PCAB ARC TYPE NAME LOCATION AMOUNT (Php, M) DUR (C.D) STARTED COMP 1 1 11 DIAMOND EAGLE CONSTRUCTION 33328 L B MA GE Flood Management Program - Construction / Maintenance of Revetment/ River Control in Binan River, Purok 2, Barangay Sto. Tomas Binan City, Laguna 11/7/2018 1st/Final Laguna 2nd DEO LF 29.40 231 13/02/2018 10/1/2018 0.00% C 0.463 0.141 0.300 - - - 90.40% 90.40% Very Satisfactory ONS 2 2 2-R CONSTRUCTION AND SUPPLY 15304 L B MA GE Widening of Camiling-Wawa- Bayambang-Malasiqui-Sta. Barbara Road, K0187+670 - K0188+306, K0189+206-K0190+099 Malasiqui, Pangasinan 11/13/2018 1st Pangasinan 4th DEO LF 41.73 278 21/02/2018 11/25/2018 -4.35% OG 0.392 0.240 0.106 0.030 0.064 0.033 86.50% - DEL 3 3 3DIAMONDS CONSTRUCTION CORPORATION 35457 L B MA GE Road Widening of Daang Maharlika Road, K0504+420 - K0506+022 Ligao City/ Guinobatan, Albay 11/5/2018 1st Albay 3rd DEO LF 47.43 270 14/03/2018 12/8/2018 -4.07% OG 0.391 0.293 0.109 0.015 0.028 0.033 86.90% - DEL 4 4 3K ROCK ENGINEERING 27908 L A MB GE Road Upgrading (unpaved to paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project AnalysiS) - Tertiary Roads Apayao-Ilocos Norte Road KO623+771-KO625+810 & KO626+019-KO626+301 kabugao, apayao 11/15/2018 1st/Final Apayao 1st DEO LF 96.50 417 04/04/2017 5/25/2018 -0.42% C 0.461 0.134 0.287 - - - 88.20% 88.20% Satisfactory DEL 5 5 3-L CONSTRUCTION 16745 L B MA GB Construction of Multi-Purpose Building, Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00% C 0.500 0.133 0.300 - - - 93.30% 93.30% Very Satisfactory ONS 6 6 888 ACY ENTERPRISES 32898 L B MA GE Construction/Maintenance of Flood Mitigation Structure and Drainage Systems/Construction of Subang Daku Flood, Suba Section 2, Sta 5+160-Sta 5+817, Sogod, Southern Leyte ( Construction of Flood Mitigation Structure) Sogod, Southern Leyte 11/13/2018 1st/Final Southern Leyte DEO LF 23.62 265 01/02/2018 23/10/2018 0.00% C 0.468 0.134 0.300 - - - 90.20% 90.20% Very Satisfactory ONS 7 7 8J BUILDERS & SUPPLY 37516 L D SB GB Local Infrastructure Program- Construction of Multi-Purpose Building (livelihood center) Barangay Ngileb Alfonso Lista, Ifugao 11/9/2018 1st/Final Ifugao 2nd DEO LF 1.91 105 22/05/2018 9/3/2018 0.00% C 0.481 0.133 0.300 - - - 91.40% 91.40% Very Satisfactory ONS 8 8 A. DE GUIA CONSTRUCTION 18228 L AA MB GE Network Development - Road Widening - Primary Roads along Daang Maharlika (LZ) (S00782LZ) K0382+(-1051) - K0382+000, K0383+450 - K0383+668, K0383+740 - K383+830, K0386+193 - K0386+291 Naguilian, Isabela 11/7/2018 1st/Final Isabela 2nd DEO LF 40.69287045 162 05/03/2018 8/13/2018 0.01% C 0.461 0.200 0.300 - - - 96.10% 96.10% Very Satisfactory AHD 9 9 A.C. RIVERO DEPARTMENT CORPORATION/EBUILDER S CONSTRUCTION & DEVELOPMENT CORP. (Joint venture) JV- 17-423 L A MB GE Organizational Outcome 1: Ensure Safe and Reliable National Road System, Netwrork Development Program, Road Widening, Tertiary Roads, Lipa - Balete Rd. - K0086+746 - K0087+775 Balete, Batangas 11/10/2018 1st Batangas 3rd DEO LF 39.19983034 300 06/02/2018 12/2/2018 -0.49% OG 0.392 0.240 0.145 0.030 0.061 0.033 90.10% - DEL REMARKS TIME ESH RDR CPES VISIT RATING FINAL RATING/ QUALITATIVE DESCRIPTION DATE SLIPPAG E (%) STATUS WMS MTL DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 4th Quarter CY 2018 No. of Project No. of Contract or NAME OF CONSTRUCTOR LICENSE NO. L/F CATEGORY PROJECT FAC DATE OF EVALUATION NO. OF VISIT *IMPL. AGENCY FUNDING SOURCE CONTRACT Consolidated in CY 2019 CPES Reports in 4th Quarter 2018 Page 1 of 72

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

1 111 DIAMOND EAGLE

CONSTRUCTION 33328 L B MA GE

Flood Management Program -

Construction / Maintenance of

Revetment/ River Control in Binan River,

Purok 2, Barangay Sto. Tomas

Binan City,

Laguna11/7/2018 1st/Final

Laguna 2nd

DEOLF 29.40 231 13/02/2018 10/1/2018 0.00% C 0.463 0.141 0.300 - - - 90.40%

90.40%

Very SatisfactoryONS

2 22-R CONSTRUCTION AND

SUPPLY15304 L B MA GE

Widening of Camiling-Wawa-

Bayambang-Malasiqui-Sta. Barbara

Road, K0187+670 - K0188+306,

K0189+206-K0190+099

Malasiqui,

Pangasinan11/13/2018 1st

Pangasinan 4th

DEOLF 41.73 278 21/02/2018 11/25/2018 -4.35% OG 0.392 0.240 0.106 0.030 0.064 0.033 86.50% - DEL

3 3

3DIAMONDS

CONSTRUCTION

CORPORATION

35457 L B MA GERoad Widening of Daang Maharlika

Road, K0504+420 - K0506+022

Ligao City/

Guinobatan,

Albay

11/5/2018 1st Albay 3rd DEO LF 47.43 270 14/03/2018 12/8/2018 -4.07% OG 0.391 0.293 0.109 0.015 0.028 0.033 86.90% - DEL

4 4 3K ROCK ENGINEERING 27908 L A MB GE

Road Upgrading (unpaved to paved)

Based on Gravel Road Strategies, Traffic

Benchmark for Upgrading to Paved Road

Standards (HDM-4 Project AnalysiS) -

Tertiary Roads Apayao-Ilocos Norte

Road KO623+771-KO625+810 &

KO626+019-KO626+301

kabugao, apayao 11/15/2018 1st/FinalApayao 1st

DEOLF 96.50 417 04/04/2017 5/25/2018 -0.42% C 0.461 0.134 0.287 - - - 88.20%

88.20%

SatisfactoryDEL

5 5 3-L CONSTRUCTION 16745 L B MA GBConstruction of Multi-Purpose Building,

Barangays Patag and Bagumbayan

Libmanan,Camar

ines Sur11/8/2018 1st/Final

Camarines Sur

1st DEOLF 4.70 100 01/03/2018 6/8/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%

93.30%

Very SatisfactoryONS

6 6 888 ACY ENTERPRISES 32898 L B MA GE

Construction/Maintenance of Flood

Mitigation Structure and Drainage

Systems/Construction of Subang Daku

Flood, Suba Section 2, Sta 5+160-Sta

5+817, Sogod, Southern Leyte (

Construction of Flood Mitigation

Structure)

Sogod, Southern

Leyte11/13/2018 1st/Final

Southern Leyte

DEOLF 23.62 265 01/02/2018 23/10/2018 0.00% C 0.468 0.134 0.300 - - - 90.20%

90.20%

Very SatisfactoryONS

7 7 8J BUILDERS & SUPPLY 37516 L D SB GB

Local Infrastructure Program-

Construction of Multi-Purpose Building

(livelihood center) Barangay Ngileb

Alfonso Lista,

Ifugao11/9/2018 1st/Final

Ifugao 2nd

DEOLF 1.91 105 22/05/2018 9/3/2018 0.00% C 0.481 0.133 0.300 - - - 91.40%

91.40%

Very SatisfactoryONS

8 8A. DE GUIA

CONSTRUCTION18228 L AA MB GE

Network Development - Road Widening -

Primary Roads along Daang Maharlika

(LZ) (S00782LZ) K0382+(-1051) -

K0382+000, K0383+450 - K0383+668,

K0383+740 - K383+830, K0386+193 -

K0386+291

Naguilian,

Isabela11/7/2018 1st/Final

Isabela 2nd

DEOLF 40.69287045 162 05/03/2018 8/13/2018 0.01% C 0.461 0.200 0.300 - - - 96.10%

96.10%

Very SatisfactoryAHD

9 9

A.C. RIVERO

DEPARTMENT

CORPORATION/EBUILDER

S CONSTRUCTION &

DEVELOPMENT CORP.

(Joint venture)

JV- 17-423 L A MB GE

Organizational Outcome 1: Ensure Safe

and Reliable National Road System,

Netwrork Development Program, Road

Widening, Tertiary Roads, Lipa - Balete

Rd. - K0086+746 - K0087+775

Balete, Batangas 11/10/2018 1stBatangas 3rd

DEOLF 39.19983034 300 06/02/2018 12/2/2018 -0.49% OG 0.392 0.240 0.145 0.030 0.061 0.033 90.10% - DEL

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 1 of 72

Page 2: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

10 10

A.C. RIVERO

DEVELOPMENT

CORPORATION

5122 L A MB GE

Construction/Improvement of Access

Road Leading to Ilog-Ilog River Water

Tubing

Rizal, Palawan 11/9/2018 1stPalawan 2nd

DEOLF 19.54 188 17/06/2018 12/21/2018 10.33% OG 0.382 0.300 0.150 0.020 0.047 0.050 94.90% - AHD

11

A.C. RIVERO

DEVELOPMENT

CORPORATION

5122 L A MB GE

Asset Preservation Program,

Rehabilitation/ Reconstruction of Roads

with Slips, Slope Collpase and Landslide,

Secondary Roads, Masbate - Millagros

Road, Sec. A K0007+075 - K0007+325,

Both sides, Sec. B: K0008+120 -

K0008+318, right side, Sec. C: K0008+369

- K0008+485, right side, Sec. D:

K000+580, right side, Sec. E: K0008+922 -

K0009+584, right side; K0008+901 -

K0009+584, Left side

Masbate City 11/9/2018 1stMasbate 1st

DEOLF 57.73 275 23/07/2018 4/23/2019 20.17% OG 0.310 0.292 0.150 0.020 0.042 0.033 83.63% - AHD

12

A.C. RIVERO

DEVELOPMENT

CORPORATION

5122 L A GE

Widening of Permanent Bridge,

Lumbayao Bridge along Lanao- Pagadian-

Zamboanga City Road, Lumbayao,

Kabasalan, Zamboanga Sibugay

Lumbayao,

Kabasalan,

Zamboanga

Sibugay

11/14/2018 1st

Zamboanga

Sibugay 2nd

DEO

LF 24.69 353 02/07/2018 6/19/2019 2.18% OG 0.400 0.240 0.150 0.030 0.037 0.050 90.70% - AHD

13 11

A.D. PENDON

CONSTRUCTION &

SUPPLY, INC./ PANAY

EAST COAST

CONSTRUCTION & SUPPLY

(JOINT VENTURE)

JV-17-890 L A MB GE

Construction of Concrete Road-

Poblacion Barotac Viejo- Vista Alegre-

Nueva Invencion- Del Pilar- Gen. Luna-

San Jose-Anabo connecting Nueva Swine

Valley, NRJ Iloilo East Coast Capiz Road

and NRJ Passi-San Rafael- Lemery- Sara

Road

Barotac Viejo,

Iloilo11/10/2018 1st Iloilo 3rd DEO LF 83.76 314 16/02/2018 12/26/2018 1.02% OG 0.385 0.247 0.150 0.030 0.050 0.050 91.20% - AHD

14 12 A.I.P CONSTRUCTION 32458 L A MA GEConstruction of Road Slope Protection-

Itogon-Dalupirip-San Manuel Bdry Road,Itogon Benguet 11/6/2018 1st

Benguet 1st

DEOLF 70.47 300 15/03/2018 1/8/2019 0.12% C 0.306 0.300 0.150 - - - 88.10%

88.10%

SatisfactoryAHD

15 13

A.J. TAYLAN

CONSTRUCTION

CORPORATION

2336 L B MA GEClearing/ Cleaning of Madongan Sabo

Dam, Madongan River

Nueva Era, Ilocos

Norte12/6/2018 1st/Final

Ilocos Norte

2nd DEOLF 41.41 375 31/03/2016 4/9/2017 0.00% C 0.450 0.200 0.300 - - - 95.00%

95.00%

Very SatisfactoryONS

16 14

A.M. ONG

CONSTRUCTION &

TRADING

34373 L D SB GE

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems - Rehabilitation of Slope

Protection Along Porac River Mabical

Section

Floridablanca,

Pampanga 11/14/2018 1st/Final

Pampanga 2nd

DEOLF 11.62594556 120 19/06/2018 10/16/2018 0.00% C 0.438 0.133 0.300 - - - 87.10%

87.10%

SatisfactoryONS

17 15

A.M.P. CONSTRUCTION /

M.M. SERRANO

CONSTRUCTION

COMPANY

JV-17-2444 L A SB GE

Construction of By-Pass Road and

Diversion Roads, Licab - Victoria Road,

Nueva Ecija

Nueva Ecija 11/12/2018 1stNueva Ecija 1st

DEOLF 50.41 270 10/05/2018 2/3/2019 0.05% OG 0.399 0.238 0.150 0.030 0.060 0.050 92.70% - AHD

18 16 A.P.B CONSTRUCTIONS 17055 L B MA GERehabilitation/Improvement of Bakir

Flood Control Structure

Sta. 0+000 to

Sta. 0+507.10,

Bagabag, Nueva

Vizcaya

11/8/2018 1stNueva Vizcaya

1st DEOLF 18.59 158 28/08/2018 2/1/2019 8.88% OG 0.381 0.247 0.150 0.030 0.050 0.050 90.80% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 2 of 72

Page 3: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

19 17A.P.O GENERAL

CONSTRUCTION7010 L B MA GE

Convergence and Special Support

Program, Construction/Improvement of

Access Roads leading to Tirad Pass View,

Fidelisan Falls,Sumaguing

Cave,Balangagan Cave,Ayyuweng di

Lambak ed Tadian Festival,Kiltepan

Sunrise,Besao Sunset,Hanging

Coffins,Echo Valley,Tadian

Besao and

Sagada,

Mountain

Province

11/8/2018 1stMt. Province

DEOLF 72.56 266 10/04/2018 12/31/2018 -3.81% OG 0.286 0.300 0.112 0.030 0.050 0.033 81.10% - DEL

20 18 A.S.T BUILDERS 34104 L B MA GEConstruction of Flood Mitigation

Structure at Butuanon River

Brgy.

Pulangbato,

Cebu City

11/17/2018 1st Cebu City DEO LF 42.91 286 07/06/2018 3/19/2019 9.44% OG 0.400 0.240 0.150 0.030 0.045 0.050 91.50% - AHD

21 19A.T. DUMLAO

CONSTRUCTION, INC.34028 L A MA GE

Widening of Wasian Bridge

(B00922MN) along Daang Maharlika

(Agusan-Davao Section) K1330+958-

K1330+984.40

Rosario, Agusan

del Sur11/12/2018 1st

Agusan del Sur

2nd DEOLF 26.75 239 3/26/2018 11/19/2018 2.86% OG 0.392 0.240 0.150 0.030 0.070 0.050 93.20% - AHD

22A.T. DUMLAO

CONSTRUCTION, INC.34028 L A MA GE

Retrofitting/Strengthening of Bayugan

Bridge 3 (B00924MN) along Daang

Maharlika Road (Agusan-Davao Section),

K1334+135 – K1334+156.95

Rosario, Agusan

del Sur11/12/2018 2nd/Final

Agusan del Sur

2nd DEOLF 6.37 84 3/19/2018 6/10/2018 0.00% C 0.494 0.185 0.300 - - - 97.90%

92.44%

Very SatisfactoryONS

23 20 AARCON BUILDERS 28336 L A MA GE

Organizational Outcome 2: Protect Lives

and Properties Against Major Floods -

Flood Management Program -

Construction/ Maintenance of Flood

Mitigation Structures and Drainage

Systems - Construction/ Improvement of

Flood Control Structures and Bank

Protection along Morong River

Morong, Rizal 11/11/2018 1st Rizal 2nd DEO LF 39.2 229 02/05/2018 12/16/2018 0.18% OG 0.372 0.240 0.150 0.030 0.060 0.033 88.50% - AHD

24 21

AB APONESTO

CONSTRUCTION PARTS

AND SUPPLIES, INC. /

RANGAY CONSTRUCTION

AND SUPPLY JOINT

VENTURE

JV-17-2032 L AA LA GE

Off-Carriageway Improvement Tagum

City Diversion Road Including ROW,

K1459+600-K1460+793

Tagum City,

Davao del

Nort6e

11/10/2018 1stDavao del

Norte 1st DEOLF 54.9 242 10/05/2018 1/6/2019 2.19% OG 0.400 0.240 0.150 0.030 0.051 0.033 90.40% - AHD

25 22ABADA CONSTRUCTION

AND SUPPLY37005 L D SB GB

Completion/Repair/Rehabiitation of

Multi-Purpose Building

Brgy. San

Agustin, Carmen

Agusan del

Norte 2nd L.D.

11/14/2018 1st/FinalAgusan del

Norte DEOLF 1.84 150 4/18/2018 9/14/2017 0.00% C 0.500 0.133 0.300 - - - 93.30%

93.3%

Very SatisfactoryONS

26 23 ABU CONSTRUCTION 22313 L AA MA GE

Installation of Gabions and Matresses

along Davao River Basin, Waan-Sta.

Lucia Section

Davao City 11/15/2018 2nd/FinalDavao City 1st

DEOLF 49 203 3/8/2018 9/26/2018 0.00% C 0.483 0.134 0.300 - - - 91.70%

90.74%

Very SatisfactoryONS

27 24ACJ CONSTRUCTION

RESOURCES10635 L B MA GE

Construction of Concrete Road - Jct.

Dualing - New Panay - Midsayap Road to

Katalicanan - UK Peak

Aleosan, North

Cotabato11/10/2018 2nd/Final

Cotabato 2nd

DEOLF 34.3 161 08/03/2018 8/15/2018 0.00% C 0.492 0.133 0.300 - - - 92.50%

90.64%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 3 of 72

Page 4: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

28 25 AFAJI BUILDERS 39489 L C SB GE

Local Infrastructure Program - Local

Roads and Bridges - Local Roads

Construction of Road

Barangay

Mabiga,

Hermosa, Bataan

11/8/2018 1st/FinalBataan 1st

DEOLF 4.8014849 150 21/03/2018 8/17/2018 0.00% C 0.471 0.133 0.300 - - - 90.40%

90.40%

Very SatisfactoryONS

29 AFAJI BUILDERS 39489 L C SB GE

Asset Preservation Program - Preventive

Maintenance - Secondary Roads - Roman

Expressway, K0116+246 to K0117+000

Abucay, Bataan 11/8/2018 1st/FinalBataan 1st

DEOLF 14.82053889 90 23/04/2018 7/21/2018 2.22% C 0.444 0.133 0.300 - - - 87.70%

87.70%

SatisfactoryAHD

30 26 AGUERO CONSTRUCTION 23338 L A MA GBConstruction of Evacuation Center,

Municipality of BaroboSurigao del Sur 11/11/2018 1st

Surigao del Sur

2nd DEOLF 28.72 290 3/27/2018 1/10/2019 1.66% OG 0.400 0.239 0.150 0.030 0.070 0.033 92.20% - AHD

31 27 AL CHRIS CONSTRUCTION 12406 L B MA GE

Rehabilitation/Reconstruction/Upgradin

g of Damaged Paved Roads - Tertiary

Roads - Tagbilaran City-Corella-Sikatuna-

Loboc Road, K0015+280-K0016+130

Sikatuna, Bohol 11/6/2018 2nd/Final Bohol 1st DEO LF 20.66 176 23/04/2018 10/15/2018 0.00% C 0.472 0.133 0.300 - - - 90.50%90.92%

Very SatisfactoryONS

32 28AL HUSSEIN

CONSTRUCTION18438 L A MB GE

Road Upgrading (Unpaved to Paved)

Based on Gravel Road Strategies, Traffic

Benchmark for Upgrading to Paved Road

Standars (HDM-4 Project Analysis)

(intermittent Sections), Lanao del Norte

Interior Circumferential Road, K1612+(-

571) - K1612+(-395), K1612+(-243) -

K1612+411, K1612+531 - K1613+597,

K1614+013 - K1614+289, K1614+621 -

K1615+015, K1617+000 - K1618+000,

K1622+542 - K1624+854

Lanao del Norte

2nd11/6/2018 1st/Final

Regional Office

No. XLF 146.25 356 15/03/2016 3/5/2017 0.00% C 0.467 0.133 0.300 - - - 90.00%

90.00%

Very SatisfactoryONS

33 29 ALCEL CONSTRUCTION 15129 L A MB GEAlong Burgos - Agno Road K0303+(-962) -

K0305+690

Burgos,

Pangasinan11/14/2018 1st/Final

Pangasinan 1st

DEOLF 38.46 60 26/02/2018 4/26/2018 18.33% C 0.500 0.133 0.300 - - - 93.30%

93.30%

Very SatisfactoryAHD

34 30

ALCEL CONSTRUCTION /

JTM CONSTRUCTION

JOINT VENTURE

JV-16-2094 L A GE

Construction of Concrete Road Bugnay

(Mangape)-Buscalan-Loccong-Butbut

Proper Leeading to Buscalan Tattoo

Village, Tinglayan, Kalinga

Tinglayan,

Kalinga11/12/2018 1st

Upper Kalinga

DEOLF 95.47 314 20/02/2018 12/30/2018 -1.96% OG 0.388 0.240 0.130 0.030 0.061 0.033 88.20% - DEL

35 31

ALCEL CONSTRUCTION/

ORIENTAL SALES CENTER

AND CONTRACTOR JOINT

VENTURE

JV-17-1917 L B MB GE

Network Development-Impvt./Widening

of National Rd. along Binalonan-Asingan-

Sta. Maria Rd. K0198+786 - K0200+405;

K0208+700 - K0208+980

Asingan,

Pangasinan11/13/2018 1st

Pangasinan 3rd

DEOLF 55.94 276 28/03/2018 12/28/2018 4.76% OG 0.390 0.240 0.150 0.030 0.052 0.033 89.50% - AHD

36 32

ALEBON GENUINE

MERCHANDISING

INCORPORATED

26300 L B MA GE

Construction / Improvement of Access

Roads Leading to Declared Tourism

Destinations, Access Road Leading to

Alibuag Park

Mangga,

Sugbongcogon,

Misamis Oriental

11/13/2018 1st/Final

Misamis

Oriental 1st

DEO

LF 19.55 178 25/03/2018 9/18/2018 0.00% C 0.488 0.133 0.300 - - - 92.10%92.10%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 4 of 72

Page 5: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

37 33

ALGON ENGINEERING

CONSTRUCTION

CORPORATION

270 L AAA LB GE

Widening (2 into 4 lanes) of Davao-

Bukidnon Road Including Slope

Protection and ROW (Brgy. Marilog

Section), Davao City, K1645+906 -

K1647+680, K1647+680 - K1648+080,

K1648+080 - K1649+820

Davao City 3rd

LD11/16/2018 1st

Regional Office

No. XIIILF 137.38 269 3/12/2018 12/5/2018 -3.97% OG 0.363 0.300 0.110 0.030 0.061 0.033 89.70% - DEL

38 34

ALHADRAX

CONSTRUCTION AND

SUPPLY

38651 L B SB GBConstruction of Multi-Purpose Building

Cluster XXIII

Juban and Bulan,

Sorsogon7/11/2018 1st/Final

Sorsogon 2nd

DEOLF 7.14 120 27/02/2018 6/26/2018 0.00% C 0.494 0.131 0.300 - - - 92.50%

92.50%

Very SatisfactoryONS

39 35 ALONZO CONSTRUCTION 32145 L A MA GE

Road Widening (4 to 6 lanes) including

Drainage and RROW along Daang

Maharlika, Pasian Section

Compostela

Valley Province11/9/2018 2nd/Final

Compostela

Valley DEOLF 35.36 187 4/11/2018 10/14/2018 0.00% C 0.489 0.135 0.300 - - - 92.40%

88.62%

SatisfactoryONS

40 36

ALPHA & OMEGA GEN.

CONTRACTOR &

DEVELOPMENT CORP.

38958 L A MA GE

Asset Preservation of National Road,

Rehabilitation/ Reconstruction of

National Road With Slip, Collapse and

Landslide, Secondary Roads Calamba -

Sta. Cruz - Famy Junction Road,

K0096+450 to

Laguna 11/8/2018 1stLaguna 1st

DEOLF 93.06 287 03/09/2018 11/21/2018 0.89% OG 0.379 0.255 0.150 0.030 0.056 0.033 90.30% - AHD

41

ALPHA & OMEGA GEN.

CONTRACTOR &

DEVELOPMENT CORP.

38958 L A MA GE

Rehabilitation/Reconstruction of

National Road with Slips, Slope Collapse

and Landslide along Puerto Princesa

North Road, K0266+067 -K0266+140;

K0266+240 -K0266+290; K0255+026 -

K0255+086

El Nido and

Taytay, Palawan11/11/2018 2nd

Palawan 1st

DEOLF 94.61 260 13/05/2018 1/27/2019 17.60% OG 0.397 0.296 0.150 0.022 0.055 0.033 95.30% - AHD

42

ALPHA & OMEGA GEN.

CONTRACTOR &

DEVELOPMENT CORP.

38958 L A MA GB

Construction of Four (4) Storey, Eight (8)

Classrooms, Two (2) Science Lab. And

Two (2) ICT Building, Gen. Emilio

Aguinaldo National High School

Ramon, Isabela 11/11/2018 1stIsabela 4th

DEOLF 17.98 238 16/07/2018 3/10/2019 1.80% OG 0.364 0.277 0.150 0.030 0.041 0.033 89.50% - AHD

43 37

ALPHA RYDER

CONSTRUCTION AND

SUPPLIES

12197 L A MB GE

Flood Management Program -

Construction/ Maintenance of Flood

Mitigation Structures and Drainage

Systems - Construction of River Control

at Osiao Bacon

Bacon District,

Sorsogon City11/7/2018 1st/Final

Sorsogon 1st

DEOLF 47.14 240 02/03/2018 10/27/2018 0.00% C 0.390 0.156 0.300 - - - 84.60%

84.60%

SatisfactoryONS

44 38ALPHATEC CHEMICAL

CORPORATION39938 L B MA GE

Rehabilitation/Major Repair of

Permanent Bridge at Taroy Bridge along

Carmen Jct'n.- Bayambang-Manat Road

Binmaley,

Pangasinan11/13/2018 1st/Final

Pangasinan

2nd DEOLF 19.60 120 13/04/2018 8/10/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%

93.30%

Very SatisfactoryONS

45 39

ALRO CONSTRUCTION &

DEVELOPMENT

CORPORATION

18361 L A MB GE

FY-2018 Network Development -

Construction if Bypass/Diversion Roads,

Construction of Jct. Nato-Sabang Coastal

Road (Sagnay-Tigaon Section) ,Sta.

0+500.00 to Sta.1 + 731.60

Sagnay and

Tigaon,Camarine

s Sur

11/10/2018 1stCamarines Sur

3rd DEOLF 92.63 301 06/05/2018 3/2/2019 0.17% OG 0.393 0.283 0.150 0.030 0.047 0.050 95.30% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 5 of 72

Page 6: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

46 40

ALXM CONSTRUCTION

DEVELOPMENT

CORPORATION /ZKR

JV-17-988 L B MA GE

Asset Preservation Program,

Construction/ Upgrading / Rehabilitation

of Drainage along National Roads,

Secondary Roads, Junction Tawad -

Balud Road, (K0036+675 - K0037+821)

Milagros,

Masbate11/9/2018 2nd/Final

Masbate 1st

DEOLF 27.48 241 21/02/2018 10/19/2018 0.00% C 0.352 0.174 0.300 - - - 82.60%

83.92%

SatisfactoryONS

47 41ALZAM ENTERPRISES

INCORPORATED19113 L A MA GE

Installation of Gabions and Mattresses

along Bago River, Kaliraya Section, Sta.

1+044-Sta. 1+587, Sta. 1+593-Sta. 1+702,

Left Bank

Davao City 11/15/2018 1stDavao City 1st

DEOLF 49 233 6/3/2018 1/21/2019 4.05% OG 0.371 0.240 0.150 0.030 0.061 0.050 90.20% - AHD

48 42 APD CONSTRUCTION 17467 L A MB GE

Construction/Improvement of Access

Road Leading to Quirino Tourism

Complex

Cabbarroquis,

Quirino11/9/2018 1st Quirino DEO LF 53.38 255 14/03/2018 11/23/2018 1.07% OG 0.387 0.271 0.150 0.030 0.050 0.050 93.80% - AHD

49 43AQUA DRAGON

CONSTRUCTION & SUPPLY36405 L C SB GE

Rehabilitation/Major Repair of Guimbal

Bridge (B00125PN) along Iloilo-Antique

Road (K0029+023)

Guimbal, Iloilo 11/17/2018 1st/Final Iloilo 1st DEO LF 6.72 119 19/02/2018 17/06/2018 38.27% C 0.500 0.134 0.300 - - - 93.40%93.40%

Very SatisfactoryAHD

50 44

AQUATERRA KONSTRUKT,

INC. / MCGABRIEL

CONSTRUCTION JOINT

VENTURE

JV-16-449 L A MB GE

Construction of Flood Control at Maasin

Creek (including Right of Way

Acquisition)

Zamboanga City 11/15/2018 2nd/Final Zamboanga

City DEOLF 23.59 547 3/22/2017 9/19/2018 0.00% C 0.400 0.133 0.300 - - - 83.30%

86.84%

SatisfactoryONS

51 45

AQUINO-DELA CRUZ

ENG'G & CONSTRUCTION

/ ALPHATEC CHEMICAL

CORPORATION (JOINT

VENTURE)

JV-17-1088 L A MB GE

Cluster I: 1) Rehabilitation/ Major Repair

of Alag Bridge (B00182MR) along

Calapan North Road, Baco, Oriental

Mindoro 2)Rehabilitation/ Major Repair

of Baguin I Bridge I, Baco Oriental

Mindoro 3) Rehabilitation / Major

Repair of Jasmine Bridge (B00188MR)

along Calapan North Road, Puerto

Galera, Oriental Mindoro 4)

Baco, Puerto

Galera and

Naujan, Oriental

11/8/2018 1st/FinalMindoro

Oriental DEOLF 47.41 180 15/03/2018 9/10/2018 10.00% C 0.499 0.133 0.300 - - - 93.20%

93.20%

Very SatisfactoryAHD

52 46

AQUINO-DELA CRUZ

ENGINEERING &

CONSTRUCTION

16751 L B MA GE

Retrofitting/Strengthening of Permanent

Bridges: San Francisco Bridge (B03295LZ)

along Concepcion - Capas Road

Concepcion,

Tarlac11/13/2018 1st/Final Tarlac 2nd DEO LF 73.34 240 21/02/2018 10/18/2018 71.07% C 0.500 0.170 0.300 - - - 97.00%

97.00%

OutstandingAHD

53 47

AQUINO-DELA CRUZ

ENGINEERING &

CONSTRUCTION /

ALPHATEC CHEMICAL

CORPORATION JOINT

VENTURE

JV-17-665 L A MB GE

Bridge - Retrofitting/Strengthening of

Permanent Bridges, Siffu Bridge

(B01157LZ) along Santiago - Tuguegarao

Road

Roxas, Isabela 11/7/2018 1st/FinalIsabela 2nd

DEOLF 28.86086855 159 14/02/2018 7/22/2018 18.50% C 0.500 0.134 0.300 - - - 93.40%

93.40%

Very SatisfactoryAHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 6 of 72

Page 7: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

54 48

AQUINO-DELA CRUZ

ENGINEERING &

CONSTRUCTION/

ALPHATEC CHEMICAL

CORPORATION JOINT

VENTURE

JV-17-391 L A MB GE

Rehabilitation/Major Repair of

Permanent Bridges, Patapat Viaduct

Bridge (B00547LZ) along MNR

MNR, Pagudpud,

Ilocos Norte11/6/2018 2nd/Final

Ilocos Norte

1st DEOLF 4.48 240 12/02/2018 10/9/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%

93.12%

Very SatisfactoryONS

55 49

AR LUSTRE

CONSTRUCTION

CORPORATION

7680 L AAA LA GE

Rehabilitation of Paved Road - Capitol -

Canigaran - Road, K0001+(-1006) -

K0002+000, K0002+000 -K002+037

Puerto Princesa

City, Palawan11/7/2018 1st

Palawan 3rd

DEO LF 58.57 330 21/02/2018 1/16/2019 2.93% OG 0.367 0.300 0.150 0.020 0.055 0.050 94.20% - AHD

56 50ARCINUE COMM'L

CORPORATION6746 L A MA GE

Construction of Concrete

Revetment/Dike along Digos River, Brgy.

Aplaya

Digos City, Davao

del Sur11/14/2018 1st/Final

Davao del Sur

1st DEOLF 47.58 244 3/5/2018 11/3/2018 0.00% C 0.477 0.133 0.300 - - - 91.00%

91.00%

Very SatisfactoryONS

57 51ARKY CONSTRUCTION

AND SUPPLY32692 L AAA LA GE

Rehabilitation/Reconstruction/Upgradin

g of Damaged Paved Roads with

Drainage - San Fernando North Road

San Fernando,

San Jacinto and

Monreal,

Masbate

11/13/2018 1stMasbate 3rd

DEOLF 46.03 240 19/03/2018 11/13/2018 -6.71% OG 0.353 0.289 0.083 0.022 0.028 0.033 80.80% - DEL

58 52 ARN BUILDERS, INC. 18930 L AAA LB GE

Retrofitting/Strengthening of Bridge-

Kabacan Bridge 1 (B00265MN) along

Paco-Roxas-Arakan Valley-Jct Davao-

Bukidnon Rd.

Pres. Roxas,

Cotabato11/12/2018 1st/Final

Cotabato 1st

DEOLF 36.64 173 3/1/2018 8/20/2018 0.00% C 0.499 0.133 0.300 - - - 93.20%

93.20%

Very SatisfactoryONS

59 53ARN BUILDERS, INC. / JO

BUILDERS JOINT VENTUREJV-17-720 L AAA LB GE

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems: Construction of River Control

along Bonawon River

Brgy. Bonawon,

Siaton, Negros

Oriental

11/10/2018 1st

Negros

Oriental 3rd

DEOLF 34.30 290 2/11/2018 11/27/2018 -0.51% OG 0.363 0.239 0.145 0.030 0.045 0.033 85.50% - DEL

60 54 ARQ BUILDERS 35966 L AA MA GE

Construction of Concrete Dike along

Poblacion-Magtuyon-Talacogon (Phase

II)

Poblacion, San

Luis, Agusan del

Sur

11/13/2018 1st/FinalAgusan del Sur

1st DEOLF 21.18 195 3/19/2018 9/29/2018 0.00% C 0.480 0.133 0.300 - - - 91.30%

91.30%

Very SatisfactoryONS

61 55ARS CONSTRUCTION AND

SUPPLY40764 L C SB GE Road Concreting of Brgy. RH X Cotabato City 11/9/2018 1st/Final

Cotabato City

DEOLF 3.43 62 6/6/2018 8/6/2018 0.00% C 0.484 0.133 0.300 - - - 91.70%

91.70%

Very SatisfactoryONS

62 56AS MACHA CONSTUCTION

AND TRADING36878 L B SB GE

Flood Management Program -

Construction/ Maintenance of Flood

Mitigation Structures and Drainage

Systems - Construction of Flood Control

Project in Pentor - Balsik River, Balsik

Section

Hermosa, Bataan 11/8/2018 1st/FinalBataan 1st

DEOLF 9.04440891 137 19/04/2018 9/10/2018 5.11% C 0.470 0.133 0.300 - - - 90.30%

90.30%

Very SatisfactoryAHD

63 57ASCENTIA

CONSTRUCTION, INC.35984 L A MA GB

Construction of 4 Storey 12 Classroom

School Building at Estaca ES

Compostela,

Cebu11/15/2018 1st Cebu 5th DEO LF 30.94 210 7/19/2018 2/13/2019 -2.03% OG 0.362 0.300 0.130 0.030 0.052 0.033 90.70% - DEL

64 58ATHENA CONSTRUCTION

AND DEVELOPMENT37750 L D SB GE

Rehabilitation/Resctoration of Mataas

Spillway, Barangay MataasBacacay, Albay 11/15/2018 1st/Final Albay 1st DEO LF 7.62 76 02/07/2018 9/15/2018 0.00% C 0.49 0.144 0.300 - - - 93.40%

93.40%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 7 of 72

Page 8: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

65 59ATLAS GEN. CONST. &

ENTERPRISES CORP. 4953 L A MA GE

Construction of Flood Control Structures

including Desilting/Dredging along San

Miguel River, Sta. Rite Section Phase II

San Miguel,

Bulacan11/7/2018 2nd/Final

Bulacan 2nd

DEOLF 77.20 243 14/03/2018 11/11/2018 4.79% C 0.475 0.133 0.300 - - - 90.80%

87.68%

SatisfactoryAHD

66 60

B.C. CUERPO

CONSTRUCTION

CORPORATION

11898 L AAA MA GE

Construction/Extension of Flood Control

Structure along Bagongbong River

(Phase 3) Protecting Bagongbong Bridge

and Biliran Circumferential Road,

Upstream (11.6116, 124.3887,

Downstream (11.6109, 124.3524)

Almeria,

Province of

Biliran

11/6/2018 1st/Final Biliran DEO LF 27.91 150 2/18/2018 7/17/2018 0.00% C 0.463 0.134 0.300 - - - 89.70%89.70%

Very SatisfactoryONS

67 61 B.M. MARKETING 9852 L AAA MB GE

Construction/Extension of Flood Control

Structure along Busali River Protecting

Busali Bridge and Biliran Circumferential

Road, (Phase 2) (11.4915, 124.4482)

Biliran, Province

of Biliran11/7/2018 1st/Final Biliran DEO LF 18.51 140 2/18/2018 7/7/2018 0.00% C 0.464 0.133 0.300 - - - 89.70%

89.70%

Very SatisfactoryONS

68 62B-12 CONSTRUCTION AND

TRADING CORPORATION31997 L A MB GE

Rehabilitation/ Improvement of San Jose

Malino - Anao Road

Mexico,

Pampanga11/12/2018 1st/Final

Pampanga 1st

DEOLF 37.58041872 208 02/04/2018 10/26/2018 13.46% C 0.475 0.133 0.300 - - - 90.80%

90.80%

Very SatisfactoryAHD

69B-12 CONSTRUCTION AND

TRADING CORPORATION31997 L A MA GB

Construction of Four (4) Storey Twelve

(12) Classrooms at Sto. Domingo

Integrated School

Angeles City 11/13/2018 1st/FinalPampanga 3rd

DEOLF 30.71390244 210 1/15/2018 8/12/2018 0.00% C 0.500 0.135 0.300 - - - 93.50%

93.50%

Very SatisfactoryONS

70 63

B2K

LUMBER,CONSTRUCTION

SUPPLIES AND SERVICES

33069 L B MA GE

Construction /Improvement of Access

Roads Leading to Airports, Seaports and

Declared Tourism Destination-Daet-Labo-

Tulay na Lupa Road; Labo-Tulay Na Lupa

Including Calabasa-Talobatib

Road,Barangay Matanlang-Napaod-

Tulay na Lupa

Labo, Camarines

Norte11/6/2018 1st/Final

Camarines

Norte DEOLF 36.11 229 12/19/2017 4/6/2018 0.00% C 0.481 0.177 0.300 - - - 95.80%

95.80%

Very SatisfactoryONS

71 64

BADOC BUILDERS &

SUPPLY, INC. (FORMERLY:

BADOC BUILDER &

SUPPLY

31564 L A MB GE

Construction/Improvement of Access

Roads Leading to Declared Tourism

Destination, Virbira-Barbaquezo Road

Network Leading to Sabo Dam

Brgy.

Barnaquero,

Carasi, Ilocos

Norte

11/6/2018 1stIlocos Norte

1st DEOLF 29.27 223 06/06/2018 1/14/2019 -4.98 OG 0.393 0.240 0.100 0.030 0.061 0.033 85.70% - DEL

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 8 of 72

Page 9: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

72 65

BADSBRO CONSTRUCTION

AND GENERAL

MERCHANDISE

32876 L A MB GE

Rehabilitation/Reconstruction of Roads

with Slips, Slope Collapse and Landslide

along Imelda-Bayog-Kumalarang-

Lapuyan-Margosatubig Road-K1751+211

to K1751+224 (LS), K1751+460 to

K1751+490 (LS), K1752+544 to

K1752+728 (BS), K1752+973 to

K1753+338 (LS), K1753+835 to

K1754+173 (LS), K1754+306 to

K1754+440 (BS), K1754+750 to

K1754+780 (RS), K1754+962 to

K1755+019 (LS), K1754+928 to

K1755+000 (RS), K1755+050 to

K1755+182, (RS)

Zamboanga

Sibugay11/13/2018 2nd

Zamboanga

Sibugay 1st

DEOLF 36.1 255 08/05/2018 1/17/2019 15.01% OG 0.376 0.243 0.150 0.030 0.070 0.033 90.20% - AHD

73

BADSBRO CONSTRUCTION

AND GENERAL

MERCHANDISE

32876 L A MB GE

Road Widening (2-4 Lanes including

Drainage along Liloy-Ipil Road,

K1978+860 to K1979+023, K1979+058 to

K1981+336

Tampilisan,

Zamboanga del

Norte

11/6/2018 1stZamboanga del

Norte 1st DEOLF 67.98 285 2/19/2018 11/30/2018 1.88% OG 0.333 0.293 0.150 0.030 0.047 0.033 88.60% - AHD

74 66

BAICAMAR

CONSTRUCTION AND

SUPPLIES, INC.

19248 L D SB GE

Rehabilitation/Reconstruction/Restorati

on of Crossing Luna Flood Control (Phase

II) along Bayugan-Esperanza Road

Esperanza,

Agusan del Sur11/13/2018 2nd/Final

Agusan del Sur

1st DEOLF 9.31 150 4/23/2018 9/19/2018 0.00% C 0.496 0.134 0.300 - - - 93.00%

86.46%

SatisfactoryONS

75 67 BALLIGI CONSTRUCTION 38005 L B SB GE

Concreting of Barangay Emilia-San

Antonio Farm to Market Road, Sta.

0+000 -Sta. 0+580

Pudtol, Luna,

Apayao11/16/2018 1st

Apayao 2nd

DEOLF 4.83 210 15/06/2018 1/10/2019 0.14% OG 0.382 0.254 0.150 0.030 0.065 0.050 93.10% - AHD

76 68BCT TRADING AND

CONSTRUCTION15199 L AAA LB GE

Road Widening of Puerto Princesa South

Road, K0023+650 - K0025+024;

K0040+000 -K0044+846; K0051+200 -

K0053+096

Puerto Princesa

City, Palawan11/6/2018 1st

Regional Office

No. IV-BLF 192.99 381 10/04/2018 4/25/2019 9.92% OG 0.379 0.287 0.150 0.030 0.042 0.050 93.80% - AHD

77 69BELANCE BUILDERS &

TRADING31611 L C SB GB

Construction of Multi purpose Building

(Covered Court)

Brgy.

Macabenga,

Dupax del Norte,

Nueva Vizcaya

11/6/2018 2nd/FinalNueva Vizcaya

2nd DEOLF 1.97 90 1/31/2018 4/30/2018 0.00% C 0.500 0.197 0.162 - - - 85.90%

71.41%

PoorONS

78 70

BESTECH CONSTRUCTION

& DEVELOPMENT

CORPORATION

17725 L A SB GBConstruction of Multi-Purpose Building,

Barangays Flordeliz and San Antonio

Milaor,

Camarines Sur11/8/2018 1st/Final

Camarines Sur

1st DEOLF 4.70 100 01/03/2018 6/8/2018 0.00% C 0.441 0.133 0.300 - - - 87.40%

87.40%

SatisfactoryONS

79 71BET CONSTRUCTION &

SUPPLY31764 L A MA GE

Flood Management Program,

Construction/Maintenance of Flood

Mitigation Structures and Drainage

System, Rehabilitation of Flood Control

Mitigation Facilities/Drainage System

along Crystal Cave to Asin

Baguio City 11/12/2018 1stBaguio City

DEOLF 43.18 290 15/02/2018 9/2/2018 0.00% OG 0.316 0.300 0.113 0.030 0.045 0.033 83.70% - ONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 9 of 72

Page 10: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

80 72

BETTER WORK

CONSTRUCTION/ILBI

CONSTRUCTION SUPPLY &

SERVICES (JOINT

VENTURE)

JV-17-2168 L B MA GE

Construction/Upgrading/ Rehabilitation

of Drainage along Cotabato - Marbel

Road, K1720+644 - K1721+553,

K1727+080 - K1727+993

South Cotabato 11/6/2018 2nd/Final

South

Cotabato 1st

DEO

LF 28.66 160 4/17/2018 9/23/2018 0.64% C 0.494 0.133 0.300 - - - 92.70%90.96%

Very SatisfactoryAHD

81 73

BICOL GOLDROCK

CONSTRUCTION

CORPORATION

32376 L B MA GE

Off Carriageaway Improvement-

Secondary Roads-Danao-Pasacao Road,

K0420+800-K0421+180

Pamplona

Camarines Sur11/8/2018 1st/Final

Camarines Sur

1st DEOLF 9.01 80 08/02/2018 4/28/2018 0.02% C 0.451 0.201 0.300 - - - 95.20%

95.20%

Very SatisfactoryAHD

82 74

BISLIG VENTURE

CONSTRUCTION & DEV'T.

INC.

36370 L AAA MB GEWidening of Bridge at Piedad Bridge

(BO1226MN) along Bayabas-Eden Road

Torril District,

Davao City11/12/2018 1st

Davao City 2nd

DEOLF 45.49 341 5/2/2018 4/7/2019 -6.88% OG 0.393 0.257 0.081 0.030 0.061 0.033 85.50% - DEL

83 75BLACKRAM BUILDERS,

INC.33899 L D SB GE

Repair/ Improvement of Palsong -La

Purisima (Pakili) Road

Bula Camarines

Sur11/12/2018 1st/Final

Camarines Sur

4th DEOLF 13.20 69 04/05/2018 7/11/2018 0.00% C 0.464 0.133 0.300 - - - 89.70%

89.70%

Very SatisfactoryONS

84 76BLESSING BUILDERS AND

CONSTRUCTION SUPPLY36064 L B SB GE

Improvement / Concreting of Maubba-

Caglayan Farm to Market Road

Barangay

Calanan, Conner,

Apayao

11/15/2018 1stApayao 1st

DEOLF 4.92 189 12/06/2018 12/17/2018 0.47% OG 0.400 0.260 0.150 0.030 0.061 0.050 95.10% - AHD

85 77

BLUE MOUNTAIN

BUILDERS & GENERAL

MERCHANDISE

34745 L A MA GEConstructio of Flood Control along

Lamuk River, Poblacion Dumalneg

Dumalneg, Ilocos

Norte11/22/2018 1st/Final

Ilocos Norte

1st DEOLF 42.03 240 21/02/2018 10/18/2018 0.00% C 0.450 0.200 0.300 - - - 95.00%

95.00%

Very SatisfactoryONS

86 78BN BUILDERS &

CONSTRUCTION SUPPLIES28232 L B MA GB

Construction of 2 Units 2 Storey 6-CL,

Doña Rosario NHS (Tubay NHS Annex)

Tubay, Agusan

del Norte11/15/2018 1st/Final

Agusan del

Norte DEOLF 14.08 286 11/22/2017 9/3/2018 0.00% C 0.500 0.130 0.300 - - - 93.00%

93.00%

Very SatisfactoryONS

87 79

BNR CONSTRUCTION &

DEVELOPMENT CORP./

EDANNA CONSTRUCTION

(JOINT VENTURE)

JV-16-732 L AAA MB GE

Construction of River Control along Kipit

River, Brgy. Kipit, Upstream-Left Side

(K0+270-K0+785), Downstream -Right

Side (K0+000 -K0+400)

Labason,

Zamboanga del

Norte

10/26/2018 1st/FinalRegional Office

No. IXLF 91.67 357 4/24/2017 4/5/2018 0.00% C 0.487 0.156 0.300 - - - 94.30%

94.30%

Very SatisfactoryONS

88 80Boki Construction Services

and Supply43177 L C SB GE

Concreting of Dulao Farm to Market

Road, Barangay DualaoLagawe, Ifugao 11/7/2018 1st Ifugao 1st DEO LF 4.86 105 22/05/2018 9/3/2018 0.00% C 0.460 0.134 0.300 - - - 89.40% - ONS

89 81

BONIMAR

CONSTRUCTION

ENTERPRISES

23760 L B MA GEConstruction of Bank Protection at Brgy.

Pangapisan

Lingayen,

Pangasinan11/13/2018 1st/Final

Pangasinan

2nd DEOLF 21.58 150 07/03/2018 8/3/2018 1.33% C 0.485 0.133 0.300 - - - 91.80%

91.80%

Very SatisfactoryAHD

90 82BOOMETRIX

DEVELOPMENT CORP.40441 L A MB GE

Construction of Katipunan-Salvacion-

Mabuhay -Maasin Road, Brgy. Katipunan

Pilar, Siargao

Island, Surigao

del Norte

11/30/2018 1st/FinalSurigao del

Norte 2nd DEOLF 99 256 12/04/2018 12/23/2018 18.19% C 0.437 0.190 0.300 - - - 92.70%

92.70%

Very SatisfactoryAHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 10 of 72

Page 11: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

91 83

BRE CONSTRUCTION /

MEGALINE BUILDERS AND

SUPPLY (JOINT VENTURE)

JV-17-2821 L A MA GB

Construction of One (1) Unit - Three (3)

Storey Nine (9) Classroom at Lake Sebu

NHS, Lake Sebu

Lake Sebu, South

Cotabato11/6/2018 1st

South

Cotabato 1st

DEO

LF 24.16 210 6/14/2018 1/9/2019 0.63% OG 0.391 0.239 0.150 0.012 0.032 0.050 87.40% - AHD

92 84

BRG CONSTRUCTION /

C.J.D. BUILDERS AND

CONSTRUCTION SUPPLIES

JV-17-952 L B MA GE

Local Program-Local Infrastructure

Program: Construction of Bintawan

Flood Control

Villaverde,

Nueva Vizcaya11/8/2018 1st/Final

Nueva Vizcaya

1st DEOLF 19.01 158 07/02/2018 7/14/2018 16.31% C 0.478 0.143 0.300 - - - 92.10%

92.10%

Very SatisfactoryAHD

93 85 BSP & COMPANY, INC. 19091 L AAA LB GE

Road Widening-Cotabato-Marbel Road,

K1726+558 (Chainage 14823- Chainage

15786), K1729+123-K1730+808

(Chainage 18361- Chainage 20051),

K1731+075-K1731+380 (Chainage 20201-

Chainage 20506), K1744+279-

K1743+500 (Chainage 30565-Chainage

32810)

Surallah, Banga

and Sto. Nino,

South Cotabato

11/6/2018 1stRegional Office

No. XIILF 130.4 263 6/11/2018 2/28/2019 -2.57% OG 0.392 0.288 0.124 0.022 0.045 0.033 90.40% - DEL

94 86

BSP & COMPANY, INC. /

GIBUILD DEVELOPMENT

CORP.

JV-17-2520 L AAA LB GE

Construction of Drainage Structure along

Marbel-Allah-Cotabato Road, K1771+000-

K1772+089

Isulan, Sultan

Kudarat11/7/2018 1st

Sultan Kudarat

1st DEOLF 49.39 221 5/2/2018 12/8/2018 -4.92% OG 0.400 0.241 0.101 0.022 0.047 0.033 84.40% - DEL

95 87

C. T. LEONCIO

CONSTRUCTION &

TRADING/ QUAD - R

BUILDING SOLUTION

JV-17-661 L AAA LA GE

Retrofitting/ Strengthening of Bridge -

Busilac Br. (B00664LZ) along Luna-

Bangar Road

Bangar, La Union 10/11/2018 2nd/FinalLa Union 1st

DEOLF 66.57 234 22/02/2018 10/13/2018 0.16% C 0.500 0.132 0.300 - - - 93.20%

93.02%

Very SatisfactoryAHD

96 88

C.B. GARAY PHILWIDE

BUILDERS / EINS HANA

CONSTRUCTION

CORPORATION (JOINT

VENTURE)

JV-17-2185 L AAA MB GE Construction of River Control

Brgy. Kabulakan,

Lambayong,

Sultan Kudarat

11/7/2018 1stSultan Kudarat

1st DEOLF 43.63 274 4/3/2018 1/1/2019 -1.53% OG 0.399 0.240 0.135 0.022 0.050 0.033 87.90% - DEL

97 89

C.B. GARAY PHILWIDE

BUILDERS / VANNIE

CONSTRUCTION AND

SUPPLY (JOINT VENTURE)

JV-16-2019 L AAA MB GE

Construction of Suage River Control

System at the Back of Federico Roman

Tirador District Memorial Hospital

Janiuay, Iloilo 11/11/2018 1st/Final Iloilo 2nd DEO LF 44.10 240 19/06/2017 2/13/2018 0.00% C 0.465 0.133 0.300 - - - 89.80%89.80%

Very SatisfactoryONS

98 90

C.B. GARAY PHILWIDE

BUILDERS/ CASTILLANES

CONSTRUCTION AND

SUPPLY (JOINT VENTURE)

JV-17-1280 L AAA MB GEConstruction of River Bank

Protection/Flood Control

Brgy. Daladap,

Esperanza,

Sultan Kudarat

11/8/2018 1st/FinalSultan Kudarat

2nd DEOLF 46.39 280 3/23/2018 1/1/2019 31.20% C 0.466 0.133 0.300 - - - 89.90%

89.90%

Very SatisfactoryAHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 11 of 72

Page 12: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

99 91

C.F. TRINIDAD

CONSTRUCTION AND

SUPPLIES CORP.

9199 L B MA GE

Asset Preservation - Preventive

Maintenance - Tertiary Road - Taytay

Diversion Road, K0022+036 - K0022+056,

K0023+378 - K0023+680

Taytay, Rizal 11/5/2018 1st/Final Rizal 1st DEO LF 45.57 90 21/02/2018 5/21/2018 89.11% C 0.451 0.199 0.300 - - - 95.00%95.00%

Very SatisfactoryAHD

100 92C.J.D BUILDERS AND

CONSTRUCTION SUPPLIES30347 L B MA GE

Local Program-Local Infrastructure

Program: Construction of Barat River

Flood Control

Brgy.

Barat,Bambang.

Nueva Vizcaya

11/8/2018 1st/FinalNueva Vizcaya

1st DEOLF 23.71 194 2/11/2018 8/23/2018 0.00% C 0.445 0.187 0.300 - - - 93.20%

93.20%

Very SatisfactoryONS

101 93

C.R. DOMINGO

CONSTRUCTION AND

POWER DEVELOPMENT,

INC.

2992 L A MA GEConstruction of Cagayan River Control

Project (Phase 1), Sta. 0+000 - Sta. 0+130

Patpat,

Angadanan,

Isabela

11/15/2018 1st/FinalIsabela 3rd

DEOLF 28.51390614 211 19/04/2018 11/15/2018 0.00% C 0.471 0.133 0.300 - - - 90.40%

90.40%

Very SatisfactoryONS

102 94

C.R. DOMINGO

CONSTRUCTION AND

POWER DEVELOPMENT,

INC. / SIFFU ROCKS

CONSTRUCTION JOINT

VENTURE

JV-17-2489 L A MA GE Concreting of San Placido - Quiling Roxas, Isabela 11/7/2018 1stIsabela 2nd

DEOLF 47.01468537 216 02/05/2018 12/3/2018 1.59% OG 0.359 0.239 0.150 0.030 0.061 0.050 88.90% - AHD

103 95

C.T. LEONCIO

CONSTRUCTION &

TRADING

17371 L AAA MB GE

Construction of Flood Control Wall along

Marilao River Poblacion I to Poblacion II

(Phase II)

Marilao, Bulacan 11/7/2018 2nd/FinalBulacan 2nd

DEOLF 47.70 200 15/02/2018 9/2/2018 0.00% C 0.433 0.133 0.300 - - - 86.60%

91.40%

Very SatisfactoryONS

104

C.T. LEONCIO

CONSTRUCTION &

TRADING

17371 L AAA MB GEConstruction of Pulot Flood Control

Structure

Sofronio

Espanola,

Palawan

11/9/2018 2ndPalawan 2nd

DEOLF 19.43 203 09/05/2018 11/27/2018 -8.00% OG 0.373 0.300 0.070 0.020 0.037 0.033 83.30% - DEL

105 96

CABILAUAN

CONSTRUCTION AND

SUPPLY

18823 L B MA GE

Preventive Maintenance of Road:

Concrete Reblocking- Cabatuan- New

Lucena- Banga Bante Road, K0034+(-496)

- K0039+197.2 (Intermittent Sections)

Iloilo 11/12/2018 1st/Final Iloilo 4th DEO LF 11.50 150 28/05/2018 10/24/2018 0.00% C 0.474 0.134 0.300 - - - 90.80%90.80%

Very SatisfactoryONS

106 97 CARTESIAN BUILDERS 35386 L B SB GB

Construction of 1 Storey, 1 Unit, Science

Lab. & 1 Unit ICT (7mx18m per Unit),

Alegria National High School (SCH. ID

304607)

Brgy Alegria, Sta.

Monica, Surigao

del Norte

11/7/2018 1st/FinalSurigao del

Norte 2nd DEOLF 8.44 115 7/8/2018 10/30/2018 0.00% C 0.497 0.134 0.300 - - - 93.10%

93.10%

Very SatisfactoryONS

107 98CASAN CONSTRUCTION

AND TRADING 36085 L C SB GE

Repair/Maintenance of Barangay II

Flood ControlJones, Isabela 11/12/2018 1st/Final

Isabela 4th

DEOLF 5.00 109 5/15/2018 8/31/2018 38.85% C 0.452 0.200 0.300 - - - 95.20%

95.20%

Very SatisfactoryAHD

108 99

CAVACON CORPORATION

(FORMERLY CAGAYAN

VALLEY CONST

2622 L AAA LB GE

Asset Preservation Program -

Construction / Upgrading /

Rehabilitation of Drainage along

National Roads - Secondary Roads,

Mindoro West Coastal Rd. - K0335+500 -

K0337+200, K0348+250 - K0349+000,

K0397+000 - K0397+635 (S0095MR)

Sablayan,

Occidental

Mindoro

11/6/2018 1st

Mindoro

Occidental

DEO

LF 47.82 310 07/05/2018 3/12/2019 0.94% OG 0.393 0.251 0.150 0.030 0.033 0.050 90.70% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 12 of 72

Page 13: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

109 100

CAVAT CAPITOL

MERCHANDISING &

CONSTRUCTION

3112 L B MA GE

Construction/Improvement of Access

Roads leading to Declared Tourism

destinations - Masi - Aridowen Road

leading to Bangalao Lake and Caves,

Brgy. Masi

Sta. Teresita,

Cagayan11/10/2018 1st/Final

Cagayan 1st

DEOLF 27.92966729 143 04/03/2018 7/24/2018 0.98% C 0.462 0.200 0.300 - - - 96.20%

96.20%

Very SatisfactoryAHD

110 101

CAVDEAL-CAVITE

INTERNATIONAL

CONSTRUCTION AND

DEVELOPMENT

CORPORATION

5599 L AAA LB GE

Road Widening of Puerto Princesa North

Road (PPNR), RBIA Station: K0014+000 -

K0015+373; K0015+508 -K0020+433,

Survey Station: K0014+000 -K0015+368;

K0015+503 -K0020+420

Puerto Princesa

City, Palawan11/6/2018 1st

Regional Office

No. IV-BLF 234.30 385 10/04/2018 4/29/2019 3.56% OG 0.387 0.284 0.150 0.030 0.047 0.050 94.80% - AHD

111 102 C-BROS CONSTRUCTION 36606 L D SB GBConstruction of Unique Workshop

Building Cabarroguis NSAT Building 1

Cabbarroquis,

Quirino11/9/2018 1st/Final Quirino DEO LF 4.87 80 13/06/2018 8/31/2018 0.00% C 0.468 0.165 0.300 - - - 93.30%

93.30%

Very SatisfactoryONS

112 103CCMALUENDA

CONSTRUCTION INC.11043 L A MB GE

Construction/Improvement of Access

Roads Leading to Trades, Industries and

Economic Zones - Ubujan-Manga Coastal

Road in Support of the Agribusiness

Industry

Tagbilaran City,

Bohol11/6/2018 1st/Final Bohol 1st DEO LF 19.40 163 5/8/2018 10/17/2018 0.00% C 0.470 0.133 0.300 - - - 90.30%

90.30%

Very SatisfactoryONS

113 104 CEAN CONSTRUCTION 41086 L B SB GE

Construction/Maintenance of Flood

Mitigation Structure and Drainage

Systems/ Construction of San Roque

River Flood Control along Bdry. So. Leyte-

Maasin-Macrohon-Sogod-Daang

Maharlika (S00194LT)

San Roque,

Macrohon,

Southern Leyte

11/14/2018 1st/FinalSouthern Leyte

DEOLF 11.76 110 3/13/2018 6/30/2018 0.00% C 0.480 0.133 0.300 - - - 91.30%

91.30%

Very SatisfactoryONS

114 105 CHARLZ CONSTRUCTION 8709 L AA A GE

Construction of Flood Mitigation

Structure at Butuanon River, Brgy. Sirao -

Pulangbato

Cebu City 11/17/2018 1st Cebu City DEO LF 36.65 256 23/04/2028 1/3/2019 8.36% OG 0.358 0.300 0.150 0.030 0.045 0.050 93.33% - AHD

115 106

CHIARA CONSTRUCTION /

DJCM CONSTRUCTION

CORPORATION JOINT

VENTURE

JV-17-1854 L AA MB GE

Road Widening-Primary Roads-Manila

North Road, K0534+000-K0535+084,

K0535+771-K0536+078, K0539+062-

K0539+342, K0544+927-K0545+734,

K0545+884-K0546+049, K0558+369-

K0561+000, K0561+174-K0562+133 and

Imprvt. Of Intersections K0486+000-

K0486+680

Pagudpud, Ilocos

Norte11/7/2018 2nd/Final

Regional Office

No. ILF 143.01 270 22/02/2018 11/18/2018 10.33% C 0.491 0.134 0.300 - - - 92.50%

92.68%

Very SatisfactoryAHD

116 107

CHIARA CONSTRUCTION/

FIRST NORTHWAY

DEVELOPMENT AND

CONSTRUCTION

CORPORATION JOINT

VENTURE

JV-17-2139 L AAA LA GE

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems: Construction of Salvador-

Bucong-Darapidap Flood Control

(Upstream Section)

Candon City,

Ilocos Sur11/8/2018 1st

Ilocos Sur 2nd

DEOLF 48.99 275 02/04/2018 1/1/2019 2.64% OG 0.360 0.240 0.150 0.024 0.056 0.033 86.30% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 13 of 72

Page 14: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

117 108CITRON BUILDERS AND

SUPPLIES36651 L D SB GB

Construction of Two (2) Storey Six (6)

Classroom at Baseco Elementary School

Mariveles

Bataan 11/9/2018 1st

Bataan 2nd

DEOLF 11.53613547 140 7/15/2018 12/1/2018 0.33% OG 0.388 0.220 0.150 0.030 0.052 0.050 89.00% - AHD

118 109 CLY - ABC BUILDERS 39231 L B SB GE

Construction of Concrete Road- Access

Road Leading to Sitio Cabanbanan, Capiz

Leading to Mt. Panginhiraon Peak

Barangay

Dolores,

Dumalag, Capiz

11/9/2018 2nd Capiz 2nd DEO LF 14.48 153 24/04/2018 9/23/2018 -7.78% OG 0.376 0.287 0.072 0.030 0.061 0.033 85.90% - DEL

119 110

CM TAN CONSTRUCTION

(Formerly; CM Tan

Construction Supplies)

28087 L B MA GE

Construction of Dike Revetment along

Tago River Basin (Gamut Section)

Protecting Gamut Bridge

Tago, Surigao del

Sur11/9/2018 1st

Surigao del Sur

1st DEOLF 32.51 253 3/28/2018 12/5/2018 1.40% OG 0.386 0.239 0.150 0.030 0.055 0.050 91.00% - AHD

120 111 COLLERA CONSTRUCTION 13246 L A MA GEConstruction of Old Sumangga Road,

Brgy. Sumangga

Ormoc City,

Leyte11/9/2018 1st/Final Leyte 4th DEO LF 13.86 90 2/22/2018 5/22/2018 0.00% C 0.436 0.133 0.300 - - - 86.90%

86.90%

SatisfactoryONS

121 112CTC BUILDER AND

SUPPLIES INCORPORATED 12088 L A MB GE

Local Road - Const. Of Girawan - Sugian -

Bandi - Juan Adre Road Including

Drainage

Donsol,

Sorsogon11/7/2018 1st

Sorsogon 1st

DEOLF 31.52 167 23/07/2018 1/5/2019 15.97% OG 0.357 0.299 0.150 0.020 0.025 0.033 88.40% - AHD

122 113

CTC BUILDER AND

SUPPLIES INCORPORATED

/ C.T LEONCIO

CONSTRUCTION &

TRADING (JOINT

VENTURE)

JV-16-2154 L A MB GE

Asset Preservation of National Roads

Rehab./Reconst./Upgrading of Damaged

Paved National Road Including Drainage

Based on Pavement Management

System / Highway Development and

Maintenance - 4 (HDM-4) Primary roads

Daang Maharlika (LZ) - K061+127.70 -

K0644+136 with exceptions

Sorsogon 2nd LD 10/19/2018 1st/FinalRegional Office

No. VLF 144.75 283 8/15/2017 5/24/2018 0.00% C 0.448 0.200 0.300 - - - 94.80%

94.80%

Very SatisfactoryONS

123CTC BUILDERS AND

SUPPLIES INCORPORATED12088 L A MB GE

Rehabilitation/ Reconstruction of

National Roads with Slips, Slope Collpase

and Landslide, tertiary Road, Baras -

Gigmot -Viga Road, K0031+700 -

K0032+052, K0081+440- K0081+590

Province of

Catanduanes11/14/2018 1st/Final

Catanduanes

DEOLF 18.92 131 02/05/2018 9/9/2018 3.00% C 0.480 0.168 0.300 - - - 94.80%

94.80%

Very SatisfactoryAHD

124 114C'ZARLES CONSTRUCTION

& SUPPLY23426 L A MB GE

Road upgrading (Unpaved to Paved)

Based on Gravel Road Strategies, Traffic

Benchmark fr Upgrading to Paved Road

Standards (HDM-4 Project

Analysis)(Intermitent Sections) Jct.

Maradugao- Camp Kibatiran- Dominorg

Road, K1626+(-579) - K 1628+595

Bukidnon 4th LD 11/11/2018 1st/FinalRegional Office

No. XLF 85.56 648 26/02/2016 12/4/2017 0.00% C 0.475 0.133 0.300 - - - 90.80%

90.80%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 14 of 72

Page 15: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

125C'ZARLES CONSTRUCTION

& SUPPLY23426 L A MB GE

Road Upgrading (Unpaved to Paved)

based on Gravel Road Strategies, Traffic

Benchmark for Upgrading to Paved Road

Standards (HDM-4 Project

Analysis)(Intermittent Sections),

Barandias-Dominorog Road, K1603+465 -

K1605+1027

Bukidnon 4th LD 11/11/2018 1st/FinalRegional Office

No. XLF 91.31 653 26/02/2016 12/9/2017 0.00% C 0.470 0.133 0.300 - - - 90.30%

90.30%

Very SatisfactoryONS

126C'ZARLES CONSTRUCTION

& SUPPLY23426 L A MA GE

Rehabilitation/Reconstruction of

Damaged Paved Roads along Butuan City

-Malaybalay Road – K1240+(-995) –

K1240+(-535)

Butuan City 11/15/2018 2nd/FinalButuan City

DEOLF 23.12 171 4/3/2018 9/20/2018 0.00% C 0.484 0.134 0.300 - - - 91.80%

89.16%

Very SatisfactoryONS

127 115

D.C.E. CONSTRUCTION /

ISNAG BUILDERS & DEV'T.

CORPORATION JOINT

VENTURE

JV-17-1011 L A MB GE

Construction/Improvement of Access

Road Leading to Declared Tourism

Destination San Isidro Sur-Poblacion-

Lappa-Marag-Cadaclan-Salagunting

Luna, Apayao 11/16/2018 2ndApayao 2nd

DEOLF 93.08 357 19/02/2018 2/10/2019 0.55% OG 0.362 0.268 0.150 0.030 0.061 0.050 92.10% - AHD

128 116

D.L CERVANTES

CONSTRUCTION

CORPORATION /

RODEKOM GENERAL

CONSTRUCTION AND

ENTERPRISE JOINT

VENTURE

JV-17-757 L AAA LB GE

Organizational Outcome 1: Ensure Safe

and Reliable National Road System Asset

Preservation Program-

Rehabilitation/Reconstruction of Roads

with Slips, Slope Collapse and Landslides

(Secondary Roads) Gurel-Bokod-

Kabayan-Abatan Road

Bokot Benguet 11/11/2018 2nd/FinalCAR Regional

OfficeLF 122.97 300 25/03/2018 1/18/2019 0.00% C 0.480 0.140 0.300 - - - 92.00%

88.76%

SatisfactoryONS

129 117

D.L. CERVANTES

CONSTRUCTION

CORPORATION / JUSTBILT

BUILDERS (JOINT

VENTURE)

JV-16-338 L AAA LA GE

MFO-2 Flood Management Service Flood

Control and River Improvement Projects

along Laguna Lake based on Metro

Manila Master Plan- Construction of

Slope Protection for Sta. Maria- Mabitac

River

Laguna 4th LD,

Laguna Province10/26/2018 1st/Final

Regional Office

No. IV-ALF 133.72 345 1/27/2017 1/6/2018 0.00% C 0.450 0.200 0.300 - - - 95.00%

95.00%

Very SatisfactoryONS

130 118

D.L. CERVANTES

CONSTRUCTION

CORPORATION / PROTECH

CONSTRUCTION &

DEVELOPMENT CORP.

(JOINT VENTURE)

JV-17-750 L AAA LA GE

Organizational Outcome 2: Protect Lives

and Properties against Major Floods-

Flood Mitigation Structures and

Drainage Systems- Construction of Slope

Protection Works along Carmona River,

Binan side

Binan City,

Laguna11/21/2018 1st

Regional Office

No. IV-ALF 142.42 330 19/02/2018 1/14/2019 3.34% OG 0.366 0.300 0.150 0.030 0.051 0.050 94.70% - AHD

131 119D.M. CATIGNAS

ENTERPRISES20149 L B SB GB

Construction of Multi-Purposed Cover

Court, Barangay Magdapio

Pangasinan,

Laguna11/7/2018 1st/Final

Laguna 1st

DEOLF 4.79 180 21/02/2018 8/19/2018 0.00% C 0.496 0.158 0.300 - - - 95.40%

95.40%

Very SatisfactoryONS

132 120DANYSONS

CONSTRUCTION25452 L A MA GE

Asset Preservation:

Rehabilitation/Reconstruction/Upgradin

g of Damaged Paved Roads - Tertiary

Road along Gamu - Roxas Road

(S00781LZ) K0401+000 - K0401+400,

K0403+700 - K0404+000, K0404+569 -

K0405+581, K0394+856 - K0395+130,

K0406+702 - K047+000, K047+000 -

K047+420

Burgos and

Gamu, Isabela11/7/2018 1st/Final

Isabela 2nd

DEOLF 46.54742078 208 14/02/2018 9/9/2018 0.05% C 0.441 0.134 0.300 - - - 87.50%

87.50%

SatisfactoryAHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 15 of 72

Page 16: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

133DANYSONS

CONSTRUCTION25452 L A MA GE

Construction/Maintenance of Flood

Mitigation Structures and Drainage

System - Construction of Siffu River

Flood Control Project (Quiling Section)

Roxas, Isabela 11/7/2018 2nd/FinalIsabela 2nd

DEOLF 27.9197494 153 14/02/2018 7/16/2018 0.04% C 0.457 0.198 0.300 - - - 95.50%

86.56%

SatisfactoryAHD

134 121DATREBIL CONSTRUCTION

& SUPPLY36908 L A MA GE

Construction of Flood Control Structures

along Agusan River

Labnig,

Talacogon,

Agusan del Sur

11/13/2018 1st/FinalAgusan del Sur

1st DEOLF 27.63 210 3/19/2018 10/14/2018 11.86% C 0.486 0.133 0.300 - - - 91.90%

91.90%

Very SatisfactoryAHD

135 122DAVAO CONCRETE

PRODUCTS12090 L A MA GE

Construction / Rehabilitation /

Reconstruction of National Roads with

Slip, Slope Collapse and Landslide along

Kibawe-Kadingilan-Kalilangan Road,

K1590+500 to K1590+600

Kadingilan,

Bukidnon11/12/2018 2nd/Final

Bukidnon 2nd

DEOLF 16.56 124 08/04/2018 8/9/2018 0.00% C 0.490 0.133 0.300 - - - 92.30%

92.30%

Very SatisfactoryONS

136 123DAVAO ROCK MIXER

ENTERPRISES22465 L AA MA GE

Rechanelling and Construction of

Revetment along Batutu River, Barangay

Fatima to Camanlangan

New Bataan,

Compostela

Valley Province

11/9/2018 2ndCompostela

Valley DEOLF 48.51 216 4/1/2018 11/14/2019 1.03% OG 0.398 0.240 0.150 0.030 0.061 0.050 92.90% - AHD

137 124 DDS BUILDERS 37010 L B SB GB

Construction/Completion of Multi-

purpose Building at San Jose Central

Elementary School

Brgy. Poblacion,

San Jose,

Dinagat Islands

11/6/2018 1st/FinalDinagat Islands

DEOLF 2.94 120 5/11/2018 9/7/2018 0.31% C 0.483 0.133 0.300 - - - 91.60%

91.60%

Very SatisfactoryAHD

138 125 DEKM CONSTRUCTION 32409 L B SB GEConstruction/Improvement of Access

Road Leading to Valugan Boulder BeachBasco, Batanes 11/14/2018 1st/Final Batanes DEO LF 11.17 175 22/05/2018 11/12/2018 0.00% C 0.405 0.144 0.300 - - - 84.90%

84.90%

SatisfactoryONS

139 126

DEKM CONSTRUCTION /

E.C.T CONSTRUCTION

(JOINT VENTURE)

JV-17-3046 L B MA GBConstruction of Batanes District

Engineering Office

Brgy.

Kayvaluganan,

Basco, Batanes

12/7/2018 1st Batanes DEO LF 45.03 410 27/07/2018 9/9/2019 21.89% OG 0.400 0.240 0.150 0.022 0.029 0.050 89.10% - AHD

140 127 DIAMOND J BUILDERS 38868 L C SB GE Construction of Hanging Foot Bridge

Dibibi,

Cabarroquis,

Quirino

11/9/2018 1st/Final Quirino DEO LF 2.21 100 03/05/2018 8/10/2018 2.45% C 0.465 0.133 0.300 - - - 89.80%89.80%

Very SatisfactoryAHD

141 128 DICON BUILDERS CORP. 33181 L B MA GE

Widening of Permanent Bridge, San

Antonio Bridge (B01111) along Butuan

City - Cagayan de Oro City (Phase II)

Jasaan, Misamis

Oriental11/9/2018 1st/Final

Misamis

Oriental 2nd

DEO

LF 27.28 170 12/02/2018 7/31/2018 0.00% C 0.466 0.155 0.300 - - - 92.10%92.10%

Very SatisfactoryONS

142 129DINAH JANE

CONSTRUCTION SUPPLY33925 L A MA GB

Construction of 4-Storey 16-CL School

Building at Colawin NHSArgao, Cebu 11/12/2018 1st Cebu 4th DEO LF 36.72 210 6/12/2018 1/7/2019 15.68% OG 0.399 0.240 0.150 0.030 0.041 0.033 89.30% - AHD

143 130DJCM CONSTRUCTION

CORPORATION 27678 L AA MA GE

Repair/Maintenance of Eroded

Protection along Bongo River, Brgy.

Poblacion

Dingras, Ilocos

Norte11/7/2018 1st

Ilocos Norte

2nd DEOLF 38.60 266 16/07/2018 4/7/2019 30.46% OG 0.400 0.240 0.150 0.030 0.051 0.033 90.40% - AHD

144 131

DMDANAN

CONSTRUCTION AND

TRADING

41374 L C SB GE

Rehabilitation/Major Repair of

Permanent Bridge, Sta. Cruz Bridge 1

(B01505LZ) along Jose Abad Santos Ave.

(JASA)

Lubao,

Pampanga11/15/2018 1st/Final

Pampanga 2nd

DEOLF 13.71840138 90 27/03/2018 6/24/2018 0.00% C 0.496 0.133 0.300 - - - 92.90%

92.90%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 16 of 72

Page 17: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

145 132 DMLC BUILDERS 36650 L A MA GEConstruction of River Control along

Bulihan River, Barangay Bulihan Famy, Laguna 11/8/2018 1st/Final

Laguna 1st

DEOLF 42.18 211 28/02/2018 9/26/2018 0.00% C 0.457 0.200 0.300 - - - 95.70%

95.70%

Very SatisfactoryONS

146 133DSB CONSTRUCTION AND

SUPPLY, INC.16126 L AA MB GE

Rehabilitation/Improvement of Malolos

River Control Protecting Imperial Bridge

along DM - Junction Legazpi - Sto.

Domingo - Tabaco - Camarines Sur

Boundary Road

Malolos,

Malinao, Albay11/15/2018 1st Albay 1st DEO LF 39.32 177 07/06/2018 11/30/2018 12.62% OG 0.357 0.300 0.150 0.020 0.040 0.033 90.00% - AHD

147 134DUROS DEVELOPMENT

CORP.22729 L AAA LA GE

MFO 1-National Road Network Services,

Asset Preservation of National Roads-

Rehabilitation/ Reconstruction of

National Roads with Slips/Slope

Collapse, and Landslide Cebu-Balamban

Transcentral Highway

Section 1:

K0036+790-

K0036+880;

Section 2:

K0031+910-

K0031+985.00

11/14/2018 1st/FinalRegional Office

No. VIILF 162.12 420 28/03/2017 5/21/2018 0.00% C 0.499 0.133 0.300 - - - 93.20%

93.20%

Very SatisfactoryONS

148 135 E.M. CUERPO, INC. 30963 L AAA LB GE

Rehabilitation of Dike System along

Madongan River, (Breached and Eroded

Dike) Right Bank, Brgy. Baresbes

Dingras, Ilocos

Norte11/7/2018 2nd/Final

Ilocos Norte

2nd DEOLF 47.65 255 28/12/2018 9/8/2019 9.41% C 0.481 0.134 0.300 - - - 91.50%

90.18%

Very SatisfactoryAHD

149 136E.M. CUERPO, INC./ EGB

CONSTRUCTIONJV-15-1765 L AAA LB GE

MF 2: Flood Management Services:

Construction/Maintenance of Flood

Mitigation Structures and Drainage

System - Cagayan River Flood

Management Projects

Baculud, Ilagan,

Isabela11/9/2018 1st/Final

Regional Office

No. IILF 184.1710349 681 14/07/2016 5/25/2018 0.79% C 0.492 0.133 0.300 - - - 92.50%

92.50%

Very SatisfactoryAHD

150 137

E.M. CUERPO,

INC./KATHA BUILDERS &

SUPPLIES (Joint Venture)

JV-17-2369 L A MB GE

Rehabilitation/Reconstruction of

National Roads with Slips, Slope

Collapse, and Landslide-Primary Roads

Manila North Road K0578+015-

K0578+092

Pagudpud, Ilocos

Norte11/6/2018 1st/Final

Ilocos Norte

1st DEOLF 96.50 105 27/06/2018 10/9/2018 73.69% C 0.500 0.133 0.300 - - - 93.30%

93.30%

Very SatisfactoryAHD

151 138E.M.L. CONSTRUCTION &

TRADING10151 L B MA GE

Network Development Program - Road

Widening of Angeles - Porac -

Floridablanca - Dinalupihan Road,

K0108+1260 - K0110+300; K0110+380 -

K0111+937.38; K0108+1260 -

K0110+300; K0110+434 - K0111+937.38

Floridablanca,

Pampanga 11/15/2018 1st

Pampanga 2nd

DEOLF 92.38944792 300 26/06/2018 4/21/2019 1.08% OG 0.386 0.234 0.150 0.030 0.056 0.050 90.60% - AHD

152E.M.L. CONSTRUCTION &

TRADING10151 L B MA GE

Road Widening - Tertiary Roads -

Amungan - Palauig - Banlog, Including

ROW - K0212+280 - K0213+680,

K0213+888 - K0214+100

Iba, Zambales 11/6/2018 1stZambales 1st

DEOLF 52.49013853 210 20/07/2018 2/14/2019 0.36% OG 0.363 0.240 0.150 0.030 0.056 0.033 87.20% - AHD

153 139E.R. DELA CRUZ

CONSTRUCTION & SUPPLY 32158 L B MA GE

Construction of Poctoy Flood Control

Structure along Tablas Circumferential

Road

Odiongan,

Romblon 11/15/2018 1st/Final Romblon DEO LF 40.53 292 09/02/2018 11/27/2018 10.38% C 0.428 0.200 0.300 - - - 92.80%

92.80%

Very SatisfactoryAHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 17 of 72

Page 18: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

154 140E.S BIHAG

CONSTRUCTION & SUPPLY35698 L B MA GE

Concreting of Farm to Market Roads,

Barangays Bagong Sirang, Anib and

Cotmo and La Purisima

Sipocot and Lupi,

Camarines Sur11/7/2018 1st/Final

Camarines Sur

5th DEOLF 20.24 150 18/05/2018 10/14/2018 1.33% C 0.485 0.200 0.300 - - - 98.50%

98.50%

OutstandingAHD

155 141E.T LATAWAN

CONSTRUCTION13919 L B MA GE

Convergence and Special Support

Program, Construction/Improvement of

Access Roads leading to Trades,

Industries and Economic

Zones,Poblacion-Sagada-Aguid Road in

support to Coffee Weaving,Food

Processing and Tourism Industries

Sagada,Mountai

n Province11/9/2018 1st/Final

Mt. Province

DEOLF 23.76 209 23/04/2018 10/18/2018 3.83% C 0.361 0.200 0.300 - - - 86.10%

86.10%

SatisfactoryAHD

156E.T LATAWAN

CONSTRUCTION13919 L B MA GE

Asset Preservation

Program,Rehabilitation/Reconstruction/

Upgrading of Damaged Paved Roads,

Secondary Roads, Baguio-Bontoc

Road(Interminnent Sections

Mountain

Province11/8/2018 1st/Final

Mt. Province

DEOLF 21.51 237 20/02/2018 8/17/2018 0.00% C 0.341 0.200 0.300 - - - 84.10%

84.10%

SatisfactoryONS

157 142EC STRUCTURAL

COMPOSITES, INC.31961 L A MA GE

Rehabilitation/Major Repair of Bridge-

Talaugis Br. (B00475PN) Along Iloilo City-

Leganes-Dumangas Coastal Road

Iloilo 11/12/2018 1st/Final Iloilo 4th DEO LF 30.88 190 27/02/2018 9/4/2018 0.19% C 0.493 0.133 0.300 - - - 92.60%92.60%

Very SatisfactoryAHD

158 143EC STRUCTURAL

COMPOSITES, INC.31961 L B MA GE

Retrofitting of Siwaragan Bridge

(B00140PN) along Iloilo-Antique Road

(K0055+725)

San Joaquin,

Iloilo11/17/2018 2nd/Final Iloilo 1st DEO LF 12.83 238 19/02/2018 10/14/2018 2.40% C 0.500 0.133 0.300 - - - 93.30%

93.00%

Very SatisfactoryAHD

159 144

EDDIE G. GUILLEN

BUILDERS / TJMT

CONSTRUCTION

JV-17-1761 L A MA GE

001: Ensure Safe and Reliable National

Road System - Network Development

Program - Road Widening - Secondary

Roads, Cagayan Valley Road (Magapit -

Jct. Aparri Airport Section) - K0567+000 -

K0570+255.80, K0570+255.80 -

K0570+295.80, K0570+295.80 - K0571+0

Camalanuigan,

Cagayan11/9/2018 1st

Cagayan 1st

DEOLF 55.893186 251 03/05/2018 1/8/2019 -0.62% OG 0.353 0.240 0.144 0.030 0.060 0.033 86.00% - DEL

160 145EDDMARI CONSTRUCTION

AND TRADING20301 L AAA LB GE

Local Infrastructure Program (LIP) -

National Roads, Construction of Apalit

Bypass Road Connecting Two Provinces

in Regional III, Bulacan and Pampanga

Apalit,

Pampanga11/13/2018 1st

Regional Office

No. IIILF 197.9999811 480 12/5/2017 3/29/2019 0.74% OG 0.359 0.273 0.150 0.030 0.047 0.033 89.20% - AHD

161 146EDISON DEVELOPMENT &

CONSTRUCTION2400 L AAA MB GE

Flood Management Program -

Construction / Maintenance of Flood

Mitigation Structures and Drainage

Systems, Construction of Revetment

along Mamburao River

Mamburao,

Occidental

Mindoro

11/7/2018 1st

Mindoro

Occidental

DEO

LF 92.44 351 12/02/2018 1/28/2019 -3.67% OG 0.389 0.300 0.113 0.030 0.050 0.033 91.50% - DEL

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 18 of 72

Page 19: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

162EDISON DEVELOPMENT &

CONSTRUCTION2400 L AAA LB GE

Bridge Program - Construction of New

Permanent Bridges, Lawaan - Tamayo

Br. Along Mindoro West Ocastal Rd.

(Phase II)

Abra de Ilog,

Occidental

Mindoro

11/7/2018 1st

Mindoro

Occidental

DEO

LF 18.82 254 05/02/2018 10/16/2018 -16.33% OG 0.273 0.300 0.000 0.030 0.045 0.033 68.10% - DEL

163EDISON DEVELOPMENT &

CONSTRUCTION2400 L AAA LB GE

Concreting of Sitio Tigib, Brgy. Lanipga

FMR, Brgy. Lanipga

Consolacion,

Cebu11/16/2018 1st Cebu 6th DEO LF 7.96 196 5/22/2018 12/3/2018 7.45% OG 0.370 0.240 0.150 0.030 0.042 0.050 88.20% - AHD

164 147

EDISON DEVELOPMENT &

CONSTRUCTION / A.C.

RIVERO DEVELOPMENT

CORPORATIO

JV-17-1058 L AAA LB GE

Road Widening - Ormoc-Baybay

Southern Leyte Bdry Road, K1015+612-

K1016+010; K1017+234-K1018+334;

K1018+459-K1019+422; K1024+382-

K1024+722; K1027+193.43-K1028+088;

K1028+118-K1029+409, K1032+000-

K1033+686; K1033+701.5-K1034+265;

K1034+340.3-K1034+516

Leyte 11/9/2018 1st Leyte 4th DEO LF 192.50 300 2/15/2018 12/11/2018 2.47% OG 0.362 0.239 0.150 0.030 0.056 0.050 88.70% - AHD

165EDISON DEVELOPMENT

CONSTRUCTION 2400 L AAA LB GE

Construction of Barangay Poblacion

Farm to Market Road

Barangay

Poblacion,

Guipos,

Zamboanga del

Sur

11/12/2018 1st/FinalZamboanga del

Sur 2nd DEOLF 4.83 27 7/30/2018 8/25/2018 0.00% C 0.486 0.134 0.300 - - - 92.00%

92.00%

Very SatisfactoryONS

166 148

EDISON DEVELOPMENT

CONSTRUCTION / M.M

RODRIGUEZ TRADING

AND CONSTRUCTION

(JOINT VENTURE)

JV-17-1575 L B LB GE

Construction / Maintenance of Flood

Mitigation Structure and Drainage

System, Construction of Tigaplan River

Flood Control Structure

Brookes Point,

Palawan11/9/2018 2nd

Palawan 2nd

DEOLF 71.53 336 18/03/2018 2/16/2019 10.00% OG 0.324 0.300 0.150 0.022 0.051 0.033 88.00% - AHD

167 149

EDISON DEVELOPMENT

CONSTRUCTION/ KRB

CONSTRUCTION JOINT

VENTURE

JV-17-2151 L AAA MB GE

Rehabilitation of Paved Road-Bacnotan-

Luna-Balaoan Road, K0301+194-

K0302+419,K0295+1003.20-K0297+000,

Brgy. Barrientos and Brgy. Darigayos,

Luna, Brgy. Almeida, Balaoan

Luna and

Balaoan, La

Union

11/5/2018 1stLa Union 1st

DEOLF 50.43 260 23/03/2018 12/7/2018 -0.79% OG 0.363 0.240 0.142 0.030 0.061 0.033 86.90% - DEL

168 150 EGB CONSTRUCTION 13722 L AA MB GE

Construction and Maintenance of

Bridges along National Roads Widening

of Permanent Bridges to more than Two

Lanes, Bayo Bridges along Cagayan

Valley Road

Iguig, Cagayan 11/13/2018 1st/FinalCagayan 3rd

DEOLF 47.34475952 425 20/03/2017 5/18/2018 0.00% C 0.490 0.161 0.300 - - - 95.10%

95.10%

Very SatisfactoryONS

169 EGB CONSTRUCTION 13722 L AA MA GE

Construction/Rehabilitation of Flood

Mitigation Facilities within Major River

Basins and Principal Rivers: Construction

of Abulug River Control, Lucban

Abulug, Cagayan 11/12/2018 1st/FinalCagayan 2nd

DEOLF 49 287 12/02/2018 11/25/2018 4.83% C 0.498 0.133 0.300 - - - 93.10%

93.10%

Very SatisfactoryAHD

170 151EGB CONSTRUCTION /

OCP CONSTRUCTIONJV-17-882 L AA MB GE

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems - Construction of Sanchez Mira

River Basin at Nangoluan

Sanchez Mira,

Cagayan11/12/2018 1st/Final

Cagayan 2nd

DEOLF 57.9 340 15/02/2018 1/20/2019 9.82% C 0.450 0.200 0.300 - - - 95.00%

95.00%

Very SatisfactoryAHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 19 of 72

Page 20: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

171 152EIRISH BUILDERS &

SUPPLY INC.33656 L B MA GE

Construction of Flood Control Structures

including Desilting/Dredging along Mag-

asawang Sapa Creek

San Ildefonso,

Bulacan11/7/2018 2nd/Final

Bulacan 2nd

DEOLF 77.20 243 14/03/2018 11/11/2018 2.48% C 0.458 0.133 0.300 - - - 89.10%

86.52%

SatisfactoryAHD

172 153 EL-JAKE BUILDERS 38162 L B SB GE

Rehabilitation of Concrete Road

Including Drainage System, Hazel Street,

Barangay San Luis

Antipolo 11/6/2018 1st/Final Rizal 1st DEO LF 2.82 120 01/03/2018 6/28/2018 0.15% C 0.491 0.152 0.300 - - - 94.30%94.30%

Very SatisfactoryAHD

173 154

ELKANKONSTRAK

DEVELOPMENT

CORPORATION

26220 L AA MA GE

Construction/Improvement of Cabilogan

River Course (West Carisac Section),

(Downstream of Dam )Let side

Libon, Albay 11/5/2018 2nd/Final Albay 2nd DEO LF 18.60 225 28/02/2018 9/10/2018 14.00% C 0.479 0.133 0.300 - - - 91.20%90.12%

Very SatisfactoryAHD

174

ELKANKONSTRAK

DEVELOPMENT

CORPORATION

26220 L AA MA GE

Construction/ Improvement of Cabilogan

River Course (San Agustin Section),

Upstream of San Agustin Bridge

Libon, Albay 11/5/2018 1st/Final Albay 3rd DEO LF 16.74 180 28/02/2018 8/26/2018 0.00% C 0.493 0.134 0.300 - - - 92.70%92.70%

Very SatisfactoryONS

175 155

EQUI-PARCO

CONSTRUCTION

COMPANY

14332 L AAA LB GE

Construction of Outfall (Cagayan de Oro

River) Diversion Channel for Gumamela,

Acasia

Carmen,

Cagayan de Oro

City

11/5/2018 1st

Cagayan de

Oro City 1st

DEO

LF 45.58 179 12/07/2018 1/6/2019 4.33% OG 0.366 0.300 0.150 0.030 0.070 0.050 96.60% - AHD

176

EQUI-PARCO

CONSTRUCTION

COMPANY

14332 L AAA LB GE

Desiltation/Channel Excavation of

CARBDP Eastbank Cutoff Channel Mahay

Lemon Creek LADP Cutoff Channel to

Protect Mayor Democrito Plaza II

Avenue along Mahay and Lemon

Sections with Sand Pocket

Butuan City 11/15/2018 1stButuan City

DEOLF 39.2 285 6/20/2018 3/31/2019 58.15% OG 0.354 0.300 0.150 0.030 0.070 0.033 93.70% - AHD

177 156

ESJ AND SONS

CONSTRUCTION SUPPLY,

INC.

17162 L AAA LA GE

Road Widening- Bacood North Road

Including ROW K0058+1167-K0059+018,

K00+059-K00059+316, K0063+000-

K0063+114

Negros

Occidental11/13/2018 1st Regional DEO LF 108.00 297 26/04/2018 2/16/2019 -5.09% OG 0.387 0.236 0.099 0.030 0.056 0.050 85.80% - DEL

178 157

ESR CONSTRUCTION AND

DEVELOPMENT

CORPORATION (Formerly:

ESR Construction)

10451 L AAA LB GE

Road Widening- Primary Roads- Lanao-

Pagadian-Zamboanga City Road

K1724+110.00 to K1724+310.90,

K1724+560.00 to K1726+480.00,

K1728+885.97 to K1729+367.02,

K1734+918.00 to K1736+403.50,

K1737+500.00 to K1738+454.08

Zamboanga

Sibugay11/12/2018 1st

Regional Office

No. IXLF 163.69 225 7/4/2018 2/13/2019 42.52% OG 0.325 0.240 0.150 0.030 0.060 0.050 85.50% - AHD

179 158

ESR CONSTRUCTION AND

DEVELOPMENT

CORPORATION/ 2M

CONSTRUCTION &

ENTERPRISES (JOINT

VENTURE)

JV-17-1936 L AAA LA GE

Construction of Concrete Bridge along

Buayan Bridge II along Lanao-Pagadian-

Zamboanga City Road

Kabasalan,

Zamboanga City

Road

11/14/2018 1st

Zamboanga

Sibugay 2nd

DEO

LF 38.3 381 02/05/2018 5/17/2019 0.32% OG 0.394 0.286 0.150 0.020 0.047 0.050 94.70% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 20 of 72

Page 21: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

180 159

EXCELSIUS ENGINEERING

SERVICES / DRAGON

HATCHED CONSTRUCTION

JOINT VENTURE

JV-17-3031 L B MA GB

Construction of Four-Storey (16

Classroom) School Building Ilagan East

C/S, City of Ilagan

City of Ilagan,

Isabela11/8/2018 1st

Isabela 1st

DEOLF 35.35362391 210 09/07/2018 2/3/2019 21.25% OG 0.386 0.239 0.150 0.030 0.047 0.050 90.20% - AHD

181 160EZ GOLD CONSTRUCTION

& SUPPLY39408 L C SB GB

Construction of Multi-Purpose Building

(Hall), Brgy. Hibao-an Norte

Mandurriao,

Iloilo City11/16/2018 1st/Final Iloilo City DEO LF 2.15 78 10/06/2018 9/4/2018 0.00% C 0.497 0.134 0.300 - - - 93.10%

93.10%

Very SatisfactoryONS

182 161

F. GURREA

CONSTRUCTION,

INCORPORATED

6995 L AAA MA GEConstruction of Jordan Wharf Shore

Protection

Jordan,

Guimaras11/5/2018 1st Guimaras DEO LF 37.22 230 02/07/2018 2/16/2019 1.28% OG 0.396 0.240 0.150 0.030 0.055 0.050 92.10% - AHD

183

F. GURREA

CONSTRUCTION,

INCORPORATED

6995 L AAA MA GEConstruction of Suage River Control

System Pototan, Iloilo 11/11/2018 1st Iloilo 2nd DEO LF 48.78 298 14/02/2018 12/8/2018 2.30% OG 0.394 0.237 0.150 0.030 0.043 0.033 88.70% - AHD

184 162

F.B BANTALES

ENGINEERING

CONSTRUCTIONS

31045 L A MA GEConstruction of Road Slope Protection

Structure-Benguet-Nueva Vizcaya Road,

La Trinidad and

Bokod,Benquet11/6/2018 1st/Final

Benguet 1st

DEOLF 47.90 210 29/01/2018 8/26/2018 0.00% C 0.373 0.200 0.300 - - - 87.30%

87.30%

SatisfactoryONS

185

F.B BANTALES

ENGINEERING

CONSTRUCTIONS

31405 L A MA GE

Construction of Mitigation Structure-

Construction of Flood Mitigation

Structure along Agno River Basin,

Ambalanga Section,

Itogon Benguet 11/6/2018 1stBenquet 1st

DEOLF 47.95 195 15/03/2018 9/25/2018 0.40% C 0.296 0.298 0.150 - - - 86.50%

86.50%

SatisfactoryAHD

186

F.B BANTALES

ENGINEERING

CONSTRUCTIONS

31045 L A MA GE

Off-Carriageway Improvement: Shoulder

Paving/Construction-Baguio-Bauang

Road

Sablan,Benguet 11/6/2018 2nd/FinalBenguet 1st

DEOLF 38.54 240 14/03/2018 10/9/2018 0.00% C 0.343 0.200 0.300 - - - 84.30%

85.72%

SatisfactoryONS

187

F.B. BANTALES

ENGINEERING

CONSTRUCTION

31405 L A GE

Construction Improvement of Access

Roads Leading to Trades,Industries and

Economic Zones: Acop-Kapangan-

Kibunga n-Bakun Road Jct. To Bangho-

Daclan-Basil Tublay Central Road in

support to Coffee,Bamboo,Food and

Feed Crops,Cut Flowers and Fruit Trees

Industry

Tublay Benguet 11/7/2018 1stBenguet 2nd

DEOLF 70.10 268 07/03/2018 11/29/2018 0.50% OG 0.331 0.300 0.150 0.018 0.040 0.050 88.90% - AHD

188 163

F.B. BANTALES

ENGINEERING

CONSTRUCTION /

BALINTUGAN

CONSTRUCTION JOINT

VENTURE

JV-17-2002 L B MB GE

Rehabilitation/Reconstruction of Roads

with Slips, Slope Collapse and Landslide

along Kennon Road

Tuba Benguet 11/5/2018 1st/FinalBenguet 1st

DEOLF 48.86 234 4/11/2018 11/30/2018 98.72% C 0.484 0.154 0.300 - - - 93.80%

93.80%

Very SatisfactoryAHD

189 164

F.B. BANTALES

ENGINEERING

CONSTRUCTION /

BALINTUGAN

CONSTRUCTION JOINT

VENTURE

JV-17-2099 L B MB GE

Rehabilitation/Reconstruction of Roads

with Slips, Slope Collapse, Landslides

(secondary roads), Hingyon, Ifugao

KO329+165-KO329+300

Hingyon, Ifugao 11/7/2018 1st/Final Ifugao 1st DEO LF 46.75 150 19/03/2018 8/15/2018 0.00% C 0.473 0.133 0.300 - - - 90.60%90.60%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 21 of 72

Page 22: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

190 165F.F GALANG

CONSTRUCTION26801 L B SB GE

Construction of Flood Control and

Drainage System along Puerto Princesa

North Road (Jct. PPNR - Honda Bay Road

to Inabuyan Bridge) K0012+(-117.70) -

K0012+455.70

Puerto Princesa

City, Palawan11/7/2018 1st

Palawan 3rd

DEOLF 9.45 240 19/02/2018 10/16/2018 -4.52% OG 0.389 0.300 0.105 0.020 0.051 0.000 86.50% - DEL

191 166F.F ROSALES GENERAL

CONTRACTOR8814 L B MA GB

Construction of Two (2) Storey ICT

Laboratory Building,Fabrica High School -

La Victoria Annex High School

Bula Camarines

Sur11/12/2018 1st

Camarines Sur

4th DEOLF 8.91 120 06/08/2018 12/3/2018 0.16% OG 0.368 0.241 0.150 0.030 0.054 0.050 89.30% - AHD

192F.F. ROSALES GENERAL

CONTRACTOR8814 L B MA GE

I. Operating Outcome 1: Ensure Safe and

Reliable National Road System 1. Asset

Preservation Program B. Rehabilitation /

Reconstruction of Roads with Slips, Slope

Collapse and Landslides 2. Tertiary

Roads 1. Junction MSR - Old Zigzag Road,

K0155+970 to K0156+278, K0156+844 to

K0157+000, K0157+055 to K0157+155

Pagbilao,

Quezon11/10/2018 2nd/Final

Quezon 4th

DEOLF 80.45 240 05/03/2018 10/30/2018 0.00% C 0.417 0.200 0.300 - - - 91.70%

92.18%

Very SatisfactoryONS

193 167F.H. GOPITEO

CONSTRUCTION & SUPPLY21336 L B MA GE

Construction of Bank Protection along

Siguel River (Upstream), Sta.0+000-

Sta.0+190

Brgy. Siguel,

General Santos

City, South

Cotabato

11/13/2018 1st/Final

South

Cotabato 2nd

DEO

LF 24.5 178 5/15/2018 11/8/2018 10.84% C 0.444 0.200 0.300 - - - 94.40%94.40%

Very SatisfactoryAHD

194 168

F.L. REGUYAL

CONSTRUCTION

CORPORATION

3315 L B MA GE

Network Development - Construction of

By-Pass and Diversion Roads, Guimba -

Talugtug - Umingan Road, Nueva Ecija

Nueva Ecija 11/12/2018 1stNueva Ecija 1st

DEOLF 46.55 270 18/03/2018 12/12/2018 9.17% OG 0.385 0.265 0.150 0.030 0.060 0.050 94.00% - AHD

195 169

FAIRCHILD BUILDERS AND

DEVELOPERS,

INCORPORATED

10024 L B MA GE

Network Development -Road-Widening-

Primary Road along Tacloban-Baybay-

South Road K0985+(-255)-K0985+204

Mahaplag, Leyte 11/12/2018 1st/Final Leyte 5th DEO LF 14.64 150 2/12/2018 7/11/2018 0.00% C 0.466 0.133 0.300 - - - 89.90%89.90%

Very SatisfactoryONS

196 170FAME BUILDER

PHILIPPINES8936 L A MB GE

Construction of Four (4) Storey Sixteen

(16) Classroom at Limay, BataanLimay, Bataan 11/9/2018 1st

Bataan 2nd

DEOLF 37.42098959 210 7/15/2018 2/9/2019 1.50% OG 0.400 0.180 0.150 0.022 0.056 0.050 85.80% - AHD

197 171FERDSTAR BUILDERS

CONTRACTORS4965 L A MB GE

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems - Construction of Slope

Protection along Sapang Maragul

Diversion Channel

Guagua,

Pampanga11/15/2018 1st/Final

Pampanga 2nd

DEOLF 48.99964304 210 28/03/2018 10/23/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%

93.30%

Very SatisfactoryONS

198FERDSTAR BUILDERS

CONTRACTORS4965 L A MB GE

Rehab./Reconst. of National Roads with

Slips, Slope Collapse and Landslide along

Tigbao-Pulak-Sta. Fe Road (S00039LT),

Sta. 910+360-Sta 910+830, Sta 910+830-

Sta 911+136

Sta. Fe, Leyte 11/15/2018 1st/Final Leyte 1st DEO LF 46.49 192 2/2/2018 8/12/2018 0.00% C 0.429 0.200 0.300 - - - 92.90%92.90%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 22 of 72

Page 23: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

199 172

FERMIDA CONSTRUCTION

SERVICES AND SUPPLIES /

R.J. IBARRA

CONSTRUCTION (JOINT

VENTURE)

JV-17-1843 L B MA GE

Construction of Slope Protection/Flood

Control, Gabor Dike (Upstream), Sta.

1+996 to Sta. 2+700

San Filipe,

Zambales11/6/2018 1st/Final

Zambales 1st

DEOLF 47.96932529 200 09/03/2018 9/24/2018 4.50% C 0.487 0.133 0.300 - - - 92.00%

92.00%

Very SatisfactoryAHD

200 173 FFJJ CONSTRUCTION 16712 L AAA MB GE

Construction of Concrete Road- Junction-

Dipolog- Sindangan- Liloy Road

Concreting to Bago- Siari Section in

Support of Rice, Rubber, Coconut and

Abaca Industries

Sindangan,

Zamboanga del

Norte

11/7/2018 1stZamboanga del

Norte 1st DEOLF 38.75 249 4/26/2018 12/30/2018 0.53% OG 0.380 0.240 0.150 0.024 0.047 0.050 89.10% - AHD

201 FFJJ CONSTRUCTION 16712 L AAA MB GE

Surigao – Davao Coastal Road –

K1305+229 – K1306+326, K1306+341 –

K1307+980, K1308+000 – K1308+256

Tago, Surigao del

Sur11/9/2018 1st

Surigao del Sur

1st DEOLF 89.58 284 4/2/2018 1/10/2019 1.40% OG 0.399 0.240 0.150 0.030 0.060 0.050 92.90% - AHD

202 174

FFJJ CONSTRUCTION /

JMT CONSTRUCTION

JOINT VENTURE

JV-17-2107 L AAA MB GE

Construction of Flood Mitigation

Structure and Drainage System along

Surigao River, Sta. 0+000 – Sta. 0+690

Brgy. Quezon,

Surigao City,

Surigao del

Norte

11/8/2018 1st/FinalSurigao del

Norte 1st DEOLF 67.46 237 3/21/2018 11/12/2018 5.06% C 0.478 0.133 0.300 - - - 91.10%

91.10%

Very SatisfactoryAHD

203 175

FFJJ CONSTRUCTION

JOINT VENTURE /

PYRAMID CONSOLIDATED

BUILDERS & GENERAL

MERCHANDISE

JV-16-527 L AAA LB GEWidening of Lunocan Br. (B0149+MN)

along Syare Highway

Manolo fortich,

Bukidnon10/3/2018 1st/Final

Bukidnon 3rd

DEOLF 39.2 249 02/03/2017 11/5/2017 0.00% C 0.480 0.133 0.300 - - - 91.30%

91.30%

Very SatisfactoryONS

204 176FIRST MAKEEN

CONSTRUCTION32352 L A SB GB

Construction of Multi-Purpose Building

(Covered Court), Barangay Tumagabok

Boac,

Marinduque11/15/2018 2nd/Final

Marinduque

DEOLF 3.83 150 16/02/2018 7/15/2018 0.00% C 0.480 0.152 0.300 - - - 93.20%

91.59%

Very SatisfactoryONS

205 177FJ MIRANDA

CONSTRUCTION41349 L D SB GB

Contruction of Two-Storey, Four

Classroom School Building at Cabiten

National High School (RA9087)

Mankayan

Benguet11/8/2018 1st/Final

Benguet 2nd

DEOLF 10.07 120 25/06/2018 10/22/2018 0.00% C 0.432 0.201 0.300 - - - 93.30%

93.30%

Very SatisfactoryONS

206 178 FLT ENTERPRISES 23039 L A MA GE Construction of Barangay Road

Buluangan I,

Valderrama,

Antique

11/6/2018 2nd/Final Antique DEO LF 1.91 66 21/03/2018 5/25/2018 -6.46% C 0.477 0.200 0.106 - - - 78.30%78.06%

UnsatisfactoryDEL

207 179

FLYING SEVEN

CONSTRUCTION/ AL-

AMEN BUILDERS (JOINT

VENTURE)

JV-17-2207 L A MA GE

Construction / Repair / Rehabilitation /

Improvement of Various Infrastructure

Including Local Projects: Construction of

Concrete Access Road Leading to

Topocon ES, Sta. 0+000 - Sta. 3+ 768

Sultan Naga

Dimaporo, Lanao

del Norte

11/6/2018 1st/FinalLanao del

Norte 1st DEOLF 36.11 156 02/04/2018 9/4/2018 0.00% C 0.469 0.153 0.300 - - - 91.20%

91.20%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 23 of 72

Page 24: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

208 180FOOTPRINTS

CONSTRUCTION16713 L B MA GE

Road Widening along Bukidnon - Davao

City Road, K1563+(-768) - K1563+(-

702.63), K1565+713 - K1565+794,

K1567+524 - K1567+595 and K1567+621 -

K1567+684, Camp I-Buayan Section

Maramag,

Bukidnon11/12/2018 2nd/Final

Bukidnon 2nd

DEOLF 9.92 75 09/07/2018 9/21/2018 0.00% C 0.480 0.146 0.300 - - - 92.60%

92.60%

Very SatisfactoryONS

209 181 FR ESPIRITU JR BUILDERS 36719 L AAA MA GEConstruction of Flood Control Revetment

along Bolo Rover

Brgy. San

Lorenzo, Bangui,

Ilocos Norte

11/6/2018 2nd/FinalIlocos Norte

1st DEOLF 25.24 197 12/02/2018 8/27/2018 0.06% C 0.425 0.133 0.300 - - - 85.80%

85.38%

SatisfactoryAHD

210 182 FRAMECON BUILDERS 22482 L B MA GE

Construction of Mag-Asawang Tubig RC

Structure, Del Pilar - Naujan To Bucayao -

Calapan City

Naujan, Oriental

Mindoro11/9/2018 1st/Final

Mindoro

Oriental DEOLF 23.43 240 15/03/2018 11/9/2018 5.33% C 0.096 0.200 0.300 - - - 59.60%

59.6%

PoorAHD

211 183 G. UY CONSTRUCTION 27999 L B MA GEConcreting Reconstruction: Pacita-Lapaz

Drive, K0090+(-585) to K0090+915Hamtic, Antique 11/6/2018 1st/Final Antique DEO LF 22.82 152 11/04/2018 9/9/2018 0.00% C 0.488 0.134 0.300 - - - 92.20%

92.20%

Very SatisfactoryONS

212 184

G.C.I CONSTRUCTION

AND DEVELOPMENT

CORP.

11346 L AAA LA GE

Construction/Rehabilitation of Flood

Mitigation Facilities within Major River

Basin and Principal River - Construction

of Dike (Along Libmanan River) within

Bicol River Basin,Barangay Potot

Libmanan,Camar

ines Sur11/9/2018 1st/Final

Camarines Sur

1st DEO LF 37.98 198 26/02/2018 9/11/2018 0.00% C 0.462 0.200 0.300 - - - 96.20%

96.20%

Very SatisfactoryONS

213 185 GCLT CONSTRUCTION 30657 L A MA GERehabilitation of Slope Protection along

Pampanga River

Calaba, San

Isidro11/8/2018 1st/Final

Nueva Ecija

2nd DEOLF 13.69 180 12/04/2018 10/8/2018 0.26% C 0.484 0.134 0.300 - - - 91.80%

91.80%

Very SatisfactoryAHD

214 186GEMMA CONSTRUCTION

SUPPLY INC. 5044 L AAA LA GE

Repair/Rehabilitation (Asphalt Overlay

with Thermoplastic Pavement Markings)

along Daang Maharlika Road (Jct. R.

Castillo), K1503+268- K1505+859

Davao City 10/27/2018 1st/FinalDavao City 1st

DEOLF 99 160 02/10/2017 3/10/2018 0.00% C 0.473 0.200 0.300 - - - 97.30%

97.30%

OutstandingONS

215 187

GEMMA CONSTRUCTION

SUPPLY INC. / MAGAR

CONSTRUCTION AND

SUPPLY JOINT VENTURE

JV-17-2463 L AAA LA GE

Road Widening (2 into 4 lanes) along

Surigao del Sur Bdry.-Davao Oriental

including ROW K1683+764 to

K1684+431, K1684+431 to K1685+430

Tarragano,

Davao Oriental11/7/2018 1st

Davao Oriental

1st DEOLF 43.67 198 4/29/2018 11/12/2018 -0.17% OG 0.363 0.212 0.148 0.030 0.056 0.033 84.20% - DEL

216 188 GENETIAN BUILDERS 18052 L A MB GE

Construction/Improvement of Access

Roads Leading to Declared Tourism

Destination at National Road Jct. leading

to Baluran Falls, Sta. 0+000 to Sta. 1+800

Barangay Lower

Baluran, Imelda,

Zamboanga

Sibugay

11/13/2018 1st

Zamboanga

SIbugay 1st

DEO

LF 56.01 320 02/04/2018 2/15/2019 -4.85% OG 0.388 0.220 0.102 0.030 0.070 0.017 82.70% - DEL

217 GENETIAN BUILDERS 18052 L A MA GBConstruction of Classrooms, Tangub City

NHS

Tangub City,

Misamis

Occidental

11/7/2018 1st/Final

Misamis

Occidental 2nd

DEO

LF 4.1 85 12/14/2017 3/8/2018 0.00% C 0.482 0.135 0.300 - - - 91.70%91.70%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 24 of 72

Page 25: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

218 189

GERRA CONSTRUCTION

INCORPORATED / JOHN

DEE B. BUSTAMANTE

CONSTRUCTION JOINT

VENTURE

29359 L A MA GE Construction of Baubo Flood ControlMaria Aurora,

Aurora11/10/2018 1st Aurora DEO LF 29.40 317 16/03/2018 1/26/2019 4.18% OG 0.374 0.238 0.150 0.030 0.060 0.050 90.20% - AHD

219 190GFJ CONSTRUCTION

SUPPLY & MERCHANDISE40789 L C SB GE

Opening and Concreting of Barangay

Midpapan II - Barangay Renibon FMR

Phase I, Barangay Midpapan II and

Barangay Renibon

Pigcawayan,

North Cotabato11/10/2018 1st/Final

Cotabato 2nd

DEOLF 4.73 36 7/5/2018 8/9/2018 0.00% C 0.492 0.134 0.300 - - - 92.60%

92.60%

Very SatisfactoryONS

220 191GICAR CONSTRUCTION,

INC.12624 L AAA MB GE

Construction of Dike/Revetment along

Agusan River, Urduja Section, Sta.

0+504.40 - Sta. 0+618.4

Butuan City,

Agusan del

Norte 1st LD

11/27/2018 1st/FinalButuan City

DEOLF 73.16 300 5/18/2017 3/13/2018 59.35% C 0.453 0.189 0.300 - - - 94.20%

94.20%

Very SatisfactoryAHD

221GICAR CONSTRUCTION,

INC.12624 L AAA LB GE

Circumferential Road Leading to Lake

Mainit/Mainit-Poblacion-Tagbuyawan

(Bridge I, Tagbuyawan Bridge)

Brgy.

Tagbuyawan,

Mainit, Surigao

del Norte

27/10/2018 1st/FinalSurigao del

Norte 1st DEOLF 77.27 455 4/6/2017 7/4/2018 0.22% C 0.483 0.135 0.300 - - - 91.80%

91.80%

Very SatisfactoryAHD

222 192 GIMPAB ENTERPRISES 34872 L C SB GBConstruction of MPB, Mahayahay , Brgy.

Cabug

Medina, Misamis

Oriental11/13/2018 1st/Final

Misamis

Oriental 1st

DEO

LF 2.35 120 01/05/2018 8/28/2018 0.00% C 0.498 0.134 0.300 - - - 93.20%93.20%

Very SatisfactoryONS

223 193GLOBAL TECH DESIGN

BUILDERS, INC. 38945 L D SB GB

Construction of Multi- Purpose Building

in Brgy. Lapasan

Cagayan de Oro

City11/15/2018 1st/Final

Cagayan de

Oro City 2nd

DEO

LF 1.88 105 20/04/2018 8/2/2018 0.00% C 0.482 0.200 0.189 - - - 87.10%87.10%

SatisfactoryONS

224 194

GOLDEN FLEECE

CONSTRUCTION AND

SUPPLY,INC

37240 L D SB GB

Construction of Multi-Purpose Building,

Barangay San Jose and Barangay Baliuag

Viejo

Milaor and

Minalabac

Camarines Sur

11/8/2018 1st/FinalCamarines Sur

1st DEOLF 4.70 100 01/03/2018 6/8/2018 0.00% C 0.483 0.133 0.300 - - - 91.60%

91.60%

Very SatisfactoryONS

225 195

GOLDRICH

CONSTRUCTION &

TRADING

16489 L AAA LA GE

Network Development Program-

Contsruction of By-Pass/Diversion Roads-

Quirino Highway(Baguio-Bauang Road to

Quezon Hill Road 1) By Pass Road

including ROW and slope protection

Baguio City 11/12/2018 1stBaguio City

DEOLF 61.41 348 18/02/2018 1/31/2019 14.30% C 0.338 0.300 0.150 - - - 91.80%

91.80%

Very SatisfactoryAHD

226

GOLDRICH

CONSTRUCTION &

TRADING

16489 L AAA LA GE

Asset Preservation Program-

Rehabilitation/Reconstruction o

National Roads with Slip, Slope Collapse

and Landslide: Kennon Road

Baguio City 11/12/2018 1st/FinalBaguio City

DEOLF 74.38 240 18/02/2018 10/15/2018 27.11% C 0.476 0.134 0.300 - - - 91.00%

91.00%

Very SatisfactoryAHD

227

GOLDRICH

CONSTRUCTION &

TRADING

16489 L AAA LA GE

Asset Preservation Program-

Rehabilitation/Reconstruction of

National Roads with Slips, Slope Collapse

and Landslide: Quirino H-way (Baguio

Bauang Road)

Baguio City 11/12/2018 1st/FinalBaguio City

DEOLF 38.85 240 18/02/2018 10/15/2018 49.18% C 0.436 0.148 0.300 - - - 88.40%

88.40%

SatisfactoryAHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 25 of 72

Page 26: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

228 196

GOLDROCK

CONSTRUCTION &

DEVELOPMENT CORP.

5389 L AA LA GE

Construction of Concrete Road -

Marufinas -Caruray - Port Barton Road

Leading to San Vicente, Sta. 0+000 - Sta.

1+550

San Vicente,

Palawan11/11/2018 2nd

Palawan 1st

DEOLF 47.17 225 10/05/2018 12/20/2018 22.54% OG 0.389 0.300 0.150 0.020 0.056 0.050 96.50% - AHD

229 197GONZALO

CONSTRUCTION1826 L A MA GE

Replacement of Permanent Weak Bridge-

Salacop Brigde (Washed out) along Acop-

Kapangan-Kibungan-Bakun Road

Kapangan,Bengu

et11/7/2018 2nd/Final

Benguet 2nd

DEOLF 28.43 162 07/03/2018 8/15/2018 1.80% C 0.442 0.176 0.300 - - - 91.80%

89.16%

Very SatisfactoryAHD

230 198GRACE CONSTRUCTION

CORPORATION3771 L AAA LB GE

Improvement/ Concreting of Road, Balas

, Potrero - Maliwalu, Potrero - Mitla, San

Antonio - Duat and Duat - Potrero

Bacolor,

Pampanga11/12/2018 1st

Pampanga 1st

DEOLF 23.86980602 195 30/05/2018 12/10/2018 1.27% OG 0.369 0.178 0.150 0.030 0.056 0.050 83.30% - AHD

231 199GRAIA CONSTRUCTION

CORPORATION30826 L AAA LB GE

Organizational Outcome: Protect Lives

and Properties Against Major Floods -

Flood Management Program -

Construction/ Maintenance of Flood

Mitigation and Drainage Systems:

Construction of Revetment along Imus

River

Brgy. Mabolo III,

Bacoor, Cavite11/14/2018 1st/Final

Cavite Sub

DEO LF 37.04981089 255 10/04/2018 12/20/2018 22.62% C 0.475 0.133 0.300 - - - 89.00%

89.00%

Very SatisfactoryAHD

232 200GREAT WALL

ENGINEERING 34573 L B SB GB

Construction of Multi-Purpose Building,

Barangay Guinacutan

Vinzons

Camarines Norte 11/6/2018 1st/Final

Camarines

Norte DEOLF 1.92 75 29/04/2018 7/12/2018 0.00% C 0.472 0.134 0.300 - - - 90.60%

90.60%

Very SatisfactoryONS

233 201GVDPM CONSTRUCTION

CORP.9052 L AA LA GE

Network Development - Construction of

Missing gaps Connecting National Roads

including ROW, Capas - Botolan Road,

(Zambales Section) Zambales 2nd

Lagislative District

Province of

Zambales11/9/2018 2nd/Final

Regional Office

No. IIILF 142.3184769 420 14/03/2017 5/7/2018 0.00% C 0.495 0.134 0.300 - - - 92.90%

88.86%

SatisfactoryONS

234GVDPM CONSTRUCTION

CORP. 9052 L AA LA GE

Rehabilitation/Improvement of Existing

Dike along Lukung River, (Brgy. Alfonso

Section, Right Bank), Sta. 02+915 to Sta.

03+375

Concepcion,

Tarlac11/13/2018 1st/Final Tarlac 2nd DEO LF 47.77 244 01/02/2018 10/2/2018 0.00% C 0.474 0.133 0.300 - - - 90.70%

90.70%

Very SatisfactoryONS

235 202H.G. LOPEZ

CONSTRUCTION17691 L A MB GE

Road Widening-Manila North Road-

K0303+811 - K0306+497Bangar, La Union 11/5/2018 1st

La Union 1st

DEOLF 71.74 255 16/03/2018 11/25/2018 9.06% OG 0.310 0.300 0.150 0.030 0.047 0.033 87.00% - AHD

236 203

HAIDEE CONSTRUCTION

AND DEVELOPMENT

CORP.

10365 L AAA LB GE

Construction and Maintenance of Bridge

along National Roads - Widening of

Permanent Bridges to more than 2 lanes -

Secondary - Friendship Bridge

(B04231LZ) along Friendship

Circumferencial Road (West

Circumderential Road)

Barangay

Anunas, Angeles

City

11/14/2018 1stRegional Office

No. IIILF 122.525114 611 5/15/2017 1/15/2019 1.53% OG 0.362 0.235 0.150 0.030 0.055 0.033 86.50% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 26 of 72

Page 27: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

237 204HAUSLAND

CONSTRUCTION32378 L A MA GE

Organizational Outcome 2: Protect Lives

and Properties Against Major Floods -

Flood Management Program -

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems: Construction of Revetment

along Baluctot River, Phase II, East Side

Brgy. Sampaloc

IV, Dasmarinas,

Cavite

11/13/2018 1stCavite Sub

DEO LF 48.74982571 300 14/02/2018 12/10/2018 3.50% OG 0.388 0.240 0.150 0.030 0.061 0.050 91.90% - AHD

238 205 HENSCHA PHILS. INC. 34164 L AAA MA GEConstruction of River Control Along Brgy.

Evangelista

Naujan, Oriental

Mindoro11/6/2018 1st/Final

Mindoro

Oriental DEOLF 18.71 195 15/03/2018 9/25/2018 10.00% C 0.425 0.133 0.300 - - - 85.80%

85.80%

SatisfactoryAHD

239 206HENSCHA PHILS. INC. /

VIRLO CONSTRUCTIONJV-16-1405 L AAA MB GE

MFO 2-Flood Management Services,

Construction/Maintenace of Flood

Mitigation Structure and Drainage

Systems, Improvement/ Rehabilitation

of Flood Control Structure at Cansaga

River, Phase III

Consolacion,

Cebu Province11/17/2018 1st/Final

Regional Office

No. VIILF 96.50 560 21/04/2017 11/1/2018 19.54 C 0.495 0.133 0.300 - - - 92.80%

92.80%

Very SatisfactoryAHD

240 207 HENSO CONSTRUCTION 10720 L B MA GE

Local Roads and Bridges- Local Roads-

Local Infrastructure Program: Concreting

of Road at Camp Arturo Enrile

Malagutay,

Zamboanga City11/15/2018 1st/Final

Zamboanga

City DEOLF 9.55 112 04/04/2018 7/24/2018 0.00% C 0.405 0.187 0.300 - - - 89.20%

89.20%

Very SatisfactoryONS

241 208HEXAMINDZ

CORPORATION31666 L AA MA GE

Organizational Outcome 2: Protect Lives

and Properties Against Major Floods -

Flood Management Program -

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems: Construction of Recetment

along Amuntay River, Phase II, East Side

Brgy. San

Agustin II,

Dasmarinas,

Cavite

11/14/2018 1st/FinalCavite Sub

DEO LF 48.74991018 300 19/02/2018 12/15/2018 26.88% C 0.480 0.133 0.300 - - - 91.30%

91.30%

Very SatisfactoryAHD

242HEXAMINDZ

CORPORATION31666 L AAA MA GE

Organizational Outcome 2: Project Lives

and Properties Against Major Floods -

Flood Management Program -

Construction/ Maintenance of Flood

Control Structures and Drainage Systems

- Construction / Rehabilitation of Flood

Mitigation Facilities of Principal River

Basin along Tanay River

Tanay, Rizal 11/11/2018 1st Rizal 2nd DEO LF 48.99934168 343 26/02/2018 2/3/2019 3.73% OG 0.395 0.240 0.150 0.030 0.070 0.050 93.50% - AHD

243HEXAMINDZ

CORPORATION31666 L AAA MB GE

Const./Imprv't, of NRJ Brgy. San Luis to

Insular Leading to San Luis Beach Line,

Brgy. San Luis

Caraga, Davao

Oriental11/7/2018 1st/Final

Davao Oriental

1st DEOLF 18.96 128 4/16/2018 8/21/2018 -2.39% C 0.469 0.133 0.228 - - - 83.00%

83.00%

SatisfactoryDEL

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 27 of 72

Page 28: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

244HEXAMINDZ

CORPORATION 31666 L AAA MA GE

Construction of Revetment, Flood

Control Structure and Flood Gate at the

Bocaue Portion of the Bulacan River

Bocaue, Bulacan 11/6/2018 1stBulacan 1st

DEOLF 91.78 210 10/08/2018 3/7/2019 24.80% OG 0.354 0.240 0.150 0.030 0.051 0.033 85.80% - AHD

245 209

HI- TONE CONSTRUCTION

AND DEVELOPMENT

CORPORATION

23385 L AAA MB GE

Asset Preservation Program-Preventive

Maintenance, Legazpi Airport Road

K0530+(-972) to K0530+(-242)

Legazpi City,

Region V11/14/2018 1st/Final Albay 2nd DEO LF 11.61 58 12/02/2018 4/10/2018 0.00% C 0.459 0.200 0.300 - - - 95.90%

95.90%

Very SatisfactoryONS

246 210HIGH STRENGTH DEV.

CORPORATION31976 L A MA GE

Construction of Slope Protection/ Flood

Control Bancal River, Barangay Parel,

Sta. 0+761 to Sta. 0+996, Botolan Side

Botolan,

Zambales11/7/2018 1st

Zambales 1st

DEOLF 37.62128687 244 23/04/2018 12/22/2018 3.84% OG 0.400 0.239 0.150 0.030 0.056 0.033 90.80% - AHD

247HIGH STRENGTH DEV.

CORPORATION31976 L A MA GE

Construction of Slope Protection/ Flood

Control , Bancal River, Barangay Parel,

Sta. 0+996 to Sta. 1+229, Botolan Side

Botolan,

Zambales11/6/2018 1st

Zambales 1st

DEOLF 37.6174186 244 02/05/2018 12/31/2018 2.24% OG 0.398 0.240 0.150 0.030 0.056 0.033 90.70% - AHD

248HIGH STRENGTH DEV.

CORPORATION31976 L A MA GE

Construction/ Maintenance of Flood

Mitigation Structures and Drainage

Systems, Improvement of Camachile

River

San Marcelino,

Zambales11/7/2018 1st/Final

Zambales 2nd

DEOLF 37.65111646 210 09/02/2018 9/6/2018 0.00% C 0.470 0.133 0.300 - - - 90.30%

90.30%

Very SatisfactoryONS

249HIGH STRENGTH DEV.

CORPORATION31976 L A MA GE

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems, Improvement of Camachile

River (Upstream)

Castillejos,

Zambales11/7/2018 1st/Final

Zambales 2nd

DEOLF 47.06122324 240 09/02/2018 10/6/2018 0.85% C 0.381 0.200 0.300 - - - 88.10%

88.10%

SatisfactoryAHD

250 211

HI-TONE CONSTRUCTION

& DEVELOPMENT CORP. /

6RM CONSTRUCTION

JOINT VENTURE

JV-17-1966 L AAA MB GE

Road Widening- Sarangani- Davao Del

Sur Coastal Road, K1658+783-

K1664+298 (Chainage 5093- Chainage

10630), K1664+630- K1666+264

(Chainage 10962- Chainage 12592),

K1666+620- K1666+680 (Chainage 12948-

Chainage 13008)

Alabel and

Malapatan,

Sarangani

11/13/2018 1stRegional Office

No. XIILF 179.01 313 4/30/2018 3/8/2019 0.13% OG 0.392 0.239 0.150 0.024 0.047 0.050 90.20% - AHD

251 212HI-TRI DEVELOPMENT

CORPORATION1758 L AAA LB GE

Asset Preservation of National Roads -

Rehabilitation/ Reconstruction /

Uprgading - Secondary - Reconstruction

from Asphalt to Concrete - Masbate -

Milagros Road (K0006+709 - K0007+075,

K0008+000 - K0008+120, K0013+518 -

K0014+000

Masbate City 11/9/2018 1st/FinalMasbate 1st

DEOLF 44.41 367 08/05/2017 5/9/2018 0.00% C 0.475 0.140 0.300 - - - 91.50%

91.50%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 28 of 72

Page 29: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

252 213HMM BUILDERS AND

CONSTRUCTION SUPPLY35636 L D SB GE Construction of Road

Barangay

Esparar,

Barbaza, Antique

11/6/2018 2nd/Final Antique DEO LF 1.97 66 20/04/2018 6/24/2018 -4.92% C 0.491 0.200 0.152 - - - 84.30%79.56%

UnsatisfactoryDEL

253 214HONEYVILLE

CONSTRUCTION32160 L A MB GE

MFO-1 National Road Netwrork Services

Construction of By-Passes/ Diversion

Roads Including ROW, Malagasang -

Bucandala-Alapan Road

Cavite 3rd LD,

Cavite Province12/11/2018 1st/Final

Regional Office

No. IV-ALF 104.4638227 785 14/03/2016 5/7/2018 0.00% C 0.447 0.156 0.300 - - - 90.30%

90.30%

Very SatisfactoryONS

254HONEYVILLE

CONSTRUCTION32160 L A MB GE

Organizational Outcome 2: Protect Lives

and Properties Against Major Floods -

Flood Management Program -

Construction/ Maintenance of Flood

Mitigation Facilities within Major River

Basins River and Principal Rivers -

Construction / Improvement /

Rehabilitation of Flood Control

Structures along Upper Marikina River

and Puray River

Brgy. San Isidro,

Rodriguez,Rizal11/11/2018 1st Rizal 2nd DEO LF 28.15041325 214 18/04/2018 11/17/2018 0.83% OG 0.391 0.240 0.150 0.030 0.060 0.050 92.10% - AHD

255 215HONY TRADING AND

CONSTRUCTION26898 L B MA GE

Organizational Outcome 1: Network

Development Program, Road Widening,

Secondary Roads, Manila East Road -

K0021+357 to K0022+000, K0024+340 to

K0025+450, K0025+450 to K0025+550

Taytay, Rizal 11/5/2018 1st Rizal 1st DEO LF 57.80 360 05/03/2018 2/27/2019 1.67% OG 0.399 0.254 0.150 0.030 0.051 0.033 91.70% - AHD

256 216

HVC SAGITTARIUS

COMMERCIAL &

CONSTRUCTION

12954 L B SB GBConstruction of New Barangay Hall,

Brgy. Rotunda

Koronadal City,

South Cotabato11/5/2018 2nd/Final

South

Cotabato 1st

DEO

LF 1.38 90 4/26/2018 7/24/2018 20.00% C 0.497 0.133 0.300 - - - 93.00%86.35%

SatisfactoryAHD

257 217I & E CONSTRUCTION

CORPORATION10410 L AA GE

Road Upgrading (Unpaved to Paved)

Based on Gravel Road Strategies, Traffic

Benchmark for Upgrading to Paved Road

Standards (HDM-4 Project Analysis) -

Tertiary Roads, Bagac - Mariveles Road,

Bataan 2nd Legislative District, Province

of Bataan

Mariveles

Bataan 11/8/2018 2nd/Final

Regional Office

No. IIILF 117.4497943 370 5/16/2017 4/20/2018 0.00% C 0.494 0.134 0.300 - - - 92.80%

91.38%

Very SatisfactoryONS

258 202I.A. BOSQUE

CONSTRUCTION CORP.12597 L A MB GE

Retroffiting/ Strengthening of Bridges -

Macalelon Bridge and Catanaunan

Bridge along Gumaca - Pitogo - Mulanay -

San Narciso Road

Macalelon and

Catanauan,

Quezon

11/12/2018 1st/FinalQuezon 3rd

DEOLF 52.75 210 09/02/2018 9/6/2018 0.00% C 0.493 0.133 0.300 - - - 92.60%

92.60%

Very SatisfactoryONS

259 203I.A. BOSQUE

CONSTRUCTION CORP.12597 L A MB GE

Off-Carriageway Improovement :

Shoulder Paving / Construction - Pitogo

Junction - Poblacion Road, K02015+(-

692) to K0207+622

Pitogo, Quezon 11/12/2018 1st/FinalQuezon 3rd

DEOLF 33.60 270 12/02/2018 11/8/2018 20.00% C 0.474 0.148 0.300 - - - 92.20%

92.20%

Very SatisfactoryAHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 29 of 72

Page 30: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

260 204IBC INTERNATIONAL

BUILDERS CORPORATION8576 L AAA LB GE

Road Widening- Barotac Viejo- San

rafael Road, K0084+998-K0088+350

Barotac Viejo,

Iloilo11/11/2018 2nd Iloilo 3rd DEO LF 93.17 266 26/03/2018 12/16/2018 5.89% OG 0.380 0.216 0.150 0.030 0.051 0.050 87.70% - AHD

261 205

IBC INTERNATIONAL

BUILDERS CORPORATION

/ J.S. LAYSON & CO. , INC.

JOINT VENTURE

JV-17-1665 L AAA MA GEConstruction of Aganan Flood Control

project (Jaro-Aganan River)

Brgy. 6, San

Miguel, Iloilo11/12/2018 1st Iloilo 4th DEO LF 18.62 215 27/04/2018 11/27/2018 2.25% OG 0.394 0.240 0.150 0.030 0.051 0.050 91.50% - AHD

262 206ILBI CONSTRUCTION

SUPPLY & SERVICES32021 L B SB GB

Construction of Multi-Purpose Building

(New Gym), Yellow Bell, Barangay Sta.

Cruz

Koronadal City,

South Cotabato11/5/2018 1st/Final

South

Cotabato 1st

DEO

LF 2.44 105 4/25/2018 8/7/2018 20.00% C 0.485 0.133 0.300 - - - 91.80%91.80%

Very SatisfactoryAHD

263 207ILC SUMMIT

CONSTRUCTION INC.36862 L A SB GE

Concreting of Barangay Road, Brgy.

Quezon, Libjo, Dinagat Islands

Brgy. Quezon,

Surigao City,

Surigao del

Norte

11/6/2018 2nd/FinalDinagat Islands

DEOLF 3.96 160 18/04/2018 9/24/2018 29.35% C 0.480 0.133 0.300 - - - 91.30%

90.46%

Very SatisfactoryAHD

264 208IRC CONSTRUCTION &

SUPPLIES29943 L A MA GE

Construction of San Isidro - Diteki River

Flood Control

San Luis and

Maria Aurora,

Aurora

11/10/2018 1st Aurora DEO LF 51.40 319 12/02/2018 12/27/2018 1.32% OG 0.378 0.206 0.150 0.030 0.050 0.050 86.40% - AHD

265 209ISNAG BUILDERS & DEV'T.

CORPORATION33781 L B SB GE

Construction/Improvement of Access

Road Leading to Trades, Insdustries &

Economic Zone San Carlos-Palali-

Malekkeg Road in Support of Casava,

Corn, Rice, Mandarin, Tourism

Handicrafts, Furniture and Coconut San

Carlos-Palali-Malekkeg STA. O+000-

0+800,

sta. marcela,

apayao11/16/2018 2nd/Final

Apayao 2nd

DEOLF 18.65 210 08/02/2018 9/5/2018 0.00% C 0.490 0.133 0.300 - - - 92.30%

89.60%

Very SatisfactoryONS

266 210IVY MICHELLE

CONSTRUCTION34093 L AAA LA GE

Road Concretig-Access Roads to

Barangay Aporawan, barake,

Magbabadil,Mabini to Poblacion, In

Support of Coconut, Cacao and Oil Palm

Industry, Sta. 000+000 - Sta. 002+840

Aborlan,

Palawan11/8/2018 1st

Palawan 3rd

DEOLF 65.82 258 22/05/2018 2/3/2019 13.10% OG 0.371 0.263 0.150 0.020 0.051 0.050 90.50% - AHD

267 211J & A PIMENTEL

CONSTRUCTION7953 L A MA GE

Access Road Leading to San Isidro Busay

Falls

Brgy. San Isidro,

Tandag City,

Surigao City

11/9/2018 1st/finalSurigao del Sur

1st DEOLF 38.12 183 5/2/2018 1/31/2018 0.00% C 0.475 0.133 0.300 - - - 90.80%

90.80%

Very SatisfactoryONS

268 212J.E. TICO CONSTRUCTION

CO., INC.7063 L A MB GE

Road Widening- Guimaras

Circumferential Road Including ROW,

K0027+209 to K0028+904

Buenavista,

Guimaras11/5/2018 1st Guimaras DEO LF 61.90 272 20/04/2018 1/16/2019 2.44% OG 0.367 0.239 0.150 0.030 0.061 0.033 88.00% - AHD

269 213

J.G GUTIERREZ

CONSTRUCTION AND

TRADING

32116 L D SB GB

Construction of Two (2) Storey Two (2)

Classroom School Building at Macabud

NHS

Rodriguez, Rizal 11/11/2018 1st/Final Rizal 2nd DEO LF 6.47511694 115 09/01/2018 5/3/2018 0.00% C 0.497 0.134 0.300 - - - 93.10%93.10%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 30 of 72

Page 31: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

270 214

J.M. LUCIANO

CONSTRUCTION, INC.

(Formerly: J.M. Luciano

Construction)

2083 L AAA LB GE

Construction of By-Pass and Diversion

Roads – Tagongon – Sta. Maria – Sta.

Juana – Maputi – Dreamland –

Bingcongan – San Roque

Bincongan

Section, Surigao

del Sur

11/10/2018 1st/FinalSurigao del Sur

2nd DEOLF 9.65 209 4/10/2018 11/4/2018 8.69% C 0.443 0.134 0.300 - - - 87.70%

87.70%

SatisfactoryAHD

271

J.M. LUCIANO

CONSTRUCTION, INC.

(Formerly: J.M. Luciano

Construction)

2083 L AAA LB GE

Construction/Impovement of Access

Roads leading to Declared Tourism

Destinations NRJ-Cumawas-Tinuy-an

Falls Road,

Borboanan,

Bislig City,

Surigao del Sur

11/10/2018 1st/FinalSurigao del Sur

2nd DEOLF 49 259 3/1/2018 11/14/2018 20.82% C 0.479 0.133 0.300 - - - 91.20%

91.20%

Very SatisfactoryAHD

272 215JAIME B. CHING

ENTERPRISES4256 L A MB GE

Road Widening- Bacolod South Rd

(Kabankalan-Hinobaan Section),

K0098+575-K0100+134, K0100+270-

K0102+131

Negros

Occidental11/14/2018 1st Regional DEO LF 108.43 294 08/05/2018 2/25/2019 1.40% OG 0.395 0.239 0.150 0.030 0.051 0.033 89.80% - AHD

273 216

JAMJLE PROPERTIES

(SUBIC) AND

DEVELOPMENT

CORPORATION

35039 L AA MA GE

Flood Management Program -

Construction/ Maintenance of Flood

Mitigation Structures and Drainage

Systems, Construction/Extension of

Jetty, Kalaklan Mouth

Olongapo City,

Zambales11/7/2018 1st

Zambales 2nd

DEOLF 46.3068412 180 20/07/2018 1/15/2019 3.98% OG 0.400 0.240 0.150 0.030 0.050 0.050 92.00% - AHD

274 217

JANN-NORRIS

CONSTRUCTION AND

SUPPLIES INC

35880 L A MB GE

Road widening of Primary Road, Daang

Maharlika K0216+886 - K0219+092.70,

K00219+224 - K00219+899,

K0219+954.70 - K0220+490.80,

K0220+874.60 - K0222+828

Sta. Fe, Nueva

Vizacaya11/7/2018 1st/Final

Regional Office

No. IILF 157.41 354 12/04/2018 3/31/2019 56.17% C 0.48 0.134 0.300 - - - 91.40%

91.40%

Very SatisfactoryAHD

275 218

JANN-NORRIS

CONSTRUCTION AND

SUPPLIES INC. / ALPHA &

OMEGA GEN.

CONTRACTOR &

DEVELOPMENT CORP.

(JOINT VENTURE)

35880 L A MA GBConstruction of Regional Evacuation

Center

Bayombong,

Nueva Vizcaya11/7/2018 1st/Final

Regional Office

No. IILF 30.31 330 7/31/2017 6/25/2018 1.85% C 0.498 0.161 0.300 - - - 95.90%

95.90%

Very SatisfactoryAHD

276

JANN-NORRIS

CONSTRUCTION AND

SUPPLIES,INC.

35880 L A MB GE

Rehabilitation/Reconstruction/Upgradin

g of Damaged Paved Roads, Daang

Maharlika (LZ) K0233+341 to K023+020

Aritao, Nueva

Vizcaya11/6/2018 1st/Final

Nueva Vizcaya

2nd Disrict

DEO

LF 46.43 197 04/02/2018 8/19/2018 3.93% C 0.448 0.198 0.300 - - - 94.60%94.60%

Very SatisfactoryAHD

277 219

JASA BUILDER'S / CDC

CONSTRUCTION AND

SUPPLIES (JOINT

VENTURE)

JV-17-1203 L AA MA GE

Construction of Slope Protection/ Flood

Control along Pamatawan River Phase

IV, Sta. 1+369.50 to Sta. 2+044.50

San Antonio,

Zambales11/6/2018 1st/Final

Zambales 1st

DEOLF 38.195492 210 05/03/2018 9/30/2018 18.57% C 0.440 0.133 0.300 - - - 87.30%

87.30%

SatisfactoryAHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 31 of 72

Page 32: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

278 220

JASMIG CONSTRUCTION

CORPORATION / JEMAK

CONSTRUCTION & SUPPLY

(JOINT VENTURE)

26069 L A MB GE

FY 2018 DPWH Infrastructure Program,

Organizational Outcome 1: Ensure Safe

and Reliable National Road System

Network Development Road Widening/

Primary Roads Manila - Batangas Rd.

K0098+739.00 - K0100+340.00,

K0101+435.00 - K0103+7373.00

Batangas

Province11/7/2018 1st

Regional Office

No. IV-ALF 137.6632547 390 19/02/2018 3/15/2019 24.24% OG 0.379 0.240 0.150 0.030 0.047 0.050 89.60% - AHD

279 221JASMIG CONSTRUCTION

SUPPLY26069 L A MB GE

Batangas - Lobo Road - K0109+932 -

K0111+253 (As Advertised -

Organizational Outcome 1: Ensure Safe

and Reliable National Road System,

Network Development, Off- Carriageway

Improvement, Secondary Road,

Batangas - Lobo Road, K0109+932 -

K011+253)

Batangas City,

Batangas11/8/2018 1st/Final

Batangas 2nd

DEOLF 41.55494 160 14/02/2018 7/23/2018 16.60% C 0.478 0.133 0.300 - - - 91.10%

91.10%

Very SatisfactoryAHD

280 222

JBERNARDO

CONSTRUCTION AND

SUPPLY

42108 L D SB GE

Construction of Brgy. Bantay Flood

Control, Construction of Brgy. Boton

Flood Control

Boac,

Marinduque11/15/2018 1st/Final

Marinduque

DEOLF 14.48 212 02/04/2018 10/30/2018 0.00% C 0.421 0.183 0.300 - - - 90.40%

90.40%

Very SatisfactoryONS

281 223

JC PALOMO

CONSTRUCTION &

CONSTRUCTION SUPPLY /

C.T. LEONCIO

CONSTRUCTION &

TRADING (JOINT

VENTURE)

JV-17-1880 L AAA LA GE

Organizational Outcome 1: Ensure Safe

and Reliable National Road System:

Network Development Program : Road

Widening - Primary Roads along Daang

Maharlika (LZ)

K0309+000 to

K0309+467 &

K0341+920 to

K0342+542.2,

Cordon, San

11/10/2018 1stRegional Office

No. IILF 166.92 359 12/04/2018 4/5/2019 0.79% OG 0.379 0.239 0.150 0.030 0.042 0.050 89.00% - AHD

282 224JEJAN CONSTRUCTION

AND SUPPLY34712 L C SB GB

Local Infrastructure Program-

Construction of Multi-Purpose Building

Barangay Ilawod East

Legazpi City,

Albay11/13/2018 1st/Final Albay 2nd DEO LF 4.94 120 17/02/2018 6/6/2018 19.27% C 0.499 0.141 0.300 - - - 94.00%

94.00%

Very SatisfactoryAHD

283 225JEJOR'S CONSTRUCTION

CORPORATION5143 L AAA LB GE

Construction / Improvement of Cross -

Country Road, Mainit, Catarman to

Mambajao

Catarman-

Mambajao,

Camiguin

11/14/2018 1st/Final Camiguin DEO LF 46.51 175 15/02/2018 8/8/2018 -1.50% C 0.458 0.200 0.255 - - - 91.30%91.30%

Very SatisfactoryDEL

284 226 JELM CONSTRUCTION 33230 L A MA GE

Rehab./Improvement of Flood Control

Wall along Binahaan River, Tanauan

Section Left Side, Sta. 10+489-Sta10+519,

Right Side: Sta 10+489-Sta 10+891

Tanauan, Leyte 11/15/2018 1st/Final Leyte 1st DEO LF 41.00 165 2/2/2018 7/16/2018 0.00% C 0.479 0.133 0.300 - - - 91.20%91.20%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 32 of 72

Page 33: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

285 227JEMAK CONSTRUCTION &

SUPPLY32056 L A MA GE

Construction/ Maintenance of Flood

Mitigation Facilities along Major River

Basins and Principal Rivers -

Construction of Flood Control Structures

along Agos River

Infanta, Quezon 11/9/2018 1st/FinalQuezon 1st

DEO LF 49.00 395 13/02/2018 3/14/2019 33.92% C 0.438 0.200 0.300 - - - 93.80%

93.80%

Very SatisfactoryAHD

286 228

JERCON TRADE

CONSTRUCTION

DEVELOPMENT

8816 L B SB GE

Ensure Safe and Reliable National Road

System - Asset Preservation Program -

Preventivve Maintenance - Primary

Roads: Daang Maharlika (LZ) K0394+(-

827) - K0394+000, K0411+138 -

K0411+190, K0415+520 - K0415+900,

K0416+433 - K0417+144, K0419+152 -

K0419+305

City of Ilagan,

Isabela11/8/2018 1st/Final

Isabela 1st

DEOLF 24.63153199 82 10/05/2018 7/30/2018 3.62% C 0.467 0.133 0.300 - - - 90.00%

90.00%

Very SatisfactoryAHD

287 229JERRY R. SANTIAGO

CONSTRUCTION18453 L B MA GE

Concreting of Kasamne - Pinaltakan

Road, Palayan City, Nueva Ecija

Palayan City,

Nueva Ecija11/8/2018 1st/Final

Nueva Ecija

2nd DEOLF 32.44 120 08/05/2018 9/4/2018 0.00% C 0.464 0.146 0.300 - - - 91.00%

91.00%

Very SatisfactoryONS

288 230

JIMWEN CONSTRUCTION

& GENERAL

MERCHANDISE

33066 L B MA GB

Construction of One (1) Unit Regular

Workshop with Toilet Building at Kipit

Agro Fishery National High School

Labason,

Zamboanga del

Norte

11/6/2018 1st

Zamboanga del

Norte 2nd 1st

DEO

LF 36.03 210 7/8/2018 2/2/2019 -5.96% OG 0.396 0.240 0.090 0.030 0.054 0.017 82.70% - DEL

289

JIMWEN CONSTRUCTION

& GENERAL

MERCHANDISE

33066 L B MA GE

Construction of Drainage at Apovel,

Bulua Section, From Apovel to Bulua

Bridge along Carmen - Patag Road,

Including RROW

Bulua, Cagayan

de Oro City11/5/2018 1st

Cagayan de

Oro City 1st

DEOLF 34.88 256 28/02/2018 11/10/2018 0.31% OG 0.360 0.300 0.150 0.030 0.052 0.050 94.20% - AHD

290 231JJ &J CONSTRUCTION AND

GENERAL SUPPLY30231 L AAA MA GE

Construction of Flood Control Structure

along Mactan Circumferential Road,

K0022+000 - K0024+000

Lapu-Lapu City,

Cebu11/15/2018 1st Cebu 6th DEO LF 33.21 270 2/22/2018 11/18/2018 -3.89% OG 0.388 0.240 0.111 0.030 0.061 0.033 86.30% - DEL

291 232

JJA CONSTRUCTION &

SUPPLY / D.C.E.

CONSTRUCTION /

BLESSING BUILDERS AND

CONSTRUCTION JOINT

VENTURE

JV-17-517 L A GE

Rehabilitaion/Reconstruction of Road

with Slips, Slope Collapse, Landslides

National Roads, Mt. Province-Calanan-

Pinukpuk-Abbut Road

Pinukpuk,

Kalinga11/13/2018 1st

Lower Kalinga

DEOLF 44.14 370 23/04/2018 4/27/2019 17.01% OG 0.383 0.240 0.150 0.022 0.033 0.050 87.80% - AHD

292 233 JMD-68 BUILDERS 36943 L B SB GBConstruction of Unique Workshop

Building, Aglipay National High SchoolAglipay, Quirino 11/9/2018 1st/Final Quirino DEO LF 4.82 80 04/07/2018 9/21/2018 0.00% C 0.495 0.179 0.300 - - - 97.40%

97.40%

OutstandingONS

293 234 JMLD CONSTRUCTION 22679 L D SB GB

Construction of Two (2) Storey ICT

Laboratory Building, Haluban National

High School

Lupi Camarines

Sur11/7/2018 1st

Camarines Sur

5th DEOLF 12.03 120 05/07/2018 11/1/2018 0.26% OG 0.400 0.241 0.150 0.030 0.059 0.050 93.00% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 33 of 72

Page 34: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

294 235 JMT CONSTRUCTION 14186 L AA MA GE

Construction of Flood Control Structure

along Barangays and San Isidro and

Villaflor, Sta. 0+520 to Sta. 0+679

Gigaguit, Surigao

del Norte10/27/2018 1st/Final

Surigao del

Norte 1st DEOLF 27.93 164 2/22/2018 8/4/2018 0.26% C 0.428 0.200 0.300 - - - 92.80%

92.80%

Very SatisfactoryAHD

295 JMT CONSTRUCTION 14186 L A MA GE

Construction of Dike, Revetment along

Tago River Basin (Carromata Section)

Protecting the NIA Dam

San Miguel,

Surigao del Sur11/9/2018 1st/Final

Surigao del Sur

1st DEOLF 32.55 206 3/26/2018 10/17/2018 2.49% C 0.406 0.200 0.300 - - - 90.60%

90.60%

Very SatisfactoryAHD

296 236JONIK TRADING &

CONSTRUCTION20612 L B MA GE

Asset Preservation - Preventive

Maintenance - Secondary Roads

Alaminos - Bolinao Road (K0323+199 -

K0324+634; K0339+632 - K0340+530)

Bani, Pangasinan 11/14/2018 1st/FinalPangasinan 1st

DEOLF 36.21 75 09/02/2018 4/24/2018 1.33% C 0.500 0.133 0.300 - - - 93.30%

93.30%

Very SatisfactoryAHD

297 237JQD CONSTRUCTION AND

GENERAL SERVICES18852 L A MB GB

Buildings and Other Structures-Multi-

Purpose/Facilities-Local Infrastructure

Program/Construction of Multi-Purpose

Building - Construction of Multi-Purpose

Building (Gym and Sports Center)

Maasin City,

Southern Leyte11/12/2018 1st

Southern Leyte

DEOLF 19.80 195 5/29/2018 12/9/2018 0.00% OG 0.398 0.236 0.150 0.030 0.047 0.050 91.10% - ONS

298 238JRD CONSTRUCTION AND

SUPPLY37318 L D SB GE

Concreting of Pabalay-Potia FMR,

Barangay Potia

Alfonso Lista,

Ifugao11/9/2018 1st/Final

Ifugao 2nd

DEOLF 4.77 60 03/07/2018 8/31/2018 0.00% C 0.485 0.133 0.300 - - - 91.80%

91.80%

Very SatisfactoryONS

299 239 JTA BUILDERS 18401 L A MA GB Completion of Municipal GymVillanueva,

Misamis Oriental11/9/2018 1st/Final

Misamis

Oriental 2nd

DEOLF 18.37 238 12/02/2018 10/7/2018 0.00% C 0.500 0.131 0.300 - - - 93.10%

93.10%

Very SatisfactoryONS

300 240JTC CRUZ CONSTRUCTION

CO. INC32479 L AA MA GE

Asset Preservation Program - Preventive

Maintenance - Tertiary Roads - Lipa City -

Alaminos Road, K0076+965 to

K0078+800

Alaminos,

Laguna11/14/2018 1st/Final

Laguna 3rd

DEOLF 28.21 75 29/06/2018 9/11/2018 0.00% C 0.464 0.200 0.300 - - - 96.40%

96.40%

Very SatisfactoryONS

301 241 KALINGA BUILDERS 16046 L B MA GE

Construction/Improvement of Poblacion

Tinglayan-Tulgao East- Tulgao West in

Support of Processed Food Industry,

Blacksmith Industry and Rattan/Bamboo

Weaving Industry, Tinglayan, Kalinga

tinglayan,

kalinga11/12/2018 1st

Upper Kalinga

DEOLF 33.42 240 19/03/2018 11/13/2018 -4.63% OG 0.394 0.252 0.104 0.030 0.061 0.033 87.40% - DEL

302 KALINGA BUILDERS 16046 L B MA GE

Asset Preservation -

Rehabilitation/Reconstruction of Roads

with Slips, Slope Collapse and Landslide

along Mt. Province Boundary-Calanan-

Pinukpuk-Abbut Road

tinglayan,

kalinga11/13/2018 1st

Upper Kalinga

DEOLF 25.23 247 15/03/2018 11/16/2018 -4.30% OG 0.326 0.300 0.107 0.030 0.052 0.033 84.80% - DEL

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 34 of 72

Page 35: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

303 242 KANE CONSTRUCTION 2888 L A MB GE

Contract Package 13: Brigde Program-

Widening of Permanent Bridges:

A.)Demonstrating Brigde along

Demonstration Road B.) Kennon Bridge

along Kennon Road

Baguio City 11/11/2018 1stBaguio City

DEOLF 15.78 240 5/17/2018 1/11/2019 -1.28% OG 0.305 0.300 0.137 0.030 0.050 0.033 85.50% - DEL

304 243

KATHA BUILDERS /

DRAGON TWELVE

BUILDERS &

CONSTRUCTION SUPPLY

JV-17-2342 L A MB GE

Rehabilitation/Major Repair of

Permanent Bridges - Abuan Br.

(BO3237LZ) along Ilagan - Bigao -

Palanan Road

Ilagan City,

Isabela11/8/2018 1st/Final

Isabela 1st

DEOLF 27.87998088 134 10/04/2018 8/21/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%

93.30%

Very SatisfactoryONS

305 244KAUIE BUILDERS AND

CONSTRUCTION SUPPLIES33841 L C SB GE

Construction of Flood Control Badiang

River

Badiang, Villaba,

Leyte11/8/2018 1st/Final Leyte 3rd DEO LF 9.60 150 2/6/2018 7/5/2018 0.00% C 0.447 0.133 0.300 - - - 88.00%

88.00%

SatisfactoryONS

306 245

KEASCIA CONSTRUCTION

& SUPPLY / SANSTORM

CONSTRUCTION (JOINT

VENTURE)

JV-17-535 L A MA GB

Construction of Three (3) Storey, Twelve

(12) Classroom School Building at Calaca

Central School

Calaca, Batangas 11/7/2018 1st/FinalBatangas 1st

DEOLF 28.86938 300 1/15/2018 11/10/2018 4.00% C 0.491 0.133 0.300 - - - 92.40%

92.40%

Very SatisfactoryAHD

307 246

KEILANA RESOURCE AND

DEVELOPMENT

CORPORATION

37270 L AAA LB GE

Road Upgrading (Unpaved to Paved)

Culandanum- Panalingaan Cross Country

Road, Chainage 14869- Chainage

16169/Chainage 16210- Chainage 16442/

Chainage 18680- Chainage 20009

Rizal, Palawan 11/9/2018 2ndPalawan 2nd

DEOLF 71.03 348 14/03/2018 2/24/2019 40.89% OG 0.384 0.300 0.150 0.020 0.056 0.050 96.00% - AHD

308 247

KGD BUILDERS / EL-JAKE

BUILDERS (JOINT

VENTURE)

JV-17-973 L B MA GE

Construction of Flood Mitigation

Structures along Albert Morrow Blvd.

(Western Section), (Silway-Sinawal River

Basin), Sta.0+000 to Sta.0+183

General Santos

City, South

Cotabato

11/14/2018 2nd/Final

South

Cotabato 2nd

DEO

LF 24.49 188 4/17/2018 10/21/2018 2.75% C 0.472 0.200 0.300 - - - 97.20%92.34%

Very SatisfactoryAHD

309 248 KIRSKAT VENTURE 32042 L A MB GE

Improvement/Widening National Roads-

Secondary Roads, Iloilo-East, Coast Capiz

Road, K0134+458- K0135+270,

K0137+484.45-K0138+656.45,

K0159+785- K0160+802.2-K0161+302.2,

K0162+644-K0162+894, K0162+921-

K0163+551

Pontevedra &

Pilar Capiz12/11/2018 1st/Final Capiz 1st DEO LF 96.50 327 16/03/2017 2/5/2018 0.00% C 0.468 0.153 0.300 - - - 92.10%

92.10%

Very SatisfactoryONS

310 KIRSKAT VENTURE 32042 L A MA GE

Construction of Concrete Road- Access

Road from Barangay Balaring Leading to

the Beach Area

Barangay Basiao,

Ivisan, Capiz11/8/2018 2nd/Final Capiz 2nd DEO LF 16.91 128 10/05/2018 9/14/2018 0.00% C 0.479 0.133 0.300 - - - 91.20%

84.78%

SatisfactoryONS

311 249KMD BUILDERS AND

CONSTRUCTION SUPPLY33971 L A SB GB Construction of Multi Purpose Building

Brgy. San

Ramos,

Nagtipunan,Quiri

no

11/9/2018 1st/Final Quirino DEO LF 4.45 90 08/03/2018 6/5/2018 0.00% C 0.497 0.155 0.300 - - - 95.20%95.20%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 35 of 72

Page 36: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

312 250 KVC CONSTRUCTION 28959 L A MA GE

Network Development-Off-Carriageway

Improvement of Secondary Road along

Kabugao-Pudtol-Luna-Cagayan Boundary

Road- KO672+698-KO672+808-

KO672+781, KO673+012-KO672+975-

KO673+012-KO677+100-KO677+166-

KO677+596-KO677+166-KO677+448-

KO677+519-KO677+596, KO677+582 -

K0679+000, KO679+650-36, KO657+798 -

KO559+125

kabugao-pudtol-

luna-cagayan

boundary road

11/16/2018 1stApayao 2nd

DEOLF 30.43 240 06/04/2018 12/1/2018 0.46% OG 0.373 0.245 0.150 0.030 0.061 0.033 89.20% - AHD

313 251L.B LEONCIO TRADING &

CONSTRUCTION31587 L B MA GE

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems, Construction fo Panacan

Seawall

Narra, Palawan 11/8/2018 1st/FinalPalawan 2nd

DEOLF 19.01 150 4/11/2018 9/7/2018 0.00% C 0.400 0.200 0.300 - - - 90.00%

90.00%

Very SatisfactoryONS

314 252

L.C. TING

CONSTRUCTION/ FIVE

STAR BUILDERS (JOINT

VENTURE)

JV-17-1423 L A MB GEConstruction of Concrete Road NRJ

Leading to Aurora Wonderland

Barangay

Bayabas, Aurora,

Zamboanga del

Sur

11/10/2018 1st/finalZamboanga del

Sur 1st DEOLF 18.62 120 12/04/2018 8/9/2018 0.00% C 0.493 0.134 0.300 - - - 92.70%

92.70%

Very SatisfactoryONS

315 253 L.M.G. CONSTRUCTION 5719 L A MA GE

Construction of Concrete Slope

Protection with Steel Sheet Pile and Box

Culvert

Brgy.

Concepcion, Sto.

Domingo

11/12/2018 1st/FinalNueva Ecija 1st

DEOLF 19.14 150 29/01/2018 6/27/2018 0.00% C 0.487 0.200 0.300 - - - 98.70%

98.70%

OutstandingONS

316 254 L.R TIQUI BUILDERS, INC 13810 L AAA LB GE

Ensure Safe and Reliable National Road

System (MFO-1), Network Development -

Construction of Flyovers / Interchanges /

Underpasses / Long Span Bridges,

Construction of Underpass along MSR

Diversion Road, K0129+260 to

K0129+563.8

Lucena City 11/19/2018 1st Quezon 2nd

DEOLF 139.93 450 26/02/2018 5/21/2019 -0.08% OG 0.389 0.240 0.149 0.030 0.047 0.050 90.50% - DEL

317 255L.S.D CONSTRUCTION &

SUPPLIES8980 L AAA MB GE

Flood Management Program,

Construction/Maintenance of Flood

Mitigation Structures and Drainage

System, Rehabilitation/Restoration of

Upper Chico River Flood-Erosion Control

Projects-Magatiley Monamon Sur

Bauko,Mountain

Province11/9/2018 2nd/Final

Mt. Province

DEO,LF 88.26 273 05/03/2018 11/2/2018 0.00% C 0.325 0.200 0.300 - - - 82.50%

84.06%

SatisfactoryONS

318 256 LABB CONSTRUCTION 13524 L A MB GE

Rehabilitation/Reconstruction/Upgradin

g of Damaged Paved Road - Tagbilaran

East Road (Tagbilaran-Jagna) K0251+000-

K0252+876

Baclayon, Bohol 11/6/2018 1st Bohol 1st DEO LF 51.93 264 4/23/2018 1/11/2019 1.70% OG 0.378 0.240 0.150 0.030 0.060 0.050 90.80% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 36 of 72

Page 37: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

319 LABB CONSTRUCTION 13524 L A MB GE

Network Development-

Improvement/Widening of National

Roads-Primary Roads- other Primary

Roads Ormoc- Baybay-Southern Leyte

Boundary Road-K1043+120-K1043+325,

K1043+341-K1043+809, K1043+838-

K1044+870, K1046+835-K1047+147,

K1047+824-K1048+091, K1048+105-

K1049+651, K1049+963-K1050+349,

K1038+000-K1038+254, K1038+266-

K1038+632, K1038+660-K1039+000

Baybay City,

Leyte11/10/2018 1st/Final Leyte 5th DEO LF 144.75 450 7/19/2017 10/11/2018 0.00% C 0.480 0.148 0.300 - - - 92.80%

92.80%

Very SatisfactoryONS

320 257LADY OF ASSUMPTION

ENTERPRISES25360 L AA MB GE

Construction/ Improvement of Access

Roads Leading to Seaports-Access Road

Leading to Hindang Port

Hindang, Leyte 11/12/2018 1st/Final Leyte 5th DEO LF 19.60 150 2/19/2018 7/18/2018 0.00% C 0.467 0.133 0.300 - - - 90.00%90.00%

Very SatisfactoryONS

321 258LAHDETH CONSTRUCTION

AND SUPPLY 34833 L C SB GB

Construyction of Two(2) Storey , Four (4)

Classrooms School Building, Ragay

Central School

Ragay Camarines

Sur11/7/2018 1st

Camarines Sur

5th DEO LF 9.69 120 05/07/2018 11/1/2018 1.07% OG 0.392 0.240 0.150 0.030 0.059 0.050 92.10% - AHD

322 259

LEDA CONSTRUCTION

INC. / ROCKWORLD

INDUSTRIES (JOINT

VENTURE)

17-1623 L A MA GE

Widening of Permanent Bridges,

Telegrafo I Bridges (B00039LT) along

Daang Maharlika (LT) Road Tolosa, Leyte

Tolosa, Leyte 11/15/2018 1st/Final Leyte 1st DEO LF 19.53 247 2/6/2018 10/10/2018 0.00% C 0.455 0.161 0.300 - - - 91.60%91.60%

Very SatisfactoryONS

323 260

LEGACY CONSTRUCTION /

ASHLEYKA

CONSTRUCTION AND

SUPPLIES (JOINT

VENTURE)

JV-16-1460 L A MB GE

Off-Carriage Improvement Including

Drainage of Tablas Circumferential Road,

Section 2: K0002+700 -K0002+937;

Section 3: K0018+200 -K0019+003;

Section 4: K0044+000 -K0045+129;

Section 5: K0053+000 -K0053+643;

Section 6: K0075+100 -K0076+304;

Section 7: K0092+000 -K0092+076

Tablas Island,

Romblon10/19/2018 1st/Final

Regional Office

No. IV-BLF 93.59 427 22/05/2017 7/22/2018 0.00% C 0.478 0.151 0.300 - - - 92.90%

92.90%

Very SatisfactoryONS

324 261LEGACY CONSTRUCTION

CORPORATION22465 L A MA GE

Construction of Banadero Flood Control

Structure

Calatrava,

Romblon11/15/2018 1st Romblon DEO LF 46.88 335 14/03/2018 2/11/2019 12.01% OG 0.396 0.300 0.150 0.030 0.042 0.050 96.80% - AHD

325LEGACY CONSTRUCTION

CORPORATION22465 L A LA GE

Construction/Improvement of Jct.

Manay-Taocanga Road Leading to

Diamaboc Lake

Manay, Davao

Oriental11/7/2018 2nd

Davao Oriental

1st DEOLF 93.1 228 4/1/2018 11/14/2018 1.21% OG 0.380 0.238 0.150 0.030 0.061 0.050 90.90% - AHD

326

LEGACY CONSTRUCTION

CORPORATION

(FORMERLY: LEGACY

CONSTRUCTION)

22465 L AA LA GE

Preventive Maintenance, Asphalt

Overlay of Surigao Wharf Road,

K1123+641.00 – K1125+068.00

Surigao City,

Surigao del

Norte

11/8/2018 1st/FinalSurigao del

Norte 1st DEOLF 23.9 95 4/10/2018 7/13/2018 0.00% C 0.449 0.134 0.300 - - - 88.30%

88.30%

SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 37 of 72

Page 38: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

327 262

LEGACY CONSTRUCTION

CORPORATION / GROUP

UP CONSTRUCTION AND

SUPPLIES (JOINT

VENTURE)

JV-17-1777 L AA LA GE

Paving of Unpaved Roads -Tertiary

Roads, Lubi-Binoog Roads, K0065+836 -

K0068+319 (As Modified ) K0065+836 -

K0067+661.87

Tablas Island,

Romblon11/15/2018 1st Romblon DEO LF 93.55 210 30/05/2018 12/25/2018 -4.89% OG 0.368 0.300 0.101 0.030 0.040 0.017 85.60% - DEL

328 263

LEGAZPI PREMIUM

DEVELOPMENT

CORPORATION

20701 L AAA LB GE

Network Development Program - Off

Carriageway Improvement - Secondary

Roads - Junction Putiao - Pillar - Donsol

Road K0544+(-980) - K0547+074

Pillar, Sorsogon 11/7/2018 1stSorsogon 1st

DEOLF 93.09 270 18/04/2018 1/12/2019 7.00% OG 0.383 0.243 0.150 0.020 0.037 0.033 86.60% - AHD

329 264LIBRIUS CONSTRUCTION

& SUPPLY CORPORATION23580 L A SB GE

Organizational Outcome 2: Protect Lives

and Properties Against Major Floods,

Flood Management Program,

Construction/ Maintenance of Flood

Mitigation Structures and Drainage

Systems, Construction of Slope

Protection/Revetment at Laiya Bridge

Brgy. San Juan,

Batangas11/6/2018 1st/Final

Batangas 4th

DEOLF 9.8 259 28/02/2018 11/13/2018 4.78% C 0.489 0.133 0.300 - - - 92.20%

92.20%

Very SatisfactoryAHD

330 265LJPM BUILDERS &

CONSTRUCTION SUPPLY29981 L B SB GE

Construction/Extension of Flood Control

Structures along Bool River Protecting

Bool Bridge and Biliran Circumferential

Road, (11.550, 000.00) Culaba, Province

of Biliran

Culaba, Province

of Biliran11/7/2018 1st/Final Biliran DEO LF 11.55 114 2/18/2018 6/11/2018 1.18% C 0.478 0.133 0.300 - - - 91.10%

91.10%

Very SatisfactoryAHD

331 266LLM UNIFIED BUILDERS &

TRADING CORP.14235 L B MA GE

Improvement/Rehabilitation of Drainage

(Grouted Riprap) at Brgy. Tugbok (To

Carmelite)

Tugbok District,

Davao City11/11/2018 2nd/Final

Davao City 2nd

DEOLF 19.6 162 3/27/2018 9/4/2018 0.00% C 0.404 0.143 0.300 - - - 84.70%

84.04%

SatisfactoryONS

332 267LM CONSTRUCTION AND

GENERAL MARKETING33727 L B MA GE

Construction/Improvement of Access

Roads Leading to Declared Tourism

Destinations of NRJ Brgy. 1-Bitan-Agan-

Das-Agan Road Leading to Cave City/

Aningaw Cave K0+000 – K1+280

San Francisco,

Agusan del Sur11/12/2018 2nd/Final

Agusan del Sur

2nd DEOLF 44.1 240 3/12/2018 11/6/2018 2.50% C 0.491 0.138 0.300 - - - 92.90%

91.24%

Very SatisfactoryAHD

333 268 LMD CONSTRUCTION 9410 L B MA GBConstruction of One (1) Storey Two (2)

Classroom School Building at Lenienza ES

Pagadian City,

Zamboanga del

Sur

11/10/2018 1stZamboanga del

Sur 1st DEOLF 3.12 85 19/09/2018 12/12/2018 3.39% OG 0.399 0.230 0.150 0.015 0.047 0.050 89.10% - AHD

334 269

LUCBAN BUILDERS AND

CONSTRUCTION SUPPLY

INCORPORATED

31336 L B MA GEConstruction of Barangay Road,

Barangay AliliwLucban, Quezon 11/9/2018 1st/Final

Quezon 1st

DEO LF 4.95 180 16/03/2018 9/11/2018 0.00% C 0.441 0.186 0.300 - - - 92.70%

92.70%

Very SatisfactoryONS

335 270LUCK-WELL

CONSTRUCTION17510 L AAA MA GE

Construction of Seaport (Rock Causeway

with Stair Landing and Roro Ramp on

Fill)

Tubalan, Malita,

Davao

Occidental

11/13/2018 1st

Davao

Occidental

DEO

LF 49.35 360 4/11/2018 4/5/2019 -0.32% OG 0.392 0.240 0.147 0.030 0.051 0.033 89.30% - DEL

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 38 of 72

Page 39: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

336 271LUCKY A CONSTRUCTION

CORPORATION38293 L C SB GE

Concreting of Calimag FMR, Barangay

Calimag

Alfonso Lista,

Ifugao11/9/2018 1st/Final

Ifugao 2nd

DEOLF 4.65 60 03/07/2018 8/31/2018 -1.20% C 0.486 0.133 0.264 - - - 88.30%

88.30%

SatisfactoryDEL

337 272LUMEL GLENN

CONSTRUCTION26817 L B MA GE

Restoration of Alag River Control

Approach "B" Upstream

Baco, Oriental

Mindoro11/9/2018 1st/Final

Mindoro

Oriental DEOLF 8.74 234 08/03/2018 10/27/2018 0.00% C 0.426 0.134 0.300 - - - 86.00%

86.00%

SatisfactoryONS

338LUMEL GLENN

CONSTRUCTION26817 L B MA GE

Construction of Flood Mitigation with

Major River Basins and Principal Rivers,

Construction of Balite River Control

Structure

Gloria, Oriental

Mindoro11/12/2018 1st

Southern

Mindoro DEOLF 48.80 200 28/05/2018 12/13/2018 1.42% OG 0.328 0.300 0.150 0.030 0.035 0.050 89.30% - AHD

339LUMEL GLENN

CONSTRUCTION26817 L B MA GE

Construction of Flood Mitigation

Structures and Drainage Systems,

Construction of San Mariano River

Control Structure

Roxas, Oriental

Mindoro11/12/2018 1st

Southern

Mindoro DEOLF 49.00 315 25/04/2018 3/5/2019 0.60% OG 0.303 0.300 0.150 0.030 0.055 0.050 88.80% - AHD

340 273M. MONTESCLAROS

ENTERPRISES, INC. 6506 L AAA LB GE

Concreting of Jct. Sayre Highway- Mt.

View College

Valencia City,

Bukidnon11/13/2018 1st/Final

Regional Office

No. XLF 241.25 416 05/06/2017 7/25/2018 29.09% C 0.482 0.132 0.300 - - - 91.40%

91.40%

Very SatisfactoryAHD

341 274

M.A GUINTO

CONSTRUCTION (SAN

JOSE BRANCH)

26576 L B MA GB

National Building Program - Multi-

Purpose / Facilities, Construction of

DPWH Building, Mindoro Occidental

DEO

Mamburao,

Occidental

Mindoro

11/7/2018 2nd

Mindoro

Occidental

DEO

LF 16.66 249 05/02/2018 10/11/2018 -4.86% OG 0.400 0.241 0.101 0.030 0.047 0.033 85.20% - DEL

342 275

M.G. LUALHATI

CONSTRUCTION CORP./

M.V. SABALBURO CONST.

AND SUPPLY

JV-16-2042 L AA MB GE

Construction and Maintenance of

Bridges along National Roads.

Replacement of Permanent Weak

Bridges, Quinarayan Bridge along Manila

North Road

Narvacan, Ilocos

Sur11/8/2018 2nd/Final

Ilocos Sur 2nd

DEOLF 38.00 281 7/11/2017 4/17/2018 0.00% C 0.474 0.133 0.300 - - - 90.70%

87.04%

SatisfactoryONS

343 276M.S. RAMOS

CONSTRUCTION INC. 31684 L B MA GE

Construction/Rehabilitation of Flood

Control Structure along Bocaue River at

Tambubong Section

Bocaue, Bulacan 11/6/2018 1st/FinalBulacan 1st

DEOLF 23.27 180 20/03/2018 9/15/2018 16.00% C 0.442 0.133 0.300 - - - 87.50%

87.50%

SatisfactoryAHD

344 277 MAC BUILDERS 7249 L AAA LB GEConstruction of Flood Mitigation

Structure, BacanAlbuera, Leyte 11/9/2018 1st/Final Leyte 4th DEO LF 18.62 210 3/2/2018 9/27/2018 0.00% C 0.406 0.201 0.300 - - - 90.70%

90.70%

Very SatisfactoryONS

345 278MACASAET BUILDERS

AND TRADING37440 L B SB GE

Construction of Flood Control and

Mitigation Structures at Inayawan River,

Irawan - Tagburos Road, K0014+700,

Irawan - Tagburos Road

Puerto Princesa

City11/7/2018 1st

Palawan 3rd

DEOLF 9.50 150 08/03/2018 8/4/2018 -2.46% OG 0.339 0.300 0.125 0.030 0.061 0.000 85.50% - DEL

346 279MAER SUMMIT

KONSTRUKT CO.25262 L AA LA GE

Road Widening (2 into 4 lanes) along Jct.

Manikling- Governor- Generoso Road

San Isidro, Davao

del Norte11/6/2018 1st/Final

Davao Oriental

2nd DEOLF 48.75 179 23/02/2018 8/20/2018 0.00% C 0.476 0.132 0.300 - - - 90.80%

90.80%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 39 of 72

Page 40: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

347 280 MAFIL BUILDERS, INC 35845 L B SB GBConstruction of Multi-purpose Building,

Brgy. Casisang

Malaybalay City,

Bukidnon11/12/2018 1st

Bukidnon 1st

DEO LF 9.9 186 28/05/2018 11/29/2018 5.08% OG 0.387 0.257 0.150 0.030 0.035 0.050 90.90% - AHD

348 281MAGNA RICH TRADING &

CONSTRUCTION29108 L B MA GE

Network Development Program - Road

Widening of Tertiary Roads Along San

Pablo - Dolores Road - K0087+(-1386) to

K0087+(-386)

San Pablo City,

Laguna11/14/2018 1st/Final

Laguna 3rd

DEOLF 28.59 225 06/02/2018 9/18/2018 0.00% C 0.480 0.134 0.300 - - - 91.40%

91.40%

Very SatisfactoryONS

349 282 MAKAPA CORPORATION 30029 L AA MB GE

Construction / Improvement of

Cabilogan River Course (Downstream),

Balangibang

Polangui, Albay 11/5/2018 1st Albay 3rd DEO LF 18.63 180 12/04/2018 10/8/2018 -3.51% OG 0.392 0.268 0.155 0.020 0.030 0.033 85.80% - DEL

350 MAKAPA CORPORATION 30029 L AA MA GEConstruction of Flood Control Structure

along Cadac-an River

Sangkayon,

Juban Sorsogon11/8/2018 1st/Final

Sorsogon 2nd

DEOLF 48.25 269 01/08/2018 4/26/2019 0.00% C 0.475 0.133 0.300 - - - 90.80%

90.80%

Very SatisfactoryONS

351 283

MAMSAR CONSTRUCTION

AND INDUSTRIAL

CORPORATION/ AEJ

HARDWARE

CONSTRUCTION &

ENTERPRISES JOINT

VENTURE

JV-16-459 L AAA MA GE

Construction of Flood Control at Labuan

River, Labuan Section, (Including Right of

Way Acquisition)

Zamboanga City

1st LD11/15/2018 2nd/Final

Zamboanga

City DEOLF 26.91 379 3/22/2017 4/4/2018 0.00% C 0.476 0.133 0.300 - - - 90.90%

90.30%

Very SatisfactoryONS

352 284MARC JILL

CONSTRUCTION39585 L B SB GE

Concreting Sitio Ilaya - Anilao FMR,

Brgy. Camansihan

Calapan City,

Oriental

Mindoro

11/10/2018 1st/FinalMindoro

Oriental DEOLF 4.77 99 27/05/2018 9/2/2018 18.00% C 0.484 0.133 0.300 - - - 91.70%

91.70%

Very SatisfactoryAHD

353MARC JILL

CONSTRUCTION39585 L B SB GE

Rehabilitation / Reconstruction of Alag

Gabions

Baco, Oriental

Mindoro11/10/2018 1st/Final

Mindoro

Oriental DEOLF 4.25 51 10/05/2018 6/29/2018 0.00% C 0.454 0.133 0.300 - - - 88.70%

88.70%

SatisfactoryONS

354MARC JILL

CONSTRUCTION39585 L B SB GB

Construction of 1-3 Storey 6 Classrooms

Reg. Workshop at San Agustin NHS,

Naujan

Naujan, Oriental

Mindoro11/10/2018 1st

Mindoro

Oriental DEO LF 13.49 210 07/06/2018 1/2/2019 1.04% OG 0.300 0.240 0.150 0.030 0.041 0.050 81.10% - AHD

355 285MARCBILT

CONSTRUCTION INC.21844 L AAA GE

Organizational Outcome 1: Ensure Safe

and Reliable National Road System,

Network Development Program, Road

Widening, Primary Roads, Daang

Maharlika (L7) - K0059+411 - K0060+003,

K0060+794 - K0060+915, K0060+988.3 -

K0061+379

Sto. Tomas,

Batangas11/10/2018 1st

Batangas 3rd

DEOLF 96.49159805 360 17/04/2018 4/11/2019 12.57% OG 0.392 0.240 0.150 0.030 0.070 0.050 93.20% - AHD

356 286MARCPHIL

CONSTRUCTION10949 L A MB GE

Rehabilitation / Reconstruction /

Upgrading of Damaged Paved Roads,

MOOECR (k0201+833 - K0202+361.50)

Bulalacao,

Oriental

Mindoro

11/13/2018 1st/FinalSouthern

Mindoro DEOLF 15.33 190 12/04/2018 10/18/2018 0.00% C 0.462 0.200 0.300 - - - 96.20%

96.20%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 40 of 72

Page 41: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

357 287MAR-DEB CONSTRUCTION

& DEVELOPMENT6715 L AAA MA GE

Network Development -

Improvement/Widening of National

Roads - Cauayan - Cabatuan Road -

K0375+549 - K0377+436 - K0377+549 -

K0378+668

Luna - Cabatuan,

Isabela11/6/2018 1st/Final

Isabela 3rd

DEOLF 64.84347702 205 08/02/2018 8/31/2018 2.90% C 0.478 0.132 0.300 - - - 91.00%

91.00%

Very SatisfactoryAHD

358

MAR-DEB CONSTRUCTION

& DEVELOPMENT

CORPORATION

6715 L AAA MA GE

Rehab./ Reconstruction of Roads with

Slips, Slope Collapse and Landslide -

Secondary Roads jct. Nat'l-Potia Road

(K0342+018 - K0342+250, K0343+780 -

K0344+257)

Ramon, Isabela 11/10/2018 1st/FinalIsabela 4th

DEOLF 45.84 270 05/02/2018 11/1/2018 0.50% C 0.438 0.133 0.300 - - - 87.10%

87.10%

SatisfactoryAHD

359 288MASBATE-ILOILO CONST.

& TRADING CORP.26579 L D SB GB

Construction of Multi-Purpose Building

(Day Care)

Rizal Estanzuela,

City Proper,

Iloilo

11/16/2018 1st/Final Iloilo City DEO LF 4.66 181 02/04/2018 9/29/2018 0.00% C 0.500 0.134 0.300 - - - 93.40%93.40%

Very SatisfactoryONS

360 289MAVERICK BUILDERS

INCORPORATED14466 L AAA LB GE

Widening (2 into 4 lanes) of Pres.

Diosdado P. Macapagal National

Highway including Slope Protection and

ROW (Brgy. Badas-Brgy. Dawan Section),

K1727+572-K1729+270

Davao Oriental 11/6/2018 1st Regional DEO LF 139.83 269 5/28/2018 2/20/2019 0.08% OG 0.399 0.289 0.150 0.030 0.061 0.050 97.00% - AHD

361 290 MBM CONSTRUCTION 37891 L B SB GE

Construction of Concrete Road- Access

Road Leading to Gugma Inns and Beach

Resorts

Lanoy, Sapian,

Capiz11/8/2018 2nd/Final Capiz 2nd DEO LF 14.40 159 24/04/2018 9/29/2018 0.00% C 0.465 0.134 0.300 - - - 89.90%

88.46%

SatisfactoryONS

362 291 MEGAY CONSTRUCTION 34354 L A SB GE

Operations: Organizational Outcome 1:

Ensure Safe & Reliable National Road

System, Network Development Program,

Road Widening, Santiago - Tuguegarao

Road, K0435+144 - K0436+226

Enrile, Cagayan 11/14/2018 2nd/FinalCagayan 3rd

DEOLF 28.50265453 180 30/04/2018 10/26/2018 9.04% C 0.448 0.134 0.300 - - - 88.20%

90.54%

Very SatisfactoryAHD

363 292 META CONSTRUCTION 28882 L B SB GB

Construction of Two Storey (4

Classroom) 2 ICT Lab. Building Cagasat

National High School

Magsaysay

Annex, Cordon11/11/2018 1st

Isabela 4th

DEOLF 9.16 148 16/07/2018 12/10/2018 4.06% OG 0.384 0.242 0.150 0.030 0.047 0.050 90.30% - AHD

364 293 MFN BUILDERS 36402 L B MA GB

Construction of Elementary and

Secondary Classrooms 3 Storey 12

Classrooms Buayan National High School

General Santos

City11/14/2018 1st/Final

South

Cotabato 2nd

DEO

LF 27.88 205 1/16/2018 8/8/2018 0.00% C 0.496 0.133 0.300 - - - 92.90%92.90%

Very SatisfactoryONS

365 294MG SAMIDAN

CONSTRUCTION33234 L A MB GE

Convergence and Special Support

Program, Construction/Improvement of

Access Roads leading to Trades,

Industries and Economic Zones,Lukib-

Naigawa-Tamog-o-Suyo-Panas Road in

Support to Agribusiness Industry

Bauko,Mountain

Province11/9/2018 2nd/Final

Mt. Province

DEOLF 23.55 179 18/04/2018 10/13/2018 0.00% C 0.365 0.199 0.300 - - - 86.40%

88.62%

SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 41 of 72

Page 42: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

366 295MGB CONSTRUCTION &

TRADING 32387 L AAA LB GE

Construction of Road Slope Protection

Structure, Puerto Princessa South Road,

K0033+655 -K0033+705; K0033+950 -

K0033+980; K0034+025 -K0034+115;

K0034+280 -K0034+560; K0034+580 -

K0034+760; K0034+800 -K0034+950;

K0034+950 -K0035+305

Puerto Princesa

City, Palawan11/7/2018 1st

Palawan 3rd

DEOLF 49.28 285 26/03/2018 1/4/2019 17.56% OG 0.378 0.266 0.150 0.020 0.051 0.033 89.80% - AHD

367 296

MICKAJETTE

CONSTRUCTION AND

TRADING

35239 L D SB GB

Local Infrastructure Program/ Building

and other Structure / Multi-

Purpose/Facilities;

Construction/Rehabilitation of Multi-

Purpose Building (Covered Court)

Bonifacio V. Romero

Barangay Pulung

Cacutud,

Angeles City,

Pampanga

11/13/2018 1st/FinalPampanga 3rd

DEOLF 1.92186934 90 10/04/2018 7/8/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%

93.30%

Very SatisfactoryONS

368

MICKAJETTE

CONSTRUCTION AND

TRADING

35239 L D SB GE

Concreting of Barangay Magsaysay FMR,

Barangay Magsaysay, Castillejos,

Zambales

Castillejos,

Zambales11/7/2018 1st/Final

Zambales 2nd

DEOLF 4.64139058 55 22/06/2018 8/15/2018 0.00% C 0.471 0.133 0.300 - - - 90.40%

90.40%

Very SatisfactoryONS

369 297

MICLOVER GENERAL

CONSTRUCTION & IRON

WORKS

31527 L B MA GB

CY 2017 Basic Educational Facilities Fund

(Construction of Classroom) Batch 7,

Construction of 4STY8CL Tanauan School

of Fisheries

Tanauan City,

Batangas11/10/2018 2nd/Final

Batangas 3rd

DEOLF 21.6097317 285 11/21/2017 9/1/2018 0.00% C 0.453 0.134 0.300 - - - 88.70%

92.27%

Very SatisfactoryONS

370 298 MIGO CONSTRUCTION 34663 L D SB GBConstruction of New Barangay Gym, San

Antonio, Brgy. Sta. Cruz

Koronadal City,

South Cotabato11/5/2018 2nd/Final

South

Cotabato 1st

DEO

LF 2.47 105 3/1/2018 6/13/2018 0.00% C 0.500 0.134 0.300 - - - 93.40%89.20%

Very SatisfactoryONS

371 299MJMARI BUILDERS AND

ENTERPRISES36434 L A MA GB

Construction of Two (2) Storey Six (6)

Classroom School Building at Buug

Central SPED Center

Buug,

Zamboanga

Sibugay

11/13/2018 2nd

Zamboanga

Sibugay 1st

DEO

LF 11.86 170 17/06/2018 12/3/2018 -4.79% OG 0.396 0.228 0.102 0.030 0.064 0.033 85.30% - DEL

372 300

MONOLITHIC

CONSTRUCTION &

CONCRETE PRODUCTS,

INC.

5733 L AAA LB GE

Off-Carriageway Improvement of

Romblon-Cogon-Sablayan Road,

K0007+280 - K0008+708, K0011+000 -

K0013+724, K0013+915 - K0014+430,

K0015+792 - K0016+009, K0017-054 -

K0017+356, K0017+659 - K0017+861 (As

Modified) K0007+280 - K008+699.4,

K0011+000 - K0013+710.4, K0013+871.3,

K0014+430, K0015+714.5 - K0016+020,

K0017+035 - K0017+372, K0017+646.4 -

K0017+880

Romblon,

Romblon11/16/2018 1st Romblon DEO LF 48.21 208 07/05/2018 11/30/2018 -8.86% OG 0.350 0.300 0.061 0.030 0.040 0.000 78.10% - DEL

373

MONOLITHIC

CONSTRUCTION &

CONCRETE PRODUCTS,

INC.

5733 L AAA LB GE

Construction of Missing Links/ New

Roads, Dr. Damian Reyes Memorial

Road, Marinduque, K0028+056.50 -

K0030+056.50

Boac,

Marinduque11/15/2018 1st

Marinduque

DEOLF 96.50 389 01/03/2018 3/24/2019 -0.64% OG 0.400 0.300 0.144 0.022 0.056 0.017 93.90% - DEL

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 42 of 72

Page 43: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

374

MONOLITHIC

CONSTRUCTION &

CONCRETE PRODUCTS,

INC.

5733 L AAA GE

Construction of Lunas Flood Control

Structure Along Romblon-Cogon

Sablayan Circumferential Road

Romblon,

Romblon11/16/2018 1st Romblon DEO LF 42.62 270 27/03/2018 12/21/2018 -7.97% OG 0.396 0.300 0.070 0.030 0.047 0.000 84.30% - DEL

375 301

MONOLITHIC

CONSTRUCTION &

CONCRETE PRODUCTS,

INC. / ALBERTO UY

CONSTRUCTION &

DEVELOPMENT (JOINT

VENTURE)

JV-17-2034 L AAA LB GE

Off-Carriageway Improvement of

Secondary Roads, Bongabong - Sagana -

Roxas - San Aquilino Road, K0105+767 -

K0106+345 & K0106+368 - K0110+734

Bongabong,

Oriental

Mindoro

11/13/2018 1stSouthern

Mindoro DEOLF 92.42 690 22/04/2018 3/11/2020 45.85% OG 0.367 0.300 0.150 0.030 0.052 0.050 94.90% - AHD

376 302

MONOLITHIC

CONSTRUCTION &

CONCRETE PRODUCTS,

INC. / LUMEL GLENN

CONSTRUCTION (JOINT

VENTURE)

JV-17-2035 L AAA LB GE

Rehabilitation / Concreting of

Pinagsabangan Beach Road Including

Drainage, Sta. 2+799.00 - Sta. 6+929.76;

Sta. 7+409.87 - Sta. 8+046.49

Naujan, Oriental

Mindoro11/10/2018 1st

Regional Office

No. IV-BLF 134.43 283 28/03/2018 1/4/2019 -8.93% OG 0.392 0.300 0.061 0.030 0.055 0.000 83.80% - DEL

377 303

MONOLITHIC

CONSTRUCTION &

CONCRETE PRODUCTS,

INC. / SIXTEEN

ENTERPRISES - CALAPAN

BRANCH (JOINT VENTURE)

JV-17-1286 L AAA LB GE

Road Widening of Calapan South Road,

K0064+(-780) - K0064+ (-320); K0064+(-

200) - K0064+328; K0064+456 -

K0064+638; K0064+822 - K0066+680;

K0066+868 - K0069+053; K0069+356 -

K0071+160; K0071+273 - K0072+445;

K0072+628 - K0073+687; K0073+794 -

K0074+640

Southern

Mindoro11/10/2018 1st

Regional Office

No. IV-BLF 198.32 411 10/04/2018 5/25/2019 0.29% OG 0.393 0.236 0.150 0.030 0.052 0.033 89.40% - AHD

378 304 MONTADEL ENTERPRISES 20553 L B MA GB

Local Program - Local Infrastructure

Program, Buildings and Other Structures,

Multi-Purpose/Facilities, Construction of

Multi-Purpose Building (Covered Court),

Brgy. Pasong Buaya 2; Vallejo Place

Subdivision, Brgy. Pasong Buaya 2; La

Joya Subd., Buhay na Tubig; and

Treelane 3, Phase E, Brgy. Bayan Luma 5;

Construction of Multi-Purpose Building,

Brgy. Espeleta 2; Bloomfield Subd., Brgy.

Alapan; and Phase 2, Brgy. , Brgy. Buhay

Buhay na Tubig; Construction

(Completion) of Multi- Prupose Building,

Brgy. Espeleta 3; and Brgy. Buhay na

Tubig, Imus, Cavite

Imus, Cavite 11/12/2018 1st/Final Cavite 1st DEO LF 25.37543432 120 27/05/2018 9/23/2018 0.00% C 0.500 0.134 0.300 - - - 93.40%93.40%

Very SatisfactoryONS

379 305

MONTAÑO

CONSTRUCTION &

DEVELOPMENT

CORPORATION

19473 L AAA LB GE

Construction of New Permanent Ecuan

Bridge and Approaches along Eastern

Bobongan-Sominot-Midsalip-Dumingag

Road Zamboanga del Sur; Sta.

1669+783.85; Abutment B; Sta.

1669+874.69 (Bridge Length: 90.84 ln.m)

Zamboanga del

Sur 10/26/2018 1st/Final

Regional Office

No. IXLF 115.7 408 3/28/2016 5/9/2017 0.00% C 0.490 0.159 0.300 - - - 94.90%

94.90%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 43 of 72

Page 44: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

380 306

MONTAÑO

CONSTRUCTION &

DEVELOPMENT

CORPORATION/

MONTPHIL

CONSTRUCTION

CORPORATION (JOINT

VENTURE)

JV-15-1563 L AA LA GE

Construction of New Permanent

Timbaboy Bridge and Approaches, along

Eastern Bobongan-Sominot-Midsalip-

Dumingag Road Sta. 1666+495.11-

K1666+742.74 Abutment A:

1666+536.36; Abutment B: 1666+597.2

Zamboanga del

Sur 10/26/2018 1st/Final

Regional Office

No. IXLF 56.55 291 4/11/2016 1/26/2017 0.00% C 0.473 0.200 0.300 - - - 97.30%

97.30%

OutstandingONS

381 307

MONTAÑO

CONSTRUCTION &

DEVELOPMENT

CORPORATION/WESTMIN

ENTERPRISES AND

CONSTRUCTION SERVICES

JV-17-1299 L AAA LB GE

Construction/Improvement of Access

Roads Leading to Trades, Industries and

Economic Zones-Biayon-Wilben- San

Jose Road, in Support of Biayon Corn and

Coconut Production

Sergio Osmeña,

Zamboanga del

Norte

11/9/2018 1stZamboanga del

Norte DEOLF 69.88 237 4/23/2018 12/15/2018 14.58% OG 0.396 0.235 0.150 0.030 0.047 0.050 90.80% - AHD

382 308MOTHER'S ROLE

CONSTRUCTION32781 L D SB GB

Construction of Two (2) Storey Six (6)

Classroom School Building at Talisayan

National School

Talisayan,

Zamboanga City11/15/2018 1st/Final

Zamboanga

City DEOLF 12.53 256 1/10/2018 9/22/2018 0.00% C 0.486 0.135 0.300 - - - 92.10%

92.10%

Very SatisfactoryONS

383 309MRB11 CONSTRUCTION

CORPORATION17701 L AAA MA GE

Rehabilitation/Reconstruction of Roads

with Slips, Slope Collapse and Land Slide,

Basco-Mahatao - Evana- Uyugan-

Imnajbu Road

K0004+090-

K0004+200,

K0004+854.8-

K0000+900.3,

Mahatao,

Batanes

11/14/2018 1st Batanes DEO LF 36.32 314 19/06/2018 4/28/2019 19.76% OG 0.388 0.253 0.150 0.022 0.035 0.050 89.80% - AHD

384 310MS CRUZ BUILDERS &

TRADING33697 L C SB GE

Flood Management Program;

Construction/Maintenance of Flood

Mitigation Structures and Drainage

System, Construction/Rehabilitation

Slope Protection

Angeles City,

Pampanga11/13/2018 1st/Final

Pampanga 3rd

DEOLF 9.21048428 90 08/06/2018 9/5/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%

93.30%

Very SatisfactoryONS

385 311MT. GUITING-GUITING

CONSTRUCTION17412 L B MA GE

Rehabilitation /Reconstruction/

Upgrading of Damaged Paved of Looc

(Cogon - Tulay) - Odiongan Road,

K0103+(-303) - K0103+000, K0101+409 -

K0101+912 (As Modified) K103+ (-303) -

K0103+008.78, K0104+409 -

K0104+838.68

Tablas Island,

Romblon11/15/2018 1st Romblon DEO LF 23.77 168 07/05/2018 10/21/2018 -9.51% OG 0.339 0.300 0.055 0.030 0.041 0.000 76.50% - DEL

386 312

MUAÑA CONSTRUCTION

AND DEVELOPMENT

CORP.

9354 L B MA GE

Asset Preservation -

Rehabilitation/Reconstruction of

National Roads with Slips, Slope Collapse

and Landslide - Secondary Roads -

Construction of Road Slope Protection

Structure-Tagbilaran East Road (Tagb. -

Jagna)

Jagna, Bohol 11/7/2018 1st Bohol 3rd DEO LF 22.97 243 6/12/2018 2/9/2019 1.97% OG 0.360 0.251 0.150 0.030 0.056 0.050 89.70% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 44 of 72

Page 45: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

387 313N.B. SALBO

CONSTRUCTION6091 L A MB GE

Construction of Floof Control Structures

along Mandulog River at Dodiongan

Bridge Upstream R/S, Brgy. Bonbonon

including ROW

Brgy. Bonbonon,

Iligan City11/6/2018 2nd/Final

Lanao del

Norte 2nd DEOLF 41.65 237 20/02/2018 10/14/2018 12.66% C 0.469 0.201 0.300 - - - 97.00%

97.00%

OutstandingAHD

388 314 NANA BUILDERS 18863 L D SB GEConcreting/Rehabilitation of Brgy.

Badiangon FMR

Brgy. Badiangon,

Prsiden Roxas,

Capiz

11/9/2018 1st/Final Capiz 1st DEO LF 4.76 67 06/05/2018 7/11/2018 0.00% C 0.470 0.133 0.300 - - - 90.30%90.30%

Very SatisfactoryONS

389 315 NASCON BUILDERS 14786 L B SB GB

Construction of Two (2) Units - Two (2)

Storey Six (6) Classroom at Lugan CES,

T'boli, South Cotabato

T'boli, South

Cotabato11/14/2018 1st

South

Cotabato 1st

DEO

LF 23.28 240 6/14/2018 2/8/2019 6.37% OG 0.395 0.239 0.150 0.012 0.041 0.050 88.70% - AHD

390 316 NES-SAN BUILDERS 25142 L B MA GEConstruction/Rehabilitation of

Telabastagan Road

City of San

Fernando,

Pampanga

11/12/2018 1st/FinalPampanga 1st

DEOLF 8.24530204 101 23/04/2018 8/1/2018 0.00% C 0.486 0.134 0.300 - - - 92.00%

92.00%

Very SatisfactoryONS

391 317

NEW KANLAON

CONSTRUCTION, INC. /AL

HUSSEIN CONSTRUCTION

(JOINT VENTURE)

JV-13-815 L AAA LA GE

Reconstruction of Flood Control Dike

along Iligan River, Right Bank, Sta.

2+260.00 - Sta. 3+060

Iligan City 11/6/2018 1st/FinalRegional Office

No. XLF 137.98 772 26/01/2016 3/7/2018 0.00% C 0.496 0.132 0.300 - - - 92.80%

92.80%

Very SatisfactoryONS

392 318NEWBIG FOUR J

CONSTRUCTION INC.15104 L AAA LB GB

Local Program - Construction/ Repair/

Rehabilitation/ Improvement of Various

Infrastructure including Local Projects,

Buildings and other Structures

Multipurpose/ Facilities, Completion of

Granstand/ Stadium and Sports Facilities

Phase II

Malagasang 1-6,

Imus, Cavite11/12/2018 1st Cavite 1st DEO LF 91.52964395 300 02/05/2018 2/25/2019 19.67% OG 0.399 0.199 0.150 0.030 0.060 0.050 88.80% - AHD

393NEWBIG FOUR J

CONSTRUCTION INC.15104 L AAA LB GE

Construction/Maintenance of Flood

Mitigation Structures & Drainage

Systems -Construction of Flood

Mitigation System Along Lacag-Inarado

River

Daraga,Albay,Re

gion V-Bicol11/13/2018 1st/Final Albay 2nd DEO LF 46.29 180 07/02/2018 8/5/2018 0.04% C 0.499 0.133 0.300 - - - 93.20%

93.20%

Very SatisfactoryAHD

394 319NFH CONSTRUCTION &

SUPPLY 16055 L AAA LB GE

FY 2018 - Asset Preservation of National

Road- Rehabilitation/Reconstruction of

National Road with Slips Slope Collapse

and Landslide(Construction of Road

Slope Protection Structure) Along Pili-

Tigaon- Albay Boundary

Road,K0496+000.00 to K0497+000.00;

K0504+660.00 to

K0504=800.00;K0505=257.00 to

K0505+415.50,Bongalon-Patitinan

Section

Sagnay

Camarines Sur11/10/2018 1st

Camarines Sur

3rd DEOLF 91.69 326 04/03/2018 1/23/2019 8.15% OG 0.385 0.283 0.150 0.030 0.056 0.050 95.40% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 45 of 72

Page 46: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

395 320

NFH CONSTRUCTION &

SUPPLY/ SOPHIA

CONSTRUCTION AND

SUPPLY JOINTVENTURE

JV-17-2068 L AAA LB GE

Road Widening- Dipolog-Sindangan-Liloy

Road, K1891+000 to K1892+460,

K1885+820 to K1886+800

Barangay Tamil

and Tabon, Jose

Dalman,

Zamboanga del

Norte

11/7/2018 2ndZamboanga del

Norte 1st DEOLF 62.27 244 4/26/2018 12/25/2018 1.13% OG 0.390 0.288 0.150 0.024 0.052 0.033 93.70% - AHD

396 321 NOE'S BUILDERS 37700 L D SB GE

Constyruction of Flood

Control/Drainage, San Antonio, Socorro

Subdivision

Molo, Iloilo City 11/16/2018 2nd/Final Iloilo City DEO LF 5.43 169 02/04/2018 9/17/2018 0.00% C 0.495 0.134 0.300 - - - 92.90%91.46%

Very SatisfactoryONS

397 322NORSAM BUILDERS &

CONSTRUCTION SUPPLY21184 L B AAA GE

Construction of Lane Divider and

Lightings along Iloilo-Antique Road

(Brgy. Rizal Tuguisan, Brgy. Gerona-

Gimeno, Brgy. Grijalvo)

Guimbal, Iloilo 11/17/2018 2nd/Final Iloilo 1st DEO LF 9.76 111 19/06/2018 10/7/2018 0.00% C 0.489 0.133 0.300 - - - 92.20%90.28%

Very SatisfactoryONS

398 323

NORTH TECH BUILDERS

AND CONSTRUCTION

SUPPLY

37062 L A MB GEConstruction of Flood Control along

Baclig - Margaay River

Cabugao, Ilocos

Sur11/8/2018 2nd/Final

Ilocos Sur 1st

DEOLF 20.68 201 12/02/2018 8/31/2018 6.97% C 0.484 0.134 0.300 - - - 91.80%

89.52%

Very SatisfactoryAHD

399 324

NORTH TECH BUILDERS

AND CONSTRUCTION

SUPPLY / JLP

CONSTRUCTION & SUPPLY

JOINT VENTURE

JV-17-2164 L A MB GEConstruction of Flood Control along

Bungo River

Dinalungan,

Aurora11/10/2018 1st Aurora DEO LF 24.50 309 18/05/2018 3/22/2019 -2.69% OG 0.341 0.238 0.123 0.030 0.060 0.033 82.50% - DEL

400 325

NORTH TECH BUILDERS

AND CONSTRUCTION

SUPPLY/E.E. MADAYAG

CONSTRUCTION JOINT

VENTURE

JV-17-2564 L A MB GE

Construction of Flood Control along

Naguilian-Burgos River and Naguilian-

Bagulin River Phase II

Nagulian, La

Union11/9/2018 1st

La Union 2nd

DEOLF 46.53 231 30/04/2018 12/16/2018 -3.66% OG 0.385 0.285 0.113 0.030 0.051 0.033 89.70% - DEL

401 326 NORTHERN BUILDERS 8789 L AAA LB GE

Bridges - Widening of Permanent

Bridges, Cojuangco Bridge (B01363LZ)

along Paniqui - Camiling - Wawa Road

(Phase II), Tarlac 1st Legislative District

Province of

Tarlac11/14/2018 1st

Regional Office

No. IIILF 57.83 360 15/03/2018 3/9/2019 7.21% OG 0.392 0.199 0.150 0.030 0.061 0.033 86.50% - AHD

402 Northern Builders 8789 L AAA GE

Rehabilitation/Reconstruction of Road

with Slips, Slope Collapse and Land Slide,

Nueva Vizcaya-Pangasinan Road

K0217+733-0217+783,K0218+238-

K0218+434,K0218+298-

K0218+323,K0218+354+K0218+366.8,

K0218+580-K0218+601+K0218+623-

K0218+670,K0219+129-

K0219+157,K0219+168-

K0219+191,K0219+561-

K0219+690,K0219+790-K0219+994,

K0219+957-K0219+990, K0220+033-

K020+046, K0220+144-

K0220+175.40,K0220+561-K0220+617.2,

K0220+303-

K0226+330,K0226+330,K0227+100-

K0227+274

Santa Fe, Nueva

Vizcaya11/6/2018 1st

Nueva Vizcaya

2nd Disrict

DEO

LF 46.99 187 12/04/2018 10/15/2018 3.44% OG 0.378 0.240 0.150 0.030 0.029 0.050 87.70% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 46 of 72

Page 47: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

403 327NTL BUILDERS AND

DEVELOPER33450 L B MA GB

Constuction of 2 Storey 4 Classroom

School Building, Quirino General High

School

Cabbarroquis,

Quirino11/9/2018 1st/Final Quirino DEO LF 9.40 150 12/14/2017 4/12/2018 0.00% C 0.468 0.153 0.300 - - - 92.10%

92.10%

Very SatisfactoryONS

404 328

NUEDA BUILDERS

CONSTRUCTION & SUPP/

R.A. PAHATI CONST. &

SUPPLY, INC. JOINT

VENTURE

JV-17-1277 L A MA GE

Rechanneling/Construction Revetment

with Sheet Pile of Kingking River,

Balanban Section R/S

Pantukan,

Compostela

Valley

11/9/2018 1st/FinalCompostela

Valley DEOLF 34.03 156 4/13/2018 9/15/2018 0.00% C 0.446 0.200 0.300 - - - 94.60%

94.60%

Very SatisfactoryONS

405 329

NUMERICAL GATE

CONSTRUCTION & SUPPLY

CORPORATION

34122 L A SB GE

Construction /Rehabilitation of Flood

Mitigation Facilities within Major River

Basins and Principal Rivers -

Construction/Rehabilitation of Purok 3,

Quirangay

Camalig, Albay 11/14/2018 1st/Final Albay 2nd DEO LF 28.16 160 12/02/2018 7/21/2018 5.05% C 0.474 0.133 0.300 - - - 90.70%90.70%

Very SatisfactoryAHD

406 330O. G. SANTOS

CONSTRUCTION2050 L A MA GE

Construction of Concrete Road Sominot-

Mahayag Road

Sominot,

Zamboanga del

Sur

11/10/2018 1stZamboanga del

Sur 1st DEOLF 62.95 175 19/06/2018 12/10/2018 0.60% OG 0.361 0.240 0.150 0.030 0.051 0.033 86.50% - AHD

407 331O.L DE LEON

CONSTRUCTION16194 L B MA GB

Construction (Completion) of Multi

Purpose Building, Barangay Casalugan

Paracale,

Camarines Norte11/6/2018 1st/Final

Camarines

Norte DEOLF 0.97 60 20/03/2018 5/18/2018 0.00% C 0.467 0.157 0.300 - - - 92.40%

92.40%

Very SatisfactoryONS

408 332OCTAGON CONCRETE

SOLUTIONS34475 L A MB GE

Asphalt Overlay with Thermoplastic

Pavement Markings along Palo-Carigara

Ormoc Road,

K0996+335-

K0998+916

11/9/2018 1st/Final Leyte 4th DEO LF 94.45 120 5/9/2018 9/5/2018 0.00% C 0.440 0.200 0.300 - - - 94.00%94.00%

Very SatisfactoryONS

409 333OIC CONSTRUCTION &

SUPPLY23727 L A MA GE

Organizational Outcome 1: Ensure Safe

and Reliable National Road System,

Asset Preservation Program,

Rehabilitation/Reconstruction/Upgradin

g of Damage Paved Roads, Secondary

Roads, Banay - Banay - Mojon - Cuenca

Rd. K0090+(-861) - K0091+332.4,

K0092+089 - K0092+193, K0092+352 -

K0093+160, K0095+049.5 - K0095+128,

K0098+000 - K0098+850, K0099+820 -

K0100+117, K0102+434 - K0102+895

Alitagtag,

Batangas11/10/2018 1st

Batangas 3rd

DEOLF 77.19407523 300 09/02/2018 12/5/2018 -1.67% OG 0.371 0.237 0.133 0.030 0.060 0.033 86.40% - DEL

410 334

OMENGAN

CONSTRUCTION &

DEVELOPMENT

CORPORATION

5119 L AAA SB GE

Construction of Revetment,

Embankment of Dike & Channeling along

Chico River

tabuk city,

kalinga11/13/2018 1st

Lower Kalinga

DEOLF 95.44 313 25/04/2018 3/3/2019 4.31% OG 0.392 0.258 0.150 0.022 0.045 0.050 91.70% - AHD

411

OMENGAN

CONSTRUCTION &

DEVELOPMENT

CORPORATION

5119 L AAA LA GE

Network Development-Road Widening

Kalinga-Cagayan Road (calanan-enrile

section), KO504+000-KO506+846 &

KO506+905-KO507+208, KO509+270-

KO509+414

tabuk city,

kalinga11/13/2018 1st

Lower Kalinga

DEOLF 95.44 260 26/02/2018 11/12/2018 -2.86% OG 0.348 0.299 0.121 0.030 0.055 0.033 88.60% - DEL

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 47 of 72

Page 48: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

412 335

ONE TERRA BUILDERS

AND CONSTRUCTION

SUPPLY

40848 L D SB GE

Concreting of Junction Tagbu-an-Sitio

Libiot Libot-Sambag Farm-to-Market

Road, Sta. 0+000 to Sta. 0+500, Brgy.

Pandan

Ponteverde,

Negros

Occidental

11/15/2018 1st/Final

Negros

Occidental 4th

DEO

LF 4.83 37 07/06/2018 7/13/2018 0.00% C 0.475 0.133 0.300 - - - 90.80%90.80%

Very SatisfactoryONS

413 336ORANI BUILDERS &

SUPPLY5349 L B MA GE

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems - Construction of Flood Control

Project in Colo River, Bacong Section

Barangay

Bacong,

Hermosa, Bataan

11/7/2018 1st/FinalBataan 1st

DEOLF 18.36029919 191 07/03/2018 9/13/2018 0.00% C 0.475 0.133 0.300 - - - 90.80%

90.80%

Very SatisfactoryONS

414ORANI BUILDERS &

SUPPLY5349 L B MA GE

Asset Preservation Rehabilitation/

Reconsruction/Upgrading of Damaged

Paved Roads - Tertiary Road - Mt. Samat

Road (K0134+913 - K0135+900,

K0166+479 - K0166+169) Bataan 2nd L.D.

Pilar, Bataan 11/9/2018 2nd Bataan 2nd

DEOLF 82.54289447 294 13/02/2018 12/3/2018 11.15% OG 0.368 0.240 0.150 0.030 0.050 0.033 87.10% - AHD

415 337

P.B. OBIAL

CONSTRUCTION / FIRST

GRANDEUR BUILDERS

JV-17-2320 L A MB GE

Upgrading (Asphalt to Concrete) of

Carcar-Barili Road, K0052+000-

K0053+000, K0055+000-K0057+000

Barili, Cebu 11/11/2018 1st Cebu 3rd DEO LF 91.63 309 3/27/2018 1/29/2019 7.65% OG 0.374 0.240 0.150 0.030 0.047 0.033 87.40% - AHD

416 338P.L. SEBASTIAN

CONSTRUCTION35840 L AAA LB GE

Widening (2 into 4 lanes) of Davao-

Bukidnon Road Including Slope

Protection and ROW (Brgy. Baganihan &

Brgy. Marilog Section), K1637+876 -

K1638+1008, K1642+795 - K1645+906

Davao City 11/16/2018 1stRegional Office

No. XILF 184.12 269 3/26/2018 12/19/2018 -5.82% OG 0.348 0.300 0.092 0.030 0.061 0.033 86.40% - DEL

417 339PABLO S. LABASBAS

CONSTRUCTION6302 L B MA GE

Asset Preservation-Rehab./

Reconst./Upgrading of Damaged Paved

Roads along Tertiary Roads, along

Bagahupi-Babatngon-Sta. Cruz-Barugo-

Carigara Road (S00064LT), K0920+000-

K0921+190

Babatngon,

Leyte11/15/2018 1st/Final Leyte 1st DEO LF 36.65 150 2/2/2018 7/1/2018 3.33% C 0.481 0.091 0.300 - - - 87.20%

87.20%

SatisfactoryAHD

418 340PALMARES GENERAL

MERCHANDISE24657 L B SB GB

Construction of Multi-Purpose Building

(New Gym), Tagumpay, Barangay GPS

Koronadal City,

South Cotabato11/5/2018 1st/Final

South

Cotabato 1st

DEO

LF 2.47 105 4/25/2018 8/7/2018 0.00% C 0.483 0.135 0.300 - - - 91.80%91.80%

Very SatisfactoryONS

419 341PALMARES GENERAL

MERCHANDISE24657 L B MA GE

Road Widening - Midsayap - Marbel Rd.,

K1786+478 to K1787+574.5South Cotabato 11/5/2018 2nd/Final

South

Cotabato 1st

DEO

LF 27.63 193 2/20/2018 8/31/2018 0.00% C 0.491 0.132 0.300 - - - 92.30%88.16%

SatisfactoryONS

420 342 PASCAL CONSTRUCTION 34168 L B SB GE

Local Infrastructure Program - Local

Roads and Bridges - Local Roads

Construction of Roads

Barangay Tipo,

Hermosa, Bataan11/8/2018 1st/Final

Bataan 1st

DEOLF 1.9206 90 16/03/2018 6/13/2018 10.00% C 0.466 0.134 0.300 - - - 90.00%

90.00%

Very SatisfactoryAHD

421 343 PATRILA BUILDERS, INC. 26628 L A MA GE

Widening of Bridge- Agcawayan Br.

(B00216PN) along Iloilo East Coast-Capiz

Rd

Ajuy, Iloilo 11/10/2018 1st/Final Iloilo 3rd DEO LF 15.00 220 11/02/2018 9/18/2018 0.00% C 0.497 0.160 0.300 - - - 95.70%95.70%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 48 of 72

Page 49: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

422 344 PGO CONSTRUCTION 15153 L B MA GE

Road Widening of Jct. Balintawak- Old

Escalante Road Including ROW,

K0096+000-K0097+500

Escalante,

Negros

Occidental

11/13/2018 2nd/Final

Negros

Occidental 1st

DEO

LF 41.20 258 08/02/2018 10/23/2018 0.00% C 0.477 0.132 0.300 - - - 90.90%90.54%

Very SatisfactoryONS

423 345 PHESCO, INCORPORATED 145 L AAA LB GE

Asset Preservation Program -

Rehabilitation/Reconstruction of Roads

with Slips,Slope Collapse and Landslide-

Tertiary Road Jct. Abbag-Guingin

Bdry.Rd. K0392+900-K0393+255

Nagtipunan

Quirino 11/9/2018 1st/Final Quirino DEO LF 53.07 210 21/05/2018 12/16/2018 23.72% C 0.500 0.133 0.300 - - - 93.30%

93.30%

Very SatisfactoryAHD

424 346PHILIPPINE CHEMSTEEL

INDUSTRIES, INC.16965 L A MA GE

Asset Preservation Program - Prevention

Maintenance - Secondary Roads -

Repair/ Rehabilitation/Improvement,

Overlay with Pavement Markings along

Angeles -Porac - Floridablanca -

Dinalupihan Road, K0113+(-225) -

K0115+810, K0117+800 - K0118+1215

Dinalupihan,

Bataan11/8/2018 2nd/Final

Bataan 1st

DEOLF 64.6549998 120 04/06/2018 10/1/2018 0.83% C 0.460 0.133 0.300 - - - 89.30%

88.52%

SatisfactoryAHD

425 347

PHILSOUTH BUILDERS

(FORMERLY: LOTIFF

CONSTRUCTION)

21962 L AAA MB GE

Construction/Improvement of Access

Roads leading to Declared Tourism

Destinations: Access Road leading to

Casaroro Fall

Valencia, Negros

Oriental11/10/2018 1st

Negros

Oriental 3rd

DEO

LF 67.55 309 25/02/2018 12/30/2018 12.06% OG 0.352 0.240 0.150 0.030 0.045 0.033 85.00% - AHD

426 348PHILWORKS

CONSTRUCTION & SUPPLY32103 L AAA LB GE

Construction of Diking System with

Revetment and Appurtenant Structures

(Sluiceway and Conduit, Lined Canal),

along Aklan River

Pusiw,

Numancia,

Aklam

11/7/2018 2nd Aklan DEO LF 36.00 240 06/04/2018 12/1/2018 -10.43 OG 0.387 0.292 0.046 0.030 0.050 0.033 83.80% - DEL

427 349 PINS CONSTRUCTION 13630 L B SB GBConstruction of Multi-Purpose Building

at Dinas Community MPC

Barangay Don

Jose, Dinas,

Zambaonga del

Sur

11/12/2018 1st/FinalZamboanga del

Sur 2nd DEOLF 2.93 85 30/04/2018 7/23/2018 0.00% C 0.498 0.134 0.300 - - - 93.20%

93.20%

Very SatisfactoryONS

428 350 PLD CONSTRUCTION 1859 L AAA LA GB

Retrofitting/Strengthening of Permanent

Bridges -Marcelo Fernan Br. (B00619CB)

along Marcelo B. Fernan Br. &

Approaches

Mandaue City

and Lapu-Lapu

City, Cebu

11/15/2018 2nd/Final Cebu 6th DEO LF 27.34 240 2/22/2018 10/19/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%88.38%

SatisfactoryONS

429 PLD CONSTRUCTION 1859 L AAA MA GE

Asset Preservation Program, Preventive

Maintenance, Primary Roads, Iligan City -

Marawi City Road, K1543+000 -

K1543+773 and K1548+036 - K1548+704

Balo-I and

Pantar, Lanao

Del Norte

11/6/2018 1st/FinalLanao del

Norte 1st DEOLF 33.44 55 02/07/2018 8/25/2018 0.00% C 0.482 0.134 0.300 - - - 91.60%

91.60%

Very SatisfactoryONS

430 351

PLERM CONSTRUCTION

AND DEVELOPMENT

CORPORATION

33288 L AAA MA GE

Widening of Permanent Bridges to more

than 2 Lanes : Madugo Br. (B00062MR)

along Calapan South Road

Roxas, Oriental

Mindoro11/13/2018 1st/Final

Southern

Mindoro DEOLF 14.19 330 13/06/2017 5/8/2018 0.00% C 0.474 0.201 0.300 - - - 97.50%

97.50%

OutstandingONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 49 of 72

Page 50: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

431 352POLYMER-VIC

CONSTRUCTION6157 L B MA GE

Rehabilitation/Major Repair of

Permanent Bridges Saysain Bridge,

(B03391LZ) Bagac - Mariveles Road

Bagac, Bataan 11/9/2018 1st/FinalBataan 2nd

DEOLF 14.7 90 13/02/2018 5/13/2018 0.00% C 0.499 0.133 0.300 - - - 93.20%

93.20%

Very SatisfactoryONS

432 353POWER K CONSTRUCTION

SUPPLY & SERVICES31574 L B MA GB

Construction of Tiaong Convention

Center (Phase I)Tiaong, Quezon 11/13/2018 1st

Quezon 2nd

DEOLF 46.53 180 25/06/2018 12/21/2018 1.06% OG 0.331 0.259 0.150 0.030 0.051 0.050 87.10% - AHD

433 354PRECIOUS

CONSTRUCTION32995 L A MB GE

Road Upgrading/Concreting of Sta. Cruz-

Sigay Road Leading to Kagutungan Falls,

Brgy. Daligan

Sta. Cruz, Ilocos

Sur11/8/2018 2nd/Final

Ilocos Sur 2nd

DEOLF 8.46 170 14/02/2018 8/2/2018 0.00% C 0.390 0.133 0.300 - - - 82.30%

84.10%

SatisfactoryONS

434PRECIOUS

CONSTRUCTION32995 L A MB GE

001: Ensure Safe and Reliable National

Road System, Network Development

Program, Road Widening - Secondary

Roads; Iriga City San Isidro-Sagrada-San

Ramon-Hanawan Road

Camarines Sur 11/12/2018 1stRegional Office

No. VLF 74.44 246 25/07/2018 2/9/2019 14.36% OG 0.382 0.300 0.150 0.030 0.047 0.050 95.90% - AHD

435 355

PRISMODIAL

CONSTRUCTION

CORPORATION

28345 L AAA MA GE

Convergence and Special Support -

Construction/Improvement of Access

Roads leading to Declared Tourism

Destinations - Construction of Concrete

Road - Access Road leading to Bagsang

Falls

Brgy. Santa

Clara, Gonzaga,

Cagayan

11/18/2018 1st/FinalCagayan 1st

DEOLF 33.10408082 175 03/05/2018 10/24/2018 0.00% C 0.469 0.133 0.300 - - - 90.20%

90.20%

Very SatisfactoryONS

436 356PROTECH CONSTRUCTION

& DEVELOPMENT CORP.15408 L AAA MA GE

Construction and Maintenance of Bridge

along National Roads, Widening of

Permanent Bridge Including Row to

More Than Two (2) Lanes, Pangil Bridge I

Aling Calamba - Sta. Cruz - Famy

Junction Road

Pangil, Laguna 11/8/2018 1stLaguna 1st

DEOLF 36.16 323 02/05/2018 1/29/2019 4.44% OG 0.398 0.240 0.150 0.024 0.047 0.050 90.90% - AHD

437 357

PROTECH CONSTRUCTION

& DEVELOPMENT CORP. /

JOBEL ENTERPRISES

(JOINT VENTURE)

JV- 17- 1925 L AAA MA GE

Construction / Maintenance for Flood

Mitigation Structures and Drainage

System, Construction of River Control

along Sta. Cruz River, Brgy. Pagsanjan

Sta. Cruz, Laguna 11/7/2018 1st/FinalLaguna 1st

DEOLF 47.08 253 21/02/2018 10/31/2018 0.00% C 0.475 0.133 0.300 - - - 90.80%

90.80%

Very SatisfactoryONS

438 358

PYRAMID CONSOLIDATED

BUILDERS & GEN.

MERCHANDISE

15599 L A MB GE

Construction of Concrete Road, Access

Road Leading to Dahilayan Adventure

Park, K1442+200.27 to K1446+923.27

Manolo fortich,

Bukidnon11/10/2018 2nd/Final

Bukidnon 3rd

DEOLF 96.5 256 28/02/2018 11/10/2018 0.00% C 0.487 0.134 0.300 - - - 92.10%

92.10%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 50 of 72

Page 51: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

439 359 QM BUILDERS 30743 L AAA LA GE

Asset Preservation -

Rehabilitation/Reconstruction of Roads

with Slips, Slope Collapse and -

Secondary Roads, Cebu-Toledo Wharf

Road (Jct. Naga-Uling)

Cebu Province 11/5/2018 1st Cebu 2nd DEO LF 93.00 333 2/13/2018 1/11/2019 -7.43% OG 0.398 0.240 0.076 0.030 0.050 0.033 82.70% - DEL

440 360QM BUILDERS/ FIRST

GRANDEUR BUILDERS JV-17-779 L AAA MA GE

Construction of Flood Control Structures

Abuno RiverMinglanila, Cebu 11/5/2018 1st/Final Cebu 2nd DEO LF 27.90 182 2/13/2018 8/13/2018 0.00% C 0.482 0.133 0.300 - - - 91.50%

91.50%

Very SatisfactoryONS

441 361

QUEZON VICTORY

LUMBER AND GENERAL

CONTRACTOR

6631 L A MA GEConstruction of Barangay Road, Brgy.

Tuhian

Catanuan,

Quezon11/12/2018 1st/Final

Quezon 3rd

DEOLF 33.27 240 22/03/2018 11/16/2018 0.45% C 0.439 0.192 0.300 - - - 93.10%

93.10%

Very SatisfactoryAHD

442 362QUIRANTE

CONSTRUCTION32827 L A MB GB

Construction of 4-Storey, 12-CL School

Building at Jugan ES

Consolacion,

Cebu11/16/2018 1st Cebu 6th DEO LF 31.13 180 05/07/2018 12/31/2018 0.00% OG 0.397 0.240 0.150 0.030 0.041 0.033 89.10% - ONS

443 363QUITUINAN WRRIORS

CONSTRUCTION42500 L D SB GE

Concreting of Sta. Rosa - Almine Farm to

Market Road, Barngay Sta. Rosa and

Barangay Almine

San Jacinto,

Masbate11/12/2018 1st/Final

Masbate 3rd

DEOLF 6.65 90 28/06/2018 9/25/2018 0.00% C 0.471 0.133 0.300 - - - 90.40%

90.40%

Very SatisfactoryONS

444 364

R. ALLOSA

CONSTRUCTION &

TRUCKING SERVICES

12964 L A MA GE

Rehabilitation / Major Repair of

Permanent Bridge Badiang Br.

(B00164LT), along Calubian Jct.-San

Isidro-Tabango-Villaba-Palompon

Brgy. Badiang,

Villaba, Leyte11/8/2018 1st/Final Leyte 3rd DEO LF 1.93 60 2/7/2018 4/7/2018 30.00% C 0.440 0.134 0.300 - - - 87.40%

87.40%

SatisfactoryAHD

445 365

R. SEMILLA

CONSTRUCTION &

MARKETING/SOUTHERN

PHILIPPINES JRH

INDUSTRIAL

CORPORATION JOINT

VENTURE

JV-17-3065 L A MA GE

Construction/Rehabilitation of Road

Purok 1, Brgy. Linao - Purok 4, Brgy. San

Miguel

San Isidro, Davao

del Norte11/10/2018 1st

Davao del

Norte 1st DEOLF 38.02 174 25/07/2018 1/14/2019 -4.65% OG 0.379 0.117 0.104 0.030 0.061 0.033 72.40% - DEL

446 366

R.A PAHATI CONTS. &

SUPPLY INC./ AA PAHATI

CONSTRUCTION AND

SUPPLY Joint Venture

JV-17-2671 L AA MA GE

Organizational Outcome 2: Protect Lives

and Properties (Againts Major Flood

Construction/Rehabilitation/improvent

of Canaman Flood Control (Phase 2)

Canaman

,Camarines Sur11/9/2018 1st/Final

Camarines Sur

2nd DEOLF 27.92 299 27/05/2018 12/11/2018 -4.10% OG 0.372 0.300 0.109 0.030 0.056 0.033 90.00% - DEL

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 51 of 72

Page 52: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

447 367

R.A PAHATI CONST. &

SUPPLY, INC. / NUEDA

BUILDERS CONSTRUCTION

& SUPPLY INC. (JOINT

VENTURE)

JV-17-673 L A MA GE

Organizational Outcome 2: Protect Lives

and Properties Against Major Floods -

Flood Management Program -

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems: Construction of Retaining

Wall/Revetment/ Slope Protecting along

Carmona - Binan River (Municipal Park),

Phase I

Brgy. Lantic,

Carmona, Cavite11/13/2018 1st

Cavite Sub

DEO LF 48.74044015 300 02/03/2018 12/26/2018 5.71% OG 0.384 0.240 0.150 0.030 0.060 0.033 89.70% - AHD

448 368R.A. PAHATI CONST. &

SUPPLY, INC.35843 L AA LA GE

Construction of Road Dike leading to

Bancal Pugad

Lubao,

Pampanga11/15/2018 1st

Pampanga 2nd

DEOLF 48.65909361 210 04/07/2018 1/29/2019 0.17% OG 0.397 0.300 0.150 0.030 0.056 0.050 98.30% - AHD

449R.A. PAHATI CONST. &

SUPPLY, INC. 35843 L AA LA GE

FY 2018 DPWH Infrastructure Program,

Organizational Outcome 1: Ensure safe

and Reliable National Road System,

Bridge Program, Construction of New

Permanent Bridges Diokno Highway Br.

Along Diokno Highway (Phase II)

Batangas

Province11/6/2018 1st/Final

Regional Office

No. IV-ALF 18.76486086 150 19/02/2018 7/18/2018 0.00% C 0.493 0.133 0.300 - - - 92.60%

92.60%

Very SatisfactoryONS

450 369

R.A.G. CORONA

CONSTRUCTION AND

AGGREGATES SUPPLY

39473 L B SB GE

Concreting of Hacienda Sto. Domingo-

Hacienda Consolacion, Brgy. Granada

FMR

Bacolod City 11/15/2018 1st/FinalBacolod City

DEO LF 4.73 90 16/05/2018 8/13/2018 0.00% C 0.459 0.133 0.300 - - - 89.20%

89.20%

Very SatisfactoryONS

451 370R.D. INTERIOR JUNIOR

CONSTRUCTION6483 L AAA LB GE

Preventive Maintenance- Asset

Preservation Program-Various Roadlines

Bauk-Pinukpuk-Rizal-Tanudan, KO

509+038 - KO 509+430

kalinga 11/13/2018 1st/FinalLower Kalinga

DEOLF 91.13 150 05/03/2018 8/1/2018 0.00% C 0.476 0.200 0.300 - - - 97.60%

97.60%

OutstandingONS

452 371

R.D. INTERIOR JUNIOR

CONSTRUCTION / CREST

CONSTRUCTION

JV-17-1772 L AAA LB GEConstruction/Urgent River Bank

Protection Works, Phase 1, San VicenteIguig, Cagayan 11/13/2018 1st/Final

Cagayan 3rd

DEOLF 64.41807626 300 09/04/2018 2/2/2019 41.66% C 0.467 0.133 0.300 - - - 90.00%

90.00%

Very SatisfactoryAHD

453 372

R.D. SADSAD

CONSRTUCTION AND

TRADING

19240 L A MA GE

Flood Management Program -

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems - Construction of Flood Control

along San Juan River, Barangay

Banadero

Calamba, Laguna 11/2/2018 1st/FinalLaguna 2nd

DEOLF 19.60 222 21/02/2018 9/30/2018 28.66% C 0.412 0.200 0.300 - - - 91.20%

91.20%

Very SatisfactoryAHD

454 373

R.L. PACANA'S

CONSTRUCTION &

DEVELOPMENT

26187 L C SB GEConstruction of San Antonio Bridge aling

Radio Station RoadBasco, Batanes 11/14/2018 1st/Final Batanes DEO LF 7.59 216 20/03/2018 10/21/2018 0.00% C 0.468 0.133 0.300 - - - 90.10%

90.10%

Very SatisfactoryONS

455 374

R.R. RICAFORT

CONSTRUCTION AND

SUPPLIES

14402 L AA MA GE

Construction of Slope Protection along

Tarlac River Central Left Dike, Sembrano

Section (Phase II)

Gerona, Tarlac 11/15/2018 1st/Final Tarlac 1st DEO LF 42.34 175 12/04/2018 10/3/2018 0.00% C 0.440 0.189 0.300 - - - 92.90%92.90%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 52 of 72

Page 53: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

456 375

R.S. SEPIAN

CONSTRUCTION &

TRUCKING / YUNAKIM

CONSTRUCTION JOINT

VENTURE

JV-17-600 L B MB GE

Construction of Concrete Road-Mountain

Province Boundary Cagaluan Junction

Sukiap-Tanglag-Mabongtot Road in

Support of Agri Business industry

(Coffee, Heirloom rice and other high

value crops)

Lubuangan,

Kalinga11/13/2018 1st

Upper Kalinga

DEOLF 33.09 268 22/02/2018 11/16/2018 -4.85% OG 0.366 0.291 0.102 0.030 0.055 0.033 87.70% - DEL

457 376R.T. MORABE

CONSTRUCTION11377 L B MA GE

Network Development-Road Widening-

Tertiary Roads, along Leyte-Samar-Inter

Provincial Road (S00042LT), K0905+054-

K0906+760, K0906+792-K0907+039

Babatngon,

Leyte11/15/2018 1st/Final Leyte 1st DEO LF 39.64 120 2/2/2018 6/1/2018 0.00% C 0.452 0.134 0.300 - - - 88.60%

88.60%

SatisfactoryONS

458 377 R.T.Y. CONSTRUCTION 10341 L A MB GE

Construction of MSR Junction -

Concepcion - Banahaw - Masalukot -

Pinagdanlayan Road

Dolores, Quezon 11/13/2018 1stQuezon 2nd

DEOLF 45.56 240 03/04/2018 11/28/2018 -3.87% OG 0.384 0.287 0.111 0.024 0.047 0.033 88.60% - DEL

459 378 R.V. LABORTE BUILDERS 20459 L A MB GE

I. Operations A. Organizational Outcome

1: Ensure Safe and Reliable National

Road System 1. Asset Preservation

Program B. Rehabilitation /

Reconstruction / Upgrading of Damaged

Paved Roads 1. Primary Roads 1. Quirino

Highway, K0251+(-511) to K0251+000,

K0252+000 to K0252+400, K0258+974 to

K0259+200, K0259+767 to K0260+656

Guinayangan -

Tagkawayan,

Quezon

11/10/2018 2nd/FinalQuezon 4th

DEOLF 46.95 210 21/02/2018 9/18/2018 0.00% C 0.455 0.133 0.300 - - - 88.80%

89.70%

Very SatisfactoryONS

460 379 RAM BUILDERS 10549 L B MA GE

I. Operations A. Organizational Outcome

1: Ensure Safe and Reliable National

Road System 1. Asset Preservation

Program C. Rehabilitation /

Reconstruction of Roads with Slips, Slope

Collapse and Landslide 1. Primary Roads

1. Daang Maharlika (LZ), K0186+939 to

K0187+230

Plaridel and

Gumaca, Quezon 11/10/2018 2nd/Final

Quezon 4th

DEOLF 47.29 240 19/02/2018 10/16/2018 12.50% C 0.420 0.200 0.300 - - - 92.00%

90.82%

Very SatisfactoryAHD

461 380

RAMARPLUS

INCORPORATED

(FORMERLY: RAMAR

ENTERPRISE)

8092 L A MA GERehabilitation of Boranguit River Flood

Control

Barangay Kinale,

Polangui, Albay11/5/2018 1st Albay 3rd DEO LF 28.22 195 6/11/2018 12/22/2018 8.56% OG 0.393 0.247 0.150 0.020 0.035 0.033 87.80% - AHD

462 381 RAMISES CONSTRUCTION 17351 L A MA GE

Rehabilitation/Major Repair of Subait

Bridge (B00890MN) along Butuan City –

Malaybalay Road

Butuan City 11/15/2018 1st/FinalButuan City

DEOLF 10.8 120 3/26/2018 7/23/2018 55.83% C 0.471 0.133 0.300 - - - 90.40%

90.40%

Very SatisfactoryAHD

463 382 RAVH CONSTRUCTION 41971 L C SB GE

Construction/ Maintenance of Flood

Mitigation Structures and Drainage

Systems Talisay River, Cupang Section

Balanga City,

Bataan11/9/2018 1st/Final

Bataan 2nd

DEOLF 9.30263818 187 13/02/2018 8/18/2018 52.50% C 0.462 0.133 0.300 - - - 89.50%

89.50%

Very SatisfactoryAHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 53 of 72

Page 54: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

464 383

RCDG CONSTRUCTION

CORP. / A.T. DUMLAO

CONST. INC. (JOINT

VENTURE)

JV-17-2001 L AAA MA GE

Construction of River Bank Protection

along Hinatuan River (Maglambing Br.

Section), Construction/ Maintenance of

Flood Mitigation Structures and

Drainage System Construction of River

Bank Protection along Hinatuan River

(Maglambing Br. Section),

Maglambing,

Tagbina, Surigao

del Sur

11/11/2018 1stSurigao del Sur

2nd DEOLF 36.67 228 4/16/2018 11/29/2018 0.44% OG 0.396 0.240 0.150 0.030 0.070 0.050 93.60% - AHD

465 384RDEN CONSTRUCTION &

SUPPLY33707 L B MA GE

Construction of Concrete Road - San

Mateo to Upper Mingading Leading to

UK Peak, Barangay San Mateo

Aleosan, North

Cotabato11/10/2018 2nd/Final

Cotabato 2nd

DEOLF 32.57 131 4/1/2018 8/9/2018 0.00% C 0.480 0.135 0.300 - - - 91.50%

91.02%

Very SatisfactoryONS

466 385REDSON CONSTRUCTION

AND SUPPLIES35128 L C SB GE

Cosnstruction f Flood Control Control

Structure along Matigay Creek

(Upstream)

Brgy. Rizal, Silay

City, Negros

Occidental

10/8/2018 2nd/Final

Negros

Occidental 1st

DEO

LF 43.81 180 12/04/2018 10/8/2018 0.00% C 0.480 0.133 0.300 - - - 91.30%91.00%

Very SatisfactoryONS

467 386 REGG'S BUILDERS 33262 L B SB GB

Construction of Two (2) Storey, Four (4)

Classrooms, Two (2) Science Lab.

Building, Pangal Sur High School

Echague, Isabela 11/11/2018 1stIsabela 4th

DEO LF 9.39 148 16/07/2018 12/10/2018 0.05% OG 0.385 0.245 0.150 0.018 0.041 0.050 88.90% - AHD

468 387

RELY CONSTRUCTION

AND SUPPLY / ALFREGO

BUILDERS & SUPPLY JOINT

VENTURE

JV-17-1147 L AA MA GE

Construction of Concrete Revetment of

Steel Sheet Pile along Talomo River,

Riverside-Tugbok Section

3rd

Congressional

District, Davao

City

11/11/2018 1st/FinalDavao City 2nd

DEOLF 47.51 210 3/7/2018 10/2/2018 0.00% C 0.466 0.151 0.300 - - - 91.70%

91.70%

Very SatisfactoryONS

469 388REX E. MORALES

CONSTRUCTION17427 L AA MA GE

Construction of Flood Control Structure

along Moog River Protecting Moog

Bridge and Biliran Circumferential Road,

Leftside (11.4878, 124.4494), Rightside

(11.4881, 124.4493)

Biliran, Province

of Biliran11/6/2018 1st/Final Biliran DEO LF 28.05 180 2/18/2018 8/16/2018 0.00% C 0.469 0.140 0.300 - - - 90.90%

90.90%

Very SatisfactoryONS

470 389

REYROSE CONSTRUCTION

& SUPPLY DEV'T

CORPORATION

22934 L B MA GE

Construction and Maintenance of

Bridges along National Roads-Widening

of Permanent Bridges to more than 2

Lanes, Widening of Bridge-Baleguian Br.

(B00830MN) along Daang Maharlika

(Surigao-Agusan Section)

Jabonga, Agusan

del Norte 2nd

L.D.

11/14/2018 1st/FinalAgusan del

Norte DEOLF 23.3 382 3/30/2017 4/15/2018 0.00% C 0.499 0.134 0.300 - - - 93.30%

93.30%

Very SatisfactoryONS

471 390 RJIR ENTERPRISES 34843 L B MA GE

Construction/Improvement of Access

Roads Leading to Seaports-Access Road

Leading to Silad Port

Villaba, Leyte 11/8/2018 1st/Final Leyte 3rd DEO LF 31.01 179 2/6/2018 8/3/2018 24.58% C 0.467 0.134 0.300 - - - 90.10%90.10%

Very SatisfactoryAHD

472 391

ROAD EDGE TRADING &

DEVELOPMENT SERVICES

/ JAYKRIS ENTERPRISES &

CONSTRUCTION JOINT

VENTURE

JV-17-454 L A MA GE

Construction of Flood Control Structure

(Revetment Wall) along Sibuguey River,

Sta. 00+002 t Sta. 00+251.60, Upstream

Barangay Pilar,

Diplahan,

Zamboanga

Sibugay

11/13/2018 1st

Zamboanga

Sibugay 1st

DEO

LF 29.37 220 02/04/2018 11/7/2018 -2.50% OG 0.392 0.221 0.125 0.020 0.047 0.033 83.80% - DEL

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 54 of 72

Page 55: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

473 392ROBIG BUILDERS AND

DEVELOPMENT CORP.35327 L A MA GE

Asset Preservation Program, Preventiive

Maintenance, Primary Roads, Calamba -

Sta. Cruz - Famy Junction Road,

K0057+207 To K0057+531,K0058+050 -

K0058+420

Los Banos,

Laguna11/7/2018 1st/Final

Laguna 2nd

DEOLF 19.60 105 09/07/2018 10/21/2018 18.10% C 0.473 0.200 0.300 - - - 97.30%

97.30%

OutstandingAHD

474 393ROCK 101 CONSTRUCTION

AND SUPPLY38070 L B SB GE

Concreting of Brgy. Gines- Inagdangan

Sur- Inagdangan Norte FMR Brgy. Gines

Inagdangan Sur

and Inagdangan

Norte, Zarraga,

Iloilo

11/12/2018 1st Iloilo 4th DEO LF 9.95 145 04/07/2018 11/25/2018 3.17% OG 0.362 0.246 0.150 0.030 0.051 0.050 88.90% - AHD

475 394

RODEKOM GENERAL

CONSTRUCTION AND

INTERPRISE

38656 L B SB GEConstruction of Flood Control at Atad-

AsinTuba Benguet 11/5/2018 1st/Final

Benguet 1st

DEOLF 18.69 157 15/03/2018 8/18/2018 5.70% C 0.386 0.200 0.300 - - - 88.60%

88.60%

SatisfactoryAHD

476

RODEKOM GENERAL

CONSTRUCTION AND

INTERPRISE

38656 L A MA GE

Construction of By-Passes/Diversion

Roads including ROW Baguio La-Trinidad-

Itogon-Sablan-Tuba-Tublay-(BLISTT)

Outer Ring Circumferential Road

including ROW and Slope

Protection,Phase 3 (Labey-Lacamen

Section ,Bokod, Benguet),

Tublay Benguet 11/8/2018 2nd/FinalBenguet 2nd

DEOLF 89.41 228 01/03/2018 10/14/2018 8.00% C 0.432 0.201 0.300 - - - 93.30%

88.32%

SatisfactoryAHD

477 395ROIM BUILDERS &

CONSTRUCTION SUPPLY20226 L AA LA GE

Off Carriageway Improvement along NRJ

San Francisco-Bahi-Barobo Road

(S00463MN) K1309+793- K1310+889

San Francisco,

Agusan del Sur11/12/2018 2nd/Final

Agusan del Sur

2nd DEOLF 11.81 167 18/04/2018 10/1/2018 0.60% C 0.500 0.141 0.300 - - - 94.10%

90.98%

Very SatisfactoryAHD

478 396

ROLCO CONSTRUCTION &

DEVELOPMENT

CORPORATION / ALJON

CONSTRUCTION & SUPPLY

JOINT VENTURE

JV-17- 1793 L B MA GE

Preventive Maintenance - Secondary

Roads, Catanduanes Circumferential

Road, K0006+083 - K0007+900,

K0015+000 - K0016+000, K0020+000 -

K0020+682, K0030+000 - K0031+000,

K0031+000 - K0032+000, K0038+223 -

K0038+370, K0043+300 - K0043+600,

K0045+000 - K0046+000, K0046+000 -

K0046+304, K0046+376 - K00656,

K00047+000 - K0047+065, K0049+276 -

K0050+000

Viga,

Catanduanes11/14/2018 1st

Catanduanes

DEOLF 45.88 270 23/02/2018 11/19/2018 -2.00% OG 0.384 0.292 0.130 0.020 0.035 0.033 86.10% - DEL

479 397

ROMA CONSTRUCTION &

DEVELOPMENT

CORPORATION/ ZEDIK

BUILDERS JOINT VENTURE

JV-15-631 L AA LA GE

Replacement of Permanent Weak

Bridges, Malamin Bridge (B02410LZ)

along Ilocos Norte- Abra

Malamin, Ilocos

Norte12/21/2018 1st/Final

Regional Office

No. ILF 60.79 779 01/02/2016 3/20/2018 -2.00% C 0.497 0.200 0.240 - - - 93.70%

93.70%

Very SatisfactoryDEL

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 55 of 72

Page 56: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

480 398

ROMA CONSTRUCTION

AND DEVELOPMENT

CORPORATION

6514 L AAA LB GE

Road Widening - Secondary Roads -

Olongapo - Bugalion Road, Including

ROW - K0201+429 - K0203+000,

K0206+000 - K0206+897.60

Iba, Zambales 11/5/2018 1st Zambales 1st

DEOLF 76.42710815 334 30/04/2018 3/29/2019 0.35% OG 0.384 0.244 0.150 0.030 0.056 0.033 89.70% - AHD

481 399RONWOOD

CORPORATION25311 L AA MB GE

Construction of Alegria Bagahak-

Canlipos-Garcia Road, (Sta. 0+000 to Sta.

1+740)

Brgy. Alegria,

Sta. Monica,

Surigao Del

Norte

11/7/2018 1st/FinalSurigao del

Norte 2nd DEOLF 47.7 163 4/12/2018 9/21/2018 0.00% C 0.481 0.133 0.300 - - - 91.40%

91.40%

Very SatisfactoryONS

482 400 ROPRIM CONSTRUCTION 8546 L A MB GEConstruction of Tigbao River Control

System, San Antonio

Nueva Valencia,

Guimaras11/5/2018 1st Guimaras DEO LF 3.72 326 09/06/2018 4/30/2019 0.61% OG 0.384 0.243 0.150 0.030 0.055 0.033 89.50% - AHD

483 401 RRC CONSTRUCTION 24369 L A MA GE

Construction/Rehabilitation of Flood

Mitigation Facilities within Major River

Basins and Principal Rivers -

Construction of Pinacanauan River Flood

Control Project (Del Pilar Section)

San Mariano,

Isabela11/7/2018 1st/Final

Isabela 2nd

DEOLF 46.50099303 170 12/03/2018 8/28/2018 0.01% C 0.440 0.200 0.300 - - - 94.00%

94.00%

Very SatisfactoryAHD

484 402 RRN CONSTRUCTION 20228 L B MA GE

Road Widening along Jct. Sayre

Highway, Impasug-ong-Patulangan By-

Pass Road, K1478+(-911) - K1478+000

Impasug-ong ,

Bukidnon11/12/2018 1st/Final

Bukidnon 1st

DEO LF 27.3 180 08/03/2018 9/3/2018 0.00% C 0.489 0.134 0.300 - - - 92.30%

92.30%

Very SatisfactoryONS

485 RRN CONSTRUCTION 20228 L B MA GE

Rehabilitation/ Reconstruction /

upgrading of Damaged Paved Road

along Sayre Highway, K1553+270 -

K1554+414 and K1555+041 - K1555+272

Maramag,

Bukidnon11/12/2018 2nd/Final

Bukidnon 2nd

DEOLF 43.15 172 01/05/2018 10/19/2018 0.00% C 0.479 0.145 0.300 - - - 92.40%

92.40%

Very SatisfactoryONS

486 403 RSKC CONSTRUCTION 38292 L B MA GE

Construction of Three-Storey (9

Classroom) School Building Manaring

Integrated School, City of Ilagan

City of Ilagan,

Isabela11/8/2018 1st

Isabela 1st

DEOLF 24.67627314 180 09/07/2018 1/4/2019 0.39% OG 0.367 0.240 0.150 0.030 0.042 0.033 86.20% - AHD

487 404

RUCKS KONSULT 7

CONSTRUCTION SERVICES

/ J.D. LEGASPI

CONSTRUCTION (JOINT

VENTURE)

JV-17-1730 L AAA LB GE

Construction of Concrete Dike Flood

Control Structure along Boac River at

Brgy. Tanza

Boac,

Marinduque11/14/2018 1st/Final

Marinduque

DEOLF 23.75 262 27/02/2018 11/15/2018 0.38% C 0.414 0.187 0.300 - - - 90.10%

90.10%

Very SatisfactoryAHD

488 405 RUDHIL CONSTRUCTION 22901 L A MB GE

Road Concreting of Barangay San Jose

Leading to San Jose Multi-Purpose

Cooperative, in support of Agribusiness:

Rice and Rubber

Kalawit,

Zamboanga del

Norte

11/6/2018 1st/FinalZamboanga del

Norte 2nd DEOLF 71.86 285 19/02/2018 11/30/2018 3.00% C 0.460 0.132 0.300 - - - 89.20%

89.20%

Very SatisfactoryAHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 56 of 72

Page 57: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

489

RUDHIL CONSTRUCTION &

ENTERPRISES, INC.

(FORMERLY: RUDHIL

CONSTRUCTION)

22901 L A MA GE

Construction / Rehabilitation of

Revetment along Iligan River (Upstream

of Tubod Bridge, Left and Right Bank),

Including ROW

Tubod, Iligan

City11/6/2018 1st/Final

Lanao del

Norte 2nd DEOLF 60.09 277 20/02/2018 11/23/2018 6.61% C 0.494 0.159 0.300 - - - 95.30%

95.30%

Very SatisfactoryAHD

490 406S&RV CONSTRUCTION &

SUPPLY19203 L D SB GB

Constructionof Multi-Purpose Building

(Municipal Building) Phase 2

Poblacion,

Batuan, Masbate11/12/2018 1st/Final

Masbate 3rd

DEOLF 4.91 150 20/03/2018 8/16/2018 0.00% C 0.496 0.136 0.300 - - - 93.20%

93.20%

Very SatisfactoryONS

491 407 SAKI Construction 42952 L D SB GEConcreting od Sitio Nabanngan,

Barangay Payawan Farm to Market RoadLamut, Ifugao 11/7/2018 1st/Final Ifugao 1st DEO LF 4.84 78 22/05/2018 8/7/2018 41.76% C 0.473 0.133 0.300 - - - 90.60%

90.60%

Very SatisfactoryAHD

492 408

SANLAHI GROUP OF

BUILDERS, INC. / B5

BUILDERS & SUPPLIES

(JOINT VENTURE)

11874 L A MA GEConstruction of Mag-Asawang Tubig RC

Structure, Pinagsabangan Section

Naujan, Oriental

Mindoro11/9/2018 1st/Final

Mindoro

Oriental DEOLF 18.81 180 15/03/2018 9/10/2018 16.00% C 0.016 0.200 0.300 - - - 51.60%

51.60%

PoorAHD

493 409

SANRHO BUILDERS, INC.

(FORMERLY: SANRHO

CONSTRUCTION AND

SUPPLIES)

24213 L A MA GE

Construction/Improvement of Access

Roads Leading To Aiports, Seaports and

Declared Tourism Destinations:Access

Roads Leading to Bacacay Seaport and

Leading to San Roque Port

Bacacay and

Tabaco City,

Albay

12/8/2018 1st/Final Albay 1st DEO LF 96.04 302 30/03/2017 1/28/2018 13.23% C 0.475 0.157 0.300 - - - 93.20%93.20%

Very SatisfactoryAHD

494 410

SANRHO BUILDERS, INC.

(FORMERLY: SANRHO

CONSTRUCTION AND

SUPPLIES)

24213 L A MA GE

Rehabilitation/Restoration/Reconstructi

on of Flood Control Projects Damaged By

Typhoon "Nina" and Super Typhoon

"Lawin"

Tabaco City ,

Albay12/7/2018 1st/Final Albay 1st DEO LF 74.73 211 13/09/2017 4/11/2018 0.00% C 0.444 0.200 0.300 - - - 94.40%

94.40%

Very SatisfactoryONS

495 411

SARGASSO

CONSTRUCTION &

DEVELOPMENT CORP. /

GREAT ZONE ENTERPRISE

JOINT VENTURE

JV-17-877 L AAA LB GE

Bridge Program: Widening of Permanent

Bridge-Kennon Br.2 along Kennon

Rd.Incl.ROW

Baguio City 11/12/2018 1stBaguio City

DEOLF 44.99 240 05/03/2018 10/30/2018 3.00% OG 0.328 0.300 0.150 0.030 0.050 0.033 89.10% - AHD

496 412SBK CONSTRUCTION

SUPPLIES AND SERVICES34150 D SB GE

Concreting of Sitio Tagbuan-Sitio

Kalibunan

Brgy. Himaya,

Hinigaran,

Negros

Occidental

11/14/2018 1st/Final

Negros

Occidental 2nd

DEO

LF 4.97 49 02/08/2018 9/19/2018 0.00% C 0.429 0.136 0.300 - - - 86.50%86.50%

SatisfactoryONS

497 413

SCP CONSTRUCTION / RED

CONSTRUCTION TECHNIK

(JOINT VENTURE)

JV-17-1458 L A MB GE

Construction of Flood Mitigation

Facilities along Major River Basins and

Principal Rivers, Mandulog River,

Lambaguhon Section (Along Emerald

Homes) Including ROW

Brgy. San Roque,

Iligan City11/6/2018 1st/Final

Lanao del

Norte 2nd DEOLF 43.65 274 20/02/2018 11/20/2018 3.39% C 0.495 0.134 0.300 - - - 92.90%

92.90%

Very SatisfactoryAHD

498 414

SEVEN DIGIT

CONSTRUCTION &

SUPPLIES

25471 L B MA GE

Construction/ Improvement of Access

Road Leading to Malampaya Sound

Dolphin Watching Tour, Brgy. Old

Guinlo, Sta. 204+500 - Sta. 205+700

Taytay, Palawan 11/10/2018 1st/FinalPalawan 1st

DEOLF 28.32 140 14/03/2018 7/31/2018 -4.00% C 0.455 0.200 0.180 - - - 83.50%

83.50%

SatisfactoryDEL

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 57 of 72

Page 58: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

499 415

SILVERGRACES

CONSTRUCTION AND

CONSTRUCTION SUPPLY

3658 L A MA GE Construction of Overfloow Bridge

Brgy. Cansilayan,

Murcia, Negros

Occidental

11/13/2018 2nd/Final

Negros

Occidental 1st

DEOLF 6.11 141 26/04/2018 9/13/2018 0.00% C 0.499 0.133 0.300 - - - 93.20%

92.24%

Very SatisfactoryONS

500 416SIXTEEN ENTERPRISES-

CALAPAN BRANCH18187 L B MA GE

Construction of Flood Mitigation

Structures and Drainage System,

Construction of Malayong River Control

Structure

Gloria, Oriental

Mindoro11/12/2018 1st/Final

Southern

Mindoro DEOLF 19.16 163 10/05/2018 10/19/2018 0.00% C 0.443 0.200 0.300 - - - 94.30%

94.30%

Very SatisfactoryONS

501 417SOLFIO P. JACINTO

CONSTRUCTION17799 L B MA GE

Rehabilitation of

Rehabilitation/Improvement of

Pampanga River Flood Control, Sta.

98+748.6 to Sta. 99+293

Brgy.

Pinagbayanan,

Laur, Nueva Ecija

11/8/2018 1st/FinalNueva Ecija

2nd DEOLF 58.75 171 7/15/2018 1/1/2019 1.15% OG 0.398 0.212 0.150 0.030 0.045 0.050 88.50% - AHD

502 418SOPHIA CONSTRUCTION

AND SUPPLY33484 L B SB GB

Construction of Multi-Purpose Building

(New Gym) in Barangay Talisay

Lake Sebu, South

Cotabato11/6/2018 1st/Final

South

Cotabato 1st

DEO

LF 2.47 105 4/26/2018 8/8/2018 0.70% C 0.500 0.134 0.300 - - - 93.40%93.40%

Very SatisfactoryAHD

503 419SOUTHERN DAWN

DEVELOPMENT CO.12294 L D SB GB

Construction of Two (2) Storey Four (4)

Classrooms Academic School Building at

Claro M. Recto Memorial Central School

Tiaong, Quezon 11/13/2018 1st/FinalQuezon 2nd

DEOLF 10.65 180 11/24/2017 5/22/2018 0.00% C 0.499 0.133 0.300 - - - 93.20%

93.20%

Very SatisfactoryONS

504 420

SOUTHLAND

CONSTRUCTION AND

SUPPLIES

39555 L C SB GEConcreting of Dinapugan-Duit Farm to

Market Road, Barangay Tuplac & DuitKiangan, Ifugao 11/7/2018 1st/Final Ifugao 1st DEO LF 6.83 108 22/05/2018 9/6/2018 0.00% C 0.482 0.132 0.300 - - - 91.40%

91.40%

Very SatisfactoryONS

505 421

SPECO BUILDERS INC.

(FORMERLY:VRF

CONSTRUCTION)

15301 L AA MB GE

Construction of Concrete Slope

Protection with Steel Sheet Pile along

Pampanga River

Brgy. San

Gregorio, Rizal,

Nueva Ecija

11/12/2018 1st/FinalNueva Ecija 1st

DEOLF 65.09 270 07/02/2018 11/3/2018 30.00% C 0.487 0.200 0.300 - - - 98.70%

98.70%

OutstandingAHD

506 422

SPRING STAR

CONSTRUCTION AND

SUPPLY

20240 L B MA GE

Asset Preservation Program,

Rehabilitation/Reconstruction of Roads

with Slips, Slope Collapse and Landslide,

Secondary Roads, Junction Milagros -

Baleno - Lagta Road, K0079+902 -

K0080+608, 668.00

Aroroy Masbate 11/9/2018 1stMasbate 1st

DEOLF 36.63 235 02/05/2018 12/23/2018 10.68% OG 0.357 0.246 0.150 0.022 0.037 0.033 84.53% - AHD

507 423

ST GERRARD

CONSTRUCTION GEN.

CONTRACTOR &

DEVELOPMENT CORP.

31762 L AA LA GE

Rehabilitation/Reconstruction of Roads

with Slips and Slope Collapse and

Landslide, Marikina - Infanta Road,

K0122+685 to K0123+045

Infanta, Quezon 11/9/2018 1st Quezon 1st

DEO LF 96.50 300 15/02/2018 12/11/2018 10.60% OG 0.325 0.284 0.150 0.024 0.019 0.050 85.20% - AHD

508 424

ST. GERRARD

CONSTRUCTION / DMLC

BUILDERS (JOINT

VENTURE)

JV-16-664 L AA LA GE

Flood Control and River Improvements

Projects along Laguna Lake Based on

Metro Maila Master Plan - Construction

of Slope Protection for Tanay River

Tanay, Rizal 11/22/2018 1st/FinalRegional Office

No. IV-ALF 92.117006 270 24/01/2017 10/20/2017 0.00% C 0.440 0.200 0.300 - - - 94.00%

94.00%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 58 of 72

Page 59: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

509 425

ST. GERRARD

CONSTRUCTION GEN.

CONTRACTOR &

DEVELOPMENT CORP. /

TWIN DRAGON

CONSTRUCTION (JOINT

VENTURE

JV-16-1704 L AA LA GE

Construction / Upgrading /

Rehabilitation of Drainage along

National Roads-Tertiary-Odiongan-East-

West Road, K0004+000 - K0004+220,

K0004+480 - K0004+597.79, K0006+674 -

K0007+508.5, K0007+931 K0008+186.91

(S00007TL)

Tablas Island,

Romblon11/15/2018 2nd/Final Romblon DEO LF 42.88 240 27/06/2017 2/21/2018 0.00% C 0.491 0.200 0.178 - - - 86.90%

89.96%

Very SatisfactoryONS

510 426

ST. GERRARD

CONSTRUCTION GEN.

CONTRACTOR &

DEVELOPMENT CORP./

RUDHIL CONSTTRUCTION

& ENTERPRISES, INC.

(FORMERLY: RUDHIL

CONSTRUCTION)

JV-14-625 L A MB GE

Widening of Permanent Bridge Pulauan

RCDG Bridges (BOQ588MN) along

Dipolog-Oroquieta National Road,

Zamboanga del Norte, Sta. 1826+260.00

to Sta. 1826+800.00

Dapitan,

Zamboanga del

Norte

11/8/2018 1st/FinalRegional Office

No. IXLF 58.15 303 4/14/2015 11/6/2018 0.00% C 0.417 0.200 0.300 - - - 91.80%

91.80%

Very SatisfactoryONS

511

ST. GERRARD

CONSTRUCTION GEN.

CONTRACTORS &

DEVELOPMENT CORP.

31762 L AA MA GE

Const./Maintenance of Flood Mitigating

Structures & Drainage System Const. of

Calao East Slope Protection

Santiago City,

Isabela11/11/2018 1st/Final

Isabela 4th

DEOLF 45.74 205 05/02/2018 8/28/2018 1.29% C 0.460 0.133 0.300 - - - 89.30%

89.30%

Very SatisfactoryAHD

512 427

ST. GERRARD

CONSTRUCTION/

REBTRADE

INTERNATIONAL

CORPORATION JOINT

VENTURE

JV-16-013 L AA LA GE

Rehabilitation/Reconstruction of

National Roads with Slips, Slope Collapse

and Lanslide- Primary Road Dumaguete

North Road (Jct. Bais- Kabankalan-Nocc

Boundary, K0062+030- K0062+696 L/S

and K0063+365-K0063+413 L/S

Negros Oriental

Province10/11/2018 1st/Final

Negros

Oriental 1st

DEO

LF 192.83 441 19/09/2016 12/3/2017 5.47 C 0.453 0.200 0.300 - - - 95.30%95.30%

Very SatisfactoryAHD

513

ST. GERRERD

CONSTRUCTION GEN.

CONTRACTOR &

DEVELOPMENT CORP.

31762 L AA LA GE

Organizational Outcome 1: Ensure Safe

and Reliable National Road System -

Asset Preservation Program -

Rehabilitation/ Reconstruction of Road

with Slips, Slope Collapse and Landslide -

Secondary Roads - Manila East Road -

K0039 + (-669) - K0039+000

Cardona, Rizal 11/11/2018 1st Rizal 2nd DEO LF 92.6431399 330 26/02/2018 1/21/2019 1.19% OG 0.400 0.240 0.150 0.030 0.060 0.050 93.00% - AHD

514 428

ST. JOSEPH

CONSTRUCTION AND

TRADING

36890 L C SB GB

Construction of One (1) Storey- Two (2)

Classroom School Building at Don Jose

ES

Dinas,

Zamboanga del

Sur

11/12/2018 1st/FinalZamboanga del

Sur 2nd DEOLF 2.79 115 12/29/2017 4/22/2018 2.35% C 0.481 0.133 0.300 - - - 91.40%

91.40%

Very SatisfactoryAHD

515 429

ST. MATTHEW GEN.

CONTRACTOR &

DEVELOPMENT CORP.

40908 L B SB GEConcreting of Purok 4, Brgy. Bagong

Barrio FMR, Brgy. Bagong Barrio

San Ildefonso,

Bulacan11/7/2018 1st/Final

Bulacan 2nd

DEOLF 6.69 100 18/07/2018 10/25/2018 0.00% C 0.473 0.134 0.300 - - - 90.70%

90.70%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 59 of 72

Page 60: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

516 430ST. PIUS CONSTRUCTION

AND SUPPLY41263 L B SB GB

Construction of DPWH Building (Officials

and Employees Quartes), Romblon DEO

Brgy. Batian,

Odiongan,

Tablas Island,

Romblon

11/15/2018 1st Romblon DEO LF 14.86 240 27/02/2018 10/24/2018 -4.84% OG 0.395 0.300 0.102 0.030 0.045 0.033 90.50% - DEL

517 431

ST. RAYMUND

CONSTRUCTION INC. /CFC

FIBER CONSTRUCTION

CORPORATION (JOINT

VENTURE)

JV-17-806 L B MB GE

Retroffiting/Strengthening of Permanent

Bridges, Biglang Awa (B0000MQ) along

Marinduque Circumferential Road

Boac,

Marinduque11/15/2018 1st/Final

Marinduque

DEOLF 10.88 90 16/02/2018 5/16/2018 1.11% C 0.472 0.133 0.300 - - - 90.50%

90.50%

Very SatisfactoryAHD

518 432

ST. TIMOTHY

CONSTRUCTION

CORPORATION

39196 L A MA GE

Rehabilitation/Reconstruction of Roads

with Slips, Slope Collapse, Ladslides

Claveria-Calanasan-Kabugao Road

KO652+137-KO652+262

calanasan,

apayao11/16/2018 1st/Final

Apayao 2nd

DEOLF 51.49 196 19/02/2018 9/2/2018 0.00% C 0.480 0.133 0.300 - - - 91.30%

91.30%

Very SatisfactoryONS

519

ST. TIMOTHY

CONSTRUCTION

CORPORATION

39196 L A MA GE

Construction/ Maintenance of Flood

Mitigation Facilities along Major River

Basins and Principal Rivers, Construction

of Flood Control Tignoan River

Real, Quezon 11/9/2018 1st/FinalQuezon 1st

DEO LF 49.00 173 13/02/2018 8/4/2018 0.00% C 0.417 0.200 0.300 - - - 91.70%

91.70%

Very SatisfactoryONS

520

ST. TIMOTHY

CONSTRUCTION

CORPORATION

39196 L A MA GE

Construction of Flood Mitigation

Structures and Drainage System,

Construction of Mara gooc Seawall

Gloria, Oriental

Mindoro11/12/2018 1st

Southern

Mindoro DEOLF 96.50 286 28/05/2018 3/9/2019 1.26% OG 0.333 0.300 0.150 0.030 0.050 0.050 91.30% - AHD

521

ST. TIMOTHY

CONSTRUCTION

CORPORATION

39196 L A MB GE

Construction of Agnipa Flood Control

Structure along Romblon - Cogon -

Sablayan Circumferential Road

Agnipa, Romblon 11/16/2018 1st Romblon DEO LF 46.44 330 07/05/2018 4/1/2019 5.01% OG 0.391 0.300 0.150 0.030 0.040 0.033 94.40% - AHD

522

ST. TIMOTHY

CONSTRUCTION

CORPORATION

39196 L A MA GE Construction of Concrete RevetmentMalalag, Davao

del Sur11/14/2018 1st/Final

Davao del Sur

1st DEOLF 96.5 297 3/14/2018 1/4/2019 22.40% C 0.482 0.134 0.300 - - - 91.60%

91.60%

Very SatisfactoryAHD

523

ST. TIMOTHY

CONSTRUCTION

CORPORATION

39196 L A MA GE

Road Widening-Dulawan-Marbel Road,

K1762+305-K1763+320, K1764+320,

K17864+(-494)-K1764+506

Tacurong City,

Sultan Kudarat11/7/2018 1st

Sultan Kudarat

1st DEOLF 70.2 203 5/17/2018 12/5/2018 -2.70% OG 0.389 0.239 0.123 0.024 0.047 0.033 85.50% - DEL

524 433STALL CONSTRUCTION

SUPPLIES & SERVICES29930 L B GE

Local Program, Local Infrastructure

Program, Local Roads and Bridges, Local

Roads, Concreting of Road

Brgy. Dalipit,

Cuenca,

Batangas

11/10/2018 1st/FinalBatangas 3rd

DEOLF 0.96943377 120 19/02/2018 6/18/2018 0.00% C 0.490 0.133 0.300 - - - 92.30%

92.30%

Very SatisfactoryONS

525 434STAR WILLIAM

CONSTRUCTION35938 L B SB GE

Construction of Concrete Slope

Protection along Angat River Dampol

Section

Plaridel, Bulacan 11/5/2018 1st/FinalBulacan 1st

DEOLF 28.90 180 01/03/2018 8/27/2018 47.41% C 0.477 0.201 0.300 - - - 97.80%

97.80%

OutstandingAHD

526 435STEVEN CONSTRUCTION

& SUPPLY21987 L B MA GB Rehabilitation of Municipal Hall

Magarao,Camari

nes Sur11/9/2018 1st/Final

Camarines Sur

2nd DEOLF 2.82 90 14/02/2018 5/14/2018 0.00% C 0.451 0.113 0.300 - - - 86.40%

86.40%

SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 60 of 72

Page 61: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

527STEVEN CONSTRUCTION

AND SUPPLY21987 L B MA GE

Construction of Flood Mitigation

Structures (Concrete Revement) along

Buenos Aires River Barangay Buenos

Aries

San Fernando,

Masbate11/12/2018 2nd/Final

Masbate 3rd

DEOLF 47.55 280 08/02/2018 11/14/2018 0.00% C 0.455 0.135 0.300 - - - 89.00%

88.52%

SatisfactoryONS

528 436

STEVEN CONSTRUCTION

AND SUPPLY JOINT

VENTURE/ S.R. BALDON

CONSTRUCTION AND

SUPPLY

JV-17-1594 L B MA GE

Construction/ Improvement of Access

Road Leading to Declared Tourism

Destination - Donsol - Pillar - Castilla -

Sorsogon City (Don Picaso) Tourism

Highway (sorsogon city section)

Sorsogon City 11/7/2018 1stSorsogon 1st

DEOLF 47.38 270 01/03/2018 11/25/2018 1.77% OG 0.388 0.239 0.150 0.022 0.037 0.033 86.93% - AHD

529 437

STO. CRISTO

CONSTRUCTION &

TRADING

26096 L B MA GE

Rehabilitation/Improvement of Existing

Dike along Parua River (San Vicente

Section), Sta. 11+900 to Sta. 12+210.40,

Concepcion

Concepcion,

Tarlac11/13/2018 1st/Final Tarlac 2nd DEO LF 23.33 136 27/03/2018 8/9/2018 0.00% C 0.466 0.133 0.300 - - - 89.90%

89.90%

Very SatisfactoryONS

530

STO. CRISTO

CONSTRUCTION AND

TRADING

26096 L B MA GE

Rehabilitation/Construction of Slope

Protection at Cabatuhan River Phase I,

Sta. 0+520.80 to Sta. 0+760

Palangianan, Iba,

Zambales11/6/2018 1st/Final

Zambales 1st

DEOLF 37.6437831 210 02/05/2018 11/27/2018 49.52% C 0.489 0.133 0.300 - - - 92.20%

92.20%

Very SatisfactoryAHD

531

STO. CRISTO

CONSTRUCTION AND

TRADING

26096 L B MA GEConstruction of Sumangga Flood Control

Structure

Mogpog,

Marinduque11/15/2018 2nd/Final

Marinduque

DEOLF 17.69 242 16/02/2018 10/15/2018 0.00% C 0.464 0.174 0.300 - - - 93.80%

89.96%

Very SatisfactoryONS

532 438

STRONGLANE

CONSTRUCTION &

TRADING

32333 L B MA GEConstruction of Flood Control Structure

Along River, Barangay Poblacion Passi City, Iloilo 10/19/2018 1st/Final Iloilo 2nd DEO LF 29.40 195 14/02/2018 8/27/2018 0.00% C 0.410 0.199 0.300 - - - 90.90%

90.90%

Very SatisfactoryONS

533 439STRUKTURA TEKNIKA

SERVICES COMPANY16646 L A MA GE

Local Infrastructure Program -

Construction of Hugom - Malabrigo

(Hugom Section) Road, Hugom, San

Juan, Batangas

Hugom, San

Juan, Batangas11/6/2018 2nd/Final

Batangas 4th

DEOLF 29.7 300 7/10/2017 5/5/2018 0.00% C 0.500 0.200 0.000 - - - 70.00%

75.34%

UnsatisfactoryONS

534 440 STX ENTERPRISES 21547 L AAA LB GE

Rehabilitation/ Reconstruction /

Upgrading of Damaged Paved Roads

Calapan South Road K004+150 -

K005+415

Calapan City,

Oriental

Mindoro

11/10/2018 1st/FinalMindoro

Oriental DEOLF 28.29 210 18/04/2018 11/13/2018 3.35% C 0.393 0.200 0.300 - - - 89.30%

89.30%

Very SatisfactoryAHD

535 STX ENTERPRISES 21547 L AAA LB GE

Network Development - Off -

Carriageway Improvement - Secondary

Roads, Mindoro Oriental / Occidental

East Coastal Rd. - K0214+900 -

K0218+390 (S00094MR)

Magsaysay,

Occidental

Mindoro

11/6/2018 1st

Mindoro

Occidental

DEO

LF 74.02 288 05/03/2018 12/17/2018 -1.46% OG 0.353 0.238 0.135 0.030 0.045 0.033 83.40% - DEL

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 61 of 72

Page 62: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

536 441SUNSTONE

CONSTRUCTION11122 L B MA GE

Construction/Improvement of Access

Roads Leading to Trades, Industries and

Economic Zones Along Aleosan Barangay

Road from Upper Katalicanan

Connecting to Sitio Citrus New Leon in

Support of Rubber and Palm Oil

Industries

Aleosan, North

Cotabato11/10/2018 2nd/Final

Cotabato 2nd

DEOLF 38.95 162 3/15/2018 8/23/2018 3.00% C 0.488 0.134 0.300 - - - 92.20%

89.62%

Very SatisfactoryAHD

537 442

SUNSTONE

CONSTRUCTION/ J-ONE

BUILDERS (JOINT

VENTURE)

JV-17-1062 L B MA GE

Construction/Improvement of Access

Roads Leading to Trades, Industries and

Economic Zone along Aleosan Brgy.

Road From San Mateo - Sitio Taguan

Connecting to Pupoyon, Dualing, In

Support of Rubber, Palm Oil and Coconut

Inductries

Aleosan, North

Cotabato11/10/2018 2nd/Final

Cotabato 2nd

DEOLF 27.93 123 3/15/2018 7/15/2018 0.81% C 0.492 0.133 0.300 - - - 92.50%

90.46%

Very SatisfactoryAHD

538 443

SUNWEST

CONSTRUCTION AND

DEVELOPMENT

CORPORATION

15906 L AAA LB GE

Asphalt Overlay of Ligao - Tabaco

Junction San Antonio - Estancia -Malinao

Poblacion Road

Malinao, Albay 11/15/2018 1st/Final Albay 1st DEO LF 28.23 56 07/06/2018 8/1/2018 0.00% C 0.475 0.139 0.300 - - - 91.40%91.40%

Very SatisfactoryONS

539

SUNWEST

CONSTRUCTION AND

DEVELOPMENT

CORPORATION

15906 L AAA LB GE Construction of Maninila Flood ControlGuinobatan,

Albay11/5/2018 1st Albay 3rd DEO LF 92.56 180 20/06/2018 12/16/2018 2.00% OG 0.320 0.293 0.150 0.020 0.030 0.033 84.60% - AHD

540

SUNWEST

CONSTRUCTION AND

DEVELOPMENT

CORPORATION

15906 L AAA LB GE

Asset Preservation Program - Preventive

Maintenance - Secondary Roads -

Junction Putiao - Pillar - Donsol Road

K0556+700 - K0559+028

Pillar, Sorsogon 11/7/2018 1stSorsogon 1st

DEOLF 94.43 210 06/08/2018 3/3/2019 5.47% OG 0.392 0.237 0.150 0.020 0.037 0.033 86.90% - AHD

541 444

SUPREME ABF CONST. &

CONST. SUPPLY

COMPANY INC.

25226 L AAA LB GE

Rehabilitation of Concrete Road Jaime

Cardinal Sin Avenue- (S00335PN)

K0285+129-K0285+466, K0285+944-

K0285+950, K0286+027-K0286+040,

(S00481PN) K0288+210-K0288+636

Kalibo-New

Washington,

Aklan

11/7/2018 2nd Aklan DEO LF 18.62 166 28/03/2018 9/9/2018 -7.61% OG 0.350 0.294 0.074 0.030 0.055 0.033 83.60% - DEL

542

SUPREME ABF CONST. &

CONST. SUPPLY

COMPANY INC.

25226 L AAA MA GEConstruction of Flood Control Structure

Along Tabigue River (Upstream)

EB. Magalona,

Negros

Occidental

9/8/2018 2nd/Final

Negros

Occidental 1st

DEO

LF 18.62 150 12/04/2018 9/8/2018 0.00% C 0.480 0.133 0.300 - - - 91.30%89.50%

Very SatisfactoryONS

543

SUPREME ABF CONST. &

CONST. SUPPLY

COMPANY INC.

25226 L AAA LB GEConstruction/Improvement of Access

Road Leading to Kabankalan Airport

Kabankalan City,

Negros

Occidental

11/14/2018 1st

Negros

Occidental 3rd

DEO

LF 46.54 315 08/02/2018 12/19/2018 0.10% OG 0.356 0.238 0.150 0.030 0.050 0.033 85.70% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 62 of 72

Page 63: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

544

SUPREME ABF

CONSTRUCTION &

CONSTRUCTION SUPPLY

COMPANY INC.

25226 L AAA MA GE

Organization Outcome 2: Protect Lives

and Properties Againts Major Floods,

Flood Management Program,

Construction/Maintenance of Flood

Mitigation Structures and Drainage

Systems Reconstruction/Rehabilitation

of Bais River Control

Bais City, Negros

Oriental11/10/2018 1st

Negros

Oriental 2nd

DEO

LF 32.58 210 29/05/2018 12/24/2018 -26.18% OG 0.360 0.300 0.000 0.030 0.061 0.000 75.10% - DEL

545 445SYNDTITE CONSTRUCTION

CORPORATION11597 L AAA MA GE

Construction of Flood Control along

Tibyawan River (Upstream) at Brgy.

Poblacion

Tayasan, Negros

Negros Oriental11/9/2018 2nd/Final

Negros

Oriental 1st

DEO

LF 27.92 205 3/11/2018 10/1/2018 0.00% C 0.429 0.200 0.300 - - - 92.90%92.96%

Very SatisfactoryONS

546

SYNDTITE CONSTRUCTION

CORPORATION

(FORMERLY: R.C TAGALA

CONSTRUCTION)

11597 L AAA LA GE

Network Development - Road Widening -

Secondary Roads, Mindoro West Coastal

Rd. - K0244+022 - K0245+805,

K0249+106 - K0250+152 (S00095MR)

San Jose

Occidental

Mindoro

11/7/2018 1st

Mindoro

Occidental

DEO

LF 78.57 309 09/02/2018 12/14/2018 -4.48% OG 0.317 0.300 0.105 0.030 0.045 0.033 83.00% - DEL

547

SYNDTITE CONSTRUCTION

CORPORATION

(FORMERLY: R.C TAGALA

CONSTRUCTION)

11597 L AAA MB GE

Road Upgrading (Unpaved to Paved) of

Aramaywan -Berong-Puerto Princesa

Road, K0202+521 - K0205+825

Quezon, Palawa 11/9/2018 1stPalawan 2nd

DEOLF 93.57 303 09/05/2018 3/7/2019 19.50% OG 0.391 0.240 0.150 0.030 0.037 0.050 89.80% - AHD

548 446

TARLAC 3-G

CONSTRUCTION &

DEVELOPMENT/ BIG

BERTHA CONSTRUCTION

& DEV

JV-17-2694 L AA MA GE

Construction/Improvement of Access

Roads Leading to Declared Tourism

Destinations - Clark Green City to Mac

Arthur Acees Road Leading to Clark

Green City

Tarlac 11/13/2018 1st Tarlac 2nd DEO LF 93.06 229 04/06/2018 1/18/2019 2.65% OG 0.373 0.225 0.150 0.030 0.051 0.050 87.90% - AHD

549 447TEDDIE CONSTRUCTION

DEVELOPMENT, INC.6313 L A MB GE

Rehabilitation/Reconstruction/

Upgrading of Damaged Paved National

Road including Drainage A. K1959+597

to K1959+853 B. K1962+000 to

K1963+000 C. K1963+000 to K1963+271

D. K1963+297 to K1963+398 E.

K1964+135 to K1965+000 F. K1966+000

to K1967+000

Zamboanga City 11/15/2018 1st/FinalZamboanga

City DEOLF 46.42 392 8/1/2017 8/27/2018 0.51% C 0.315 0.200 0.200 - - - 81.50%

81.50%

UnsatisfactoryAHD

550 448TEDDIE CONSTRUCTION

DEVELOPMENT, INC.6313 L A MA GE

Completion of Reinforced Concrete

Pier/Wharf, DPWH Regional Office

Equipment Service

Panacan, Davao

City11/16/2018 2nd/Final

Regional Office

No. XILF 72.37 517 25/04/2017 9/23/2018 0.00% C 0.483 0.175 0.300 - - - 95.80%

90.22%

Very SatisfactoryONS

551 449 THREE G BUILDERS 43055 L B SB GBConstruction of Multi-Purpose Building

(Gym) Purok Dos Urban, Brgy. Sto. Nino

Koronadal City,

South Cotabato11/5/2018 2nd/Final

South

Cotabato 1st

DEO

LF 2.37 105 7/4/2018 10/16/2018 0.00% C 0.500 0.133 0.300 - - - 93.30%89.64%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 63 of 72

Page 64: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

552 450 THREE W BUILDERS, INC 10722 L AAA MB GEConstruction/ Deeping of Bulaw River,

Brgy. Muntindilaw

Antipolo City,

Rizal11/6/2018 1st Rizal 1st DEO LF 49.00 390 01/03/2018 3/25/2019 0.06% OG 0.380 0.240 0.150 0.022 0.047 0.033 87.20% - AHD

553 451

THREE W BUILDERS, INC. /

MGBJ RISING

CONSTRUCTION & LAND

DEVELOPER (JOINT

VENTURE)

JV-17-663 L AAA LB GE

Preventive Maintenance-Secondary

Roads, Makar-Kiamba Rd.- K1658+(-235)-

K1658+480, K1658+525-K1658+648,

K1658+678-K1660+259

General Santos

City, South

Cotabato

11/14/2018 1st/Final

South

Cotabato 2nd

DEO

LF 81.4 180 12/03/2018 9/7/2018 0.00% C 0.489 0.134 0.300 - - - 92.30%92.30%

Very SatisfactoryONS

554 452

THREE W BUILDERS, INC. /

SOLRAC SETPH BUILDERS

JOINT VENTURE

10722 L AAA LB GE

Road Concreting of Calinan-Baguio

National Road, (Baguio Proper Portion)

to Wines-Tamugan-Tambobong Road to

Magpet (North Cotabato)

3rd

Congressional

District, Davao

City

11/12/2018 1stDavao City 2nd

DEOLF 72.08 277 5/2/2018 2/2/2019 0.17% OG 0.358 0.250 0.150 0.030 0.061 0.050 89.90% - AHD

555 453

THREE W BUILDERS, INC./

AMPLEX BUILDERS &

CONSTRUCTION SUPPLY

(JOINT VENTURE)

JV-17-575 L AAA LB GE

Retrofitting/Strengthening of Permanent

Bridges Polanco Bridge (B00418MN)

along Dipolog-Polanco-Piñan-Jct.

Oroquieta Road

Zamboanga del

Norte11/8/2018 3rd/Final

Zamboanga del

Norte 3rd DEOLF 41.88 225 19/03/2018 10/29/2018 -40.07 C 0.493 0.134 0.300 - - - 92.70%

91.50%

Very SatisfactoryDEL

556 454

THREE-IN- ONE

CONSTRUCTION &

TRADING

14695 L B SB GBConstruction / Rehabilitation of Multi-

Purpose Building

Pandaras, City of

San Fernando,

Pampanga

11/12/2018 1st/FinalPampanga 1st

DEOLF 1.87505 60 25/06/2018 8/23/2018 0.00% C 0.498 0.134 0.300 - - - 93.20%

93.20%

Very SatisfactoryONS

557 455THUNDERBLAST

VENTURES33377 L B MA GE

Construction of Taboc Seawall and

Baywalk Pavement

Taboc, San Juan,

La Union11/5/2018 1st/Final

La Union 1st

DEOLF 9.74 175 26/02/2018 8/19/2018 0.00% C 0.496 0.133 0.300 - - - 92.90%

92.90%

Very SatisfactoryONS

558 456

TKS BUILDERS AND

SUPPLIES/ DIGOS

TESSTON CONSTRUCTION

& SUPPLIES JOINT

VENTURE

JV-17-1042 L B MA GEConstruction of Concrete Revetment

along Cebulan River

Sta. Cruz, Davao

del Sur12/16/2018 1st/Final

Davao del Sur

DEOLF 47.53 214 3/5/2018 10/4/2018 0.00% C 0.452 0.200 0.300 - - - 95.20%

95.20%

Very SatisfactoryONS

559 457TOKWING

CONSTRUCTION, CORP.9650 L AAA LB GE

Flood Management Program;

Construction/ Maintenance of Flood

Mitigation Structures and Drainage

System; Construction of Reinforced

Concrete Slope Protection with Steel

Sheet Piles Foundation alond Abacan

River, Barangay Sapalibutad

Angeles City,

Pampanga11/13/2018 1st/Final

Pampanga 3rd

DEOLF 48.29720383 210 09/03/2018 10/4/2018 0.00% C 0.447 0.200 0.300 - - - 94.70%

94.70%

Very SatisfactoryONS

560 458 TONKA CONSTRUCTION 4064 L B MA GE

Construction/ Maintenance of Flood

Mitigation Structures and Drainage

Systems - Rehabilitation/Improvement

of Dike with Slope Protection along

Porac River, Hacienda Dolores

Porac,

Pampanga 11/15/2018 1st/Final

Pampanga 2nd

DEOLF 27.63515122 150 22/05/2018 10/18/2018 0.00% C 0.467 0.133 0.300 - - - 90.00%

90.00%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 64 of 72

Page 65: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

561 459

TOREJA'S CONSTRUCTION

SUPPLY CORP. / E.M

CUERPO INC. JOINT

VENTURE

JV-16-1132 L AAA MA GE

MFO - 2 Flood Management Services,

Construction/ Maintenance of Flood

Mitigation Structures and Drainage

System, Construction/ Improvement of

Flood Control Structure along Lobo

Rivebanks , Tayuman

Lobo, Batangas

2nd LD11/8/2018 1st/Final

Batangas 2nd

DEOLF 77.2 390 30/03/2017 4/23/2018 0.00% C 0.467 0.133 0.300 - - - 90.00%

90.00%

Very SatisfactoryONS

562 460

TOREJA'S CONSTRUCTION

SUPPLY CORPORATION /

J.D. LEGASPI

CONSTRUCTION (JOINT

VENTURE)

JV-17-1241 L AAA LA GE

Rehabilitation / Major Repair of

Permanent Bridges Lobo Br. (Malabrigo

Br.) (B03073LZ) along Lobo - Malabrigo -

Sn Juan Rd.

Batangas

Province12/14/2018 1st/Final

Regional Office

No. IV-ALF 175.8462586 390 26/02/2018 3/22/2019 4.20% C 0.499 0.132 0.300 - - - 93.10%

93.10%

Very SatisfactoryAHD

563 461TRANS-AURORA

CONSTRUCTION11388 L A MA GE

Construction of Road Brgy. Dinadiawan,

Dipaculao, Aurora

Brgy.

Dinadiawan,

Dipaculao,

Aurora

11/10/2018 1st/Final Aurora DEO LF 19.80 169 4/11/2018 9/26/2018 0.00% C 0.472 0.134 0.300 - - - 90.60%90.60%

Very SatisfactoryONS

564 462TRIBU DESIGN &

CONSTRUCTION12756 L A MA GE

Retrofitting/Strengthening of Permanent

Bridges, Ini-In Bridge along Abbut-

Conner Road

conner, apayao 11/15/2018 1st/FinalApayao 1st

DEOLF 21.49 271 2/11/2018 11/8/2018 37.43% C 0.494 0.134 0.300 - - - 92.80%

92.80%

Very SatisfactoryAHD

565TRIBU DESIGN &

CONSTRUCTION12756 L A MA GE

Construction/Maintenance of Flood

Mitigation Structures and Drainage

System-Construction of Nabuangan

Flood Control

Barangay

Nabuangan,

Conner, Apayao

11/15/2018 1stApayao 1st

DEOLF 35.93 417 2/11/2018 4/3/2019 1.14% OG 0.378 0.229 0.150 0.030 0.070 0.033 89.00% - AHD

566 463TRI-EX TOWER COMPANY,

INC.33326 L AAA SB GB

Construction (Completion) of Multi

Purpose Building, Barangay Poblacion

Norte

Paracale,

Camarines Norte11/6/2018 1st/Final

Camarines

Norte DEOLF 0.97 60 27/03/2018 5/25/2018 0.00% C 0.474 0.134 0.300 - - - 90.80%

90.80%

Very SatisfactoryONS

567 464TRIPARCO DEVELOPMENT

CORPORATION23327 L A MA GE

Construction/Upgrading/Rehabilitation

of Drainage along Butuan City/Pianing-

Tandag Road – K1232+(-1016) – K1232+(-

716)

Butuan City 11/15/2018 2nd/FinalButuan City

DEOLF 9.8 206 3/21/2018 10/12/2018 1.16% C 0.492 0.133 0.300 - - - 92.50%

93.64%

Very SatisfactoryAHD

568 465T-SQUARE

CONSTRUCTION CORP.14268 L A MA GE

Construction/Upgrading/Rehabilitation

of Drainage along National Roads:

Marbel - Makar Rd. K1700+525 -

K1701+185, K1700+800 - K1701+237.24,

K1701+243.24 - K1701+264.35

South Cotabato 11/6/2018 2nd/Final

South

Cotabato 1st

DEO

LF 18.2 135 4/28/2018 9/9/2018 -1.46% C 0.496 0.133 0.256 - - - 88.50%89.67%

Very SatisfactoryDEL

569 466 UKC BUILDERS, INC. 10759 L AAA LB GE

Widening of Permanent Bridge, Initao

Bridge along Butuan City - Cagayan de

Oro City - Iligan City Road (Phase III)

Initao, Misamis

Oriental11/9/2018 2nd/Final

Misamis

Oriental 2nd

DEO

LF 21.46 196 12/02/2018 8/26/2018 0.00% C 0.450 0.166 0.300 - - - 91.60%91.60%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 65 of 72

Page 66: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

570 467

UNIMASTERS

CONGLOMERATION,

INCORPORATED

3390 L AAA LB GE

Network Development Program Road

Widening Tertiary Roads Bagahupi-

Babatngon-Sta. Cruz-Barugo-Carigara

Rd.-K0941+000-K0942+293, K0942+353-

K0942+614

Barugo and

Carigara, Leyte11/5/2018 1st/Final Leyte 2nd DEO LF 46.20 180 3/7/2018 9/2/2018 1.11% C 0.474 0.134 0.300 - - - 90.80%

90.80%

Very SatisfactoryAHD

571

UNIMASTERS

CONGLOMERATION,

INCORPORATED

3390 L AAA LB GE

Construction of By-Pass and Diversion

Roads, San Francisco (NRJ Hubang - Sta.

Ana - San Isidro) By-pass Road, Daang

Maharlika Alternate Route), Including

ROW and Bridge

San Francisco,

Agusan del Sur11/12/2018 1st

Regional Office

No. XIIILF 108.9 300 5/24/2018 3/19/2019 20.95% OG 0.394 0.241 0.150 0.030 0.060 0.050 92.50% - AHD

572 468UY CONDEV

CORPORATION12336 L AA LA GE

ORGANIZATIONAL OUTCOME 1: Ensure

Safe and Reliable National Road System,

Asset Preservation Program

Rehabilitation/ Reconstruction/

Upgrading of Damaged Paved Roads,

Sta. Catalina-Pamplona-Tanjay City,

K0034+000-K0035+000; K0038+172-

K0039+000, K0044+411-K-K0044+508,

K0047+271-K0047+360, K0052+000-

K0052+066, K0055+255-K0055+490,

K0059+637-K0060+137

Pamplona,

Negros Oriental11/10/2018 1st

Negros

Oriental 2nd

DEO

LF 68.12 268 10/05/2018 2/1/2019 9.74% OG 0.374 0.225 0.150 0.030 0.060 0.050 88.90% - AHD

573UY CONDEV

CORPORATION 12336 AA LA GE

Construction of Concrete Road-

Himamaylan City- Negros Oriental

Boundary- Tayasan Road

Negros

Occidental11/14/2018 1st

Regional Office

No. VILF 172.34 297 08/05/2018 2/28/2019 -1.84% OG 0.385 0.238 0.132 0.030 0.051 0.033 86.90% - DEL

574 469

V. BERNARDO

CONSTRUCTION AND

TRADING

34490 L D SB GE

Organizational Outcome 1: Ensure Safe

and Reliable National Road System -

Asset Preservation Program -

Construction / Upgrading /

Rehabilitation of Drainage Along

National Roads - Secondary Roads -

Manila East Road - K0039+700 -

K0040+162

Cardona, Rizal 11/11/2018 1st/Final Rizal 2nd DEO LF 9.35899196 158 13/02/2018 7/20/2018 0.00% C 0.488 0.134 0.300 - - - 92.20%92.20%

Very SatisfactoryONS

575 470V.R. PATRON BUILDERS &

DEVELOPERS CORP.13487 L AAA LA GE

Asset Preservation Program -Program -

Preventive Maintenance - Secondary

Roads along Ternate-Nasugbu Rd. -

K0084+500 - K0084+831, K0085+000 -

K0086+060, K0086+120 - K0086+390,

K0086+405 - K0088+100, K0088+554 -

K0090+000, K0091+683 - K0091+880,

K0092+685 - K0094+000, K0096+1152 -

K0096+1229

Nasugbu,

Batangas10/12/2018 1st/Final

Batangas 1st

DEO LF 95.66624 180 12/02/2018 8/10/2018 50.00% C 0.469 0.134 0.300 - - - 90.30%

90.30%

Very SatisfactoryAHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 66 of 72

Page 67: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

576V.R. PATRON BUILDERS &

DEVELOPERS CORP.13487 L AAA LA GE

MFO-3 Maintenance and Construction

Services of Other Infrastructures,

Construction/ Improvement of Access

Roads Leading to Declared Tourism

Destinations, Taal Lake Circumferential

Road along Municipalities of San Nicolas -

Sta. Teresita - Alitagtag, Batangas

San Nicolas and

Sta. Teresita,

Batangas

10/12/2018 1st/FinalBatangas 3rd

DEOLF 96.49818864 360 03/03/2017 2/25/2018 0.00% C 0.477 0.134 0.300 - - - 91.10%

91.10%

Very SatisfactoryONS

577 471VCH CONSTRUCTION AND

TRADING32050 L A MA GE

Widening of Permanent Bridges Bato

Bridge (B00238PW) along Puerto

Princesa North Road

Taytay, Palawan 11/10/2018 1stPalawan 1st

DEOLF 10.39 335 14/03/2018 2/11/2019 3.23% OG 0.370 0.300 0.150 0.020 0.056 0.033 92.90% - AHD

578 472VEN RAY CONSTRUCTION

CORPORATION18310 L AAA LB GE

Road Widening along Jct. Manolo Fortich-

Libona-Indahag Road, K1454+070 to

K1457+508

Manolo fortich,

Bukidnon11/10/2018 1st/Final

Bukidnon 3rd

DEOLF 91.57 228 28/02/2018 10/13/2018 0.88% C 0.484 0.139 0.300 - - - 92.30%

92.30%

Very SatisfactoryAHD

579VEN RAY CONSTRUCTION

CORPORATION18310 L AAA LA GE

Cluster "52" Rehabilitation /

Reconstruction / Upgrading of Damaged

Road in Misamis Oriental: 1) Butuan City -

Cagayan de Oro City- Iligan City Road,

K1305+535-K1399+318.65;2) Butuan City-

Cagayan de Oro City- Iligan City Road,

K1342+000- K1378+300, both at

intermittent sections.

Misamis Oriental 11/14/2018 1stRegional Office

No. XLF 230.19 388 12/07/2018 8/3/2019 25.05% OG 0.390 0.240 0.150 0.030 0.060 0.050 92.00% - AHD

580VENRAY CONSTRUCTION

CORPORATION18310 L AAA LA GE

Construction/Improvement of Access

Roads Leading to Trades, Industries and

Economic Zome - Tinago-Biking Road in

Support of the Agribusiness Industry

Dauis, Bohol 11/6/2018 1st Bohol 1st DEO LF 43.53 263 4/2/2018 12/20/2018 8.57% OG 0.380 0.228 0.150 0.030 0.061 0.050 89.90% - AHD

581 473VERZONTAL BUILDERS,

INC. 31579 L AAA MA GE

Construction of Flood Control Structures

along Sta. Teresita River, River

Downstream of Sorsogon Bridge

Brgy. Sta.

Teresita, Bulan

Sorsogon (Sta.

0+10 - Sta.

0+750, both

sides)

11/8/2018 1stSorsogon 2nd

DEOLF 23.64 227 02/08/2018 3/16/2019 49.94% OG 0.385 0.241 0.150 0.020 0.030 0.033 85.90% - AHD

582

VERZONTAL BUILDERS,

INC. (FORMERLY:

VERZONTAL BUILD)

31579 L AAA MA GE

Rehabilittation/ Reconstruction of

National Roads with Slips, Slope Collapse

and Landslide - Tertiary Roads, San

Fernando - Talisay Road

San Fernando,

Masbate11/12/2018 2nd/Final

Masbate 3rd

DEOLF 46.50 270 01/03/2018 11/25/2018 32.96% C 0.478 0.144 0.300 - - - 92.20%

88.40%

SatisfactoryAHD

583 474VICENTE T. LAO

CONSTRUCTION7040 L AAA LB GE

Construction of Concrete Road- NRJ

Leading to Morias Falls

Barangay

Miatan,

Katipunan,

Zamboanga del

Norte

11/7/2018 1stZamboanga del

Norte 1st DEOLF 82.47 295 4/23/2018 2/11/2019 1.26% OG 0.363 0.300 0.150 0.024 0.042 0.050 92.90% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 67 of 72

Page 68: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

584 475 VICMAR CONSTRUCTION 28997 L AAA MB GE

Network Development Program - Road

Widening - Secondary Roads along

Balayan - Balibago Road - K0106+ -166 -

K0107+008.4, K0107+081 - K0107+683 -

K0108+740, K0109+000, K0111+037 -

K0111+401.3

Batangas

Province11/7/2018 1st

Batangas 1st

DEOLF 96.5 300 25/02/2018 12/21/2018 0.48% OG 0.391 0.240 0.150 0.030 0.061 0.033 90.50% - AHD

585VICMAR CONSTRUCTION,

INC.28997 L AAA MB GE

Organizational Outcome 1: Ensure Safe

and Reliable National Road System,

Asset Preservation Rehabilitation /

Reconstruction of Roads w/ Slips, Slope

Collapse and Landslide, Secondary

Roads, Batangas - Tabangao - Lobo Rd.

K0128+252 - K0128+384, K0137+400 -

K0137+510

Pagkilatan and

Dela Paz,

Batangas

11/8/2018 1st/FinalBatangas 2nd

DEOLF 52.10991464 312 10/04/2018 2/15/2019 46.96% C 0.500 0.133 0.300 - - - 93.30%

93.30%

Very SatisfactoryAHD

586 476

VICTORIA DEVELOPMENT

AND CONSTRUCTION

SUPPLY CORP.

32638 L A MB GE

Construction/Improvement of Access

Roads Leading to Declared Tourism

Destinations/Ma. Clara-Cagnituan Road

Leading to Maasin Tourism Loop (Monte

Cueva, Danao Camp Tree Park, St.

Francis Javier Shrine, Maasin City Zoo

Theme) Brgy. Rizal, (Const. of Concrete

Road)

Maasin City,

Southern Leyte11/12/2018 1st

Southern Leyte

DEOLF 27.44 315 2/1/2018 12/12/2018 0.00% OG 0.395 0.240 0.150 0.030 0.056 0.033 90.40% - ONS

587 477

VICTORIA DEVELOPMENT

AND CONSTRUCTION

SUPPLY CORP./ EC

SOLICON BUILDERS &

SUPPLY, INC. JOINT

VENTURE

JV-17-1049 L A MB GE

Construction/Improvement of NRJ

Rancho Centro Nagpan - Sitio

Kalonbarak Road Leading to Kalonbarak

Skyline

Barangay

Poblacion,

Malungon,

Sarangani

Province

11/13/2018 1st Sarangani DEO LF 34.27 268 2/25/2018 11/19/2018 -1.90% OG 0.395 0.300 0.131 0.024 0.048 0.033 93.10% - DEL

588 478VIEWPOINT

CONSTRUCTION & SUPPLY31546 L D SB GE

Concreting of National Highway Junction

Brgy. Tibuloy FMR, Brgy. Tibuloy

Toril District,

Davao City11/12/2018 1st/Final

Davao City 2nd

DEOLF 9.63 104 7/12/2018 10/23/2018 0.00% C 0.470 0.179 0.300 - - - 94.90%

94.90%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 68 of 72

Page 69: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

589 479VIGUZ CONSTRUCTION

CORPORATION8178 L A MA GE

Asset Preservation Program Preventive

Maintenance Tertiary Roads, Jaro-

Dagami-Burauen-La Paz Road,

K0942+110.00-K0942+462.00,

K0946+650.00-K0947+192.00,

K0947+192.00-K0947+640.20,

K0955+579.10-K0955+652.60,

K0956+020.00-K0957+000.00,

K0957+150.00-K957+500, K0958+841.00-

K0959+050, K0969+800-K0969+900,

K0971+000.00-K0972+481.00,

K0974+819.00-K0975+363.00

Jaro-Dagami-

Burauen-La Paz,

Leyte

11/5/2018 1st/Final Leyte 2nd DEO LF 43.98 116 4/19/2018 8/12/2018 1.72% C 0.469 0.133 0.300 - - - 90.20%90.20%

Very SatisfactoryAHD

590 480 VIRGO CONSTRUCTION 31068 L D SB GB

Construction of Three (3) Storey Regular

Workshop, ICT and Science Laboratory

School Building,Tambo National High

School

Tambo,Buhi

Camarines Sur11/12/2018 1st

Camarines Sur

4th DEOLF 14.43 150 14/08/2018 1/10/2019 0.63% OG 0.348 0.239 0.150 0.030 0.059 0.033 85.90% - AHD

591 481VULCAN DEVELOPMENT

CONSTRUCTION19080 L B MB GE

Reabilitation/ Reconstruction of

National Roads with Slips, Slope Collapse

and Landslide - Secondary Roads, San

Fernando North Road

San Fernando,

Masbate11/12/2018 1st/Final

Masbate 3rd

DEOLF 18.82 100 05/06/2018 9/12/2018 9.00% C 0.484 0.133 0.300 - - - 91.70%

91.70%

Very SatisfactoryAHD

592 482VYNE CONSTRUCTION

AND SUPPLY37601 L C SA GE

Local Roads and Bridges- Local Roads-

Local Infrastructure Program: Road

Concreting including Drainage Facilities

Barangay

Baluno,

Zamboanga City

11/16/2018 1st/FinalZamboanga

City DEOLF 4.23 97 04/04/2018 7/9/2018 7.22% C 0.483 0.133 0.300 - - - 91.60%

91.60%

Very SatisfactoryAHD

593 483W.J.P. CONSTRUCTION

AND SUPPLY23192 L B MA GE

Construction/Upgrading of Cabalaongan-

Zone I Road

Rosales,

Pangasinan11/13/2018 1st

Pangasinan 3rd

DEOLF 27.93 312 03/04/2018 2/8/2019 19.64% OG 0.400 0.240 0.150 0.030 0.061 0.033 91.40% - AHD

594 484WAYCON BUILDERS &

CONSTRUCTION SUPPLY34778 L A MA GE

Construction of Seawall and Breakwater

along Perimeter of BPAHS, Barangay Sta.

Rosa

Mulanay,

Quezon 11/12/2018 1st/Final

Quezon 3rd

DEOLF 39.63 270 09/02/2018 11/5/2018 9.82% C 0.458 0.200 0.300 - - - 95.80%

95.80%

Very SatisfactoryAHD

595 485 WBX CONSTRUCTION, INC 28370 L A SB GE

Construction/Rehabilitation of Flood

Control Structure along Bakagtas River

at Dalig Section

Balagtas,

Bulacan11/6/2018 1st/Final

Bulacan 1st

DEOLF 18.61 147 14/03/2018 8/7/2018 0.00% C 0.472 0.133 0.300 - - - 90.50%

90.50%

Very SatisfactoryONS

596 486WELEX CONSTRUCTION

INCORPORATED9323 L AAA LB GE

Rehabilitation/ Construction of Tabunan

Protection Wall

Matnog,

Sorsogon11/8/2018 1st

Sorsogon 2nd

DEOLF 26.59 411 30/07/2018 9/13/2019 25.87% OG 0.398 0.232 0.150 0.020 0.033 0.033 86.60% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 69 of 72

Page 70: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

597 487

WIZARD CONCRETE

SOLUTIONS AND

CONSTRUCTION

CORPORATION

21921 L A MA GE

Asset Preservation - Preventive

Maintenance Secondary Road, San Jose

City - Rizal Road, via Pinili - Purais Villa

Joson (Palarilla Rd) K0160+(-141) to

K0160+100 to K0176+606 to K0176+841

(Intermittent Sections)

Nueva Ecija 11/12/2018 2nd/FinalNueva Ecija 1st

DEOLF 40.82 140 10/05/2018 9/26/2018 0.00% C 0.486 0.134 0.300 - - - 92.00%

92.30%

Very SatisfactoryONS

598 488

WRC CONSTRUCTION

AND GENERAL

MERCHANDISE

42440 L C GB

Local Infrastructure Program -

Construction of Rainwater Collection

System (RWCS) Alfonso, Magallanes,

Naic, Tagaytay City and Ternate

Province of

Cavite11/15/2018 1st/Final

Cavite 2nd

DEOLF 2.79591605 120 28/05/2018 9/24/2018 0.00% C 0.485 0.134 0.300 - - - 91.90%

91.90%

Very SatisfactoryONS

599 489

WTG CONSTRUCTION

AND DEVELOPMENT

CORPORATION

7494 L AAA LB GE

Convergence and Special Support

Program, Construction/Improvement of

Access Roads Leading to Seaports,

Siquijor-San Antonio-Campalanas Road

Leading to Roro Port

Siquijor, Siquijor 11/7/2018 1st Siquijor DEO LF 50.57 224 13/04/2018 11/22/2018 -2.63% OG 0.383 0.300 0.124 0.030 0.061 0.033 93.10% - DEL

600 490

WTG CONSTRUCTION

AND DEVELOPMENT

CORPORATION / ROVILLA

CONSTRUCTION (JOINT

VENTURE)

JV-17-2218 L AAA LB GE

Off-Carriageway Improvement-Bogo-

Curva-Medellin-Daanbantayan-Maya Rd-

K0109+000-K0112+400

Medellin, Cebu 11/14/2018 1st Cebu 1st DEO LF 76.05 239 4/13/2018 12/7/2018 0.00% OG 0.390 0.220 0.150 0.030 0.061 0.050 90.10% - ONS

601 491

WTG CONSTRUCTION

AND DEVELOPMENT

CORPORATION

7494 L AAA LA GE

Rehabilitation/Improvement of Flood

Control Wall along Bangon River, Palo

Section, Sta. 04+032 - Sta 04+571

Palo, Leyte 11/15/2018 1st/Final Leyte 1st DEO LF 40.96 165 2/2/2018 7/16/2018 0.00% C 0.470 0.134 0.300 - - - 90.40%90.40%

Very SatisfactoryONS

602 492 XY BUILDERS 37726 L D SB GB

Construction of Multi-Perpose Building

(Municipal Gymnasium) at Barangay

Poblacion

Kadingilan,

Bukidnon11/12/2018 1st

Bukidnon 2nd

DEOLF 4.7 201 05/07/2018 1/21/2019 5.01% OG 0.385 0.255 0.150 0.030 0.047 0.050 91.70% - AHD

603 493 Y S CONSTRUCTION 11928 L A MB GE

Rehabilitation/Reconstruction/Upgradin

g of Damaged Paved Roads-Jct. (TNR)

Cortes-Balilihan-Catigbian-Macaas Road,

K0034+200-K0035+000, K0039+493-

K0041+679

Catigbian, Bohol 11/6/2018 1st Bohol 1st DEO LF 78.78 303 4/27/2018 2/23/2019 11.46% OG 0.388 0.221 0.150 0.030 0.060 0.050 89.90% - AHD

604 Y S CONSTRUCTION 11928 L A MA GBConstruction of DPWH Bohol 2nd DEO

Building

Bood, Ubay,

Bohol11/7/2018 1st Bohol 2nd DEO LF 34.93 270 2/19/2018 11/15/2018 0.00% OG 0.384 0.299 0.150 0.030 0.050 0.050 96.30% - ONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 70 of 72

Page 71: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

605 494Y S CONSTRUCTION / SLP

CONSTRUCTIONJV-17-2203 L A MB GE

Construction/Improvement of Access

Roads leading to Declared Tourism

Destinations - Catigbian-Canmano Road

(Catigbian Section) leading to Sagbayan

Peak, Chocolate Hills and Danao

Adventure Park

Catigbian, Bohol 11/6/2018 1st Bohol 1st DEO LF 46.96 230 5/25/2018 1/9/2019 1.31% OG 0.376 0.240 0.150 0.030 0.061 0.050 90.70% - AHD

606 495 YAKAL CONSTRUCTION 9685 L AAA LA GE

Construction/Improvement of Access

Road Leading to Trades, Industries

Zones, NRJ Villa Consuelo Connecting to

Libtong Road in Support of the Food and

Resources-Based Processing

Naval, Province

of Biliran11/7/2018 1st/Final Biliran DEO LF 27.80 180 2/15/2018 8/13/2018 0.00% C 0.435 0.146 0.300 - - - 88.10%

88.10%

SatisfactoryONS

607 496

YAP MABUHAY

ENTERPRISES

INCORPORATED

15540 L B SB GE

Construction/Rehabilitation of Flood

Control Mitigation Facilities along

Principal River (Buayan River)

Alabel,

Sarangani

Province

11/13/2018 1st/Final Sarangani DEO LF 9.76 240 2/25/2018 10/22/2018 0.41% C 0.458 0.133 0.300 - - - 89.10%89.10%

Very SatisfactoryAHD

608 497 YOYEN ENTERPRISES 15541 L A MA GE

Construction/Extension of Flood Control

Structure along Anas River (Phase 3)

Protecting Anas Bridge and Biliran

Circumferential Road, Naval, Upstream

Rightside (11.5733, 124.4034), Upstream

Leftside (11.5572, 124,4027)

Naval, Province

of Biliran11/6/2018 1st/Final Biliran DEO LF 27.73 150 2/18/2018 7/17/2018 1.57% C 0.465 0.142 0.300 - - - 90.70%

90.70%

Very SatisfactoryAHD

609 YOYEN ENTERPRISES 15541 L A MA GE

Construction/Extension of Flood

Constrol Structures along Amambahag

River (Phase 3) Protecting Amambahag

Bridge and Biliran Circumferential Road,

Upstream (11.6656, 124.5243);

Downstream (11.6645, 124.5199)

Culaba, Province

of Biliran11/7/2018 1st/Final Biliran DEO LF 2.78 180 18/02/2018 8/16/2018 0.00% C 0.455 0.141 0.300 - - - 89.60%

89.60%

Very SatisfactoryONS

610 498YURICH BUILDERS AND

CONSTRUCTION SUPPLY37064 L B MA GE

Construction of Concrete Road - Little

Caramay - TDC - Pagdanan leading to

Proposed Port, Sta. 00+000 - Sta. 1+210

San Vicente,

Palawan11/11/2018 2nd

Palawan 1st

DEOLF 74.65 195 6/11/2018 12/22/2018 -2.61% OG 0.363 0.300 0.124 0.022 0.051 0.033 89.30% - DEL

611 499 ZEDIK BUILDERS 33330 L A MA GE

Widening of Permanent Bridges,

Tamucalao Bridge 2 (B00525LZ), along

Manila North Road

Bacarra, Ilocos

Norte11/7/2018 1st

Ilocos Norte

1st DEOLF 30.82 295 02/05/2018 2/20/2019 45.79% OG 0.360 0.239 0.150 0.030 0.035 0.033 84.70% - AHD

612 500 ZMS CONST. & DEV CORP. 10471 L AA LA GERoad Widening Tukuran Jct. Karomatan

Jct. Road, K1651+456 to K1653+207

Tukuran,

Zamboanga del

Sur

11/10/2018 2nd/FinalZamboanga del

Sur 1st DEOLF 46.7 120 19/06/2018 10/16/2018 0.00% C 0.478 0.133 0.300 - - - 91.10%

89.60%

Very SatisfactoryONS

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 71 of 72

Page 72: DPWH CONSTRUCTORS' PERFORMANCE SUMMARY ......Barangays Patag and Bagumbayan Libmanan,Camar ines Sur 11/8/2018 1st/Final Camarines Sur 1st DEO LF 4.70 100 01/03/2018 6/8/2018 0.00%

PCAB ARC TYPE NAME LOCATIONAMOUNT

(Php, M)

DUR

(C.D)STARTED COMP

REMARKSTIME ESH RDRCPES VISIT

RATING

FINAL RATING/

QUALITATIVE

DESCRIPTION

DATESLIPPAG

E (%)STATUS WMS MTL

DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS)

4th Quarter CY 2018

No. of

Project

No. of

Contract

or

NAME OF

CONSTRUCTOR

LICENSE

NO.L/F

CATEGORY PROJECT

FAC DATE OF

EVALUATION

NO. OF

VISIT

*IMPL.

AGENCY

FUNDING

SOURCE

CONTRACT

613ZMS CONSTRUCTION &

DEVELOPMENT CORP.10471 L AA MA GE

Network Development: Road Widening,

Primary Roads: Dumaguete South Road

including ROW-K0040+934-K0043+000

(K0041+775-K0043+000), K0044+655-

K0045+960

Siaton, Negros

Oriental11/10/2018 1st

Negros

Oriental 3rd

DEO

LF 96.28 328 04/03/2018 1/25/2019 0.63% OG 0.383 0.241 0.150 0.030 0.045 0.033 88.20% - AHD

Consolidated in CY 2019

CPES Reports in 4th Quarter 2018 Page 72 of 72