2
CONTRACT NO.: 3R-09-MN-HA11-Z03-02 DESCRIPTION : PROPOSED PIPE RELOCATION OF EXISTING 150mmØ WATERLINE ALONG SANCIANGCO FROM GOV. PASCUAL AVE. TO M.H. DEL PILAR AND RETRIEVAL OF 900mmØ OLD STEEL PIPE ALONG GOV. PASCUAL AVE. FROM SANCIANGCO TO NEAR FISHPOND AFFECTED BY DPWH FLOOD CONTROL PROJECT CONTRACTOR : A.A. ALARILLA CONSTRUCTION CO. INC. The above contract was completed in accordance with the approved plans and specifications and hereby turned-over to Maynilad Water Services, Incorporated (Maynilad). NOMER E. GARCIA VP AND AREA MANAGER A.A. ALARILLA CONSTRUCTION CO. INC. That Maynilad Water Services, Inc. hereby certifies that no defects were noted during the maintenance/defects liability period starting on the 28 th day of January 2010 until 28 th day of January 2011. Project Inspection for maintenance / defect liability period was conducted last 25 th day of March 2011. ACCEPTANCE IS HEREBY RECOMMENDED BELEN R. VARELA Head, Reservoir and Pumping Station ELIAS R. LARRACAS Head, Special Projects Form No.: PM-COA-001 Date: 01/17/12 Certificate of (After maintenance / Defect Liability Period)

Dragonhart Tondo COA

Embed Size (px)

Citation preview

Page 1: Dragonhart Tondo COA

CONTRACT NO.: 3R-09-MN-HA11-Z03-02

DESCRIPTION : PROPOSED PIPE RELOCATION OF EXISTING 150mmØ WATERLINE ALONG SANCIANGCO FROM GOV. PASCUAL AVE. TO M.H. DEL PILAR AND RETRIEVAL OF 900mmØ OLD STEEL PIPE ALONG GOV. PASCUAL AVE. FROM SANCIANGCO TO NEAR FISHPOND AFFECTED BY DPWH FLOOD CONTROL PROJECT

CONTRACTOR : A.A. ALARILLA CONSTRUCTION CO. INC.

The above contract was completed in accordance with the approved plans and specifications and hereby turned-over to Maynilad Water Services, Incorporated (Maynilad).

NOMER E. GARCIAVP AND AREA MANAGER

A.A. ALARILLA CONSTRUCTIONCO. INC.

That Maynilad Water Services, Inc. hereby certifies that no defects were noted during the maintenance/defects liability period starting on the 28th day of January 2010 until 28th day of January 2011. Project Inspection for maintenance / defect liability period was conducted last 25th day of March 2011.

ACCEPTANCE IS HEREBY RECOMMENDED

BELEN R. VARELA

Head, Reservoir and Pumping Station

ELIAS R. LARRACASHead, Special Projects

The project is hereby accepted this 8th day of February 2012

ACCEPTANCE

ARLENE A. PESITOHead, Construction Management

Program Management

RUFINO T. DOMINGO JR.Head

Malabon/Navotas Business Area

Form No.: PM-COA-001Date: 01/17/12

Certificate of Acceptance(After maintenance / Defect Liability Period)