22
DTE Energy Commercial & Industrial Energy Optimization Program Energy Efficient, Sustainable Detroit DTE Energy Headquarters December 9, 2010

DTE Energy Commercial & Industrial Energy Optimization Program Energy Efficient, Sustainable Detroit DTE Energy Headquarters December 9, 2010

Embed Size (px)

Citation preview

DTE Energy Commercial & Industrial Energy Optimization Program

Energy Efficient, Sustainable Detroit

DTE Energy HeadquartersDecember 9, 2010

Agenda

• DTE Energy Your Energy Savings Program Overview• Making the Program Work For You• How the Program Can Improve

Your Business• Q & A• Closing

2

DTE Energy Your Energy Savings Program Overview

3

• Lower customer bills

• Reduce energy demand throughout Michigan

• Help protect the environment

• Helps motivate as well as offset the costs of investment when upgrading to or replacing with energy efficient products

• Provides long term energy savings

• Lowers electric/gas bills compared to less efficient equipment

• Reduces your carbon footprint

• Michigan Public Act 295 (PA 295)

• Passed October 2008

• Requires investor owned utilities, municipalities, and rural electric cooperatives to institute energy optimization programs

Key Energy Optimization (EO) Elements of Michigan Legislation

PA 295

DTE Energy Participation

Customer Benefits

4

2010 Program Results

• Active applications received: over 1900• Total number of measures: over 4400• Customers involved with program: over 1100• Total incentives reserved for gas and electric

projects: over $10M• Savings of over 120,000 MWH expected• Savings of 300,000 MCF expected

*Based on data as of October 2010

5

Incentive Types

• Prescriptive Incentives – Predetermined measures and incentives for industrial and

commercial customers for the installation of specific energy efficient equipment for numerous applications

– Incentives typically average 20% to 50% of the incremental cost of purchasing qualifying technologies

• Custom Incentives– Custom incentives are determined on a case-by-case basis

and are paid per unit energy saved ($0.08/kWh and/or $4/MCF)

• New Construction & Renovation– Incentives are available for up to $3,000 for whole building

modeling– Additional incentives are determined based on modeling

results showing that energy efficiency exceeds ASHRAE 90.1-2004 standards by 10% 6

Making the Program Work for You

7

2011 Program Overview

• 2011 Program Application was made available on October 1, 2010

• Project must be completed after November 1, 2010 to be considered for 2011 funds

• 2011 Reservation Applications will be accepted after October 1, 2010

• 2011 Final Applications will be accepted after January 1, 2011

8

Requesting a Reservation Before the Prescriptive Project Begins

For PRESCRIPTIVE PROJECTS, the customer must complete and submit ALL of the following pages: APPLICATION CHECKLIST CUSTOMER INFORMATION CONTRACTOR INFORMATION PRESCRIPTIVE WORKSHEETS for each prescriptive energy saving measure

9Note: A Your Energy Savings inspector may contact you to schedule a visit to your facility in order to verify your existing conditions.

Application ChecklistCustomer & Contractor

Information Prescriptive Worksheets

Requesting a Reservation Before the Custom Project Begins

For CUSTOM PROJECTS, the customer must complete and submit ALL of the following pages: APPLICATION CHECKLIST CUSTOMER INFORMATION CONTRACTOR INFORMATION CUSTOM WORKSHEET providing a brief project description ITEMIZED QUOTE providing the cost of each piece of custom equipment MANUFACTURER’S EQUIPMENT SPECIFICATIONS for each piece of custom equipment

10Note: A Your Energy Savings inspector will contact you to schedule a visit to your facility in order to verify your existing conditions.

Requesting an Incentive PaymentAfter the Project Is Completed

For both PRESCRIPTIVE and CUSTOM PROJECT incentives, the customer must complete and submit ALL of the following pages:

APPLICATION CHECKLIST CUSTOMER INFORMATION CONTRACTOR INFORMATION CUSTOMER AGREEMENT All applicable PRESCRIPTIVE and/or CUSTOM WORKSHEETS ITEMIZED INVOICE(S) MANUFACTURER’S EQUIPMENT SPECIFICATIONS for all equipment

11Note: A Your Energy Savings inspector may contact you to schedule a visit to your facility in order to verify the installation and operation of your new equipment.

11

Program Caps and Limitations

Incentive Funds are Limited

Funds are Reserved Based on Availability

Per Facility $25,000 $150,000

Per Customer $100,000 $500,000

Customer sites with self-directed EO programs will not be eligible to participate in DTE Energy’s EO incentive program.

Yearly Program Caps Gas Electric

12

Finding Information on the Website

13

Then Select:1. “My Business”2. “Rebates and Offers”3. “2011 Prescriptive” or “2011 Custom,” depending on your project type

To obtain an application, visit: www.YourEnergySavings.com

13

Downloading an Application

CLICK TO DOWNLOAD EXCEL OR PDF VERSION OF APPLICATION

14

Keeping Informed of Program Status

Orange arrows- Paid:Funds paid to date

Blue arrows- Active: Funds that have been paid to or reserved by our customers

15

How the Program Can Improve Your Business

16

DTE Energy’s Your Energy Savings Program Can Improve Your Business

• Reduces your project cost to customer with EO incentives and allows you the opportunity to become the direct payee

• Builds customer awareness for your company by providing you the opportunity to be listed in the DTE Energy – Energy Efficiency Directory

• Lends credibility to your business• Allows networking with other trade allies• Assists in introducing new technologies

17

Level of Support You Can Count On

• Joint site visits or presentations to identify energy savings opportunities

• Jointly pursuing new market opportunities

• Assistance in quantifying savings for custom measures

• Frequent program updates – quarterly newsletters, new measures, changes in incentives, current status

18

Level of Support You Can Count On

• Collateral Materials Available:– Case Studies– Fact Sheets– Brochures– Guidelines for Completing

Your Application– Policies and Procedures

Manual– Measures Checklist

19

Lessons Learned

• Reserve funds prior to starting your project

• Turn in complete Reservation and Final Applications along with all required documentation

• Work with us to validate the savings projections for custom projects

• Remember that it’s to our advantage to partner with trade allies to improve the program and our offerings

20

QUESTIONS?

21

Thank You!

[email protected]

Or, contact any Your Energy Savings team member for personal assistance.

Phone 1-866-796-0512

Fax1-877-607-0744

Website www.YourEnergySavings.com 22