Dungeness Link hse AA to west - · PDF filerevisions client: job: drawing: drawn: scale(onA3):-DUNGENESS LINK HOUSE DUNGENESS KENT drg.no: rev: Section AA to West

Embed Size (px)

Citation preview

  • revisions

    client:

    job:

    drawing:

    drawn: scale (onA3):

    -DUNGENESS LINK HOUSE DUNGENESS KENT

    drg. no: rev:

    Section AA to West Proposed25 January 2012 1:50 093/491 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres

    x

    P16 30 January 2012

    P16

    21

    093/41093/41

    093/42 093/42

    093/45093/45

    65mm PIR roof slabs on existing asphalt

    200mm quilt insulation + 45mm gap below soffit 12.5mm duplex plasterbord + lime plaster setting coat

    Ceiling suspended 260mm o/a below soffit on metal hanger system

    450 x 450 x 38mm pc slabs as ballast

    15

    2121

    093/41093/41

    093/42 093/42

    093/45093/45

    65mm PIR roof slabs on existing asphalt

    200mm quilt insulation + 45mm gap below soffit 12.5mm duplex plasterbord + lime plaster setting coat

    Ceiling suspended 260mm o/a below soffit on metal hanger system

    450 x 450 x 38mm pc slabs as ballast

    21

  • revisions

    client:

    job:

    drawing:

    drawn: scale (onA3):

    -DUNGENESS LINK HOUSE DUNGENESS KENT

    drg. no: rev:

    Section BB to East Proposed25 January 2012 1:50 093/491 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres

    x

    P16 30 January 2012

    P16

    50

    60

    093/41 093/41

    093/42093/42

    093/45 093/45

    65mm PIR roof slabs on existing asphalt

    200mm quilt insulation + 45mm gap below soffit 12.5mm duplex plasterbord + lime plaster setting coat

    Ceiling suspended 260mm o/a below soffit on metal hanger system

    450 x 450 x 38mm pc slabs as ballast

  • revisions

    client:

    job:

    drawing:

    drawn: scale (onA3):

    -DUNGENESS LINK HOUSE DUNGENESS KENT

    drg. no:

    East/front/seaward elevation Proposed30 January 2010 1:50 093/501 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres

    MATERIALS Existing! ! ! ! Proposed01 insitu concrete! ! ! 11 insitu concrete! ! 21 rendered services stack! ! ! !02 fletton brickwork - stretcher bond ! ! ! ! 22 flue with horizontal baffle03 cast iron downpipe! ! ! ! ! ! 23 ventilation cowls04 hardwood door! ! ! ! ! ! ! 24 vertical axis wind turbine!! ! !05 painted metal windows! ! ! ! ! ! 25 equipment & fuel store08 300 x 300mm matt-glazed tiles!! ! ! !09 rooflight on upstand! ! ! ! ! ! !

    rev:

    P14 5 August 2011

    P14

    093/41 093/41

    093/42093/42

    093/45 093/45

    093/41 093/41

    093/42093/42

    093/45 093/45

    11

    05

    04

    03

    22

    19 19

    23

    03

    01

    02

    01

    02 02

    2121

    21

    02 02

    23

    01

    01

    01

    01

    08

    08

    08

    0202

    05

    21

    01

    11

    0201

    05

    212121

  • revisions

    client:

    job:

    drawing:

    drawn: scale (onA3):

    -DUNGENESS LINK HOUSE DUNGENESS KENT

    drg. no:

    First Floor plan @ +2850 Proposed30 July 2010 1:50 093/431 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres rev: P16

    P16 25 January 2012

    dF2

    dF9

    093/

    5209

    3/52

    093/

    5209

    3/52

    093/53093/53

    093/51093/51

    093/47093/47

    F7 Living room

    F6 Dining

    F8

    F5 Kitchen

    F2

    F9

    mv mvrw

    rwflue

    dF2

    dF9

    456 3810121314 11 9 7

    Demolish 215mm skin. Rebuild brickworkms angle bolted to each skin as SE drg.11/909/04

    Demolish 103mm skin. Rebuild across 65mm cavity

    10mm gap

    65mm injected PUR foam155mm sprayed hemp/lime insulation15mm nom. lime plaster setting coat

    Demolish 215mm skin. Rebuild brickworkms angle bolted to each skin as SE drg.11/909/04

    Demolish 103mm skin. Rebuild across 65mm cavity

    65mm injected PUR foam155mm sprayed hemp/lime insulation15mm nom. lime plaster setting coat

    70 x 50mm sw studs +120mm PIR insulation batts18mm FR plywood lining

    093/

    4909

    3/49

    093/

    4809

    3/48

    fire place

  • revisions

    client:

    job:

    drawing:

    drawn: scale (onA3):

    -DUNGENESS LINK HOUSE DUNGENESS KENT

    drg. no:

    Ground Floor plan @ +1000 Proposed27 July 2010 1:50 093/421 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres rev:

    P16 25 January 2012

    P16

    (250

    mm

    w. B

    eam

    B o

    ver)

    dG1

    093/

    5209

    3/52

    093/53093/53

    093/51093/51

    093/47093/47

    + 75

    G8 Bedroom 3G7 Bedroom 2

    G6 Bedroom 1

    G1 Entry

    G9 Bedroom 4

    G2 Lobby

    G5 WC

    G3 Stair

    093/

    5009

    3/50

    (heat pump)

    + 0

    Store

    G4 Bathroom

    dG5 dG4

    dG3

    dG9dG8

    ddG2

    dG1

    stove

    456

    23 1

    810121314 11 9 7

    G10 Hall

    (electric mains entry) mv mvrw

    rwflue

    10mm gap

    Demolish 215mm skin. Rebuild brickworkms angle bolted to each skin as SE drg.11/909/04

    Demolish 103mm skin. Rebuild across 65mm cavity

    65mm injected PUR foam25mm corkboard +100mm Warmcel insulation in 100 x 50mm sw studs15mm nom. lime plaster setting coat

    200mm w. rc nib + 110-190mm fin asSE drg. 11/909/10

    70 x 50mm sw studs with 70mm PIR batts + 50mm PIR insulation batts

    18mm FR plywood lining

    70mm studs + 70mm Warmcel acoustic insulation in partitions

    093/

    4909

    3/49

    093/

    4809

    3/48

    vp

  • revisions

    client:

    job:

    drawing:

    drawn: scale (onA3):

    -DUNGENESS LINK HOUSE DUNGENESS KENT

    drg. no:

    North flank elevation Proposed30 January 2010 1:50 093/531 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres

    MATERIALS Existing! ! ! ! Proposed01 insitu concrete! ! ! 11 insitu concrete! ! ! 21 rendered services stack! ! ! !02 fletton brickwork - stretcher bond ! ! ! ! ! 22 flue with horizontal baffle03 cast iron downpipe! ! 15 painted metal window! ! 23 ventilation cowls! ! ! ! ! 16 opening window, concealed frame! ! ! ! ! !! ! ! ! ! 17 painted metal ventilator! ! 24 vertical axis wind turbine09 rooflight on upstand! ! ! ! ! ! ! 25 equipment & fuel store

    rev:

    P14 5 August 2011

    P14

    11

    25

    093/45 093/45

    093/44 093/44

    093/43 093/43

    093/42093/42

    093/41 093/41x

    11

    07

    02

    01

    01

    19 19

    21

    23

    23

    11

    01

    02

    03

    01

    01

    21

    07

    01

    (30)

    16

    16 16 16

    16

    16

  • 11

    01

    11

    25

    02

    03

    01

    01

    19 19

    21

    (22)

    24

    07

    (30)

    16

    1516

    16 16

    16wG15 wG16

    wG17 wG20

    wG18(G

    F st

    ove

    flue)

    wG15 wG16

    wG17

    wG18wG15 wG16

    wG17

    wG18

    wG19

  • revisions

    client:

    job:

    drawing:

    drawn: scale (onA3):

    -DUNGENESS LINK HOUSE DUNGENESS KENT

    drg. no:

    South flank elevation Proposed30 January 2010 1:50 093/511 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres

    MATERIALS Existing! ! ! ! Proposed01 insitu concrete! ! ! 11 insitu concrete! ! ! 21 fairfaced concrete stack!! ! !02 fletton brickwork - stretcher bond ! ! ! ! ! 22 flue with horizontal baffle03 cast iron downpipe! ! 15 painted metal window! ! 23 ventilation cowls! ! ! ! ! 16 opening window, concealed frame! ! ! ! ! !! ! ! ! ! ! ! ! ! ! 24 vertical axis wind turbine09 rooflight on upstand! ! ! ! ! ! ! 25 equipment & fuel store

    rev:

    P16 4 January 2012

    P16

    11

    01

    11

    25

    02

    03

    01

    01

    19 19

    21

    (22)

    24

    07

    (30)

    16

    1516

    16 16

    16wG15 wG16

    wG17 wG20

    wG18

    (GF

    stov

    e flu

    e)

    wG15 wG16

    wG17

    wG18wG15 wG16

    wG17

    wG18

    wG19

  • revisions

    client:

    job:

    drawing:

    drawn: scale (onA3):

    -DUNGENESS LINK HOUSE DUNGENESS KENT

    drg. no:

    West/rear/landward elevation Proposed30 January 2010 1:50 093/521 2! ! ! 3! ! ! 4! 5! ! 6! ! 7! ! 8! ! ! 9metres

    MATERIALS Existing! ! ! ! Proposed01 insitu concrete! ! ! 11 insitu concrete! ! ! 21 rendered services stack! ! ! !02 fletton brickwork - stretcher bond ! ! ! ! ! 22 flue with horizontal baffle03 cast iron downpipe! ! 15 painted metal-faced windows! ! 23 ventilation cowls! ! ! ! ! 16 painted metal-faced doors ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! 24 vertical axis wind turbine09 rooflight on upstand! ! 18 300 x 300mm concrete tiles! ! ! ! ! ! !

    MATERIALS Existing! ! ! ! Proposed01 insitu concrete! ! ! 11 insitu concrete! ! ! 21 rendered services stack! ! ! !02 fletton brickwork - stretcher bond ! ! ! ! ! 22 flue with horizontal baffle03 cast iron downpipe