    Leader-Sunnic Joint VentureReconstruction, Improvement and Rehabilitation of Kai Tak

    River from Wong Tai Sin Police Station To Tung Tau II Estate

    Contract No.DC/2011/04

    Near Miss Case Report on the failure of anchor eye of water tankat Zone W5 on 12 Dec 2012

    P1 of 4

    1. Record Information

    Date of Event : 12 Dec 2012

    Time : Around 10:30am

    Weather Condition : Fine

    Event Classification : Near Miss Incident

    Scene : Pipe Pile Zone W5

    Injury : Nil

    Loss of property : Nil

    Public Impact : Nil

    2. Circumstance

    This is the record of which a near miss incident was happened on 12December 2012 at about 10:30am. In the cause of trial shifting of a watertank, the anchor eye welded on the water tank for fixing of pumpdischarge pipe was accidentally pulled out. The water tank wasremained stationary on the platform; no property damage, personalinjuries or public nuisance was caused.

    3. Cause of near miss

    After deep investigation and analysis of the case by the Site Agent,Assistant Contruction Manager, Site Engineers, Safety Officerand Assistant Safety Officer, the probable causes could besummarised as follows:

    3.1 The worker misunderstood the purpose of the anchor eye, whichwas not for lifting purpose.

    3.2 No suitable identification sign or warning notice displayed to

  • 7/28/2019 Drill Report on Electric

    2/4

    Leader-Sunnic Joint VentureReconstruction, Improvement and Rehabilitation of Kai Tak

    River from Wong Tai Sin Police Station To Tung Tau II Estate

    Contract No.DC/2011/04

    Near Miss Case Report on the failure of anchor eye of water tankat Zone W5 on 12 Dec 2012

    P2 of 4

    indicate the particular purpose of the anchor eye.

    3.3 Inadequate frontline supervision.

    4 Proposed Improvement Measures

    The proposed measures listed below should be followed:

    4.1 All lifting operation should be monitored and supervised by anexperienced foreman/supervisor

    4.2 To prevent any misunderstanding or misusing, all unnecessary

    anchor eyes should be removed from the water tank.

    4.3 Display warning notice This eye is prohibited for lifting in the

    vicinity of the anchor eye to warn the workers against misusing.

    4.4 Share the lesson learnt from the finding of the near miss incident

    and clearly explain the particular purpose of the anchor eye toarouse the safety awareness among the workers. (Photo 1.)

    4.5 Apply specific colour coding for the anchor eye for ease of

    identification. (Photo 2.)

  • 7/28/2019 Drill Report on Electric

    3/4

    Leader-Sunnic Joint VentureReconstruction, Improvement and Rehabilitation of Kai Tak

    River from Wong Tai Sin Police Station To Tung Tau II Estate

    Contract No.DC/2011/04

    Near Miss Case Report on the failure of anchor eye of water tankat Zone W5 on 12 Dec 2012

    P3 of 4

    Photo 1 Case study briefing was conducted by Safety Officer on 14-Dec-2012

  • 7/28/2019 Drill Report on Electric

    4/4

    Leader-Sunnic Joint VentureReconstruction, Improvement and Rehabilitation of Kai Tak

    River from Wong Tai Sin Police Station To Tung Tau II Estate

    Contract No.DC/2011/04

    Near Miss Case Report on the failure of anchor eye of water tankat Zone W5 on 12 Dec 2012

    P4 of 4

    Photo 2 Proper warning notice This eye is prohibited for lifting was

    displayed on the anchor eye for fixing the pump discharge pipe of water

    tank. Also, specific colour coding for theanchor eye of water tank was

    applied.

    Reported by :

    _____________________T.K. Tsang & Stephen PangSafety Officer, Assistant SafetyOfficer14 December 2012

    Endorsed by :

    _____________________Stephen LeungSite Agent14 December 2012