Upload
trinhnguyet
View
214
Download
0
Embed Size (px)
Citation preview
Municipal Governance and Services Project (MGSP)
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
1 MGSP/NCC/W-01 Construction of road & embankment
protection along the river Shitalakhya
starting from Bandar 01 no Kheya Ghat
upto Tribini khal with necessary
beautification
km 1.000 1 120.00 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015
2 MGSP/NCC/W-02 Improvement of Mobarak Shah road
and road side drain with footpath
km 0.950 1 74.44 NCB BG No 28-03-2014 30-05-2014 30-04-2015
3 MGSP/NCC/W-03 (a). Improvement of Jallerpar road and road
side drain with footpath starting from
Jimkhana bridge to Joy Gobidha School
via Paikpara bridge.
km 0.575 1 37.94 NCB BG No 25-04-2014 27-06-2014 27-05-2015
(b). Improvement of Shah Suja road
starting from Foodland Bakery to
Choto Kabarstan with Nayapara link
road and Bhuyanpara link road.
km 1.045
4 MGSP/NCC/W-04 (a). Construction of drain starting from 2
no.Rail Gate to ex BKMEA president
Mr.Fazlul Haque's house via Golachipa
Sugandha Bakery.
km 0.685 1 31.50 NCB BG No 25-05-2014 27-07-2014 27-06-2015
(b). Construction of footpath cum drain by
the side of Khalghat road.
km 0.270
5 MGSP/NCC/W-05 Rehabilitation work of T-hossain road
starting from Nobiganj ghat to
Modonganj -Modonpur road by RCC
road, drain and electrification work in
word no. 24 under Narayanganj CC (ch.
2013-2014)
km 0.760 1 73.10 NCB BG Yes 25-06-2014 27-08-2014 27-07-2015
(Works)
DRAFT PROCUREMENT PLAN
Quantity/
Number
53
H/Report/Procurement Plan for 18 months
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
Sub-total of Narayanganj km 4.525 5 263.88
5 MGSP/TAN/W-01 Rehabilitation road from R&H Victoria
road to Baray R&H Road via Adi
Tangail Textile mill to Mirarbetka
LGED road.
km 3.615 1 33.30 NCB BG No 28-03-2014 30-05-2014 30-04-2015
6 MGSP/TAN/W-02 (a). Improvement road from Alowa Amtola
to Sontosh Bayan para bridge.
km 1.090 1 43.80 NCB BG No 28-04-2014 30-06-2014 30-05-2015
(b). Improvement Bazitpur Thakurbari road. km 0.350
.(c). Rehabilitation road from Gala Verchand
road H/O Joaher Ali to Dharerbari road.
km 1.340
(d). Improvement road starting Hazraghat
morh to Bailla Madrasa moar.
km 1.500
(e). Improvement Sakrail Saruti road from
Omarpur road to Sakrail Bazar.
km 1.710
(f). Rehabilitation of road starting from
Central Graveyard R & H road to
Putiajani Bazar R&H road via
Sajujbag.
km 6.220
(g). Rehabilitation of of Stand road
starting from Babystand R&H road to
Bottola Bazar.
km 2.100
7 MGSP/TAN/W-03 Construction of Bypass Road Leading
from Kagmari Bridge upto Tangail Zilla
porisad.
km 4.000 1 57.10 NCB BG No 25-05-2014 27-06-2014 27-05-2015
Sub-total of Tangail km 21.925 3 134.20
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
8 MGSP/ELN/W-01 (a). Improvement road with side drain and
culverts from R&H National Highway
to Baganbari super market.
km 3.030 1 57.70 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015
(b). Improvement road with roadside drain,
bridge from R&H National Highway
and Vabla play ground.
km 2.880
Sub-total of Elenga km 5.910 1 57.70
9 MGSP/MAD/W-01 (a). Improvement of Madaripur Main road
from police line moar RHD road to
Puran bazaar Muchi bari More(Ch.00-
1+360m)
km 1.360 1 46.78 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015
(b). Construction of RCC Drain on Left
Side Madaripur Main Road Stating
From Police Line More(RHD Road) to
Puran Bazar Muchi Bari More (Ch o.oo
to 1+360 m)
km 1.360
.(c). Construction of Brick Drain on Right
Side Madaripur Main Road Stating
From Police Line More(RHD Road) to
Puran Bazar Muchi Bari More (Ch o.oo
to 1+360 m)
km 1.360
(d). Construction Footpatht Both Side
Madaripur Main Road Stating From
Police Line More(RHD Road) to Puran
Bazar Muchi Bari More (Ch o.oo to
1+360 m
km 1.360
10 MGSP/MAD/W-02 (a). Construction of RCC Road at
Shahid Bachu Sarak Starting from
Kazir More to Howlader Godi. (Ch.
1230.00-1572.00m)
km 0.342 1 29.87 NCB BG No 28-02-2014 30-04-2014 30-03-2015
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
(b). Construction of Amin Uddin
Howlader Sarak RCC Road With
Brick Massonary Drain. (Ch. 0.00-
430.00m)
km 0.430
(c) Construction of RCC Road at
Hamid Sikder Sarak Starting from
RHD Road to Hamid Akondo Sarak.
(Ch. 0.00-440.00m)
km 0.440
(d). Construction of Shahid Surjo Sarak
RCC Road With Brick Massonary
Drain. (Part-1: 330.00m & Part-2:
103.00m)
km 0.433
11 MGSP/MAD/W-03 (a). Construction of RCC Road at
Shahid Harun Sarak Starting from
Madaripur Main Road to Dorgha
Sharif Road. (Ch. 0.00-365.00m)
km 0.365 1 19.28 NCB BG No 25-03-2014 27-05-2014 27-04-2015
(b). Construction of RCC Road Starting
from Shahid Bachu Sarak to
Stadium road. (Ch. 0.00-205.00m)
km 0.205
(c) Construction of Jotish Dey Sarak
RCC Road With Brick Massonary
Drain. (Ch. 0.00-192.00m)
km 0.192
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
(d). Rehabilitation of Charmuguria
Abu Munsi Goli & Nasimnagor
Graveyard road Starting from
Kumar riaver to Charmuguria
Hazrapur main road.(Ch0.00m
to 1030.00m)
km 1.030
(e). Improvement of the Pakdi
Peshker Bari road starting from
Charmuguria Puraton road to
Beri badh (Ch0.00m to
280.00m)
km 0.280
(f). Rehabiltation of Sultan
Howlader Bituminous
Carpetting road starting from
RHD main road to end of Pouro
area.(Ch0.00m to 425.00m)
km 0.425
Sub-total of Madaripur km 9.582 3 95.93
12 MGSP/SHA/W-01 (a). Construction of road from RHD Road
to Nilkandi via RHD road to house of
Mr.Opu Ghos.
km 1.780 1 45.80 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015
(b). Construction of road from Bus Stand
north side to house of Mr. Ohab Ali
Munshi via house of Mr.Kongso Bonik.
km 1.500
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
.(c). Construction of road from Pourashava
BC road to house of Mr.Onu Chaudhary
and house of Mojid Chairman via Sadar
Hospital to house of Salma Councilor
km 1.020
13 MGSP/SHA/W-02 (a). Construction of road from RHD road at
Ansar VDP barak to Baghia canel via
Palong High School.
km 1.600 1 37.90 NCB BG No 25-03-2014 27-05-2014 27-04-2015
(b). Construction of road from Police Line
to house of Mr.Siddik Munshi via
Shariatpur Stadium to house of
Mr.Abdul Hai Sikder
km 2.760
Sub-total of Shariatpur km 8.660 2 83.70
14 MGSP/GOP/W-01 (a). Construction of Dhalibari road to Fire
service road via Faringabari road &
German mission road
km 3.855 1 40.60 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015
(b). Construction of Kabarstan road to
Arambag Yusuf Drivers house via
Biswasbari road & Biswasbari 1st lane
km 2.725
15 MGSP/GOP/W-02 (a). Construction of Joggeshar road to BB
road via Power house road & Udayan
road
km 2.800 1 45.80 NCB BG No 25-03-2014 27-05-2014 27-04-2015
(b). Construction of Janat road to
Chandmari road via Amena School road
& chachaniakandi road
km 2.950
.(c). Construction of Panchuria BB road to S
P Office road via Asram road, Natun
school road, Bodor road &
Mohammadpar road
km 4.600
Sub-total of Gopalganj km 16.930 2 86.40
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
16 MGSP/BLK/W-01 (a). Construction of road at Dhaka -
Mymensingh Highway near Khironnodi
bridge to Central Eidgah.
km 0.500 1 38.00 NCB BG No 28-02-2014 30-04-2014 30-03-2015
(b). Construction of road at Dhaka-
Mymensingh Highway to Bhaluka
Health Complex & Trauma Center via
Bhandhabu moar.
km 2.405
.(c). Construction of road at Bhaluka Degree
College to Golam Mustafa's house via
Chaprabari Primary School.
km 1.500
(d). Construction of road at Bhaluka-
Gofforgoan Highway to Chaprabari
road.
km 0.500
17 MGSP/BLK/W-02 (a). Construction of road at Gofforgoan
Highway near Fire Service moar to
Biruniya road via Bhaluka Fazil
Madrasa.
km 1.400 1 44.00 NCB BG Yes 25-03-2014 27-05-2014 27-04-2015
(b). Construction of road at Russell
Spinning Mill to house of Lebu
member.
km 1.200
.(c). Construction of road from Bhaluka Bus
Stand to Sub-registry Office including
Pilot High School gate and Bhaluka
bazar internal road.
km 1.600
(d). Development of road at Faruk Fishiries
to Mr. Borkot Councilor's house.
km 0.700
(e). Development of road at Shaik
Johiruddin house to Roton Agro moar.
km 1.150
Sub-total of Bhaluka km 10.955 2 82.00
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
18 MGSP/TRI/W-01 (a). Improvement of Commissioner road
from Mr Lalu's shop to Dhaka
Mymensingh highway.
km 1.00 1 38.10 NCB BG No 28-02-2014 30-04-2014 30-03-2015
(b). Rehabilitation of fishery road from
Dhaka road to Medherpar end point of
Pourashava.
km 2.51
.(c). Construction of Fulbari road. km 3.05
(d). Improvement of Bazit Ali road from
Trishal Dhanikhol road to Nodirpar.
km 0.36
19 MGSP/TRI/W-02 (a). Construction of Trishal - Dhanikhol
road near Etimkhana Madrasa to Ex
Commissioner Mustafa's house.
km 1.20 1 45.20 NCB BG Yes 25-03-2014 27-05-2014 27-04-2015
(b). Improvement of Baparipara road from
Dhaka roa to Bapari Bari.
km 2.00
.(c). Improvement of road from Trishal
Nazrul Museum to Fulbaria road.
km 0.75
(d). Development of road from Trishal-
Dhanikhola road near Etimkhana
Madrasha to Ex-Commissioner
Mostafa's house.
km 0.73
(e). Construction of RCC drain beside
Commissioner road from Mr Lalu's
shop to Dhaka Mymensingh highway.
km 0.980
Sub-total of Trishal km 12.578 2 83.30
20 MGSP/MDI/W-01 Construction of road from Amtala
Masjid at Kotoalir char upto old rail
line.
km 1.180 1 49.60 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
21 MGSP/MDI/W-02 (a). Construction of road from Bow Bazaar
to Tatapar UPHCP Hospital.
km 1.071 1 39.30 NCB BG No 25-03-2014 27-05-2014 27-04-2015
(b). Construction of road from Faith
General Hospital to Habibur Rahman
house via Ikbal house.
km 1.250
Sub-total of Madhabdi km 3.501 2 88.90
22 MGSP/BHB/W-01 Construction of Bhairab Bazaar
Internal road.
km 3.000 1 40.30 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015
23 MGSP/BHB/W-02 (a). Construction & widening of Kalipur to
Ramshankkarpur road.
km 2.000 1 42.90 NCB BG Yes 28-03-2014 30-05-2014 30-04-2015
(b). Construction of road from Ghastalaghat
towards north direction up to Bhairab
Kishoreganj Highway via Upazila
complex, Haji Asmat college &
Stadium.
km 1.260
24 MGSP/BHB/W-03 Construction of Chandiber road. km 3.900 1 47.20 NCB BG Yes 25-04-2014 27-06-2014 27-05-2015
Construction of road at Bhairabpur
South Para
km 1.050
Sub-total of Bhairab km 11.210 3 130.40
25 MGSP/SHE/W-01 Construction of road at Dhunat road
Doctors' Clinic to Hajipur Highway
road vai Sherpur Thana including
roadside drain.
km 2.950 1 31.90 NCB BG No 28-02-2014 30-04-2014 30-03-2015
Construction of road from Dr. Asraf's
Chember to Sherpur Thans via Prince's
Saw Mill including road side drain.
km 1.200
26 MGSP/SHE/W-02 (a). Construction of road at Dublagari Cold
Storage to Mr. Aktaru Zaman house via
ABC Eye Hospital including roadside
drain.
km 2.400 1 32.50 NCB BG No 28-03-2014 30-05-2014 30-04-2015
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
(b). Construction of road at Highway
Upazila Porishod Gate Pintu shop to
Shisu Park vai Shapla Chattor.
km 0.800
.(c). Construction of road from house of
Engineer Rashid to AC Land Office via
National Highway including road side
drain.
km 0.700
(d). Construction of road at Highway Don
Pharmacy to Gora Store including road
side drain.
km 0.350
27 MGSP/SHE/W-03 (a). Construction of road at AC Land Office
to Uttor Bahini Maha Shosan including
road side drain.
km 1.700 1 31.50 NCB BG No 25-04-2014 27-06-2014 27-05-2015
(b). Construction of road from Highway
Road Dada Enterprize to Madrasha
Gate of Dhunat road vai Mosla market.
km 1.150
Sub-total of Sherpur km 11.250 3 95.90
29 MGSP/RCC/W-01 (a). Improvement of Nisbetgonj road from
Cachari Bazaar to Central Bus
Terminal.
km 2.500 1 36.60 NCB BG No 28-02-2014 30-04-2014 30-03-2015
(b). Improvement of Terminal road form
Shapla Moar to Central Bus Terminal
km 2.200
.(c). Rehabilitation of RK Road to Lalbag
Hat via 20 megawatt
km 0.905
(d). Rehabilitation of Adorsho Para road
and internal road of Adorsho Para
km 1.815
(e). Rehabilitation of road from Tazhat Rail
gate to Chalk Bazer Via City Biscuit
Factory.
km 1.500
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
(f). Rehabilitation of road starting from
Bongobondu Hospital upto Girls'
School.
km 0.700
30 MGSP/RCC/W-02 (a). Construction of drain from Mouvasa to
KD canal
km 1.250 1 31.00 NCB BG No 28-03-2014 30-05-2014 30-04-2015
(b). Construction of drain at south side of
Terminal road
km 1.200
31 MGSP/RCC/W-03 (a). Construction of drain at RK road from
TV Centre to Check post.
km 1.500 1 30.10 NCB BG No 25-04-2014 27-06-2014 27-05-2015
(b). Construction of drain from Kerani Para
Garian tari to Nasirabad Mosque
km 0.500
.(c). Construction of drain from
Robertsonganj saw mill to Mondolpara
bridge.
km 0.900
32 MGSP/RCC/W-04 (a). Construction of drain from shop of ex
commissioner Mr.Nurul Haque at
Kellabond
km 0.600 1 31.80 NCB BG No 25-05-2014 27-07-2014 27-06-2015
(b). Construction of drain from Kamar para
to Babukhaon road.
km 0.470
.(c). Construction of Tatipara drain staring
from Pirgachha Bus stand to Tati para
existing drain
km 0.550
(d). Construction of drain from Rangpur
community centre to Pakpara .
km 0.400
(e). Construction of drain from Babupara
road to city biscuit factory
km 0.500
(f). Construction of drain at Dhap
Ganganath road
km 0.500
(g). Construction of drain from Mohadebpur
Kalam’s Godown to Mohadebpur Jame
Mosque.
km 0.650
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
(h). Construction of drain from Dhap Hazi
para to Pakar matha
km 0.900
Sub-total of Rangpur km 19.540 4 129.50
33 MGSP/SAD/W-01 (a). Construction of Shahid Dr. Zikrul
Haque road from Rail Crossing to Rail
Station
km 1.300 1 39.50 NCB BG No 28-02-2014 30-04-2014 30-03-2015
(b). Construction of Shahid Dr. Zohirul
Haque road from Dinajpur road to
Boshuniapara last area of Pourashava.
km 3.200
34 MGSP/SDP/W-02 (a). Construction of Shahid Dr. Shamsul
Haque road from Dinajpur road to
Shahid Dr Zikrul Haque road via cloth
market
km 1.250 1 37.70 NCB BG No 28-03-2014 30-05-2014 30-04-2015
(b). Construction of Sher-E-Bangl road &
Kazi Nazrul Islam road from
Bangobondhu road to WAPDA moar.
km 3.700
35 MGSP/SDP/W-03 (a). Construction of road from Panch Matha
moar to Kundol via slaughter house.
km 3.000 1 32.50 NCB BG No 25-04-2014 27-06-2014 27-05-2015
(b). Construction of road from Kazi Nazrul
Islam road to Bangobondhu road via
Joshim Bazar.
km 2.600
Sub-total of Saidpur km 15.050 3 109.70
36 MGSP/GOB/W-01 (a). Improvement of road from Aminar vita
nearer Mohimagonj road to pourashava
boundary.
km 1.190 1 35.60 NCB BG No 28-02-2014 30-04-2014 30-03-2015
(b). Improvement of road from highway
nearer Hamdard to Mohimaganj road
via Prodhanpara jam Mosque
km 0.730
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
.(c) Improvement of road from Toslim
driver's house to Durgapur pond of
Amirul.
km 0.560
(d). Improvement of road from highway to
Durgapur mor via house of Mr Lutfar
MP and from Durgapur moar to
Highway via house of Dr. Dulu.
km 0.995
(e). Improvement of road from Highway to
Durgapur moar via house of Mr Lutfar
MP and from Durgapur moar to
Highway via house of Dr. Dulu.
km 1.595
(f). Improvement of road from Durgapur
moar to Highway via house of Dr. Dulu.
km 0.466
(g). Construction of road from Highway
near JB patrol pump to puraton UP
office and from T&T moar to Rajmoti
moar.
km 1.228
(h). Improvement of road from Aminar vita
near Mohimagonj road to Poura
boundary.
km 0.660
(i). Improvement of road from Sonar Para
moar towards north upto Jahidul's rice
chatal.
km 0.275
(j). Improvement of road from Durgapur
moar to Highway via house of Dr.Dulu.
km 0.440
(k). Improvement of road from Highway
near Mohila collage towards east upto
the house of Raju and Romjan.
km 0.865
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
(l). Improvement of road from Girls' High
School moar to Dinajpur road via house
of Amirul
km 0.655
37 MGSP/GOB/W-02 Improvement of drain at Chandpur
Govania Road.
km 1.850 1 33.60 NCB BG No 25-03-2014 27-05-2014 27-04-2015
Sub-total of Gobindaganj km 11.509 2 69.20
38 MGSP/CCC/W-01 Improvement of Nazrul Avenue km 1.550 1 34.90 NCB BG No 28-02-2014 30-04-2014 30-03-2015
39 MGSP/CCC/W-02 (a). Improvement of Chak bazaar Shapla
market to Abdul Awal Road
km 0.930 1 31.20 NCB BG No 27-03-2014 30-05-2014 30-04-2015
(b). Improvement of Abu Zahid Road km 1.310
.(c) Improvement beside park Road DC
office road to Eidgh road
km 0.520
(d). Improvement of Otindra Mohan Roy
Road
km 0.610
(e). Improvement of Munsef Quarter
Chowmohani to Habibur Rahman house
up to Gomti River par
km 1.375
(f). Improvement of N K Bahadur Road km 0.610
(g). Improvement of Hochamia Girls'
School to Sorder Bari Graveyard
km 0.350
40 MGSP/CCC/W-03 (a). Improvement of Mogoltoly Shah Suja
Mosque road
km 0.610 1 30.20 NCB BG No 25-04-2014 27-06-2014 27-05-2015
(b). Improvement of Vatpara Chowmohani
up to Pakkar Math road
km 0.975
.(c) Improvement of Digamborito road City
road to Circular road
km 1.310
(d). Improvement of Chartha Chowmohani
to EPZ road
km 1.000
Sub-total of Comilla km 11.150 3 96.30
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
41 MGSP/DAD/W-01 (a). Construction of road from Daudkandi
Bazaar to Tuzarvanga Kanu Bepari
house road
km 0.518 1 35.30 NCB BG No 28-02-2014 30-04-2014 30-03-2015
(b). Construction of road from Daudkandi
Taltoli Bazaar to Hasanpur road
km 0.503
.(c) Construction of road from Daudkandi
Hasanpur Yusuf Jamil Babu house to
Hasanpur Khalpar road
km 0.762
(d). Construction of road from Daudkandi
North Stanandi road to Councilor Abdul
Hoque’s house via Durga bari road
km 0.315
(e). Construction of road from Daudkandi
R& H road to West Maizpara Ali
Amjad‘s house road
km 0.223
(f). Construction of road from Daudkandi
west Maizpara bridge to Digirpar
Nazrul’s house road
km 0.335
(g). Construction of road from Daudkandi
R&H road to Daudkandi bazaar
km 1.890
Sub-total of Daudkandi km 4.546 1 35.30
42 MGSP/CND/W-01 (a). Improvement of road from Moharong
house of Moba to house of Moslem
Driver.
km 0.600 1 45.10 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015
(b). Construction of road from Belashor
Kachuarpar to Harong North Para.
km 1.100
.(c) Construction of road from Haronng
H/O Ansor Ali to Abdulir Par.
km 1.700
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
(d). Construction of road from Belashor
Thangaon Road to Chandina Barer
road.
km 0.400
(e). Construction of road from Dhaka
Chittagong Highway to Rapnagar.
km 0.500
(f). Construction of road from Baro
Gobindhapur Nath Para at H/O
Shymshundor to Dhaka Chittagong
Highway via Baro Gobindapur Ali Mia
High School.
km 0.460
(g). Construction of road from Tolatali
Moulabi Bari Jame mosque towards
South Baniachong connecting bridge.
km 0.458
(h). Development of road from Biswas
Primary School to Gobindapur Primary
School.
km 0.609
(i). Construction of drain from Chandina
Bazaar Shah Plaza to Belashor
Government Primary School east side &
west side RNR road to TMSS office.
km 1.500
Sub-total of Chandina km 7.327 1 45.10
43 MGSP/CHM/W-01 (a). Rehabilitation of road from Dhaka
Chiitagong Highway to Natapara H/O
Judge Abul Kashem.
km 0.900 1 31.90 NCB BG No 28-02-2014 30-04-2014 30-03-2015
(b). Rehabilitation of road from Dhaka
Chiitagong Highway to Ramrygram
H/O Khandaker bari.
km 0.522
.(c) Rehabilitation of road from Dhaka
Chiitagong Highway to Bidderkhil
Jame Mosque Road.
km 0.780
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
(d). Improvement of road from Dhaka-
Chiitagong Highway to Sonakatia H/O
Miker Via H/O Jalal Master.
km 0.925
(e). Rehabilitation of road from Dhaka
Chiitagong Highway to East
Chandishkara Laxum road.
km 0.450
(f). Rehabilitation of road from Dhaka
Chiitagong Highway Nearest BICIC to
Pachra H/O Muktijudda Commander
Taher.
km 0.850
(g). Improvement of road by RCC work
from Dhaka-Ctg highway to Sonakatia
H/O Jafor Driver.
km 0.550
Sub-total of Chaddagram km 4.977 1 31.90
44 MGSP/FNI/W-01 (a). Improvement of Hazrat Phagla Miah
road from Dhaka - Chittagong highway
to Feni Comilla Trunk road
km 1.360 1 30.40 NCB BG No 28-02-2014 30-04-2014 30-03-2015
(b). Improvement of Bijoysingh Dighi west
side to Lotif Bhuiyan road.
km 1.100
.(c) Improvement of Modhupur Hazi
Mukhlesur Rahman road.
km 1.500
(d). Improvement of road at Kadal Gazi rail
gate to Chowrasta.
km 0.650
(e). Improvement of Barahipur Shisu
Kishore Academy road, GA academy
road to Hospital road upto Rail gate.
km 0.900
45 MGSP/FNI/W-02 (a). Improvement of MES Road Hospital
moar to Sonapur.
km 1.100 1 31.30 NCB BG No 28-03-2014 30-06-2014 30-04-2015
(b). Improvement of Lomi Hazari Road km 0.410
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
.(c) Improvement of Bijoy Singh-Abu Bakr road
at Circuit House road to Latif Bhuiya road.
km 1.100
(d). Improvement at Lomi-Hazari road to
Rail gate
km 0.800
46 MGSP/FNI/W-03 (a). Improvement of Hanger road start from
Hospital moar.
km 0.550 1 30.50 NCB BG No 25-04-2014 27-06-2014 27-05-2015
(b). Improvement of Khiru Shah road. km 1.325
.(c) Improvement of Shibpur Nurani
Madrasa road with 1 no cross drain.
km 0.810
(d). Improvement of MP Khaju Miah road
at Shibpur Tremuhini to Soap Factory.
km 0.600
(e). Improvement of Middle Sharipur -
Alauddin market to BISIC
km 1.205
48 MGSP/FNI/W-05 Construction of RCC drain at east side
of Feni Comilla Trunk road and Jail
road to Daudpur khal.
km 1.100 1 30.00 NCB BG No 25-05-2014 27-07-2014 27-06-2015
Sub-total of Feni km 14.510 4 122.20
49 MGSP/PAT/W-01 (a). Improvement of road Sanda Market to
Mager Ghata; via Kalo Fokir tea shop.
km 1.800 1 41.50 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015
(b). Improvement of road from Post Office
to Sabjer Para Mosque including 5 link
roads.
km 1.300
.(c) Improvement of Club Road Circle to
Post Office including 3 link roads.
km 1.000
(d). Improvement of road Dhopa Pukur Par
to Suchakradandi Primary School.
km 1.500
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
(e). Improvement of Cox’s Bazaar road west
side from Indropol to Bipo Nondi road.
km 0.550
(f). Construction of Hadu Chowdhury Bari
road.
km 0.750
50 MGSP/PAT/W-02 (a). Construction of Potiya Kelyshohar
road.
km 0.250 1 43.70 NCB BG Yes 25-03-2014 27-05-2014 27-04-2015
(b). Construction of Alam road & Pike Para
Mohammad Zaman Sikder road.
km 1.250
.(c) Development of Prof. Abul Monsur
Mohammad Ibrahim road &
Improvement of road by Allai to end
point of the Okhara.
km 1.390
(d). Development of Shean para Buirga Bari
road.
km 0.500
(e). Development of South Gobinderkhil
Jamie mosque road to Bahuly link road.
km 0.750
(f). Development of BOC road to Faillatoli
link.
km 0.800
(g). Development of Moulana Nural Hoque
Shah road.
km 0.750
(h). Construction of drain with top slab at
Potiya Indra pool to Upazila Complex
main road
km 1.000
Sub-total of Patiya km 13.590 2 85.20
51 MGSP/MIR/W-01 (a). Improvement of Anuram Sahaji Road. km 1.220 1 66.90 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015
(b). Improvement of Shahid Mostafa road. km 1.000
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
(f) Improvement of Chandpur-Govania
Road
km 5.280
Sub-total of Mirsharai km 7.500 1 66.90
52 MGSP/SIT/W-01 (a). Improvement of Dhongazi road. km 0.600 1 48.80 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015
(b). Improvement of Bohdder road. km 0.510
.(c) Improvement of Golum Mohiuddin
road.
km 0.500
(d). Improvement of Samsu Uddin
Chairman road.
km 0.700
(e). Improvement of Bhuiyanpar road from
Chypar road.
km 0.400
(f). Improvement of Moulavi par road from
Rail line.
km 0.400
(g). Improvement of South Suagazi road
starting from Shibpur Primary School
road.
km 0.400
(h). Improvement of Fokirhat BOC road. km 0.500
(i). Construction of RCC Retaining wall
along the Hasan Gomosta Road near rail
line.
km 0.100
(j). Improvement of Tulatoli road. km 0.500
Sub-total of Sitakunda km 4.610 1 48.80
53 MGSP/CHO/W-01 (a). Improvement of road from Tin Bot Tola
to Shubahania Khom via Kazirpara
station.
km 1.072 1 36.50 NCB BG No 28-02-2014 30-04-2014 30-03-2015
(b). Improvement of road from Pourashava
Office to Gaonosham Bazaar road.
km 0.690
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
.(c) Improvement of road from New Market
corner to Nath par road to Army
Canteen via Ujjal Shop and Kali
Mondir, Hori Mondir and Mahamub
Shop to Chowrasta mur connecting
road.
km 1.025
(d). Improvement of road from Hal Kakara
Nobarun Sanga to Fultala, Fultala to
Thana mur and Thana mur to Mog
Bazar.
km 2.000
(e). Improvement of Chiringa Bitussharaf
road.
km 0.442
(f). Improvement of road from Mog Bazar
Farid Showdagor's dokan to Jahir
Showdagor's house.
km 0.670
54 MGSP/CHO/W-02 (a). Improvement of road from Matamohori
bridge south side to Coch Para Terminal
road via Basgat and Asian hospital
connecting road.
km 2.115 1 42.70 NCB BG Yes 25-03-2014 27-05-2014 27-04-2015
(b). Improvement of road from Jahir
Showdagor's house to Haizza Pukur Par
via Shyed Alam's house.
km 1.000
.(c) Improvement of road from Rain
Community Centre of Arkan road to Al-
Modina Jame Mosjid.
km 0.500
(d). Construction of RCC drian at Chiringa
Bitussharaf road.
km 0.560
Sub-total of Chakoria km 10.074 2 79.20
55 MGSP/SCC/W-01 (a). Improvement of Howladarpara to
Biresh Chandra School road.
km 1.00 1 34.80 NCB BG No 28-02-2014 30-04-2014 30-03-2015
(b). Improvement of Link road from
Shamimabad to Kanishail
km 0.53
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
.(c) Improvement of Gashitula Nobab road
from Osmani Medical road to Kazir
Bazar road.
km 1.50
56 MGSP/SCC/W-02 (a). Improvement of Kazir Bazar and
Sheikghat main road.
km 1.20 1 38.40 NCB BG No 28-03-2014 30-05-2014 30-04-2015
(b). Improvement of Zatarpur main Road km 0.85
.(c) Improvement of road from Shibgonj
Akbori Mosque to Baluchar Road
km 0.95
57 MGSP/SCC/W-03 (a). Improvement of road at Block D of
Upashahar
km 0.60 1 35.60 NCB BG No 28-04-2014 30-06-2014 30-05-2015
(b). Improvement of Mendibag road. km 1.45
.(c) Improvement of road from Kadomtali to
Shib Bari.
km 1.00
(d). Improvement of Road from Dorgah
Moholla to Dorshan
km 1.00
58 MGSP/SCC/W-04 (a). Improvement of Gutatikor Road km 0.70 1 35.20 NCB BG No 28-05-2014 30-07-2014 30-06-2015
(b). Improvement of Road at Perss Club
area.
km 0.42
.(c) Improvement of Dariapara main Road. km 1.00
(d). Improvement of Lechu Bagan road
from Airport road to Housing Estate.
km 1.00
(e). Improvement of Kamla Bagan and
Kunapara Road
km 0.80
59 MGSP/SCC/W-05 (a). Construction of Darussalam Madrasha
Road
km 1.00 1 34.80 NCB BG No 15-06-2014 14-08-2014 13-07-2015
(b). Improvement of Road no-3 at
Chowkidekhi.
km 1.00
.(c) Improvement of Chararpar road km 0.90
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
(d). Construction of drain at Hazaribag area km 0.80
60 MGSP/SCC/W-06 (a). Improvement of road at Soyef Khan-
Londoni road
km 1.20 1 35.10 NCB BG No 25-06-2014 27-082014 27-06-2015
(b). Improvement of Kadomtali Doriashah
Mazar road.
km 1.00
.(c) Improvement of Gupaltila road and
Baluchar road
km 1.00
61 MGSP/SCC/W-07 (a). Improvement of Link road from
Mirapara to Sabuj bag.
km 0.90 1 34.40 NCB BG No 25-07-2014 27-09-2014 27-08-2015
(b). Construction of drain at Zindapir Mazar
to Zinda bazar.
km 0.41
.(c) Construction of drain at Darus Salam
Madras road opposite of PDB office,
Amberkhana.
km 0.85
(d). Construction of drain at Picher Mukh to
Kalapara
km 0.45
(e). Construction of drain at Kazir Bazar
and Sheik ghat
km 0.75
(f). Construction of drain at Sheikghat
Nobab road.
km 1.00
Sub-total of Sylhet km 25.26 7 248.30
62 MGSP/STG/W-01 (a). Improvement of South Lanja Para road
from R&H road to Hazi Zahir Ahmed
road via Hobigonj PBS & improvement
of South Lenja Para Workshop road
from R&H road to Hazi Zahir Ahmed
road via Khairul Alam Councilor's
house.
km 2.296 1 30.80 NCB BG No 28-02-2014 30-04-2014 30-03-2015
(b). Improvement of road at Biramchar from
Syed Elias Saheb's Boiler to Dhaka
Sylhet highway.
km 0.655
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
.(c) Improvement of West Lanja Par road
from Hazi Zahir Ahmed's house to
Shaistagonj kamil Madrasa &
Sudiakhola road.
km 0.745
63 MGSP/STG/W-02 (a). Improvement of road from R&H road to
Ubahata Government Primary School.
km 0.216 1 30.20 NCB BG No 25-03-2014 27-05-2014 27-04-2015
(b). Improvement of road from East Borchor
road to Rail Way Pond via BD Mithro
Saheb's house.
km 1.060
.(c) Improvement of road from
Jagannathpur Mohululsonam mosque to
Sulaiman's house via Zia Uddin's house
km 0.662
d. Improvement of road from Sudikhola
BC road to Sudikhola Old BC road via
Kodar Ali's house.
km 0.844
Sub-total of Shaistagonj km 6.478 2 61.00
64 MGSP/MDP/W-01 (a). Construction of Girder Bridge with
Approach road on Sonal River at
Noagaon to Ganganagar road.
km 0.042 1 60.40 NCB BG Yes 28-02-2014 30-04-2014 30-03-2015
(b). Construction of Bituminous Carpeting
road from Highway to Rajghat Road up
to end of pourashava.
km 1.521
.(c) Construction of Bituminous Carpeting
road from Highway to Ganganagar
house of Probesh Rishi
km 0.635
(d). Construction of RCC road from
Gumutia road to West of Kabarsthan
road via around Krishnanagar.
km 0.715
H/Report/Procurement Plan for 18 months
Sl
No
.
Contract Package
Number
Contract description Unit Estimated
Cost
(in million
Taka)
OR
Actual
Contract
Price with
Contract
Currency)
Procedure
/
Method
Procuremen
t Guideline
(PPA/BG)
Prior
Review*
*
(Yes/No)
Planned
date of bid
opening
(Actual date
of bid
opening)
Planed date
of Contract
Signing
(Actual date
of Contract
Signing)
Planed date
of
Completion
(Actual date
of
Completion)
Name of
Contractor
Progress of
Procuremen
t as of
...............
Remarks
1 2 4 6 7 8 9 10 11 12 13 14 15
Quantity/
Number
53
(e). Construction of protection wall by
palisading, gradewall & earth filling
from Gas field to Shibpur Bridge in
Side khal.
km 1.520
Sub-total of Madhabpur km 4.433 1 60.40
Grand-total 277.58 63 2491.31