13
75561 OREGON EXPIRES: 06/30/21 E N G I N E E R J A N . 11 , 2 0 0 5 R E G I S T E R E D P R O F E S S I O N A L J O H N M . K E L L E R ISSUE DATE: PROJECT NO.: SHEET: REVISIONS This document, and the ideas and designs incorporated herein, as an instrument of professional service, is the property of Ki stler Small + White Architects and is not to be used, in whole or in part, for any other project without the written authoriz ation of Kistler Small + White Architects. Copywrite 2016 Kistler Small + White Architects, LLC 66 WATER STREET SUITE 101 ASHLAND, OR 97520 TEL.: 541.488.8200 SOUTHERN OREGON UNIVERSITY SISKIYOU BOULEVARD, ASHLAND OREGON, 97520 THESE DRAWINGS SHALL BE USED FOR: CONSTRUCTION BIDDING RECORDATION CONVEYANCE ISSUANCE OF A PERMIT 7/28/2020 10:48:06 AM M1.0 02.13.2020 1905 PHASE 2 BID SET B R I T T H A L L - R E N O V A T I O N MECHANICAL LEGEND AND NOTES SEISMIC UPGRADE / OHSU RENOVATION - PHASE 2 GENERAL SYMBOLS DUCT & FITTING SYMBOLS GENERAL NOTES HVAC SYMBOLS & ABBREVIATIONS HVAC ABBREVIATIONS PIPE SYMBOLS T XXX XX (F) T P NATURAL GAS PIPING CONDENSATE DRAIN PIPING DIRECTION OF FLOW CHANGE IN SIZE PIPE UNION GATE VALVE BALL VALVE PRESSURE GAUGE TEMPERATURE GAUGE GAUGE PRESSURE REDUCING VALVE PRESSURE & TEMPERATURE GAUGE PORT BALANCING VALVE PUMP CAP TEE UP TEE DOWN PIPE UP PIPE DOWN CHECK VALVE GLOBE VALVE REFRIGERANT PIPING SAFETY RELIEF VALVE TWO WAY CONTROL VALVE THREE WAY CONTROL VALVE STRAINER HOT WATER HEATING RETURN HOT WATER HEATING SUPPLY STEAM CONDENSATE TRAP R NG CD HWHS HWHR CHILLED WATER RETURN CHILLED WATER SUPPLY CWS CWR KEYED NOTES X SHEET NUMBER SECTION DESIGNATION XX XX X XX REMOVED INDICATES ITEMS TO BE ON DEMOLITION PLANS, LINE BREAK GENERAL BREAK SHEET NUMBER (NUMERICAL) DESIGNATION SECTION (LETTER) OR DETAIL REVISION NUMBER POINT OF NEW CONNECTION CAP FOR FUTURE EXISTING ES SMOKE DETECTOR COSP SD D T H or PARALLEL BLADE DAMPER BD M AD EMERGENCY SWITCH CARBON DIOXIDE SENSOR STATIC PRESSURE SENSOR DUCT SMOKE DETECTOR THERMOSTAT OR TEMP SENSOR HUMIDITY SENSOR HUMIDISTAT OR REGISTER, OR DIFFUSER A FIRE RATED GRILLE, PREFIX (F) INDICATES AIRFLOW, CFM OUTLET / INLET TAG LINEAR DIFFUSER REGISTER OR GRILLE WALL OR DUCT EXHAUST GRILLE RETURN GRILLE SUPPLY DIFFUSER DIRECTION OF AIRFLOW FLEXIBLE DUCT CONNECTION OPPOSED BLADE DAMPER BACKDRAFT DAMPER MOTORIZED DAMPER VERTICAL FIRE DAMPER FIRE DAMPER COMBINATION FIRE / SMOKE DAMPER VOLUME DAMPER ACCESS DOOR DUCT WITH INTERNAL ACOUSTICAL INSULATION TEMPERATURE GAUGE FILTER PRESSURE RELIEF GRILLE PRESSURE GAUGE FUTURE AD CEILING ACCESS DOOR GPM X" PIPE SIZE AND FLOW TAG NOTE : ABBREVIATIONS AND SYMBOLS ARE ARCSINE ENGINEERING STANDARDIZED SYMBOL LEGENDS. AS SUCH, ALL SYMBOLS SHOWN MAY NOT APPEAR ON OR WITHIN THIS SET OF CONTRACT DOCUMENTS. VD ON BRANCH DUCT (E) (F) (C) DIMENSIONS ARE INCHES. R D or W R W/ TURNING VANES RECTANGULAR TEE - 90° MITERED ELBOWS D R RND SQR 48x1848x1812"12"12x12 12x12 DOUBLE LINE SINGLE LINE DESCRIPTION DUCT) (ROUND OR RECTANGULAR ELBOW, R=1.5 DIA OR WIDTH 90° OR 45° LONG RADIUS ELBOW W/ TURNING VANES RECTANGULAR MITERED END CAP DUCT SLOPE DOWN (DROP) DUCT SLOPE UP (RISE) (ROUND / OVAL DUCT) 45° LATERAL TAKE-OFF (ROUND / OVAL DUCT) CONICAL 90° TAKE-OFF FROM RECTANGULAR MAIN) (SQR TO RND TAKEOFF TAKE-OFF FITTING W / VD LATERAL HIGH EFFICIENCY (RECTANGULAR DUCT) FLANGED TAKEOFF TRANSITION SQUARE TO ROUND TRANSITION OR SECTION EXHAUST DUCT DOWN OR SECTION EXHAUST DUCT UP DUCT DOWN OR SECTION RETURN OR OSA DUCT UP OR SECTION RETURN OR OSA OR SECTION AWAY SUPPLY DUCT DOWN OR SECTION SUPPLY DUCT UP FLAT OVAL DUCT ROUND DUCT DIAMETER HIDDEN DIMENSION. ALL SECOND NUMBER INDICATES VISIBLE DIMENSION AND FIRST NUMBER INDICATES RECTANGULAR DUCT SIZE SUPPLY AIR RETURN AIR EXHAUST AIR OUTSIDE AIR SA RA OSA EA ECONOMIZER RELIEF AIR ERA FD FD FSD 1 ACFM ACTUAL AIR - CUBIC FEET PER MINUTE ACH AIR CHANGES PER HOUR AD ACCESS DOOR AFF ABOVE FINISH FLOOR AHU AIR HANDLING UNIT AL ALUMINUM AP ACCESS PANEL ARCH ARCHITECT OR ARCHITECTURAL ATD AIR TRANSFER DUCT BD BACKDRAFT DAMPER BLDG BUILDING BM BEAM BOD BOTTOM OF DUCT BOP BOTTOM OF PIPE BOS BOTTOM OF STEEL BTU BRITISH THERMAL UNIT CDV CLOTHES DRYER VENT CFH CUBIC FEET PER HOUR CFM CUBIC FEET PER MINUTE CLG CEILING CONSTR CONSTRUCTION CR CONDENSATE RETURN (STEAM) CWS CHILLED WATER SUPPLY CWR CHILLED WATER RETURN CV CONSTRAINT VOLUME DB DRY BULB DIA DIAMETER DN DOWN DWG DRAWING DX DIRECT EXPANSION (REFRIGERATION) EA EXHAUST AIR EAT ENTERING AIR TEMPERATURE EC ELECTRICAL CONTRACTOR ELEV ELEVATION ERA ECONOMIZER RELIEF AIR ESP EXTERNAL STATIC PRESSURE EWT ENTERING WATER TEMPERATURE EXH EXHAUST °F FAHRENHEIT FC FLEXIBLE CONNECTION FD FIRE DAMPER FLA FULL LOAD AMPS FLR FLOOR FOB FLAT ON BOTTOM FOT FLAT ON TOP FPM FEET PER MINUTE FSD COMBINATION FIRE / SMOKE DAMPER GALV GALVANIZED STEEL GC GENERAL CONTRACTOR GM GAS METER GPM GALLONS PER MINUTE GRD GRILLES, REGISTERS, DIFFUSERS H HUMIDISTAT HDPE HIGH-DENSITY POLYETHYLENE HEPA HIGH EFFICIENCY PARTICULATE AIR HP MOTOR HORSEPOWER HVAC HEATING, VENTING, AND CONDITIONING HWHS HOT WATER HEATING SUPPLY HWHR HOT WATER HEATING RETURN LB(S) POUND, POUNDS LAT LEAVING AIR TEMPERATURE LWT LEAVING WATER TEMPERATURE MA MIXED AIR MAX MAXIMUM MBH THOUSAND BTU PER HOUR MC MECHANICAL CONTRACTOR MCA MINIMUM CIRCUIT CAPACITY MECH MECHANICAL MFR MANUFACTURER MFS MAXIMUM FUSE SIZE MIN MINIMUM MOCP MAXIMUM OVERCURRENT PROTECTION NC NORMALLY CLOSED NG NATURAL GAS NIC NOT IN CONTRACT NO NORMALLY OPEN NTS NOT TO SCALE OBD OPPOSED BLADE DAMPER OC ON CENTER OA or OSA OUTSIDE AIR OMSC 2014 OREGON MECHANICAL SPECIALTY CODE OSSC 2014 OREGON STRUCTURAL SPECIALTY CODE PBD PARALLEL BLADE DAMPER PD PRESSURE DRIP PSI POUNDS PER SQUARE INCH PT PRESSURE / TEMPERATURE PLUG PVC POLYVINYL CHLORIDE RA RETURN AIR RECT RECTANGULAR RPM REVOLUTIONS PER MINUTE REQ'D REQUIRED SA SUPPLY AIR SCFM STANDARD AIR - CUBIC FEET PER MINUTE SEC SECTION SF or SQ FT SQUARE FEET SIM SIMILAR SM SHEET METAL SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION SP STATIC PRESSURE SPEC SPECIFICATION OR SPECIFIED SS STAINLESS STEEL STD STANDARD STM STEAM T THERMOSTAT TA TRANSFER AIR TC TEMPERATURE CONTROLS TEMP TEMPERATURE TOS TOP OF STEEL TYP TYPICAL UNO UNLESS NOTED OTHERWISE VAV VARIABLE AIR VOLUME VD VOLUME DAMPER VFD VARIABLE FREQUENCY DRIVE WB WET BULB W/ WITH WG WATER GAUGE 1. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO CONSTRUCT A COMPLETE, OPERATIONAL HVAC SYSTEM FOR THE ENTIRE PROJECT AS SHOWN ON THESE DRAWINGS, INCLUDING ALL NECESSARY FEES AND PERMITS. 2. THE ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF THE MOST RECENTLY ADOPTED BUILDING CODE, MECHANICAL CODE, PLUMBING CODE, ELECTRICAL CODE, AND ALL OTHER APPLICABLE CITY, COUNTY, STATE, AND FEDERAL CODES AND REGULATIONS IN EFFECT AT THE DATE OF THE BID. WHEREVER THE REQUIREMENTS OF THE SPECIFICATIONS OR DRAWINGS EXCEED THOSE OF THE ITEMS ABOVE, THE REQUIREMENTS OF THE SPECIFICATIONS OR DRAWINGS SHALL GOVERN. 3. WHERE THE MECHANICAL WORK WILL BE INSTALLED IN CLOSE PROXIMITY TO, OR WILL INTERFERE WITH, WORK OF OTHER TRADES, THE CONTRACTOR SHALL ASSIST IN WORKING OUT SPACE CONDITIONS TO MAKE A SATISFACTORY ADJUSTMENT PRIOR TO COMMENCING WORK. IF THE CONTRACTOR INSTALLS HIS/HER WORK BEFORE COORDINATING WITH OTHER TRADES, SO AS TO CAUSE ANY INTERFERENCE WITH WORK OF OTHER TRADES, THE CONTRACTOR SHALL MAKE THE NECESSARY CHANGES IN HIS/HER WORK TO CORRECT THE CONDITION WITHOUT EXTRA CHARGE. 4. THE DRAWINGS SHOW THE GENERAL DESIGN, ARRANGEMENTS AND THE EXTENT OF THE SYSTEM. IT SHALL BE THE WORK OF THE CONTRACTOR TO MAKE SUCH ALTERATIONS AS MAY BE NECESSARY TO MAKE THE SYSTEM COMPLETE AND OPERATIONAL IN ACCORDANCE WITH THE DESIGN INTENT. MAJOR DEVIATIONS SUCH AS CHANGES IN COMPONENT SIZES, WEIGHTS, QUANTITIES, OR MATERIAL REQUIRE PRIOR APPROVAL BY THE CONSULTING ENGINEER. 5. CONTRACTORS AND SUB-CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY DETERMINED WITHOUT REFERENCE TO THE COMPLETE DOCUMENT SET. 6. THE WORKING DRAWINGS ARE DIAGRAMMATIC. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, THEY DO NOT SHOW EVERY OFFSET, BEND OR ELBOW NECESSARY FOR THE COMPLETE INSTALLATION IN THE SPACE PROVIDED. ALL LOCATIONS FOR HVAC EQUIPMENT AND PIPING SHALL BE CHECKED AND COORDINATED WITH THE ARCHITECTURAL, MECHANICAL, STRUCTURAL AND ELECTRICAL DRAWINGS. 7. SPACE ABOVE ALL CEILINGS IS EXTREMELY LIMITED. CONTRACTORS SHOULD EXPECT AN EXTRA-ORDINARY NUMBER OF OFFSETS, TRANSTIONS, ETC. (WHICH MAY OR MAY NOT BE SHOWN ON THE DRAWINGS) WILL BE REQUIRED. CAREFUL COORDINATION IS REQUIRED WITH ALL TRADES BEFORE ANY PIPE, DUCT, OR EQUIPMENT IS ORDERED, FABRICATED, AND/OR INSTALLED. ANY CONFLICTS AND/OR CHANGES FOUND DURING INSTALLATION THAT RESULT FROM LACK OF COORDINATION BY THE CONTRACTORS DURING THE SHOP DRAWING PROCESS ARE THE RESPONSIBILITY OF THE CONTRACTOR. 8. THE DRAWINGS AND SPECIFICATIONS HAVE BEEN PREPARED TO SUPPLEMENT EACH OTHER AND THEY SHALL BE INTERPRETED AS AN INTEGRAL UNIT WITH THE ITEMS SHOWN ON ONE AND NOT THE OTHER BEING FURNISHED AND INSTALLED AS THOUGH SHOWN AND CALLED OUT IN BOTH. 9. DETAILS: THE CONTRACTOR IS RESPONSIBLE TO REVIEW AND USE WHERE APPROPRIATE ALL OF THE MECHANICAL DETAILS SHOWN ON THE DRAWINGS. DETAILS MAY OR MAY NOT BE CALLED OUT ON THE DRAWINGS WITH SYMBOLS OR KEYED NOTES. ANY CHANGES RESULTING FROM FAILURE TO INSTALL THE MECHANICAL SYSTEM WITHOUT USING THE INCLUDED DETAILS IS THE RESPONSIBILITY OF THE CONTRACTOR. 10. PIPING SCHEMATICS: THE CONTRACTOR IS RESPONSIBLE TO REVIEW THE PIPING SCHEMATICS INCLUDED WITH THE DRAWINGS FOR PIPING CONNECTIONS TO ALL MECHANICAL EQUIPMENT. THE PIPING SCHEMATICS SHOW DETAILED CONNECTIONS INCLUDING NECESSARY VALVES, FITTINGS, PRESSURE AND TEMPERATURE GAUGES, ETC., THAT ARE NOT SHOWN ON THE PIPING PLANS. ANY CHANGES RESULTING FROM FAILURE TO INSTALL THE MECHANICAL SYSTEM WITHOUT USING THE INCLUDED PIPING SCHEMATICS IS THE RESPONSIBILITY OF THE CONTRACTOR. 11. ALL DUCTWORK SHALL BE GALVANIZED STEEL, ROUND OR RECTANGULAR. GAUGE, REINFORCEMENT, AND SUPPORT SHALL BE PER SMACNA DUCT CONSTRUCTION STANDARDS. UNLESS NOTED OTHERWISE, SUPPLY AIR DUCTS SHALL BE CONSTRUCTED TO +2” PRESSURE STANDARD, RETURN DUCTS SHALL BE CONSTRUCTED TO -1” PRESSURE STANDARD. SEAL ALL DUCTS TO SMACNA CLASS “B” STANDARDS. INSTALL IN CONFORMANCE TO MECHANICAL CODES. FLEXIBLE DUCTS SHALL BE INSULATED NONMETALLIC, FORM "NM-IL", MAXIMUM LENGTH OF 5'-0" AT DIFFUSER OR GRILLE CONNECTION. PROVIDE BUTTERFLY BALANCING DAMPERS WHERE SHOWN OR REQUIRED, ROUND OR RECTANGULAR, GALVANIZED SHEET METAL, WITH EXTERNAL INDICATING QUADRANT AND SETSCREW. PROVIDE TURNING VANES FOR ALL RECTANGULAR ELBOWS. 12. SHEET METAL DUCT SIZES SHOWN ARE NET CLEAR INSIDE DIMENSIONS. WHEN INTERNAL INSULATION IS REQUIRED, DUCT SIZE SHALL BE INCREASED TO PROVIDE NET CLEAR DIMENSIONS INDICATED. 13. CONTRACTOR SHALL INSTALL EXPOSED DUCTWORK IN A NEAT AND CLEAN MANNER AND UTILIZE SPIRAL DUCTWORK WHERE POSSIBLE. SCRATCHED OR DENTED DUCTWORK SHALL BE REPLACED. THE ARCHITECT AND/OR ENGINEER SHALL BE THE FINAL JUDGE OF ACCEPTANCE. 14. ALL PIPING SERVING AS PART OF A HEATING OR COOLING SYSTEM SHALL BE INSULATED PER SECTION 503.2.8 OF THE OEESC. 15. DUCTWORK INSULATION: A. ALL SUPPLY AIR DUCTS IN UNCONDITIONED SPACES AND PLENUMS (ABOVE CEILINGS, WITHIN CHASES, SHAFTS, OR MECHANICAL ROOMS) AND WITHIN THE BUILDING ENVELOPE SHALL BE INSULATED WITH 2" THICK FIBERGLASS DUCT WRAP FACED WITH OUTER FOIL BLANKET, OR LINED WITH 1-1/2" THICK, COATED FIBERGLASS INSULATION, MINIMUM INSTALLED R-VALUE OF 5. B. ALL OUTSIDE AIR DUCTS IN UNCONDITIONED SPACES AND PLENUMS (ABOVE CEILINGS, WITHIN CHASES, SHAFTS, OR MECHANICAL ROOMS) AND WITHIN THE BUILDING ENVELOPE SHALL BE INSULATED WITH 1-1/2" THICK, 3/4 LB. DENSITY, FIBERGLASS DUCT WRAP FACED WITH OUTER FOIL BLANKET, OR LINED WITH 1/2" THICK, COATED FIBERGLASS INSULATION, MINIMUM INSTALLED R-VALUE OF 1.9. C. ALL OUTSIDE AIR DUCTS WITHIN FULLY CONDITIONED SPACES SHALL BE INSULATED WITH 1-1/2" THICK, 3/4 LB. DENSITY, FIBERGLASS DUCT WRAP FACED WITH OUTER FOIL BLANKET, OR LINED WITH 1" THICK, COATED FIBERGLASS INSULATION, MINIMUM INSTALLED R-VALUE OF 3.5. D. ALL EXHAUST AIR DUCTWORK SHALL BE INSULATED BETWEEN THE FAN OUTLET AND WALL/ROOF OUTLET WITH 1-1/2" THICK, 3/4 LB. DENSITY, FIBERGLASS DUCT WRAP FACED WITH OUTER FOIL BLANKET, MIN. INSTALLED R-VALUE OF 3.5. E. EXPOSED SUPPLY AND RETURN AIR DUCTWORK WITHIN CONDITIONED SPACES NEED NOT BE INSULATED UNLESS NOTED OTHERWISE. 16. PROVIDE FLEXIBLE DUCT CONNECTORS WHERE DUCTS CONNECT TO AIR HANDLING EQUIPMENT. 17. DUCT SMOKE DETECTORS: A. UPON ACTIVATION, THE SMOKE DETECTORS SHALL SHUT DOWN ALL OPERATIONAL CAPABILITIES OF THE AIR DISTRIBUTION SYSTEM IN ACCORDANCE WITH THE LISTING AND LABELING OF APPLIANCES USED IN THE SYSTEM. B. WHEN A FIRE ALARM SYSTEM IS PROVIDED THE DUCT SMOKE DETECTORS SHALL BE CONNECTED TO THE BUILDING'S FIRE ALARM CONTROL PANEL. C. PROVIDE REMOTE TEST AND RESET CAPABILITIES FOR ALL DUCT DETECTORS. 18. THE STRUCTURE SHOWN ON ALL DETAILS MAY OR MAY NOT PERTAIN TO A PORTION OR ANY PORTION OF THE BUILDING. COORDINATE MOUNTING REQUIREMENTS WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS. 19. ALL EQUIPMENT SHALL PROVIDE THE SCHEDULED PERFORMANCE AT THE SITE ALTITUDE OF 1950 FT. ALL MANUFACTURERS’ SUBMITTAL DATA SHEETS SHALL SHOW PERFORMANCE AT SITE ALTITUDE. 20. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL FITTINGS, TRANSITIONS, VALVES, DAMPERS, AND OTHER DEVICES AND ACCESSORIES REQUIRED FOR A COMPLETE, WORKABLE INSTALLATION. 21. ALL MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING MUST BE SEISMICALLY BRACED FOR THE SITE SPECIFIC SEISMIC DESIGN CATEGORY AND SEISMIC USE GROUP, IN ACCORDANCE WITH THE LATEST ADOPTED EDITIONS OF THE OSSC, OMSC, ASHRAE, AND SMACNA. COORDINATE SITE SPECIFIC SEISMIC REQUIREMENTS WITH STRUCTURAL ENGINEER AND/OR ARCHITECT. 22. THE MECHANICAL CONTRACTOR SHALL FURNISH ALL REQUIRED MOTORS AND STARTERS. DISCONNECTS, WHEN NOT A PART OF THE EQUIPMENT, WILL BE FURNISHED BY THE ELECTRICAL CONTRACTOR. 23. EXISTING INTERIOR PIPING, EQUIPMENT, AND DUCTWORK HAS BEEN LOCATED IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL VERIFY LOCATIONS AND POINTS OF CONNECTION AND PIPE ROUTING THROUGH EXISTING CONDITIONS PRIOR TO COMMENCING WORK. 24. IF CONTRACTOR ENCOUNTERS MATERIAL WHICH MAY CONTAIN ASBESTOS, IMMEDIATELY STOP WORK IN THIS AREA AND NOTIFY THE OWNER. 25. THE CONTRACTOR IS RESPONSIBLE FOR HVAC EQUIPMENT CHECK-IN, SAFEKEEPING, AND DAMAGE. 26. DO NOT ROUTE DUCTS AND PIPES ABOVE ELECTRICAL PANELS. ALL ELECTRICAL PANELS MUST HAVE CLEAR ACCESS SPACE IN FRONT OF PANEL 4'-0" DEEP AND 6'-6" HIGH. DO NOT ROUTE DUCT AND PIPES IN ELECTRICAL ROOMS, EXCEPT DUCTS AND PIPES SERVING THE ROOM. 27. COORDINATE EXACT LOCATIONS OF CEILING DIFFUSERS AND GRILLES WITH ARCHITECTURAL REFLECTED CEILING PLAN. 28. ALL FIRE DAMPERS SHOWN ARE 1-1/2 HOUR UNLESS OTHERWISE NOTED. INSTALL IN COMPLIANCE WITH MANUFACTURER’S U.L. LISTING. 29. PROVIDE CEILING ACCESS PANELS AS REQUIRED WHERE MECHANICAL EQUIPMENT, VALVES, VAV BOXES, FIRE DAMPERS, ETC. ARE LOCATED ABOVE INACCESSIBLE CEILINGS. MINIMUM ACCESS PANEL SIZE IS 24”x24” UNLESS OTHERWISE NOTED. 30. TWO OPERATING AND MAINTENANCE MANUALS SHALL BE PROVIDED IN HARD BACK LOOSE LEAF BINDERS. MANUALS SHALL CONTAIN PRODUCT CUT SHEETS AND OPERATING AND MAINTENANCE INSTRUCTIONS ON ALL EQUIPMENT, ACCESSORIES, FIXTURES, VALVES, ETC., PROVIDED FOR THE PROJECT. PROVIDE LIST OF EQUIPMENT WITH ALL NAMEPLATE DATA INCLUDING TAG #, MODEL NUMBER, SERIAL NUMBER, AND NAME OF LOCAL REPLACEMENT PARTS SUPPLIER. 31. UPON COMPLETION OF THE WORK, REMOVE ALL SURPLUS MATERIALS AND RUBBISH. MAKE ALL REQUIRED PATCHING AND REPAIRS OF OTHER TRADES' WORK DAMAGED BY THE MECHANICAL CONTRACTOR, AND LEAVE THE PREMISES IN A CLEAN, ORDERLY CONDITION. 32. THE MECHANICAL CONTRACTOR SHALL OPERATE THE SYSTEM AND DEMONSTRATE ALL ASPECTS TO THE ENGINEER AND/OR OWNER, TO PROVE ITS OPERATION. ALL FILTERS USED DURING CONSTRUCTION SHALL BE REPLACED PRIOR TO THE TEST RUN PERIOD. 33. THE CONTRACTOR SHALL, DURING CONSTRUCTION, MAINTAIN A SET OF AS-BUILT REDLINED RECORD DRAWINGS AT THE PROJECT SITE. ALL CHANGES IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, AND ACCESSORIES SHALL BE RECORDED. SHEET LIST M1.0 MECHANICAL LEGEND AND NOTES M1.1 MECHANICAL SCHEDULES M2.1 BASEMENT MECHANICAL DEMOLITION PLAN M2.2 LEVEL 1 MECHANICAL DEMOLITION PLAN M2.3 LEVEL 2 MECHANICAL DEMOLITION PLAN M3.1 BASEMENT MECHANICAL PLAN - NORTH M3.2 BASEMENT MECHANICAL PLAN - SOUTH M3.3 BASEMENT MECHANICAL PIPING PLAN M3.4 LEVEL 1 MECHANICAL PLAN M3.5 LEVEL 2 MECHANICAL PLAN M3.6 LEVEL 2 MECHANICAL PIPING PLAN AND SECTIONS M4.1 MECHANICAL PIPING SCHEMATIC M4.2 MECHANICAL DETAILS DEMOLISH REPLACE 2 2 IB-1 07.24.2020

DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

  • Upload
    others

  • View
    46

  • Download
    1

Embed Size (px)

Citation preview

Page 1: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N. 11, 2 0 0 5

RE

GIS

T ERED PROF ESSION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

This

docu

ment,

and t

he id

eas a

nd de

signs

inco

rpor

ated h

erein

, as a

n ins

trume

nt of

profe

ssion

al se

rvice

, is th

e pro

perty

of K

istler

Sma

ll + W

hite A

rchite

cts an

d is n

ot to

be us

ed, in

who

le or

in pa

rt, fo

r any

othe

r pro

ject w

ithou

t the

writt

en au

thoriz

ation

of Ki

stler

Sma

ll + W

hite A

rchite

cts.

Copy

write

2016

Kist

ler S

mall +

Whit

e Arch

itects

, LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

7/2

8/2

020

10:4

8:0

6 A

M

M1.0

02.13.2020

1905

PHASE 2BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

MECHANICALLEGEND AND

NOTES

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2

GENERAL SYMBOLSDUCT & FITTING SYMBOLS GENERAL NOTESHVAC SYMBOLS & ABBREVIATIONS HVAC ABBREVIATIONS

PIPE SYMBOLS

T

XXX

XX(F)

T

P

NATURAL GAS PIPING

CONDENSATE DRAIN PIPING

DIRECTION OF FLOW

CHANGE IN SIZE

PIPE UNION

GATE VALVE

BALL VALVE

PRESSURE GAUGE

TEMPERATURE GAUGE GAUGE

PRESSURE REDUCING VALVE

PRESSURE & TEMPERATURE GAUGE PORT

BALANCING VALVE

PUMP

CAP

TEE UP

TEE DOWN

PIPE UP

PIPE DOWN

CHECK VALVE

GLOBE VALVE

REFRIGERANT PIPING

SAFETY RELIEF VALVE

TWO WAY CONTROL VALVE

THREE WAY CONTROL VALVE

STRAINER

HOT WATER HEATING RETURN

HOT WATER HEATING SUPPLY

STEAM CONDENSATE TRAP

R

NG

CD

HWHS

HWHR

CHILLED WATER RETURN

CHILLED WATER SUPPLYCWS

CWR

KEYED NOTES

X

SHEET NUMBER

SECTION DESIGNATION

XX

XX

XXX

REMOVED

INDICATES ITEMS TO BE

ON DEMOLITION PLANS,

LINE BREAK

GENERAL BREAK

SHEET NUMBER

(NUMERICAL) DESIGNATIONSECTION (LETTER) OR DETAIL

REVISION NUMBER

POINT OF NEW CONNECTION

CAP FOR FUTURE

EXISTING

ES

SMOKE DETECTOR

CO₂

SP

SD

D

T

H

or

PARALLEL BLADE DAMPER

BD

M

AD

EMERGENCY SWITCH

CARBON DIOXIDE SENSOR

STATIC PRESSURE SENSOR

DUCT SMOKE DETECTOR

THERMOSTAT OR TEMP SENSOR

HUMIDITY SENSOR

HUMIDISTAT OR

REGISTER, OR DIFFUSER

A FIRE RATED GRILLE,

PREFIX (F) INDICATES

AIRFLOW, CFM

OUTLET / INLET TAG

LINEAR DIFFUSER

REGISTER OR GRILLE

WALL OR DUCT

EXHAUST GRILLE

RETURN GRILLE

SUPPLY DIFFUSER

DIRECTION OF AIRFLOW

FLEXIBLE DUCT CONNECTION

OPPOSED BLADE DAMPER

BACKDRAFT DAMPER

MOTORIZED DAMPER

VERTICAL FIRE DAMPER

FIRE DAMPER

COMBINATION FIRE / SMOKE DAMPER

VOLUME DAMPER

ACCESS DOOR

DUCT WITH INTERNAL ACOUSTICAL INSULATION

TEMPERATURE GAUGE

FILTER

PRESSURE RELIEF GRILLE

PRESSURE GAUGE

FUTURE

ADCEILING ACCESS DOOR

GPM X" PIPE SIZE AND FLOW TAG

NOTE : ABBREVIATIONS AND SYMBOLS ARE ARCSINE

ENGINEERING STANDARDIZED SYMBOL LEGENDS. AS

SUCH, ALL SYMBOLS SHOWN MAY NOT APPEAR ON OR

WITHIN THIS SET OF CONTRACT DOCUMENTS.

VD ON BRANCH DUCT

(E)

(F)

(C)

DIMENSIONS ARE INCHES.

R

D or W

R

W/ TURNING VANES

RECTANGULAR TEE -

90° MITERED ELBOWS

D

R

RNDSQR

48x18∅48x18∅

12"∅ 12"∅

12x1212x12

DOUBLE LINE SINGLE LINE DESCRIPTION

DUCT)

(ROUND OR RECTANGULAR

ELBOW, R=1.5 DIA OR WIDTH90° OR 45° LONG RADIUS

ELBOW W/ TURNING VANES

RECTANGULAR MITERED

END CAP

DUCT SLOPE DOWN (DROP)

DUCT SLOPE UP (RISE)

(ROUND / OVAL DUCT)

45° LATERAL TAKE-OFF

(ROUND / OVAL DUCT)

CONICAL 90° TAKE-OFF

FROM RECTANGULAR MAIN)(SQR TO RND TAKEOFF

TAKE-OFF FITTING W / VD

LATERAL HIGH EFFICIENCY

(RECTANGULAR DUCT)

FLANGED TAKEOFF

TRANSITION

SQUARE TO ROUND

TRANSITION

OR SECTION

EXHAUST DUCT DOWN

OR SECTION

EXHAUST DUCT UP

DUCT DOWN OR SECTIONRETURN OR OSA

DUCT UP OR SECTION

RETURN OR OSA

OR SECTION AWAYSUPPLY DUCT DOWN

OR SECTION

SUPPLY DUCT UP

FLAT OVAL DUCT

ROUND DUCT DIAMETER

HIDDEN DIMENSION. ALLSECOND NUMBER INDICATESVISIBLE DIMENSION ANDFIRST NUMBER INDICATESRECTANGULAR DUCT SIZE

SUPPLY AIR

RETURN AIR

EXHAUST AIR

OUTSIDE AIR

SA

RA

OSA

EA

ECONOMIZER RELIEF AIRERA

FD

FD

FSD

1

ACFM ACTUAL AIR - CUBIC FEET PER MINUTEACH AIR CHANGES PER HOURAD ACCESS DOORAFF ABOVE FINISH FLOORAHU AIR HANDLING UNITAL ALUMINUMAP ACCESS PANELARCH ARCHITECT OR ARCHITECTURALATD AIR TRANSFER DUCT

BD BACKDRAFT DAMPERBLDG BUILDINGBM BEAMBOD BOTTOM OF DUCTBOP BOTTOM OF PIPEBOS BOTTOM OF STEELBTU BRITISH THERMAL UNIT

CDV CLOTHES DRYER VENTCFH CUBIC FEET PER HOURCFM CUBIC FEET PER MINUTECLG CEILINGCONSTR CONSTRUCTIONCR CONDENSATE RETURN (STEAM)CWS CHILLED WATER SUPPLYCWR CHILLED WATER RETURNCV CONSTRAINT VOLUME

DB DRY BULBDIA DIAMETERDN DOWNDWG DRAWINGDX DIRECT EXPANSION (REFRIGERATION)

EA EXHAUST AIREAT ENTERING AIR TEMPERATUREEC ELECTRICAL CONTRACTORELEV ELEVATIONERA ECONOMIZER RELIEF AIRESP EXTERNAL STATIC PRESSUREEWT ENTERING WATER TEMPERATUREEXH EXHAUST

°F FAHRENHEITFC FLEXIBLE CONNECTIONFD FIRE DAMPERFLA FULL LOAD AMPSFLR FLOORFOB FLAT ON BOTTOMFOT FLAT ON TOPFPM FEET PER MINUTEFSD COMBINATION FIRE / SMOKE DAMPER

GALV GALVANIZED STEELGC GENERAL CONTRACTORGM GAS METERGPM GALLONS PER MINUTEGRD GRILLES, REGISTERS, DIFFUSERS

H HUMIDISTATHDPE HIGH-DENSITY POLYETHYLENEHEPA HIGH EFFICIENCY PARTICULATE AIRHP MOTOR HORSEPOWERHVAC HEATING, VENTING, AND CONDITIONINGHWHS HOT WATER HEATING SUPPLYHWHR HOT WATER HEATING RETURN

LB(S) POUND, POUNDSLAT LEAVING AIR TEMPERATURELWT LEAVING WATER TEMPERATURE

MA MIXED AIRMAX MAXIMUMMBH THOUSAND BTU PER HOURMC MECHANICAL CONTRACTORMCA MINIMUM CIRCUIT CAPACITYMECH MECHANICALMFR MANUFACTURERMFS MAXIMUM FUSE SIZEMIN MINIMUMMOCP MAXIMUM OVERCURRENT PROTECTION

NC NORMALLY CLOSEDNG NATURAL GASNIC NOT IN CONTRACTNO NORMALLY OPENNTS NOT TO SCALE

OBD OPPOSED BLADE DAMPEROC ON CENTEROA or OSA OUTSIDE AIROMSC 2014 OREGON MECHANICAL SPECIALTY CODEOSSC 2014 OREGON STRUCTURAL SPECIALTY CODE

PBD PARALLEL BLADE DAMPERPD PRESSURE DRIPPSI POUNDS PER SQUARE INCHPT PRESSURE / TEMPERATURE PLUGPVC POLYVINYL CHLORIDE

RA RETURN AIRRECT RECTANGULARRPM REVOLUTIONS PER MINUTEREQ'D REQUIRED

SA SUPPLY AIRSCFM STANDARD AIR - CUBIC FEET PER MINUTESEC SECTIONSF or SQ FT SQUARE FEETSIM SIMILARSM SHEET METALSMACNA SHEET METAL AND AIR CONDITIONING

CONTRACTORS NATIONAL ASSOCIATIONSP STATIC PRESSURESPEC SPECIFICATION OR SPECIFIEDSS STAINLESS STEELSTD STANDARDSTM STEAM

T THERMOSTATTA TRANSFER AIRTC TEMPERATURE CONTROLSTEMP TEMPERATURETOS TOP OF STEELTYP TYPICAL

UNO UNLESS NOTED OTHERWISE

VAV VARIABLE AIR VOLUMEVD VOLUME DAMPERVFD VARIABLE FREQUENCY DRIVE

WB WET BULBW/ WITHWG WATER GAUGE

1. PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO CONSTRUCT A COMPLETE, OPERATIONAL HVAC SYSTEM FOR THE ENTIRE PROJECT AS SHOWN ON THESE DRAWINGS, INCLUDING ALL NECESSARY FEES AND PERMITS.

2. THE ENTIRE INSTALLATION SHALL CONFORM TO THE REQUIREMENTS OF THE MOST RECENTLY ADOPTED BUILDING CODE, MECHANICAL CODE, PLUMBING CODE, ELECTRICAL CODE, AND ALL OTHER APPLICABLE CITY, COUNTY, STATE, AND FEDERAL CODES AND REGULATIONS IN EFFECT AT THE DATE OF THE BID. WHEREVER THE REQUIREMENTS OF THE SPECIFICATIONS OR DRAWINGS EXCEED THOSE OF THE ITEMS ABOVE, THE REQUIREMENTS OF THE SPECIFICATIONS OR DRAWINGS SHALL GOVERN.

3. WHERE THE MECHANICAL WORK WILL BE INSTALLED IN CLOSE PROXIMITY TO, OR WILL INTERFERE WITH, WORK OF OTHER TRADES, THE CONTRACTOR SHALL ASSIST IN WORKING OUT SPACE CONDITIONS TO MAKE A SATISFACTORY ADJUSTMENT PRIOR TO COMMENCING WORK. IF THE CONTRACTOR INSTALLS HIS/HER WORK BEFORE COORDINATING WITH OTHER TRADES, SO AS TO CAUSE ANY INTERFERENCE WITH WORK OF OTHER TRADES, THE CONTRACTOR SHALL MAKE THE NECESSARY CHANGES IN HIS/HER WORK TO CORRECT THE CONDITION WITHOUT EXTRA CHARGE.

4. THE DRAWINGS SHOW THE GENERAL DESIGN, ARRANGEMENTS AND THE EXTENT OF THE SYSTEM. IT SHALL BE THE WORK OF THE CONTRACTOR TO MAKE SUCH ALTERATIONS AS MAY BE NECESSARY TO MAKE THE SYSTEM COMPLETE AND OPERATIONAL IN ACCORDANCE WITH THE DESIGN INTENT. MAJOR DEVIATIONS SUCH AS CHANGES IN COMPONENT SIZES, WEIGHTS, QUANTITIES, OR MATERIAL REQUIRE PRIOR APPROVAL BY THE CONSULTING ENGINEER.

5. CONTRACTORS AND SUB-CONTRACTORS SHALL CAREFULLY REVIEW THE CONSTRUCTION DOCUMENTS. INFORMATION REGARDING THE COMPLETE WORK IS DISPERSED THROUGHOUT THE DOCUMENT SET AND CANNOT BE ACCURATELY DETERMINED WITHOUT REFERENCE TO THE COMPLETE DOCUMENT SET.

6. THE WORKING DRAWINGS ARE DIAGRAMMATIC. BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, THEY DO NOT SHOW EVERY OFFSET, BEND OR ELBOW NECESSARY FOR THE COMPLETE INSTALLATION IN THE SPACE PROVIDED. ALL LOCATIONS FOR HVAC EQUIPMENT AND PIPING SHALL BE CHECKED AND COORDINATED WITH THE ARCHITECTURAL, MECHANICAL, STRUCTURAL AND ELECTRICAL DRAWINGS.

7. SPACE ABOVE ALL CEILINGS IS EXTREMELY LIMITED. CONTRACTORS SHOULD EXPECT AN EXTRA-ORDINARY NUMBER OF OFFSETS, TRANSTIONS, ETC. (WHICH MAY OR MAY NOT BE SHOWN ON THE DRAWINGS) WILL BE REQUIRED. CAREFUL COORDINATION IS REQUIRED WITH ALL TRADES BEFORE ANY PIPE, DUCT, OR EQUIPMENT IS ORDERED, FABRICATED, AND/OR INSTALLED. ANY CONFLICTS AND/OR CHANGES FOUND DURING INSTALLATION THAT RESULT FROM LACK OF COORDINATION BY THE CONTRACTORS DURING THE SHOP DRAWING PROCESS ARE THE RESPONSIBILITY OF THE CONTRACTOR.

8. THE DRAWINGS AND SPECIFICATIONS HAVE BEEN PREPARED TO SUPPLEMENT EACH OTHER AND THEY SHALL BE INTERPRETED AS AN INTEGRAL UNIT WITH THE ITEMS SHOWN ON ONE AND NOT THE OTHER BEING FURNISHED AND INSTALLED AS THOUGH SHOWN AND CALLED OUT IN BOTH.

9. DETAILS: THE CONTRACTOR IS RESPONSIBLE TO REVIEW AND USE WHERE APPROPRIATE ALL OF THE MECHANICAL DETAILS SHOWN ON THE DRAWINGS. DETAILS MAY OR MAY NOT BE CALLED OUT ON THE DRAWINGS WITH SYMBOLS OR KEYED NOTES. ANY CHANGES RESULTING FROM FAILURE TO INSTALL THE MECHANICAL SYSTEM WITHOUT USING THE INCLUDED DETAILS IS THE RESPONSIBILITY OF THE CONTRACTOR.

10. PIPING SCHEMATICS: THE CONTRACTOR IS RESPONSIBLE TO REVIEW THE PIPING SCHEMATICS INCLUDED WITH THE DRAWINGS FOR PIPING CONNECTIONS TO ALL MECHANICAL EQUIPMENT. THE PIPING SCHEMATICS SHOW DETAILED CONNECTIONS INCLUDING NECESSARY VALVES, FITTINGS, PRESSURE AND TEMPERATURE GAUGES, ETC., THAT ARE NOT SHOWN ON THE PIPING PLANS. ANY CHANGES RESULTING FROM FAILURE TO INSTALL THE MECHANICAL SYSTEM WITHOUT USING THE INCLUDED PIPING SCHEMATICS IS THE RESPONSIBILITY OF THE CONTRACTOR.

11. ALL DUCTWORK SHALL BE GALVANIZED STEEL, ROUND OR RECTANGULAR. GAUGE, REINFORCEMENT, AND SUPPORT SHALL BE PER SMACNA DUCT CONSTRUCTION STANDARDS. UNLESS NOTED OTHERWISE, SUPPLY AIR DUCTS SHALL BE CONSTRUCTED TO +2” PRESSURE STANDARD, RETURN DUCTS SHALL BE CONSTRUCTED TO -1” PRESSURE STANDARD. SEAL ALL DUCTS TO SMACNA CLASS “B” STANDARDS. INSTALL IN CONFORMANCE TO MECHANICAL CODES. FLEXIBLE DUCTS SHALL BE INSULATED NONMETALLIC, FORM "NM-IL", MAXIMUM LENGTH OF 5'-0" AT DIFFUSER OR GRILLE CONNECTION. PROVIDE BUTTERFLY BALANCING DAMPERS WHERE SHOWN OR REQUIRED, ROUND OR RECTANGULAR, GALVANIZED SHEET METAL, WITH EXTERNAL INDICATING QUADRANT AND SETSCREW. PROVIDE TURNING VANES FOR ALL RECTANGULAR ELBOWS.

12. SHEET METAL DUCT SIZES SHOWN ARE NET CLEAR INSIDE DIMENSIONS. WHEN INTERNAL INSULATION IS REQUIRED, DUCT SIZE SHALL BE INCREASED TO PROVIDE NET CLEAR DIMENSIONS INDICATED.

13. CONTRACTOR SHALL INSTALL EXPOSED DUCTWORK IN A NEAT AND CLEAN MANNER AND UTILIZE SPIRAL DUCTWORK WHERE POSSIBLE. SCRATCHED OR DENTED DUCTWORK SHALL BE REPLACED. THE ARCHITECT AND/OR ENGINEER SHALL BE THE FINAL JUDGE OF ACCEPTANCE.

14. ALL PIPING SERVING AS PART OF A HEATING OR COOLING SYSTEM SHALL BE INSULATED PER SECTION 503.2.8 OF THE OEESC.

15. DUCTWORK INSULATION:A. ALL SUPPLY AIR DUCTS IN UNCONDITIONED SPACES AND PLENUMS (ABOVE CEILINGS, WITHIN CHASES, SHAFTS, OR MECHANICAL ROOMS) AND WITHIN THE BUILDING ENVELOPE SHALL BE INSULATED WITH 2"

THICK FIBERGLASS DUCT WRAP FACED WITH OUTER FOIL BLANKET, OR LINED WITH 1-1/2" THICK, COATED FIBERGLASS INSULATION, MINIMUM INSTALLED R-VALUE OF 5.B. ALL OUTSIDE AIR DUCTS IN UNCONDITIONED SPACES AND PLENUMS (ABOVE CEILINGS, WITHIN CHASES, SHAFTS, OR MECHANICAL ROOMS) AND WITHIN THE BUILDING ENVELOPE SHALL BE INSULATED WITH

1-1/2" THICK, 3/4 LB. DENSITY, FIBERGLASS DUCT WRAP FACED WITH OUTER FOIL BLANKET, OR LINED WITH 1/2" THICK, COATED FIBERGLASS INSULATION, MINIMUM INSTALLED R-VALUE OF 1.9.C. ALL OUTSIDE AIR DUCTS WITHIN FULLY CONDITIONED SPACES SHALL BE INSULATED WITH 1-1/2" THICK, 3/4 LB. DENSITY, FIBERGLASS DUCT WRAP FACED WITH OUTER FOIL BLANKET, OR LINED WITH 1" THICK,

COATED FIBERGLASS INSULATION, MINIMUM INSTALLED R-VALUE OF 3.5.D. ALL EXHAUST AIR DUCTWORK SHALL BE INSULATED BETWEEN THE FAN OUTLET AND WALL/ROOF OUTLET WITH 1-1/2" THICK, 3/4 LB. DENSITY, FIBERGLASS DUCT WRAP FACED WITH OUTER FOIL BLANKET,

MIN. INSTALLED R-VALUE OF 3.5.E. EXPOSED SUPPLY AND RETURN AIR DUCTWORK WITHIN CONDITIONED SPACES NEED NOT BE INSULATED UNLESS NOTED OTHERWISE.

16. PROVIDE FLEXIBLE DUCT CONNECTORS WHERE DUCTS CONNECT TO AIR HANDLING EQUIPMENT.

17. DUCT SMOKE DETECTORS:A. UPON ACTIVATION, THE SMOKE DETECTORS SHALL SHUT DOWN ALL OPERATIONAL CAPABILITIES OF THE AIR DISTRIBUTION SYSTEM IN ACCORDANCE WITH THE LISTING AND LABELING OF APPLIANCES USED

IN THE SYSTEM.B. WHEN A FIRE ALARM SYSTEM IS PROVIDED THE DUCT SMOKE DETECTORS SHALL BE CONNECTED TO THE BUILDING'S FIRE ALARM CONTROL PANEL. C. PROVIDE REMOTE TEST AND RESET CAPABILITIES FOR ALL DUCT DETECTORS.

18. THE STRUCTURE SHOWN ON ALL DETAILS MAY OR MAY NOT PERTAIN TO A PORTION OR ANY PORTION OF THE BUILDING. COORDINATE MOUNTING REQUIREMENTS WITH ARCHITECTURAL AND STRUCTURALDRAWINGS.

19. ALL EQUIPMENT SHALL PROVIDE THE SCHEDULED PERFORMANCE AT THE SITE ALTITUDE OF 1950 FT. ALL MANUFACTURERS’ SUBMITTAL DATA SHEETS SHALL SHOW PERFORMANCE AT SITE ALTITUDE.

20. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL FITTINGS, TRANSITIONS, VALVES, DAMPERS, AND OTHER DEVICES AND ACCESSORIES REQUIRED FOR A COMPLETE, WORKABLE INSTALLATION.

21. ALL MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING MUST BE SEISMICALLY BRACED FOR THE SITE SPECIFIC SEISMIC DESIGN CATEGORY AND SEISMIC USE GROUP, IN ACCORDANCE WITH THE LATESTADOPTED EDITIONS OF THE OSSC, OMSC, ASHRAE, AND SMACNA. COORDINATE SITE SPECIFIC SEISMIC REQUIREMENTS WITH STRUCTURAL ENGINEER AND/OR ARCHITECT.

22. THE MECHANICAL CONTRACTOR SHALL FURNISH ALL REQUIRED MOTORS AND STARTERS. DISCONNECTS, WHEN NOT A PART OF THE EQUIPMENT, WILL BE FURNISHED BY THE ELECTRICAL CONTRACTOR.

23. EXISTING INTERIOR PIPING, EQUIPMENT, AND DUCTWORK HAS BEEN LOCATED IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL VERIFY LOCATIONS AND POINTS OF CONNECTION AND PIPE ROUTINGTHROUGH EXISTING CONDITIONS PRIOR TO COMMENCING WORK.

24. IF CONTRACTOR ENCOUNTERS MATERIAL WHICH MAY CONTAIN ASBESTOS, IMMEDIATELY STOP WORK IN THIS AREA AND NOTIFY THE OWNER.

25. THE CONTRACTOR IS RESPONSIBLE FOR HVAC EQUIPMENT CHECK-IN, SAFEKEEPING, AND DAMAGE.

26. DO NOT ROUTE DUCTS AND PIPES ABOVE ELECTRICAL PANELS. ALL ELECTRICAL PANELS MUST HAVE CLEAR ACCESS SPACE IN FRONT OF PANEL 4'-0" DEEP AND 6'-6" HIGH. DO NOT ROUTE DUCT AND PIPES IN ELECTRICAL ROOMS, EXCEPT DUCTS AND PIPES SERVING THE ROOM.

27. COORDINATE EXACT LOCATIONS OF CEILING DIFFUSERS AND GRILLES WITH ARCHITECTURAL REFLECTED CEILING PLAN.

28. ALL FIRE DAMPERS SHOWN ARE 1-1/2 HOUR UNLESS OTHERWISE NOTED. INSTALL IN COMPLIANCE WITH MANUFACTURER’S U.L. LISTING.

29. PROVIDE CEILING ACCESS PANELS AS REQUIRED WHERE MECHANICAL EQUIPMENT, VALVES, VAV BOXES, FIRE DAMPERS, ETC. ARE LOCATED ABOVE INACCESSIBLE CEILINGS. MINIMUM ACCESS PANEL SIZE IS 24”x24” UNLESS OTHERWISE NOTED.

30. TWO OPERATING AND MAINTENANCE MANUALS SHALL BE PROVIDED IN HARD BACK LOOSE LEAF BINDERS. MANUALS SHALL CONTAIN PRODUCT CUT SHEETS AND OPERATING AND MAINTENANCE INSTRUCTIONS ON ALL EQUIPMENT, ACCESSORIES, FIXTURES, VALVES, ETC., PROVIDED FOR THE PROJECT. PROVIDE LIST OF EQUIPMENT WITH ALL NAMEPLATE DATA INCLUDING TAG #, MODEL NUMBER, SERIAL NUMBER, AND NAME OF LOCAL REPLACEMENT PARTS SUPPLIER.

31. UPON COMPLETION OF THE WORK, REMOVE ALL SURPLUS MATERIALS AND RUBBISH. MAKE ALL REQUIRED PATCHING AND REPAIRS OF OTHER TRADES' WORK DAMAGED BY THE MECHANICAL CONTRACTOR, AND LEAVE THE PREMISES IN A CLEAN, ORDERLY CONDITION.

32. THE MECHANICAL CONTRACTOR SHALL OPERATE THE SYSTEM AND DEMONSTRATE ALL ASPECTS TO THE ENGINEER AND/OR OWNER, TO PROVE ITS OPERATION. ALL FILTERS USED DURING CONSTRUCTION SHALL BE REPLACED PRIOR TO THE TEST RUN PERIOD.

33. THE CONTRACTOR SHALL, DURING CONSTRUCTION, MAINTAIN A SET OF AS-BUILT REDLINED RECORD DRAWINGS AT THE PROJECT SITE. ALL CHANGES IN LAYOUT, ROUTING, EQUIPMENT, COMPONENTS, AND ACCESSORIES SHALL BE RECORDED.

SHEET LIST

M1.0 MECHANICAL LEGEND AND NOTES

M1.1 MECHANICAL SCHEDULES

M2.1 BASEMENT MECHANICAL DEMOLITION PLAN

M2.2 LEVEL 1 MECHANICAL DEMOLITION PLAN

M2.3 LEVEL 2 MECHANICAL DEMOLITION PLAN

M3.1 BASEMENT MECHANICAL PLAN - NORTH

M3.2 BASEMENT MECHANICAL PLAN - SOUTH

M3.3 BASEMENT MECHANICAL PIPING PLAN

M3.4 LEVEL 1 MECHANICAL PLAN

M3.5 LEVEL 2 MECHANICAL PLAN

M3.6 LEVEL 2 MECHANICAL PIPING PLAN AND SECTIONS

M4.1 MECHANICAL PIPING SCHEMATIC

M4.2 MECHANICAL DETAILS

DEMOLISH

REPLACE

2

2 IB-1 07.24.2020

mcnamaraj
Text Box
EXHIBIT B TO BRITT HALL COMMISSIONING RFP 2021-XX
Page 2: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N. 11, 2 0 0 5

RE

GIS

T ERED PROF ESSION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

This

docu

ment,

and t

he id

eas a

nd de

signs

inco

rpor

ated h

erein

, as a

n ins

trume

nt of

profe

ssion

al se

rvice

, is th

e pro

perty

of K

istler

Sma

ll + W

hite A

rchite

cts an

d is n

ot to

be us

ed, in

who

le or

in pa

rt, fo

r any

othe

r pro

ject w

ithou

t the

writt

en au

thoriz

ation

of Ki

stler

Sma

ll + W

hite A

rchite

cts.

Copy

write

2016

Kist

ler S

mall +

Whit

e Arch

itects

, LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

7/2

8/2

020

10:4

8:0

7 A

M

M1.1

02.13.2020

1905

PHASE 2BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

MECHANICALSCHEDULES

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2

3

3

2 IB-1 07.24.20203 IB-2 07.24.2020

2

2

Page 3: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

FD

FD

1

D

2 1195 6 7 843

C

A

E

F

G

H

I

10 12

J

BDEMO STM & CR FROM FLOOR LEVEL TO 2ND LEVEL ATTIC

FLOOR MOUNTED STEAM HEATERS WERE REMOVED IN THE PREVIOUS PHASE. REMOVE ALL REMAINING EXPOSED PIPING AND CAP BELOW FLOOR LEVEL. TYPICAL, 13 PLACES.

STM AND CR OFFSET IN CEILING

CWS, CWR, STM, AND CR UP

CWS & CWR UP TO ROOF TO REMAIN

(E) 4” STM (NEAR FLR) AND 1-1/2” PUMPED CR TO REMAIN

(E) 4" CWS & CWR TO REMAIN

(E) STM & CR TO REMAIN

1 1/2" PUMPED CR TO REMAIN

2

M2.1

REMOVE AND REPLACE 4" STM AND 1-1/2" PUMPED CR IN THIS AREA AS REQUIRED FOR INSTALLATION OF SHOTCRETE

DEMO STEAM MANIFOLD

DEMO STM AND CR TO ROOF

2

3

1-1/2" PUMPED CR TO REMAIN

REPLACE TRAP AND STRAINER OFF STEAM MAIN DRIP LEG

STEAM MAIN DRIP LEG TO REMAIN

STEAM MAIN FROM ADJACENT MECHANICAL SUPPORT ROOM

DEMOLISH STEAM MANIFOLD

DEMO GRAVITY CONDENSATE FROM (E) AC-1

DUCTWORK DEMO'D IN 1ST PHASE

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N. 11, 2 0 0 5

RE

GIS

T ERED PROF ESSION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

This

docu

ment,

and t

he id

eas a

nd de

signs

inco

rpor

ated h

erein

, as a

n ins

trume

nt of

profe

ssion

al se

rvice

, is th

e pro

perty

of K

istler

Sma

ll + W

hite A

rchite

cts an

d is n

ot to

be us

ed, in

who

le or

in pa

rt, fo

r any

othe

r pro

ject w

ithou

t the

writt

en au

thoriz

ation

of Ki

stler

Sma

ll + W

hite A

rchite

cts.

Copy

write

2016

Kist

ler S

mall +

Whit

e Arch

itects

, LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

7/2

8/2

020

10:4

8:0

9 A

M

M2.1

02.13.2020

1905

PHASE 2BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

BASEMENTMECHANICAL

DEMOLITION PLAN

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2

1/8" = 1'-0"1

BASEMENT MECHANICAL DEMOLITION PLAN

SHEET NOTES

A. EXISTING INTERIOR PIPING, EQUIPMENT, AND DUCTWORK HAS BEEN LOCATED IN AN APPROXIMATE WAY ONLY. FIELD VERIFY LOCATION AND SIZE OF ALL EXISTING DUCTWORK, PIPING AND EQUIPMENT.

B. ABBREVIATIONS:STM STEAMCR STEAM CONDENSATE RETURNCWS CHILLED WATER SUPPLYCWR CHILLED WATER RETURN

POINT OF DEMOLITION. REMOVE PIPE FROM THIS POINT.

NOT TO SCALE2

STEAM MANIFOLD

2 IB-1 07.24.20203 IB-2 07.24.2020

Page 4: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

1

D

2 1195 6 7 843

C

E

F

G

H

I

10 12

J

K

B

1 2 3 4 5 6 7 8 9 10 11 12

B

C

D

E

F

G

H

I

J

K

DEMOLISH EXHAUST DUCT AND FAN ON ROOF ABOVE

DEMOLISH EXHAUST DUCT AND FAN ON ROOF ABOVE

DEMO STM & CR

DEMO STM & CR

(E)CWS & CWR TO REMAIN

(E)1-1/2" CWS & CWR TO REMAIN

REMOVE ALL DUCTWORK IN THIS AREA.

REMOVE BRANCH DUCT INTO LOBBY FROM AHU-4. CAP DUCT.

2

3

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N. 11, 2 0 0 5

RE

GIS

T ERED PROF ESSION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

This

docu

ment,

and t

he id

eas a

nd de

signs

inco

rpor

ated h

erein

, as a

n ins

trume

nt of

profe

ssion

al se

rvice

, is th

e pro

perty

of K

istler

Sma

ll + W

hite A

rchite

cts an

d is n

ot to

be us

ed, in

who

le or

in pa

rt, fo

r any

othe

r pro

ject w

ithou

t the

writt

en au

thoriz

ation

of Ki

stler

Sma

ll + W

hite A

rchite

cts.

Copy

write

2016

Kist

ler S

mall +

Whit

e Arch

itects

, LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

7/2

8/2

020

10:4

8:1

1 A

M

M2.2

02.13.2020

1905

PHASE 2BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

LEVEL 1MECHANICAL

DEMOLITION PLAN

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2

1/8" = 1'-0"1

LEVEL 1 MECHANICAL DEMOLITION PLAN

SHEET NOTES

A. EXISTING INTERIOR PIPING, EQUIPMENT, AND DUCTWORK HAS BEEN LOCATED IN AN APPROXIMATE WAY ONLY. FIELD VERIFY LOCATION AND SIZE OF ALL EXISTING DUCTWORK, PIPING AND EQUIPMENT.

B. ABBREVIATIONS:STM STEAMCR STEAM CONDENSATE RETURNCWS CHILLED WATER SUPPLYCWR CHILLED WATER RETURN

POINT OF DEMOLITION. REMOVE PIPE OR DUCT FROM THIS POINT.

2 IB-1 07.24.20203 IB-2 07.24.2020

Page 5: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

D

5 6 7 843

C

B

3 4 5 6 7 8

B

C

D

BASE BID. REMOVE (E) EXH FANAND CAP CURB.

BASE BID. REMOVE (E) EXH FANAND REPLACE WITH NEW.SEE M3.5.

60x20 DEMO ALL HATCHED

DUCTWORK

36x30

36x18

DEMO SIDEWALL RETURN GRILLE AND BRANCH DUCT ON BACK WALL OF STAGE,

TYP OF 2.

DEMO RETURN FAN AND DUCTWORK

DEMO FAN COIL.

DEMO DUCT MOUNTED COOLING COIL.

DEMO FAN COIL AND DUCTWORK

(E) LOUVER TO REMAIN, DEMO ALL CONNECTED DUCTWORK IN ATTIC

(E) LOUVER TO REMAIN. DEMO RELIEF DUCTWORK IN ATTIC. LOWER EXHAUST DUCTWORK TO REMAIN.(E) EXH FAN (F-10) AND

DUCTWORK TO REMAIN

DEMO (E) FAN COIL, BRANCH PIPING AND ALL ASSOCIATED DUCTWORK. (PREVIOUSLY ABANDONED IN PLACE)

DEMO ALL STEAM AND CONDENSATE PIPING FROM BASEMENT TO COIL CONNECTIONS IN ATTIC

DEMO DUCT MNT COOLING COIL.

DEMO SUPPLY AND EXHAUST GRILLES IN RESTROOMS, TYP.

DEMO BRANCH EA DUCT AND GRILLE

2

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N. 11, 2 0 0 5

RE

GIS

T ERED PROF ESSION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

This

docu

ment,

and t

he id

eas a

nd de

signs

inco

rpor

ated h

erein

, as a

n ins

trume

nt of

profe

ssion

al se

rvice

, is th

e pro

perty

of K

istler

Sma

ll + W

hite A

rchite

cts an

d is n

ot to

be us

ed, in

who

le or

in pa

rt, fo

r any

othe

r pro

ject w

ithou

t the

writt

en au

thoriz

ation

of Ki

stler

Sma

ll + W

hite A

rchite

cts.

Copy

write

2016

Kist

ler S

mall +

Whit

e Arch

itects

, LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

7/2

8/2

020

10:4

8:1

2 A

M

M2.3

02.13.2020

1905

PHASE 2BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

LEVEL 2MECHANICAL

DEMOLITION PLAN

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2

1/4" = 1'-0"1

LEVEL 2 MECHANICAL DEMOLITION PLAN

SHEET NOTES

A. FIELD VERIFY SIZE AND LOCATION OF ALL EXISTING DUCTWORK, PIPING AND EQUIPMENT.

B. DEMOLISH ALL HATCHED DUCTWORK AND EQUIPMENT. SEE SHEET M3.5 FOR NEW WORK.

2 IB-1 07.24.2020

Page 6: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

1

D

2 1195 6 7 843

C

A

E

F

G

10 12

B

2

M3.1

6

M3.2

2

M3.3

FRESH AIR INTAKE LOUVER IN PLACE OF WINDOW

36x34 RELIEF LOUVER

40x14

32x16

32x34 RELIEF LOUVER INSAME LOCATION AS(E) 32x12 INTAKE LOUVER20x20

BOD: 8' - 0"

VV-21

VV-22

AH-2

VV-23

(F)VV

VV-11

VV-12

VV-14

VV-15

VV-16

VV-32

VV-31

(F)VV

(F)VV

AH-3

20x12

28x12

20x8

16x10

15x10

10"ø

24x16

22x18

14x10

16x10

10x8

14x10

12x10

20x24

20x22

20x22

10x10 1

4x12

8x8

12x1010"ø

10x8

6"ø

4"ø

12x10

L-2

L-4

20x12

14x10

(E) 10x8 DUCT

DEBRIEF

038

OFFICE

003

DEBRIEF

004

LOBBY

001

SKILLS LAB

021

HALL

032

LARGE

CLASSROOM

036CHRNC SIM.

THEATER

031

CONTROL

ROOM

030

PROVIDER'S

OFFICE

029

ACTOR STOR.

/ CHANGE

025

SKILLS

STORAGE

026

WOMEN'S RR

010

MEN'S RR

009

FACULTY

LOUNGE

008

STUDENT

LOUNGE

007

JAN.

005

HALL

002

OFFICE

040

OFFICE

039

SIM. PREP. /

STOR.

020

MANQ'N.

STOR.

019

4" DN TO CLOTHES DRYER

IDF

037

AC-1

16"ø

7"ø

7"ø

7"ø

8x12

7"ø

7"ø

7"ø

6"ø

10x8

7"ø

10x8

6"ø

SG-1

80

SG-1

130

14x8

18x8

6"ø

SG-2

220

SG-2

220

SG-2

160

SG-1

100

SG-2

220SG-2

220

SG-2

220

SG-2

220

SG-1

155

SG-2

215

RG-6

350

(E)RG

350

SG-1

145

SG-1

120

6x10

6x10

6x10

SG-2

210

16x9

6"ø

4"ø

4"ø

8x6

15x6

SG-4

200

SG-4

200

SG-1

120

6"ø

10"ø

10x10

20x16

12x18

12x8

12x8

6"ø

20x20

1 2 3 4 5 6 7 8 9 10 11 12

A

B

C

D

E

F

G

RG-3

VV-13

32x16

ACUTE SIM. THEATER

014

AC

UT

E S

IM. T

HE

AT

ER

016

CONTROL ROOM

015

(2)

6"ø

20x8

10x10

16x10

14x14

5

M3.2

4

M3.2

ALTERNATE 2: VV-16 AND ALL DOWNSTREAM SUPPLY DUCT

AND DIFFUSERS

RG-4 RG-4

ALTERNATE 3

20x12

7"ø

NEW SHOTCRETE WALL. COORDINATE PENETRATIONS WITH

STRUCTURAL DRAWINGS.

NEW SHOTCRETE WALL, TYP. COORDINATE PENETRATIONS

WITH STRUCTURAL DRAWINGS.

3

M3.1

9x8

8"ø

6"ø

6"ø

14x8

9x8

8"ø

8x10

8x6

8x6

VV-33

14x8 RA CAPPED

RG-2

RG-1

RG-1

RG-1 10x10

18x10

RG-1

RG-3

RG-1

RG-1

RG-1

RG-3

RG-1

RG-1

RG-7

RG-6

RG-4

RG-4

RG-4

CAP FOR FUTURE

CAP FOR FUTURE

UP BETWEEN FLR JOISTS, TYP

UP BETWEEN FLR JOISTS, TYP

ENLARGE (E) OPENING FOR NEW DUCT

22x10

SG-14

400

12x10

SUPPLY GRILLE ON SIDE OF EXPOSED DUCT

20"ø

20"ø

12"ø

12x12

10x4

ø6

8"ø

10x12

8"ø

18x18

HEAT EXCHANGER AND PUMPS

SEE MECH PIPING PLAN

SIDEWALL RETURN FOR FUTURE T.I., TYP.

L-1

RG-5SG-11

295(2)

FC-1

SG-10

200

SG-10

200

10"ø

SG-9

30

EG-1

50

5"ø

8"ø

10x10

EG-3

210

EG-3

210

SG-6

100

SG-6

100

SG-10

110

18x6

16x6

10x10

10"ø

(2)

SG-5

265(2)

SG-5

265

12"ø

SG-3

575

6"ø

6"ø

8"ø

8"ø

6"ø

6"ø

6"ø

6"ø CAP FOR FUTURE

DEF-1

10"ø

SG-16

210

SG-16

125

RG-1

(2)ROUND MITERED ELBOWS

(2)

SG-9

60

SG-10

120

SG-9

30

SG-15

50

6"ø

16x10

12x1018x6

6"ø FRESH AIR DUCT TO SEIHO MODEL SFX 6

WALL CAP

5"ø

8"ø

6"ø

8"ø

7"ø

6"ø

6"øSG-6

50

SG-6

50

MEDS

017

CLN SPL

018

SG-12

90

SG-12

95

SG-12

95

10x6

26x14

22x22

18x10

8"ø

6x8

6x8

SG-10

270

RG-4

16x106"ø

12x10

RG-6

18x10

16x10

10x8RG-4

SG-17

530

SG-17

530

VV-24

8"ø

18x10

30x12 DN TO LOW RETURN

6x10

14x12

15x10

8x8

8x6

6"ø

SG-12

110

1

2

3

4

5

6

7

2

3

8

8

3

9

7

10

2

11

2 2

/1 M3.2

BASE BID

ALTERNATE 1

9 5678 4 33456789

3

M3.1

20x1012x10 20x16

7"ø

18x8

10x12

12x12

6"ø 8"ø 6"ø 18x8 10x48"ø 10x1220"ø 20"ø

RG-3 RG-3

1-1/2" HWHS & HWHR

3/4" HWHS & HWHR

3/4" HWHS & HWHR 1-1/2" HWHS & HWHR

16x618x6 12x10

CB

2

M3.1

B C

VV-32

10"ø6x1812"ø

SG-16

2101-1/2" HWHS & HWHR

OFFSET DUCT DN TO RUN THRU OPENING. OFFSET ADJACENT RETURN DUCT SIMILARLY.

10x10

DEBRIEF

004

HALL

002

(E) 4" STM AND COND IN THIS AREA

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N . 11, 2 0 0 5

RE

GIS

T ERED PROF ESS ION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

Thi

s do

cum

ent,

and

the

idea

s an

d de

sign

s in

corp

orat

ed h

erei

n, a

s an

inst

rum

ent o

f pr

ofes

sion

al s

ervi

ce, i

s th

e pr

oper

ty o

f Kis

tler

Sm

all +

Whi

te A

rchi

tect

s an

d is

not

to

be u

sed,

in w

hole

or

in p

art,

for

any

othe

r pr

ojec

t w

ithou

t th

e w

ritte

n au

thor

izat

ion

of K

istle

r S

mal

l + W

hite

Arc

hite

cts.

Cop

ywrit

e 20

16 K

istle

r S

mal

l + W

hite

Arc

hite

cts,

LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

2/1

9/2

020

3:3

3:1

9 P

M

M3.1

02.13.2020

1905

BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

BASEMENTMECHANICAL PLAN -

NORTH

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2

3/16" = 1'-0"1

BASEMENT MECHANICAL PLAN - NORTH

KEYED NOTES

3/16" = 1'-0"2

BASEMENT SECTION - GRIDLINE C (ALTERNATE 1) 3/16" = 1'-0"3

VV-32 SECTION (ALTERNATE 1)

1 SIDEWALL DUCTLESS SPLIT SYSTEM FAN COIL. CONNECT TO CONDENSING UNITON LEVEL 1 ROOF. COORDINATE LOCATION WITH SOU I.T. DEPARTMENT.COORDINATE INSTALL OF REFRIGERANT LINES WITH STRUCTURAL WORK ONFLOOR ABOVE.

2 EXPOSED DUCT.

3 DUCT IN SOFFIT.

4 DUCT RUNS BETWEEN WIDE FLANGE (WF) BEAMS.BRANCH DUCTS TO DIFFUSERSOFF TOP OF 14x12, OVER WF BEAMS AND BETWEEN FLOOR JOISTS.

5 DUCT UP TO RUN BETWEEN FLOOR JOISTS, TYP.

6 PROVIDE 4"ø DRYER EXHAUST DUCT OUT THROUGH WALL TO CAP. COORDINATELOCATION WITH ARCHITECT.

7 SUPPLY AIR GRILLE ON SIDE OF EXPOSED DUCT, TYP.

8 SUPPLY GRILLE IN SIDEWALL OF SOFFIT, TYP.

9 EXHAUST DUCT UP TO FAN ON ROOF.

10 POINT OF CONNECTION, TYP. FIELD VERIFY SIZE AND LOCATION OF EXISTINGDUCT/PIPE.

11 TRANSITION TO 20x16, DROP IN EXISTING OPENING, AND OFFSET INTO CHASE.SEE 6/M3.2.

SHEET NOTES

A. WITH THE EXCEPTION OF RESTROOMS 009 AND 010, ALL WORK ON THIS SHEET IS PART OF ALTERNATES 1, 2, OR 3. EXTEND SUPPLY DUCTS FROM RESTROOM DIFFUSERS OUT INTO HALLWAY FOR FUTURE CONNECTION.

Page 7: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

1 2 1195 6 7 843

G

H

I

10 12

J

6

M3.2

2

M3.2

32x30 FRESH AIRINTAKE LOUVER

20x20 10

' -

0"

(F)VV(F)VV

20x16

20x26

RF-1

AH-1

(E) 52x36 FRESH AIR DUCT OUT TO LOUVER

(E)66x36 RELIEF DUCT OUT TO LOUVER

DUCT UP TO 1ST FLR, TYP OF 4 PLACES

SIDEWALL RETURN FOR FUTURE T.I., TYP.

L-3

L-4

12x8

16x16

26x26

16x16

24x24

1 2 3 4 5 6 7 8 9 10 11 12

G

H

I

J

3

M3.2

8x6

RG-4

RG-4

NEW SHOTCRETE WALL. COORDINATE PENETRATIONS WITH

STRUCTURAL DRAWINGS.

MIN

. B

ET

WE

EN

LO

UV

ER

S

SG-13

100

1 1

2

40x18 RA UP

18x14 SA UP

16x16 SA UP

/1 M3.1

3

3

ALTERNATE 1

ALTERNATE 1

BASE BID

HH

RF-1

42x42

42x42

34x34

16x16

26x26

24x24

40x18 RA DN FROM LVL 1

MOTORIZED DAMPER

RELIEF AIR

TO AH-1SAME SIZE AS AH-1 RA OPENINGINSTALL MOTORIZED DAMPER

HI

31x33 16x20

30x20

16x16

16x16

AH-1

SUPPLY FAN SECTION (FRONT AND TOP DISCHARGE)

COOLING COIL

ACCESS SECTION

MIXING SECTION WITH FILTERS (OA TOP, RA SIDE)

HEATING COIL(S)

ACCESS SECTION

UP THRU (E) FLOOR OPENINGS

OA

SA

RA

SA

BASE BID ALTERNATE 1

DC E

2

M3.3

C D E

AH-2

14x26

30x12

26x18

28x14

16x32

18x26

16x10 BEYOND

TO 30x30 RETURN GRILLE

40x146x8 8x8

10x15

8"øVV-22

14x12

VV-21

ø6 8"ø VV-24

TO 18x10 SUPPLY GRILLE

TO 18x10 SUPPLY GRILLE

22x22

SG-12

110

10x10

SUPPLY FAN SECTIONTOP DISCHARGE

ACCESS SECTION

COOLING COIL

RETURN FAN SECTIONBACK RETURN, TOP RELIEF

MIXING SECTION WITH FILTERSTOP OAHEATING COIL

STORAGE

034

COPY / WORK / MED.

PREP.

033

HALL-1

032-1

FF

14x14

16x20

24x16

20x20

22x22

16"ø10x14

AH-3

RETURN FAN SECTION (BACK RA, TOP RELIEF)

MIXING BOX WITH FILTERS (TOP OA)

HEATING COIL

COOLING COIL

SUPPLY FANTOP DISCHARGE

ACCESS SECTION

DC E F G H I2

M3.1

2

M3.3

C D E F G H I

AH-116x20

30x2026x20

16x16

24x2022x20

6"ø

12"ø

20x22

7"ø

20"ø

16x2

0

12x107"ø 22x10 6"ø 12x8 12x8 12x8 12x8 12x818x18

8x12

12x18

16x1624x24

OFFSET DOWN IN (E) OPENING

10x20

1-1/2" HWHS & HWHR

1-1/4" CWS & CWR

2" HWHS & 1" HWHR

2" HWHR3/4" HWHS & HWHR

OA

FROM RF-1

BASE BIDALTERNATE 1

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N . 11, 2 0 0 5

RE

GIS

T ERED PROF ESS ION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

Thi

s do

cum

ent,

and

the

idea

s an

d de

sign

s in

corp

orat

ed h

erei

n, a

s an

inst

rum

ent o

f pr

ofes

sion

al s

ervi

ce, i

s th

e pr

oper

ty o

f Kis

tler

Sm

all +

Whi

te A

rchi

tect

s an

d is

not

to

be u

sed,

in w

hole

or

in p

art,

for

any

othe

r pr

ojec

t w

ithou

t th

e w

ritte

n au

thor

izat

ion

of K

istle

r S

mal

l + W

hite

Arc

hite

cts.

Cop

ywrit

e 20

16 K

istle

r S

mal

l + W

hite

Arc

hite

cts,

LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

2/1

9/2

020

9:2

6:2

8 A

M

M3.2

02.13.2020

1905

BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

BASEMENTMECHANICAL PLAN -

SOUTH

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2

3/16" = 1'-0"1

BASEMENT MECHANICAL PLAN - SOUTH

1/4" = 1'-0"3

RF-1 SECTION1/4" = 1'-0"

2AH-1 SECTION

1/4" = 1'-0"4

AH-2 SECTION (ALTERNATE 1)1/4" = 1'-0"

5AH-3 SECTION (ALTERNATE 1)

3/16" = 1'-0"6

BASEMENT SECTION - NORTH/SOUTH

KEYED NOTES

1 POINT OF CONNECTION, TYP. FIELD VERIFY SIZE AND LOCATION OF EXISTINGDUCT/PIPE.

2 SUPPLY GRILLE ON END OF EXPOSED DUCT.

3 INSTALL MODULATING CONTROL DAMPERS IN RELIEF AIR AND RETURN AIR DUCTS

Page 8: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

T

T

T

T

T

T

T

T

T

T

T

T

T

1

D

2 1195 6 7 843

C

A

E

F

G

H

I

10 12

J

B2

M3.1

6

M3.2

2

M3.3

AH-3

AH-2

(F)VV(F)VV

VV-31

VV-32

VV-14VV-12

VV-11

VV-22

VV-21

VV-23

(F)VV

VV-16

VV-15

AH-1

PROVIDE NEW FLOW METERS IN (E) 4" CWS, 4" STM, AND 1-1/2" PUMPED CR LINES.

VV-13

1-1/4" CWS/CWR

(E) CWS/CWR

ALTERNATE 3

ALTERNATE 2

CAP

CONNECT TO (E) CWS/CWR

2"ø 3"ø

2"ø

3/4"ø

2"ø

1"ø

2"ø

2"ø

1"ø

1 1/2"ø

1 1/2"ø

1 1/2"ø

1 1/4"ø

1 1/2"ø

1"ø

1 1/2"ø1 1/4"ø

3/4"ø

2"ø

2"ø

1-1/4" CWS & CWR AND 1" HWHS & HWHR TO AH-2

NO REHEAT COIL AT VV-24

1 1/2"ø

1 1/4"ø

1"ø

3/4"ø

3/4"ø

VV-33

3/4"ø3/4"ø

1 1/2"ø1 1/2"ø

1 1/2"ø1 1/4"ø

1 1/2"ø

DN TO BELOW SA DUCT

OFFICE

003

LOBBY

001

OFFICE

040

OFFICE

039DEBRIEF

038

LARGE

CLASSROOM

036

IDF

037

HALL

032

CHRNC SIM.

THEATER

031

DEBRIEF

004

JAN.

005

HALL

002

STUDENT

LOUNGE

007FACULTY

LOUNGE

008

MEN'S RR

009

WOMEN'S RR

010

ACUTE SIM.

THEATER

016

CONTROL

ROOM

015

ACUTE SIM.

THEATER

014

PROVIDER'S

OFFICE

029

MECH.

035

STAIR 1

041

HALL

006

MEDS

017

CLN SPL

018

PIPING DROPS TO RUN BELOW DUCTWORK

CAP FOR FUTURE

1 1/4"ø

PIPES CROSS OVER BEAM

PIPES BETWEEN FLOOR JOISTS

3"ø INSTALL NEW 4" STM & 1-1/2" CR AFTER SHOTCRETE IS INSTALLED.OFFSET AS REQUIRED.

1-1/2" TO AH-1 HEATING COIL

FC-1

3/4" HWHS & HWHR

3/4" CWS & CWR

HW

HS

HW

HR

HW

HS

HW

HR

HW

HR

CWSCWR

HWHRHWHS

HW

HS

HW

HR

VV-24HWHS, HWHR, CWS, & CWR PIPING TO FC-1 IS PART OF ALTERNATE 3

HX-1

4"ø

1 1/4"ø2"ø

ET-1

P-1

P-2

(F)P-3

1

2

3

BASE BIDALTERNATE 1

ALT

ER

NA

TE

1B

AS

E B

ID

CAP STM AND CR

3

1 2 536

M3.21 2 3 4 5 6 7

4

M3.2

22x20

14x40

L-1

AH-2

16x108"ø 10"ø

12x8

20x1212x1832x16 18x10 10x1012x8 18x18 TO 20"ø

18x12 TO 20"ø

12"ø

20x22

14x10

1-1/4" CHS & CHR1" HWHS2" HWHR

1-1/4" CHS & CHR

3/4" HWHS& HWHR

CONNECT TO (E) 2" CHS/CHR IN CORRIDOR

18x26

32x16

10x16 BEYOND

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N. 11, 2 0 0 5

RE

GIS

T ERED PROF ESSION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

This

docu

ment,

and t

he id

eas a

nd de

signs

inco

rpor

ated h

erein

, as a

n ins

trume

nt of

profe

ssion

al se

rvice

, is th

e pro

perty

of K

istler

Sma

ll + W

hite A

rchite

cts an

d is n

ot to

be us

ed, in

who

le or

in pa

rt, fo

r any

othe

r pro

ject w

ithou

t the

writt

en au

thoriz

ation

of Ki

stler

Sma

ll + W

hite A

rchite

cts.

Copy

write

2016

Kist

ler S

mall +

Whit

e Arch

itects

, LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

7/2

8/2

020

10:4

8:1

6 A

M

M3.3

02.13.2020

1905

PHASE 2BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

BASEMENTMECHANICALPIPING PLAN

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2

1/8" = 1'-0"1

BASEMENT MECHANICAL PIPING PLAN

3/16" = 1'-0"2

BASEMENT SECTION - GRIDLINE E (ALTERNATE 1)

SHEET NOTES

KEYED NOTES

A. OTHER THAN THE LOWER RIGHT HAND CORNER, ALL WORK ON THIS SHEET IS PART ALTERNATES 1, 2, OR 3.

B. SEE PIPING SCHEMATIC ON SHEET M4.1 FOR PIPING CONNECTION DETAILS FOR HEAT EXCHANGER, PUMPS, EXPANSION TANK, AIR SEPARATOR, HEATING AND COOLIING COILS, ETC.

C. COORDINATE CONDENSATE DRAIN PIPING WITH PLUMBING CONTRACTOR.

D. NEW STEAM, PUMPED CONDENSATE, AND CHILLED WATER FLOW METERS SHALL BE PROVIDED BY THE CONTROLS CONTRACTOR (SEE SECTION 23 09 23)AND INSTALLED BY THE MECHANICAL CONTRACTOR. INSTALL PER MANUFACTURER'S INSTRUCTIONS WITH RECOMMENDED UP AND DOWN STREAM CLEARANCES, ECCENTRIC REDUCERS, FLOW STRAIGHTENERS, ETC. AS REQUIRED. CONTRACTOR TO FIELD VERIFY EXACT LOCATIONS FOR NEW METERS.

1 CONNECT CONDENSATE FROM HX-1 TO EXISTING BELOW GRADE CONDENSATERETURN TANK.

2 AIR SEPARATOR IN THIS AREA. SEE EXPANSION TANK SCHEDULE FOR SIZE.

3 3" HWHS & HWHR UP IN (E) CHASE. PROVIDE ISOLATION VALVES ON PIPING RISINGTO LEVEL 1. PROVIDE DRAIN DOWN VALVES WITH HOSE CONNECTIONS.

3 IB-2 07.24.2020

Page 9: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

FD

FD

T

T

T

T

1

D

2 1195 6 7 843

C

E

F

G

H

I

10 12

J

K

B

VV-17

VV-18

3" HWS/HWR REHEAT PIPING DN TO MECH ROOM

16"ø

1 2 3 4 5 6 7 8 9 10 11 12

B

C

D

E

F

G

H

I

J

K

16x16 SA DUCT DN TO BASEMENT.

CAP DUCT FOR FUTURE.

16x16 SA DUCT DN TO BASEMENT.

14x18 SA DN TO BASEMENT

40x18 RA DN TO BASEMENT

20x15

20x15

20x15

20x15

SG-8

500(4)

SG-8

400(4)

DIFFUSER ON BOTTOM OF EXPOSED DUCT, TYP.

(E) 14x14 14x8

6"ø

8"ø

8"ø

EG-3

210

EG-3

210

EG-2

709x6

SG-7

200

3/4"ø

2 1/2"ø

2"ø

2"ø

2"ø

3/4"ø

CAP FOR FUTURE

3/4" CAPPED TEES FOR FUTURE

2"ø

3/4" CAPPED TEES FOR FUTURE

CAP

UP TO (E)F-4

(E) SA FROM MZ-3

CAP

UNFINISHED

ROOM

150

WOMEN RR

123

MEN RR

121

HALL

104

8x10

12"ø 1

6"ø

SG-7

400

10x10 EA FROM BASEMENT RESTROOMS CONTINUES UP THROUGH ROOF TO NEW EXH FAN F-8

CAP

BRANCH OFF TOP OF MAIN TO RUN BETWEEN FLOOR JOISTS, TYP.

SG-10

200

CAP

CEILINGS IN THIS AREA TO BE REMOVED AND REPLACED. SEE SHEET NOTES.

CEILINGS IN THIS AREA TO BE REMOVED AND REPLACED. SEE SHEET NOTES.

HW

HR

HW

HS

HWHRHWHS

HWHR

HWHS

(E)SG

335

(E)SG

335

(E)SG

335

(E)SG

280

(E)SG

175

(E)SG

210

(E)SG

225

(E)SG

225

(E)SG

225

(E)SG

225

(E)SG

315

(E)SG

200

(E)SG

275

(E)SG

275

(E)SG

250

(E)SG

250

(E)SG

250

(E)SG

165

(E)SG

105

(E)SG

165

(E)SG

165

(E)SG

400(E)SG

100

(E)SG

275

(E)SG

275

(E)SG

300

(E)SG

300

(E)SG

200

(E)SG

200

(E)SG

300

(E)SG

300

(E)SG

300

(E)SG

100

(E)SG

300

(E)SG

300

(E)SG

300

(E)SG

100

(E)SG

400

(E)SG

400

(E)SG

300

(E)SG

300

2"ø

2"ø

BALL VALVE, TYP.

SG-10

200

(E)10x6

RG-4

EG-3

CONNECT SIDEWALL GRILLE IN CORRIDOR WITH CEILING GRILLE IN TOILET ROOM FOR TRANSFER AIR, TYP OF 2 PLACES

RG-4 EG-3

OPEN END RETURN AT BOTTOM OF STRUCTURE

OFFICE

141 OFFICE

140

HALL

145

OFFICE

139

OFFICE

138

OFFICE

142

WORK ROOM

143

OFFICE

137

OFFICE

136WAITING

144

LOBBY

103

HALL

102

SG-18

400

SG-2

205SG-1

140

SG-1

150

SG-1

85

SG-2

210

SG-18

300

SG-2

200

SG-18

300

SG-2

225

SG-1

85

SG-1

90

SG-6

115

SG-6

115

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

RG-1

24x14 18x14

14x14

12"ø

28x10

24x10

16x12

18x14

14x14

14x12

12"ø

12"ø

12x10

14"ø

12"ø

10"ø

8"ø

6"ø

6"ø

8"ø

6"ø

6"ø6"

ø

6"ø

8"ø

8"ø

14x10

10"ø

6"ø

7"ø

10"ø

12x8

8"ø

UP TO LEVEL 2

NEW SHOTCRETE WALL, TYP.

UP INTO CLOSET ON LEVEL 2.CORE DRILL WALL AT GRID LINE 8 TO

ACCESS ATTIC ABOVE THE EAST WINGVV-52

VV-53

VV-51

VV-54

12"ø

10"ø

8"ø

6"ø

6"ø

8"ø

10"ø

8"ø

10"ø

8"ø

9"ø

8"ø

8"ø

12x8

1

2

3

4

3

2

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N. 11, 2 0 0 5

RE

GIS

T ERED PROF ESSION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

This

docu

ment,

and t

he id

eas a

nd de

signs

inco

rpor

ated h

erein

, as a

n ins

trume

nt of

profe

ssion

al se

rvice

, is th

e pro

perty

of K

istler

Sma

ll + W

hite A

rchite

cts an

d is n

ot to

be us

ed, in

who

le or

in pa

rt, fo

r any

othe

r pro

ject w

ithou

t the

writt

en au

thoriz

ation

of Ki

stler

Sma

ll + W

hite A

rchite

cts.

Copy

write

2016

Kist

ler S

mall +

Whit

e Arch

itects

, LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

7/2

8/2

020

10:4

8:2

0 A

M

M3.4

02.13.2020

1905

PHASE 2BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

LEVEL 1MECHANICAL PLAN

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2

3/16" = 1'-0"1

LEVEL 1 MECHANICAL PLAN

SHEET NOTES

A. THE CEILINGS IN THE EAST AND WEST WINGS WERE REMOVED DURING PHASE 1 AND WILL BE REPLACED IN PHASE 2. THE CONTRACTOR SHALL RE-INSTALL THE GRILLES, REGISTERS, AND DIFFUSERS (GRD) IN THE NEW CEILING. PROVIDE NEW FLEXIBLE DUCT TO CONNECT TO THE (E) DUCTWORK. PROVIDE NEW MANUAL BALANCING DAMPERS WHERE (E) DUCT MOUNTED OR DIFFUSER MOUNTED DAMPERS ARE NOT PRESENT.

B. TEST AND BALANCE THE EXISTING HVAC SYSTEMS TO THE LISTED SUPPLY AIR VOLUMES (COPIED FROM THE EXISTING DRAWINGS).

C. COPIES OF THE EXISTING DRAWINGS ARE AVAILABLE FROM THE SOU FACILITIES PROJECT MANAGER.

KEYED NOTES

1 1-1/4" CWS & CWR AND 3/4" HWHS & HWHR UP TOAH-5.

2 3/4" HWHS & HWHR TO REHEAT COILS. INSTALL 3/4"TO EACH COIL.

3 CAP 2" HWHS & HWHR FOR FUTURE.

4 CONNECT TO (E) 1-1/2" CWS & CWR RISING UP FROMBASEMENT. FIELD VERIFY LOCATION.

2 IB-1 07.24.20203 IB-2 07.24.2020

Page 10: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

FD

FD

1

D

2 1195 6 7 843

C

E

F

G

H

I

10 12

B

(E)EF-10

36x14

34x34

34x34

34x34

AH-4

FC-2

14x10

(E)RG

3750

(E)RG

3750

(E)6

0x20

RG-9

850

RG-8

750RG-8

750

(E)SG

150

(E)SG

150

(E)SG

150

AC-1ALTERNATE 1:

CONDENSING UNIT FOR BASEMENT IDF ROOM.COORDINATE INSTALLATION OF REFRIGERANT

LINESET WITH STRUCTURAL WORK ON FLOORSBELOW. 36x16

12x12

F-8

12x12

BASE BID.NEW EXH FAN FOR BASEMENT RESTROOMS. DEMO (E) FAN IN THIS LOCATION AND REPLACE WITH NEW.

SG-6

150

EG-3

250

SG-7

250

(E)EG

150

(E)EG

150

(E)EG

75CAP (E)

BRANCH

INSTALL FC-2 ON TOP OF SOUND LINED RETURN AIR PLENUM

1

(E)AHU-4

AH-5

EG-3

250

(E)EG

75

(E)EG

150

(E)EG

200

CONNECT DUCT TO EXISTING LOUVER

(E)SG

230

(E)SG

50

(E)SG

100

(E)SG

25

(E)SG

25

(E)SG

100

(E)SG

50

TYPICAL FOR HIGH CEILING AREAS

3

2

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N. 11, 2 0 0 5

RE

GIS

T ERED PROF ESSION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

This

docu

ment,

and t

he id

eas a

nd de

signs

inco

rpor

ated h

erein

, as a

n ins

trume

nt of

profe

ssion

al se

rvice

, is th

e pro

perty

of K

istler

Sma

ll + W

hite A

rchite

cts an

d is n

ot to

be us

ed, in

who

le or

in pa

rt, fo

r any

othe

r pro

ject w

ithou

t the

writt

en au

thoriz

ation

of Ki

stler

Sma

ll + W

hite A

rchite

cts.

Copy

write

2016

Kist

ler S

mall +

Whit

e Arch

itects

, LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

7/2

8/2

020

10:4

8:2

2 A

M

M3.5

02.13.2020

1905

PHASE 2BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

LEVEL 2MECHANICAL PLAN

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2

3/16" = 1'-0"1

LEVEL 2 MECHANICAL PLAN

SHEET NOTES

A. SEE SHEET M2.3 FOR 2ND LEVEL MECHANICAL DEMOLITION.

B. SEE SHEET M3.6 FOR 2ND LEVEL MECHANICAL PIPING AND SECTIONS.

C. TEST AND BALANCE ALL NEW AND EXISTING DIFFUSERS AND GRILLES SERVED BY (E)EF-10, AH-4 AND FC-2.

D. TEST AND BALANCE (E)EF-10 TO 1,300 CFM.

2

1 REVISION 1 02.07.20202 IB-1 07.24.20203 IB-2 07.24.2020

Page 11: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

FD

FD

D

5 6 7 843

C

3 4 5 6 7 8

C

D

AH-4

FC-2

3/4" TO HEATINGAND COOLING COILS

2" HWS & HWR DN TO LEVEL 1

CONNECT TO (E) 2-1/2" CWS & CWR IN ATTIC

2"ø2"ø

(E) 2-1/2" CWS & CWR DN TO BASEMENT

3/4"ø3/4"ø

2"ø2"ø

CW

S

CW

R

5 644 5 6

AH-4

FC-2

34x34

34x34

34x34

14x36

24x41

14x10

20x2020x53

60x20

3

M3.6

12x12

12x12

RETURN AIR PLENUM BELOW FC-1

D CCD2

M3.6

AH-4

FC-2

10x14

41x24

34x34

12x12

20x60CONNECT TO (E) LOUVER

RG-8

750

RG-9

850

INSTALL FC-2 ON TOP OF SOUND LINED RETURN AIR PLENUM

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N. 11, 2 0 0 5

RE

GIS

T ERED PROF ESSION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

This

docu

ment,

and t

he id

eas a

nd de

signs

inco

rpor

ated h

erein

, as a

n ins

trume

nt of

profe

ssion

al se

rvice

, is th

e pro

perty

of K

istler

Sma

ll + W

hite A

rchite

cts an

d is n

ot to

be us

ed, in

who

le or

in pa

rt, fo

r any

othe

r pro

ject w

ithou

t the

writt

en au

thoriz

ation

of Ki

stler

Sma

ll + W

hite A

rchite

cts.

Copy

write

2016

Kist

ler S

mall +

Whit

e Arch

itects

, LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

7/2

8/2

020

10:4

8:2

4 A

M

M3.6

02.13.2020

1905

PHASE 2BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

LEVEL 2MECHANICAL

PIPING PLAN ANDSECTIONS

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2

1/4" = 1'-0"1

LEVEL 2 MECHANICAL PIPING PLAN

SHEET NOTES

1/4" = 1'-0"2

AH-4 SECTION1/4" = 1'-0"

3AH-4 CROSS SECTION

A. ALL WORK ON THIS SHEET IS ALTERNATE 3.

B. SEE SHEET M2.3 FOR LEVEL 2 MECH DEMOLITION.

C. SEE SHEET M3.5 FOR LEVEL 2 DUCTWORK.

2 IB-1 07.24.2020

2

Page 12: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

NONE NONE

2-1/2"

PROVIDE 2-WAY VALVES ON ALL COILS EXCEPT THOSE NOTED ONSCHEDULE.

R

S

REDUCER, IF REQUIRED

WATER COIL

R

S

WATER COIL

PIPE HANGER SHALLSUPPORT PIPINGINDEPENDENT OFCOIL

TEST PLUG(TYP.)

2-WAY AUTOMATIC VALVE

AUTOMATIC BALANCEVALVE WITH TWO QUICKDISCONNECT FITTINGS

STRAINER WITHVALVE AND HOSECONNECTION

COIL WITH 2-WAY CONTROL VALVE

DRAIN WITHVALVE ANDHOSECONNECTION

UNION(TYP.)

PIPE HANGER SHALLSUPPORT PIPINGINDEPENDENT OFCOIL

TEST PLUG(TYP.)

UNION(TYP.)

AUTOMATIC BALANCEVALVE WITH TWO QUICKDISCONNECT FITTINGS

AUTOMATIC 3-WAY VALVE,SEE TERMINAL BOXSCHEDULE FOR GPM

DRAIN WITHVALVE AND HOSECONNECTION

STRAINER WITHVALVE AND HOSECONNECTION

COIL WITH 3-WAY CONTROL VALVE

2COIL PIPING CONNECTIONS

C

NO

NC

MANUAL AIR VENT AT ALLHIGH POINTS (TYP.).

BUTTERFLY VALVES, TYP. 2" AND SMALLER

USE BALL VALVES

MANUAL AIR VENT AT ALLHIGH POINTS (TYP.).

BUTTERFLY VALVES, TYP. 2" AND SMALLER

USE BALL VALVES

1PIPING SCHEMATIC

TO DRAIN

3/4" COLD WATERFILL LINE.

RPBFP W/DRAIN PAN

PRV

EXTEND LINE TO NEAREST DRAIN

3/4"

WATER METER.

12 PSIG STEAMFROM TUNNEL

M

ET

1

HEX

1

P

1P

2

P

3

TANK SADDLE

AIR CONTROL TANK FITTING

1" CONNECTOR PIPE

GAUGE GLASS

HANGER ROD SUPPORTS

EXPANSION TANK

FUNNEL

CONCRETE BASE

DRAIN

PUMP

MOTOR

TANK DRAINER-AIR CHARGER

3" HWS

3" HWR

1"

BALL VALVE (TYP.)3" HWS

0-200°F THERMOMETER (TYP.)

4"

3" HWS

HWS

HW

S

SEE PIPING DRAWINGS FORDETAILED PIPE ROUTING ANDSIZING TO HEATING COILS.

PITCH UP 1.6%SLOPE (MIN.)

NORMALLY OPENBALL VALVE INVERTICAL (REMOVEHANDLE)

CHEMICALPOT FEEDER

TO NEARESTFLOOR DRAIN

BLOW DOWN VALVE.EXTEND LINE TODRAIN

0-100 PSIG PRESSURE GAUGE WITHPIGTAIL & GAUGE COCK (TYP.)

SUCTION DIFFUSER WITHBUILT-IN STRAINER (TYP.)

FLEXIBLE CONNECTION (TYP.)

BUTTERFLY VALVE (TYP.)

BALANCING VALVE (TYP.)

HOSE CONNECTION (TYP.)

1" MIN. DIA. PIPE STAND (TYP.)

3/4"

3/4"

2-1/2"

3/4"

ECCENTRIC REDUCER(WHERE REQ'D.)

9" INDUSTRIAL THERMOMETERW/ COPPER WELL

STEAM TO WATER HEAT EXCHANGER(SHELL & U-TUBE TYPE)

GRAVITY RETURN TOVENTED RECEIVER

6" MINIMUMDIRT LEG

TO DRAIN

STRUCTURAL STEEL SUPPORT -FIELD FABRICATED

BLOWDOWN ASSEMBLY

TEST & PRESSURERELIEF SYSTEM

MINIMUM 2'STATIC HEAD

VACUUMBREAKER

HOSE-ENDED DRAINVALVE W/ CAP

1/2" TEST & PRESSURERELIEF SYSTEM

SWING CHECK VALVE

TODRAIN

HIGH CAPACITYF & T TRAP

TO DRAIN

TEMPERATURE SENSING POINT

MINIMUM 18"

6" MINIMUMDIRT LEG

GATE VALVE

2/3 VALVE

"H" STYLE F & T TRAP

TO DRAIN

GLOBE VALVE

CONTROL VALVE

1/3 VALVE

TO DRAINUNION

PRESSURE ANDTEMPERATURE PORT

10PIPEDIA.

TO DRAIN

2/3 LTUBE BUNDLE

REMOVAL AREA

TO DRAIN

MANUAL AIR VENT

P/T RELIEF VALVE

PRESSUREGAUGE

PIGTAIL SYPHON

NEEDLE VALVESTEAM RELIEF VALVE

3" HWS

4" STM

AIR SEPARATOR.SEE EXP TANKSCHEDULE FOR SIZE

2-1/2"

FUTURE. SEE SHEET NOTE A

L

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N . 11, 2 0 0 5

RE

GIS

T ERED PROF ESS ION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

Thi

s do

cum

ent,

and

the

idea

s an

d de

sign

s in

corp

orat

ed h

erei

n, a

s an

inst

rum

ent o

f pr

ofes

sion

al s

ervi

ce, i

s th

e pr

oper

ty o

f Kis

tler

Sm

all +

Whi

te A

rchi

tect

s an

d is

not

to

be u

sed,

in w

hole

or

in p

art,

for

any

othe

r pr

ojec

t w

ithou

t th

e w

ritte

n au

thor

izat

ion

of K

istle

r S

mal

l + W

hite

Arc

hite

cts.

Cop

ywrit

e 20

16 K

istle

r S

mal

l + W

hite

Arc

hite

cts,

LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

2/1

9/2

020

9:2

6:3

6 A

M

M4.1

02.13.2020

1905

BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

MECHANICALPIPING SCHEMATIC

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2

SHEET NOTES

A. PUMP SIZING / DESGIN INTENT: THE TWO PUMPS SHALL OPERATE IN A LEAD / STANDBY MODE WITH 100% REDUNDANCY. WHEN THE REMAINING STEAM HEAT AIR HANDLERS ARE CONVERTED TO HOT WATER HEATING, A THIRD PUMP WILL BE ADDED AND THE PUMPS WILL OPERATE IN A LEAD/LAG/STANDBY MODE WITH 50% REDUNDANCY.

B. THE STEAM TO HOT WATER CONVERTOR IS SIZED TO PROVIDE HEATING HOT WATER TO THE ENTIRE BUILDING. iT INCLUDES CAPACITY FOR THE FUTURE CONVERSION OF THE REMAINING STEAM AIR HANDLERS TO HOT WATER HEAT.

C. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE FIRST 2 HANGERS FOR EACH PIPE SHALL BE SPRING & NEOPRENE TYPE.

D. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE OF ACCESS DOORS OR PANELS: NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS, VALVES, OR EQUIPMENT.

E. SEE EXPANSION TANK SYSTEM SCHEDULE FOR COMPONENT SIZES.

F. PROVIDE UNIONS FOR THE REMOVAL OF VALVES WITH SCREWED CONNECTIONS.

Page 13: DUCT & FITTING SYMBOLS HVAC SYMBOLS & …

MANUAL BALANCING DAMPER

NTS

NTS NTS

NTS

NTS

NTS

6LOW PRESSURE DUCT CONSTRUCTION DETAILS

5RADIUS ELBOWS

4DUCT TRANSITIONS

1ROOF MOUNTED EXHAUST FAN

2OUTDOOR HEAT PUMP UNIT

3CONDENSATE TRAP DETAIL

W

H

90° MITERED ELBOW

ASHRAE #CR3-9 ASHRAE #SD5-10

CONICAL 90° TEE

45° TAPER

3/8" FLANGE

D45° TEE

ASHRAE #SD5-1

D

15° MAX.

REDUCER

ASHRAE #SD4-1

H

15° MAX.

REDUCER

W

15° MAX.H

D

RECT. TO ROUND TRANSITION

ASHRAE #SD4-3

90° 3-GORE ELBOW

ASHRAE #CD3-12

45° - 90° TEE

15° MAX.

ASHRAE #SD4-2

ROUND TO RECT. TRANSITION

W

H

D

RECTANGULAR TEE

H

2WW

W

W

H

SINGLE THICKNESSTURNING VANES

W/2

45° MAX

ASHRAE #SR5-1

BRANCH TAKE-OFF

W

H

30° MAXH

L

RECT. MITERED OFFSET

L

15° MAX

H

W

RECT. ANGLED OFFSET

D

W=0.75D 2

H

30°

H

30°

90°

AIR FLOW

BRANCH DUCT

ROUND DUCT

45°

SEAL ALL AROUND

90° ROUND COMBINATION TEE

SINGLE THICKNESSTURNING VANES

R/D=1.5 UNO

ROUND-RECTANGULAR-ROUNDTRANSITION

D

D

SHORT RADIUS ELBOW WITH TWO VANES

SHORT RADIUS ELBOW WITH ONE VANE

STANDARD RADIUS ELBOW

VANE

W

R

2/3 W

1/3 W

R

W

VANE

1/2 W

1/6 W

1/3 W

R

W

CENTERLINE R=3W/2

R SHALL EQUAL ORBE GREATER THAN1/6 W.

R SHALL EQUAL ORBE GREATER THAN1/3 W.

NOTES:

1. THIS DETAIL APPLIES TO RECTANGULAR DUCT ONLY.

2. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.

3. ALL STANDARD RADIUS ELBOWS SHOWN ON DRAWINGS MAY BE MADE SHORT RADIUS

ELBOWS. ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE

CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.

ECCENTRIC TRANSITION : MAX. 30° ANGLE

EXCEPT 45° IS PERMITTED AT ROUND TO FLAT OVAL

L (MIN.) = (W 2-W1)/0.58 FOR 30°

L (MIN.) = W 2-W1 FOR 45°

CONVERGING CONCENTRIC TRANSITION :

X° = 60° MAX.

L (MIN.) = (W 2 - W1) / 1.15

DIVERGING CONCENTRIC TRANSITION :

X° = 45° MAX.

L (MIN.) = (W 2 - W1) / 2

L

W1

W2

L

W2 W1

W2 X°

L

W1

NOTE:

1. UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM

ANGLES SHOWN SHALL APPLY.

AIR FLOW

AIR FLOW

FAN BASE

MOTORIZED DAMPER

CANT STRIP

ANCHOR FAN TOCURB AND SEALALL AROUND

INSULATED FACTORY CURB,SECURE TO ROOF

COUNTER FLASHINGUNDER FAN BASE

SEE ARCH. FOR INFO. ONROOF CONSTRUCTION

DUCTTRANSITION ASREQUIRED

CAP & FLASHING

TYPICAL OF 4 CORNERS1/4" x 2 1/2" LAG BOLT

1/4" THICK

NEOPRENE

PAD

PRESSURE TREATED 4x4ANCHOR TO ROOF STRUCTURE

ROOFING

REFRIGERATIONLINE SET

PIPE SAME SIZE ASUNIT'S CONDENSATEDRAIN CONNECTIONSIZE

INDO0RS - ROUTE CONDENSATE PIPE TOACCEPTABLE DISPERSAL SITE

ROOFMOUNTED - ROUTE CONDENSATE PIPE TO

CLOSEST ROOF DRAIN

CLEAN OUTPLUGS

HVAC UNITCONDENSATE

DRAIN PAN

OPEN VENT

W

18" MIN.

2"

2"

1"

75561

OREGON

EXPIRES: 06/30/21

E

N G I N E E R

J A N . 11, 2 0 0 5

RE

GIS

T ERED PROF ESS ION

AL

J O H N M . K E L L E R

ISSUE DATE:

PROJECT NO.:

SHEET:

REVISIONS

Thi

s do

cum

ent,

and

the

idea

s an

d de

sign

s in

corp

orat

ed h

erei

n, a

s an

inst

rum

ent o

f pr

ofes

sion

al s

ervi

ce, i

s th

e pr

oper

ty o

f Kis

tler

Sm

all +

Whi

te A

rchi

tect

s an

d is

not

to

be u

sed,

in w

hole

or

in p

art,

for

any

othe

r pr

ojec

t w

ithou

t th

e w

ritte

n au

thor

izat

ion

of K

istle

r S

mal

l + W

hite

Arc

hite

cts.

Cop

ywrit

e 20

16 K

istle

r S

mal

l + W

hite

Arc

hite

cts,

LLC

66 WATER STREETSUITE 101ASHLAND, OR97520TEL.: 541.488.8200

SO

UT

HE

RN

OR

EG

ON

UN

IVE

RS

ITY

SIS

KIY

OU

BO

ULE

VA

RD

, A

SH

LA

ND

OR

EG

ON

, 97520

THESE DRAWINGS SHALLBE USED FOR:

CONSTRUCTIONBIDDING

RECORDATIONCONVEYANCE

ISSUANCE OF A PERMIT

2/1

9/2

020

9:2

6:3

6 A

M

M4.2

02.13.2020

1905

BID SET

B R

I T

T H

A L

L -

R E

N O

V A

T I O

N

MECHANICALDETAILS

SE

ISM

IC U

PG

RA

DE

/ O

HS

U R

EN

OV

AT

ION

-P

HA

SE

2