CONTRACT NO.: 3R-09-MN-HA11-Z03-02
DESCRIPTION : PROPOSED PIPE RELOCATION OF EXISTING 150mmØ WATERLINE ALONG SANCIANGCO FROM GOV. PASCUAL AVE. TO M.H. DEL PILAR AND RETRIEVAL OF 900mmØ OLD STEEL PIPE ALONG GOV. PASCUAL AVE. FROM SANCIANGCO TO NEAR FISHPOND AFFECTED BY DPWH FLOOD CONTROL PROJECT
CONTRACTOR : A.A. ALARILLA CONSTRUCTION CO. INC.
The above contract was completed in accordance with the approved plans and specifications and hereby turned-over to Maynilad Water Services, Incorporated (Maynilad).
NOMER E. GARCIAVP AND AREA MANAGER
A.A. ALARILLA CONSTRUCTIONCO. INC.
That Maynilad Water Services, Inc. hereby certifies that no defects were noted during the maintenance/defects liability period starting on the 28th day of January 2010 until 28th day of January 2011. Project Inspection for maintenance / defect liability period was conducted last 25th day of March 2011.
ACCEPTANCE IS HEREBY RECOMMENDED
BELEN R. VARELA
Head, Reservoir and Pumping Station
ELIAS R. LARRACASHead, Special Projects
The project is hereby accepted this 8th day of February 2012
ACCEPTANCE
ARLENE A. PESITOHead, Construction Management
Program Management
RUFINO T. DOMINGO JR.Head
Malabon/Navotas Business Area
Form No.: PM-COA-001Date: 01/17/12
Certificate of Acceptance(After maintenance / Defect Liability Period)