25
Municipal Governance and Services Project (MGSP) Sl No . Contract Package Number Contract description Unit Estimated Cost (in million Taka) OR Actual Contract Price with Contract Currency) Procedure / Method Procuremen t Guideline (PPA/BG) Prior Review* * (Yes/No) Planned date of bid opening (Actual date of bid opening) Planed date of Contract Signing (Actual date of Contract Signing) Planed date of Completion (Actual date of Completion) Name of Contractor Progress of Procuremen t as of ............... Remarks 1 2 4 6 7 8 9 10 11 12 13 14 15 1 MGSP/NCC/W-01 Construction of road & embankment protection along the river Shitalakhya starting from Bandar 01 no Kheya Ghat upto Tribini khal with necessary beautification km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015 2 MGSP/NCC/W-02 Improvement of Mobarak Shah road and road side drain with footpath km 0.950 1 74.44 NCB BG No 28-03-2014 30-05-2014 30-04-2015 3 MGSP/NCC/W-03 (a). Improvement of Jallerpar road and road side drain with footpath starting from Jimkhana bridge to Joy Gobidha School via Paikpara bridge. km 0.575 1 37.94 NCB BG No 25-04-2014 27-06-2014 27-05-2015 (b). Improvement of Shah Suja road starting from Foodland Bakery to Choto Kabarstan with Nayapara link road and Bhuyanpara link road. km 1.045 4 MGSP/NCC/W-04 (a). Construction of drain starting from 2 no.Rail Gate to ex BKMEA president Mr.Fazlul Haque's house via Golachipa Sugandha Bakery. km 0.685 1 31.50 NCB BG No 25-05-2014 27-07-2014 27-06-2015 (b). Construction of footpath cum drain by the side of Khalghat road. km 0.270 5 MGSP/NCC/W-05 Rehabilitation work of T-hossain road starting from Nobiganj ghat to Modonganj -Modonpur road by RCC road, drain and electrification work in word no. 24 under Narayanganj CC (ch. 2013-2014) km 0.760 1 73.10 NCB BG Yes 25-06-2014 27-08-2014 27-07-2015 (Works) DRAFT PROCUREMENT PLAN Quantity/ Number 5 3 H/Report/Procurement Plan for 18 months Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Embed Size (px)

Citation preview

Page 1: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Municipal Governance and Services Project (MGSP)

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

1 MGSP/NCC/W-01 Construction of road & embankment

protection along the river Shitalakhya

starting from Bandar 01 no Kheya Ghat

upto Tribini khal with necessary

beautification

km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015

2 MGSP/NCC/W-02 Improvement of Mobarak Shah road

and road side drain with footpath

km 0.950 1 74.44 NCB BG No 28-03-2014 30-05-2014 30-04-2015

3 MGSP/NCC/W-03 (a). Improvement of Jallerpar road and road

side drain with footpath starting from

Jimkhana bridge to Joy Gobidha School

via Paikpara bridge.

km 0.575 1 37.94 NCB BG No 25-04-2014 27-06-2014 27-05-2015

(b). Improvement of Shah Suja road

starting from Foodland Bakery to

Choto Kabarstan with Nayapara link

road and Bhuyanpara link road.

km 1.045

4 MGSP/NCC/W-04 (a). Construction of drain starting from 2

no.Rail Gate to ex BKMEA president

Mr.Fazlul Haque's house via Golachipa

Sugandha Bakery.

km 0.685 1 31.50 NCB BG No 25-05-2014 27-07-2014 27-06-2015

(b). Construction of footpath cum drain by

the side of Khalghat road.

km 0.270

5 MGSP/NCC/W-05 Rehabilitation work of T-hossain road

starting from Nobiganj ghat to

Modonganj -Modonpur road by RCC

road, drain and electrification work in

word no. 24 under Narayanganj CC (ch.

2013-2014)

km 0.760 1 73.10 NCB BG Yes 25-06-2014 27-08-2014 27-07-2015

(Works)

DRAFT PROCUREMENT PLAN

Quantity/

Number

53

H/Report/Procurement Plan for 18 months

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

Sub-total of Narayanganj km 4.525 5 263.88

5 MGSP/TAN/W-01 Rehabilitation road from R&H Victoria

road to Baray R&H Road via Adi

Tangail Textile mill to Mirarbetka

LGED road.

km 3.615 1 33.30 NCB BG No 28-03-2014 30-05-2014 30-04-2015

6 MGSP/TAN/W-02 (a). Improvement road from Alowa Amtola

to Sontosh Bayan para bridge.

km 1.090 1 43.80 NCB BG No 28-04-2014 30-06-2014 30-05-2015

(b). Improvement Bazitpur Thakurbari road. km 0.350

.(c). Rehabilitation road from Gala Verchand

road H/O Joaher Ali to Dharerbari road.

km 1.340

(d). Improvement road starting Hazraghat

morh to Bailla Madrasa moar.

km 1.500

(e). Improvement Sakrail Saruti road from

Omarpur road to Sakrail Bazar.

km 1.710

(f). Rehabilitation of road starting from

Central Graveyard R & H road to

Putiajani Bazar R&H road via

Sajujbag.

km 6.220

(g). Rehabilitation of  of  Stand road

starting from Babystand R&H road to

Bottola Bazar.

km 2.100

7 MGSP/TAN/W-03 Construction of  Bypass Road Leading

from Kagmari Bridge upto Tangail Zilla

porisad.

km 4.000 1 57.10 NCB BG No 25-05-2014 27-06-2014 27-05-2015

Sub-total of Tangail km 21.925 3 134.20

H/Report/Procurement Plan for 18 months

Page 3: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

8 MGSP/ELN/W-01 (a). Improvement road with side drain and

culverts from R&H National Highway

to Baganbari super market.

km 3.030 1 57.70 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015

(b). Improvement road with roadside drain,

bridge from R&H National Highway

and Vabla play ground.

km 2.880

Sub-total of Elenga km 5.910 1 57.70

9 MGSP/MAD/W-01 (a). Improvement of Madaripur Main road

from police line moar RHD road to

Puran bazaar Muchi bari More(Ch.00-

1+360m)

km 1.360 1 46.78 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015

(b). Construction of RCC Drain on Left

Side Madaripur Main Road Stating

From Police Line More(RHD Road) to

Puran Bazar Muchi Bari More (Ch o.oo

to 1+360 m)

km 1.360

.(c). Construction of Brick Drain on Right

Side Madaripur Main Road Stating

From Police Line More(RHD Road) to

Puran Bazar Muchi Bari More (Ch o.oo

to 1+360 m)

km 1.360

(d). Construction Footpatht Both Side

Madaripur Main Road Stating From

Police Line More(RHD Road) to Puran

Bazar Muchi Bari More (Ch o.oo to

1+360 m

km 1.360

10 MGSP/MAD/W-02 (a). Construction of RCC Road at

Shahid Bachu Sarak Starting from

Kazir More to Howlader Godi. (Ch.

1230.00-1572.00m)

km 0.342 1 29.87 NCB BG No 28-02-2014 30-04-2014 30-03-2015

H/Report/Procurement Plan for 18 months

Page 4: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

(b). Construction of Amin Uddin

Howlader Sarak RCC Road With

Brick Massonary Drain. (Ch. 0.00-

430.00m)

km 0.430

(c) Construction of RCC Road at

Hamid Sikder Sarak Starting from

RHD Road to Hamid Akondo Sarak.

(Ch. 0.00-440.00m)

km 0.440

(d). Construction of Shahid Surjo Sarak

RCC Road With Brick Massonary

Drain. (Part-1: 330.00m & Part-2:

103.00m)

km 0.433

11 MGSP/MAD/W-03 (a). Construction of RCC Road at

Shahid Harun Sarak Starting from

Madaripur Main Road to Dorgha

Sharif Road. (Ch. 0.00-365.00m)

km 0.365 1 19.28 NCB BG No 25-03-2014 27-05-2014 27-04-2015

(b). Construction of RCC Road Starting

from Shahid Bachu Sarak to

Stadium road. (Ch. 0.00-205.00m)

km 0.205

(c) Construction of Jotish Dey Sarak

RCC Road With Brick Massonary

Drain. (Ch. 0.00-192.00m)

km 0.192

H/Report/Procurement Plan for 18 months

Page 5: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

(d). Rehabilitation of Charmuguria

Abu Munsi Goli & Nasimnagor

Graveyard road Starting from

Kumar riaver to Charmuguria

Hazrapur main road.(Ch0.00m

to 1030.00m)

km 1.030

(e). Improvement of the Pakdi

Peshker Bari road starting from

Charmuguria Puraton road to

Beri badh (Ch0.00m to

280.00m)

km 0.280

(f). Rehabiltation of Sultan

Howlader Bituminous

Carpetting road starting from

RHD main road to end of Pouro

area.(Ch0.00m to 425.00m)

km 0.425

Sub-total of Madaripur km 9.582 3 95.93

12 MGSP/SHA/W-01 (a). Construction of road from RHD Road

to Nilkandi via RHD road to house of

Mr.Opu Ghos.

km 1.780 1 45.80 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015

(b). Construction of road from Bus Stand

north side to house of Mr. Ohab Ali

Munshi via house of Mr.Kongso Bonik.

km 1.500

H/Report/Procurement Plan for 18 months

Page 6: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

.(c). Construction of road from Pourashava

BC road to house of Mr.Onu Chaudhary

and house of Mojid Chairman via Sadar

Hospital to house of Salma Councilor

km 1.020

13 MGSP/SHA/W-02 (a). Construction of road from RHD road at

Ansar VDP barak to Baghia canel via

Palong High School.

km 1.600 1 37.90 NCB BG No 25-03-2014 27-05-2014 27-04-2015

(b). Construction of road from Police Line

to house of Mr.Siddik Munshi via

Shariatpur Stadium to house of

Mr.Abdul Hai Sikder

km 2.760

Sub-total of Shariatpur km 8.660 2 83.70

14 MGSP/GOP/W-01 (a). Construction of Dhalibari road to Fire

service road via Faringabari road &

German mission road

km 3.855 1 40.60 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015

(b). Construction of Kabarstan road to

Arambag Yusuf Drivers house via

Biswasbari road & Biswasbari 1st lane

km 2.725

15 MGSP/GOP/W-02 (a). Construction of Joggeshar road to BB

road via Power house road & Udayan

road

km 2.800 1 45.80 NCB BG No 25-03-2014 27-05-2014 27-04-2015

(b). Construction of Janat road to

Chandmari road via Amena School road

& chachaniakandi road

km 2.950

.(c). Construction of Panchuria BB road to S

P Office road via Asram road, Natun

school road, Bodor road &

Mohammadpar road

km 4.600

Sub-total of Gopalganj km 16.930 2 86.40

H/Report/Procurement Plan for 18 months

Page 7: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

16 MGSP/BLK/W-01 (a). Construction of road at Dhaka -

Mymensingh Highway near Khironnodi

bridge to Central Eidgah.

km 0.500 1 38.00 NCB BG No 28-02-2014 30-04-2014 30-03-2015

(b). Construction of road at Dhaka-

Mymensingh Highway to Bhaluka

Health Complex & Trauma Center via

Bhandhabu moar.

km 2.405

.(c). Construction of road at Bhaluka Degree

College to Golam Mustafa's house via

Chaprabari Primary School.

km 1.500

(d). Construction of road at Bhaluka-

Gofforgoan Highway to Chaprabari

road.

km 0.500

17 MGSP/BLK/W-02 (a). Construction of road at Gofforgoan

Highway near Fire Service moar to

Biruniya road via Bhaluka Fazil

Madrasa.

km 1.400 1 44.00 NCB BG Yes 25-03-2014 27-05-2014 27-04-2015

(b). Construction of road at Russell

Spinning Mill to house of Lebu

member.

km 1.200

.(c). Construction of road from Bhaluka Bus

Stand to Sub-registry Office including

Pilot High School gate and Bhaluka

bazar internal road.

km 1.600

(d). Development of road at Faruk Fishiries

to Mr. Borkot Councilor's house.

km 0.700

(e). Development of road at Shaik

Johiruddin house to Roton Agro moar.

km 1.150

Sub-total of Bhaluka km 10.955 2 82.00

H/Report/Procurement Plan for 18 months

Page 8: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

18 MGSP/TRI/W-01 (a). Improvement of Commissioner road

from Mr Lalu's shop to Dhaka

Mymensingh highway.

km 1.00 1 38.10 NCB BG No 28-02-2014 30-04-2014 30-03-2015

(b). Rehabilitation of fishery road from

Dhaka road to Medherpar end point of

Pourashava.

km 2.51

.(c). Construction of Fulbari road. km 3.05

(d). Improvement of Bazit Ali road from

Trishal Dhanikhol road to Nodirpar.

km 0.36

19 MGSP/TRI/W-02 (a). Construction of Trishal - Dhanikhol

road near Etimkhana Madrasa to Ex

Commissioner Mustafa's house.

km 1.20 1 45.20 NCB BG Yes 25-03-2014 27-05-2014 27-04-2015

(b). Improvement of Baparipara road from

Dhaka roa to Bapari Bari.

km 2.00

.(c). Improvement of road from Trishal

Nazrul Museum to Fulbaria road.

km 0.75

(d). Development of road from Trishal-

Dhanikhola road near Etimkhana

Madrasha to Ex-Commissioner

Mostafa's house.

km 0.73

(e). Construction of RCC drain beside

Commissioner road from Mr Lalu's

shop to Dhaka Mymensingh highway.

km 0.980

Sub-total of Trishal km 12.578 2 83.30

20 MGSP/MDI/W-01 Construction of road from Amtala

Masjid at Kotoalir char upto old rail

line.

km 1.180 1 49.60 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015

H/Report/Procurement Plan for 18 months

Page 9: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

21 MGSP/MDI/W-02 (a). Construction of road from Bow Bazaar

to Tatapar UPHCP Hospital.

km 1.071 1 39.30 NCB BG No 25-03-2014 27-05-2014 27-04-2015

(b). Construction of road from Faith

General Hospital to Habibur Rahman

house via Ikbal house.

km 1.250

Sub-total of Madhabdi km 3.501 2 88.90

22 MGSP/BHB/W-01 Construction of Bhairab Bazaar

Internal road.

km 3.000 1 40.30 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015

23 MGSP/BHB/W-02 (a). Construction & widening of Kalipur to

Ramshankkarpur road.

km 2.000 1 42.90 NCB BG Yes 28-03-2014 30-05-2014 30-04-2015

(b). Construction of road from Ghastalaghat

towards north direction up to Bhairab

Kishoreganj Highway via Upazila

complex, Haji Asmat college &

Stadium.

km 1.260

24 MGSP/BHB/W-03 Construction of Chandiber road. km 3.900 1 47.20 NCB BG Yes 25-04-2014 27-06-2014 27-05-2015

Construction of road at Bhairabpur

South Para

km 1.050

Sub-total of Bhairab km 11.210 3 130.40

25 MGSP/SHE/W-01 Construction of road at Dhunat road

Doctors' Clinic to Hajipur Highway

road vai Sherpur Thana including

roadside drain.

km 2.950 1 31.90 NCB BG No 28-02-2014 30-04-2014 30-03-2015

Construction of road from Dr. Asraf's

Chember to Sherpur Thans via Prince's

Saw Mill including road side drain.

km 1.200

26 MGSP/SHE/W-02 (a). Construction of road at Dublagari Cold

Storage to Mr. Aktaru Zaman house via

ABC Eye Hospital including roadside

drain.

km 2.400 1 32.50 NCB BG No 28-03-2014 30-05-2014 30-04-2015

H/Report/Procurement Plan for 18 months

Page 10: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

(b). Construction of road at Highway

Upazila Porishod Gate Pintu shop to

Shisu Park vai Shapla Chattor.

km 0.800

.(c). Construction of road from house of

Engineer Rashid to AC Land Office via

National Highway including road side

drain.

km 0.700

(d). Construction of road at Highway Don

Pharmacy to Gora Store including road

side drain.

km 0.350

27 MGSP/SHE/W-03 (a). Construction of road at AC Land Office

to Uttor Bahini Maha Shosan including

road side drain.

km 1.700 1 31.50 NCB BG No 25-04-2014 27-06-2014 27-05-2015

(b). Construction of road from Highway

Road Dada Enterprize to Madrasha

Gate of Dhunat road vai Mosla market.

km 1.150

Sub-total of Sherpur km 11.250 3 95.90

29 MGSP/RCC/W-01 (a). Improvement of Nisbetgonj road from

Cachari Bazaar to Central Bus

Terminal.

km 2.500 1 36.60 NCB BG No 28-02-2014 30-04-2014 30-03-2015

(b). Improvement of Terminal road form

Shapla Moar to Central Bus Terminal

km 2.200

.(c). Rehabilitation of RK Road to Lalbag

Hat via 20 megawatt

km 0.905

(d). Rehabilitation of Adorsho Para road

and internal road of Adorsho Para

km 1.815

(e). Rehabilitation of road from Tazhat Rail

gate to Chalk Bazer Via City Biscuit

Factory.

km 1.500

H/Report/Procurement Plan for 18 months

Page 11: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

(f). Rehabilitation of road starting from

Bongobondu Hospital upto Girls'

School.

km 0.700

30 MGSP/RCC/W-02 (a). Construction of drain from Mouvasa to

KD canal

km 1.250 1 31.00 NCB BG No 28-03-2014 30-05-2014 30-04-2015

(b). Construction of drain at south side of

Terminal road

km 1.200

31 MGSP/RCC/W-03 (a). Construction of drain at RK road from

TV Centre to Check post.

km 1.500 1 30.10 NCB BG No 25-04-2014 27-06-2014 27-05-2015

(b). Construction of drain from Kerani Para

Garian tari to Nasirabad Mosque

km 0.500

.(c). Construction of drain from

Robertsonganj saw mill to Mondolpara

bridge.

km 0.900

32 MGSP/RCC/W-04 (a). Construction of drain from shop of ex

commissioner Mr.Nurul Haque at

Kellabond

km 0.600 1 31.80 NCB BG No 25-05-2014 27-07-2014 27-06-2015

(b). Construction of drain from Kamar para

to Babukhaon road.

km 0.470

.(c). Construction of Tatipara drain staring

from Pirgachha Bus stand to Tati para

existing drain

km 0.550

(d). Construction of drain from Rangpur

community centre to Pakpara .

km 0.400

(e). Construction of drain from Babupara

road to city biscuit factory

km 0.500

(f). Construction of drain at Dhap

Ganganath road

km 0.500

(g). Construction of drain from Mohadebpur

Kalam’s Godown to Mohadebpur Jame

Mosque.

km 0.650

H/Report/Procurement Plan for 18 months

Page 12: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

(h). Construction of drain from Dhap Hazi

para to Pakar matha

km 0.900

Sub-total of Rangpur km 19.540 4 129.50

33 MGSP/SAD/W-01 (a). Construction of Shahid Dr. Zikrul

Haque road from Rail Crossing to Rail

Station

km 1.300 1 39.50 NCB BG No 28-02-2014 30-04-2014 30-03-2015

(b). Construction of Shahid Dr. Zohirul

Haque road from Dinajpur road to

Boshuniapara last area of Pourashava.

km 3.200

34 MGSP/SDP/W-02 (a). Construction of Shahid Dr. Shamsul

Haque road from Dinajpur road to

Shahid Dr Zikrul Haque road via cloth

market

km 1.250 1 37.70 NCB BG No 28-03-2014 30-05-2014 30-04-2015

(b). Construction of Sher-E-Bangl road &

Kazi Nazrul Islam road from

Bangobondhu road to WAPDA moar.

km 3.700

35 MGSP/SDP/W-03 (a). Construction of road from Panch Matha

moar to Kundol via slaughter house.

km 3.000 1 32.50 NCB BG No 25-04-2014 27-06-2014 27-05-2015

(b). Construction of road from Kazi Nazrul

Islam road to Bangobondhu road via

Joshim Bazar.

km 2.600

Sub-total of Saidpur km 15.050 3 109.70

36 MGSP/GOB/W-01 (a). Improvement of road from Aminar vita

nearer Mohimagonj road to pourashava

boundary.

km 1.190 1 35.60 NCB BG No 28-02-2014 30-04-2014 30-03-2015

(b). Improvement of road from highway

nearer Hamdard to Mohimaganj road

via Prodhanpara jam Mosque

km 0.730

H/Report/Procurement Plan for 18 months

Page 13: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

.(c) Improvement of road from Toslim

driver's house to Durgapur pond of

Amirul.

km 0.560

(d). Improvement of road from highway to

Durgapur mor via house of Mr Lutfar

MP and from Durgapur moar to

Highway via house of Dr. Dulu.

km 0.995

(e). Improvement of road from Highway to

Durgapur moar via house of Mr Lutfar

MP and from Durgapur moar to

Highway via house of Dr. Dulu.

km 1.595

(f). Improvement of road from Durgapur

moar to Highway via house of Dr. Dulu.

km 0.466

(g). Construction of road from Highway

near JB patrol pump to puraton UP

office and from T&T moar to Rajmoti

moar.

km 1.228

(h). Improvement of road from Aminar vita

near Mohimagonj road to Poura

boundary.

km 0.660

(i). Improvement of road from Sonar Para

moar towards north upto Jahidul's rice

chatal.

km 0.275

(j). Improvement of road from Durgapur

moar to Highway via house of Dr.Dulu.

km 0.440

(k). Improvement of road from Highway

near Mohila collage towards east upto

the house of Raju and Romjan.

km 0.865

H/Report/Procurement Plan for 18 months

Page 14: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

(l). Improvement of road from Girls' High

School moar to Dinajpur road via house

of Amirul

km 0.655

37 MGSP/GOB/W-02 Improvement of drain at Chandpur

Govania Road.

km 1.850 1 33.60 NCB BG No 25-03-2014 27-05-2014 27-04-2015

Sub-total of Gobindaganj km 11.509 2 69.20

38 MGSP/CCC/W-01 Improvement of Nazrul Avenue km 1.550 1 34.90 NCB BG No 28-02-2014 30-04-2014 30-03-2015

39 MGSP/CCC/W-02 (a). Improvement of Chak bazaar Shapla

market to Abdul Awal Road

km 0.930 1 31.20 NCB BG No 27-03-2014 30-05-2014 30-04-2015

(b). Improvement of Abu Zahid Road km 1.310

.(c) Improvement beside park Road DC

office road to Eidgh road

km 0.520

(d). Improvement of Otindra Mohan Roy

Road

km 0.610

(e). Improvement of Munsef Quarter

Chowmohani to Habibur Rahman house

up to Gomti River par

km 1.375

(f). Improvement of N K Bahadur Road km 0.610

(g). Improvement of Hochamia Girls'

School to Sorder Bari Graveyard

km 0.350

40 MGSP/CCC/W-03 (a). Improvement of Mogoltoly Shah Suja

Mosque road

km 0.610 1 30.20 NCB BG No 25-04-2014 27-06-2014 27-05-2015

(b). Improvement of Vatpara Chowmohani

up to Pakkar Math road

km 0.975

.(c) Improvement of Digamborito road City

road to Circular road

km 1.310

(d). Improvement of Chartha Chowmohani

to EPZ road

km 1.000

Sub-total of Comilla km 11.150 3 96.30

H/Report/Procurement Plan for 18 months

Page 15: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

41 MGSP/DAD/W-01 (a). Construction of road from Daudkandi

Bazaar to Tuzarvanga Kanu Bepari

house road

km 0.518 1 35.30 NCB BG No 28-02-2014 30-04-2014 30-03-2015

(b). Construction of road from Daudkandi

Taltoli Bazaar to Hasanpur road

km 0.503

.(c) Construction of road from Daudkandi

Hasanpur Yusuf Jamil Babu house to

Hasanpur Khalpar road

km 0.762

(d). Construction of road from Daudkandi

North Stanandi road to Councilor Abdul

Hoque’s house via Durga bari road

km 0.315

(e). Construction of road from Daudkandi

R& H road to West Maizpara Ali

Amjad‘s house road

km 0.223

(f). Construction of road from Daudkandi

west Maizpara bridge to Digirpar

Nazrul’s house road

km 0.335

(g). Construction of road from Daudkandi

R&H road to Daudkandi bazaar

km 1.890

Sub-total of Daudkandi km 4.546 1 35.30

42 MGSP/CND/W-01 (a). Improvement of road from Moharong

house of Moba to house of Moslem

Driver.

km 0.600 1 45.10 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015

(b). Construction of road from Belashor

Kachuarpar to Harong North Para.

km 1.100

.(c) Construction of road from Haronng

H/O Ansor Ali to Abdulir Par.

km 1.700

H/Report/Procurement Plan for 18 months

Page 16: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

(d). Construction of road from Belashor

Thangaon Road to Chandina Barer

road.

km 0.400

(e). Construction of road from Dhaka

Chittagong Highway to Rapnagar.

km 0.500

(f). Construction of road from Baro

Gobindhapur Nath Para at H/O

Shymshundor to Dhaka Chittagong

Highway via Baro Gobindapur Ali Mia

High School.

km 0.460

(g). Construction of road from Tolatali

Moulabi Bari Jame mosque towards

South Baniachong connecting bridge.

km 0.458

(h). Development of road from Biswas

Primary School to Gobindapur Primary

School.

km 0.609

(i). Construction of drain from Chandina

Bazaar Shah Plaza to Belashor

Government Primary School east side &

west side RNR road to TMSS office.

km 1.500

Sub-total of Chandina km 7.327 1 45.10

43 MGSP/CHM/W-01 (a). Rehabilitation of road from Dhaka

Chiitagong Highway to Natapara H/O

Judge Abul Kashem.

km 0.900 1 31.90 NCB BG No 28-02-2014 30-04-2014 30-03-2015

(b). Rehabilitation of road from Dhaka

Chiitagong Highway to Ramrygram

H/O Khandaker bari.

km 0.522

.(c) Rehabilitation of road from Dhaka

Chiitagong Highway to Bidderkhil

Jame Mosque Road.

km 0.780

H/Report/Procurement Plan for 18 months

Page 17: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

(d). Improvement of road from Dhaka-

Chiitagong Highway to Sonakatia H/O

Miker Via H/O Jalal Master.

km 0.925

(e). Rehabilitation of road from Dhaka

Chiitagong Highway to East

Chandishkara Laxum road.

km 0.450

(f). Rehabilitation of road from Dhaka

Chiitagong Highway Nearest BICIC to

Pachra H/O Muktijudda Commander

Taher.

km 0.850

(g). Improvement of road by RCC work

from Dhaka-Ctg highway to Sonakatia

H/O Jafor Driver.

km 0.550

Sub-total of Chaddagram km 4.977 1 31.90

44 MGSP/FNI/W-01 (a). Improvement of Hazrat Phagla Miah

road from Dhaka - Chittagong highway

to Feni Comilla Trunk road

km 1.360 1 30.40 NCB BG No 28-02-2014 30-04-2014 30-03-2015

(b). Improvement of Bijoysingh Dighi west

side to Lotif Bhuiyan road.

km 1.100

.(c) Improvement of Modhupur Hazi

Mukhlesur Rahman road.

km 1.500

(d). Improvement of road at Kadal Gazi rail

gate to Chowrasta.

km 0.650

(e). Improvement of Barahipur Shisu

Kishore Academy road, GA academy

road to Hospital road upto Rail gate.

km 0.900

45 MGSP/FNI/W-02 (a). Improvement of MES Road Hospital

moar to Sonapur.

km 1.100 1 31.30 NCB BG No 28-03-2014 30-06-2014 30-04-2015

(b). Improvement of Lomi Hazari Road km 0.410

H/Report/Procurement Plan for 18 months

Page 18: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

.(c) Improvement of Bijoy Singh-Abu Bakr road

at Circuit House road to Latif Bhuiya road.

km 1.100

(d). Improvement at Lomi-Hazari road to

Rail gate

km 0.800

46 MGSP/FNI/W-03 (a). Improvement of Hanger road start from

Hospital moar.

km 0.550 1 30.50 NCB BG No 25-04-2014 27-06-2014 27-05-2015

(b). Improvement of Khiru Shah road. km 1.325

.(c) Improvement of Shibpur Nurani

Madrasa road with 1 no cross drain.

km 0.810

(d). Improvement of MP Khaju Miah road

at Shibpur Tremuhini to Soap Factory.

km 0.600

(e). Improvement of Middle Sharipur -

Alauddin market to BISIC

km 1.205

48 MGSP/FNI/W-05 Construction of RCC drain at east side

of Feni Comilla Trunk road and Jail

road to Daudpur khal.

km 1.100 1 30.00 NCB BG No 25-05-2014 27-07-2014 27-06-2015

Sub-total of Feni km 14.510 4 122.20

49 MGSP/PAT/W-01 (a). Improvement of road Sanda Market to

Mager Ghata; via Kalo Fokir tea shop.

km 1.800 1 41.50 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015

(b). Improvement of road from Post Office

to Sabjer Para Mosque including 5 link

roads.

km 1.300

.(c) Improvement of Club Road Circle to

Post Office including 3 link roads.

km 1.000

(d). Improvement of road Dhopa Pukur Par

to Suchakradandi Primary School.

km 1.500

H/Report/Procurement Plan for 18 months

Page 19: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

(e). Improvement of Cox’s Bazaar road west

side from Indropol to Bipo Nondi road.

km 0.550

(f). Construction of Hadu Chowdhury Bari

road.

km 0.750

50 MGSP/PAT/W-02 (a). Construction of Potiya Kelyshohar

road.

km 0.250 1 43.70 NCB BG Yes 25-03-2014 27-05-2014 27-04-2015

(b). Construction of Alam road & Pike Para

Mohammad Zaman Sikder road.

km 1.250

.(c) Development of Prof. Abul Monsur

Mohammad Ibrahim road &

Improvement of road by Allai to end

point of the Okhara.

km 1.390

(d). Development of Shean para Buirga Bari

road.

km 0.500

(e). Development of South Gobinderkhil

Jamie mosque road to Bahuly link road.

km 0.750

(f). Development of BOC road to Faillatoli

link.

km 0.800

(g). Development of Moulana Nural Hoque

Shah road.

km 0.750

(h). Construction of drain with top slab at

Potiya Indra pool to Upazila Complex

main road

km 1.000

Sub-total of Patiya km 13.590 2 85.20

51 MGSP/MIR/W-01 (a). Improvement of Anuram Sahaji Road. km 1.220 1 66.90 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015

(b). Improvement of Shahid Mostafa road. km 1.000

H/Report/Procurement Plan for 18 months

Page 20: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

(f) Improvement of Chandpur-Govania

Road

km 5.280

Sub-total of Mirsharai km 7.500 1 66.90

52 MGSP/SIT/W-01 (a). Improvement of Dhongazi road. km 0.600 1 48.80 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015

(b). Improvement of Bohdder road. km 0.510

.(c) Improvement of Golum Mohiuddin

road.

km 0.500

(d). Improvement of Samsu Uddin

Chairman road.

km 0.700

(e). Improvement of Bhuiyanpar road from

Chypar road.

km 0.400

(f). Improvement of Moulavi par road from

Rail line.

km 0.400

(g). Improvement of South Suagazi road

starting from Shibpur Primary School

road.

km 0.400

(h). Improvement of Fokirhat BOC road. km 0.500

(i). Construction of RCC Retaining wall

along the Hasan Gomosta Road near rail

line.

km 0.100

(j). Improvement of Tulatoli road. km 0.500

Sub-total of Sitakunda km 4.610 1 48.80

53 MGSP/CHO/W-01 (a). Improvement of road from Tin Bot Tola

to Shubahania Khom via Kazirpara

station.

km 1.072 1 36.50 NCB BG No 28-02-2014 30-04-2014 30-03-2015

(b). Improvement of road from Pourashava

Office to Gaonosham Bazaar road.

km 0.690

H/Report/Procurement Plan for 18 months

Page 21: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

.(c) Improvement of road from New Market

corner to Nath par road to Army

Canteen via Ujjal Shop and Kali

Mondir, Hori Mondir and Mahamub

Shop to Chowrasta mur connecting

road.

km 1.025

(d). Improvement of road from Hal Kakara

Nobarun Sanga to Fultala, Fultala to

Thana mur and Thana mur to Mog

Bazar.

km 2.000

(e). Improvement of Chiringa Bitussharaf

road.

km 0.442

(f). Improvement of road from Mog Bazar

Farid Showdagor's dokan to Jahir

Showdagor's house.

km 0.670

54 MGSP/CHO/W-02 (a). Improvement of road from Matamohori

bridge south side to Coch Para Terminal

road via Basgat and Asian hospital

connecting road.

km 2.115 1 42.70 NCB BG Yes 25-03-2014 27-05-2014 27-04-2015

(b). Improvement of road from Jahir

Showdagor's house to Haizza Pukur Par

via Shyed Alam's house.

km 1.000

.(c) Improvement of road from Rain

Community Centre of Arkan road to Al-

Modina Jame Mosjid.

km 0.500

(d). Construction of RCC drian at Chiringa

Bitussharaf road.

km 0.560

Sub-total of Chakoria km 10.074 2 79.20

55 MGSP/SCC/W-01 (a). Improvement of Howladarpara to

Biresh Chandra School road.

km 1.00 1 34.80 NCB BG No 28-02-2014 30-04-2014 30-03-2015

(b). Improvement of Link road from

Shamimabad to Kanishail

km 0.53

H/Report/Procurement Plan for 18 months

Page 22: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

.(c) Improvement of Gashitula Nobab road

from Osmani Medical road to Kazir

Bazar road.

km 1.50

56 MGSP/SCC/W-02 (a). Improvement of Kazir Bazar and

Sheikghat main road.

km 1.20 1 38.40 NCB BG No 28-03-2014 30-05-2014 30-04-2015

(b). Improvement of Zatarpur main Road km 0.85

.(c) Improvement of road from Shibgonj

Akbori Mosque to Baluchar Road

km 0.95

57 MGSP/SCC/W-03 (a). Improvement of road at Block D of

Upashahar

km 0.60 1 35.60 NCB BG No 28-04-2014 30-06-2014 30-05-2015

(b). Improvement of Mendibag road. km 1.45

.(c) Improvement of road from Kadomtali to

Shib Bari.

km 1.00

(d). Improvement of Road from Dorgah

Moholla to Dorshan

km 1.00

58 MGSP/SCC/W-04 (a). Improvement of Gutatikor Road km 0.70 1 35.20 NCB BG No 28-05-2014 30-07-2014 30-06-2015

(b). Improvement of Road at Perss Club

area.

km 0.42

.(c) Improvement of Dariapara main Road. km 1.00

(d). Improvement of Lechu Bagan road

from Airport road to Housing Estate.

km 1.00

(e). Improvement of Kamla Bagan and

Kunapara Road

km 0.80

59 MGSP/SCC/W-05 (a). Construction of Darussalam Madrasha

Road

km 1.00 1 34.80 NCB BG No 15-06-2014 14-08-2014 13-07-2015

(b). Improvement of Road no-3 at

Chowkidekhi.

km 1.00

.(c) Improvement of Chararpar road km 0.90

H/Report/Procurement Plan for 18 months

Page 23: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

(d). Construction of drain at Hazaribag area km 0.80

60 MGSP/SCC/W-06 (a). Improvement of road at Soyef Khan-

Londoni road

km 1.20 1 35.10 NCB BG No 25-06-2014 27-082014 27-06-2015

(b). Improvement of Kadomtali Doriashah

Mazar road.

km 1.00

.(c) Improvement of Gupaltila road and

Baluchar road

km 1.00

61 MGSP/SCC/W-07 (a). Improvement of Link road from

Mirapara to Sabuj bag.

km 0.90 1 34.40 NCB BG No 25-07-2014 27-09-2014 27-08-2015

(b). Construction of drain at Zindapir Mazar

to Zinda bazar.

km 0.41

.(c) Construction of drain at Darus Salam

Madras road opposite of PDB office,

Amberkhana.

km 0.85

(d). Construction of drain at Picher Mukh to

Kalapara

km 0.45

(e). Construction of drain at Kazir Bazar

and Sheik ghat

km 0.75

(f). Construction of drain at Sheikghat

Nobab road.

km 1.00

Sub-total of Sylhet km 25.26 7 248.30

62 MGSP/STG/W-01 (a). Improvement of South Lanja Para road

from R&H road to Hazi Zahir Ahmed

road via Hobigonj PBS & improvement

of South Lenja Para Workshop road

from R&H road to Hazi Zahir Ahmed

road via Khairul Alam Councilor's

house.

km 2.296 1 30.80 NCB BG No 28-02-2014 30-04-2014 30-03-2015

(b). Improvement of road at Biramchar from

Syed Elias Saheb's Boiler to Dhaka

Sylhet highway.

km 0.655

H/Report/Procurement Plan for 18 months

Page 24: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

.(c) Improvement of West Lanja Par road

from Hazi Zahir Ahmed's house to

Shaistagonj kamil Madrasa &

Sudiakhola road.

km 0.745

63 MGSP/STG/W-02 (a). Improvement of road from R&H road to

Ubahata Government Primary School.

km 0.216 1 30.20 NCB BG No 25-03-2014 27-05-2014 27-04-2015

(b). Improvement of road from East Borchor

road to Rail Way Pond via BD Mithro

Saheb's house.

km 1.060

.(c) Improvement of road from

Jagannathpur Mohululsonam mosque to

Sulaiman's house via Zia Uddin's house

km 0.662

d. Improvement of road from Sudikhola

BC road to Sudikhola Old BC road via

Kodar Ali's house.

km 0.844

Sub-total of Shaistagonj km 6.478 2 61.00

64 MGSP/MDP/W-01 (a). Construction of Girder Bridge with

Approach road on Sonal River at

Noagaon to Ganganagar road.

km 0.042 1 60.40 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015

(b). Construction of Bituminous Carpeting

road from Highway to Rajghat Road up

to end of pourashava.

km 1.521

.(c) Construction of Bituminous Carpeting

road from Highway to Ganganagar

house of Probesh Rishi

km 0.635

(d). Construction of RCC road from

Gumutia road to West of Kabarsthan

road via around Krishnanagar.

km 0.715

H/Report/Procurement Plan for 18 months

Page 25: DRAFT PROCUREMENT PLAN - documents.worldbank.orgdocuments.worldbank.org/.../839870PROP0P130Box0382124B00PUBLIC0.pdf · km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30 ... km

Sl

No

.

Contract Package

Number

Contract description Unit Estimated

Cost

(in million

Taka)

OR

Actual

Contract

Price with

Contract

Currency)

Procedure

/

Method

Procuremen

t Guideline

(PPA/BG)

Prior

Review*

*

(Yes/No)

Planned

date of bid

opening

(Actual date

of bid

opening)

Planed date

of Contract

Signing

(Actual date

of Contract

Signing)

Planed date

of

Completion

(Actual date

of

Completion)

Name of

Contractor

Progress of

Procuremen

t as of

...............

Remarks

1 2 4 6 7 8 9 10 11 12 13 14 15

Quantity/

Number

53

(e). Construction of protection wall by

palisading, gradewall & earth filling

from Gas field to Shibpur Bridge in

Side khal.

km 1.520

Sub-total of Madhabpur km 4.433 1 60.40

Grand-total 277.58 63 2491.31

H/Report/Procurement Plan for 18 months