Draft Final Annex to the GCVTC Report
September 25, 2000
Outline of Presentation
Contents of Annex Resolution of Outstanding Issues Ongoing work
The Annex
Description of Milestones and Trading Program– Executive Summary– Description of Decisions – Annex Recommendations– Model Rule (Attachment A)– Memorandums of Understanding (Attachments
B & C)
The Annex
Supporting Documentation– Greater Reasonable Progress than BART
demonstration (Attachment D)– List of BART Eligible Sources (Attachment E)– Distribution of Allocations by Industrial Sector
and State (Attachment F)– Reallocation of Tribal Set-Aside (Attachment G)– Other support documents (Attachment H)
The Annex
Other Supporting Documentation - numerous documents– Emissions Data Refinement– Economic Impact Study– Visibility Analysis– Others ...
Resolution of Outstanding Issues
Milestones– The Numbers– The Mohave Error– Compliance and Averaging– CEMS Bias
Allocations– New Source Set-aside– Individual Source Allocations
Opt-in/Opt-out - distribution of set-asides
Resolution of Outstanding Issues
Viability of the Market Audit and Reconciliation Greater Reasonable Progress than BART
Milestones - Principles
Achieve Steady Continuing Emissions Reductions
Provide Flexibility to Sources “Up-Front” for Greater “Back-End” Reductions
Policy driven Informed by best available information
2018 Milestone - Revised Basis
Baseline emissions projection 622,000 tons– Known reductions– Assumed retirements & tech. changes– New source & utility growth– Operational adjustments
Estimated BART reductions -168,000 Utility CEM adjustment - 10,000 Uncertainty/Headroom + 35,000 Total (rounded to nearest 5,000) 480,000 Smelter Set-aside + 30,000 2018 Milestone 510,000
SO2 Milestones
831
723 720 715
655
510
480
682677
625
0
100
200
300
400
500
600
700
800
900
1990 2000 2010 2020 2030 2040
GC
VT
C R
egio
n T
otal
Ann
ual S
O2
of T
ons
(000
)
w/ Smelter Set-aside w/o Smelters
13% Reduction
52% Reduction
Compliance with Milestones(hypothetical case)
500
550
600
650
700
750
2003 2005 2007 2009 2011 2013 2015 2017 2019
GC
VT
C R
egio
nwid
e A
nnua
l SO
2 T
ons
(000
)
Compliance with Milestones - 2003 thru 2006
500
550
600
650
700
750
2003 2005 2007 2009 2011 2013 2015 2017 2019
GC
VT
C R
egio
nwid
e A
nnua
l SO
2 T
ons
(000
)
Compliance with Milestones - 2003 thru 2006The Mohave Problem Solved
650
675
700
725
750
775
2003 2004 2005 2006
GC
VT
C R
egio
nwid
e A
nnua
l SO
2 T
ons
(000
)
w/o Mohave Post-control Mohave Pre-control Mohave
MilestoneCommitted Emissions Reductions
Compliance with Milestones - 2003 thru 2006The Mohave Problem Solved
650
675
700
725
750
775
2003 2004 2005 2006
GC
VT
C R
egio
nwid
e A
nnua
l SO
2 T
ons
(000
)
w/o Mohave Post-control Mohave
Milestone
Compliance with Milestones(hypothetical case)
500
550
600
650
700
750
2003 2005 2007 2009 2011 2013 2015 2017 2019
GC
VT
C R
egio
nwid
e A
nnua
l SO
2 T
ons
(000
)
Milestone Emissions 3yr Avg. Emissions
2013 Avg.Milestone
2014 Avg.Milestone
2 yr average
1 yr Check
1 yr Check
CEMS Bias
Blanket adjustment of milestones would be spurious
Protocol to be developed that will revise milestones based upon documented impact of new technology and revised procedures on a source-by-source basis.
Adjustment of milestones may require SIP revisions
Allocations
New Source Set-aside– Estimated 27,000 tons of growth 2003-2018– 9,000 tons per five year period– Available on first-come first-served basis– Unused tons would roll-over to next period– New sources needing to buy credits would be
first in line for next five year period
Allocations
Individual Source Allocations– Actual allocations not necessary - need to
submit allocation method– Estimates prepared - See Appendix F– Final determination of individual source floors
for non-utilities needed
Opt-in/Opt-out
Existing source allocations Distribution of set-asides
– New source growth based on projections developed by ICF and Pechan-Avanti on a state-by-state geographic area basis
– Tribal allocation (See Appendix G)
Penalties for Exceeding Allowances
$5,000/ton, CPI adjusted from 2000 base year
Mitigation - 2 ton credit reduction in allocation for each ton over-emitted
Better Reasonable Progress Than BART
Provides both remedy for existing and prevention of future impairment.
More sources and total tonnage covered. New source growth capped for the region. Mass-based cap on actual emissions. Greater total tonnage reduction. Regional haze visibility improvement not
distinguishable from application of BART.
Other Issues
Audit and Reconciliation– Working with EPA to include in program
Viability of Market– Majority of reductions in Colorado, Wyoming
& Arizona– Hire contractor to evaluate
Continuing Work
Allocations Polished Annex for submittal October 2 Draft Revisions to §51.309 Final resolution of outstanding EPA issues