CROSS SECTION
LONGITUDINAL SECTION
SCHEDULE OF
DOOR AND WINDOWS
SECTION A
OIC,BUILDING DIVISION
NOTE :
5/19/2018 Dpwh 1 Classroom
8/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISA-4BOD 5
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T)
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWH
PROPOSEDPROJECTS
PERSPECTIVECEILING PLAN
S E C T I O N
D E T A I L
OIC,BUILDING DIVISION
TYP. CLG. VENT SECTION DETAIL
TYP. CLG. VENT PLAN DETAIL
TYP. CLG. VENT SECTION DETAIL
CEILING PLAN,PERSPECTIVE,
SECTION,
TYPICAL CEILING VENTPLANANDVENTSECTIONDETAIL
NOTE :
5/19/2018 Dpwh 1 Classroom
9/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISA-5BOD 6
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EET )
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWHPROPOSED PROJECTS
DETAILEDCROSSSECTION,DET.SECTIONOF EAVES FRONT,
DETAILSECTIONOF RAMP& CORRIDOR,
DETAILSECTIONOF CORRIDOR&SPOTDETAIL OF RAMP FLOORING
OIC,BUILDING DIVISION
DETAILED CROSS SECTION DETAILED SECTION OF RAMP AND CORRIDOR
TYIPICAL DETAIL SECTION OF EAVE (FRONT)
DETAIL SECTION OF CORRIDOR
SPOT DETAIL RAMP FLOORING
NOTE :
5/19/2018 Dpwh 1 Classroom
10/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISA-6BOD 7
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EET )
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWHPROPOSED PROJECTS
BLACKBOARDDETAIL,CONNECTIONSECTIONDETAIL,
SECTION,
SPOTDETAIL SECTION EDGEFRAMING,
CHALK DUSTBOXDETAIL
OIC,BUILDING DIVISION
BLACKBOARD DETAIL CONNECTION SECTION DETAIL
S E C T I O N
CHALK DUST BOX DETAIL
SPOT DETAIL SECTION
EDGE FRAMING
NOTE :
5/19/2018 Dpwh 1 Classroom
11/22
STRUCTURAL
5/19/2018 Dpwh 1 Classroom
12/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISS-1BOD 8
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EET )
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWHPROPOSED PROJECTS GENERAL NOTES,
BEAMCONSTRUCTION JOINT,
TYPICAL REINFORCEMENT DETAIL,
CONTROL JOINTSFOR SLAB-ON-FILL
1S-1
GENERAL NOTES & STANDARD DETAILSNOT TO SCALE
1C CONTROL JOINTS FOR SLAB-ON-FILL
NOT TO SCALE
BEAM CONSTRUCTION JOINT1AS-1
TYP. REINFORCEMENT DETAIL1BNOT TO SCALE
NOT TO SCALE
S-1
S-1
OIC,BUILDING DIVISION
DOMICIANO B. LUSICA
PROJECT MANAGER
NELSON S. ANTONIO
PRC No.: 14234 TIN No.: 178-384-258
NAPOLEON B. TORIBIO
PRC No.: 32516 TIN No.: 107-915-002
STRUCTURALDESIGN
POSITION: STRUCTURA LENGINEER
STRUCTURALDESIGN
POSITION: STRUCTURALENGINEER
GENERAL NOTES:
5/19/2018 Dpwh 1 Classroom
13/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISS-2BOD 9
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EET )
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWHPROPOSED PROJECTS
STANDARD DETAILS
OIC,BUILDING DIVISION
DOMICIANO B. LUSICA
PROJECT MANAGER
NELSON S. ANTONIO
PRC No.: 14234 TIN No.: 178-384-258
NAPOLEON B. TORIBIO
PRC No.: 32516 TIN No.: 107-915-002
STRUCTURALDESIGN
POSITION: STRUCTURA LENGINEER
STRUCTURALDESIGN
POSITION: STRUCTURALENGINEER
NOTE :
NOTE :
NOTE :BEAMS COLUMNS FLOOR SLABS
SPLICING REQUIREMENT OF REINFORCING BARS "Ls" or "Ld"
REMOVAL OF FORMS & SHORINGS CAMBER REQUIREMENT
STRUCTURAL ELEMENTSCLEARSPAN
BETWEENS UPPORTS
MINIMUMTIME PERIOD
(DAYS) ELEMENT MINIMUM CAMBER
BEAM RE-BARTERMINATION BEND TYPICAL BEAM & GIRDER RE-BAR LAYOUT
CORNER / EXTERIOR COL.
TERMINATION BEND
INTERIOR COLUMN
TERMINATION BEND
TYP. PLAN OF BEAM /
GIRDER COL. JOINTTYP. BEAM PENETRATION DETAIL
STANDARD DETAILS
5/19/2018 Dpwh 1 Classroom
14/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISS-3BOD 10
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EET )
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWHPROPOSED PROJECTS
STANDARD DETAILS
OIC,BUILDING DIVISION
DOMICIANO B. LUSICA
PROJECT MANAGER
NELSON S. ANTONIO
PRC No.: 14234 TIN No.: 178-384-258
NAPOLEON B. TORIBIO
PRC No.: 32516 TIN No.: 107-915-002
STRUCTURALDESIGN
POSITION: STRUCTURA LENGINEER
STRUCTURALDESIGN
POSITION: STRUCTURALENGINEER
NOTE :
LINTEL BEAMS MASONRY
SCHEDULE OF MASONRY WORKS
TYP. CHB WALL OPENING ELEV.TYPICAL MASONRY ELEVATION
STANDARD DETAILS
TYPICAL LINTEL BEAM DETAIL
R.C. & CHB EXTERIOR WALLSIDE ANCHORAGE DET.
5/19/2018 Dpwh 1 Classroom
15/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISS-4BOD 11
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EET )
VARIOUS DPWHPROPOSED PROJECTS
OIC,BUILDING DIVISION
STANDARD ONE-STOREYSCHOOL BUILDING
FOUNDATION PLANDETAIL OF F-1 / C-1 COLUMN ELEVATION
DETAIL OF FOOTING TIE BEAM
DETAIL SECT. OF RAMP & CORRIDOR DETAIL SECT. OF CORRIDOR
DOMICIANO B. LUSICA
PROJECT MANAGER
NELSON S. ANTONIO
PRC No.: 14234 TIN No.: 178-384-258
NAPOLEON B. TORIBIO
PRC No.: 32516 TIN No.: 107-915-002
STRUCTURALDESIGN
POSITION: STRUCTURA LENGINEER
STRUCTURALDESIGN
POSITION: STRUCTURALENGINEER
FOUNDATIONPLAN, DETAIL OFF-1 /C-1,COLUMNELEVATION,
DETAILOF STIFFENER,
DETAILOF FOOTING TIE BEAM,
DETAILSECTIONOF RAMP& CORRIDOR,
DETAIL OF STIFFENER
NOTE :
5/19/2018 Dpwh 1 Classroom
16/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISS-5BOD 12
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EET )
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWHPROPOSED PROJECTS
OIC,BUILDING DIVISION
ROOF FRAMING PLAN
DETAIL OF ROOF BEAM (RB-1)
DETAIL OF ROOF BEAM (RB-2)
DETAIL SECTION OF LRB-1 & PC-1
ELEV. OF END WALL FRAME
D E T A I L
CONNECTION OF PURLINS TO LRB-1
D E T A I L
DOMICIANO B. LUSICA
PROJECT MANAGER
NELSON S. ANTONIO
PRC No.: 14234 TIN No.: 178-384-258
NAPOLEON B. TORIBIO
PRC No.: 32516 TIN No.: 107-915-002
STRUCTURALDESIGN
POSITION: STRUCTURA LENGINEER
STRUCTURALDESIGN
POSITION: STRUCTURALENGINEER
ROOFFRAMINGPLAN,DETAILOF ROOFBEAM RB-1&RB-2,
DETAILSECTIONOF LRB-1 &PC-1,
ELEVATION OFENDWALL FRAME,CONNECTIONOF PURLINS TOLRB-1
D E T A I L
5/19/2018 Dpwh 1 Classroom
17/22
TRUSS DETAILS
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISS-6BOD 13
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EET )
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWHPROPOSED PROJECTS
OIC,BUILDING DIVISION
DETAIL ELEVATION OF TRUSS
DETAIL-1 DETAIL-2
CONNECTION OF G.I.
SHEET ROOFING TO PURLIN DETAIL-3
DETAIL-4
D E T A I L
DOMICIANO B. LUSICA
PROJECT MANAGER
NELSON S. ANTONIO
PRC No.: 14234 TIN No.: 178-384-258
NAPOLEON B. TORIBIO
PRC No.: 32516 TIN No.: 107-915-002
STRUCTURALDESIGN
POSITION: STRUCTURA LENGINEER
STRUCTURALDESIGN
POSITION: STRUCTURALENGINEER
NOTES ON ROOF CONSTRUCTION :
5/19/2018 Dpwh 1 Classroom
18/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISS-7BOD 14
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EET )
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWHPROPOSED PROJECTS
DETAIL SECTION AT EAVES
ISOMETRIC VIEW OF CONNECTION
OF G.I. SHEET TO PURLIN
TRUSS SUPPORT CONN. DETAIL PURLIN SPLICE
SPOT DETAIL
DETAIL PLAN CONN. OF
PURLINS AND SAG ROD
DETAIL CONN. OF CROSS BRACING
DETAIL OF EAVE @END WALL OF BUILDING
OIC,BUILDING DIVISION
DOMICIANO B. LUSICA
PROJECT MANAGER
NELSON S. ANTONIO
PRC No.: 14234 TIN No.: 178-384-258
NAPOLEON B. TORIBIO
PRC No.: 32516 TIN No.: 107-915-002
STRUCTURALDESIGN
POSITION: STRUCTURA LENGINEER
STRUCTURALDESIGN
POSITION: STRUCTURALENGINEER
ROOFING FIXER
DETAILSECTION@EAVES,
CONN. OFG.I. S HEET ROOFING TO PURLIN,
TRUSS SUPPORT CONNECTIONDETAIL,
SPOT DETAIL,
DETAIL CONN. OF CROSS BRACING
PURLINSPLICE, ROOFING FIXER
NOTE :
5/19/2018 Dpwh 1 Classroom
19/22
ELECTRICAL
5/19/2018 Dpwh 1 Classroom
20/22
SECRETARYDIRECTORIV,BOD
GILBERTO S. REYES ROGELIO L. SINGSON
UNDERSECRETARY
RAUL C. ASISEE-1BOD 15
15
( SE E CO VE R SH EE T) ( SE E CO VE R SH EE T) ( SE E CO VE R SH EET )
STANDARD ONE-STOREYSCHOOL BUILDING
VARIOUS DPWHPROPOSED PROJECTS
OIC,BUILDING DIVISION
POWERAND LIGHTING LAYOUT,
ELECTRICAL SYMBOLS, GENERALNOTES,
ELECTRICALRISER DIAGRAM,
SCHEDULE OF LIGHTING FIXTURES ANDLAMPS,SCHEDULE OF LOADS AND COMPUTATION,
LIGHTING LAYOUT
POWER LAYOUT
ELECTRICAL RISER DIAGRAM
NOTE :
WF
WF
M
1
2
CKT.
NO.
LIGHT OUTLETS
LOAD DESCRIPTIONBRANCH CKT. BREAKER
50614 230
900
VA PER
CKT.AF
VOLTS
2 15
P AT
SIZE OF HOMERUN
( WIRES IN CONDUIT )
1514 MACB : 50AF, 2P, 240V, 40AT, 18kAIC
CONVENIENCE OUTLETS
AND CEILING FANS20 2 - 3.5mm TW + 1 - 3.5mm TW (G) in 15mm C
2 - 3.5mm TW + 1 - 3.5mm TW (G) in 15mm C
1.00 = 6.58 AMPERESL 230
1514I @ 100% D.F. =
USE : 2 - 5.5mm THWN + 1 - 5.5mm TW (G) in 20m RSC
50230 2
NOTE:
ONE (1)-18W, 230V, 60Hz AC,COMPACT FLUORESCENT LIGHTING FIXTURE WITH MEDIUM
BASE KEYLESS TYPE PORCELAIN RECEPTACLE
TWO (2)-36W, 230V, 60Hz AC, FLUORESCENT LIGHTING FIXTURE , BOX TYPE2
SYMBOLS
SURFACED CEILING
MOUNTED
DESCRIPTION
1
SCHEDULE OF LIGHTING FIXTURES AND LAMPS :
ALL FLUORESCENT LIGHTING FIXTURES SHALL BE EQUIPPED WITH A HIGH P OWER FACTOR, PRE-HEAT
WITH STARTER AND THERMALLY PROTECTED BALLAST, COMPLETE WITH ALL NECESSARY ACCESSORIES,
WIRED AND READY FOR USE.
INSTALLATION/
MOUNTING
SCHEDULE OF LOADS AND COMPUTATIONS :
DISTRIBUTION PANELBOARD " DP "
T O T A L
SURFACED CEILING
MOUNTED
GENERAL NOTES :
ELECTRIC SERVICE METER
ELECTRIC SERVICE ENTRANCE
M
UNDERGROUND OR UNDERFLOOR CONDUIT RUN
DISTRIBUTION PANELBOARD
CIRCUIT HOMERUN
CONCEALED OR EMBEDDED CONDUIT RUN
2 SINGLE POLE WALL SWITCHES IN ONE SWITCH PLATE
SINGLE POLE WALL SWITCH
S
S
ELECTRICAL RISER
PULL BOX / JUNCTION BOX WITH COVER PLATE
ELECTRICAL SYMBOLS :
WALL FAN CONTROL SWITCHFC
2-36 WATTS, 230 VOLTS, 60Hz, FLUORESCENT LIGHTING FIXTURE,
WALL FAN, 65 WATTS, 230V, 60HzWF
S
GROUNDING SYSTEM
2
1 18 WATTS COMPACT FLUORESCENT LAMP WITH MEDIUM BASE,KEYLESS TYPE PORCELAIN RECEPTACLE OUTLET
DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE, 20A, 250VOLTS"WP" DENOTES WEATHERPROOF OUTLET
1800mm
3100mm(MIN.)
OVERHEAD SERVICE ENTRANCE: 230
V, 1, 2W, 60Hz., A.C. WITH 20mm
TYPE "F" CONDULET, WEATHERHEAD
2 - 5.5mm THWN + 1-5.5mm
TW (G) in 20mm RSC
M
"DP"
GROUNDING SYSTEM
16mm X 2400mm LENGTH
COPPERCLAD GROUNDING
ROD
5.5mm TW GROUND WIRE
in 15mm C - CLAMPED TO
COPPER-CLAD GROUNDING
ROD
1800mm
GROUNDFLOORLEVEL
FINISHEDGRADELEVEL
BU
ILDINGLINE
BOX TYPE
5/19/2018 Dpwh 1 Classroom
21/22
REPUBLIC OF THE PHILIPPINES
PROJECT MANAGEMENT OFFICE - BUREAU OF DESIGN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
VARIOUS DPWH PROPOSED PROJECTS
OIC, BUILDING DIVISION, BOD
REVIEWED: RECOMMENDING APPROVAL:
MANILA, PHILIPPINES
(DETAILED ENGINEERING DESIGN AND/OR SPECIAL S
STANDARD ONE-STOREY
SCHOOL BUILDING(1, 2, 3 & 4 - CLASSROOMS)
MARIANO C. DEL CASTILLO
DIRECTOR IV, BOD
GILBERTO S. REYES
UNDERSECRETARY
RAUL C. ASIS
5/19/2018 Dpwh 1 Classroom
22/22
RE
PUBLICOFTHEPHILIPPINES
PROJECTMAN
AGEMENTOFFICE-BUREAUOFDESIGN
DEPARTMENTOF
PUBLICWORKSANDHIGHWA
YS
VARIOUSDPW
HPROPOSEDPROJE
CTS
OIC,BUILDINGDIVISION,BOD
REVIEWED
:
R
ECOMMENDINGAPPROVAL:
APPROVED:
MANILA,PHILIPPINES
(DE
TAILEDENGINEERING
DESIGNAND/ORSPE
CIALSTUDIES)
STANDARDONE&TWOSTOREY
SCHOOLBUILDING
(1,2,3,4,5
AND8-CLASSROOMS)
MARIANOC.DELCASTILLO
DIRECTORIV,BOD
GILBERTOS.REYE
S
UNDERSECRETARY
RAULC.ASIS
SECRETARY
ROGELIO
L.SINGSON
SECRETARY
ARMINA.LUISTRO
DEPARTMENTOFEDUCATION
CONCURRED: