402
E-GOVERNANCE MISSION MODE PROJECT (MMP) CRIME AND CRIMINAL TRACKING NETWORK & SYSTEMS RFP FOR SELECTION OF SYSTEM INTEGRATOR VOLUME I: Technical & Functional Requirements RELEASED BY: Rajasthan Police Government of Rajasthan

E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Embed Size (px)

Citation preview

Page 1: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

E-GOVERNANCE

MISSION MODE PROJECT

(MMP)

CRIME AND CRIMINAL TRACKING

NETWORK & SYSTEMS

RFP FOR SELECTION OF SYSTEM

INTEGRATOR

VOLUME – I: Technical & Functional

Requirements

RELEASED BY:

Rajasthan Police

Government of Rajasthan

Page 2: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 2 of 241

Table of Contents

1 INTRODUCTION ................................................................................................................................... 11

1.1 PROJECT BACKGROUND ...................................................................................................................................... 11

1.2 BACKGROUND OF POLICE SYSTEMS IN INDIA ........................................................................................................... 11

1.3 CRIME AND CRIMINALS INFORMATION SYSTEM (CCIS) ............................................................................................ 11

1.4 COMMON INTEGRATED POLICE APPLICATION (CIPA)............................................................................................... 12

1.5 CRIME AND CRIMINAL TRACKING NETWORK & SYSTEMS (CCTNS)............................................................................. 13

1.6 CCTNS IMPLEMENTATION FRAMEWORK ............................................................................................................... 14

1.7 GOALS FOR THE REQUEST FOR PROPOSAL (RFP) ..................................................................................................... 15

2 PROJECT DETAILS............................................................................................................................... 17

2.1 NEED FOR THE PROJECT ..................................................................................................................................... 17

2.2 VISION AND OBJECTIVES OF THE PROJECT .............................................................................................................. 17

2.3 STAKEHOLDERS OF THE PROJECT .......................................................................................................................... 17

2.4 DESIRED OUTCOMES FOR VARIOUS STAKEHOLDERS .................................................................................................. 18

3 RAJASTHAN STATE POLICE DEPARTMENT .............................................................................. 21

3.1 DEPARTMENT'S ORGANIZATION STRUCTURE .......................................................................................................... 21

3.2 EXISTING LEGACY SYSTEMS ................................................................................................................................. 23

3.3 EXISTING DATA CENTRE INFRASTRUCTURE ............................................................................................................. 23

3.4 EXISTING WAN INFRASTRUCTURE ........................................................................................................................ 24

3.5 EXISTING CLIENT SITE INFRASTRUCTURE ................................................................................................................ 24

4 SCOPE OF THE PROJECT ................................................................................................................... 31

4.1 GEOGRAPHICAL SCOPE:...................................................................................................................................... 31

4.2 SCOPE OF SERVICES DURING IMPLEMENTATION PHASE ............................................................................................. 31

4.3 PROJECT PLANNING AND MANAGEMENT ............................................................................................................... 32

4.4 PROJECT DOCUMENTATION ................................................................................................................................ 33

4.5 PROJECT MANAGEMENT TOOL ............................................................................................................................ 33

4.6 CONFIGURATION MANAGEMENT TOOL ................................................................................................................. 33

4.7 ISSUE TRACKER ................................................................................................................................................. 34

4.8 CONFIGURATION, CUSTOMIZATION AND EXTENSION (DEVELOPMENT OF NEW MODULES AND FEATURES) OF CAS AND

INTEGRATION WITH EXTERNAL AGENCIES THROUGH AGILE SOFTWARE DEVELOPMENT METHODOLOGY ............................................. 34

4.9 SITE PREPARATION AT POLICE STATIONS AND HIGHER OFFICES .................................................................................. 42

4.10 DATA MIGRATION AND DATA DIGITIZATION ........................................................................................................... 42

4.11 CAPACITY BUILDING AND CHANGE MANAGEMENT .................................................................................................. 43

Page 3: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 3 of 241

4.12 HANDHOLDING SUPPORT ................................................................................................................................... 43

4.13 REQUIREMENT ON ADHERENCE TO STANDARDS ...................................................................................................... 43

4.14 COMPLIANCE WITH INDUSTRY STANDARDS ............................................................................................................ 43

4.15 3RD PARTY ACCEPTANCE TESTING, AUDIT AND CERTIFICATION .................................................................................. 44

4.16 SCOPE OF SERVICES DURING POST IMPLEMENTATION PHASE ..................................................................................... 46

5 CAS CUSTOMIZATION AND INTEGRATION WORK PROPOSAL ......................................... 48

5.1 PROJECT MANAGEMENT WORK PROPOSAL ........................................................................................................... 48

5.1.1 Project Work Plan and Schedule .................................................................................................... 49

5.1.2 Project Work Plan Baselines ........................................................................................................... 49

5.1.3 Work Breakdown Structure (WBS) ............................................................................................... 49

5.1.4 System Environments ...................................................................................................................... 49

5.1.5 Facilities ............................................................................................................................................. 50

5.1.6 Meeting Rooms and Workspace Requirements ........................................................................... 51

5.1.7 Indicative Customization and Integration List ........................................................................... 51

6 ANNEXURE ............................................................................................................................................. 53

6.1 ANNEXURE-I SERVICE LEVEL AGREEMENT ................................................................................................... 53

6.1.2 Mandatory Qualification Criteria for Key Profiles and Numbers ............................................ 57

6.2 ANNEXURE- II- POST IMPLEMENTATION SERVICES ...................................................................................... 62

6.3 ANNEXURE- III- FUNCTIONAL REQUIREMENT SPECIFICATIONS ................................................................... 68

6.3.1 Core Application Software .............................................................................................................. 68

6.3.2 CAS (Centre) ...................................................................................................................................... 68

6.3.3 CAS (State) ......................................................................................................................................... 69

6.3.4 Development of CCTNS Core Application Software (CAS) ........................................................ 72

6.4 FUNCTIONAL REQUIREMENT SPECIFICATION ........................................................................................................... 73

6.4.1 Extended CAS Functional Requirements (Sample): ................................................................... 73

6.5 ANNEXURE- IV- IT INFRASTRUCTURE REQUIREMENTS ................................................................................ 78

6.5.1 Introduction....................................................................................................................................... 78

6.5.2 Wide Area Network (WAN) & ISP Services .................................................................................. 78

6.5.3 Proposed Network Architecture ..................................................................................................... 78

6.5.4 Data Centre ....................................................................................................................................... 80

6.5.5 Architectural Aspect ......................................................................................................................... 81

6.5.6 DC Design Description ..................................................................................................................... 83

6.5.7 Set-up at Data Centre and DR Site ................................................................................................ 83

6.5.8 Hardware and Security Components at Data Centre ................................................................ 84

Page 4: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 4 of 241

6.5.9 Network Components at DC ........................................................................................................... 85

6.5.10 Collation with State Data Center ................................................................................................... 85

6.5.11 Hardware at the DC ......................................................................................................................... 86

6.5.12 DR Site ................................................................................................................................................ 90

6.5.13 Hardware and Security Components at DR Site ......................................................................... 92

6.5.14 Co-located with CCTNS DR Site: ................................................................................................... 92

6.5.15 Hardware at the DR Site ................................................................................................................. 92

6.5.16 Client/ User Locations ..................................................................................................................... 94

Additional Requirements at Client Location to be purchased by SI ......................................................... 96

6.5.17 Requirements at Client Location .................................................................................................... 97

6.5.18 Specification of Proposed Software at DC & DR ....................................................................... 104

6.5.19 Minimum Technical Specifications- Hardware at DC & DR ................................................... 140

6.5.20 Minimum Technical Specifications Requirement at Client Site .............................................. 158

6.5.21 Earthling Recommendations: ...................................................................................................... 166

6.5.22 Furniture .......................................................................................................................................... 166

6.5.23 Fire Extinguisher (5 Kg) ................................................................................................................ 167

6.5.24 Web Based PMIS ............................................................................................................................. 168

6.5.25 Standard Operating Procedure for Hardware Procurement and Quality Assurance ........ 168

6.5.26 Details of Technology Stack CAS (State) and CAS (Center) .................................................... 170

6.6 ANNEXURE- V-DATA CAPTURE AND APPLICATION INTEGRATION ........................................................................... 176

6.6.1 Types of Data .................................................................................................................................. 176

6.6.2 Migration Strategy ........................................................................................................................ 183

6.7 ANNEXURE- VI-CAPACITY BUILDING & CHANGE MANAGEMENT ............................................................... 185

6.7.1 Introduction..................................................................................................................................... 185

6.7.2 Overview of the Capacity building Scope ................................................................................... 185

6.7.3 Training and Capacity Building As-Is ........................................................................................ 190

6.7.4 Implementation Plan ..................................................................................................................... 200

6.7.5 Indicative Training Plan for the Members of Police Department .......................................... 202

6.7.6 Handholding Support .................................................................................................................... 205

6.8 ANNEXURE VII GOVERNANCE STRUCTURE................................................................................................. 207

6.9 ANNEXURE VIII ITEMS WHICH CAN BE DROPPED, IN CASE OF SHORTAGE OF FUNDS OR DUE TO ANY OTHER

REASONS 213

6.10 ANNEXURE IX: SERIAL NUMBER OF EXISTING HARDWARE AT DC AND CLIENT LOCATIONS ....................... 214

6.11 ANNEXURE X DISTRICTWISE DATA OF CASES REGISTERED AND SAMPLE FORMS FOR DATA DIGITIZATION

235

Page 5: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 5 of 241

6.12 ANNEXURE XI SPECIFICATIONS - LAN CABLING AND MULTIPOINT CONTROL UNIT (MCU) FOR VIDEO

CONFERENCING ......................................................................................................................................................... 239

Page 6: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 6 of 241

LIST OF ABBREVIATIONS / ACRONYMS

ADGP Additional Director General of Police

AFIS Automated Fingerprint Identification System

AIG Assistant Inspector General of Police

AMC Annual Maintenance Contract

AT Acceptance Testing

ATS Annual Technical Support

BG Bank Guarantee

BOM Bill of Material

BPM Business Process Management

BPR Business Process Reengineering

BSNL Bharat Sanchar Nigam Limited

CAD Computer Aided Dispatch

CAS Core Application Software

CB Capacity Building

CBI Central Bureau of Investigation

CCIS Crime and Criminals Information System

CCTNS Crime & Criminal Tracking Network and Systems

CID Criminal Investigation Department

CIPA Common Integrated Police Application

COTS Commercial Off The Shelf

CPMU Central Program Management Unit

CrPC Criminal Procedure Code

CUG Closed User Group

DC Data Centre

DCRB District Crime Record Bureau

DG Director General

DG Set Diesel Generator Set

DGP Director General of Police

DHCP Dynamic Host Configuration Protocol

DIG Deputy Inspector General of Police

DeitY Department of Electronics and Information Technology

DMZ Demilitarized Zone

Page 7: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 7 of 241

DR Disaster Recovery

DRC Disaster Recovery Centre

DSP Deputy Superintendent of Police

EMD Earnest Money Deposit

EMS Enterprise Management System

FIR First Information Report

FRS Functional Requirement Specifications

GIGW Guidelines for Indian Government Website

GIS Geographical Information System

GO Gazetted Officer

GOI Government of India

GPS Global Positioning System

GRP Government Railway Police

GUI Graphical User Interface

HDD Hard Disk Drive

HLD High Level Design

HQ Headquarters

HTTP Hypertext Transfer Protocol

IB Intelligence Bureau

IC Integration Components

ICT Information & Communication Technology

IGP Inspector General of Police

IIF Integrated Investigation Forms

IO Investigation Officer

IPC Indian Penal Code

ISO International Organization for Standardization

IT Information Technology

LAN Local Area Network

LD Liquidated Damages

LIMS Lawful Interception Monitoring System

LLD Low Level Design

MACs Message Authentication Codes

MHA Ministry of Home Affairs

MIS Management Information System

MMP Mission Mode Project

Page 8: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 8 of 241

MPLS Multiprotocol Label Switching

MTBF Mean Time Between Failures

MTTA Mean Time To Attend

MTTR Mean Time To Repair

NCR Non-Cognizable Report

NCRB National Crime Records Bureau

NeGP National eGovernance Plan

NGO Non-Gazetted Officer

NIC National Informatics Centre

NOC No Objection Certificate

NSDG National e-Governance Service Delivery Gateway

OEM Original Equipment Manufacturer

OLAP Online Analytical Processing

QGR Quarterly Guaranteed Revenue

PBG Performance Bank Guarantee

PCR Police Control Room

PHQ Police Headquarters

PKCS Public Key Cryptography Standards

PM Preventive Maintenance

PMIS Project Management Information System

RDBMS Relational Database Management System

RFC Request for Clarification

RFP Request for Proposal

RPO Recovery Point Objective

RTI Right To Information

RTM Requirements Traceability Matrix

RTO Recovery Time Objective

SAN Storage Area Network

SCRB State Crime Records Bureau

SDA Software Development Agency

SDC State Data Centre

SDPO Sub-Division Police Office

SHO Station House Officer

SI System Integrator

SLA Service Level Agreement

Page 9: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 9 of 241

SOA Service Oriented Architecture

SOAP Simple Object Access Protocol

SP Superintendent of Police

SPMU State Program Management Unit

SPOC Single Point of Contact

SRS Software Requirement Specifications

SSDG State e-Governance Service Delivery Gateway

SSL Secure Sockets Layer

SWAN State Wide Area Network

SyRS System Requirement Specifications

TCP/IP Transmission Control Protocol/Internet Protocol

UAT User Acceptance Testing

UID Unique Identification

UL Underwriters Laboratories

UT Union Territory

VPN Virtual Private Network

WAN Wide Area Network

XML Extensible Markup Language

Page 10: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 10 of 241

Table of Contents

Introduction

1

Page 11: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 11 of 241

1 INTRODUCTION

The Ministry of Home Affairs has conceptualized the Crime & Criminals Tracking Network and

Systems (CCTNS) project as a Mission Mode Project under the National e- Governance Plan

(NeGP). This is an effort of the Government of India to modernize the police force giving top

priority to citizen services, information gathering, and its dissemination among various police

organizations and units across the country.

1.1 Project background

Availability of relevant and timely information is of utmost necessity in conduct of business by

police, particularly in investigation of crime and in tracking & detection of criminals. Police

organizations everywhere have been handling large amounts of information and huge volume of

records pertaining to crime and criminals. Information Technology (IT) can play a very vital role

in improving outcomes in the areas of Crime Investigation and Criminal Detection and

other functioning of the Police organizations, by facilitating easy recording, retrieval, analysis

and sharing of the pile of Information. Quick and timely information availability about

different facets of police functions to the right functionaries can bring in a sea change both

in Crime & Criminals handling and related operations, as well as administrative processes.

Creation and maintenance of databases on Crime & Criminals in digital form for sharing by all

the stakeholders in the system is therefore very essential in order to effectively meet the

challenges of crime control and maintenance of public order. In order to achieve this, all the

states should meet a common minimum threshold in the use of IT, especially for crime &

criminals related functions.

1.2 Background of Police Systems in India

Several initiatives have been introduced in the past to leverage IT in police functioning. Some of

these initiatives include centrally initiated programs such as the NCRB-led CCIS (Crime and

Criminals Information System) and CIPA (Common Integrated Police Application), and State-

led initiatives such as e-COPS (in Andhra Pradesh), Police IT (in Karnataka), Thana Tracking

System (in West Bengal), CAARUS (in Tamil Nadu) and HD IITS (in Gujarat).

Presently automation in the area of Civil Police is addressed mainly through the two GOI-led

initiatives – CCIS and CIPA and in some States such as Andhra Pradesh, Karnataka and Gujarat,

through State- led initiatives.

The following section explores the details of the two Government of India (GOI)-led initiatives.

1.3 Crime and Criminals Information System (CCIS)

CCIS was an NCRB-driven program and has been launched in 1990. Since then, it has been

implemented in 35 states and union territories and spans over 700 locations. Most of the state

police headquarters and district headquarters are covered by CCIS and so are some of the

14,000+ police stations in the country.

Page 12: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 12 of 241

CCIS was primarily an initiative to create crime and criminals related database that can be used

for crime monitoring by monitoring agencies such as National Crime Records Bureau (NCRB),

State Crime Records Bureau (SCRB) and District Crime Records Bureau (DCRB) and to

facilitate statistical analysis of crime and criminals related information by these monitoring

agencies and also to be shared by states.

CCIS data was used for publishing online reports such as Missing Persons Report and is also

used as the basis for online query facilities that are available through the NCRB website. In

addition, it is also used by NCRB to publish an annual nation-wide crime report. CCIS focuses

exclusively in crime and criminals information and does not address the other aspects of police

functioning.

CCIS was originally built on Unix OS and Ingres database, but has since been ported to

Windows platform and has released its last three versions on Windows (the last release having

taken place in September 2002).

1.4 Common Integrated Police Application (CIPA)

A feature common to most of the early efforts has been a predominant focus on collection of

data as required by the monitoring agencies and on specific functions such as records

management, statistical analysis and office automation; rather than on police stations, which are

the primary sources of crime and criminals related data generation.

In order to provide an application that supports police station operation and investigation

process, and that is common across all states and union territories, MHA had conceptualized the

Common Integrated Police Application (CIPA) in 2004. It has been initiated as part of the

―Modernization of State Police Forces (MPF)‖ scheme of the Ministry of Home Affairs. The aim

of CIPA is to bring about computerization and automation in the functioning at the police

station with a view to bringing in efficiency and transparency in various processes and functions

at the police station level and improve service delivery to the citizens. So far about 2,760 police

stations, out of a total of 14,000+ police stations across the country, have been covered under

the scheme.

CIPA is a stand-alone application developed to be installed in police stations and to support the

crime investigation and prosecution functions. CIPA is a centrally managed application: an

application core centrally developed and is installed in police station. Any state-specific

customization would be evaluated and developed on need basis.

The core focus of the CIPA application is automation of police station operation. Its core

functionality includes the following modules: (i) Registration Module (ii) Investigation Module

(iii) Prosecution Module. There is also a Reporting module that addresses basic reporting needs.

Page 13: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 13 of 241

CIPA is built on client-server architecture on a NIC Linux platform using Java and PostgreSQL.

Benefits realized from CIPA include the ability to enter registration (FIR) details into the system

and print out copies and the ability to create and manage police station registers on the system,

etc.

It was felt, however, that a standalone application couldn‘t provide the enhanced outcomes in

the areas of Crime Investigation and Criminals Detection that are necessary. For this reason,

MHA has decided to launch the Crime and Criminal Tracking Network & Systems (CCTNS)

program.

1.5 Crime and Criminal Tracking Network & Systems (CCTNS)

Crime and Criminal Tracking Network & Systems (CCTNS) is a Mission Mode Project

conceptualized and sponsored by the Ministry of Home Affairs (MHA) towards enhancing

outcomes in Crime Investigation and Criminals Tracking; and in enhancing the efficiency and

effectiveness of police departments in all States and Union Territories.

The CCTNS project aims at creating a comprehensive and integrated system for enhancing the

efficiency and effectiveness of policing at the Police Station level through adoption of principles

of e-Governance, and creation of a nationwide networked infrastructure for evolution of IT-

enabled state-of-the-art tracking system around ―investigation of crime and detection of

criminals‖ in the real time. This is a critical requirement in the context of the present day

internal security scenario.

The following objectives have been defined for CCTNS:

a. Provide Enhanced Tools for Investigation, Crime Prevention, Law & Order Maintenance

and other functions like Traffic Management, Emergency Response, etc.

b. Utilize IT for efficiency and effectiveness of core policing operations.

c. Provide information for easier and faster analysis.

d. Increase Operational Efficiency by:

a. Reducing the necessity to manually perform monotonous and repetitive tasks.

b. Improving the communication e.g. Police messaging, email systems etc.

c. Automating back-office functions, and thereby releasing police staff for greater

focus on core police functions.

e. Create platforms at State and Central level for sharing crime and criminal information/

databases across state and the country. This would enable easy sharing of real-time

information across police stations and districts at the State level/ UT level and across

States/ UTs at the National level, there by resulting in:

a. Improved investigation and crime prevention.

b. Better tracking of criminals, suspects, accused, repeat offenders etc.

c. Create a platform for sharing intelligence across the states, across the country

and across other State-level / UT level and GoI-level agencies.

Page 14: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 14 of 241

d. Improved service delivery to the public/ citizen/ stakeholders.

e. Access to police services in a citizen-friendly manner.

f. Provide alternate modes of service delivery such as internet (for general requests

such as NOC, for following up on status, e.g. Ministry of External Affairs,

Ministry of Transport).

The following figure is a simplistic representation of the ‗Change‘ in policing system envisaged

under the CCTNS project. In the existing system, most of the police function and systems are

manual and paper based. The interaction of citizen with department and also of various offices

within the department is either through physical presence of individuals or through the post –

commonly known as ‗Daak System‖.

Figure 1: Change in Policing System

In CCTNS scenario, certain services of police department for citizens would become online and

could be accessed / requested through web. Also, the associated workflow of police processes

would become automated. The connectivity would be provided at all police station level and all

higher offices with State Data Centre. The department would further be connected centrally with

other police offices in all the States / UTs and centre as well as with NCRB and MHA at the

central level via National Data Centre. This envisaged scenario would lead to integrated policing

system across the country.

1.6 CCTNS Implementation Framework

CCTNS would be implemented in a way where the States and UTs play a major role. CCTNS

would be implemented in alignment with the NeGP principle of ―centralized planning and

Page 15: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 15 of 241

de-centralized implementation‖. MHA and NCRB would play a key role in planning the

program in collaboration with the Police leadership within states, in the development of a few

core components and in monitoring and reviewing the program. It is, however, the States and

UTs that would drive the planning and implementation at the state level.

The role of the Centre (MHA and NCRB) focuses primarily around planning, providing the core

application software (to be configured, customized, enhanced and deployed in States),

managing (from a high level) and monitoring the program. States would drive the

implementation at the state level and would continue to own the system after deployment.

The implementation of CCTNS would be taking an ―integrated service delivery‖ approach rather

than that of procurement of hardware and software.

The central feature of CCTNS implementation at the State level is the ―bundling of services‖

concept. According to this, each state shall select a System Integrator (SI) who would be the

single point of contact for the State for all the components of CCTNS. These components include

the application (the changes made to the core application provided by MHA), hardware,

communications infrastructure, associated services such as Capacity Building, Handholding etc.

1.7 Goals for the Request for Proposal (RFP)

The primary goal of this RFP is to select a SI for CCTNS Rajasthan project through a competitive

bidding process. This volume of RFP intends to bring out all the details with respect to solution

and other requirements that are deemed necessary to share with the potential bidders. The goals

of RFP are further elaborated below:

a) To seek proposals from potential bidders for providing the ―bundle of services‖ in

implementing and managing the CCTNS solution in Rajasthan.

b) To understand from the bidders how they propose to meet the technical and

operational requirements of CCTNS.

c) To ascertain how potential bidders propose to deliver the services and sustain the

demand and growth in the requirements.

d) To ascertain from bidders on how they will ensure scalability and upgradeability

of the infrastructure and solution proposed to be deployed.

e) To understand from the bidders as to how they intend to innovate further on this service

delivery model.

Page 16: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Project Details

2

Page 17: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 17 of 241

2 PROJECT DETAILS

2.1 Need for the Project

A need has been felt to adopt a holistic approach to address the requirements of Rajasthan

Police, mainly with relation to functions in the police stations, traffic management and other

functionaries of the department. There is also a need to strengthen the citizen interfaces with the

police. Interfaces need to be built with external agencies like courts, jails, transport authorities,

hospitals, and municipal authorities etc. to be able to share information between departments.

Therefore, it becomes critical that information and communication technologies are made an

integral part of policing in order to enhance the efficiency and effectiveness of the police

department.

2.2 Vision and Objectives of the Project

Vision: To transform the police force into a knowledge-based force and improve the delivery of

citizen-centric services through enhancing the efficiency and effectiveness of the police stations

by creating a platform for sharing crime and criminal information across the police stations in

the country.

The overall objective of the MMP is based on enhancing the operational efficiency and

effectiveness of the police force in delivering the services. The broad objectives of the project are

as follows:

a) Improve Service Delivery to the Public: Citizens should be able to access police services

through multiple, transparent, and easily accessible channels in a citizen-friendly

manner. The focus is not only to improve the current modes of the service delivery but

also provide alternate modes such as internet for the public to communicate with the

police.

b) Provide Enhanced Tools for Law & Order Maintenance, Investigation, Crime

Prevention, & Traffic Management which are core components of policing. Information

technology can both enable and improve the effectiveness and efficiency of the core

activities of the police. Police should be provided with data amenable for easier and

faster analysis in order to enable them to make better and informed decisions.

c) Increase Operational Efficiency: Police should spend more time on the public facing

functions. Information technology solutions should help in reducing the repetitive

paperwork/records and making the back-office functions more efficient.

d) Create a platform for sharing crime & criminal information across the country: There

is a critical need to create a platform for sharing crime and criminal information across

police stations within and between the different states in order to increase the

effectiveness in dealing with criminals across the state borders.

2.3 Stakeholders of the Project

The impact of the police subject being sensitive, a consultative and a bottom-up approach has to

be adopted in designing the Project impacting the following stakeholders:

Page 18: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 18 of 241

1. Citizens and Citizen groups

2. Police Personnel at the police station level (Station House Officers, Investigation

Officers, Station Writers, and Constables etc)

3. Senior Officers in the State Police /State Government

4. Ministry of Home Affairs

5. External Departments such as Jails, Courts, Passports Office, Transport

Department etc.

2.4 Desired outcomes for various stakeholders

The following are the expected benefits envisaged from successful implementation of the CCTNS

project:

S. No Stakeholder Benefits

1. Citizens Simplified process for registering and tracking complaints

and FIRs.

Simplified process for registering grievances against police.

Faster and assured response from police to any emergency

calls for assistance.

Simplified process for tracking the progress of the case

during trials.

Simplified access to view/report unclaimed/recovered

vehicles and property.

Multiple channels to access services from police.

Simplified process for accessing general services such

as requests for certificates, verifications, and permissions.

Improved relationship management for victims and

witnesses.

Greater access to traffic police for registering traffic

complaints.

Ability to view and pay pending traffic challans from

multiple access points.

Page 19: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 19 of 241

S No Stakeholder Benefits

2. Police Department Centralized crime and criminal information repository

along with the criminal's images and fingerprints with

advanced search capabilities.

Enhanced ability to analyze crime patterns and modus

operandi.

Reduced workload of the police station back-office

activities such as preparation of regular and ad-hoc reports

and station records management.

A collaborative knowledge-oriented environment where

knowledge is shared across the different regions and units.

Better coordination and communication with external

stakeholders through implementation of electronic

information exchange systems.

Enhanced tools for investigation.

Enhanced ability to analyze accidents and other road

incidents.

Faster turnaround time for the analysis results (crime and

traffic) to reach the officers on the field.

Enhanced tools to optimize resource allocation for patrols,

emergency response, petition enquiries, and other general

duties.

Advanced tools for traffic regulation and enforcement.

3. Police Officials

(via integration

with iHRMS and

Police LMS)

Balanced performance evaluation metrics and framework.

Simplified process for registering grievances within the

department.

Simplified process for personnel‘s administrative services

such as leave, pay-roll, loans, and bill claims.

Integrated view of the service record that presents the

performance feedback and training needs.

4. Ministry of Home

Affairs

Standardized means of capturing the crime and criminal

data across the police stations in the country.

Faster and easier access to crime and criminal information

across the country in a manner amenable for trend and

pattern analysis.

Enhanced ability to detect crime patterns and modus

operandi across the states and communicate to the state

police departments for aiding in crime prevention.

5. External

Departments

Seamless integration with police systems for better citizen

service delivery and improved law enforcement.

Table 1: Benefits to Stakeholders

Page 20: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 20 of 241

Rajasthan State Police

3

Page 21: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 21 of 241

3 RAJASTHAN STATE POLICE DEPARTMENT

3.1 Department's Organization Structure

Rajasthan is divided into 8 ranges, 2 Commissionerates having a total of 45 SP/ DCP offices. At

some of the offices, SP and Addl. SP share the same premise, however, there are 24 locations

where Addl. SP office is different than the SP office.

Figure 2: Range/ Commissionerates and SP & Addl. SP Offices

Following figure gives the sum of Circle offices (210) in all ranges and commissionerates as on

November 2013

Figure 3: Range/ Commissionerates and Circle Offices

AjmerBharat

purBikan

erGRP

JaipurJaipur

Jaipur Commissionerate

Jodhpur

Jodhpur

Commissionerate

KotaUdaip

ur

Sum of no. of SP Offices 4 4 4 2 5 6 6 3 5 6

Sum of no. of Addl. SP Offices 5 2 4 0 5 2 4 1 0 1

01234567

Range/ Commissionerate and SP & Addl. SP Offices

AjmerBharatp

urBikaner

GRP Jaipur

Jaipur

Jaipur Commissionerat

e

Jodhpur

Jodhpur Commissionerat

e

Kota Udaipur

Total 29 19 22 6 31 18 24 6 24 31

05

101520253035

Range/ Commissionerates and Circle Offices

Page 22: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 22 of 241

The following graph depicts the sum of police stations (total of 863 notified police stations):

Figure 4: Range and Police Stations

AjmerBharat

purBikane

rCID (IB)

GRP Jaipur

Jaipur

Jaipur Commissionerate

Jodhpur

Jodhpur

Commissionerate

KotaUdaip

urSOG SCRB

Total 121 75 87 1 25 120 63 117 26 98 128 1 1

0

20

40

60

80

100

120

140

Division of Police Stations

Page 23: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 23 of 241

The following highlights the field establishment of the Rajasthan Police:

Director General of Police (DGP) {Head of the Department}

Additional Director General of Police (Addl. DGP)

Inspector General of Police (IGP) {In-charge of a range}

Deputy Inspector General of Police (Dy. IGP)

Superintendent of Police (SP) {In-charge of a District}

Additional Superintendent of Police (Addl. SP)

Assistant/ Deputy Superintendent of Police (ASP/ Dy. SP) {In-charge of a

Circle in a district}

Inspector of Police {In-charge of some Police Station}

Sub-Inspector of Police (SI) {In-charge/Staff of a smaller Police Station}

Assistant Sub-Inspector of Police (ASI) {Staff of the Police Station}

Police Head Constable (HC) {Staff of the Police Station}

Police Constable {Staff of the Police Station}

Hierarchy of Commissionerate office:

Commissioner of Police

Additional Commissioner of Police

Deputy Commissioner of Police

Assistant Commissioner of Police

Table 2: Rajasthan Police Hierarchy

Detailed information on Police hierarchy is available on www.police.rajasthan.gov.in

3.2 Existing Legacy Systems

The existing Legacy systems are:

Crime and Criminals Information System (CCIS)

Common Integrated Police Application (CIPA)

3.3 Existing Data Centre Infrastructure

The Rajasthan State Data Centre (RSDC) is located at Yojana Bhawan, Jaipur. Partial IT

infrastructure for CCTNS project is already installed at RSDC. Details of indicative network

architecture, specification of deployed IT infrastructure, and specification of remaining IT

infrastructure at RSDC, are given in succeeding sections (Refer: Annexure IV). Disaster

Recovery (DR) Site shall be set up at NIC, Shastri Park, New Delhi by the successful bidder. The

detailed information pertaining to the RSDC and DR Site is available in Annexure IV of this

volume.

Page 24: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 24 of 241

3.4 Existing WAN Infrastructure

The Government of Rajasthan wishes to establish a State Wide Area Network (SWAN) as the

backbone network for data, voice and video communications throughout the State. SWAN would

act as the vehicle for effective implementation of Electronic Governance (e-Governance) across

the state.

The state is determined to make efforts to effectively use Information Technology for delivering

quality services to citizens and quicken the overall development of the State through

improvement of G2G and G2C Interface.

The Primary connectivity by BSNL (VPN0BB- 512 kbps) has been provided at all Police Stations

and higher offices. Where the VPNoBB connectivity is not feasible the WiMAX/VSAT (CAR-64

kbps, MAR- 512 kbps) connectivity would be used. BSNL has provided 20 Mbps line at SDC for

aggregation of VPNoBB/WIMAX/VSAT connectivity. The provision of 8 Mbps has been made

for connectivity between SDC and DR (NIC Data Centre at New Delhi). The RSWAN and

SecLAN would be the redundant connectivity for all feasible locations. The RSWAN (Rajasthan-

SWAN) has covered around 450+ CCTNS locations by November 2013. RSWAN is tentatively

scheduled to cover all the CCTNS locations by April 2014 (for details refer). SecLAN would be

providing the network in place of SWAN for Jaipur district.

3.5 Existing Client Site Infrastructure

This section details the infrastructure available at the client site. The sites have been categorized

broadly into 3 major categories, CIPA locations (locations where CIPA has been rolled out and

CIPA infrastructure is available), NON CIPA locations (Locations where CIPA has not been

commissioned) and higher offices (PHQ, SP office, etc).

Following gives the snapshot of the CIPA and Non – CIPA Police Stations as on November, 2013

Figure 5: CIPA Vs. Non – CIPA Police Stations

0

200

400

600

800

1000

Sum Police StationsSum of CIPA

Sum of Non CIPA

863

566

297

Page 25: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 25 of 241

CIPA was made functional at about 69% of the Police stations including SOG.

The following table gives a list of locations where CIPA has been operational

District CIPA-I CIPA-II CIPA-II Total

AJMER 32 32

ALWAR 29 1 30

BARAN 18 18

BARMER 21 21

BHARATPUR 23 1 24

BHILWARA 27 2 29

BIKANER 21 1 22

BUNDI 14 14

CHURU 16 16

DAUSA 13 13

DHOLPUR 13 13

JAIPUR (SOG) 1 1

JAIPUR (EAST) 2 10 2 14

JAIPUR (NORTH) 14 14

JAIPUR (SOUTH) 2 10 1 13

JAIPUR (WEST) 3 8 2 13

JAIPUR RURAL 17 1 18

JALORE 15 15

JHALAWAR 23 23

JODHPUR EAST 9 1 10

JODHPUR RURAL 13 13

JODHPUR WEST 8 8

KARAULI 16 16

KOTA CITY 14 1 15

KOTA-RURAL 15 15

NAGAUR 30 30

PRATAPGARH 2 2

SAWAIMADHOPUR 12 12

SIKAR 19 19

SRI GANGANAGAR 24 1 25

TONK 21 21

UDAIPUR 36 1 37

Grand Total 103 217 246 566

Table 3: CIPA Locations

Page 26: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 26 of 241

Following diagram represents Phase wise CIPA implementation

Figure 6: Phase wise CIPA Implementation

CIPA was commissioned at a total of 5 districts in the year 2006, 13 districts in 2007 and 13

districts in 2009.

CIPA

Phase

Year of

Implement

ation

End of

warranty

Count

of

District

Sum of Number

of Police Stations

Sum of Total

available

Computers

First 2006 2009 4 103 430

Second 2007 2010 13 217 910

Third 2009 2013 13 246 978

Grand

Total

30 566 2318

Table 4: Total Computers Available under CIPA locations (Phase wise)

Note:

a) The computers purchased under Phase I and Phase II and Phase III are out of warranty.

Other IT peripherals available at CIPA locations:

Each CIPA location has below peripherals (one unit per location):

UPS 2 KVA

Multifunctional HP Laser Jet Printer

Duplex HP Laser Jet Printer

16 Port Networking Switch

First 2006 Second 2007 Third 2009

Total 4 13 13

0

2

4

6

8

10

12

14

No

. of

Dis

tric

tsCIPA Phase

Page 27: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 27 of 241

Table 5: Total Geographical spread of Police offices S. No. Location Higher Offices Police Stations Other Offices

No

. of S

P O

ffice

s

No

. of A

dd

l. SP

Offic

e

(ou

tsid

e H

Q)

No

. Dy

SP

(SC

/ ST

/ Wo

ma

n

atr

oc

ities

) offic

es

No

. of D

y S

P ( T

ra

ffic) o

ffice

s

Cir

cle

Offic

es

CIP

A

No

n C

IPA

No

. of P

olic

e S

tatio

ns

Oth

er

Offic

es

No

. of C

on

tro

l Ro

om

s

1 Ajmer Range 4 5 4 1 29 112 9 121 1 4

1.1 Ajmer 1 1 1 1 8 32 2 34 1

1.2 Bhilwara 1 2 1 9 29 4 33 1

1.3 Nagaur 1 1 1 7 30 2 32 1

1.4 Tonk 1 1 1 5 21 1 22 1

1.5 Ajmer Range Office 1

2 Bharatpur

Range 4 2 4 0 19 65 10 75 1 4

2.1 Bharatpur 1 1 1 6 24 2 26 1

2.2 Dholpur 1 1 5 13 2 15 1

2.3 Karauli 1 1 4 16 2 18 1

2.4 Sawai

Modhopur 1 1 1 4 12 4 16 1

2.5 Bharatpur Range

Office 1

3 Bikaner Range 4 4 4 0 22 63 24 87 1 4

3.1 Bikaner 1 1 7 22 4 26 1

3.2 Churu 1 2 1 5 16 3 19 1

3.3 Hanumangarh 1 1 1 4 15 15 1

3.4 Sri Ganganagar 1 1 1 6 25 2 27 1

3.5 Bikaner Range Office 1

4 GRP Jaipur 2 0 0 0 6 25 25 1 2

4.1 GRP Ajmer 1 4 17 17 1

4.2 GRP Jodhpur 1 2 8 8 1

4.3 GRP Range Office 1

5 Jaipur Range 5 5 5 1 31 80 40 120 1 5

Page 28: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 28 of 241

5.1 Alwar 1 2 1 1 8 30 8 38 1

5.2 Dausa 1 1 5 13 5 18 1

5.3 Jaipur Rural 1 2 1 6 18 3 21 1

5.4 Jhunjhunu 1 1 6 20 20 1

5.5 Sikar 1 1 1 6 19 4 23 1

5.6 Jaipur Range Office 1

6 Jaipur

Commissionerate 6 2 0 4 18 54 9 63 1 5

6.1 Jaipur East 1 1 5 14 2 16 1

6.2 Jaipur North 1 1 5 14 14 1

6.3 Jaipur South 1 4 13 1 14 1

6.4 Jaipur West 1 4 13 3 16 1

6.5 Jaipur (Traffic) 1 4 0 1

6.6 Jaipur (Metro) 1 1 1

6.7 JDA/Tourist 2 2

6.8 Commissionerate

Office 1

7 Jodhpur Range 6 4 6 0 24 49 68 117 1 6

7.1 Barmer 1 1 1 4 21 4 25 1

7.2 Jaisalmer 1 1 3 17 17 1

7.3 Jalore 1 1 1 4 15 1 16 1

7.4 Jodhpur Rural 1 1 1 4 13 4 17 1

7.5 Pali 1 1 1 6 27 27 1

7.6 Sirohi 1 1 3 15 15 1

7.7 Jodhpur Range Office 1

8 Jodhpur

Commissionerate 3 1 0 2 6 18 8 26 1 3

8.1 Jodhpur East 1 1 3 10 3 13 1

8.2 Jodhpur West 1 3 8 5 13 1

8.3 Jodhpur traffic 1 2 1

8.4 Commissionerate

Office 1

9 Kota Range 5 0 5 1 24 85 13 98 1 5

9.1 Baran 1 1 5 18 1 19 1

9.2 Bundi 1 1 5 14 4 18 1

9.3 Jhalawar 1 1 6 23 2 25 1

9.4 Kota City 1 1 1 4 15 4 19 1

9.5 Kota Rural 1 1 4 15 2 17 1

9.6 Kota Range Office 1

Page 29: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 29 of 241

10 Udaipur Range 6 1 6 1 31 39 89 128 1 6

10.1 Banswara 1 1 4 16 16 1

10.2 Chittorgarh 1 1 1 8 26 26 1

10.3 Dungarpur 1 1 2 13 13 1

10.4 Pratapgarh 1 1 4 2 13 15 1

10.5 Rajsamand 1 1 4 15 15 1

10.6 Udaipur 1 1 1 9 37 6 43 1

10.7 Udaipur Range Office 1

11 SCRB 1 1

12 SOG 1 0 1

13 CID (IB) 1 1

14 FPB 1

15 PHQ 1 1

16 FSL 1

Grand Total 45 24 34 10 210 566 297 863 14 45

Page 30: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 30 of 241

Scope of the Project

4

Page 31: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 31 of 241

4 SCOPE OF THE PROJECT

This section will provide detailed information on the scope of each of the component

required for the implementation of this project.

4.1 Geographical Scope:

The table below highlights total locations which are to be considered for CCTNS roll out.

Type of Office Number of Offices

Police Station 760

Circle Office (CO)/ SDPO 188

DySP (SC/ ST/ Women Atrocities/ Traffic) 29

Addl. SP 14

SP office 42

Range office 8

Commissionerates 2

SCRB 1

Forensic Science Laboratory + Fingerprint Bureau 2

Police Control Room (State + District) 43

PHQ 1

Total 1090

Table 6: Total Geographical Scope

4.2 Scope of Services during implementation phase

The scope of the ―bundled services‖ to be offered by the SI includes the following:

Project planning and management: SI should align with the overall Project planning

and management functions as prescribed by Rajasthan Police. The project plan may

be modified on mutual consent between Rajasthan Police and the selected bidder.

Configuration, Customization and Extension (New Modules) of CAS (State) and

Integration with External Agencies through Agile Software Development

methodology. SI shall procure all the necessary underlying solution components

required to deploy the Enhanced CAS for the State.

Site preparation at the Client site locations (Police Stations, Circle Offices, District SP

Office, Range Office, Commissionerate, SCRB and PHQ)

IT Infrastructure at the Client site locations (Police Stations, Circle Offices, District

SP Office, Range Office, Commissionerate, SCRB and PHQ).

Co-ordinate with DoIT&C, SWAN Operator, BSNL, SecLAN operator for ensuring

Network connectivity at all locations.

Installation and Setting up of IT infrastructure at the Data Center and DR Site

including the necessary hardware, software and other networking components.

Setting up of NOC and Helpdesk at SCRB with adequate Communication facilities.

SI shall provide maintenance services for the existing hardware at DC and Pilot

locations.

SI shall provide adequate maintenance services for all the hardware supplied (DC/

DR/ Client locations) to ensure that As-Is CAS is operational at all locations during

the implementation phase.

Deployment of enhanced CAS and ensuring availability in all locations.

Page 32: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 32 of 241

Data migration and digitization of historical data.

Migration of data from CIPA Police Stations / Higher Offices to CCTNS.

Handholding support.

3rd party acceptance testing, audit and certification.

Capacity Building and Change Management.

Operation and Maintenance for 3 years after project Go-Live.

In implementing the above, the SI shall strictly adhere to the standards set by the MHA,

NCRB, and State Government.

The project will be managed out of SCRB office at Jaipur. At all points in the execution of the

project, key senior resources including the project manager must be based at SCRB office.

Successful bidders are requested to note that any changes within the scope of work will be

presumed to be included in the overall scope of work.

4.3 Project Planning and Management

This project is a geographically spread initiative involving multiple stakeholders. Its

implementation is complex and though its ultimate success depends on all the stakeholders;

the role of SI is key and hence SI is required to design and implement a comprehensive and

effective project management methodology together with efficient & reliable tools.

To have an effective project management system in place, it is necessary for the SI to use a

Web based Project Management Information System (PMIS). The SI shall address at the

minimum the following using PMIS:

Create an organized set of activities for the project

Establish and measure resource assignments and responsibilities

Construct a project plan schedule including milestones

Measure project deadlines, budget figures, and performance objectives

Communicate the project plan to stakeholders with meaningful reports

Provide facility for detecting problems and inconsistencies in the plan

During the project implementation the SI shall report to the Rajasthan Police, on following

items:

Results accomplished during the period

Cumulative deviations to date from schedule of progress on milestones as specified in

this RFP read with the agreed and finalized Project Plan

Corrective actions to be taken to return to planned schedule of progress

Proposed revision to planned schedule provided such revision is necessitated by

reasons beyond the control of the SI

Other issues and outstanding problems, and actions proposed to be taken

Progress reports on a fortnightly basis

Interventions which the SI expects to be made by the State Nodal Officer and/or

actions to be taken by the State Nodal Officer before the next reporting period

Project quality assurance reports

Provide update on Warranty and AMC of equipment provided under the project

Page 33: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 33 of 241

As part of the project management activities, the SI shall also undertake:

o Issue Management to identify and track the issues that need attention and

resolution from the Government of Rajasthan/ NCRB/ MHA.

o Scope Management to manage the scope and changes through a formal

management and approval process

o Risk Management to identify and manage the risks that can hinder the project

progress

4.4 Project Documentation

The SI shall create and maintain all project documents that would be submitted to Rajasthan

Police as deliverables as per the agreed project timelines. The documents created by the SI

will be reviewed and approved by the Governance Structure Setup in the State Mission Team

would also approve any changes required to these documents during the course of the

project. Rajasthan Police will finally sign-off on the documents on the recommendation of

State Mission Team / SPMU.

The SI shall submit a list of deliverables that they would submit based on the methodology

they propose. The SI shall prepare the formats/templates for each of the deliverables upfront

based upon industry standards and the same will be approved by Rajasthan Police prior to

its use for deliverables.

All project documents are to be kept up-to-date during the course of the project. The SI shall

maintain a log of the internal review of all the deliverables submitted. The logs shall be

submitted to State Nodal Officer on request. All project documentation shall conform to the

industry leading standards of documentation.

The SI will also be required to procure commission and maintain Project Management,

Configuration management and Issue tracker tools at the SCRB during the course of project

implementation. The requirements are listed below:

4.5 Project Management Tool

The SI shall keep the project plan and all related artifacts up-to-date during the course of the

project. In order to help with the project management, the SI shall use a suitable standard,

proven off-the-shelf web based project management tool. The SI shall install the project

management software at Rajasthan Police's premises right at the beginning of the project.

The tool shall provide the dashboard view of the progress on project milestones to the Nodal

Officer and other Supervisory Officers of Rajasthan Police.

4.6 Configuration Management Tool

In order to help with the version/configuration management for all documents (including

source code and all other project artifacts), the SI shall use a suitable standard, proven off-

the-shelf configuration management tool. The SI shall install the configuration management

software at Rajasthan Police's premises right at the beginning of the project.

Page 34: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 34 of 241

4.7 Issue Tracker

The SI shall employ a suitable and proven tool for tracking issues through the execution of

the project. The SI shall install the Issue Tracking System at Rajasthan Police's premises to

enable State‘s users to access and use the same.

The SI shall procure and commission the required infrastructure (software, servers) for

Project Management Tool, Configuration Management Tool and Issue Tracker tool and

maintain the same through the duration of the project. These tools along with the servers on

which they are deployed will become property of the Rajasthan Police and will be used by

Rajasthan Police even beyond the contract period.

The SI would setup an online repository on Project Monitoring / Configuration Management

Tool for providing centralized access to all project documents including manuals and other

materials. The online repository would be maintained by the SI through the engagement

period. The SI should ensure that the repository is built on appropriate security features such

as role- and necessity-based access to documents.

4.8 Configuration, Customization and Extension (Development of New

Modules and Features) of CAS and Integration with External Agencies

through Agile Software Development Methodology

Due to evolving requirements under CCTNS project, integration and interfacing with

external agencies, the Rajasthan Police favors an agile development approach. The Rajasthan

Police defines agile as any process in which system development is performed in an iterative

and incremental manner with collaboration between the System Integrator and the

Rajasthan Police teams, allows for evolving requirements, and demonstrable software is the

measurement of progress. Hereafter, the term Agile is used to encapsulate the above

definition.

The technical proposals must also include an Agile Project Plan that describes, in detail, how

the following will be accomplished.

Creation and support of Agile development environments that will allow

configuration and coding changes to be made and tested in an iterative and

incremental manner, with releases of code to other production environment.

Describe the tools the Agile development environment will use to facilitate

continuous code integration as developers check code into a code repository.

Describe how automated test scripts would be configured to run against the

developed and checked-in code.

Detail how test-driven development will be used to ensure individual unit code passes

testing and how tests then become part of a greater automated testing base.

At a minimum, the proposed system must include Development, Integration, Quality

Assurance (QA) and User Acceptance Testing (UAT), Knowledge transfer, and

Production environments.

Describe when and how code and database changes will be migrated between

environments, and the tools used to perform this migration.

As part of the successful proposal, the Rajasthan Police requires a comprehensive

methodology for system design and a testing plan that facilitates Agile development. The

Rajasthan Police intends to select a Third Party Auditor that will operate as technically,

Page 35: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 35 of 241

managerially, and financially independent of the System Integrator (SI). The bidder should

propose the third part agency from the firms empanelled at (Department of Electronics and

Information Technology) DeitY, GoI. The Third Party Auditor will perform the following

functions:

Ensure the software provided by the SI meets the users needs (Validation)

Check that the system is well engineered and meets NCRB guidelines (Verification)

Ensure the quality of deliverables (QA)

Participate in Agile Development Cycle planning, which will be facilitated by the SI

to gather and document detailed requirements

Conduct audits as determined by the Rajasthan Police and contract

The SI is required to study the key process requirements, the functional requirements and

develop the required solution with respect to the requirements, required configuration and

customization specific to the Rajasthan Police. The detailed Functional Requirement

Specifications, Non Functional Requirements of CAS developed as on the date and future

development are detailed in Annexure III. The requirement specific to Rajasthan Police

would be developed, integrated and interfaced with CAS using Agile Development

methodology.

In terms of functionality, Enhanced CAS would cover those police functions that are over and

above the CAS provided by central CAS and specific to the Rajasthan for the CCTNS project.

It is estimated that of the possible police functions that could potentially be part of the

CCTNS application at the State level, the CAS provided by NCRB would cover the core

functionality common to all states of India.

Therefore, Enhanced CAS should be developed as a product-like application that could be

centrally managed and at the same time customized to meet the unique requirements of the

State. SI would be responsible for adding the functionality over and above the core CAS

(State) using Agile Development methodology. An indicative list of functionality is available

at Annexure III.

a) Agile Development Cycle (ADC) Planning

At the beginning of each ADC, the System Integrator must conduct participatory meetings

with Rajasthan Police staff to progressively elaborate the high-level business and systems

requirements and convert this into detailed, programmable requirements associated with the

deliverables in that ADC. This includes concept discussions, design prototyping, test

scenarios required for Rajasthan Police driven development, and validation that the correct

deliverables are included in the ADC.

These planning meetings will ensure the System Integrator understanding is consistent with

Rajasthan Police expectations. During the ADC, Rajasthan Police staff co-located with the

Agile development teams will provide feedback on design, prototyping, development, test

scenarios, and test results to the System Integrator.

The technical proposals should describe, in detail, Rajasthan Police active role in

requirements gathering using an Agile development process, as successive product iterations

are developed and integrated into the complete code base. The System Integrator must

propose how often and in what format (use cases, user stories, or other format) prioritized

requirements are expected from the Rajasthan Police.

Each Agile development team will work to elaborate and document detailed, programmable

requirements and to ensure the development teams have a thorough, detailed understanding

of Rajasthan Police requirements. Planning meetings will also allow the development team

Page 36: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 36 of 241

to determine the level of effort required to design, develop, test, and deploy each Rajasthan

Police requirement. This will ensure the appropriate numbers of prioritized requirements are

included in each ADC. At the end of each ADC, the functionality provided by each completed

requirement will be demonstrated to the Rajasthan Police for official acceptance. These

activities will also provide an opportunity for the System Integrator to:

Validate and refine the requirements specified with the Rajasthan Police staff

Elaborate and document the architectural and system requirements of the developed

system

Demonstrate the completed functionality

Demonstrate updated system documentation

The System Integrator, must ensure that the system requirements are continually elaborated

prior to the ADC planning meeting so that Agile development teams are not delayed in

accepting requirements into each ADC at the planning meeting.

An Agile development approach includes a desire to view rapid prototypes of requirements

and design concepts, screens, content, and application flow. Prototypes do not necessarily

need to become operational or be reused during development. Workflow and performance

simulation within the design task of the each ADC is also preferred. Successive iterations will

build on functionality completed during previous iterations, resulting in functionality that

can be exposed to user acceptance testing and validation at each Agile release (group of

ADCs).

The Rajasthan Police must approve the content and format of all deliverables prior to the

System Integrator beginning work on each deliverable. This approval should include both

initial elaborated requirements, in the form of user stories, use cases, or other acceptable

format, and continuous feedback from Rajasthan Police staff assigned to work with each

Agile development team. The Rajasthan Police reserves the right to reject any deliverable

that is not in the proper format or does not appear to address the function of the deliverable

requirement completely.

b) Requirements Traceability Matrix (RTM)

The System Integrator must develop a Requirements Traceability Matrix (RTM).

Requirements must be tracked through each stage of the Agile development life cycle

including Rajasthan Police prioritization, requirements elaboration, design, development,

testing, and deliverable release.

The requirements must be stored in a requirements management repository, using a

requirements management tool, which permits reporting of a specific requirement,

requirements based on type or attributes, and a complete detailed listing of all requirements.

This matrix and the repository will be used throughout the project to assure all requirements

are implemented, tested, and approved by the Rajasthan Police. Reports from the RTM will

be submitted to the Rajasthan Police at the end of each ADC and Agile release. The

requirements management repository must be accessible by the Rajasthan Police, third party

auditor, SPMU and System Integrator.

Page 37: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 37 of 241

c) Agile Development Cycles (ADC)

The System Integrator must have open, continuous communication with the Rajasthan

Police during each ADC. Each ADC will include requirements elaboration, system design,

development, testing, and documentation. Domain Experts will be involved with

development teams to ensure requirements are progressively elaborated, System Integrator

understanding of the requirements is consistent with the Rajasthan Police‘s intent, and

developed code accurately performs the intended function(s).

The technical proposal must describe, in detail, how version control will be applied to the

system code, including how successive versions of the code will be managed to allow rollback

to a previous code version. The proposal must describe how the System Integrator will

enforce coding standards, including QA processes that will be used to validate System

Integrator coding conforms to standards. Standards must specify a maximum time window

within which a developer must fix a broken build when code is introduced that causes

automated test failure.

d) Detailed System Design (DSD) Documentation

As an Agile project, the Rajasthan Police will value working code over comprehensive

documentation. To facilitate the mutual understanding of the functions to be developed in

each ADC, the System Integrator‘s development teams will lead a collaborative meeting with

the Rajasthan Police staff to design the test cases, functional tests, and storyboard the

expected user experience with the features being developed. The use cases, user stories or

other applicable artifacts will be modified and maintained so the functional code resulting

from the ADC can be measured against the initial understanding of the problem.

Architectural or global system changes must be shared across develop teams to ensure and

maintain a common understanding of the system architecture. The System Integrator is

encouraged to hold cross-team design sessions to further the understanding of pending

changes to the system.

e) Configuration and Rules Engine

The System Integrator is responsible for developing, testing, and documenting to meet the

requirements specified in this bidding document for the Rajasthan Police. Key elements

associated with this task are:

Demonstrate that all hardware, software, and communication linkages are functional

and will support the Rajasthan Police requirements

Ensure that the developed solution meets design criteria and satisfies the intended

purpose

Install and enhance or modify modules of the proposed systems, according to the

specifications developed and approved by the Rajasthan Police in the systems design

task

Provide module walk-through and demonstrations to the Rajasthan Police

Present all standard output reports

Demonstrate functionality of all interfaces

Populate the rules engine

Update the CMP

Page 38: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 38 of 241

f) Test Management Plan

The System Integrator must submit, for the Rajasthan Police approval, an Agile Test

Management Plan that will be executed during each Agile cycle and includes unit,

integration, regression, load testing (if applicable), user acceptance, and operational

readiness testing. The plan must include an explanation of how these deliverables will be

provided to the Rajasthan Police for the requirements being tested in each Agile cycle and

meet the following conditions:

An explanation of how test-driven development will be used to ensure individual unit

code tests become part of a greater automated testing base

Iterative system integration testing, regression testing, and support for UAT

A description of the active role business users will have in testing code developed in

each Agile cycle

A description of the test environments, methods, and workflow

Inclusion of testing personnel in each Agile development team

Procedures and the proposed tracking tool the System Integrator will use to track and

correct deficiencies and defects discovered during testing

The plan has to test all interfaces.

A listing and description of automated testing tools that will be used

A plan for system performance, measuring, and tuning

A plan for operational readiness testing

Testing Activities

The System Integrator must use test-driven development. Test cases and scenarios must be

created based on use cases and input from Rajasthan Police. Actual test results will be

supplied for all test cases, including any scenarios submitted by the Rajasthan Police. All

discrepancies, deficiencies, and defects must be identified, explained, and corrected before

the completed functionality described in each requirement is delivered to the Rajasthan

Police at the ADC Review meeting.

The System Integrator must track all automated test scenarios and cases and all defects must

be tracked through successful build. All tests results must be acceptable to the Rajasthan

Police and approved before testing is considered complete. The System Integrator must

make the changes necessary to the system to meet all requirements. Reports of metrics from

the testing will be reported at the end of ADC Review meetings. At a minimum, the

automated tracking tool reports must:

Capture or assign a unique ID for each test scenario and case

Organize test scenarios, cases, and results by business process (module)

Cross-reference test scenarios and cases to the RTM

Report metrics for test scenarios and cases to include, but not be limited to, number

of test scenarios and cases per module and status of test scenarios and cases (i.e.,

passed, failed, retested, percentage passed and or failed)

Report metrics for defects to include, but not be limited to:

o Severity of defects

o Status of defects

o Number of defects per module

Page 39: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 39 of 241

Separate test environments are required to perform unit, module, integration, and UAT, with

acceptable results approved by the Rajasthan Police, ensuring that all requirements have

been satisfied and successfully tested.

The System Integrator will be working closely with the Rajasthan Police, third party auditor

and SPMU during all testing phases. The System Integrator must permit complete systems

access to the Rajasthan Police and offer timely assistance when requested.

The System Integrator‘s responsibilities include the following:

Establish and Implement Testing Environments

Test Plans

Test Cases and Scripts

Test Results

Establish & Implement Testing Environments

The unit and system testing may be done in the System Integrators development

environment. Establishment of these environments is to be identified as milestones in the

applicable work plan, to be approved by the Rajasthan Police.

In addition, the System Integrator must establish the following environments:

UAT Environment: System Integrator will provide a UAT environment as a scaled down

version of the production environment, that allow users to perform system testing to ensure

the system meets the requirements for the user community. Users must be able to mimic

production work to ensure the system performs as expected. The System Integrator will

provide a method to refresh the UAT environment with a full set of data from the production

system at the Rajasthan Police request.

Unit Testing: The System Integrators responsibilities for this deliverable include

programming and unit testing on all requirements. The System Integrator must test all

modules (i.e., programs) as stand-alone entities. Unit testing ensures that a single module is

resilient and will function correctly on a stand-alone basis (e.g., the modified module can

take inputs and produce expected outputs). The System Integrator must submit successful

unit test results to the Rajasthan Police for approval.

Rules Testing: The System Integrator must test all rules populated into the rules engine.

The testing function must be automated through test scenarios and test scripts and during

the course of module and integration testing. Rules testing ensure the Rajasthan Police

policy is accurately reflected in the rules engine.

Module Testing: The System Integrator must update the RTM and repository, verifying

that all requirements have been addressed through test scenarios and test scripts. The

System Integrator must also verify that, during the course of module and integration testing,

system successfully met the requirements.

Integration Testing: The System Integrator must test modifications within the context of

the integrated modules in which it functions. Integration testing helps ensure that a defined

set of interconnected modules will perform, as designed, after additions and/or

modifications to modules. The testing must also ensure that interfaces with external systems

are exchanging data correctly. These tests must use a sample of preliminary converted files.

Additionally, the System Integrator must update the RTM and repository, verifying that all

requirements have been addressed through test scenarios and test scripts. The System

Integrator must also verify that, during the course of Module and Integration testing.

Page 40: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 40 of 241

User Acceptance Testing: UAT demonstrates that the system is ready to perform all

required functions, satisfies all requirements, and that all reported defects have been

corrected and accepted by the Rajasthan Police. All system modules will be tested before the

start of operations.

During the UAT activities conducted by each Agile development team in each ADC, few

errors will be found. The requirements developed in the ADC should have been thoroughly

debugged by the System Integrator. Therefore, developed code should regularly perform

correctly, as stated in the requirements documentation.

The System Integrator must provide a letter certifying that all data, user manuals, testing

facilities, and security accesses necessary to perform UAT have been provided.

Beta Testing: For system modules that affect external users, such as web portals, web-

based application submission and data, the System Integrator must have a beta testing plan,

allowing external users to participate in the testing process. The System Integrator must

describe its approach to beta testing. Beta Testing will continue in the Operations &

Maintenance period as well.

Load Testing: The System Integrator performs this test using a load-testing tool. The

System Integrator must conduct load testing to determine online, web-access, and batch

performance levels under expected system loading conditions with production-sized

databases. Load testing must also be conducted to evaluate system performance to verify the

capacity to handle the expected number of citizens and users, within specified performance

levels. The results of the load test may also result in re-work and systems tuning if the

processing schedule negatively affects the Rajasthan Police‘s ability to work a normal

business day.

Test Plans

The System Integrator must use structured data tests to create test scenarios based on use

cases or other requirements documentation methodology acceptable to the Rajasthan Police.

Actual test results will be supplied for all test cases including any scenarios submitted by the

Rajasthan Police. Test plans are required for all deliverables included in each ADC and will

be created and delivered as part of each ADC. All discrepancies, deficiencies, and defects

must be identified, explained, corrected, and approved by the Rajasthan Police before

moving to the next ADC.

The System Integrator will perform UAT testing in the UAT environment and will include

scenarios that test all modules and interfaces.

The System Integrator must establish a test plan and schedule for each phase of testing: unit,

rules, integration, user acceptance, operational readiness, and all components. The plans

must include the proposed path for a successful implementation and the System Integrator

must take responsibility for execution of the plans. The test plans must include:

A description of the test environments, methods, workflow, and knowledge transfer

required

A description of test scenarios and expected test results

An organization plan showing System Integrator personnel responsible for testing

A discussion of management of the testing process, including strategies for dealing

with delays in the testing effort, backup plan, and backup personnel

A contingency plan for risk mitigation

A plan for updating the RTM based on test results

Page 41: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 41 of 241

List of inputs to the tests

Steps in the testing process

A template progress report that will be issued at intervals approved by the Rajasthan

Police, as well as the content within the progress report

Procedures for notifying the Rajasthan Police of problems discovered in testing,

testing progress, and adherence to the test schedule

A plan for organizing test results for Rajasthan Police review

A plan for system performance measuring and tuning, based on the results of load

testing

A description of how the development of the test scenarios ensures that all modules,

rules, and functions of the UAT are evaluated and accepted

Test Cases and Scripts

The System Integrator must deliver test case and scripts for each phase of testing, unit, rules,

module, integration, user acceptance, and operational readiness for each module in the new

Eligibility System. These test cases and scripts will fulfill all requirements and provide very

thorough testing for all enterprise functionality. Test cases will be tracked for all

requirements and the status of each test will be traced through the RTM to ensure all

requirements are successfully met. Additionally, these scripts must provide step-by-step

instructions for executing the tests. The technical Proposals must specify the preferred

automated testing tools the Bidder intends to use.

Test Results

The System Integrator must deliver test results for each phase of testing: unit, rules, module,

integration, user acceptance, and operational readiness for deliverables produced in each

ADC. The test results must be submitted to the Rajasthan Police for review, accepted as

passed and approved by the Rajasthan Police before proceeding to the next requirement

deliverable, and must follow the proposed path for a successful implementation. The test

results must:

Be submitted at each bi-weekly ADC Review

Contain references to which requirements are fulfilled

Provide an updated RTM

Be in a format acceptable to the Rajasthan Police

Final Testing Reports

At each ADC Review meeting, the System Integrator must summarize the results of the

testing in a final testing report including, but not limited to:

A summary of the testing process including, but not limited to number of test

scenarios and cases tested and pass and/or fail ratio

Number of defects identified and corrected by module

Number of defects identified and not corrected by module

A description of issues outstanding at the end of UAT, the plan for resolution, and the

impact on the Implementation tasks

Page 42: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 42 of 241

g) Agile Development Cycle Review Meetings

The System Integrator must facilitate meetings with the Rajasthan Police at the end of each

ADC to demonstrate completed deliverables and discuss progress made during the

completed ADC. Except as otherwise approved, review meetings will be held at the end of

each ADC during the development phase. The SI, SPMU and third party auditor should

participate in ADC review meetings as requested by the Rajasthan Police.

The review and status meeting schedules will be proposed by the System Integrator in its

project management plans and will be mutually agreed upon between the System Integrator,

SPMU, third party auditor, and the Rajasthan Police.

The Rajasthan Police expects ADC Review meetings to be conducted on a bi-weekly basis.

The schedule must include a review and demonstration of teams deliverables at the

conclusion of every ADC to provide the Rajasthan Police with an opportunity to approve each

deliverable. When deliverables do not completely meet Rajasthan Police requirements, the

deliverable will be corrected in the next ADC.

The System Integrator must render all designs and system documentation for formal

approval at the conclusion of each ADC Review meeting. The System Integrator cannot

consider any deliverable complete before it is accepted formally by the Rajasthan Police

during an end of ADC Review meeting.

The System Integrator will conduct walk-through of deliverables at each ADC Review

meeting. A final review and walk-through will be conducted after system implementation

and prior to transition to maintenance and operations.

As the System Integrator provides deliverables at the conclusion of each ADC, the Rajasthan

Police will review the demonstrated code and accompanying documentation during the

Review meeting and either approve or reject each deliverable. The Final System

Documentation, Forms, Source Code, Data, User Manuals, and other Materials will be

submitted by the date indicated in the approved Project Work Plan.

At the ADC Review meeting, the Rajasthan Police will provide feedback necessary to modify

any rejected deliverables during the following ADC. The Rajasthan Police will accept or again

request modification of the deliverable at the conclusion of that ADC Review. When the

Rajasthan Police accepts the deliverable, the Rajasthan Police will provide a signed

acceptance letter to the System Integrator at the conclusion of the ADC Review meeting.

4.9 Site Preparation at Police Stations and Higher Offices

The SI is expected to prepare the client sites for setting up the necessary client site

infrastructure. Site preparation at Police Stations & Higher Offices will include but not

limited to:

Provision of Local area network (Structured LAN cabling, LAN ports)

Provision of computer furniture for Police Stations

Ensure adequate power points in adequate numbers with proper electric earthling.

4.10 Data Migration and Data Digitization

The Data Digitization and Migration requirements is as per Annexure V of this RFP

Page 43: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 43 of 241

4.11 Capacity Building and Change Management

SI shall undertake Capacity Building and Change Management of Rajasthan Police personnel

as per the scope defined in Annexure-VI.

4.12 Handholding Support

The System Integrator will provide one qualified and trained person per police station for a

period of 6 months or one trained person for period of 1 year for two Police stations (would

be decided by Rajasthan Police); to handhold the staff in the police station and ensure that

the staffs in that police station are able to use CAS application on their own by the end of the

handholding period. Depending upon the project requirements, SI shall be intimated to

deploy the handholding persons at a later stage. SI should provide manuals and CD‘s for

handholding support.

4.13 Requirement on Adherence to Standards

CCTNS system must be designed following open standards, to the extent feasible and in line

with overall system requirements set out in this RFP, in order to provide for good inter-

operability with multiple platforms and avoid any technology or technology provider lock-in.

4.14 Compliance with Industry Standards

In addition to above, the proposed solution has to be based on and compliant with industry

standards (their latest versions as on date) wherever applicable. This will apply to all the

aspects of solution including but not limited to design, development, security, installation,

and testing. There are many standards that are indicated throughout this volume as well as

summarized below. However the list below is just for reference and is not to be treated as

exhaustive.

Particulars Required Standards to be adhered to

Portal development W3C specifications, GIGW

Information access/transfer protocols SOAP, HTTP/HTTPS

Interoperability Web Services, Open standards

Photograph JPEG (minimum resolution of 640 x 480 pixels)

Scanned documents TIFF (Resolution of 600 X 600 dpi)

Biometric framework BioAPI 2.0 (ISO/IEC 19784-1:200 Specification

Finger print scanning IAFIS specifications

Digital signature RSA standards

Document encryption PKCS specifications

Information Security CCTNS system to be ISO 27001 certified and

CERTin certified

Operational integrity & security

Management

CCTNS system to be ISO 17799 compliant

IT Infrastructure management ITIL / EITM specifications

Service Management ISO 20000 specifications

Project Documentation IEEE/ISO specifications for documentation

Table 7: Industry Standards

Page 44: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 44 of 241

The SI shall adhere to the standards published by the DeitY, Government of India.

4.15 3rd Party Acceptance Testing, Audit and Certification

The Acceptance Testing, Audit & Certification is to ensure that the system meets

requirements, standards, and specifications as set out in this RFP and as needed to achieve

the desired outcomes. The basic approach for this will be ensuring that the following are

associated with clear and quantifiable metrics for accountability:

ADC requirements review

Test cases and Requirements Mapping

Infrastructure Compliance Review

Availability of Services in the defined locations

Performance and Scalability

Security / Digital Signatures

Manageability and Interoperability

SLA Reporting System

Project Documentation

Data Quality Review

As part of acceptance testing, audit and certification, performed through a third party

agency, state shall review all aspects of project development and implementation covering

software, hardware and networking including the processes relating to the design of solution

architecture, design of systems and sub-systems, coding, testing, business process

description, documentation, version control, change management, security, service oriented

architecture, performance in relation to defined requirements, interoperability, scalability,

availability and compliance with all the technical and functional requirements of the RFP

and the agreement. Here it is important to mention that the bidder should propose the third

party agency from the firms empanelled at DeITY, GoI.

The Rajasthan Police will establish appropriate processes for notifying the SI of any

deviations from defined requirements at the earliest instance after noticing the same to

enable the SI to take corrective action. Such an involvement of the Acceptance Testing &

Certification agencies, nominated by State, will not, however, absolve the operator of the

fundamental responsibility of designing, developing, installing, testing and commissioning

the various components of the project to deliver the services in perfect conformity with the

SLAs. Application audit is part of SI scope.

Following sub sections discusses the acceptance criteria to be adopted for system as

mentioned above:

a) ADC Requirements Review

The system developed/customized by SI shall be reviewed and verified by the agency against

the Agile Requirements signed-off between Rajasthan Police and SI. Any gaps, identified as a

severe or critical in nature, shall be addressed by SI immediately prior to Go-live of the

system. One of the key inputs for this testing shall be the traceability matrix to be developed

by the SI from system. Apart from Traceability Matrix, agency may develop its own testing

plans for validation of compliance of system against the defined requirements. The

acceptance testing w.r.t. the functional requirements shall be performed by both

Page 45: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 45 of 241

independent third party agency (external audit) as well as the select internal department

users (i.e. User Acceptance Testing).

b) Infrastructure Compliance Review

Third party agency shall perform the Infrastructure Compliance Review (DC & DR

components and 10% of Total Client locations District wise) to verify the conformity of the

Infrastructure supplied by the SI against the requirements and specifications provided in the

RFP and/or as proposed in the proposal submitted by SI. Compliance review shall not

absolve SI from ensuring that proposed infrastructure meets the SLA requirements.

c) Security Review

The software developed/customized for system shall be audited by the agency from a

security & controls perspective at the cost of SI. Such audit shall also include the IT

infrastructure and network deployed for system. Following are the broad activities to be

performed by the Agency as part of Security Review. The security review shall subject the

system for the following activities:

Audit of Network, Server and Application security mechanisms

Assessment of authentication mechanism provided in the application /components/

modules

Assessment of data encryption mechanisms implemented for the solution

Assessment of data access privileges, retention periods and archival mechanisms

Server and Application security features incorporated etc

d) Performance

Performance is another key requirement for system and agency shall review the performance

of the deployed solution against certain key parameters defined in SLA described in this RFP

and/or agreement between Rajasthan Police and SI. Such parameters include request-

response time, work-flow processing time, concurrent sessions supported by the system,

Time for recovery from failure, Disaster Recovery drill etc. The performance review also

includes verification of scalability provisioned in the system for catering to the requirements

of application volume growth in future.

e) Availability

The system should be designed to remove all single point failures. Appropriate redundancy

shall be built into all the critical components to provide the ability to recover from failures.

The agency shall perform various tests including network, server, security, DC/DR fail-over

tests to verify the availability of the services in case of component/location failures. The

agency shall also verify the availability of services to all the users in the defined locations.

f) Manageability Review

The agency shall verify the manageability of the system and its supporting infrastructure

deployed using the Enterprise Management System (EMS) proposed by the SI. The

manageability requirements such as remote monitoring, administration, configuration,

inventory management, fault identification etc. shall have to be tested out.

Page 46: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 46 of 241

g) SLA Reporting System

SI shall design, implement/customize the Enterprise Management System (EMS) and shall

develop any additional tools required to monitor the performance indicators listed under

SLA prescribed in this RFP. The Acceptance Testing & Certification agency shall verify the

accuracy and completeness of the information captured by the SLA monitoring system

implemented by the SI and shall certify the same. The EMS deployed for system, based on

SLAs, shall be configured to calculate the monthly transaction-based payout by Rajasthan

Police to SI.

h) Project Documentation

The Agency shall review the project documents developed by SI including requirements,

design, source code, installation, training and administration manuals, version control etc.

Any issues/gaps identified by the Agency, in any of the above areas, shall be addressed to the

complete satisfaction of Rajasthan Police.

i) Data Quality

The Agency shall perform the Data Quality Assessment for the Data digitized/ migrated by SI

to the system. The errors/gaps identified during the Data Quality Assessment shall be

addressed by SI before moving the data into production environment, which is a key mile

stone for Go-live of the solution.

4.16 Scope of Services during Post Implementation Phase

The SI shall be responsible for the overall management of the system including the

application and entire related IT Infrastructure. SI shall deploy an EMS tool that monitors /

manages the entire enterprise wide application, infrastructure and network related

components.

SI shall provide the Operations and Maintenance Services for a period of 3

years from “Go-Live” of the project.

Page 47: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 47 of 241

CAS Customization

and Integration Work

Proposal

5

Page 48: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 48 of 241

5 CAS Customization and Integration Work Proposal

5.1 Project Management Work Proposal

The System Integrator must submit a comprehensive Agile Project Management Proposal

describing how the project will be managed for the CAS customization and integration

requirement of Rajasthan Police. The Rajasthan Police State Mission Team will review the

System Integrator‘s Agile Project Management proposal. The System Integrator will make

any changes requested by the Rajasthan Police. The System Integrator would submit

separate proposal for every customization or integration requirement identified by Rajasthan

Police during the project implementation period. It has been envisaged that the total

customization effort would be around 180 Man-Month (3960 Man Days); for the purpose of

calculating 180 Man-Month (3960 Man Days) deployment of onsite team (Software

Development Team) would be considered. During project implementation, the bidder must

follow Government of India calendar for working. However it is assumed that onsite team

would be supported by services of specialized resources like that of Business Analyst, Data

base Administrator, System architect, Testing/Quality Assurance team, UI Designers,

Technical writers, Business Intelligence stack experts, Domain experts etc, whenever

required for quality assurance and adherence to industry standards for agile software

development. The SI must quote these Man-Months in a bundled manner.

The Agile Project Management proposal must describe the agile methodologies for managing

project processes and activities. The System Integrator‘s Project Management proposal must

include strategies to ensure all quality standards are met and deliverables are provided

according to the priority as agreed to with the Rajasthan Police. The estimated Man-Month

effort shall include resource utilization (team and tools) matrix and expected outcome from

each resource. The 80% payment for the work done by the SI would be payable at the end of

subsequent quarter. The 20 % of remaining payment would be released after the successful

release of that build and testing the product in live environment for 2 months, , in the

subsequent quarter.

The Agile Project Management Proposal must include the proposed number of teams, team

composition, roles of team members, and the proposed project schedule and timelines and

effort estimation. The Project Management Proposal must include a preliminary schedule

that describes the total number of anticipated Agile Development Cycles (ADC), and the

deliverables that are expected to be completed in each release

During the execution phase of the project, the System Integrator must exert control to assure

the completion of all tasks according to the project schedule and project budget. All

variances must be reported to the Rajasthan Police. The System Integrator must work with

the Rajasthan Police to address the priority of each requirement and determine the

appropriate strategy to ensure any variance in scope, or change in required specifications of

each deliverable, does not affect the overall completion of the project within time and budget

constraints. The Rajasthan Police will work with the System Integrator to approve fast

tracking or reallocation of System Integrator resources as necessary.

The Project Management Proposal must include the following project control subsidiary

plans, which must also reflect an Agile methodology.

Project Work Plan and Schedule

Page 49: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 49 of 241

Effort Estimation- Man Month

Work Breakdown Structure (WBS)

5.1.1 Project Work Plan and Schedule

The System Integrator will submit the project work plan for developing software for

Rajasthan Police specific customization and integration requirement. The Project Work Plan

will include activities, milestones, and deliverables. The Project Work Plan must be updated

at the conclusion of each ADC to reflect the percentage of completion. The Rajasthan Police,

SPMU and third party auditor will use the Project Work Plan to monitor System Integrator

progress.

5.1.2 Project Work Plan Baselines

The Project Work Plan will include requirements for the Rajasthan Police to be customized

and integrated around the CAS. The estimates provided by the System Integrators proposal

will form the project baseline. Once established, the baseline will only be modified with

approval from the Rajasthan Police. The approved baseline will be used for all project

metrics reported during the end of ADC Review meetings.

5.1.3 Work Breakdown Structure (WBS)

The WBS includes the System Integrator‘s suggested priority for each requirement and

identifies the ADC and anticipated release in which each requirement will be included.

Target completion dates for each deliverable must be provided. During project execution, the

System Integrator must measure performance according to the WBS and manage changes

requested by the Rajasthan Police.

The WBS must specify:

The number of ADCs necessary to complete all tasks, with a breakdown of System

Integrator personnel effort

The planned start and end dates for all ADCs, the Rajasthan Police requirements to

be completed in each ADC, a description of the interrelationships of all Agile

development teams, and tasks required to complete the requirements.

A schedule for all deliverables, by ADC, with the System Integrator‘s proposed

priority for completion of each requirement

The anticipated level of effort required to complete requirements,

5.1.4 System Environments

The System Integrator must create all required System Environments, as specified below.

The testing and production environments must remain updated and operable for the

duration of the project.

Development Environment: The System Integrator will provide a common and managed

desktop configuration for the developers. Developers will use the same versions of

development tools to ensure consistency between individual and team products. Further, the

System Integrator will provide a pre-integration environment for developers that will be

used as a trial-and-error environment for code modification.

Page 50: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 50 of 241

Integration Environment: The System Integrator will create and maintain an automated,

continuous integration environment that collects developer code, unit and functional tests.

Upon code check-in, the code base will be compiled and all available automated unit and

functional tests will run against the full code base, which contains the recently checked code,

to ensure the build is not broken. If a developer breaks the current build, there will be an

established timeframe in which they must correct the problem. Developers will be

encouraged to check in code often throughout the day to encourage iterative and incremental

development practices and avoid lengthy refactoring.

Unit/System Testing Environment: The System Integrator must provide a unit/system

testing environment to be a mirror image of the production environment that allow

developers to perform system testing to ensure the system meets the requirements.

Developers must be able to mimic production work to ensure the system performs as

expected. The System Integrator will provide a method to refresh the unit/system testing

environment with a full set of test data from the production system or other data source at

the Rajasthan Police‘s request.

Unit Tests: The System Integrator will establish that developers use test-driven

development and that unit tests are created for every code change. The System Integrator‘s

development effort must ensure that unit tests are being created and checked in with code,

so that the automated test library grows in depth and complexity of available tests.

Quality Assurance/UAT Environment: The System Integrator will provide a UAT

environment to be a mirror image of the production environment, that allow users to

perform system testing to ensure the system meets the requirements for the user

community. Users must be able to mimic production work to ensure the system performs as

expected. The System Integrator will provide a method to refresh the UAT environment with

a full set of test data from the production system or other data source at the Rajasthan

Police‘s request.

Knowledge Transfer Environment: The System Integrator will create a separate and

stable environment that will be used to train the Rajasthan Police‘s workforce, and other

system users. This environment must be created and accessible to support the System

Integrator‘s knowledge transfer plan. It is preferred that the System Integrator establish a

method of creating a base of test records, or refreshing this environment from another data

source at the Rajasthan Police‘s request

Production Environment: The System Integrator will create a highly available and stable

environment that is used for operating the system for the Rajasthan Police‘s workforce, and

other systems users. Production must have access and usage security enabled that does not

allow developers the ability to move code into production without qualification and

migration through development and testing environments.

5.1.5 Facilities

The System Integrator will need to establish a temporary project office at SCRB, Jaipur

Rajasthan. All costs associated with establishing and maintaining temporary project office

space including, but not limited to, office space, network connections, computers, monitors,

printers, phone systems, workstations, secure access, and utilities must be identified

separately in the System Integrators technical and commercial proposal. All costs associated

Page 51: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 51 of 241

with the temporary offices are the responsibility of the System Integrator. The systems

integrator key personnel will perform duties at these facilities.

5.1.6 Meeting Rooms and Workspace Requirements

The System Integrator must develop adequate meeting room to accommodate required

System Integrator staff and up to 20 members from Rajasthan Police, as specified by the

Rajasthan Police, attending regular planning, review, status, and strategy meetings. The

System Integrator is responsible for furnishing appropriate equipment that will

accommodate, at minimum, 30 Rajasthan Police, and the System Integrator‘s developers,

testers, technical writers, and other staff. The System Integrator is responsible for the

furnishing of the telecom equipment to accommodate phone lines, network access, and

supplies for the facility, for Rajasthan Police staff.

The meeting rooms must have, at a minimum, two computers with Internet and Intranet

access, two projectors for displaying Internet-based and Windows PowerPoint presentations,

telecom equipment with high-quality speakerphones for remote staff to attend meetings by

telephone, and ability to access network printer(s) in the same building for use by meeting

participants. Meeting rooms must also accommodate video conferencing and web-based

application sharing for attendees.

5.1.7 Indicative Customization and Integration List

State Police Portal, e-Sugam, IFMS, e-GRAS (https://egras.raj.nic.in/), RTI, ATS, Business

Intelligence Tool, Jail, e-Courts, ITMS (Integrated Traffic Management System), e-

Office, Motor Vehicle Coordination System, iHRMS, Vahan, Sarthi, Talash, CCC, e-District,

SSDG, Passport, e-Challan, Dreams (http://dreams.raj.nic.in/), Vidhan Sabha Question

Monitoring System, Inventory Management System, Vehicle Fleet management System,

Files / Letter Monitoring System, Audit Para management System, Zonal Integrated Police

Network (ZIPNET), SmartCop, Budget Monitoring System.

Page 52: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 52 of 241

Annexures

6

Page 53: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 53 of 241

6 ANNEXURE

6.1 ANNEXURE-I SERVICE LEVEL AGREEMENT

Liquidated Damages (LD) shall be applicable for all activities to be completed during

Implementation Phase (Site Preparation, Hardware Commissioning, Capacity Building, Data

Digitization, and CAS Customization). LD shall be calculated as per Implementation Plan

(Clause 3.1, Volume - II) and LD (Clause 3.1 (5) Volume -III) mentioned in this RFP.

The SI has to deploy the mandatory manpower (as per clause 6.1.2) for the smooth execution

of the project and thus monitoring and control of team deployment and continuity needs to

be ensured. In this context, the table below illustrates the penalty applicable on non

availability of resource and replacement of resources during implementation period.

Service Level

Requirement

The mandatory deployment of the following resources will be

required during the Implementation Phase:

1. Project Manager

2. Team Lead - Capacity Building

3. Team Lead - CAS Customization

4. Team Lead - Infrastructure

5. Team Lead - Data Digitization

6. Resources deployed for Agile development

7. Handholding support resources

The replacement of the resources should be done after taking prior

approval from Rajasthan Police. The replaced resource should

provide Knowledge Transfer with an overlapping period of at least 15

days.

Measurement of

Service Level

Parameter

To be measured in Number of Week of delay from the date of

deployment mentioned in the RFP and for the replacement of

resources.

Delay of every Week would attract a penalty per Week as per the

following –

Non Availability of Resources = Per Week Penalty multiplied by No.

of week of delay. (If the resource is not available for 3 or more days

in a week then the entire week would be considered for penalty

calculation).

Delay of 3 day or more days in a particular week would be counted as

full week. The deployed resources should follow the office time and

working days of Rajasthan Police.

The deployed resources are entitled for 1 leave per month, with prior

approval from Nodal Officer. The leave not taken in that month

would be carried forward to next month subject to maximum of 12

leaves in a year.

The Penalty per week is INR 10,000 per Resources.

Page 54: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 54 of 241

6.1.1 Post -Implementation Phase SLA

SLA defines the terms of the System Integrator‘s (SI) responsibility in ensuring the

performance of the CCTNS project based on the agreed Performance Indicators. This section

defines various Service Levels for various components of CCTNS Project, which shall be

considered by the Rajasthan Police in establishing the performance benchmark of SI.

The selected bidder has to meet the service level norms as defined in this clause, failing

which the SI is liable to be penalized.

Working Days: CCTNS Application has to be made available 24 x 7. The service window

for CCTNS Application Availability shall be as per the Service window defined in table below

Description Prime Hours Non Prime Hours

Working Days 8AM to 8PM 8PM to 8AM

SLA Matrix: MTTR (Mean Time to Repair) to rectify and restore the services will be

calculated from the time of detection of non-availability of services at Help Desk. The SI shall

provide Operations and Maintenance services as per SLA matrix given below:

Location MTTR

At SDC 30 Minutes

At Police Station Within 24 hours for the Police Station situated in District HQ

or location within less than 50 Km from District HQ.

48 hours for the location situated more than 50 Km from the

District HQ.

At other Higher

Offices

Within 24 working hours

a) Availability Management

The SI will have to submit weekly call reports (Closed/ Open) at respective SP/DCP office.

The calls will be closed in two ways (Either mutually agreed between SI and In-charge at

Client Location OR by SI only). The mutually agreed closed tickets (calls) need to be signed

by both parties. In case the In-charge at Client Location does not sign the call closed report,

the same will be submitted unsigned to the respective SP/DCP by SI. For DC-DR replication,

RTO shall be less than or equal to six (6) hours and RPO should be less than 60 minutes.

Component availability (Up time) shall be calculated as:

[1-(Downtime / Total time)]*100

Page 55: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 55 of 241

S

No

Parameter Description Target Penalty Measureme

nt Tool/

Method

1 DC/DR(Repli

cation)

/NOC/

Helpdesk

Servers, Network

Components etc.

installed should be

available, for the CAS

Application to run

successfully

> 97% No Penalty Reports from

SLA

management

Tool

calculated on

monthly basis

<=97% > 96% 5.0% of DC &

DR QGR

<=96% > 95% 10.0% of DC&

DR QGR

<=95% 20% of DC&

DR QGR

2 Application

and System

Software

Availability of

application and

system software as

mentioned in scope of

work

> 97% No Penalty Reports from

SLA

management

Tool

calculated on

monthly basis

<=97% > 96% 5.0% of DC&

DR QGR

<=96% > 95% 10.0% of DC&

DR QGR

<=95% 20% of DC&

DR QGR

3 Resource

Availability

at DC/ DR/

Helpdesk

/NOC

The resources should

be available as per the

agreed project plan

and manpower

deployment plan. No

change of team

structure would be

entertained without

prior approval of

Rajasthan Police.

The deployed

resources

shall be

entitled for 1

leave per

month with

prior approval

from Nodal

Officer

Rs. 15000/-

per week per

person for

number of

week for which

the resource is

absent from

DC & DR QGR.

Attendance

Track

4 Client

location

Hardware

Critical equipments:

Desktops, UPS,

Network switch,

Workstation

Within 24

hours for the

Police Station

situated in

District HQ or

location

within less

than 50 Km

from District

HQ.

48 hours for

the location

situated more

than 50 Km

from the

District HQ.

No Penalty Reports from

SLA

management

Tool

calculated on

24*7 basis

Page 56: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 56 of 241

S

No

Parameter Description Target Penalty Measureme

nt Tool/

Method

1-3 days after

the breach of

above

mentioned

SLA

Rs. 250/- per

equipment per

day from

Client Location

QGR payment

> 3 days Rs. 500/- per

day per

equipment per

day from

Client Location

QGR payment

It is to be noted that if the overall penalty applicable for any of the quarter during the

Operation & Maintenance phase exceeds 50% of QGR payment or if the overall penalty

applicable for any of the successive quarterly periods during the Operation & Maintenance

phase is above 10% of cost of O&M phase (OPEX); then Rajasthan Police shall have the right

to terminate the contract.

b) Service Management

Successful Bidder should setup a centralized IVRS based helpdesk at SCRB. Successful

Bidder shall arrange and maintain within the contract value and throughout the contract

period, all infrastructure necessary for managing the Help Desk including provisioning and

rent charges for One Toll-free number and minimum 3 telephone line(s) at the Help Desk

location. The bidder shall deploy a centralized IVRS with 1 toll free number (minimum 3

lines) and associated infrastructure for 3 helpdesk executives Resources deployed for

providing support services should be equipped with mobile phones. Cost of the same,

throughout the contract period shall be borne by the Bidder within the contract value. Bidder

should provide multiple channels to log a complaint such as Toll-free lines, cell phones,

landlines, E-mail, Intranet, direct walk-in etc. Outage of any component would be calculated

as a time between logging the call and closing the call. Minimum 3 persons should be

available at Help Desk on 24X7 basis.

c) Scheduled activities

S.

No.

Parameter Description Target Penalty Measurement

Tool/Method

1 Back up Scheduled

Activities such as

Back up shall be

taken up as per the

policy

As per the

policy

Would be

decided

mutually

during

O&M

From backup

and installation

logs

2 Upgrade and The Successful < 7days No Installation logs

Page 57: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 57 of 241

New release of

CAS at DC & DR

Bidder would

inform on any

upgrade released

for CAS and system

software by the

OEM for a period

of 3 years from Go-

Live

penalty

>=7 days <9

days

2.0% of

DC & DR

QGR

>=9 days 5.0% of

DC & DR

QGR

3 Upgrade and

New release at

Client Locations

The Successful

Bidder would

inform on any

upgrade released

for CAS and system

software by the

OEM for a period

of 3 years from Go-

Live

< 7days No

penalty

Installation logs

>=7 days <9

days

2.0% of

Client

Location

QGR

>=9 days 5.0% of

Client

Location

QGR

4 Bugs Successful bidder

shall remove any

bugs in the

customized CAS.

< 7days No

penalty

Tools

>=7 days <9

days

2.0% of

DC & DR

QGR

>=9 days 5.0% of

DC & DR

QGR

6.1.2 Mandatory Qualification Criteria for Key Profiles and Numbers

For each profile, bidder shall comply with the minimum qualification (from recognized

institutions, wherever applicable) requirement as mentioned in the table below.

Noncompliance with any of the mentioned qualification requirement may lead to imposition

of penalty as per Annexure-I of Volume-I.

The bidder is mandatorily required to deploy the following resources during implementation

phase:

1. Project Manager

2. Team Lead CAS Customization

3. Team Lead Infrastructure

4. Team Lead Capacity Building

5. Team Lead Data Digitization

The bidder is mandatorily required to deploy the following resources during O&M phase:

1. Team Lead Operation & Maintenance

2. Network Administrator

3. Database Administrator

4. System Administrator

Page 58: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 58 of 241

5. Help Desk Operators

The following table provide details of mandatory qualification to be complied by bidder for

resource deployment.

S.

No.

Key Profile Mandatory Requirement Minimum

Numbers

1. Project Manager

throughout the

project period

The person suggested should have minimum

educational qualification like BE/ B. Tech/

MCA or equivalent and MBA

The person should be preferably PMP or

Prince 2 certified

The person should have an overall

experience of 10 years or more above

working in projects related to

implementation of IT person experience

should have minimum 5 years in at least two

software implementation projects as a

project manager with a team of 10 or more

members.

Should have minimum 2 or more years of

experience in Government projects

Age not more than 55 years

1

2. Team Leader

Software

Application and

Development

throughout the

CAS

customization

period

Should possess a minimum educational

qualification of BE / B. Tech (in Computer

Science/ IT) or MCA

Should have had an overall experience of 7

years in software development and

customization out of which past 3 years

should be as working in lead roles

exclusively for at least 1 turnkey software

project leading a team of more than 10

members

1

3. Agile Software

Development

Team

Should possess a minimum educational

qualification of BE / B. Tech (in Computer

Science/ IT) or MCA

Should have an overall experience of 5 years

or more in software development and

customization.

Should have experience in the technology

proposed for software development.

The preference would be given for the

experience on Agile Software Development.

As per

requirement

for agile

development

4. Information

Security Expert

during O&M

phase

Should have minimum educational

qualification of BE/ B. Tech (in Computer

Science/ IT) or MCA

Should have an overall experience of 7 years

or above full-time work experience in

information security management and/or

As and when

required

Page 59: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 59 of 241

related functions (such as IT audit and IT

Risk Management).

At least last 3 years should have been spent

while working as Information Security

Specialist exclusively for at least one project

wherein the person would have been solely

responsible for security planning and design.

5. Quality

Assurance

Leader during

implementation

period

Should have minimum educational

qualification of BE/ B. Tech (in Computer

Science) or MCA

Should have an overall experience of 5 years

or above in software testing and quality

assurance processes

At least 2 years experience exclusively, in

lead roles for software quality assurance

projects while leading a team of 10 members

or above

As and when

required

6. Business

Analyst during

implementation

period

Should have minimum educational

qualification of MBA or MCA

Should have an overall experience of 5 years

or above in the field of IT & ICT project

implementation

Out of 5 years ,at least the last 2 years should

have been spent exclusively in performing

requirements analysis for e-Governance

project

As and when

required

7. Team Leader

Capacity

Building

throughout

implementation

period

Should have a minimum educational

qualification of a post graduate degree like

MCA / MBA

Should have an overall experience of more

than 7 years or above in training and IT

industry with an exclusive experience of

more than 6 years or above in conducting

training or in teaching topics related to

Information Technology.

1

8. Change

Management

Expert

throughout

implementation

period

Should have a minimum educational

qualification of MBA in Human Resources

Should have an overall experience of more

than 8 years or above with an exclusive

experience of more than 6 years or above, in

conducting Organization Change

Management & Human Resource

Management

Excellent communication skills with fluency

in Hindi and English

1

9. Team Lead IT

Infrastructure

Should have a minimum educational

qualification of BE/ B. Tech (in Computer

1

Page 60: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 60 of 241

throughout

implementation

period

Science/ IT/ EC) or MCA

Should have an overall experience of 7 years

or above in the field of Information

Technology related project implementation,

of which, at least the last 2 years should have

been spent while working as IT

Infrastructure Specialist for at least one

relevant project involving Data Center and

DR center

Should have OEM/ Industry Standard

certification in Infrastructure Management

10. Team Leader

Data Migration

throughout

implementation

period

BE/ B. Tech (in Computer Science/ IT) /

MCA or equivalent

Should have overall experience of 5 years or

above with knowledge and experience in

database operations: database setup,

configuration and maintenance

Should have at least one project experience

in data migration involving data mapping

and data cleansing

1

11. Team Leader

Operations

Manager (

during O&M

period)

Should have a minimum educational

qualification like BE / BTECH / MCA or

equivalent with an additional MBA degree

Should have an overall experience of more

than 8 years or above in maintenance and

operations of IT projects

At least 3 years should be spent, exclusively,

while working in a managerial role in the

maintenance phase of at least one IT

implementation project involving 10

members or more.

1

12. System

Administrator

(during O&M

period )

Should have a minimum educational

qualification BE / BTECH (in Computer

Science/ Information Technology/

Electronics & Communications) / MCA or

equivalent.

Should have an overall experience of more

than 5 years or above as a system

administrator

Should possess Professional Certification

from the OEM / any other industry standard

certification of the proposed technology.

2 in shifts (1

per shift)

available for

24*7

13. Network

Administrator

during O&M

period

Should have a minimum educational

qualification like BE / BTECH (in Computer

Science/ Information Technology/

Electronics & Communications) / MCA or

equivalent

2 in shifts (1

per shift)

available for

24*7

Page 61: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 61 of 241

Should have an overall experience of more

than 5 years or above as Network

administrator in at least 3 projects

Should possess a Professional Certification

from the OEM / any other industry standard

certification of the proposed technology.

14. Database

Administrator

during O&M

period

Should have a minimum educational

qualification like BE / BTECH (in Computer

Science/ Information Technology/

Electronics & Communications) / MCA or

equivalent

Should have an overall experience of more

than 5 years or above as database

administrator in at least 3 projects

Should possess a Professional Certification

from the OEM / any other industry standard

certification of the proposed technology.

2 in shifts (1

per shift)

available for

24 *7

15. Help Desk

Operator

Should have a minimum educational

qualification like B.Sc/BCA/or any

equivalent graduation degree.

Should have good communication skill in

Hindi & English.

Should have exposure to working on web

based applications.

Preference would be given to one having

prior experience of call centre.

Minimum 3

during prime

time and 2

during non

prime time.

Available for

24*7

Page 62: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 62 of 241

6.2 ANNEXURE- II- POST IMPLEMENTATION SERVICES

As part of the post implementation services, the SI shall provide support for the software,

hardware, and other infrastructure provided as part of this RFP. SI shall provide Three (3)

years of comprehensive AMC that includes:

a) Warranty support

b) Annual Technical Support (ATS)

c) Handholding Services

i. Operations and maintenance services for the server and related infrastructure

supplied and commissioned by the SI for the application at the Data Center and

Disaster Recovery Center.

ii. Central Helpdesk from the state designated premises (SCRB).

iii. Software maintenance and support services.

iv. Application functional support services

The services shall be rendered onsite from the State designated premises. To provide the

support for the police stations, circle offices, sub-divisional offices, district headquarters /

Commissionerates, ranges, State police headquarters and other locations across the State

where the software, hardware, and other infrastructure will be rolled out. The SI will also

ensure that there is a Service Center available or setup at each district or a group of districts

of the State, as per mutual understanding between Rajasthan Police and the SI. The SI shall

develop a work plan for the knowledge sharing as per scope defined in this RFP for use in

future phases of the project.

a) As part of the warranty services SI shall provide:

SI shall provide a comprehensive warranty and on-site free service warranty for 3

years from the date of Go Live.

SI shall obtain the three year product warranty and three year onsite free service

warranty on all licensed software, computer hardware and peripherals,

networking equipments and other equipment.

SI shall provide the comprehensive manufacturer's warranty in respect of proper

design, quality and workmanship of all hardware, equipment, accessories etc.

covered by the RFP. SI must warrant all hardware, equipment, accessories, spare

parts, software etc. procured and implemented as per this RFP against any

manufacturing defects during the warranty period.

SI shall provide the performance warranty in respect of performance of the

installed hardware and software to meet the performance requirements and

service levels in the RFP.

SI is responsible for sizing and procuring the necessary hardware and software

licenses as per the performance requirements provided in the RFP. During the

warranty period SI shall replace or augment or procure higher-level new

equipment or additional licenses at no additional cost to the Rajasthan Police in

case the procured hardware or software is not adequate to meet the service levels.

Mean Time Between Failures (MTBF) - If during contract period, any equipment

has a hardware failure on four or more occasions in a period of less than three

months or six times in a period of less than twelve months, it shall be replaced by

equivalent or higher-level new equipment by the SI at no cost to state. However, if

Page 63: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 63 of 241

the new equipment supplied is priced lower than the price at which the original

item was supplied, the differential cost should be refunded to Rajasthan Police

For any delay in making available the replacement and repaired equipments for

inspection, delivery of equipments or for commissioning of the systems or for

acceptance tests / checks on per site basis, Rajasthan Police reserves the right to

charge a penalty.

During the warranty period SI shall maintain the systems and repair / replace at

the installed site, at no charge to state, all defective components that are brought

to the SI's notice.

The SI shall as far as possible repair the equipment at site.

In case any hard disk drive of any server, SAN, or client machine is replaced

during warranty / AMC the unserviceable HDD will be property of Rajasthan

Police and will not be returned to SI.

Warranty should not become void, if Rajasthan Police buys, any other

supplemental hardware from a third party and installs it with these machines

under intimation to the SI. However, the warranty will not apply to such

supplemental hardware items installed.

The SI shall carry out Preventive Maintenance (PM), including cleaning of

interior and exterior, of all hardware and testing for virus, if any, and should

maintain proper records at each site for such PM. Failure to carry out such PM

will be a breach of warranty and the warranty period will be extended by the

period of delay in PM. The PM should be carried out at least once in six months.

SI shall monitor warranties to check adherence to preventive and repair

maintenance terms and conditions.

The SI shall ensure that the warranty complies with the agreed Technical

Standards, Security Requirements, Operating Procedures, and Recovery

Procedures.

SI shall have to stock and provide adequate onsite and offsite spare parts and

spare component to ensure that the uptime commitment as per SLA is met.

Any component that is reported to be down on a given date should be either fully

repaired or replaced by temporary substitute (of equivalent configuration) within

the time frame indicated in the Service Level Agreement (SLA).

The SI shall develop and maintain an inventory database to include the registered

hardware warranties.

b) As part of the ATS services SI shall provide:

SI shall maintain data regarding entitlement for software upgrades,

enhancements, refreshes, replacements and maintenance.

If the Operating System or additional copies of Operating System are required to

be installed / reinstalled / de-installed, the same should be done as part of ATS.

SI should carry out any requisite adjustments / changes in the configuration for

implementing different versions of Application Software.

Updates/Upgrades/New releases/New versions. The SI shall provide from time to

time the Updates/Upgrades/New releases/New versions of the software and

operating systems as required. The SI should provide free upgrades, updates &

Page 64: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 64 of 241

patches of the software and tools to Rajasthan Police as and when released by

OEM.

SI shall provide patches to the licensed software including the software, operating

system, databases and other applications.

Software License Management. The SI shall provide for software license

management and control. SI shall maintain data regarding entitlement for

software upgrades, enhancements, refreshes, replacements, and maintenance.

SI shall provide complete manufacturer‘s technical support for all the licensed

software problems and/or questions, technical guidance, defect and non-defect

related issues. SI shall provide a single-point-of-contact for software support and

provide licensed software support including but not limited to problem tracking,

problem source identification, problem impact (severity) determination, bypass

and recovery support, problem resolution, and management reporting.

The manufacturer‘s technical support shall at a minimum include online

technical support and telephone support during the state‘s business hours

(Business hours in Rajasthan Police all days (Mon-Sun)) with access for

Rajasthan Police and SI to the manufacturer‘s technical support staff to provide a

maximum of 4 hour response turnaround time. There should not be any limits on

the number of incidents reported to the manufacturer. Rajasthan Police shall

have access to the online support and tools provided by the manufacturer.

Rajasthan Police shall also have 24x7 accesses to a variety of technical resources

including the manufacturer‘s knowledge base with complete collections of

technical articles.

c) As part of the Handholding services:

i. To provide Operations and maintenance support for the server and related

infrastructure supplied and commissioned by the SI for the application at the

Data Center and Disaster Recovery Center SI shall provide:

The scope of the services for overall IT infrastructure management as per ITIL

framework shall include 24x7 on site Monitoring, Maintenance and Management

of the server and related infrastructure supplied and commissioned by the SI for

the application at the Data Center and Disaster Recovery Center

The business hours in the Rajasthan Police would be all week days (Mon-Sun). SI will plan

these services accordingly. The SI shall provide the MIS reports for all the devices installed

in the Data Center and Disaster Recovery Center in format and media as mutually agreed

with the Rajasthan Police on a monthly basis. Whenever required by state, SI should be able

to provide additional reports in a pre-specified format. The indicative services as part of this

support are as below:

System Administration, Maintenance & Management Services

Application Monitoring Services

Network Management Services

Backend Services (Mail, messaging, etc)

Storage Administration and Management Services

Page 65: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 65 of 241

IT Security Administration Services and Services for ISO 27001 and ISO 20000

compliance

Backup and Restore Services

ii. To provide Centralized Helpdesk and Support for end users at each location SI

shall provide:

The service will be provided in Hindi language.

The help desk service that will serve as a single point of contact for all ICT related

incidents and service requests. The service will provide a Single Point of Contact

(SPOC) and also resolution of incidents. Rajasthan Police requires the SI to

provide Help Desk services to track and route requests for service and to assist

end users in answering questions and resolving problems related to the software

application, network, Data Center, Disaster Recovery Center, Client side

infrastructure, and operating systems at all locations. It becomes the central

collection point for contact and control of the problem, change, and service

management processes. This includes both incident management and service

request management.

SI shall also provide a second level of support for application and technical

support at police stations, circle offices, sub-divisional offices, district

headquarters / Commissionerates, range offices, , state police headquarters and

other locations across the Rajasthan Police where the software, hardware, and

other infrastructure will be rolled out, to meet the SLAs as per RFP.

For all the services of Rajasthan Police within the scope of this RFP, SI shall

provide the following integrated customer support and help.

Establish 24x7 Help Desk facilities for reporting issues/ problems with the

software, hardware and other infrastructure at SCRB premises.

SI shall maintain and support to all client side infrastructure including hardware,

networking components, and other peripherals.

SI shall provide maintenance of Hardware, including preventive, scheduled and

predictive Hardware support, as well as repair and / or replacement activity after

a problem has occurred.

SI shall track and report observed Mean Time between Failures (MTBF) for

Hardware.

SI shall provide functional support on the application components to the end

users.

SI shall also provide system administration, maintenance and management

services, LAN management services, and IT security administration services.

iii. To provide software maintenance and support services SI shall provide:

The Software Maintenance and Support Services shall be provided for all software

procured and implemented by the SI. The SI shall render both on-site and offsite

maintenance and support services to the Rajasthan Police to all the designated

locations. The Maintenance and Support Services will cover, all product upgrades,

modifications, and enhancements.

Page 66: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 66 of 241

Updates/Upgrades/New releases/New versions. The SI will implement from time

to time the Updates/Upgrades/New releases/New versions of the software and

operating systems as required after necessary approvals from Rajasthan Police

about the same.

Tuning of application, databases, third party software‘s and any other

components provided as part of the solution to optimize the performance.

The SI shall apply regular patches to the licensed software including the operating

system and databases as released by the OEMs.

Software Distribution: SI shall formulate a distribution plan prior to rollout and

distribute/install the configured and tested software as per the plan.

Software License Management. The SI shall provide for software license

management and control. SI shall maintain data regarding entitlement for

software upgrades, enhancements, refreshes, replacements, and maintenance. SI

should perform periodic audits to measure license compliance against the

number of valid End User software licenses consistent with the terms and

conditions of site license agreements, volume purchase agreements, and other

mutually agreed upon licensed software terms and conditions and report to

Rajasthan Police on any exceptions to SI terms and conditions, to the extent such

exceptions are discovered.

The SI shall undertake regular preventive maintenance of the licensed software.

iv. To provide application functional support services SI shall provide:

The Application Functional Support Services shall be provided for all software

procured and implemented by the SI. The SI shall render both on-site

maintenance and support services to Rajasthan Police from the development

center in the state

Enhancements and defect fixes. SI shall incorporate technological changes, and

provide enhancements as per the requests made by state. SI shall perform minor

changes, bug fixes, error resolutions and minor enhancements that are incidental

to proper and complete working of the application.

Routine functional changes that include user and access management, creating

new report formats, and configuration of reports.

SI shall provide user support in case of technical difficulties in use of the software,

answering procedural questions, providing recovery and backup information, and

any other requirement that may be incidental/ancillary to the complete usage of

the application.

The SI shall migrate all current functionality to the new / enhanced version at no

additional cost to Rajasthan Police and any future upgrades, modifications or

enhancements.

The SI shall perform user ID and group management services.

The SI shall maintain access controls to protect and limit access to the authorized

end users of the state.

The services shall include administrative support for user registration, creating

and maintaining user profiles, granting user access and authorization, providing

ongoing user password support, announcing and providing networking services

Page 67: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 67 of 241

for users and providing administrative support for print, file, directory and e-mail

servers.

Exit Management and Transition – Capacity Building at state

After the exit of the SI, Rajasthan Police shall take up the management of CAS

(state). Therefore before the exit of the SI, Rajasthan Police must be strengthened

and capacity must be developed for the Rajasthan Police to manage CAS. The SI

must plan the capacity building initiative to enable Rajasthan Police to manage

CAS, and will collaborate with Rajasthan Police to implement the plan.

The SI shall create a detailed plan for Capacity Building (CB) required at

Rajasthan Police to manage CAS and a Transition Plan (implemented over a

minimum period of three months) to affect the handover to state; and implement

the same in collaboration with the Rajasthan Police before the completion of their

engagement.

Other details of Exit management are defined in Volume III of RFP.

Page 68: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 68 of 241

6.3 ANNEXURE- III- FUNCTIONAL REQUIREMENT SPECIFICATIONS

The Functional requirements mentioned in this section have been delivered as part of CAS

developed centrally at NCRB. The state specific customization and integration requirement

would be undertaken by the Rajasthan Police.

6.3.1 Core Application Software

The CCTNS application software will contain a ―core‖ for the States/ UTs that is common

across all 35 States and UTs. The CCTNS Core Application Software (henceforth referred to

as CAS) will be developed at NCRB premises and provided to States and UTs for deployment.

States and UTs also have an option to develop and deploy additional applications over and

above the customized CAS. The choice of such applications lies exclusively with the

State/UT.

This section provides the details of the CAS (State) and CAS (Center) that will be developed

by the Software Development Agency at the Center.

The CCTNS application software can be conceptualized as comprising different services that

fall under two broad categories, CAS (Center) and CAS (State).

6.3.2 CAS (Centre)

CAS (Centre): CAS (Centre) would reside at NCRB and would cater to the functionality

that is required at the GOI level (by MHA and NCRB). Like CAS (State), CAS (Centre) would

also be developed by NCRB. CAS (Centre) would enable NCRB to receive crime and

criminals‘ related data from States/UTs in order to organize it suitably to serve NCRB‘s

requirements and to provide NCRB with the analysis and reporting abilities to meet their

objective as the central level crime and criminals‘ data repository of the nation. This would

address the crime- and criminals-related information needs of MHA, NCRB, the Parliament,

and central government ministries and agencies, citizens and citizen groups. CAS (Centre)

also facilitates the flow of crime and criminals information across States/UTs on a need-

basis. CAS (Centre) will be developed and deployed at NCRB. Also, CAS (Centre) is expected

to interface with external agencies such as passports, transport authorities, etc.

Overview of Services for CAS (Centre)

State-SCRB-NCRB Data Transfer and Management

The service shall enable the NCRB to receive, transform, and collate the crime, criminal, and

related data from States/UTs, to organize it suitably to serve NCRB requirements.

Crime and Criminal Reports

The service shall enable authorized personnel to generate the reports and perform analysis

on the central crime, criminals, and related data repository of the nation.

Crime and Criminal Records and Query Management

The service shall enable the authorized personnel to view various registers and perform basic

and advanced queries on the central crime, criminals, and related data repository of the

nation.

Talaash Service

The service will enable the user to search for missing persons across a central/ national

database.

Page 69: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 69 of 241

Person of Interest

The service will enable the user to search for persons of interest such as persons wanted on

outstanding warrants, accused, charged, habitual offenders, convicts across the national

database.

Registered Vehicle and Vehicle of Interest Service

The service will enable the user to search for registered vehicles and vehicles of interest such

as, missing / stolen vehicles, abandoned / unclaimed vehicles, and vehicles involved in traffic

incidents across the national database.

Publication Service

This functionality will help the NCRB to publish the periodic crime reviews to the NCRB

portal.

NCRB Citizen Interface

The service shall enable the citizens to access/ search the NCRB National Database on the

data (ex, Stolen Vehicles / Property, Missing Persons, etc.) that is approved to be made

accessible to public.

NCRB Interface for RTI

Due to the sensitivity of the information that pertains to national security and harmony, this

service shall enable a limited and restricted access to the authorized external stakeholders to

search the NCRB National Database, upon submission of any RTI requests.

6.3.3 CAS (State)

CAS (State): CAS (State) covers functionality that is central to the goals of CCTNS and is

common to all States and UTs. It would focus primarily on functionality at police station

with special emphasis on crime investigation and criminals‘ detection. This part would be

developed at NCRB and provided to the States and UTs for configuration, customization and

enhancements / extensions. The Rajasthan Police would determine the requirements for

configuration, customization and enhancements / extensions and would get those developed.

The following are the main function blocks that would comprise CAS (State):

Registration

Investigation

Prosecution

Records Management

Search and Basic Reporting

CAS(State) will also include the functionality required at Higher Offices such as State Police

HQ, Range Offices, District HQ and SCRB.

It is envisioned that CAS (State), once operational, will significantly enhance the outcomes in

core police functions at Police Stations. It will do so primarily through its role- and event-

orientation, providing role based user access and controls and an event driven interface that

helps police personnel (playing different roles) in more effectively performing their core

functions and that relieves police personnel from repetitive tasks that claim much of their

time while returning low or no value.

Page 70: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 70 of 241

In order for CAS (State) to achieve the above goals, it is envisaged to meet the following

requirements:

It will lay special emphasis on the functions at police stations with focus on usability

and ease of use of the application

It will be designed to provide clear and tangible value to key roles at the Police

Station: specifically the SHO (Station House Officer), the IO (Investigation Officer)

and the Station Writer.

It will be event and role driven. Access controls will be developed and role based

access will be provided in the application.

It will be content/forms-based, with customized forms based on requirements

It will be a flexible application, event and role-driven system where actions on a case

can be taken as required without rigid sequence / workflows

It will eliminate the need for duplicate and redundant entry of data, and the need for

repetitive, manual report preparation – this freeing valuable time and resources for

the performance of core police functions

It will be intelligent and help police perform their roles by providing alerts,

highlighting key action areas, etc.

Ability to view and exchange information amongst Police Stations, between Police

Stations and other Police formations and with external entities including citizens

Reporting and data requirements of higher offices must be met at the State Data

Centre/SCRB level and not percolate to the police station level

Central facilitation and coordination; but primarily driven and owned by States/UTs

where States/UTs can configure and customize the CAS for their unique

requirements without the intervention of the central entity

Overview of Services for CAS (State)

Citizens Portal Service

This service shall enable Citizens to request services from Police through online complaints

and track status of registered complaints and requests online. Citizens requests/services

include passport verification services, general service petitions such as No Objection

Certificate (NOC) for job, NOC for vehicle theft, NOC for lost cell phone/passport, Licenses

for arms, processions etc.

Verification Management Service

The service shall enable the police personnel to register and process the different kinds of

verification service of citizen.

Unclaimed/Abandon Property Register Service

The service shall enable the police personnel to record and maintain unclaimed/abandoned

property registers and match unclaimed/ abandoned property with property in lost/stolen

registers.

Complaint and FIR Management Service

The service shall enable the police personnel to register and process the complaints (FIR for

Page 71: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 71 of 241

cognizable complaints, Non-Cognizable Report for non-cognizable, Complaint Report for

genera complaints, etc.) reported by the public.

PCR Call Interface and Management Service

The service shall enable the police personnel to register and process the complaints as

received through the Police Control Room through the Dial 100 emergency contact number.

Investigation Management Service

The service shall enable the police personnel to process the complaints through capturing the

details collected during the investigation process that are required for the investigation

officer to prepare a final report.

Court and Jail Interface and Prosecution Management Service

The service shall enable the police personnel to interface with the courts and jails during the

investigation process (for producing evidence, producing arrested, remand etc) and during

the trial process.

Crime and Criminal Records and Query Management Service

The service shall enable the police personnel to view various registers and perform basic and

advanced queries on the crime and criminal information.

Police Email and Messaging Service

The service shall enable the police personnel to send / receive, official as well as personal

correspondence.

Periodic Crime, and Law & Order Reports and Review Dashboard Service

The service shall enable the police personnel to view relevant reports and dashboards and to

conduct periodic crime, and law & order reviews of the police station(s) under the officer‘s

jurisdiction.

Notification of Alerts, Important Events, Reminders and Activity Calendar or

Tasks Service

The service shall capture / generate the required alerts, important events, reminders, activity

calendar and tasks.

State-SCRB-NCRB Data Transfer and Management Service

The service shall enable the States/UTs to collate, transform and transfer the crime,

criminal, and other related data from state to NCRB.

State CAS Administration and Configuration Management Service

The service shall enable the individual State/UT to configure/ customize the application to

suit to their unique requirements.

User Help and Assistance Service

The service shall enable the end user to view the help manuals of the application and in

Page 72: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 72 of 241

guiding the end user in using the application.

User Feedback Tracking and Resolution Service

The service shall enable the police personnel in logging the issues/defects occurred while

using the system.

Activity Log Tracking and Audit Service

The service shall capture the audit trail resulting from execution of a business process or

system function.

User Access and Authorization Management Service

The service shall enable the administrative user in setting the access privileges and will

provide authentication and authorization functionality

6.3.4 Development of CCTNS Core Application Software (CAS)

CAS (Centre) and CAS (State) has been developed at NCRB under the overall guidance and

supervision of MHA, and a dedicated team from NCRB. NCRB, on behalf of MHA, engaged a

professional software development agency (SDA) to design and develop CAS (Centre) and

CAS (State) and offer associated services. The SDA would enhance and maintain CAS

(Centre) and CAS (State) until the end of the engagement with NCRB and subsequent to that,

CAS (Centre) would be managed by NCRB under the guidance of NIC, DIT and MHA and

CAS (State) would be managed by the State under guidance of the State IT Department.

CAS (State) has been built as a platform at NCRB addressing the core requirements of the

Police Station that provides a basic framework to capture and process crime and criminal

information at the police station while providing the States/UTs with the flexibility to build

their state specific applications around it and in addition to it. CAS (State) has been provided

to States and UTs for deployment. Each State/UT would customize the CAS according to

their unique requirements and thereafter commission the same.

In order to achieve the above stated goals of simultaneously ensuring consistency and

standardization across States/UTs (where necessary and possible), and enabling States/UTs

to meet their unique requirements, CAS will be built as a highly configurable and

customizable application. CAS is a product-like application that can be centrally managed

and at the same time customized to meet the unique requirements of the States/UTs and

deployed in all States/UTs.

In order to achieve the key CCTNS goal of facilitating the availability of real time information

across police stations and between police stations and higher offices, CAS has been built as a

web application. However, given the connectivity challenges faced in a number of police

stations, especially rural police stations, the application has been built to work in police

stations with low and/or unreliable connectivity.

Page 73: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 73 of 241

6.4 Functional Requirement Specification

This Annexure outlines the sample functional requirements for development under CAS

customization activity. Rajasthan Police shall finalize the set of requirements to be developed

in each Agile Development Cycle and convey it on periodic basis.

6.4.1 Extended CAS Functional Requirements (Sample):

S.No Sample Requirements

1 The system should be able to create the Bail form

2 The system should be able to create the Charge sheet

3 System should present the IO dashboard of under trials, under investigation, re-

opened cases, Put to court cases to users based on their roles and their jurisdiction.

4 System should provide the dashboards to higher officials about the case progress and

metrics about U/I cases etc.

5 The system should allow to create, update and maintain general diary, case diary

6

System should allow the CO, SP & Senior Officers to view the summary of Cases

based type of case and cases falling in their jurisdiction also have an access to the

Case Basket

7

System should present the SHO & Senior officials about the details of the cases based

on the status like open, closed, re-open, disposed, unresolved and case pending for

trial.

8 The system should be able to integrate with the Court IT system

9 System should have the capability to link the courts to receive orders for a particular

case. The same should also be updated in the inward and court registers.

10 System should have the capability to link the SP office/Higher office to receive orders

for a particular case

11 System to have the capability to share the case diaries and case files with the courts

12 System should have the facility to generate a case diary for all kinds of cases (NCR

and FIR)

13 System should allow the SHO to assign an Investigating Officer for a registered FIR.

14 System should have the facility to allow the SHO to change the name of the IO for a

particular case.

15

Access rights to a case diary for a particular case should be decided by the

SHO/higher officer. Thus the access of the case diaries for a particular case should

change with the change of IO

16 System should have a system to register all the IOs in a police station for the SHO to

assign access rights to the IO

17 System should allow all the reviewing officers i.e. CO/SP to review the crime/fir

Page 74: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 74 of 241

register.

18 System should update all the concerned registers i.e. Case Diary/ Crime Register/

VCNB register based on the events and updates

19

System should have the capability to link the courts to receive summons for a

particular case through the system. The same should also be updated in the inward

and court registers.

The system should be able to integrate with the Court IT system

S.No Traffic Challaning

1 The system should have the facility to enter the challan details in the system

2 The system should be able to generate the challan report

3 The system should allow to update and maintain the bank receipt records

4

The hand held device provided to the police officer will enable to generate the challan

details in the system directly and also authenticate the documents held by the motor

driver

Traffic Challaning at Police Station

5 The system should have the facility to enter the challan details in the system

6 The system should be able to generate the challan report

7 The system should allow to update and maintain the bank receipt records

8

The hand held provided to the challaning officer will enable to generate the challan

details in the system directly and also authenticate the documents held by the motor

driver

Non Functional Requirements

Sl. No Functionality

General Requirements

1. The system should be capable to link to existing state initiatives( Applications

where Rajasthan Police service are availed)

2. At police station will able to work on offline environment and post that data

will synchronization at state level when internet connectivity will available.

3. System should support multilingual interface.

4. System should support multilingual labels.

5. Will provide services to user future

Page 75: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 75 of 241

6. The system should ensure easy scalability and extensibility through minimum

effort(this will vary based on the requirements)

7. The system should be designed in manner that operational data will never be

lost until a manual intervention/hardware failure.

8. The system should run on multiple browsers (IE 6.0 and above, Firefox 2.0

and above, and Konqueror)

9. The system should be designed to have minimum satisfactory performance

even in Police Stations connected on low-bandwidth (28 kbps).

10. The solution should be provided along with the product manuals, user

manuals and functional specifications.

11. The solution should maintain a database of frequently asked questions (FAQ).

12. Will provide data dictionary for mandatory fields.

13. This solution will customized state labels

14. The Solution will support following front end modifications: Look & Feel,

Display languages(labels)

15. Solution should follow NIC website development guidelines and standard

guidelines too.

16. The solution should ensure that data deletion is controlled centrally as per the

defined policy or the person having right to do so.

17. The process for removing unnecessary code from the application after it is

released should be documented.

18. Application code should not contain invalid references to network resources

(Pathnames, URLs etc).

19. The solution should not display the entire path of URL in the browser based

application. We will manage through app server and web servers.

20. Solution will prompt proper error messages.

21. All the exceptions will store at DB end and pass the same at state/centre label

for further escalation

22. Application will not failure without manual intervention.

23. This is web based solution, no temporary object will create.

24.

The solution should support e-mail integration(SMS integration in not

inducted in this phase). Upload and download multiple types of documents

(i.e. ms-word, excel and image file formats)

25. Application will maintain audit log for important data transactions like

updation and deletion

26. Data model should be flexible to add more data fields as per changing business

needs

27. Data should be entered at each police station and this will synchronization at

Page 76: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 76 of 241

state level through net connectivity or manually using external devices (pen

drive, CD etc.)

28. At state level application will built in common technology/platform to avoid

any compatible issue.

29. Application will provide facility to export data for further use.

30. Application will provide reporting option.

31. Will provide web services

32. Will provide standard security i.e. roll base, password policy

33. System should provide for data entry in regional scheduled languages (based

on tool from CDAC)

34. System should provide for translation / transliteration of data from regional

scheduled languages to English (based on tool from CDAC)

35. System should provide for data entry in English and Hindi (only, in the

interim till CDAC tool is in place) for all states

System availability , performance and scalability

36. Application will up and running (at least 99% if no other disturbance i.e.

power failure, LAN problem and any other infra-structure issues).

37. System will provide proper adequate response for accessing each of the

modules.

38. System will show quick response in simple search and will take little bit more

time for advance search and this will vary based on input conditions.

39. Application scalability at least 600 will confirm during load testing also.

40. Memory leakage Benchmarks: The memory leakage per request should be less

than 1kb.

41. Application will work based on roles and rights

42. Application will run at secure platform.

43. Application will follow security standard guidelines.

44. Application will work smoothly

Ease of Use

45. All error messages produced by the System must be meaningful,

46. The System will employ a single set of user interface to provide a familiar and

common look and feel for the application.

47. The System must be able to display several entities (cases, suspects)

simultaneously.

48. The interfaces will customizable or user-configurable to the extent possible

(look and feel, logos).

Page 77: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 77 of 241

49.

The System user interface must be suitable for users with special needs; that

is, compatible with specialist software that may be used and with appropriate

interface guidelines

50. The System will provide role based access to the application‘s modules.

51. The System must allow persistent defaults for data entry where desirable.

52. Frequently-executed system transactions must be designed so that they can be

completed with a small number of interactions (e.g. mouse clicks).

53.

Unique Id for PS and small units like villages have to be made available. NCRB

coding pattern and RGI Master data being collected for location codes for

districts, towns, villages, habitations, etc can be used in CCTNS

Usability Guidelines

54. We will follow standard guidelines for development and designing and will

follow ISO 9241-20,ISO 9241- 171,ISO 9241-110 too.

Page 78: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 78 of 241

6.5 ANNEXURE- IV- IT INFRASTRUCTURE REQUIREMENTS

6.5.1 Introduction

This section will outline the minimum technical specifications required for meeting the scope

of hardware supply for CCTNS Rajasthan Project. This will cover, but is not limited to the:

1) Data Center

2) Disaster Recovery Site

3) Client Sites (Police Station and Other Higher Offices)

The System integrator is free to suggest specifications which could be over and above the

minimum specification mentioned below. All products to be proposed and supplied by SI

should be brand new, defect free and of reputed brands/ make.

6.5.2 Wide Area Network (WAN) & ISP Services

The CCTNS project would require a Wide Area Network created exclusively for connecting

smaller computer network at Police stations, Circle Office, SP, and other offices of special

units spread across length and breadth of Rajasthan into one network. The basic purpose of

creating such vast network is to adopt the latest technology to cater to faster and easier mode

of communications within this network to achieve the day-to-day information exchange of

the Rajasthan Police. This network not only caters to the information exchange within the

department but also with the offices outside the department.

The connectivity has been provisioned through BSNL/RSWAN/SecLAN at all client locations

and SDC; thus providing network connectivity is not under the scope of SI.

6.5.3 Proposed Network Architecture

Network architecture is a blueprint of the complete computer communication network,

which provides a framework and technology foundation for designing, building and

managing a communication network. It typically has a layered structure. Layering is a

modern network design principle which divides the communication tasks into a number of

smaller parts, each part accomplishing a particular sub-task and interacting with the other

parts in a small number of well-defined ways. Layering allows the parts of a communication

to be designed and tested without explosion of cases, keeping design relatively simple. In the

centralized architecture, the main site would be known as Data Centre and the alternate

site is known as Disaster Recovery site. The diagram below represents the same:

Page 79: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 79 of 241

DC

Switch

Ethernet

Printer

Multi-functional devices

Router

Users

MPLS/ VPNoBB

Users

Switch

Ethernet

Printer

Multi-functional devices Router

Users Users

Switch

Ethernet

Printer

Multi-functional devices

RouterUsers Users

MPLS/ VPNoBB

MP

LS

/ V

PN

oB

B

SP / Add SP Office

CO Office / Range Office

Police Station

Figure 7: Suggested End User Connectivity

Page 80: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 80 of 241

The calculation for estimated number of external users is as below.

Figure 8: Estimated Number of External Users

The total number of external users expected to use the CCTNS is application is estimated at

12338 and assuming a 10% concurrency, a total of 1234 Users at a time. This is just a

suggested figure, and the number may rise owing to stabilization of application, increased

internet penetration and increased public awareness.

A MoU was signed between MHA and BSNL on 24th October, 2011; BSNL is providing

connectivity for implementation of CCTNS Networking and Connectivity Solution for

States/Union Territories on Pan India basis. The connectivity provided by the BSNL would

be the primary network. The redundancy has been planned through RSWAN and SecLAN

network connectivity. However some highlights of the network connectivity are given below:

i. VPNoBB/WiMax/VSAT Connectivity from BSNL- Primary Network

ii. SWAN Connectivity (SecLAN for Jaipur locations)- Redundant Network

iii. MPLS VPN Connectivity- Primary Network Link for SDC-DR replication

6.5.4 Data Centre

The Data Centre (DC) is situated in DoIT, Jaipur. The DC is partially working as some of the

hardware and software are yet to be deployed. Details of indicative network architecture,

specification of deployed items, and specification of remaining items are given in succeeding

sections. Following are the details for CCTNS data centre in Rajasthan.

S.No. Items Details

1. Address of Data Center

Building

State Data Center IT Building,Yojana Bhawan

Tilak Marg, C-Scheme

Jaipur-302005 (Raj), INDIA

Total Users Estimated is 1% of Internet Penetration 12338

Total Internet penetration in Rajsthan 1233872 (2011: Maps of india)

Total Polpulation in Rajasthan 68548437(2011: Census Data)

Page 81: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 81 of 241

6.5.5 Architectural Aspect

The proposed application will be N-tier Service oriented Architecture – with separation of

business logic from application, database and presentation. The application will be on the

central servers at Data Center in Jaipur and the Disaster Recovery (DR) site as decided by

the department at New Delhi. The proposed application will be on Web services model.

The application shall be architected with traditional 3-tier architecture.

a) Database Tier: This shall be diagonally scaling and deployed on a DC class server as

specified in this document. Database servers shall be deployed in n+1 cluster. If n is 1

(as per ISV sizing) then Data base servers shall be deployed in 1+1 cluster.

b) Application Server: Application servers shall be deployed in multiple servers

(horizontal scaling)

c) Web Tier: Web servers shall be deployed in multiple servers (horizontal scaling) There

should be databases for application servers and web servers. The web servers shall be

deployed with external load balancers for high availability

The proposed network and security architecture solution and diagram for DC is only a

representative and is subject to the overall requirement of all functionalities listed in this

section. The feature of the proposed network and security architecture is as below:

Page 82: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 82 of 241

Figure 9: Proposed DC Connectivity

Page 83: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 83 of 241

6.5.6 DC Design Description

a) The router at DC has capability to handle the data traffic and multiple SSL/VPN

encapsulations for secured data transfer between any of the department offices. The

router would also connect to the internet and would offer Server connectivity to

external users. The router should be capable to handle both MPLS and Internet

connectivity.

b) The DC- DR replication router would replicate data across MPLS connectivity to the

DR site and vice – versa

c) Intrusion Prevention system (IPS) should detect malicious traffic and further protects

the DC – DR sites. Intrusion system detect (and prevent) any intrusion from

Internet/extranet network.

d) The Network Infrastructure (Switches , firewalls, IDS / IPS , routers, server load

balancer, etc) has been configured in active – active and in high availability mode

e) Firewalls provides next layer of protection between the extranets and DMZ (which has

hosted the application server).

f) Web server Users: All the servers are connected to high capacity L2 Switch, which can

process million of packets within seconds, depending on the Users and Application and

its contents.

g) The Application servers are accessing the database from the backend in order to

process the user / citizens queries/requests.

h) The Database servers (RDBMS) are further hosted in higher security layer, comprising

of components such as Firewall and Intrusion Prevention system.

i) In this secure infrastructure it has been ensured that the security devices in the

network such as Firewalls, are in high-availability mode, and these devices should be

evenly distributed to optimize performance.

j) The set up has Antivirus , web server and DNS servers connected and configured

k) The application can be accessed through VPN over broadband and through MPLS

connectivity

l) The DR replication would happen through MPLS cloud

6.5.7 Set-up at Data Centre and DR Site

The following highlights the different server zone available at the Data Centre

1. Militarized and De-Militarized Zone at Data center:

De-militarized zone will contain the following:

Server Zone: The server zone will host the following applications:

Mail and Messaging solution

Antivirus solution

Single Sign on

Directory Services

Portal Server

Militarized zone will contain the following:

Critical Server Zone: The critical server zone will host the following

applications:

Page 84: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 84 of 241

CCTNS Application

EMS Application

Other Module of CAS State

Document Management Systems

6.5.8 Hardware and Security Components at Data Centre

Following server components are proposed at the Data Centre for the CCTNS application:

a) Portal/Web Server: Web based applications are easily accessible from any sort of

the network, Intranet, internet or extranet. Therefore, portal server plays a vital role

this initiative. The portal server has been used for providing access to the CCTNS

application through internet / intranet. Using portal, relevant contents of the

applications can be easily enabled, updated and deployed at the earliest. Portal would

provide a base template to users who want to access the application via internet.

b) Application Server: Application server has been taking care of the necessary

workflow and portal server would be required for the interfacing with the end user.

Both the portal and application server would be seamlessly integrated to provide high

availability and performance. With the use of load balancers, user requests are

distributed among various clustered/common servers. The application servers have

been configured in active – active and in cluster mode and also have the database

configured accordingly.

c) Database Servers: The database/repository provides all the relevant information

required to process the applications. This has been integrated with multiple

applications, residing at the DC.

d) Enterprise Access Server: Using Directory services DC administrator has been able

to define centralized authentication & authorization mechanisms for users. This would

enable associate policies such as security, management etc on all servers/systems from

a centralized console and enhances security, reduces IT complexity and increase overall

efficiency.

e) Staging Server : It would be required to deploy a separate server as Staging server

where all the new services are deployed on this staging server before it is brought on to

the production servers. There shall be provision in the hardware for separate Test &

Development System for each software application so that production system shall not

get affected in case of application of patches, versions change etc. The development

server shall make provision for all different system software platform used along with

all required compilers and libraries. It shall have all application software and utilities

along with the provision to customize and test the applications. It shall also have

provision for version control and version management. Test and Development set up

shall be the exact miniature replication of production environment in 3-tier

architecture with hardware as per sizing from application vendor.

f) Backup server: Backup server has been used for backing up the key data on regular

interval. The backing up of the data would be an automated process. Whenever desired

the backed up data can be restored/retrieved to the desired system configuration

g) Training Server: There is a provision for Training server for CCTNS system. Training

set is the exact miniature replication of production environment in 3-tier architecture

with hardware as per sizing from application vendor.

h) Email Server : The email server has been provide emailing solution to the users of

Rajasthan Police

Page 85: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 85 of 241

i) Enterprise Management Server: For overall management of the Data center

components, an Enterprise Management System (EMS) will be provided and would be

integrated with the CCTNS application. SI shall have to prepare a category wise

detailed list of elements to be monitored, monitoring parameters and the monitoring

frequency in terms of critical, semi critical and non-critical categories in each Data

Center and the application.

6.5.9 Network Components at DC

The entire infrastructure at DC & DR should be compatible with 10G enabled

equipments.

a) Router: Router has been installed in a redundant mode at the primary data center.

The entire infrastructure at DC & DR should be compatible with 10G enabled

equipments.

b) Core Switch: Access switch controls and automate network access for both managed

and un-managed users.

c) IDS/IPS: An intrusion detection system is used to detect several types of malicious

behaviors that can compromise the security and trust of a computer system. This

includes network attacks against vulnerable services, data driven attacks on

applications, host based attacks such as privilege escalation, unauthorized logins and

access to sensitive files, and malware (viruses, Trojan horses, and worms). IDS/IPS will

be deployed in a redundant mode at server and critical server zone to provide high

availability and fault tolerance.

d) Firewall: A firewall will be a part of network that is designed to block unauthorized

access while permitting outward communication. Firewall will be installed in

redundant mode at server zone and critical server zone to provide features like high-

availability and fault tolerance.

e) Load Balancer: The load balancer would be required for distributing workloads to a

set of networked computer servers in such a manner that the computing resources are

used in an optimal manner. The load balancer will support segmentation/virtualization

to distribute load for multiple services, servers. This would increase the availability of

the server and will also increase the performance as multiple servers would be sharing

the service load.

The load balancer would be used for the following servers:

Mail Servers

Application Server

Database Servers

Web Server

6.5.10 Collation with State Data Center

Data center will be collocated in the State Data Center. The following components have been

used:

Rack Space

Power and Cooling

SNMP based UPS, DG set power backup

Fire prevention

Physical security surveillance

Page 86: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 86 of 241

6.5.11 Hardware at the DC

The details of the hardware, already installed at DC are given below. The remaining

hardware which needs to be deployed by SI is also given below. (Refer Annexure-IX- Clause

6.10-(a) for serial number) For minimum specification of the hardware mentioned below

please refer to the section 6.5.20.

S.

No.

Environment Server/Box Model OS Quantity Warranty

upto

Servers

1 Development Development

Server

HP BL

460c

G7

Window

Server2008 R2

Enterprise

2 30-Apr-15

2 Test/QA Test/QA

Server

HP BL

460c

G7

Window

Server2008 R2

Enterprise

1 30-Apr-15

3 Training Training

server

HP BL

460c

G7

Window Server

2008 R2

Standard

2 30-Apr-15

4 Production Application

Server

HP BL

460c

G7

Window

Server2008 R2

Enterprise

4 30-Apr-15

5 Database

Server

HP DL

585 G7

Window

Server2008 R2

Enterprise

4 30-Apr-15

6 Email

Server/ Mail

& Messaging

HP BL

460c

G7

Cent OS 2 30-Apr-15

7 Web Server HP BL

460c

G7

Window

Server2008 R2

Enterprise

2 30-Apr-15

8 Backup

Server

HP BL

460c

G7

Window

Server2008 R2

Enterprise

1 30-Apr-15

9 Access

Control

Server/

Single Sign

On

HP BL

460c

G7

Window Server

2012

Datacenter

edition

2 30-Apr-15

10 DMS Server HP BL

460c

G7

Window

Server2008 R2

Enterprise

2 30-Apr-15

11 EMS Server HP BL

460c

G7

Window Server

2008 R2

Standard/Cent

7 30-Apr-15

Common Data Centre facility Maintenance and Support

Page 87: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 87 of 241

OS (1 proxy

server)

12 Antivirus

Server

HP BL

460c

G7

Window Server

2008 R2

Standard

1 30-Apr-15

Total 30

Storage

13 Production SAN

(External

Storage) -

List the total

capacity

offered on

FC and

SATA disks

HP F400 3Par storage

with backup software

1 29-May-

2105

14 Tape Library HP MSL 4048 1 23-May-

2013

(Expired)

15 Other

Component

SAN Switch HP SN3000B 2 07-Jun-

2103

(Expired)

Network Component

16 Network Core Switch HP A7510 2 27-Jun-

2013

(Expired)

17 Access

Switch

HP A5120 4 26-May-

2111

18 Internal

Firewall

HP S 1000E VPN

firewall appliance

2 28-Jun-

2013

(Expired)

19 Core Router MSR 50-60 2 28-Jun-

2013

(Expired)

Table 8: Existing Hardware at DC

S. No. Component Make and

Model

Quantity

1 Storage management Software (SMS) HP 3 PAR 1

2 Mail and Messaging Solution X Gen Email

Software

1

3 Document Management System (DMS) Microsoft Share

Point

1

Table 9: Existing Software at DC

Page 88: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 88 of 241

Existing Application Software at DC

Product Version Quantity Reorder/Software

Assurance End

Date

Microsoft® Office

2010 Indic

Government OPEN 1

License Level C

2010 125 30-11-2014

Microsoft® Project

Server 2013 Sngl

OPEN 1 License

Level C

2013 1 31-01-2015

Microsoft® Visual

Studio Pro w/MSDN

All Lng License/

Software Assurance

Pack OPEN 1 License

No Level Qualified

Non-specific 6 31-01-2015

Microsoft® Visual

Studio Test Pro

w/MSDN All Lng

License/Software

Assurance Pack

OPEN 1 License No

Level Qualified

Non-specific 3 31-01-2015

Microsoft® Visual

Studio Ultimate

w/MSDN All Lng

License/Software

Assurance Pack

OPEN 1 License No

Level Qualified

Non-specific 1 31-01-2015

Microsoft® Project

Server CAL 2013

Sngl OPEN 1

License Level C User

CAL User CAL

2013 25 31-01-2015

Microsoft®

SharePoint

Enterprise CAL 2013

Sngl OPEN 1 License

Level C User CAL

User CAL

2013 80 31-01-2015

Microsoft®

SharePoint Server

2013 Sngl OPEN 1

License Level C

2013 4 31-01-2015

Microsoft® 2013 125 31-01-2015

Page 89: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 89 of 241

SharePoint Standard

CAL 2013 Sngl OPEN

1 License Level C

User CAL User CAL

Microsoft® SQL Svr

Enterprise Core 2012

Sngl OPEN 2

Licenses Level C

Core License

2012 12 31-01-2015

Microsoft® SQL Svr

Standard Core 2012

Sngl OPEN 2

Licenses Level C

Core License

2012 4 31-01-2015

Microsoft®

Windows® Server

CAL 2012 Sngl

OPEN License Level

C User CAL User

CAL

2012 125 31-01-2015

Microsoft®

Windows® Server

Datacenter 2012 Sngl

OPEN 1 License

Level C 2 PROC

2012 15 31-01-2015

Microsoft®

Windows® Server

External Connector

2012 Sngl OPEN 1

License Level C

2012 3 31-01-2015

Microsoft®

Windows® Server

Standard 2012 Sngl

OPEN 1 License

Level C 2 PROC

2012 13 31-01-2015

The remaining IT Infrastructure items are as shown below for procurement:

S.

No.

Environment Component Estimated

number of boxes

1 Network

Component

Global Load Balancer 1

2 Server Load Balancer 1

3 IDS/IPS 2

4 External Firewall 2

5 FC-IP Router (DC-DR Replication) 2

6 KVM Switch 1

Table 10: Remaining Hardware need to be deployed by System Integrator in DC

Page 90: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 90 of 241

S.No. Component Estimated number

of boxes

1 Enterprise Management System (EMS) 1

2 Host Intrusion Prevention System (HIPS) 1

3 Backup Software 1

4 Antivirus 2905

Table 11: Remaining Software need to be deployed by System Integrator at DC

Refer to the DC architecture diagram for details of these suggested components.

6.5.12 DR Site

The proposed DR site for Rajasthan Police would be located independently at New Delhi.

The DR site would set up at NIC, New Delhi. The following figure depicts the proposed DR

architecture:

Page 91: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 91 of 241

Database ServersApplication Servers

External

Firewall

IDS / IPS

Core Switch

(L3)

Internal

Firewall

Access Switch

(L2)

Web Servers

Core Router

Storage Area

Network

Tape Library

SAN Switch

DC

Connectivity

(MPLS)

Access Switch

(L2)

Mail server / Antivirus / AAA / DNS

Replication server

State DR Site4 Mbps connectivity to DC

CCTNS : Rajasthan Police

Figure 10: Proposed DR

Page 92: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 92 of 241

a) Connectivity at DR Site

o DR site will be located in New Delhi and will be connected with an

MPLS/Leased link with the SDC at Jaipur.

b) Militarized and De-Militarized Zone at DR Site:

i. De-militarized zone will contain the following:

o Server Zone

Server Zone: The server zone will host the following applications:

o Mail and Messaging solution

o Single Sign on

o Directory Services

ii. Militarized zone will contain the following:

o Critical Server Zone

Critical Server Zone: The critical server zone will host the following applications:

o CCTNS Application

6.5.13 Hardware and Security Components at DR Site

a) Following hardware components will be deployed at the DR Site:

i. Router

ii. Core Switch

iii. IDS/IPS

iv. Firewall

b) Replication with Data Center: The replication from DC to DR site will happen through

log-shipping. Log shipping will allow automatically sending transaction log backups

from a primary database on a primary server instance to one or more secondary

databases on separate secondary server instances. The transaction log backups are

applied to each of the secondary databases individually. An optional third server

instance, known as the monitor server or log server records the history and status of

backup and restores operations and, optionally, raises alerts if these operations fail to

occur as scheduled.

6.5.14 Co-located with CCTNS DR Site:

Disaster Recovery site is collated with the common CCTNS DR site (NIC Delhi), the

following components may be used commonly:

a) DR Site components (cooling, cabling etc.)

b) Rack space

c) Physical Security

d) WAN Link (DR-DC)

6.5.15 Hardware at the DR Site

NIC Delhi has provided space for 3 Racks for the establishment of DR site at New Delhi.

However Server Racks/ Blade chassis would be provided by SI for DR based on the proposed

BOM in next section.

Page 93: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 93 of 241

Environment Server/box Estimated number of boxes

Servers

Production

Application Servers 2

Database Servers 2

Mail and Messaging Solution 2

Access Control Server/ Single Sign

On

1

Antivirus Server 1

Back up servers 1

Web Server 1

Total 10

Storage

Production

External Storage Box 1

Tape Library 1

Other Components

NA

SAN Switch 2

KVM Switch 1

Network Components

Network L3 Core Switch 1

L2 Switch 2

IDS/IPS 2

Firewall (External) 1

Firewall (Internal) 1

Core Router 1

Table 12: Proposed Bill of Material (BoM) for DR

Software at DR Site:

S.

No.

Component Proposed Quantity

1 Storage management Software (SMS) 1

3 Document Management System (DMS) 1

4 Backup Software 1

5 Antivirus As per requirement

6 HIPS 1

Page 94: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 94 of 241

The hardware & software of DR site should be compatible with DC hardware & software.

There DC-DR replication and Data recovery should not be affected due to non compatibility

of hardware & software components of DC-DR.

6.5.16 Client/ User Locations

Existing Hardware at Client Location

38 locations from Jaipur west & Jodhpur West have been provided equipped with client side

hardware and would be taken over by SI. The details of existing hardware of the locations are

provided below. (Refer Annexure-IX- Clause 6.10-(b) for serial number)

Offices IT Infrastructure

S.

N

o.

Location

Name District

Office

Type

CIPA

/ Non

CIPA

No. of

Client

Syste

m

Instal

led

No.

Multi-

Functio

n

Laser(

PSC)

No.

16

Port

Switc

h

Instal

led

No. of

HDD

160

GB

Hando

ver

1 P S Sadar Jaipur

West

Police

Station

2nd

Phase 2 1 1 No

2 P S

Banipark

Jaipur

West

Police

Station

2nd

Phase 2 1 1 No

3 P S Sindhi

Camp

Jaipur

West

Police

Station

2nd

Phase 2 1 1 No

4 P S Vaishali

Nagar

Jaipur

West

Police

Station

2nd

Phase 2 1 1 No

5 P S Karni

Vihar

Jaipur

West

Police

Station

3rd

Phase 2 No 1 No

6 P S Bagru Jaipur

West

Police

Station

1st

Phase 2 No 1 No

7 P S Chomu Jaipur

West

Police

Station

1st

Phase 2 1 1 No

8 P S

Harmada

Jaipur

West

Police

Station

2nd

Phase 2 1 1 No

9 P S

Vishvkarma

Jaipur

West

Police

Station

2nd

Phase 2 1 1 No

10 P S

Jhotwara

Jaipur

West

Police

Station

2nd

Phase 2 1 1 No

11 P S Murli

Pura

Jaipur

West

Police

Station

2nd

Phase 2 No 1 No

12 P S Kar

Dhani

Jaipur

West

Police

Station

3rd

Phase 2 1 1 No

13 P S Kalwar Jaipur

West

Police

Station

1st

Phase 2 1 1 No

Page 95: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 95 of 241

Offices IT Infrastructure

S.

N

o.

Location

Name District

Office

Type

CIPA

/ Non

CIPA

No. of

Client

Syste

m

Instal

led

No.

Multi-

Functio

n

Laser(

PSC)

No.

16

Port

Switc

h

Instal

led

No. of

HDD

160

GB

Hando

ver

14 PS

Bhankrota

Jaipur

West

Police

Station

Non

CIPA 2 1 1 No

15 PS Mahila

Thana

Jaipur

West

Police

Station

Non

CIPA 2 1 1 No

16 CO Sadar Jaipur

West

Circle

Office N/A 2 1 1 No

17 CO Vaishali

Nagar

Jaipur

West

Circle

Office N/A 2 1 1 No

18 CO Chomu Jaipur

West

Circle

Office N/A 2 No 1 No

19 CO

Jhotwara

Jaipur

West

Circle

Office N/A 2 1 1 No

20 DCP West Jaipur

West

DCP

Office N/A 4 2 1 No

21

Jaipur

Commissio

narate

Jaipur

Commissio

narate

Commissi

oner

Office

N/A 18 No 2 No

22

Control

Room -

Jaipur

West

Jaipur

West

Control

room N/A 2 No No No

23 P S Pratap

Nagar

Jodhpur

West

Police

Station

2nd

Phase 2 1 1 1

24 P S Soor

Sagar

Jodhpur

West

Police

Station

2nd

Phase 2 1 1 1

25

P S

Chaupasni

Housing

Board

Jodhpur

West

Police

Station

2nd

Phase 2 1 1 1

26 P S

Jhanwar

Jodhpur

West

Police

Station

2nd

Phase 2 1 1 1

27 P S Sardar

Pura

Jodhpur

West

Police

Station

2nd

Phase 2 1 1 1

28 P S Shastri

Nagar

Jodhpur

West

Police

Station

2nd

Phase 2 1 1 1

29 P S Basni Jodhpur

West

Police

Station

2nd

Phase 2 1 1 1

Page 96: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 96 of 241

Offices IT Infrastructure

S.

N

o.

Location

Name District

Office

Type

CIPA

/ Non

CIPA

No. of

Client

Syste

m

Instal

led

No.

Multi-

Functio

n

Laser(

PSC)

No.

16

Port

Switc

h

Instal

led

No. of

HDD

160

GB

Hando

ver

30 P S Luni Jodhpur

West

Police

Station

2nd

Phase 2 1 1 1

31 P S

Boranada

Jodhpur

west

Police

Station

Non

CIPA 2 1 1 No

32

P S Kudi

Bhagat Sani

(Newly

Created)

Jodhpur

west

Police

Station

Non

CIPA No No No No

33

CO

Boranada

(Newly

Created)

Jodhpur

west

Circle

Office

Non

CIPA 2 No No No

34

CO

Jodhpur

west

Jodhpur

West

Circle

Office

Non

CIPA 2 1 1 No

35 CO Pratap

Nagar

Jodhpur

West

Circle

Office

Non

CIPA 2 1 1 No

36 DCP West Jodhpur

West

DCP

Office

Non

CIPA 10 1 1 No

37

Jodhpur

Commision

arate

Jodhpur

Commissio

narate

Commissi

oner

Office

Non

CIPA 9 No 1 No

38

Control

Room

Jodhpur

Jodhpur

Commissio

narate

Control

room

Non

CIPA 1 No No No

Total 106 29 35 8

Additional Requirements at Client Location to be purchased by SI

Item Total

Client Systems 2470

Workstation 297

Duplex Printer 297

MFD Printer 1460

Page 97: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 97 of 241

Table 13: Proposed Bill of Material (BoM) for Client locations

6.5.17 Requirements at Client Location

The following table highlights the number of locations at client side and also the primary

scope at these sites. The following table should be considered for financials for CIPA/ Non

CIPA locations:

Client Location Scope

Component Number Site

Preparation

Client Side

Infrastructure

Additional

Hardware (Digital

camera, Electronic

pen,

Generator and 16

port switch)

Police Station CIPA Phase 1 103 No Yes Yes

Police Station CIPA Phase 2 217 No No Yes

Police Station CIPA Phase 3 246 No No Yes

Police Station Non- CIPA 194 Yes Yes Yes

Higher Offices 330 Yes As per tables

below

As per tables below

The following table highlights the suggested requirements at the Client Sites; the same may

vary after the SI will conduct a site analysis:

UPS (2 kVA) 1344

UPS (1 kVA) 100

Generator (2.1 kVA) 760

Switch 16 Port 1015

Digital Camera 760

External Hard Disk 752

Electronic Pen 760

Environment Control (AC) 760

Computer Table 2326

Chair 2326

Fire Extinguisher 479

Site Preparation (Networking,

Earthling, Electrification with

Power strips)

479

White board (min 2 ft.X2 ft.) 479

Paper & Toner At all locations

Page 98: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 98 of 241

For Non – CIPA location following items should be considered in the financials

Item Quantity

Client Systems 3

Workstation 1

HDD 500 GB 1

Duplex Printer 1

MFD Printer 1

UPS 2 KVA with 120 minute backup 1

Generator 2.1 KVA 1

Switch 16 Port 1

Digital Camera 1

Electronic Pen 1

Environment Control (AC) 1

Site Preparation Yes

Opn Expense (paper / toner) Yes

Additional Hardware for CIPA Locations – CIPA Phase II and III locations.

There are 463 locations covered under phase II and III of CIPA. Approved additional items

have been taken into consideration for CIPA Phase II and III locations.

Item Quantity

Client Systems 0

HDD 500 GB 1

Duplex Printer 0

MFD Printer 0

UPS 2 KVA with 120 minute backup 0

Generator 2.1 KVA 1

Switch 16 Port 1

Digital Camera 1

Electronic Pen 1

Environment Control 1

Site Preparation No

Opn Expense (paper / toner) Yes

Page 99: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 99 of 241

HARDWARE (POLICE STATIONS) - CIPA phase I

Following has been taken into consideration for CIPA phase I location which are 103 in

numbers. The CIPA phase I hardware is not in usable condition and is agreed to be replaced.

Item Quantity

Client Systems 3

Workstation 1

HDD 500 GB 1

Duplex Printer 1

MFD Printer 1

UPS 2 KVA with 120 minute backup 1

Generator 2.1 KVA 1

Switch 16 Port 1

Digital Camera 1

Electronic Pen 1

Environment Control (AC) 1

Site Preparation No

Opn Expense (paper / toner) Yes

HARDWARE (HIGHER OFFICES): The following highlights the number of

higher offices which are considered for financials:

Entity Numbers

Circles office 188

SP Office 42

Addl SP office 14

DySP Office (Traffic/ SC-ST/ Women atrocity) 29

Range office 8

Commissionerates 2

PHQ- Large 1

SCRB 1

Forensic Science Laboratory + Fingerprint bureau 2

Police Control Room (State + District) 43

Page 100: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 100 of 241

For Circle Office following items should be considered in the financials

Item Quantity

Client Systems 3

HDD 500 GB 0

Duplex Printer 0

MFD Printer 1

UPS 2 KVA with 120 minute backup 1

Generator 2.1 KVA 0

Switch 16 Port 1

Digital Camera 0

Electronic Pen 0

Site Preparation Yes

Opn Expense (paper / toner) Yes

For Range Office following items should be considered in the financials

Item Quantity

Client Systems 4

HDD 500 GB 0

Duplex Printer 0

MFD Printer 1

UPS 2 KVA with 120 minute backup 1

Generator 2.1 KVA 0

Switch 16 Port 1

Digital Camera 0

Electronic Pen 0

Site Preparation Yes

Opn Expense (paper / toner) Yes

For SP / Addl. SP / Dy SP Office following items should be considered in the

financials

Item Quantity

Client Systems 10

HDD 500 GB 0

Duplex Printer 0

MFD Printer 10

UPS 2 KVA with 120 minute backup 10

Generator 2.1 KVA 0

Switch 16 Port 1

Digital Camera 0

Electronic Pen 0

Site Preparation Yes

Opn Expense (paper / toner) Yes

Page 101: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 101 of 241

For Commissionerate following items should be considered in the financials

Item Quantity

Client Systems 25

HDD 500 GB 0

Duplex Printer 0

MFD Printer 25

UPS 1 KVA with 60 minute backup 25

Generator 2.1 KVA 0

Switch 16 Port 2

Digital Camera 0

Electronic Pen 0

Site Preparation Yes

Opn Expense (paper / toner) Yes

For SCRB following items should be considered in the financials

Item Quantity

Client Systems 4

HDD 500 GB 0

Duplex Printer 0

MFD Printer 1

UPS 2 KVA with 120 minute backup 1

Generator 2.1 KVA 0

Switch 16 Port 1

Digital Camera 0

Electronic Pen 0

Site Preparation Yes

Opn Expense (paper / toner) Yes

For PHQ following items should be considered in the financials

Item Quantity

Client Systems 50

HDD 500 GB 0

Duplex Printer 0

MFD Printer 50

UPS 1 KVA with 60 minute backup 50

Generator 2.1 KVA 0

Switch 16 Port 4

Digital Camera 0

Electronic Pen 0

Site Preparation Yes

Opn Expense (paper / toner) Yes

Page 102: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 102 of 241

For Forensic Science Laboratory / Finger Print Bureau following items should

be considered in the financials

Item Quantity

Client Systems 2

HDD 500 GB 0

Duplex Printer 0

MFD Printer 1

UPS 2 KVA with 120 minute backup 0

Generator 2.1 KVA 0

Switch 16 Port 0

Digital Camera 0

Electronic Pen 0

Site Preparation No

Opn Expense (paper / toner) Yes

For PCR District Level following items should be considered in the financials

Item Quantity

Client Systems 3

HDD 500 GB 0

Duplex Printer 0

MFD Printer 1

UPS 2 KVA with 120 minute backup 0

Generator 2.1 KVA 0

Switch 16 Port 0

Digital Camera 0

Electronic Pen 0

Site Preparation No

Opn Expense (paper / toner) Yes

For PCR State Level following items should be considered in the financials

Item Quantity

Client Systems 5

HDD 500 GB 0

Duplex Printer 0

Page 103: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 103 of 241

MFD Printer 1

UPS 2 KVA with 120 minute backup 0

Generator 2.1 KVA 0

Switch 16 Port 0

Digital Camera 0

Electronic Pen 0

Site Preparation No

Opn Expense (paper / toner) Yes

Other requirements

Description Quantity

Digital Camera

Each Police Station would be equipped with Digital Camera

Electronic Pen Each Police Station would be equipped with Electronic Pen

Others Environment control at the client side (only Police stations) would be

provisioned.

Site

Preparation The LAN cabling/ Electric cabling covered under CIPA locations are

mostly found to be unstructured and would need to be upgraded to

meet the requirements of CCTNS application deployment and hence up

gradation of the same is proposed.

SI shall prepare a platform to install DG set at appropriate location.

Operational

Expenses SI shall be responsible for bearing all operational expenses (which

includes paper and toner) at all client locations, for a period of 3 years.

Operational expenses may vary from location to location, however the

SI can take an assumption of a replacement of 2 toner (OEM compatible

toner of GSM minimum 70) every 3 months, and consumption of at

least 4 legal size paper ream (1000 sheets) in a month, per location.

The delivery of paper and toner will be done at the respective District

Head Quarter. If any changes are required in such distribution, it will be

at the discretion of Rajasthan Police.

The above distribution matrix is indicative, and final distribution details for above hardware

shall be communicated by Rajasthan Police to successful bidder at the time of project

implementation.

Page 104: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 104 of 241

6.5.18 Specification of Proposed Software at DC & DR

a) Antivirus specifications

Sr

No

Specifications

1 All the Solutions should be virtualization aware providing flexibility of deploying the

solution both in Virtualization and physical environment.

2 The antivirus solution should have enhanced protection from Network virus/Worms,

Trojans, Key loggers, Intrusions, Conceivably harmful websites/Phishing sites, Malicious

behavior, data loss, web based threats, root kits, mixed threats, real-time compressed

executable files, spyware/gray ware etc.

3 Should have Compressed File Detection and Repair and should also be able to reduce the

risk of virus/malware entering the network by blocking files with real-time compressed

executable files.

4 Should have Unknown Virus Detection & Repair. Should have behavioral & Heuristic

scanning to protect from unknown viruses.

5 Must be capable of cleaning viruses/malware even without the availability of virus

cleanup components. Using a detected file as basis, it should be able to determine if the

detected file has a corresponding process/service in memory and a registry entry, and

then remove them altogether

6 Must have the capability to detect and clean Virus and also perform different Scan

Actions based on the virus type (Trojan/ Worm, Joke, Hoax, Virus, other)

7 Should have buffer overflow protection integrated with AV scan engine for protection

from threats/exploits that uses buffer overflow vulnerability regardless of presence of

signature / OS patches

8 Should have cloud-client infrastructure with Reputation services like File Reputation,

Web Reputation & Email Reputation working in correlation.

9 Should have web based management console to give administrators transparent access to

all clients and servers on the network and also provide automatic deployment of security

policies, AV signatures, and software updates on every client and server.

10 Should support Active Directory integration and also have security compliance to

leverage Microsoft Active Directory services to determine the security status of the

computers in the network and also have logical group based on IP addresses (Subnets).

11 Establish separate configuration for internally versus externally located machines (Policy

Page 105: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 105 of 241

action based on location awareness)

12 Should have Configurable Scanning. Should have the ability to control the amount of

CPU resources dedicated to a scan process.

13 Must have behavior monitoring to restrict system behavior and malicious changes in

applications, keeping security-related processes always up and running.

14 Should have device control to regulate the access to external storage devices and network

resources, as well as USB autorun prevention and also provide the granular level access

like No Access, Read Only, Read & write, Full Access etc.

15 Must provide the flexibility to create firewall rules to filter connections by IP address,

port number, or protocol, and then apply the rules to different groups of users

16 Must reduce network traffic generated when downloading the latest signature by

downloading only incremental updates of signatures and scan engine.

17 Reduces network bandwidth consumed during pattern updates. The bulk of pattern

definition updates only need to be delivered to the cloud or some kind of repository and

not to many endpoints

18 Should be able to update definitions & scan engine on the fly, without a need for reboot

or stopping of services on servers.

19 Must have the flexibility to roll back the Virus Pattern and Virus Scan Engine if required

via the web console

20 Should have the capability to assign a client the privilege to act as a update agent for the

update of rest of the agents in the network for AV signatures and hotfix/ service pack/

patch update/upgrade.

21 Should enable administrators to easily move clients (who have changed departments, for

example) from one physical parent server to another simply by dragging and dropping

through the central management console.

22 Should have role based administration with active directory integration to add the

custom role type and also use the predefined roles as per requirement.

23 Should have multiple client deployment options like Web install page, Remote

installation, MSI/EXE package installation, Login Script, Vulnerability Scanner etc.

24 Should have enhanced tamper protection that guards against unauthorized access and

attacks, protecting users from viruses that attempt to disable security measures.

Page 106: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 106 of 241

25 Should support 32bit and 64bit operating systems

26 Should have Cache files for scans which can help up to 40% improvement to speed

performance.

27 Should have a feature of scan cache based on digital signatures or on-demand scan cache.

28 It should recognize a missed event on a machine, which was switched off, and restart the

same when machine is turned on.

29 Should have feedback option so that if any threat (new/earlier) is found, then relevant

data can be automatically collected and transferred to the research team for further

analysis to be conducted, and consequently, advanced solutions can evolve and be

provided.

30 Should have enhanced tamper protection that guards against unauthorized access and

attacks, protecting users from viruses that attempt to disable security measures.

31 Should support plug-in modules designed to add new security features without having to

redeploy the entire solution, thereby reducing effort and time needed to deploy new

security capabilities to clients and servers across the network

32 Should have solutions for- Stateful Inspection Firewall/IPS with Virtual Patching, VDI,

Data Protection, Mac Protection, Mobile Protection without any additional

installation and should provide single console.

33 Should provide Data Loss Protection with the capability of data protection with

multichannel monitoring, robust rules, and predefined policy templates.

34 Data Protection must have File Attribute, Key words and Pattern based technology in

single solution.

35 The solution must support IPv6 and must be capable of blocking and detecting of IPv6

attacks.

36 Data Protection should work in both environment - Workgroup and AD with User/

Group/ Domain based policy creation option.

Anti Persistent Threat (APT) specifications

S.No Feature Specifications

1 Hardware The solution should be a dedicated appliance based solution for

AntiSpam security

Page 107: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 107 of 241

The Appliance should consist a minimum of 24 GB RAM.

The Appliance should have a minimum of 1 TB Hard disk

The Appliance should have minimum 6 x GE interface

2 Web Threat

Protection

The solution should support deployment in sniffing mode or

through transparent or explicit proxy.

The solution should provide malware inspection for all protocols

tunneled over HTTP and SSL natively.

The solution should natively decrypt SSL packets to inspect

malware on SSL.

The solution should have dual anti-malware engines (Signature

and Heuristics based) and should also have capabilities to inspect

malware embedded in PDF files.

The solution should have analytics to detect and block the various

stages of malware attack including data infiltration

The solution should have comprehensive database of security risk

websites, command and control network, phishing, web and email

scam etc.

The solution should also be able to inspect content downloaded

from any website real time to inspect malicious content.

The solution must detect and block outbound Botnet and Trojan

malware communications. The solution must log and provide

detailed information on the originating system sufficient to enable

identification of infected units for mitigation.

The solution should be capable of dynamically blocking a legitimate

website which has become infected and unblock the site when the

threat has been removed

The solution should have capabilities to detect custom encrypted

payloads, password files and other identified sensitive information

getting stolen through modern malware.

The solution should be able to detect data theft even if the malware

sends the data through image files.

Page 108: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 108 of 241

The solution should provide a comprehensive threat dashboard

which provides which machine is compromised, where the malware

is trying to establish connection, Direction of communication, what

data is the malware trying to send and which geography is the

malware trying to send information.

The solution should provide geo destination awareness so the

location where the malware is trying to establish connection can be

tracked.

The solution should have automated support for the Malware

Sandbox to evaluate the malicious code and a detailed report on

analysis needs to be made available.

The solution should be able to integrate with Active directory to

enforce user based policies.

3 Email Threat

Prevention

The solution should be deployed in sniffing mode or as explicit

MTA means in blocking mode.

The solution should be able to analyse links real time on incoming

mails and natively block malicious, phishing, Bot links.

The solution should have dual anti-malware engines(Signature and

Heuristics based) and should also have capabilities to inspect

malware embedded in PDF files.

The solution should be able to quarantine mails with suspicious

files, do sandboxing of files and if the file is detected to have

malicious content, the mail should not be delivered to end user and

a detailed forensic analysis report should be made available.

The solution should also determine if the mail is SPAM through

various detection techniques.

The solution should also have capabilities to do image analysis even

if the mail body is an image.

The solution should have automated support for the Malware

Sandbox to evaluate the malicious code and a detailed report on

analysis needs to be made available.

Page 109: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 109 of 241

The solution should have URL sandboxing to prevent the point of

click malicious URL link even clicked from outside of corporate

network or from any device like smart phone.

The solution should also have capabilities to monitor and prevent

data theft through email.

4

Administration,

Authentication

and Policy

Controls.

The management console provides Security administrators with a

comprehensive, up-to-date view of threat characteristics and

response, user activity, network load, system stats and more.

The solution should have authentication options for

administration, the specific permissions available depend on the

type of administrator and Administrator activity is logged and

available for auditing or troubleshooting.

The solution should integrate with LDAP, Microsoft Active

Directory to identify users and display user information in reports.

The solution should have a centralized management for both email

and Web

The solution should have support Authentication for Management

Server.

5 Logs and

Reporting

The solution should support real time graphical and chart based

dashboard for the summary of activities over Web

The solution should pre-built report templates which the

administrator can use for generating reports.

The solution should support custom report creation in HTML,

Excel and PDF.

The solution should have capabilities to automatically deliver

reports based on schedule to selected recipients

The solution should be able to consolidate reports from multiple

boxes for centralized logging and reporting.

The solution should provide detailed information on security

incidents to comprehensively investigate individual threat events

The solution should be integrated to third-party SIEM applications

like syslog/CEF (ArcSight), syslog key-value pairs (Splunk and

Page 110: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 110 of 241

others), syslog LEEF (QRadar), and Custom.

The solution should have ability to capture data for security

incidents and the captured characteristics include: Source of the

request, destination IP, File name and size, parameters and Body

(CGI and HTML information from the file header).

The solution should provide native system health monitoring,

alerting and troubleshooting capabilities.

The solution should support configuring scheduled automatic

backup of system configuration

The solution should support automatic download of available

patches or fixes

The Solution should have inbuilt reporting feature like real time

monitoring, reporting templates and investigation drill down

report.

The solution should have reporting on the user agent strings of

applications to provide details on application usage and version

details including browser version reports.

6 Support The OEM should provide 24x7 support for the solution

The OEM should have own TAC center in India.

Web Security Specification

S.No Feature Specifications

1 Hardware The solution should be appliance/Software based solution for web

security.

2 Web Threat

Protection

The solution should provide proxy, caching, on box malware

inspection, content filtering, SSL inspection, protocol filtering on the

same appliance. Its should have malware scanning and content

inspection through third party integration, however all inspection

needs to be local and on-premise.

The Solution should intercepts user requests for web destinations

(HTTP, HTTPS, and FTP)

Page 111: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 111 of 241

The solution should have gateway level AV and malware protection.

The solution should have at least 30+ million websites in its URL

filtering database and should have pre-defined 100+ URL

categories,

The solution should have partnerships or third party inputs for web

threat ratings like facebook.

The solution must detect and block outbound Botnet and Trojan

malware communications. The solution must log and provide

detailed information on the originating system sufficient to enable

identification of infected units for mitigation.

The solution should be capable of dynamically blocking a legitimate

website which has become infected and unblock the site when the

threat has been removed

The solution should be able to perform SSL inspection to detect and

block malicious content downloaded through SSL and also blocking

sensitive information uploaded to SSL websites.

The solution should support policy enforcement for users even when

they access Internet outside the corporate network, this should be

enforced through an agent deployment on roaming endpoints. And

this solution should be on premises based, but not with the help of

VPN or complete traffic redirect to corporate network.

The agent on the roaming user machines should be tamperproof, for

example, the agent cannot be uninstalled by the user even with

admin rights to the system or the user cannot stop the services

The solution should have management and validation of SSL

certificates. Validation checking can be set as certificate revocation

(CRL), online certificate status protocol (OCSP).

The solution should have ability to block anonymizer sites or proxy

avoidance tools.

The solution should have automated support for the Malware

Sandbox to evaluate the malicious code.

The solution should have range based IP spoofing to provide

accurate representation of the IP addresses as it exits the proxy.

Page 112: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 112 of 241

3 Web content,

video& social

Media

control

The solution should apply security policy to 100+ protocols in 15

categories. This includes the ability to allow, block, log, and assign

quota time for IM, P2P, and streaming media.

The solution should filter out embedded objectionable or

unproductive content, this includes examination of the source

server, URL, page content, and active content

The solution should support custom allow/deny web ratings. The

administrators can create, modify, and manage URL categories to

accommodate specific needs for controlling users‘ web access

The solution should have granular control over popular social web

applications like Facebook, LinkedIn, Twitter, YouTube, and others.

The solution should have social social control Video uploads to

Facebook and YouTube applications.

The solution should have functionality to control web 2.0 and real

time content categorization.

The solution should have support for YouTube for Education, It

should simplifies design and implementation of policy to ensure user

compliance to company AUPs.

4 Content

Control

The solution should have atleast 500+ pre-defined content rules

inbuilt with web Security & embedded in the product

The solution should have pre-defined dictionaries, key phrases to

detect financial terms, offensive language etc.

The solution should have ability to detect slow cumulative data leaks

through web channel.

The solution should have capability to analyse text inside image

going through web channel

The solution should have ability to provide geo-location awareness

for security incidents

The solution should be able to fingerprint files, folders, databases

and prevent the information from being sent over outbound web

channel.

Page 113: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 113 of 241

5

Administrati

on,

Authenticati

on and

Policy

Controls.

The management console provides Security administrators with a

comprehensive, up-to-date view of threat characteristics and

response, user activity, network load, system stats and more.

The solution should have authentication options for administration,

the specific permissions available depend on the type of

administrator and Administrator activity is logged and available for

auditing or troubleshooting.

The solution should have authentication options for users/groups, It

should supports authentication of users via Integrated Windows

Authentication (Kerberos), NTLM (NTLM v1 and v2 in Session

Security), and LDAP.

The solution should have support of multiple domains, the

administrators can specify the sequence (domain controllers

checked first, second, next, etc.) used to authenticate users who

login from different locations.

The solution should supports credential caching (for transparent

and explicit proxy) to reduce load on domain controllers.

The solution should have centralized management for multiple web

egress points

The solution should have Multi-Domain authentication to allow the

admin to create rules that authenticate against multiple domain

controllers in a sequence

The solution should have Mac Logon Agent Authentication of

Macintosh users and the ability to apply policy based on the

username.

The solution should have support two factor Authentication for

Management Server.

6 Logs and

Reporting

The solution should support real time graphical and chart based

dashboard for the summary of web filtering activities.

The solution should pre-built report templates which the

administrator can use for generating reports.

The solution should support custom report creation in Excel and

PDF.

Page 114: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 114 of 241

The solution should have capabilities to automatically deliver

reports based on schedule to selected recipients

The solution should be able to consolidate reports from multiple

boxes for centralized logging and reporting.

The solution should provide detailed information on security

incidents to comprehensively investigate individual threat events

The solution should be integrated to third-party SIEM applications

like syslog/CEF (ArcSight), syslog key-value pairs (Splunk and

others), syslog LEEF (QRadar), and Custom.

The solution should have ability to capture data for security

incidents and the captured characteristics include: Source of the

request, destination IP, File name and size , parameters and Body

(CGI and HTML information from the file header).

The solution should provide a Web UI to manage Internet usage

policies, it also should support delegated administration and

reporting capabilities so different roles can be created to manage

policies and view reports.

The solution should provide native system health monitoring,

alerting and troubleshooting capabilities.

The solution should provide reports based on hits, bandwidth and

browse time.

The solution should support configuring scheduled automatic

backup of system configuration

The solution should support automatic download of available

patches or fixes

The Solution should have inbuilt reporting feature like real time

monitoring, reporting templates and investigation drill down report.

The solution should have reporting on the user agent strings of

applications to provide details on application usage and version

details including browser version reports.

7 Supports,

Third party

The solution must be present in the latest Gartner's leader quadrant

for Secure Web gateways.

Page 115: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 115 of 241

recognitions The OEM should have Standard Support, Premium Support, and

Mission Critical Support options available globally

The OEM should have own TAC center in India.

Email Security

S.No Feature Specifications

1 Hardware The proposed system should be an dedicated appliance based solution

or Virtual Application image for email security.

2 Malware/A

nti-Virus

Protection

The Solution should have feature of virus scanning engine strip the

infected attachments.

The Solution should detect known or suspect secure-risk URLs

embedded in the email, which are reliable indicators of spyware,

malware or phishing attacks.

The Solution should have multiple AV engines for anti-virus and

malware scanning.

The Solution should provide proactive virus detection methods for

new email-borne virus.

The Solution should have feature of virus scanning engine strip the

infected attachments.

The Solution have the management on virus quarantine and should

have the access and manipulate the quarantined virus emails.

The solution virus engine should support scanning by inbound,

outbound and internal direction and configure the policy per

direction.

The Solution should have close to 100% virus detection rate for

known viruses.

The Solution should provide email attachment sandboxing

3 Antispam The Solution should provide an attachment scanning capability to

detect file-based spam messages

The Solution should support URL classification of the embedded links

and it contributes for SPAM detection.

The solution should support image based spam detection capability,

such as the pornography images within the email and it allow

customer to adjust the sensitivity level.

The solution should support dictionaries scanning and dictionaries are

built-in the product and allow customer to create his own dictionary.

The Solution should report the false positive email and a button in the

quarantine queue thus customer can simply click to have a report.

Page 116: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 116 of 241

The solution should also allow users to report SPAM mails.

4 Content

Control

The solution should have atleast 500+ pre-defined content rules

inbuilt with Email Security & embedded in the product

The solution should have pre-defined dictionaries, keyphrases to

detect financial terms, offensive language etc.

The solution should be able to look for content in the email header,

body of message and also attachments.

The solution should be able to restrict incoming, outgoing and internal

mails based on file types, file size and also by file name and also

through a combination of them.

The solution should be able to fingerprint files, folders, databases and

prevent the information from being sent over outbound mails.

The solution should have capabilities to quarantine mails with content

that violates the policy and notify sender or sender's manager

automatically. The mails that are quarantined because of content

control policies should be released if the sender's manager replies to

the notification mail.

The solution should monitor and control sensitive emails downloaded

to mobile devices through ActiveSync.

The solution should perform image based filtering. It‘s should use

algorithm to analyse image to determine attributes that indicate the

image may be of a pornographic or non- pornographic nature in

known and unknown spams emails.

The solution should have capability to analyse text inside image going

through email.

5 MTA

Functionali

ty

The solution should allow setting SMTP greeting message, delay time

and the full qualified domain name for SMTP session establishment.

The solution should support policy based TLS encryption between

mail domains.

The solution should provide the capability of connection control and

message rates control for inbound and outbound respectively.

The solution should have directory harvesting and DoS prevention

capabilities.

The solution should allow the administrator to specify the re-try time

for a delivery failure.

The solution should provide real time IP reputation system.

The solution should support internal sender authentication.

The solution should support user group(LDAP) or domain based

routing and delivery.

Page 117: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 117 of 241

The solution should support message stamping by adding notes or

disclaimer in the message.

The solution should support IP/address/domain based whitelist and

blacklist.

The solution should have capability for Outbound throttling by

IP/address.

The solution should support Inbound mail routing delivery

preferences to accommodate larger, more complex network

6 Manageme

nt

The solution should support centralized management, including policy

configuration, quarantines and logs/reporting.

The solution should support the real-time graphical and chart-based

dashboard for the summary of email filtering activities.

The Solution should support quarantine administrator role. Thus only

the delegated administrator is allowed to access the message in

specific queue.

The solution should search a message in the queue and should have

multiple options.

The Solution should have option for end user notification for email

quarantining letter to be customized and click boxes that enable the

user to release e-mail, report false positives, add senders to allow-or-

block lists and direct links to personal email management portal.

The solution should allow where Administrator can specify which

queues can be accessed by end user.

The Personal management portal should be a web-based UI for end

users.

The solution should allow email reply to release the email quarantined

by solution.

The solution should support native system backup and software

update functionality.

7 Logs and

Reporting

The solution should support real time graphical and chart based

dashboard for the summary of email filtering activities.

The solution should pre-built report templates which the

administrator can use for generating reports.

The solution should support custom report creation in HTML, Excel

and PDF.

The solution should have capabilities to automatically deliver reports

based on schedule to selected recipients

The solution should be able to consolidate reports from multiple boxes

for centralized logging and reporting.

Page 118: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 118 of 241

The solution should provide detailed information on messages to

comprehensively track messages.

The solution should allow parameters to be defined for searching

message logs.

The solution should have True Source IP Detection and Connection

Blocking feature should work even if Email Security is deployed

behind Corporate Email Relay Server/Firewall SMTP .

The solution should have option to monitor traffic in real time for

easier troubleshooting

8 End user

manageme

nt

The solution should provide capabilities for end users to search on

quarantined messages specific to them.

The solution should allow end users to release mails from quarantine

if approved.

Automatic notifications should be sent to end users whenever mails

are quarantined for them.

The notification message to end users should be completely

customizable.

The solution should allow end users to create their own personal allow

and block lists.

The solution should allow administrators to define which queues can

be accessed by end user

The solution should have a central end user management portal for

multiple appliances.

9 Support The OEM should have own TAC center in India.

b) EMS

Sr.

No.

Specifications

Basic Requirements

1. Enterprise Management System should provide for end to end performance,

availability, fault and event correlation and impact management for all enterprise

resources that encompasses the heterogeneous networks, systems, applications and

databases present in the system. OEM should provide this compliance on a letter

head.

2. The Service Management solution namely Service desk (incident and problem

mgmt), Change and Release, Asset, Service Request/Self Service, Knowledge and

Service level management should be built on the same platform/code and leverage

the same common, shared configuration database with a unified architecture. The

same platforms should be used across all modules, requiring no complex

Page 119: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 119 of 241

integrations to leverage the combined benefits offered by the integrated platform.

The solution should also have client automation tool.

3. The Service automation solution should be a unified solution supporting

provisioning, configuration management and compliance assurance across servers,

networks, databases and applications and should support end to end full stack and

dynamic server, network and application provisioning. Solution should provide for

future scalability of the whole system without major architectural changes. Solution

should be open, distributed, and scalable and open to third party integration.

Performance Management

4. The solution should provide Agent-based or Agentless Monitoring in a single

architecture – that will allow an organization to choose the level of management

required and deploys the right-sized solution to meet those requirements. The

agent and agentless monitor should be able to collect event/fault, performance and

capacity data and should not require separate collectors.

5. The solution should reduce manual customization efforts and should speed-up

problem identification and resolution of the IT performance anomalies with

intelligent events.

6. The solution should accelerate problem isolation through accurate analysis of

probable cause through end-to-end correlation.

7. The solution should have the capability to identify probable root cause using a

variety of filtering and statistical correlation methods to shift through every metric

to determine their relevance to the issue being researched.

8. The solution should possess capabilities that deliver self-learning capabilities to

virtually eliminate the ongoing costs of manual threshold, rule, and script

maintenance.

9. The solution should be able to generate dynamic performance baselines and

continuously update and refine these normal operational bands by automatically

adapting the changes in enterprise infrastructure.

10. The solution should have predictive analytics and intelligence in-built into it so as

to detect any anomaly before it could potentially hit the threshold thereby giving

enough lead time to users to resolve the issues before the threshold is breached.

11. Solution should carry out automated probable cause analysis by picking up feeds

and scoring to reduce the number of alerts generated thereby helping operations to

identify the probable cause without having to write complex rules for correlation.

12. Solution should carry out auto-diagnosis on occurrence of an type of event and

should provide the ability to extend this based on users knowledge.

13. Should be configurable to suppress events for key systems/devices that are down

for routine maintenance or planned outage.

14. The solution should provide end users with the ability to search for known errors

and knowledgebase.

15. Solution should be able to score the events and display the highest impacting

Page 120: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 120 of 241

events in descending order.

16. The Solution should offer the ability to monitor custom/homegrown applications.

17. The solution should integrate network, server, application and database

performance information and alarms in a single console and provide a unified

reporting interface for all network and system components. The current

performance state of the entire network and system infrastructure shall be visible

in an integrated console.

18. Should automatically create Service models to describe how IT infrastructure

supports business services.

Capacity Management

19. The solution should be extensible enough to support capacity planning and

optimization with data collected through the same performance management agent

across Servers (physical / virtual), storage, databases, and Network

20. Should provide flexible integration capabilities, open

data model and proven enterprise scalabilities

21. The Solution should be comprehensive in providing process-level and workloads

data collection capabilities including support for modeling multi-tier application

workloads

22. Should provide user friendly simulation modeling for e.g.: provide automatic

Queue Length calibration, discrete event, model based, etc

23. Capabilities to provide strong forecasting capabilities for e.g. seasonality,

automated algorithms and by-exception capabilities

24. Should provide support for optimal allocation for dynamic provisioning and well

integrated with Cloud Lifecycle Management, if needed.

25. Provide sophisticated cost modeling capabilities and chargeback mechanism for

Capacity management

Network Management

26. The Network Management function must monitor performance across

heterogeneous networks from one end of the enterprise to the other.

27. It should proactively analyze problems to improve network performance.

28. The Network Management function should create a graphical display of all

discovered resources.

29. The Network Management function should have extensive reporting facility,

providing the ability to format and present data in a graphical and tabular display

Discovery

30. Discovery solution should do a complete discovery of IT environment across

distributed, virtual and heterogeneous environment and provide a clear and visual

mapping of IT infrastructure to business services.

31. Should support discovery of Physical, virtual, network, application, storage and

Page 121: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 121 of 241

mainframe resources.

32. Solution should support complete agent-less discovery requiring no software to be

installed on devices to be discovered.

33. Should Automatically map IT infrastructure to business services and building the

Application relationships completely agent less

34. Should support continuous updates of configuration & dependency data to CMDB

35. The discovery data should be fully auditable as to where it came from and what was

the method to retrieve that.

36. Should support troubleshooting and diagnostics for any discovery scan failures.

Presentation

37. Business owners should be able to graphically view the health of their business

services and its related tickets.

38. The IT organization should be able to view their tickets by business service and

impact from the same solution.

39. Solution should have the ability to display the events in a table, service,

infrastructure, tree views. It should provide each user the ability to select or view

the events as per their convenience.

40. Should support advanced filtering to eliminate extraneous data / alarms in Web

browser and GUI.

IT Service Management

41. The Solution displays the complete ITIL process flow for Incident, Problem, and

Change Management. The solution should have the capability to automatically

create a copy of the ticket to an archival server based on conditions like after a

particular date or every ticket/change or assigned to a particular group etc. The

solution should provide email based interactions allowing ticket creation, update

and approval of request. The support person can interact with the end users

through chat in built and add those chat transcripts in the ticket. The solution

should give all the details related to a particular business services. The system

should have graphical interface to define, visualize and update ITIL processes

42. At each stage in the cycle of the incident, the system should prompt users on the

status and the missing information that is required to complete the flow through

Assignment scripts

43. In case any process step is missed, the system prompts users to complete that step

before they move to the next step.

44. Solution should support reporting on the process flow to allow management to

understand how organization is performing in terms of process adherence.

45. Solution should support multi-tenancy with complete data isolation as well as with

ability for analysts based on access rights to view data for one, two or more

organizational units. Also the ability to restrict to particular organizations.

46. Solution should provide L1 engineer an ability to see the list of assets used by the

Page 122: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 122 of 241

end user. This list should be displayed within the ticket (incident, Change and

Release, Problem etc).

47. The solution should provide chat capabilities to the End Users

48. The solution should support social collaboration like Live Twitter feeds, RSS feeds,

Salesforce chatter feeds etc.

49. Should provide relationship viewer to L1 from within the ticket. The relationship

viewer should display the dependencies and impact relationships to other assets

and users.

50. Solution should automatically provide solutions from the knowledge base to L1

51. L1 should be able to view detailed configuration of a selected asset (E.g. - amount of

CPU, RAM, Disk Space, IP address, software installed, software used etc). Should

be possible to do this from within the ticket.

52. The solution should be bundled with a tool that will allow administrators to

customize the GUI using a point-and-click interface to add and change forms,

objects, and fields in forms.

53. Workflow must be able to perform notification via email, pager, SMS and the have

provision to interface with other communication modes. The solution should

provision the administrator to create new or modify existing workflow by using

actions like set fields, push fields, SQL query etc.

54. Provide the ability to develop workflow for data level operations like record create,

update, modify and delete operation. Same workflow could be executed for both

Window and Web client.

55. Provide option for approval engine so that any customized applications developed

could incorporate the hierarchy, role based, level based, ad-hoc approval structure.

Include notification and escalation capability if approval is not performed.

56. The solution should provide the functionality of executing searches to the entire

database. It should be possible to provide query criteria using AND, OR conditions.

This allows the users to create and view workflows/reports based on their needs

rather than using only the set of workflows/reports provided out of the box.

Incident/Problem Management

57. Flexibility of logging incidents via various means - web interface, client interface,

phone, auto integration with EMS tools.

58. Service Desk solution should allow detailed multiple levels/tiers of categorization

on the type of incident being logged.

59. Service Desk solution should provide classification to differentiate the criticality of

the security incident via the priority levels, severity levels and impact levels.

60. It should allow SLA to be associated with a ticket based on priority, severity,

incident type, requestor, asset, location or group individually as well as collectively.

61. Solution should support fast service restoration leveraging previous incident data

through Incident matching

Page 123: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 123 of 241

62. It should be possible for L1 to view the 'Health of a selected Service' from within the

ticket.

63. The health view should be consistent across platform (Windows & flavours of

UNIX).

64. Should support automatic assignment of ticket to the right skilled resource based

on business priority Ex - Database crash issue need not be assigned to an L3 DBA

unless the business service is completely down.

65. Asset causing the business failure and business service that has failed should be

automatically related to the ticket.

66. It should be possible to architect a decentralized service operations (across OS,

database and application versions).

67. Should be able to implement a Follow the sun support.

68. Should be able to consolidated view/reports across locations while maintaining

localized views/reports.

69. For integrations with other EMS/NMS tools, various options for integration should

be provided - APIs, web services, SDKs.

70. It should have an updateable knowledge base for technical analysis and further

help end-users to search solutions for previously solved issues. Should support full

text search capabilities.

Change Management

71. Should support Change Impact and change collision detection based on affected

CIs from CMDB.

72. Solution should provide for Change Calendar with periodical views.

73. Should support self service change request and fulfillment with standard change

requests via service catalogue.

74. Should support Incident & problem driven change-release-deployment activities.

End to End Release Management workflows should be supported with in-built

rollback capabilities.

75. Should support unified change and release tools (planning, risk assessment,

scheduling, and execution tools) for complete enterprise across virtual & physical

environments, applications, etc.

Asset Management

76. Should manage complete lifecycle starting with the initiation of the procurement

through to retiring and (if applicable) harvesting unused software.

77. Should be integrated with ITSM Solution (Service Desk, Change and Release

Management, Problem Management, Service Level Management) for maintenance

and support of assets.

78. Should support IT Business Management data and metrics to manage asset

lifecycle TCO, ROI and Depreciation from acquisition to support to retirement.

Page 124: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 124 of 241

79. Should support Integration with supplier, contract, e-procurement data.

Configuration Management

80. The Configuration Management Database should support multiple datasets with

federation and reconciliation facilities so as to get data from various discovery tools

and also through manual import process.

81. The Configuration Management should support Definitive Software and Media

Library with content updates on a periodic basis.

82. Normalization of data should be possible along complete definitive media library –

software, hardware with standardization on attributes.

83. Reconciliation of data should be possible with multiple data providers based on

common attributes and ability to define precedence rules on attributes.

84. Federation of external data sources should be possible with ability to store common

attributes inside CMDB and getting other attributes from external data sources in

real time.

85. Should provide best in class integration capabilities with CMDBf compliant APIs.

86. Should Provide a single shared view of services supporting Service Design,

Transition and Operations stages of the lifecycle.

87. Should Provide a Service catalogue (Technical, Business Service Offerings etc.) so

as to establish a framework for Service definitions based on IT and business

alignment.

88. Should Provide Service blueprints to describe functional and deployment models

for the Service definitions.

Service Level Management

89. Solution should support comprehensive SLA management platform that cuts

across Infrastructure Management and Service Management. For e.g. monitors and

reports across different KPIs like infrastructure (CPU utilization, disk space),

response times , resolution times (eg. incident closed on 2 hours) performance and

custom parameters of an enterprise.

90. Have a consolidated, automated graphical report for SLA compliance with ability to

drill down to reason for non-compliance".

91. Manage service levels for delivery and support of business services.

92. Fast, repeatable process for defining and capturing service level measurements.

93. Real-time visualization of service level targets, agreement compliance data,

penalties and rewards.

94. Should support compliance and cost trending to assist in identifying areas for

process and operational improvements.

Service Request Management

95. Should support single service catalogue for requestable services

(Technical/Business Offerings), spanning both IT and non-IT domains.

Page 125: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 125 of 241

96. Should provide for Service Requests Workflows and Fulfillment definitions for

commonly used IT/non-IT services.

97. Catalogue based on User profile and Visibility

98. Various types of Customer profiles are supported, for ex: Gold, Platinum, Silver.

99. Integrates with any underlying service management for request fulfillment.

100. Ability to load dynamic information based on the field chosen.

101. Ability to position both Custom-made and Standard Requests

102. Should send notifications to Customers based on the status.

103. Should have the ability to extend and create new service request.

104. Should have predefined catalogues that cover specific use cases

105. Should be completely web based and should be accessible from an unified portal

106. The Solution should provide a centralized Dashboard that picks up relevant

business metrics from the monitoring and service management solution - Business

Perspectives – Business-centric dashboards giving at-a-glance visibility to key

operational initiatives

Business Service Management Dash Board and Analytics

107. Business owners should be able to graphically view the health of their business

services and its related tickets pertaining to Business applications like Motor

Banking, ERP, Messaging, Claims processing, Group banking etc

108. Business owners should have a clear view of the extent of impact to their business

services and if need be the reason behind the impact.

109. The IT organization and business stakeholders should be able to view their tickets

by business service and impact from the same solution

110. Solution should have the ability to display the events in a table, service,

infrastructure, tree views. It should provide each user the ability to select or view

the events as per their convenience

111. Should support advanced filtering to eliminate extraneous data / alarms in Web

browser and GUI.

112. These dashboards need to be dynamic that allows user to drag and drop these

metrics and create custom dashboards without any coding.

113. Apart from built-in sections, users should also be able to create custom sections

that can reference out to custom metrics stored in the monitoring tools databases

or other sources as per the business requirements

114. It should be possible to restrict access to data available in the sections as per the

user rights of the users. Profile based data access.

115. For each section, user should be able to select the time frame to report on data.

This could be monthly, quarterly, half yearly, yearly or custom dates

116. The Dashboards should support rich formatting capabilities to represent the data,

Page 126: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 126 of 241

this includes different chart formats and PDF.

117. The Solution should come with standard report on overall business service health

and performance.

Reporting

118. Should provide for OOB Reports for Service Support and Service Delivery processes

through a unified portal

119. Should have ability to have a consolidated view of data collected from different

types of operations (E.g. - SLA compliance for a selected business service, it's

dependent SLAs, OLA and UPCs, it's changes by priority, open incidents by priority

and status, it's assets and individual asset compliance, patches installed and

compliance to patches etc) and displayed in a universal portal.

120. Provide users (based on role) to drill down to specific report/data on a need basis.

121. Ability to create custom KPI metrics and scorecard/compliance reports that are

updated automatically.

122. Single dashboard provides the as-is scenario by consolidating the data across the

organization.

123. Should support and Correlate KPIs from multiple disciplines.

124. Should support top down dashboards with drill down capabilities into detailed

information.

125. Should support multiple views with flexible pod-like structure along with role

based access.

Server Automation

126. Should support all major OS and virtualization platforms.

127. Should Support comprehensive and configuration-level roll-back for changes.

128. Automated provisioning for physical, virtual, and cloud-based environments.

129. Policy-based, Cross-Platform patch support across Windows, Linux, and Unix.

130. Support compliance Policies for regulatory and security standards with integrated

exception documentation.

131. Support Granular and environment-aware configuration policies and deployment.

132. Automated packaging, promotion, and deployment of applications.

133. Should support cross-platform and reusable packaging with built-in rollback

support.

134. Should maintain complete configuration for all managed servers at completely

granular level ensuring any minor change is also tracked and reported on.

135. Should have ability to monitor the parameters in real time and confirm compliance

to security policies.

136. Integrated with Closed loop change Management workflows that monitor and track

these compliance changes.

Page 127: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 127 of 241

137. Should have audit capabilities that compare the server status to policies defined in

real time.

Database Automation

138. Should provide automated provisioning of standalone and clustered databases,

including complex dependencies across all platforms

139. Should support automated ―Pre‐Flight Checks‖ against hundreds of prerequisites to

validate environment readiness before changes

140. Should have the capability to provide

automated upgrades and patching for standalone and

clustered database

141. Should be tightly integrated with Change and Release management to deploy and

document the change across multiple databases and database cluster

142. Should have "Model-driven Configurations" to automatically adjust for complex

database interdependencies

Network Automation

143. The solution should be able to support configuration management across the

network infrastructure, including routers, switches, firewalls, load balancers,

wireless access points, and other network devices.

144. The solution should be able to instantly provide the who, what, where, and when of

planned, unplanned, and unauthorized network changes.

145. The solution should be able to audit and enforce configuration standards, such as

those around security, performance, and routing which would help in proactively

assessing the impact of change and also quickly recover from problematic changes".

146. The solution should be able to dynamically create scripts to allow for changes to be

pushed into the device without having to reboot the device (i.e., non-disruptive

rollback).

147. The solution should be able to provide the mechanism to push access control lists

(ACLs) into a device without exposing the device to potential security

vulnerabilities".

148. Should support Standard Authentication Methods, Role Based Access Control

(RBAC), Realms and Groups, Sensitive Data Masking, Telnet SSH proxy.

Storage Monitoring

149. Disk Arrays

150. Detects failures on the disks and controllers

151. Monitors key performance metrics (controller utilization, response time,

cache, etc.)

152. Reports on data traffic and I/Os (physical disks, controllers, LUNs, array)

153. Monitors the environment (temperature, fans, power supplies)

Page 128: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 128 of 241

154. Detects fiber links problems (external and internal)

155. Generates instant reports on disk space consumption (total and per volume,

oversubscription, etc.)

156. Reports on the power consumption of the disk array (in Watts and kWh)

157. Fiber Switches

158. Monitors the environment (temperature, fans, power supplies)

159. Monitors the fiber links (port, light, connection, speed, etc.)

160. Reports on the utilization of each fiber link (traffic, total amount of data per

hour or per day, bandwidth utilization)

161. Reports on the power consumption of the switch (in Watts and kWh)

162. Tape Libraries

163. Backup and restore activity and performance

164. Detection of backup and restore errors

165. Devices and media

166. Log and database storage

167. Backup servers, services and daemons

Workflow Automation

168. Tools should support workflows for leading 3rd party vendors including

virtualization and storage vendors.

169. Tool should support process, Data abstraction/ Workflow Reuse.

170. Platform and process upgrades should not require extensive workflow updates.

171. Workflow execution should have both automatic and semi-automatic modes of

execution.

172. The tool should support a flexible architecture that seamlessly incorporates high

availability at a work-flow level.

Batch Job and Workload Automation

173. Solution should allow for batch discovery to ensure the CMDB contains up to date

Batch Service data.

174. Should provide both Agent-based & Agent-less scheduling of batch jobs on all

platforms.

175. Solution should have a single Entry point to schedule, monitor and manage batch

jobs across Distributed environments.

176. Solution should provide a centralized GUI to view colour oriented job status, check

logs and view output for last 5 or more days.

177. Solution should provide user ability to map the key business impacting jobs into a

service and enables the Service Monitoring to integrate into Service Desk and

Page 129: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 129 of 241

Service Impact Management for any failure or delays.

178. Solution should have the ability to forecast the schedule for a future date and

simulate the flow of jobs in terms to the estimated start and end times of jobs and

business services with option to add what-if scenarios for better simulation.

179. Solution should have an ability to execute SAP R/3 Programs, BW Programs, Data

Archiving Programs & Business Objects reports and provides specific interface for

it as well as ability to integrate with Oracle, MS SQL & DB2 database to schedule

and run the SQL scripts, open queries, Stored procedures and SSIS packages and

provides out-of-box interface for it and not through wrapper scripts.

180. Solution should have ability to schedule; trigger and monitor file transfers across

the enterprise using sftp, ftp, compression, encryption, decompression and

decryption, restart from point of failure and provides out of box interface for it.

181. Should support workload management by defining policies for efficient job

submission to servers based upon the CPU, Memory usage and time periods.

182. Solution should also Self Service functionalities to Business users and presents a

view of the workload services relevant to them so that they can submit service

request through a service catalog. The proposed solution should also be in the

Gartner Leader Quadrant

Application Performance Management

End User Experience Management

183. Deployment & Ongoing Use

184. Easy to install for on-premise Management Console (in minutes)

185. Software-as-a-Service (SaaS) deployment option for Management Console

186. Ease of integration into existing network infrastructure

187. Deployment as a Virtual Machine on premises if needed

188. No instrumentation needed in application for end user experience - understands

end user behavior from a wire-only perspective

189. Discovery of all sites, urls, requests and responses without requiring rules

190. Ability to define and categorize traffic by any part of url, site, POST, Query, etc.

191. Ability to support compound logic including AND, OR, Boolean and Regex to

categorize traffic

192. Discovery of new sites and urls as soon as they show up on the wire

193. Ability to store/deploy configuration and grouping rules as a simple file

up/download

194. Patch management over the web with appropriate user rights

195. Security Officer role controlling ability to see/not see secure data

196. Ability to deploy multiple collection points focused into a common analysis point

197. Simple SSL key logic for deployment

Page 130: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 130 of 241

Performance Impact / Overhead

198. Zero performance impact to web site(s) for end user experience capture

199. Ability to start/stop solution independent of the web site itself.

200. Works with network TAPs, SPANs from switches or load balancers depending on

the client's need

Business Transaction Detection & Discovery

201. Ability to define custom errors based on any part of the request/response including

HTTP content

202. Ability to discover Usernames from any part of the authentication process - or later

in the session if necessary

203. Flexible Geographic Tracking, choosing client IP, X-Forwarded-For, or other user-

defined value

204. Automatic discovery of all key URLs and the performance (host, network, end-to-

end time) observed for each

205. Build data to full page understanding, not just individual requests (understands

container -> object relationship)

End-to-End Web Performance

206. Sees every user all the time in real time

207. Manages both real user and synthetic transactions with equal visibility

208. Manages both end user and web service (SOAP/XML) visitors with equal visibility

209. Captures end user visit data including ISP, Browser,

210. Understands network performance from a TCP perspective (out-of-orders, drops,

retransmits)

Performance Behavior Learning & Anomaly Detection

211. Automatic detection of what is normal for each key transaction on a web site

212. Self-learning over time, automatically deprecating/de-weighting data over time

213. Provides direct line-of-sight into impacted users during site-wide performance

problems

214. Considers number of impacted sessions as a key determinant in problem severity

215. Permits drill-down into a customer-defined number of dimensions, across

customer-defined dimensions

216. Can produce a full session transcript around impacted users, showing all pages,

with timings, errors and performance indicators as forensic detail for application

development to understand the source of problems

217. Permits the exporting of one or more sessions with an easy 'export' mechanism for

trouble ticketing

218. Performance Data Retention, Trending & Analysis

Page 131: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 131 of 241

219. Ability to keep both a near-term store and longer term store to serve different

audiences

220. Ability to keep 90 days of performance data entirely within the solution at 5 minute

summaries

221. Ability to store transcript (end user visit) data securely for as long as client desires

222. Simple HTTP API's to take information to other interfaces both as summary or

transcript data

223. Simple integration with other event management solutions

Diagnostic Data Capture & Granularity

224. Records every request/response pair, including all objects delivered off origin.

225. Captures all security-permitted POST, Query, Cookie details visible on the wire

226. Sessionizes the data for all end users and web services, joining data into transcripts

showing the sequence and performance of all end users

Deep dive application diagnostics

227. Reduced Infrastructure foot-print with centralized dashboards and single pane of

glass encompassing all APM data

228. Fast time to value with quick installation and integration among the APM

components (less than half day)

229. Provide Very quick time to value for applications monitoring - 15 minutes per

application server

230. Provide a common agent for all Java app servers and automatic detection of

application servers and versions

231. Operations team must be able to deploy monitoring agent without extensive

knowledge of the code or involvement of development team

232. Must be able to deploy new applications without extensive manual reconfiguration

of monitoring

233. Support agile release methodology by providing automatic reconfiguration of

monitoring when new application versions are deployed

234. Must be able to deploy monitoring without extensive testing and tuning

235. Provide lightweight application deep-dive monitoring (code-level) , suitable for full

time production so problems don‘t need to be recreated with monitoring active or

in a test environment

236. Ability to drill down from real end-user issue to the line of code without losing

context (parameters, etc) without having to switch consoles or using an external

correlation engine

237. Ability to automatically configure monitoring to support different application

frameworks to avoid need for operations to understand technology in use for each

monitored application

Page 132: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 132 of 241

238. Automatically provides categorization of framework into ―tiers‖ for ease of use by

operations staff (example: database, web, messaging)

239. Provide ability to define user configuration of custom tiers (example: mainframe

CICS)

240. Provide a single view with application latency, application server resources and

baselines for a captured transaction trace

241. Automatic generation of Application Flow Map for the transaction topology and top

level SQL, web service calls, messaging (MQ), etc

242. Ability to monitor users sessions getting HTTP errors and application exceptions

and drill down to the cause in the application code

243. Ability to identify which end user session was impacted by a specific application

error and see the context

244. Ability to share diagnostics data with development without giving them access to

production monitoring system

Proactive Application Operations correlation and analytics

245. Automatically learn the behavior (anomalies and dynamic baselines) for all service

components, including applications, infrastructure, real users and synthetic

transactions

246. Generate predictive alerts based on application and business impact at least four

hours prior to end user impact

247. Automatically diagnose the root cause of application events leveraging early alerts

derived from behavior learning, configuration changes, service relationships and

end user transactions

248. Automatically correlate real user events to application and infrastructure events

and provide single console one-click access to these linkages

249. Able to display business service models with real-time operational overlay from the

user location to transaction to application tier to the infrastructure

250. Provide a single pane of glass that illustrates graphically what end users are

impacted (if any) by an infrastructure issue

251. Provide a single pane of glass that illustrates graphically which application

infrastructure components are contributing to an end user issue

Page 133: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 133 of 241

c) HIPS

Sr

No

Specifications

1 Server Security should perform HIPS along with log inspection, integrity monitoring

and host based firewall with single agent. It should help to detect attacks, software

misuse, policy violations and other forms of inappropriate activities.

2 HIPS should be able to monitor multiple systems, with one system being the HIPS

server and the others the HIPS agents that report back to the server.

3 Should be a complete datacenter and virtualization aware solution that provide

advanced protection for systems in the dynamic datacenter— from virtual

desktops/servers to physical, virtual or cloud server, or a combination of the

environment can be achieved. Should be supported on multiple operating systems.

4 Virtual Patching should be achieved by using a high-performance deep packet

inspection engine to intelligently examine the content of network traffic entering and

leaving hosts. Should provide automatic recommendations against existing

vulnerabilities, Dynamically tuning IDS/IPS sensors (Eg. Selecting rules, configuring

policies, updating policies, etc...)

5 Deep Packet Inspection should protect operating systems, commercial off-the-shelf

applications, and custom web applications against attacks such as SQL injections and

cross-site scripting

6 Solution should be capable of Information gathering about network hosts and their

activities, such as operating system, services, open ports, client applications and

vulnerabilities.

7 The solution OEM should deliver virtual patching updates within 24 hours of an

application vendor announcing a vulnerability in their system

8 DPI should have Application Control rules provide increased visibility into, or control

over, the applications that are accessing the network. These rules will be used to

identify malicious software accessing the network and provide insight into suspicious

activities such as allowed protocols over unexpected ports (FTP traffic on a mail

server, HTTP traffic on an unexpected server, or SSH traffic over SSL, etc.) which can

be an indicator of malware or a compromise.

9 Solution should work in detect only mode and prevent mode. Support automatic and

Page 134: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 134 of 241

manual tagging of events.

10 Solution should provide policy inheritance exception capabilities. Also support

creation of custom DPI rule and provision inclusion of packet data on event trigger for

forensic purposes

11 Product should support CVE cross referencing when applicable? The solution shall

protect against fragmented attacks and should allow to block based on thresholds

12 Integrity Monitoring module should be capable of monitoring critical operating

system and application elements (files, directories, and registry keys) to detect

suspicious behavior, such as modifications, or changes in ownership or permissions.

13 Solution should have a Log Inspection module which provides the ability to collect

and analyze operating system, databases and applications for security events.

14 Minimum Features of Host-based Intrusion Prevention: Time to Time Signature

update. Monitoring and prevention from Intrusion attack.

16 In the virtualized environment, Should have an integration with the hypervisor to

achieve an agent less protection such as Antimalware, IDS/IPS and Firewall for all the

systems/ guest VMs running in the virtualization environment. In the Physical

environment, protection such as Antimalware, IDS/IPS and Firewall for all the

systems can be achieved with the single Agent .

17 Should have support for IPv6 and must be capable of blocking and detecting of IPv6

attacks.

18 Detects attacks that network-based systems miss

19 Well-suited for encrypted and switched environments

20 Solution should be EAL 3+ or higher certified .

21 Should have an Anti-malware working Agent based in Physical environment and

Agentless in virtualization with Real-time & Scheduled Scan configurable options like

defining exclusion list for certain file, directories, file extensions from scan, different

scan actions - Quarantine, Clean, Delete, pass etc. and even restoration of quarantined

files is possible.

22 Should provide predefined & customizable log inspection rules out of the box rules for

log collection from standard applications like OS, Database, Web Servers etc.

23 Should be able to generate detailed and summary reports. Reports can be scheduled to

be automatically delivered to the administrator via email.

Page 135: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 135 of 241

24 Management Server should be installed on Windows Server 2003 and above,

Management Server should support Active Passive high availability configuration for

DC/DR setup

d) Storage Management Software (SMS)

i. Storage management software should protect the organization from the risks of

data loss and will help in reducing complexity, managing costs and address

compliance with data retention and availability requirements.

ii. Storage Management Software should improve the business continuity by

shortening backup and recovery times and maximizing application availability

with advanced data recovery management technologies.

iii. Storage Management Software should employ data duplication and a hierarchy of

storage to increase efficiencies and conserve resources.

iv. SMS should enhance data security with innovative access and encryption

features.

v. SMS should help the department to adapt to changes within the IT infrastructure

to minimize service disruptions and speed restorations and backups.

vi. SMS should increase the visibility into the data protection environment by

providing advanced features for operational monitoring and historical reporting.

vii. SMS should be able to create, manage and protect file shares and network

application storage.

e) Backup Software

S

No

Requirements

Backup Management Software

1 All backup/restore administration must be controlled by a centralized master

system

2 The master system must support the following systems: Windows

2000/2003/2008/2008R2/2012, Linux (x8664) /Solaris Sparc & Solaris x8664),

HPUX (Itanium) & AIX (PowerPC)

3 Master system must maintain a database for all backup/restore meta-data

Comprehensive reactive database format.

Easy to reconstruct against in the unlikely event of corruption.

Easily protected with an integrated backup and recovery plugin for the database

Bare Metal Recovery option for the Backup Master system.

4 Supported client systems include: Windows, Linux, Netware, Unix and Mac OS X

Platforms

5 Should be able to manage all master systems from different locations

Page 136: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 136 of 241

6 The software must be based on Graphical User Interface (GUI) so that all backup

servers can be managed centrally, regardless of location

7 The tape format should be open standard MTF for Windows , and CPIO for Unix

/Linux for portability and independence.

8 The software must provide flexibility to backup to different media. These include

disk-to-tape, disk-to-disk and interoperability.

9 The software should be able to automatically duplicate or migrate data from disk

to alternative target backup media to prepare for offsite storage

10 The software should be able to restore from alternative media without restaging

through the disk.

11 The software must have the ability to perform disk-to-disk backup via iSCSI or FC

SAN in sharing mode

12 The proposed backup solution must be able to support raw device backup – on

both Windows, Linux and Unix (IBM AIX, Sun Solaris & HP UX)

13 The proposed backup solution must be able to support consolidated (synthetic)

backup – for file system data on all platforms.

14 The proposed backup solution must be able to encrypt backup data at source –

and store with 128-bit or greater encryption with an option to encrypt data while

performing duplicate backup jobs from disk to tape.

15 The proposed backup solution must have user level access control list security

function. Each user has different permissions and privileges on the system.

16 The proposed backup solution should be modular in architecture, allowing for

components to be added and removed without requiring the backup system to be

shutdown.

17 Scalable, distributed architecture of Master Server, Media Server and Client,

enabling high-performance backup to direct-attached devices or SAN-attached

devices without scripting.

18 Shows real-time backup progress bar.

19 Feature for reporting on tape utilization, and drive configuration.

20 Systematic, menu-driven procedures for restoring data to alternate paths or

systems to simplify disaster recovery and recovery simulation.

21 Automatic robotic/tape drive configuration. No scripting required.

22 Allows multiple heterogeneous servers to be attached to the SAN switch and these

servers can dynamically share tape and disk devices in a SAN environment.

23 Logging information is filterable and can be output into text, HTML, or

spreadsheet-usable formats to facilitate the creation of graph and pie chart to

enhance the report for storage resource planning.

24 Ability to configure automated backups for specific days and weeks within a

month, while maintaining a simplified methodology for complex date scenarios.

Page 137: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 137 of 241

25 Full backup and restoration capabilities management from remote location.

26 Network bandwidth compression for management of network utilization to reduce

loads when backup occurs during production time.

27 Support for leading connectivity protocols :-

a. SANiSCSI / FC

b. NAS

c. Ethernet Technologies 10/100/1000/10000 BaseT

28 Must be capable of ―block level‖ backups for Bare Metal Recovery of Physical

servers

29 Should have specific agents to perform ―hot‖ backups from single vender without

any 3rd party integration. Database agent should have support for below

mentioned platform.

a) oracle on Windows/Linux and Unix

b) Informix on windows/Linux and Unix

c) Sybase on windows/Linux and Unix

d) DB2 on windows/Linux and Unix

e) MS SQL on window

f) MySQL on Linux and Windows

g) Postgres SQL on Linux and Windows

h) Ms Exchange on Windows

i) Lotus Notes in Windows/Linux and Unix

30 Should support server independent restore

31 Must be able to report tape utilization and view drive configuration in multiple

views.

32 Should have reporting capabilities

a. Full job completion report. Overview of the full backup jobs that were

successful, partially successful and failed for each day

b. Full backup data volume report. Overview of the total data volumes that

were backed up for each day

c. Average tape utilization report. Listing of the average amount of data stored

on each media l

d. Storage performance report. Average data throughput

33 Should meet the following Media Management capabilities

a. Allow tape library sharing among media servers

b. Allow individual tape drive sharing among media servers and allow for

reconfiguration without rebooting media servers

c. Tape drive sharing must support both iSCSI and Fiber based connections.

Page 138: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 138 of 241

34 The software should be capable of performing latent restores on Windows

systems.

35 The software inbuilt reporting tool must has the ability to create customize reports

without any additional purchase of another reporting module or 3rd party

reporting module

36 Tape media scanning should be quick and easy to perform to rebuild a lost index

or re-import a tape with older backup data.

37 Backup Index /file catalogue should be able to be taken offline and then

compressed.

38 The software must has the ability to provide disaster recovery of Window and

Linux operating systems by use of a bare metal recovery technology.

39 The disaster recovery tool must allow backup of source (Server A) and restore to

target server (Server B) on window and Linux systems.

40 The size of index or catalogue file must be less than 100 bytes per

files/folder/directories that are being backed up.

41 Able to compress the index files automatically or by policy.

42 Able to import/scan the indexes using GUI without having to resort to the use of

CLI operations.

43 Ability to integrate with storage NAS snapshot based protection mechanisms by

providing control GUI module

44 Ability to support and manage snap shot based backup, and file based backup ―

under one roof ― while maintaining granular file level recovery.

45 Must support storage protocols such NDMP (version 3 & above). Please provide

interoperability matrix with storage appliance firmware/OS release compliance.

Specify specific features advantages aligned with the storage vendors

46 Must be able to utilize Direct Access Restore for NDMP technologies to facilitate

single file level restore.

47 Capable of providing Check –Point Restart for NDMP backup

48 Support for server virtualization especially VMWare & Hyper-V

49 Must be integrated with VMware VADP with D2D2T layout. Must be synchronized

with VMware VADP for data integrity.

50 Allows full VMware VADP backup by utilizing LAN, SAN and HotAdd advanced

transport mechanisms to optimize data transfer of virtual machine backups.

51 Must support virtual machine backup online and supports file level VADP

backups for virtual machines running Windows.

Continues Data Protection and DR

1 Please state Brand, Built & Version

Page 139: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 139 of 241

2 Provides 60 seconds or less ,application-aware recovery for

MSExchange, MSSQL Server and Windows file system data to significantly reduce

downtime

3 Recovered data is uncorrupted and completely usable by the application on first

recovery eliminating the need for multiple, time-consuming manual recoveries

4 Must be able to continuously capture every MS Exchange /MSSQL transaction or

filecsystem write to high value, time-sensitive trail reminder

5 Must be able to recover a complete Exchange Server, individual Storage Group, or

individual file to

any-point-in-time

6 Must provide granular recovery of individual mailboxes or mailbox items without

performing additional brick-level backups which eliminates backup windows

7 Must have advanced search capabilities across all mailboxes without analyzing

individual mailboxes one at a time or using Microsoft Recovery Storage Groups

speeds up individual email restores

8 Must have tight integration with traditional backup technologies including

NetVault: Backup, Symantec Backup Exec, Symantec NetBackup ,EMC Networker

or IBM TSM

9 Must be equipped with Virtual On-Demand Recovery (VODR) to bring the

application up and available to users in seconds.

10 Must provide two-tier data history as such to able to maintain both continuous

history for any point-in-time recovery or long term snapshot history for fixed

point-in-time

11 Must be able to recover protected data to a alternate server or location across a

LAN or WAN. Recovery mechanism must automatically update Active Directory

and Domain Name Service (DNS) entries so users are routed to the standby

server immediately.

12 Must be able to protect virtualized Windows applications running under VMware

ESX, Microsoft Hyper-V or Citrix Xen.

13 Microsoft Cluster Support is mandatory.

14 Must be equipped with simple to use web-based management console with Point-

and-click configuration. Also should provide Wizard-based recovery.

15 Must be able to restore individual mailbox items to PST file .Users should be able

to restore individual items to a PST file for further analysis for discovery or

investigative purposes.

16 Should have support to replicate data with application awareness to Near DR and

DR Site

Host Base Replication

1. Brand, Built & Version

Page 140: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 140 of 241

2.. True Cross Platform. Consolidates mixed environments with a single enterprise

wide solution and maintains replica of both file & metadata between

heterogeneous servers.

3. Hybrid Replication support. Security of near synchronous replication over long

distances. Collects changed data synchronously & performs replication

asynchronously.

4. Data Encryption Support. Prevents third-parties from reading sensitive and

important information over network to protect company privacy.

5. Assures data integrity through data journaling and provides resiliency against

network outages.

6. Bandwidth Throttling for Scalability. Allows existing network connections to be

shared with replication and allows for control of bandwidth consumption during

replication.

7. Policy-based Replication. Provides defined replication sets to allow for replication

policies to be set/defined.

8. Tracks changes at the byte level and works at file system level.

10. Must be able to replicate RDBMS based applications with option to do automatic

failover.

Virtualized Backup

1. Brand, Built & Version

2. Provide the support VMware ESX and ESX(i) systems for backup,

replication and recovery

3. Offered solution must be Agent Less and should support the VA cluster and

should also support management server on VM itself.

4. Offered solution must support Storage repository CIFS, NFS and direct/SAN

attached storage

5. Allows full VMware VADP backup by utilizing LAN, SAN and HotAdd advanced

transport mechanisms to optimize data transfer of virtual machine backups.

6. Must support virtual machine backup online and supports file level VADP

backups for virtual machines running Windows/Linux.

6.5.19 Minimum Technical Specifications- Hardware at DC & DR

f. Server Load Balancer

S.No Feature description

1 8 *10/100/1000Mbps Ethernet Ports and should support 2x10Gig ports

2 Memory: Minimum 8 GB

3 Minimum of 5 Gbps throughput and scalable to 10 Gbps throughput.

4 Minimum of 3 Gbps SSL throughput

Page 141: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 141 of 241

5 Minimum of 14000 SSL connections scalable to 25000 SSL connections

6 Appliance should provide full ipv6 support.

Server Load Balancing Mechanism

7 The appliance should support server load balancing algorithms i.e. round robin,

weighted round robin, least connection, Persistent IP, Hash IP, Hash Cookie,

consistent hash IP, shortest response, proximity, snmp, SIP session ID, hash header

etc.

8 Extensible policies (epolicies) scripts to implement business logic on network

without any changes in application code.

9 Should support one arm, reverse and transparent proxy mode deployment scenarios

and should support nested layer7 and l4 policies.

Redundancy Features

10 o Supports Active-Active and Active-Standby Redundancy

11 Should provide comprehensive and reliable support for high availability and N+1

clustering with active-active and active-standby support.

Server Load Balancing Features

12 Should maintain server persistency based on source ip and destination ip, http

header, url, cookie and SSL ID.

13 should support layer4 and layer 7 load balancing for HTTP/HTTPS, FTP/FTPS, SIP,

RTSP , RDP, TCP, TCPS and UDP protocols

14 Should maintain server persistency based on source ip and destination ip, http

header, url, cookie and SSL ID.

15 The appliance should support multi port, scripted and custom health check with

content verification

16 Should provide application & server health checks for well known protocols i.e. ARP,

ICMP, TCP, DNS, RADIUS, HTTP/HTTPS, RTSP etc..

17 The appliance should have and/or relationship to check various dependencies for

the application delivery

18 should support layer4 and layer 7 load balancing for HTTP/HTTPS, FTP/FTPS, SIP,

RTSP , RDP, TCP, TCPS and UDP protocols

Load Balancing Applications

19 Should provide performance optimization using TCP connection multiplexing, TCP

buffering and IEEE 802.3ad link aggregation.

20 should support TCP optimization options including windows scaling, timestamp &

Selective Acknowledgement for enhanced TCP transmission speed.

21 TCP optimization option configuration should be defined on per virtual service basis

not globally.

22 Appliance should provide real time Dynamic Web Content Compression to reduce

server load.

23 should provide selective compression for Text, HTML, XML, DOC, Java Scripts,

CSS, PDF, PPT, and XLS Mime types.

24 should provide have provision to define policy to skip compression for selected

trouble URL (RegEx, Web Objects) for the specified Virtual.

SLB should support below Management options

25 Role based access control for granular authentication and authorization.

Administrator should able to define multiple roles namely Admin,Security-admin,

Network-Engineer, Network Monitor, Network Manager on the appliance

Page 142: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 142 of 241

26 The appliance should have extensive report and logging with inbuilt tcpdump like

tool and log collecting functionality

27 The proposed SLB should be accessable as per the following:

• Using the CLI,

• Using SNMP,

• Using the Browser-Based Interface,

• Using the Management Port, with inbuilt reporting and single window console.

28 Should support XML-RPC for integration with 3rd party management and

monitoring

29 The appliance should provide detailed logs and graphs for real time and time based

statistics

30 Appliance must support multiple configuration files for better availability and easy

upgrade / fallback.

31 The system should support led warning and system log alert for failure of any of the

power and CPU issues

g. Blade Chassis Specification

Sl.

No

Features Specifications Required

1 Form Factor Max 10U Rack mounted Chassis to house at least 14 Compute

Nodes. Chassis configured should not only support current

generation of processors but should support future processor

technology.

2 IO Modules Min Four high-speed switch bays capable of supporting I/O

architectures in Ethernet, FiberChannel, FCoE and Infiniband

3 Ethernet IO

Module (10GB)

2 x 10 GBPS Ethernet switch with L2 and L3 capabilities, VM

ready support for 802.1Qbg standards. Each Switch should have

100GB uplink capability and should be scalable to provide atleast

220GB uplink capability. Switch configured should have following

features like

Non-blocking architecture with wire-speed forwarding of traffic,

Media access control (MAC) address learning: automatic update,

support of up to 1,28,000 MAC addresses VRRP for Layer 3

router redundancy, Layer 2 Trunk Failover to support

active/standby configurations of network adapter teaming on

compute nodes, 802.1Q VLAN tagging support on all ports,

VLAN-based, MAC-based, and IP-based ACLs, Support for IEEE

802.1p, IP ToS/DSCP, and ACL-based (MAC/IP source and

destination addresses, VLANs) traffic classification and

processing, IP v4 and IP v6 Layer 3 functions, Virtual Machine

ready, Simple Network Management Protocol (SNMP V1, V2, and

V3)

Page 143: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 143 of 241

4 Fibre Channel IO

Module

2 x 8Gb FC SAN switches required but IO Bays should support for

both 8Gb and 16Gb FC SAN Switches. SFP should be supplied

along with the switch.

5 Midplane Chassis should have a highly reliable mid plane for providing

connectivity of the shared resources to the compute nodes in a

highly reliable manner.

6 Power Modules Redundant power modules t0 provide N+N or N+1 redundancy

and should provide 92% efficiency at 100% load.

7 Chassis

Management

Module

Integrated two redundant chassis Management Modules

providing IP based management of the compute nodes and vital

elements like FC and Ethernet Switches. Should also provide for

controlling Power, Fan management, Chassis and compute node

initialization, Switch management, Resource discovery and

inventory management, Resource alerts and monitoring

management, Chassis and compute node power management and

diagnostics for elements including Chassis, I/O options and

compute nodes.

9 Network

Management

Should provide for the following Network Management

Capabilities for chassis internal switches:

• Management of network switches from a variety of vendors.

• Discovery, inventory, and status monitoring of switches.

• Graphical network topology views.

• Support for KVM, VMware virtual switches, and physical

switches.

• VLAN configuration of switches.

• Integration with server management.

• Per-virtual machine network usage and performance statistics.

• Logical views of servers and network devices grouped by subnet

and VLAN.

10 System Panel LEDs/LCDs on the front information panel that can be used to

obtain the status of the chassis Identify, Check log and the Fault

LED/LCD

11 Support for

Multiple

Platform

Should provide support for multiple platforms in x86/ RISC/EPIC

servers within the same enclosure.

12 RACK with TFT

monitor

42U Floor RACK with Dual redundant Power distribution Units &

Foldable 1U 17" TFT flat panel console kit with key board and

integrated pointing device & connecting cable. Rack should be

same make of Servers.

h. Blade Servers Specifications

Page 144: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 144 of 241

S.

No

Component Specifications

1 CPU 2 x Intel Xeon six Core E5-4610 CPU @ 2.4 GHz or

better and expandable upto 4 processors.

2 Cache L3 15 MB of L3 Cache

3 Chipset Intel Chipset C600

4 Memory 128GB DDR-3 LR DIMMS Memory Upgradeable to

768GB (24DIMMS Slots)

5 Memory protection support ECC, Memory Mirroring, Memory Sparing

6 SCSI Controllers Integrated/Addon Hardware Raid Controller to

supports Hardware Raid RAID 0, 1

7 Disk Drives 2 x 200GB SATA SSD Hard Disk Drive, Server should

support Hardware Raid controller supporting Raid 0

and 1.

8 Graphics Controller 16MB SDRAM

9 Ethernet Adapter Server should be configured with 2 Number of 10G

Ethernet ports, also support FCOE and ISCSI

functionality on demand. Should support Future

upgradability to at least two more 10Gb ports.

10 Fiber Channel HBA

Connectivity

1 x Dual Port 8Gbps Fiber Channel Expansion Adapter.

PCIe slot should also support 16Gbps Fiber Channel

ports from Day1.

12 I/O Expansions 2 x PCI Express 3.0 interface

16 Warranty 3 Years Onsite Comprehensive Warranty

17 USB Should support 3 USB ports

18 Failure Alerting

Mechanism

The server should be able to alert impending failures on

maximum number of components. The components

covered under alerting mechanism should at least

include Processor, memory and HDDs

19 Server Management

Software

Server should be supplied with OEM Server

Management software

Page 145: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 145 of 241

20 OS Microsoft Windows Server 2008 R2, Red Hat

Enterprise Linux 5 and 6, SUSE

Linux Enterprise Server 10 and 11, VMware ESX

i. Data Base Server (Rack)

S. No. Components Specification

1.

Processor/

CPU

Min. 4 x Intel Xeon E7 4820 (Eight Core) 2.0 GHz

processors with 24MB cache, 64bit technology or higher

2. Chipset Intel 7500 Chipset or better

3. RAM / Main

Memory

Minimum 256GB of PC3 10600 Registered ECC DDR 3

RAM upgradeable upto 1TB.

4. Hard Disk

capacity &

type

Min. 4 x 200 GB SFF Enterprise class SSD

5. RAID Controller Compatible RAID Controller with 512 MB Cache for SSD

and to be configured with RAID 5

6. Network

Interface

Minimum 2 x Gigabit Full-Duplex Ethernet ports

W/TCP IP offload

Engine & Wake On LAN feature

7. Ports Ports for Keyboard & Mouse, Min. 2 USB Ports, 1

Remote Management

Port

8. Graphics Integrated standard graphics controller

9. SAN

Connectivity

& HBA

2 x 8 Gbps FC HBA PCI-X/PCI-e based required to

configure redundant

SAN adapters.

10. Form Factor Rack Mountable (note more than 4U)

11. Free Slots Min. 2 Free 64 bit PCI-Express Slots (after populating

all the cards)

12. Removable

Drive

Internal IDE/ SCSI DVD-ROM Drive

13. Operating

System

Microsoft Windows Server 2008 R2, Red Hat Enterprise

Linux 5 and 6, SUSE Linux Enterprise Server 10 and 11,

VMware ESX

14. Power supply Redundant Hot-Swappable Voltage-sensing power

supplies and

Variable-speed Fans

15. Certification OEM ISO 9001 Manufacturer/ UL/ FCC/ RoHS and

should be certified on the supplied OS Version

16. Server

Management

Dedicated Hardware Controller based Management

along with OEM

Server management software

Page 146: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 146 of 241

j. Storage Area Network (SAN)

1. SAN controller

1.1 Dual Active Controller

2. Cache

2.1 16 GB Total Mirrored Cache for Disk IO Operations scalable to min 32 GB

3. Host interface

3.1 For front-end host connectivity, the storage system should be configured with

sufficient number of 4/8Gbps FC ports or SAS port with sufficient SAS links,

so as to provide an aggregated total bandwidth of at least 32Gbps across all

the controllers.

4. Drive interface

4.1 For back-end connectivity, the storage system should be configured with

sufficient number of 4/8Gbps FC ports or sufficient 6 Gbps of SAS-II back-

end ports/ lanes across all the controllers so as to provide an aggregated

bandwidth of at least 16Gbps across all the controllers.

5. RAID levels Supported

5.1 0, 1, 5 / 6

6. Fans and power supplies

6.1 Dual redundant, hot-swappable

7. SAN support

7.1 Box should be compatible of SAN environment

8. SAN specifications shall have the following

1. The storage array shall be configured with at least 16 GB cache scalable to min 32

GB mirrored across two storage controllers for disk I/O operations.

2. Storage subsystem shall support SSD/SAS drives or equivalent drives in the same

device array

3. Presently, the storage sub system shall be configured with 300 GB/ 450 GB of

Performance drives and 750 GB or higher on SATA / equivalent for archiving

purpose.

4. The storage system must provide upgrade path to larger or future array controller

and software technology while maintaining the existing investment.

5. All the necessary software to configure and manage the storage space, RAID

configuration, logical drives allocation, virtualization, snapshots (including snap

clones and snap mirrors) for supplied capacity etc.

6. Redundant power supplies, batteries and cooling fans and data path and storage

controller.

7. Load balancing must be controlled by system management software tools.

8. The multi-path software should support the supplied storage and operating

systems.

9. The storage array must have complete cache protection mechanism either by de-

staging data or providing complete cache data protection with battery backup for

up to 72 hours or more.

10. The storage system should be scalable from 30 TB to 60 TB of raw capacity using

40% on SAS drives and 60% on Near SAS or equivalent drives using the same

Page 147: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 147 of 241

configuration as Quoted in this tender. The Storage should have at least 4 ports of 4

Gbps Frontend ports and 4 no‘s of back end ports of 4 Gbps the storage array must

have the capability to do array based remote replication using FCIP or IP

technology.

11. The storage array should support block level Synchronous and Asynchronous

replication across heterogeneous storage arrays from different OEMs.

12. The storage array should support Operating System Platforms & Clustering

including: Windows Server 2003 (Enterprise Edition), Sun Solaris, HP-UX, IBM-

AIX, Linux / Solaris for x86. Any software or license required to enable connectivity

to these OS should be included.

13. Storage should support non-disruptive online firmware upgrade for both

Controllers and disk drives.

14. The storage array should support hardware based data replication at the Block level

across all models of the offered family.

15. Should provision for LUN masking, fiber zoning and SAN security

16. Should support storage virtualization, i.e. Easy logical drive expansion.

17. Should support hot-swappable physical drive raid array expansion with the

addition of extra hard disks

18. Should be able to support clustered and individual servers at the same time.

19. Should be able to take "snapshots" of the stored data to another logical drive on a

different Disk/RAID Group for backup purposes

20. Should be configured with "snapshots and clone"

21. Vendor should also offer storage performance monitoring and management

software.

22. The vendor must provide the functionality of proactive monitoring of Disk drive

and Storage system for all possible hard or soft disk failure

k. Tape Library

i. Tape drives

1. Minimum 2 latest generation LTO drives. .

ii. Interface

1. Fiber Channel Interface

iii. Other Specifications

1. Should have sufficient speed backup to Tape Library in High Availability for

backing up data from the SAN without any user intervention.

2. Should be able to backup 50% of the entire production landscape in 8 hours

window (indicative only).

3. Should support latest generation LTO drives or latest technology based library

with at least 2 latest generation LTO drives tape drives (>=4), rack mountable

with redundant power supplies.

4. Cartridges should have physical capacity up to 1600 GB per cartridge

compressed; 800 GB native.

5. At least 50 latest generation LTO drive Media Cartridges with 5 Cleaning

Cartridges, Barcode labels shall also be provided

l. FC-IP Router

i. Fibre Channel Ports

1. min 4 FC ports

Page 148: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 148 of 241

ii. FC Port Speed

1. Autosensing 1/2/4 Gbps

iii. iSCSI (Ethernet) Ports

1. min 4 Ethernet ports

iv. iSCSI (Ethernet) Port Speed

1. 1 Gigabit Ethernet

v. Protocol Support

1. FCP

2. iSCSI

vi. High-Availability Features

1. Two-way active/active clustering with failover and failback capabilities

2. Multiple iSCSI connections provide multipath support from a single gateway to

as many as 100 servers.

vii. Management Features

1. CLI (by Telnet, SSH, or console)

viii. iSCSI Gateway Manager

1. SNMP

2. Allows for monitoring traffic statistics on each storage and network interface,

fan and temperature and iSCSI session details.

m. SAN switch

S No Feature Description

1. Performance 8 Gbps Fibre Channel

2. Ports 16-24Fibre Channel

3. Aggregate Switch

Bandwidth

384 Gbps Maximum

4. Protocol Support Fibre Channel

5. Availability No single point of failure.

6. Media Types Hot-pluggable SFP+, LC connector; SWL, LWL, ELWL

7. Upgradeability Standard 16 Ports; 8 Port on Demand upgrades

8. Form Factor 1U

n. Core Router

S.No. Description

1 Router Architecture: The router architecture should have following

features

Modular Chassis, the architecture should be based on high performance,

distributed / centralized forwarding architecture.

Should support Data ,Voice and Video traffic.

It should support Single Operating System which includes all the feature set

2 Interface Support

Page 149: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 149 of 241

Ethernet LAN Ports -> 3 x 10Gbps Ethernet port with transceiver. It should

support additional Gigabit Ethernet modules i.e. both 10/100/1000 or SFP

type (upgradable )

It should support the industries widest range of wired and wireless

connectivity options such as T1/E1, T3/E3, copper and fiber GE, etc

3 Performance & Memory Required:

Performance Requirements for 64 byte packet -> Minimum 1.2 Mpps

4 Hardware:

Should support minimum default DRAM = 1 GB, maximum DRAM =2GB

External Compact Flash minimum default = 256MB, maximum External

Compact Flash = 1GB and above

2 External USB (2.0 or higher)

One Serial console port

One Serial auxiliary port

Should support AC and PoE, Power-supply options

Should support internal RPS

Should support 6 High port density WAN interface Modules

Should have Min three Gigabit Ethernet Port

5 Voice & Video support

Voice & Video support

Support Voice interface i.e. FXS, FXO

6 Router Functional Requirements

QoS -> ToS, CoS, Queuing, prioritizing, Resource Reservation Protocol

(RSVP)

NAT -> NAT, PAT

Access Control -> Required

Protocol Support Required:

RIP, BGP4, Policy based Routing, PPP, HDLC, OSPF Version 2, Support for

IPV6.

Re-distribution of routes from on Routing protocol should not be a bottleneck.

All the above features should be provisioned in the router from day 1.

Congestion Management:

The router should have proper congestion management to eliminate Network

congestion when the link is overloaded.

Random Early Detection, Weighted Fair/priority Queuing, IP precedence or

DSCP.

Page 150: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 150 of 241

IP Multicasting: Type Forwarding -> MBGP/PIM-DM/PIM-SM

7 Accounting:

The following accounting features should be supported:

Packet & Byte Counts

Start Time Stamp & End Time Stamps.

Network Time Protocol

Input & Output interface ports.

Type of service, TCP Flags & Protocol

Source & Destination IP addresses

Source & Destination TCP/UDP ports

8 Security Requirements:

The offered router should have following security features:

Support for Standard Access Lists to provide supervision and control.

Controlled SNMP Access through implementation of Access Lists on the

router to ensure SNMP access only to the SNMP manager or the NMS

workstation

Controlled SNMP access through the use of SNMP with MD5 authentication.

Multiple Privilege Levels for managing & monitoring

Support for Remote Authentication User Service (RADIUS) and AAA

PPP CHAP support

9 Management Features :

The offered router should have the following Management

Features:

The Router shall support Telnet, SSH, Console access.

The router shall support FTP or TFTP for easy software upgrades over the

network.

Network Management services shall be provided using open standards based

protocols like SNMP V2/V3

Configuration Management: The Router shall support configuration

management through the command line interface. GUI based software

configuration utility shall be provided. Support of configuration on web

interface shall be available.

Event and System logging: Event and system history logging functions shall be

available. The Router shall generate system alarms on events. Facility to put

selective logging of events onto a separate hardware where the analysis of log

shall be available.

Page 151: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 151 of 241

Pre-planned scheduled Reboot Facility: The Router shall support the

preplanned timed reboot to upgrade their hardware to a new software feature

and plan the rebooting as an off-peak time.

Power: Internal Redundant Power supply 230 V AC 50 Hz,

Mounting:

The offered router should be 19" rack mountable

Accessories:

Should come with all necessary power cords, adapters, data cables,

connectors, CDs, manuals, brackets accessories, wire managers, etc, required

for installation and commissioning of the equipment.

o. L3 /Core Switch (48 Ports 10/100/1000)

S.No. Description

1

Core Switch with internal firewall

Chassis based switch with in-built redundancy (power supply)

Layer 3 switch

Should be easily scalable. Should have modular architecture with Min 10 slots

which can be used for line cards.

Should support Gigabit running on fibre

Should support to providing Port level redundancy

Should have sufficient memory to support the entire feature.

19‖ rack mountable

Full duplex operation

Support for secured Web-Based Management

Support for Enhanced STP functions

High MTBF Support

Operating LED Signal

The Switches must be able to generate Syslog Messages with timestamp and

Severity codes, which can be exported to a Syslog Server.

The Switches must be able to Build up its own inventory (like Device Name,

Chassis Type, Memory, Flash, Software ver. Etc)

2

Interfaces / Slots

a. Support for Gigabit interfaces – SX, LX, 1000Base T

b. All service/payload cards/modules must be hot swappable

Page 152: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 152 of 241

c. Support for 10GbE Ports for uplinking the distribution switches/access

switches / Servers/ connectivity with network

Should support 24 Port GE module and 48 Port GE module

Should support 10 G port module

Should support 24 SFP module

3

Layer 2 Features: -

L2 Switching Support

L2 Multi-Homing Support

L2 Multicast Support – IGMP Snooping

Link aggregation

Multiple Spanning tree Domain (802.1s), IEEE 802.1w rapid spanning tree and

IEEE 802.3ad

Multi Instance Spanning Tree support for Load sharing on redundant links and

fast convergence time

Spanning-Tree Protocol (IEEE 802.1D) per bridge group

Multicast must be supported in hardware so that performance is not affected by

multiple multicast instances.

To support at least 2000 VLANs/switch

To support at least 32K MAC addresses / switch

To support bundling of multiple physical ports into a single logical channel, to

offer aggregate bandwidth

Should support virtual distribution architecture allow for the combination of

two or more switches into a single logical network entity having more switch

performance and more port density.

Support should have switching capacity of minimum 0.96 Tbps or more

The switch fabric/Supervisor engine support configurable in Active/Active and

or Active/Backup modes.

Switch should have forwarding rate of minimum 645 Mbps or more

4

Layer 3 Features: -

Support for high-performance routing with support for RIPv1, RIPv2,

OSPF,BGP

Support for VRRP or equivalent

Secondary Addressing

Classless Interdomain routing

Support for DHCP Server

To support a minimum of 4000 ACL entries

Page 153: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 153 of 241

Should Support IPv6 in Hardware

5

Other Features: -

Support for ACLs based on source and destination Media Access Control (MAC)

addresses, IP addresses, or Transmission Control Protocol (TCP)/User

Datagram Protocol (UDP) ports

IEEE 802.1Q VLAN Support – Port based VLANs

Support for Routed VLAN, Port based and QoS based ACLs

Support for Multicast routing protocols (PIM) and Internet Group Management

Protocol (IGMP) snooping in hardware, IP Multicast Support: IGMP snooping,

supporting IGMP v1, v2 and v3

Support for industry standard Differentiated Services Code Point field (DSCP)

and/or the 802.1p Class of Service (CoS) field.

Classification and reclassification based on source/destination IP address,

source/destination Media Access Control (MAC) address or the Layer 4

TCP/UDP ports.

Ability to classify, reclassify, police, and mark the incoming packets before the

packet is placed in the shared buffer.

Scheduling using Weighted Round Robin (WRR)

Congestion control via Weighted Random Early Detection (WRED).

Support for rate-limiting via Committed Access Rate (CAR) with a granularity of

increments of 64 Kbps

6

Policy Based Quality of Services (PB-QoS): -

Policy Based QoS Support

Per Port Priority Based QoS

802.1p Support

Priority Queues

Bandwidth Engineering & Management – Per Port Minimum, Rate Limiting,

excess bursting, shaping

Support for L3/L4 filtering capabilities for inter VLAN traffic

High Priority Transmit Queuing/strict queues.

QoS-based forwarding based on IP precedence

7

Redundancy: -

Redundant Power Supply Unit, Fan tray and Fabric for core switch

support Link Aggregation

Spanning Tree (802.1d) with support for spanning tree per VLAN or Equivalent

Feature

Page 154: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 154 of 241

8

Security Features: -

Layer 3 /4 Access Control Lists (ACLs) standard and extended

Security (User Access): Internal DB/External RADIUS /TACACS+

Configuration Change Tracking

System Event Logging

Syslog

Support for 802.1X Authentication

MAC lockdown for port security

Hardware based broadcast control

9

IEEE Standard Compliance: -

802.1Q VLAN tagging

802.1p Priority

802.1D Spanning Tree

802.3u Fast Ethernet

802.3x Flow Control

802.3z Gigabit Ethernet.

802.3ab 1000Base-T (Gigabit Ethernet over Copper)

Should also support Fibre Modules

802.3ae Should support 10 Gbps Ethernet

p. IDS/IPS

High performance with low latency threat prevention solution must provide hardware

(FPGA or ASIC) offloading of application level (L7) content processing (IPS, Anti Virus, Anti

Spyware, Vulnerability Protection, File-type filtering, Data filtering)

o 8 10/100/1000 interfaces and option for 4 fiber slots to cater future requirements

o Should monitor multiple segments of network for malicious traffic

o 1GBPS of threat prevention throughput (real time traffic) with IPS, Gateway

Antivirus, Antispyware & Anti malware modules & signature enabled from day one

o Support Vulnerability, Virus and Spyware Protection features

o Protection against a wide range of malware such as viruses, including HTML and

Javascript viruses, spyware downloads, spyware phone home, Trojans, etc.

o Should support for the protection against SSL based attacks. Should support built-

in/External SSL decryption Engine for SSL Traffic decryption to support prevention

of encrypted attacks.

o Support various deployment scenarios including Tap mode, transparent mode,

layer2, vWire & layer3 routed mode

o Protect the network against known and unknown threats including vulnerability

exploits and malware embedded in application traffic.

Page 155: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 155 of 241

o Should able to scan for threats inside the application e.g. Deep packet inspection

inside Facebook, twitter & peer-to-peer applications.

o Real-time stream-based inspection and not using file-based store-and-forward

techniques

o For high performance with low latency the proposed solution must provide all

application level inspection in a single content engine (each packet must only be

inspected once even with all content inspection features enabled)

o The proposed solution must have modern malware protection that identify unknown

malicious files and execute them in a sandbox environment to expose malicious

behavior even if the malware has never been seen

o Zero-Day signature feed from APT Advanced Malware scanning engine: capable of

updating signature base for threats discovered in APT advanced Malware scanning

engine.

o The proposed solution shall support sandbox behavior based inspection and

protection of unknown viruses and malware

o policy rule creation based on interfaces zones, application identification, user

identification & threat prevention

o The proposed solution shall define specific instances of traffic between peers

o The proposed solution shall delineate specific instances of instant messaging (AIM,

YIM, Facebook Chat, etc.)

o The proposed solution shall support user-identification allowing Active Directory,

LDAP, RADIUS groups, or users to access a particular application, while denying

others

o The proposed solution shall be able to create filters to control groups of application

based on category, sub category, technology, risk or characteristics etc.

o Application usage control policies can be enforced using a combination of the

following parameters:

Allow or deny

Allow but scan

Allow based on schedule

Decrypt and inspect • Apply traffic shaping

Allow for certain users or groups

Allow certain application functions

Any combination

o The proposed firewalls shall support DNS-based signatures to detect specific DNS

lookups for hostnames that have been associated with malware

o The proposed solution shall support inline control of malware infection and

command/control traffic

o The OEM should ensure the delivery of the signature in 1 hour from the time of

inspection

o The proposed solution shall support PCAP downloads of specific traffic sessions

from the GUI from the logging screen

o The proposed management (internal/external) shall also be able to provide a

customizable application dashboard or at least system monitor to provide overall

status of the network traffic and attacks going through the solution, including

potential problems that may need attention.

o The management solution must be capable of providing rich reports based on

application, users and threats or in any combination

Page 156: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 156 of 241

o The proposed solution must have built in XML API for management purposes;

custom logging capabilities.

q. External Firewall

I. Physical attributers

o Should be mountable on 19‖ Rack

II. Interfaces

o 12 10/100/1000 interfaces and option for 4 fiber slots to cater future

requirements.

o 2 10/100/1000 high availability interface

o 1 out of band management interface

III. Memory

o Minimum RAM 4GB

o Flash 64 MB & 120GB SSD hard disk

o Next Generation Firewall system, with a capability of supporting at least

2Gbps of Application Identification Enabled Firewall throughput using 64

byte HTTP packet size,(not UDP 1518)

o 250,000 concurrent sessions & 50,000 new sessions per second.

o 500Mbps of IPSec VPN throughput & 1000 IPsec & SSL VPN tunnels

IV. Routing protocols

o static routing, RIPv2, OSPF & BGP v4

o 10 virtual routers

o Ipv4 & IPv6 routing support for virtual routers

V. Application support

o Traffic classification based on applications across all ports irrespective of

port/protocol/evasive tactic

o Application detection (at least 1700 applications)

o Multiple mechanisms for classifying applications including application

signatures, SSH & SSL, Application decoders & heuristics

o Handling of unknown/unidentified applications e.g. alert, block or allow

o Protocols support IPSec, DES, 3DES, FTP, HTTP, HTTPS, IPv6

o Inspection oh HTTPS & SSH encrypted traffic

o Support for DNS proxy & DNS sinkhole to prevent against DNS attacks

VI. Other support

o Policy controls based on interfaces, zones, user-id, source & destination

address, applications (not ports)

o Dual stack support IPv4/IPv6 application support

o Deployment scenarios – TAP mode, vWire mode, Layer2 & Layer3 routed

mode

o Support active-active and active-standby HA configuration

o Policy based controls by country

o Per policy SSL decryption & inspection

o User identification – Active directory, LDAP, eDirectory, Radius, Kerberos,

client certificates & API‘s

o Protections – DOS, DDOS, IP spoofing, Brute force, Syn cookie & malformed

packet protection

VII. QOS

Page 157: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 157 of 241

o QoS features like traffic prioritization, differentiated services, committed

access rate

o QoS policy on per rule basis based on source address, destination address,

user/Group, application (such as bittorrent, Skype, Facebook), dynamic

application group & port

VIII. Management

o Internal/external management system for real-time monitoring, Logging &

reporting functions

o Customize application dashboard

o Detailed user activity report including information on applications

o Reporting based on application, users and threats or in any combination

o Report generation on a manual or schedule (Daily, Weekly, Monthly, etc)

basis

o XML API for management purposes; custom logging capabilities

o Console, Telnet, SSHv2, Browser based configuration

o SNMPv1 & v2

IX. Certifications

o Common Criteria EAL4+ certified

o ICSA certified

o Gartner Magic Quadrant of Enterprise Firewall – Leaders Quadrant

o NSS Labs recommendation

r. KVM Switch

S No KVM Switch Description 2 X 16

1. Users / Consoles

2. VGA Resolution – Max 1920 X 1440

3. VGA Resolution - Cat5 Remote 1600 X 1200

4. Cat5 Cable Length 1,000 ft

5. Server / PC Selection

6. LED Specification 16 LED Bank

7. LED Status On (Online) Green

8. LED Status Selected (In use) Red

9. LED Cat5 Power Indication Green

10. LED Cat5 Status Red

11. Scan Intervals (Seconds) 5 to 99

12. Keyboard & Mouse Emulation USB

13. Bandwidth 150 MHz

14. Cascade Levels 8

15. Server/PC Connections – Max 128

s. Global Load Balancer Specifications

S.No Feature description

1 Should Provide a scalable, dedicated hardware platform to help ensure that all

applications

2 The appliance should have minimum 4 triple speed 8*10/100/1000 Mbps Gigabit

copper ports and 2*10G SFP+ from day one.

Page 158: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 158 of 241

3 The appliance should have 5 Gbps of system throughput from day one and scalable to

10 Gbps throughput.

4 Appliance should provide full ipv6 support.

5 The appliance should support site selection feature to provide global load balancing

features for disaster recovery and site redundancy.

6 Should tightly integrates with SLB devices without sacrificing the ability to work in a

heterogeneous environment of DNS-capable networking products

7 Solution should also support full DNS server to support all kind of DNS records

including A,AAAA, MX, CNAME, PTR DNS records with option to import zone file

on the device.

8 should support dynamic proximity rules instead of static proximity rules to direct the

traffic to closest datacenter

9 GSLB solution should able to evaluate round trip time (RTT), Persistence loss ration

(PLR) and hop count for dynamic proximity calculations.

10 The appliance should support global server load balancing algorithms including

11 Weighted round robin,Weighted Least Connections,Administrative Priority,

Geography,Proximity, Global Connection Overflow (GCO),Global Least Connection

(GLC),IP Overflow (IPO)

12 Should support synchronization

6.5.20 Minimum Technical Specifications Requirement at Client Site

The below mentioned line items will have to be procured and maintained by the system

integrator. Bidder/ SI need to submit all the technical documents/certifications related to

hardware/software before installation. Bidder/SI shall submit the software licenses before or

at the time of installation. After installation bidder/SI need to run a check on systems which

provide complete report of the system. The Bidder/SI shall provide all the details or

demonstration if requested by Rajasthan Police which is not limited to Physical check. If any

of the item procured under this project is non compliance with the parameters mentioned in

this RFP by Rajasthan Police them Bidder/SI need to replace it with RFP compliance

product without any additional cost. The operating systems and office productivity tools

which the SI will propose in its solution should be industry standard and OEM supported.

i. Desktops

1. Processor: Intel Core i5 (Latest Generation) or more or equivalent processor with

cooling solution (CPU fan and heat sink) with latest chipset. Where the processor

is other than Intel Core i5, name of the processor be specified and documentary

evidence from an acceptable accrediting agency (sysmark2007/2012, SPEC CPU

2006 rating with 8GB RAM {60% of SPECint_rate_base2006 plus 40% of

SPECfp_rate_ase2006}, Basemark CL/PC Mark Score, etc.) be produced to

confirm that the proposed processor is rated either equal or higher.

2. Base Frequency: 3.2 GHz or more

3. Cache: 6 MB or more L3 Cache:

4. Mother Board: Latest Intel /OEM compatible Motherboard, Minimum 3 PCI

/Express slots with x16 graphics port/4 serial ATA 3 GB/s ports.

5. Memory: 4 GB or more DDR3 expandable up to 16 GB

6. Hard Disk Drive: 500 GB, 7200RPM serial ATA 3 Gb/s with 8 MB cache buffer

7. Disk Controller On-board Chipset: Video RAM size:

8. DVD ROM: Integrated DVD R/W16x or higher speed DVD R/W

Page 159: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 159 of 241

9. Ethernet Interface: 10/100/1000 Mbps autosensing Ethernet interface with RJ45

connector

10. Monitor Spec: 17‖ Square TFT Monitor with TCO 03 / CE Certified In-built

Speakers

11. Key Board: 104 Keys Mechanical (OEM Make) or more with Rupee Symbol, having

key life of 50 million keystrokes. Bilingual keys (English and Hindi supporting

inscript typing)

12. Mouse: optical scroll Mouse (OEM Make)

13. BIOS: Flash upgradeable

14. Ports All ports should be ‗onboard‘

o One serial port

o One parallel port

o One PS2/USB port for keyboard

o One PS2/USB port for Mouse

15. USB Ports: at least 2

16. Power supply: Standard ATX-12V, Energy-star 5.0 complied efficiency 85% or

above.

17. Operating System: Pre loaded Latest Windows OS with media & recovery disks for

each PC.

18. Accessories: Good quality dust covers, key skin and mouse pad

ii. Workstation at Client location

S. No. Component Specifications

1. CPU Quad Core Xeon Processor E3-1220 (3.10 GHz,4

Cores,8M cache and 80W)

2. Chipset Latest server class Intel chipset

3. Memory 8GB (2x4GB) DDR3 expendable up to 16GB or

higher.

4. Display Controller Integrated 8 MB or higher Video Standard

5. Hard Disk 2x500 GB SATA HDD with hot pluggable/ simple

swap both will be acceptable. HDDs with Capacity

for three or higher SATA hot pluggable drives.

Provision for adding RAID Controller for providing

RAID 5 should be there

6. Monitor 17‖ Square TFT Monitor with TCO 03 / CE Certified

In-built Speakers

7. Key Board 104 Keys Mechanical (OEM Make) or more with

Rupee Symbol, having key life of 50 million

keystrokes. Bilingual keys (English and Hindi

supporting Inscript typing)

Page 160: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 160 of 241

8. Mouse Optical scroll Mouse (OEM Make)

9. Hard Disk Controller

(Hardware/Software based)

Minimum three SATA II (3 Gbps) connectors with

RAID support in the BIOS; RAID 0, 1 supported for

SATA disk / Software RAID controller with 3Gb/s

SAS Adapter.

10. CD ROM Drive DVD RW Drive

11. DAT Drive 36/72 GB DDS-5 DAT Drive compatible with DDS-4

cartridges with backup software and One Step

Disaster Recovery

12. Ports 1 Serial, and 4 USB ports (other than the

requirement of connecting key board and mouse)

13. Ethernet card 2 Intel Gigabit Ethernet controller supporting

1000BASE-T. One Integrated NIC & one additional

will be provided

14. PCI Slots Total 2 nos. or higher including PCI and PCI-e

15. Server Management Software Appropriate Server Management software to

monitor and manage the various subsystems like

CPU, Memory, I/O, disk and environmental factors

16. Operating system Latest Windows OS (Desktop Version),

17. Power

Requirement/consumption

of servers

250 Watts

iii. Multi-Function Laser (Print/ Scan/ Copy)

S No Components Specifications

1. Print speed, black (normal quality

mode)

Up to 33 ppm, B/W, Legal (8.5 in x 14 in)

2. Print resolution, black 1200 x 1200 dpi

3. Print technology Laser

4. Duty Cycle 12000 pages

5. Duplex printing (printing on both

sides of paper)

Automatic

6. Media sizes, standard A4, ISO B5, JIS B5, A5, A6, Executive, US

Letter, US Legal, Oficio, Folio, DL Envelope,

C5 Envelope, C6 Envelope, Monarch

Page 161: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 161 of 241

Envelope, No. 10 Envelope

7. Media types Paper (bond, color, letterhead, plain,

preprinted, pre punched, recycled, rough,

light), envelopes, labels, cardstock,

transparencies, user-defined

8. Connectivity 1 Hi-Speed USB 2.0; 1 10/100 Ethernet

network port

9. Scanner Flatbed with automatic document feed, upto

1200 dpi;; Scan size maximum (flatbed):

215.9 x 297 mm (8.5 x11.7 inches),

10. Copier Black-white Up to 600x600 dpi, Copy speed

(black, draft quality, A4):Up to 25 cpm, Copy

resolution (black graphics): Up to 600 x 600

dpi, Copier resize: 25 to 400%

11. Power Device Power supply, internal

12. System Interface 1 USB (compatible with USB 2.0

specifications), 1 network port

13. Compatible operating systems Windows 8

iv. Duplex Laser Printer (Print)

S No Components Specifications

1. Print Speed Up to 33 ppm, B/W, Legal (8.5 in x 14 in)

2. Connectivity Technology

3. Interface Hi-Speed USB 2.0 port

4. Max Resolution ( B&W ) 2400 dpi x 600 dpi

5. Duplex Printout Duplex

6. PostScript Support Standard

7. First Print Out Time B/W 7 sec

8. Fonts Included 45 x TrueType , 35 x PostScript

9. Media Type Envelopes, transparencies, labels, plain

paper, glossy paper, cards

10. Max Media Size (Custom) 8.5 in x 14 in

11. Media Sizes A4, ISO B5, JIS B5, A5, A6, Executive, US

Letter, US Legal, Oficio, Folio, DL

Envelope, C5 Envelope, C6 Envelope,

Monarch Envelope, No. 10 Envelope

12. Expansion Slots Total (Free) 1 ( 1 ) x memory

13. Connections 1 x Hi-Speed USB

14. Power Device Power supply, internal

Page 162: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 162 of 241

v. Generator Set 2.1 KVA

Component Specifications

CAPACITY 2.1 KVA

ENGINE:

Type Single/Multi cylinder

Method of starting Electric start 12 V DC

Type of cooling Water cooled /Air cooled

Type of governor Mechanical/Electronic

Type of fuel Diesel

Rating Continuous

Rated Output/HP Minimum 5 HP at 3000 rpm

Alternator rated

speed

3000 RPM

Over load capacity 10% overload – minimum 1 hour

Makes of engine From leading manufacturer

Ignition Type Magnetron Electric

General Engine should be four stroke with Double ball

bearing on PTO & Flywheel with Over Head Valves and should have

Cast Iron Sleeve

ACCESSORIES Flywheel to suitable diameter and fuel injection equipment

Air cleaner

Lubricating oil cooler

Electric motor starting equipment like motor, battery, charging

generator with voltage regulator etc.

Heavy duty radiator with fan

Residential type silencer with exhaust piping with vibration

isolator

Fuel tank suitable for 8 Hrs of continuous running with necessary

piping and fuel gauge, drain valve, inlet and outlet connections.

Anti-vibration mounting pads

Speed controlling governor

Suitable coupling system to the Alternator

Tachometer

Lubricating oil pressure gauge

Hour meter to indicate number of Hrs of operation

Auto trip on low oil pressure

Over speed alarm with trip

Thermal insulation for exhaust line with glass wool, Aluminium

sheet, chicken mesh, Diesel line 12 mm dia including beads

flanger etc

Battery 12 V with lead and terminal

Battery charger.

Protection: Protection against low lubricating oil and over heat

shall be provided for engine

Engine shall be vertical Single/multi cylinder 4 stroke type in

Page 163: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 163 of 241

accordance with IS10002-1981 with latest amendments and CPCB

guidelines.

vi. 16 Port Manageable L2 Switch

S No Components Specifications

1. MAC Address Table

Size

8K

2. Switch Fabric 32Gbps Forwarding Capacity

3. Transmission

Method

Store-and-Forward

4. Diagnostic LEDs Per Unit: Power

Per Port: Activity/Link, Speed

5. Packet Buffer

Memory

512Kbytes Buffer Memory per Device

6. QoS 802.1p (4 Queues)

7. Acoustics 0 db

8. connectivity 10/100/1000

9. Network Protocol

and Standards

IEEE 802.3 Ethernet, 802.3u Fast Ethernet,

802.3x Flow Control, 802.1p QoS

10. Emissions FCC Class A, CE Class A

11. Power Supply 100-240VAC, 50/60 Hz 0.3 A Internal Power

Supply

12. Environmental RoHS Compliant

Temperature Operating: 32° to 104°F (0° to 40°C)

Storage 32° to 140°F (0° to 60°C)

Operating 15% to 90% RH

vii. Digital Camera

S No Components Specifications

1. Max resolution 4000 x 3000

2. Image ratio w:h 4:3, 16:9

3. Effective pixels 14.1 megapixels or above

4. Sensor type CCD/CMOS

5. Digital zoom Yes, 6x or above

6. Image stabilization Yes

7. Auto Focus Yes

8. Optical zoom Yes, 5x or above

9. Built-in Flash Yes

10. Battery Type Lithium (Rechargeable)(should also be

charged externally and not just with USB)

11. Memory Card 8 GB

12. Accessories Should include any required accessories

(Charger, USB cable, Drivers, etc)

Additional features:

Page 164: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 164 of 241

Blur reduction mode, SCN – Blur reduction , landscape, kids and pets etc mode , 6

continuous shots, per second, battery capability with 280 nos. of shots, movie mode 30fps,

Support for Linux Operating system.

viii. Electronic Pen

S.

No.

Parameters Specifications

1 Technology Ultrasound IR Technology or any other technology which

is equivalent or higher. Should able to write on any surface/on

any normal paper

2 Input Paper

3 Input Area A4 size and modifiable up to A3 size

4 Pen Size 12mm diameter and 130 mm length

5 OS Windows, Linux

6 SDK/APIs All API/SDK for any OS to be given free

7 Optional Customizable form filling application

8 Pen Battery Life Not less than 60-80 hrs. of continuous writing should

give XY coordinates impressions through the SDK/APIs

9 Output files File formats

10 Memory Able to store over 100 A4 fully handwritten pages

ix. External Hard disk (500 GB)

S. No. Parameters/ Specifications

1 USB 2.0/ USB 3.0

2 SATA HDD

3 USB Power

4 Hard casing

x. Environment Control (Air-Conditioner)

Type of AC Split

Type of Split Wall Mounted

Cooling capacity (Tonnes) 1.5

Energy Efficiency Ratio (EER) 7.1 or Above

Compressor Type Rotary

Number of Fan motors 1

Power Requirement (Voltage) 230

Nominal Cooling Capacity 5000 or Above

BEE Star Rating 3 - star or above

Others Installation of AC and stabilizer will be in the scope of SI

Page 165: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 165 of 241

xi. UPS 2kVA

S No Minimum Technical Specifications

1. ISO 9001 certified brand

2. True On Line Type

3. Backup period should be at least 120 Minutes

4. IGBT with High Frequency PWM (Pulse with Modulation) Technology

5. Output wave form should be Sine wave

6. Compatible with local Electricity Power Generator.

7. Total Harmonic Distortion should be less than 3%.

8. Support input voltage range of 160 V to 270 V.

9. Output Voltage should be 230 Volt AC (+/- 1%)

10. Inherent protection should be provided for over loading, low battery,

over temperature, short circuits, over and under input voltage.

11. LED indicators should be provided for at least load indication, load on

battery, low battery, overload, Mains ON.

12. Audible indicator should be provided for at least load on battery, low

battery, Mains failure, Overload

13. Power factor 0.8

14. Battery Bank minimum 6400 VAH

15. Isolation transformer

xii. UPS 1kVA

S No Minimum Technical Specifications for UPS

1. ISO 9001 certified brand

2. Backup period should be at least 60 Minutes

3. True Online Type

4. Output wave form should be Sine wave

5. Support input voltage range of 160 V to 270 V.

6. Output Voltage should be 230 Volt AC (+/- 1%)

7. Output frequency should be 50 Hz +/- 0.05 Hz (Crystal Controlled)

8. LED indicators should be provided for at least load indication, load on

battery, low battery, overload, Mains ON.

9. Power factor 0.8

10. Battery Bank minimum 1600 VAH

11. Isolation transformer

Page 166: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 166 of 241

6.5.21 Earthling Recommendations:

a) Separate earth pit(s) is/are to be prepared by the SI. Earth Pit of size 1 x 1 foot to be built

and it should not be greater than 2 inches above the ground level. The pit should be

covered with a slab of not less than 1-inch thickness. ―UPS Earth Electrode‖ should

be written inside the pit.

b) SI to undertake plate earthling through Copper wire with provision of copper plate

(300 x 300 x 3 mm) earthling by digging 12‘‘ deep hole (4 x 4) Four Sq mm wire

should be used for earth (up to the strip).

c) Proper electrical earthling to maintain earth- neutral voltage less than or equal to 3

volts in the supply to the MCB. This should be checked with a multi-meter by the

Nominated district police official/ officer at police Station.

d) All apparatus and equipment transmitting or utilizing power shall be earthed.

Copper/G.I. earth strips/wires shall be used unless otherwise indicated

e) Earth Pipe should be at least 5 feet and pipe should be 1 feet below the ground level

Connection of earth wire to the earth pipe should be visible

f) Water collecting portion in earth pipe should be tightly fitted

g) Two copper wires of thicker size have to be used to connect strip and the Earth Pipe.

h) Earth bus to the earth pit should be connected with 8 gauge thick copper wire.

i) Components for Earthling

1. Earth Bus – 1 no

2. Earth pipe with funnel – 1 no

3. Earth pit with lid – 1 no

4. Copper wire to connect earth pipe & Earth bus

5. Necessary earthling chemicals such as Charcoal, gravel, sand, salt, etc

6. 8 Gauge CU wire from earth bus to earth pipe. The connection

should connected by appropriate nut, bolt & washers

7. Earth pit as a whole should not be more than 2 inches above the ground.

This pit necessarily be covered by a lid with at least 1 inch thickness

8. The earth pipe should be min of 50 Sq mm diameter

9. The earth pipe should be tightly fitted water collecting funnel

6.5.22 Furniture

Component Detailed Specifications

Computer Table

Size: L 910 x W

610 x H 728 mm

Top: Size 910 x 610 mm made of 18 mm thick pre

laminated medium density fiber (MDF) board ISI Marked

(IS: 14587-1998). The top shall be firmly screwed on

25x25x1 mm square tube frame as shown in figure

Upper side of laminated board shall be in natural teak

shade while the bottom side shall be white/cream shade.

Sliding key Board tray: A Sliding key Board tray shall be

made of

18mm pre laminated medium density fiber board of size

725x450 mm. The gap between top and tray shall be

100mm.

The storage shelve for CVT : A storage shelve made of 18

mm particle board shall be provided along with the length

of the table at bottom about 100 mm above from the

Page 167: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 167 of 241

Component Detailed Specifications

ground level. Shelves shall be screwed on frame work of

25x25x1 mm square tube. The shelve shall be covered from

back side with 18mm pre laminated medium density fiber

board as shown in drawing.

Steel Structure: The rigid steel structure shall consist of two

nos. rectangular base tubes of size 50x25x1.25 mm about

520 mm length placed along the width on vertical tubes of

size 25x25x1 mm shall be welded for fixing up of side

panels. A supporting frame of 25x25x1 mm square tube

shall be welded on the top of the tubes for the side panels

as shown for supporting the top of the table.

The base tube shall be provided with adjustable shoes 2

nos. on each side.

Painting: Complete frame of tubes shall be powder coated.

Computer Chair with

Handle

Seat size shall be 430x430 mm on 10 mm. thick molded

comm. ply with 60 mm thick 40 density molded PU foam

Back rest size shall be 400x300 mm on 10 mm thick

molded comm. ply with 40 mm thick 32 density

molded PU foam covered with tapestry.

The height of back rest shall be 900x500 mm for top and

bottom edges respectively. The black rest shall be provided

with lifting arrangement on flat iron & helical spring.

Two nos. suitable PU handles shall be proved.

The base stand should be made up of 5 prongs duly pressed

welded together centrally with a pedestal bush with good

quality twin wheel castors. The stand and other metal parts

excluding central spindle shall be powder coated. Complete

steel structure shall be pretreated and powder coated with

minimum thickness of 60 microns coating.

A central spindle of 25mm diagonal rod without threads

shall be provided with revolving arrangements. The

adjustable height of chair shall be from 530 to 570 mm.

A good quality tapestry cloth shall be provided on seat &

back in attractive color/ shade.

6.5.23 Fire Extinguisher (5 Kg)

S No Minimum Technical Specifications

1. Class :Class "C" of American Standards i.e. For Appliances and Electrical

Equipments

2. Type : Clean Gas Agent Based

3. Approved by : NFPA/ EPA Approved

4. Operating Valve : Squeeze Grip Type with Nozzle

5. Operating Temp. range : - 10 to + 55 Degree Celsius

Page 168: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 168 of 241

6.5.24 Web Based PMIS

S No General Requirements

1. Should have a User Friendly GUI

2. Should have an Issue Tracking System

3. Should be able to assign tasks

4. Project Portfolio Management should be possible through the tool

5. Should be able to manage resources through the tool

6. Should be able to manage Documents through the too

7. Should have basic project Lifecycle workflow built within the tool

8. Should have reporting and analysis capabilities

9. Should be web based tool or hosted in the State Data Centre

10. Should be suitable for SDLC

11. Should support all major formats for preparation of project plan like

.xls, .mpp, .doc, .docx etc.

6.5.25 Standard Operating Procedure for Hardware Procurement and Quality

Assurance

System Integrator is required to procure and commission hardware identified under the

project. Following standard operating procedures have to be followed by the SI to procure

and deliver hardware at respective locations.

Procedure and Analysis

The procedure of inspection of hardware has been divided into three phases as detailed

below.

a) Phase 1: Inspection at State level

A thorough inspection of specification/ configuration of at-least one (1) equipment per

product type shall be carried out at the State Level.

The State Technical Infrastructure Committee (STIC) shall validate the quantity and

specifications of the sample hardware provided against the Bill of Materials (BoM) as stated

in the RFP. This inspection may be done at a location arranged by the System Integrator in

consultation with the Nodal Officer. The process to be followed should be as follows:

i. SCRB shall release a Delivery Order (D.O.) to the System Integrator for delivering the

required Hardware (1 Item per Product Type).

ii. Nodal Officer and STIC shall finalize the approach and schedule for inspection. The

approach shall be to inspect one (1) item of a specific product type. The same shall be

communicated to the SI.

iii. The SI shall submit a list of equipments available for inspection with a clear

comparison between the DO and BoM agreed as part of its bid.

iv. SI shall intimate the Nodal officer for supply of equipment to the agreed location.

Page 169: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 169 of 241

v. As per the agreed schedule, STIC or its nominated members shall initiate a thorough

inspection of the specification/configuration of each product type by comparing the

equipment against the BoM.

vi. For equipment that passes the inspection, a PASS (Green colour) label shall be stuck

on the equipment in a sealed manner. The label shall be signed by all the members of

the STIC available during the inspection. A cello tape should be stuck on top of the

signed labels to prevent tampering. For such ―inspection passed equipment‖, an in-

principle acceptance note shall be given to the SI with instructions to supply to the

concerned district offices.

vii. For equipment that FAILs the inspection, it shall be labelled with a red colour label

and rejected. The Rejection note shall have equipment wise details. For such

equipment, a rejection note shall be given to the SI and the SI shall be required to

resubmit another sample for testing. The outcome of the inspection would need to be

communicated to the DIC/SP of the District for reference.

viii. In case there is an appeal from the SI regarding the rejection of Items supplied by the

SI, the STIC shall hear and dispose-off the same.

b) Phase 2: Inspection at District level

For the district level inspection, District Infrastructure Committees (DICs) shall be

constituted and complete inspection of the hardware, to the satisfaction of the DIC

chairman.

The process to be followed by DICs would be as follows:

i. SI shall deliver the equipment/ hardware with the in-principle acceptance of STIC to

DIC within a maximum of 10 days from receipt of the acceptance note at an SI

identified pre-designated storage area.

ii. DIC shall finalize the approach and inspection schedule. As part of the inspection

process all equipment/ hardware would be checked for quantity and specifications as

requested in the BOM.

iii. For equipments that FAIL the inspection, a consolidated rejection note shall be given

to SI with instructions to cure within 15 working days.

iv. For equipments that PASS the inspection, a supply note shall be given to the SI and

sent to the concerned sites with the in-principle approval note of DIC attached. Also,

a PASS (Blue colour) label shall be stuck in a sealed manner on all equipments in the

lot. The label shall be signed by all members of the DIC available during the

inspection. A cello tape should be stuck on top of the signed labels to prevent

tampering.

v. If case there is an appeal from the SI regarding the rejection of Items supplied by the

SI, the STIC shall hear and dispose-off the same.

vi. Prior to delivery of the inspected hardware at sites located across the State, DIC shall

send to each location an intimation notice along with the supply note and delivery

schedule.

vii. A copy of the delivery schedule shall also be shared with the SI prior to hardware

delivery at sites.

c) Phase 3: Delivery at Sites:

The steps to be followed at Site level are listed below:

Page 170: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 170 of 241

i. The SI shall dispatch the hardware to the concerned locations and obtain Proof of

Delivery (POD) from the Station House Officer.

ii. SHO gives POD only after verifying the PASS labels.

iii. POD defines only the quantity and the item and not the detailed specifications of the

supplied hardware.

iv. System Integrator shall verify the BOM for each location in presence of Station House

Officer during installation process.

v. The BOM verification includes the package list, part nos., CD, detailed specification

etc.

vi. The SHO shall inspect the equipment upon completion of installation and shall

provide the final signoff.

vii. The Final Signoff sheet contains set of instructions along with the list of CCTNS

Hardware & Accessories delivered for Police Station.

viii. After installation of the equipment, the hardware details shall be entered into the

Government asset register and a separate CCTNS register shall be maintained with

repeat entries of all the hardware received from SI.

The Concerned Authority (STIC/ DIC/SHO) shall sign all the 4 copies only on delivery and

testing of all the hardware items mentioned in the sign-off form.

One Copy of the form shall be retained by the Verification Site.

One Copy of the signed form shall be given to the SI.

One Copy (Original) shall be sent to the District SP Office or the Nodal Officer, as

applicable.

One copy of the form shall be sent to the SCRB

6.5.26 Details of Technology Stack CAS (State) and CAS (Center)

The Technical Details for CAS (State) Solution Stack 1 and Stack2, CAS (State) Offline

solution, CAS (Centre) Solution are provided in subsequent tables. These specifications are

indicative and the system integrator may propose solutions compatible with latest

technology trends and meeting CAS (State) requirements in totality. The idea is to have a

scalable solution in technology space. System Integrator is free to choose from any of the

stacks for further customization to be done at the state level. It is also re iterated that the SI if

free to choose any other standard product, other than the ones mentioned in any of the

stacks below, for any of the services / products. The SI has to ensure that the solution

proposed for the Stack has to be in totality compatible and integrable with CAS being

developed by MHA/NCRB. The right to accept or reject any such deviation from the stacks

mentioned below will be on sole discretion of Rajasthan Police. The existing Application

software purchased/deployed by Rajasthan Police for implementing the CAS (State) solution

has been provided at Annexure VIII.

Page 171: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 171 of 241

CAS (State) Solution - Stack 1

Component Proposed

Solution by

Software

Development

Agency

Version

and

Year of

Release

Original

Supplier

Description

(include

major

features/

services

only)

Support

Provided

By

Web server Sun Java System

Web Server 7.0

7.0 SUN HTTP Server SUN

Application

Server

Glassfish

Application Server

3.0 SUN J2EE

Application

Server

SUN

Database MySQL 5.1 SUN DB Store SUN

Operating

System

Solaris 10 SUN Operating

System

SUN

Reporting

Engine

Jasper Reports 3.7 Jasper Reporting

Services

Email/Messaging Q-Mail 1.4 Qmail

Community

E-Mail

Solution

Search Engine Search:

Unstructured

data: using open

CMS search

features

Structured Data

Mysql & Custom

application

interface

N/a N/a N/a N/a

Portal Server Glassfish

Application Server

3.0 SUN J2EE

Application

Server

SUN

Workflow Engine jBPM 4.0 JBoss Workflow

engine

Rules Engine Custom Built N/a N/a N/a N/a

Directory

Services

Sun Directory

Services

7.0 SUN LDAP SUN

DMS/CMS Open CMS 7.5.1 Open CMS Content

Management

System

Page 172: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 172 of 241

Component Proposed

Solution by

Software

Development

Agency

Version

and

Year of

Release

Original

Supplier

Description

(include

major

features/

services

only)

Support

Provided

By

Security Physical Security,

Network Security,

DB Encryption

(MySQL), DB

Access Controls,

Role Based Access

Control (Custom

Developed), LDAP

(Sun Directory

Services),

N/a N/a N/a N/a

Identity

Management

OpenSSO 7.0 SUN LDAP SUN

Audit log4j, Custom

Built application

audit

N/a N/a N/a N/a

ETL Custom Built N/a N/a N/a N/a

CAS (State) Solution - Stack 2

Component Proposed

Solution by

Software

Development

Agency

Version

and

Year of

Release

Original

Supplier

Description

(include

major

features/

services

only)

Support

Provided

By

Web server IIS 6 Microsoft Web & App

Server

Microsoft

Application

Server

IIS 6 Microsoft Web & App

Server

Microsoft

Database SQL Server 2008 2008 Microsoft DB Store Microsoft

Operating

System

Windows Server

2008

2008 Microsoft Operating

System

Microsoft

Others Microsoft

Reporting

Engine

SQL Server

Reporting Services

2008 Microsoft Reporting

Services

Microsoft

Page 173: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 173 of 241

Component Proposed

Solution by

Software

Development

Agency

Version

and

Year of

Release

Original

Supplier

Description

(include

major

features/

services

only)

Support

Provided

By

Email/Messaging Q-Mail 1.4 Qmail

Community

E-Mail

Solution

Search Engine Search:

Unstructured

data: using

openCMS search

features

Structured Data:

SQL DB Search

Engine & Custom

application

interface

N/a N/a N/a N/a

Portal Server IIS 6 Microsoft Web & App

Server

Microsoft

Workflow Engine Windows

Workflow

Foundation

N/a N/a N/a N/a

Rules Engine Custom Built N/a N/a N/a N/a

Directory

Services

Microsoft Active

Directory

2008 Microsoft LDAP Microsoft

DMS/CMS Windows

SharePoint

Services

n/a n/a n/a Microsoft

Security Physical Security,

Network Security,

DB Encryption

(MySQL), DB

Access Controls,

Role Based Access

Control (Custom

Developed),

LDAP (Sun

Directory

Services),

N/a N/a N/a N/a

Identity

Management

Microsoft Active

Directory

2008 Microsoft LDAP Microsoft

Page 174: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 174 of 241

Component Proposed

Solution by

Software

Development

Agency

Version

and

Year of

Release

Original

Supplier

Description

(include

major

features/

services

only)

Support

Provided

By

Audit IIS Log, Custom

Built

N/a N/a N/a N/a

ETL SQL Server ETL 2008 Microsoft ETL Microsoft

CAS (State) Offline Solution

The below list is

indicative only

Proposed

Solution by

Software

Development

Agency

Version

and

Year of

Release

Original

Supplier

Description

(include

major

features/

services

only)

Support

Provided

By

Synchronization

Solution

Custom Built N/a N/a N/a N/a

Application

Container

Apache Tomcat 6.0 Apache

Foundation

J2EE

Application

Container

Database MySQL / SQL

Express

5.1/2008 SUN /

Microsoft

DB Store SUN /

Microsoft

CAS (Center) Solution

The below list

is indicative

only

Proposed

Solution by

Software

Development

Agency

Version

and

Year of

Release

Original

Supplier

Description

(include

major

features/

services

only)

Support

Provided

By

Web server Sun Java System

Web Server 7.0

7.0 SUN HTTP Server SUN

Application

Server

Glassfish

Application Server

3.0 SUN J2EE

Application

Server

SUN

Database Sybase IQ

Enterprise

15.1 Sybase ETL Sybase

Operating

System

Solaris

Page 175: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 175 of 241

The below list

is indicative

only

Proposed

Solution by

Software

Development

Agency

Version

and

Year of

Release

Original

Supplier

Description

(include

major

features/

services

only)

Support

Provided

By

Others

Reporting

Engine

Jasper Reports 3.7 Jasper Reporting

Services

Search Engine Search:

Unstructured data:

using Alfresco

search features

Structured Data:

Sybase DB Search

Engine & Custom

application interface

N/a N/a N/a N/a

Portal Server Glassfish

Application Server

7.0 SUN HTTP Server SUN

Workflow Engine jBPM 4.0 JBoss Workflow

engine

Rules Engine Custom Built N/a N/a N/a N/a

Directory

Services

Sun Directory

Services

7.0 SUN LDAP SUN

DMS/CMS Alfresco

Email/Messaging N/A

Security Physical Security,

Network Security,

DB Encryption

(MySQL), DB

Access Controls,

Role Based Access

Control (Custom

Developed), LDAP

(Sun Directory

Services),

N/a N/a N/a N/a

Identity

Management

Open SSO 7.0 SUN LDAP SUN

Audit log4j, Custom Built N/a N/a N/a N/a

ETL + Data

Quality

Sybase ETL 15.1 Sybase ETL Sybase

Page 176: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 176 of 241

6.6 ANNEXURE- V-Data Capture and Application Integration

The purpose of this section is to provide the details for developing the approach and

formulate a strategy for legacy data capture for implementation of Crime and Criminal

Tracking & Network System (CCTNS) for the State of Rajasthan. This project essentially

involves implementation of an Enterprise Wide application to automate all the processes of

Police. An implementation of this nature essentially requires certain data to be available

without which it would not kick start. The aim of this document is to enable the availability

of such data by virtue of the following

Identification of Data

Isolation of Data

Quantification of Data

Development of strategy for integration/capture of Data.

It is envisaged that Data digitization activity shall not be done through scanning of

documents. SI shall develop the requisite tools/ interfaces for capturing the legacy data

through operator based data entry including development and customization of forms in

enhanced CAS, wherever required.

6.6.1 Types of Data

For any enterprise solution to be implemented, the following would be the categories of data

that need to be captured and ported into the system.

a) Master Data

b) Legacy transaction data to enable the system start up

c) Data for the Content/ Document Management System.

The above types of data would need a comprehensive deployment strategy to ensure smooth

and integrated transition. The scope of this deployment strategy would include laying down

the broad guidelines for the following:

i. Preparation of a comprehensive data digitization plan.

ii. Data creation – Entries/Porting of FIRs, Investigation Details, Case Diaries,

Prosecution Details, Verification Details Etc.

iii. Data migration & conversion – Including the conversion of existing computerized

data into an appropriate format for the proposed new system.

iv. Testing of the conversion programs.

v. Testing of the migrated data validating a particular reporting, auditing, or

processing objectives as per the business rules.

a) Master Data

Master data comprises a set of the non-transactional data entities of an organization (also

called reference data). This data forms the basis for designing and further carrying out

transaction on the system. Management of such data is called Master Data Management

Page 177: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 177 of 241

(MDM). The main objective of MDM is providing processes for collecting, aggregating,

matching, consolidating and quality-assuring, persisting and distributing such data

throughout an organization to ensure consistency and control.

Issues

MDM seeks to ensure that an organization does not use multiple (potentially inconsistent)

versions of the same master data in different parts of its operations, which can occur in large

organizations. Other problems include issues with the quality of data, consistent

classification and identification of data, and data-reconciliation issues.

One of the most common reasons some large organizations experience massive issues with

MDM is integration. Two organizations which wish to integrate will typically create an entity

with duplicate master data (since each likely had at least one master database of its own

prior to the integration). Ideally, database administrators resolve such duplication in master

data as part of the integration. In practice, however, reconciling several master data systems

can present difficulties because of the dependencies that existing applications have on the

master databases. As a result, more often than not the two systems do not fully merge, but

remain separate, with a special reconciliation process defined that ensures consistency

between the data stored in the two systems. Over time, however, as further integration occur,

the problem multiplies, more and more master databases appear, and data-reconciliation

processes become extremely complex, and consequently unmanageable and unreliable.

Because of this trend, one can find organizations with 10, 15, or even as many as 100

separate, poorly-integrated master databases, which can cause serious operational problems

in the areas of operational efficiency, decision-support, and regulatory compliance.

Solutions

Processes commonly seen in MDM solutions include source identification, data collection,

data transformation, normalization, rule administration, error detection and correction, data

consolidation, data storage, data distribution, and data governance.

The selection of entities considered for MDM depends somewhat on the nature of an

organization. In this case, MDM may apply to such entities as Police Units, Unit Entitlement,

Personnel Data and list of offences/Acts/IPC. MDM processes identify the sources from

which to collect descriptions of these entities. In the course of transformation and

normalization, administrators adapt descriptions to conform to standard formats and data

domains, making it possible to remove duplicate instances of any entity. Such processes

generally result in an organizational MDM repository, from which all requests for a certain

entity instance produce the same description, irrespective of the originating sources and the

requesting destinations.

i. Source of Master Data

Police Organizations have several Police stations spread all across the state. Currently the

level of automation in the state police is restricted to the implementation of CIPA (Common

Integrated Police Application) which has been developed by NIC on Linux (Knoppix)

platform using PostgreSQL as the standard database. CIPA has been implemented at 566

Police stations out of a total of 760 (as on 31-03-2011).

Page 178: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 178 of 241

Figure 11: Source of Master Data

The aim of CIPA was to automate the police functioning as far as registration, investigation

and prosecution processes are concerned.

Following are the Master Data requirements that need to be captured/ ported into the

CCTNS system for it to kick start.

(a) Organization Structure of the complete organization

(b) Unit wise hierarchy: Outposts Police Stations and special Police stations CO/

DySP SP IG Range Police HQ

(c) Details of users at all locations

(d) Local and Special Acts of Rajasthan and

(e) History of Police Station for which data is being migrated

ii. Integration and Updation of Master Data

CCTNS Master Data will include organization structure, unit hierarchy, appointment details,

posting details, etc of all the police personnel. It will collate all relevant data under one

umbrella to ease police functioning.

Figure 12: Integration with other Applications

0

200

400

600

800

1000

Sum Police StationsSum of CIPA

Sum of Non CIPA

863

566

297

iHRMS

(Personnel Data)

RTO

(Vehicles & Licenses)

(Other application as State requires)

NAFIS/AFIS

(Finger Prints)

CCTNS Master Data

Page 179: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 179 of 241

b) Legacy Transaction Data Capture

In addition to all the types of masters discussed above, there is another important type of

data that needs to be captured in order to make the implementation of CCTNS system

effective. This is the legacy transaction data that gives the history of transactions especially

in the terms of FIR, Investigation Reports etc. Every activity in the envisaged CAS

application involves a transaction in complaint registration, Investigation, Prosecution etc.

As far as CIPA implementation is concerned FIR registration, Investigation and Prosecution

functions have been automated. However all the other functions are manual. These manual

transactions in the current system are recorded in ledgers, registers and files. Certain

activities which create transaction data are listed below:

i. Registration of FIR

ii. Registration NCR, Missing person, Unidentified dead body, Unclaimed property,

Preventive action, Proclaimed Offenders

iii. Investigation (Crime Details, Arrest/ surrender, seizure, chargesheet/FR)

iv. Prosecution (Appeal, Bail, Movements, Reopening and Reassigning, Summons/

Warrants, result of the case)

v. FSL (Inward receipt and Outward receipt)

The capture of this legacy transaction data is the most difficult part of data capture effort in

case of any implementation, because this data needs to be identified, cleansed and ported.

The activities involved in the capture of this kind of data are as follows:

i. Identification and Isolation of Digitized Data

ii. Identification and isolation from paper based forms/registers/ledgers

iii. Formatting based on the database structure

iv. Cleansing and validation

v. Entry into the database through forms

vi. Testing

Figure 13: Digitization Recommendation

CAS Application

Legacy Transaction Data

(FIR Registration/

Investigation/Prosecution)

Identification

Isolation

Formatting

Cleansing

Validation

Testing

Page 180: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 180 of 241

1. Legacy data:

The following list comprises of all the legacy data that needs to be digitized from

all the 863 Police Stations under CCTNS Rajasthan. SI has to digitize around

20.56 lacs case files plus cases upto Project Go-Live, all History-sheeters

(around 8400), Proclaimed Offenders (around 3250), Absconders (around

5550) and Standing Warranties (around 54000) data as a part of this project in

consultation with Rajasthan Police. Each case file can be assumed to consist of

approximately 10 pages. Out of 21 lac case files approximately 12 lac case files

have been registered in CIPA registration module (IIF 1), 8.5 lacs under

investigation module (IIF 2 to IIF 5) and 3.78 lacs under prosecution module

(IIF 6) (detailed break-up mentioned in below table). Also refer the sample IIF

forms at NCRB website (ncrb.nic.in/IIF.pdf).

Case files details (2004-2013)

Cognizable crimes registered during 2004-2013

S. No. Year Total no. of offences

1 2004 186161

2 2005 171989

3 2006 177934

4 2007 186501

5 2008 191533

6 2009 210345

7 2010 212767

8 2011 224604

9 2012 242552

10 2013

(estimated)

251284

Total 2055670

CIPA records (as on September' 2013)

S. No. CIPA Phase District Reg. Inv. Pros.

1 CIPA Phase - I Bharatpur 89292 16531 8064

2 Alwar 97649 67193 18777

3 Bhilwara 57722 41390 28192

4 Jaipur Rural 75237 53551 34454

5 CIPA Phase - II Ajmer 66638 60668 33841

6 Bikaner 43727 40787 23935

7 Ganganagar 68571 67083 21496

8 Jaipur East 50751 36397 24681

9 Jaipur North 37727 36198 29134

10 Jaipur South 45728 34424 14094

11 Jodhpur City 36959 32225 13343

12 Jodhpur Rural 26730 25649 9227

13 Kota City 51575 43321 10910

Page 181: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 181 of 241

14 Kota Rural 28432 27970 25739

15 Udaipur 73009 65723 34160

16 CIPA Phase - III Baran 32264 14197 215

17 Barmer 25163 19373 3576

18 Bundi 31941 21036 17146

19 Churu 22330 12874 3197

20 Dausa 34947 14701 826

21 Dholpur 23469 8235 192

22 Jalore 19116 10532 8164

23 Jhalawar 33928 22054 2280

24 Karauli 26892 16275 360

25 Nagaur 33524 15376 508

26 Sawai Madhopur 28412 19066 278

27 Sikar 37481 7747 0

28 Tonk 28759 25358 12076

TOTAL 1227973 855934 378865

Indicative list of documents to be digitized:

S No. Group List of Forms

1

IIF

First Information Report (IIF-1)

2 Crime Details Form (IIF-2)

3 Arrest/Court Surrender Form (IIF-3)

4 Property Search & Seizure From (IIF-4)

5 Final Form/Report (IIF-5)

6 Court Disposal Form (IIF-6)

7 Result of Appeal Form (IIF-7)

Flow diagram of Integration and Updation of Content/Document Management System:

CIPA

(Policy related content/ CrPC/IPC)

Digitized Documents

Enhanced CAS Document Management System

Page 182: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 182 of 241

Figure 14: Integration and Updation of Content/Document Management

System

a) Quality Control of Data Capture

Challenge of data conversion / migration is the coordination between three normally

disparate groups

Functional (From Business)

Legacy functional

Legacy technical

It is strongly recommended that the project assigns a data conversion manager.

Data conversion process will ensure that there is a focus on conversion requirements from

the start of the project. Overall conversion strategy for the project determines the approach

for data conversion and the tools and methods to be used for conversion. Data requirements

for the test database, conference pilot and the Production database will be met by this

process.

i. The conversion process will include designing and building conversion programs

and the actual data conversion from the legacy systems. The conversion process

will ensure that the team is prepared in advance with extraction scripts for the

legacy systems and the upload scripts for the new applications.

ii. Data conversion is accomplished through manual and/or automated means and

includes the creation of any data needed for new data records. It enables the new

system to accurately reflect the current status of organizational data at the start of

production. The term "data conversion" is used in the method in a wider sense

than the dictionary definition. It is defined to include four separate elements:

Purging/cleansing of existing data.

Reconciliation/balancing of the old data and the old system/new system.

Creation of new/additional data.

Conversion of the old data to the new system to create master file data and

opening balance data (where appropriate) for the new system.

iii. The conversion of data from an old system to a new system usually requires the

creation of a conversion system. The conversion system can be manual,

automated or both. Logically, conversion is taking data from one system and

moving it to another system at a point in time.

iv. Conversion may translate the format of the data but not update it and Conversion

programs may be run more than once or multiple times with each execution

converting a subset of data, such as one calendar month.

v. May be run multiple times for parallel running, phased or staged implementation

where progressive data conversion is required, and may be run multiple times

until reconciliation shows a valid conversion.

vi. System development support may be required to create a data conversion system.

In addition to the normal problems of system development, data conversion has

several unique requirements.

vii. Data may need to be created if it does not exist. Current data may need to be

purged, corrected or verified. The existing system (manual or automated) may

Page 183: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 183 of 241

need to be corrected or balanced within itself before conversion can be

commenced or completed;

viii. Timing of the data conversion process may vary, e.g., data cleansing or creation

may precede other tasks by several months.

ix. The following is a description of the various tasks that make up the data

conversion activity:

1. Analyze Data Conversion - Define and analyze data conversion entities,

both on the legacy systems and on the receiving Application.

2. Design/Build Conversion Programs - Design, construct and unit test all

conversion programs.

3. Implement Feedback from Integration Testing - Update design and code

for conversion entities, based on input from system prototyping and

testing

4. Prepare for Cutover - Make final conversion modifications to prepare for

system cutover.

6.6.2 Migration Strategy

Rajasthan Police proposes that the data digitization and migration effort of legacy data be

divided into the following phases:

Figure 15: Process Flow -Data Digitization & Migration

SI shall undertake the digitization of all case files starting 1st January 2004 to the date of Go-

Live of that police station. However, for the records dated earlier than 1st January 2004, all

records which belong to any of the following category need to be considered for purpose of

digitization and migration:

Cases having standing warrants

Cases having proclaimed offenders

Cases having absconders

Cases having history-sheeter

Filtering

Updating

Migration

Validation

Page 184: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 184 of 241

SI is required to update the records available in CIPA by referring physical case files

available in police stations. The data digitization utility provided by NCRB may be used for

the purpose of migration of records from CIPA to CAS. However regarding the data of IIF 6

& 7, SI may use CAS directly for entering the data.

SI shall undertake a proof of concept to demonstrate the data digitization and migration

process to the Rajasthan Police. Based upon the performance necessary approval shall be

provided by the Rajasthan Police subsequent to which SI shall undertake the data

digitization and migration exercise across all the locations.

Filtering: Each case file will be filtered for any irrelevant content. During this phase

it will also be ensured that the quality and sequence of the document is in conformity

to the original. All the information from the filtered document shall be validated

against the digitized information (in CIPA) available with Rajasthan Police.

Updating: Based on the case file the missing information shall be updated for

making the record complete for validation and migration.

Validation: Before each case is ported onto the system, validation is an important

activity that needs to be carried out for ensuring consistency and integrity. During

this phase the activities in all the above phases will be validated and

verified.Migration: The validated case files are finally ported into the system and

then data is live for use.

Page 185: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 185 of 241

6.7 ANNEXURE- VI-CAPACITY BUILDING & CHANGE MANAGEMENT

6.7.1 Introduction

The purpose of this section is to identify detailed requirements on Change Management and

Capacity Building to be implemented at the State. This section also provides the context to

the changes expected due to CCTNS and their anticipated impacts on skill development

requirements for the workforce. In addition, the document provides details of Capacity

Building initiatives taken by Rajasthan Police; capacity building and training requirements

plan and its implementation w.r.t. the scope of System Integrator.

State specific requirements are defined through a comprehensive understanding and

analysis of police functioning for the State, the issues and challenges faced in adopting the

new technology to improve the police functioning and enhance its efficiency as well as the

training need and capacity building requirements of the police department and its personnel

with respect to implementation of CCTNS project in the state and its sustenance.

6.7.2 Overview of the Capacity building Scope

a) Identification of Trainers (Internal)

Rajasthan Police is under the process of identification of qualified trainers with relevant IT

experience and training competency within each District Mission Team and State Mission

Team. SI would be responsible for training them and building their capacity for all the other

IT initiatives of Rajasthan Police. These Trainers will be responsible for implementing the

Capacity Building interventions beyond the scope of the System Integrator.

b) Identification of Trainers (Police Training Colleges)

Rajasthan Police is under the process of identification of qualified Trainers with relevant IT

experience and training competency within each of the Police Training Colleges in the State,

who will be directly trained by the System Integrator. These trainers will be responsible for

including training on CCTNS within the training college curriculum and impart the training

on CCTNS to the new recruits and current personnel (refresher training) at the Police

Training Colleges.

c) Identification of Trainees

Based on the nature of their responsibilities and their requirements from CCTNS, police staff

can be classified into the following categories for training purposes:

Group I: Key senior officers (ADGP, IG, DIG, SP) responsible for Crime, Law and

Order, IT, etc. who are directly impacted by the CCTNS with respect to receiving/

analyzing the reports through CCTNS.

o Change Management and Role-based training will be carried out for these

officers at suitable location in the State by the System Integrator.

Group II: Key officers (ASP, DySP, INSP., SI, ASI) in charge of a District/ Circle/

Police Station who are directly impacted by the CCTNS with respect to reviewing

the police station performance through CCTNS, reviewing the reports generated

Page 186: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 186 of 241

by the system, carrying out the required analysis using CCTNS and providing the

necessary guidance to the officers.

o Change Management and Role-based training will be carried out for these

officers at suitable location in the State or respective Districts/

Commissionerates by the System Integrator

Group III: Key officer (Station Writers, Court Duty, Head Constables, Constables)

in each of the Police Stations and Higher Offices who will use CCTNS for

capturing the data/investigation forms, generating the reports and utilize the

basic and advance search features of CCTNS to service the general service

requests and aid in investigation process.

o Orientation to Change Management and Role-based training will be carried

out for the identified officers at District Training Centers in the respective

Districts/ Commissionerates by the System Integrator

o Refresher training, subsequent training to the remaining officers/constables

in the Police Station and Higher Offices can be carried out by the internal

trainers subsequent to the System Integrator trainings

The main challenges to be addressed effectively by the SI are the geographically dispersed

trainee base, wide variability in education and computer proficiency and minimal availability

of time. The SI holds the responsibility for creation of a detailed and effective training

strategy, user groups and classifications, training plan and guidelines, detailed training

material, training program designed their delivery to the target groups.

The SI holds the responsibility for creation of training material, designing the training

programs and their delivery to the target group. The SI shall be responsible for the following

activities as part of the End User and Train the Trainer Training:

d) Develop Overall Training Plan

SI shall be responsible for finalizing a detailed Training Plan for the program in consultation

with Rajasthan Police covering the training strategy, environment, training need analysis

and role based training curriculum. SI shall own the overall Training plan working closely

with the Rajasthan Police Training team. SI shall coordinate overall training effort.

e) Develop District-Wise Training Schedule and Curriculum

SI shall develop and manage the District-Wise training schedule in consultation with

Rajasthan Police, aligned with the overall implementation roadmap of the project and

coordinate the same with all parties involved. Training schedule shall be developed by

solution and shall be optimized to reduce business impact and effective utilization of

Training infrastructure and capacities. The training curriculum for the CCTNS training

program should be organized by modules and these should be used to develop the training

materials. The training curriculum outlines the mode of delivery, module structure and

outline, duration and target audience. These sessions should be conducted such that the

users of the application/ modules are trained by the time the application ―goes-live‖ in the

district with minimal gap between completion of training and going live of modules.

Continuous reporting (MIS) and assessment should be an integral function of training.

Page 187: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 187 of 241

f) Deliver Training to End Users

Based on their needs and the objectives of CCTNS, training programs could be organized

under the following themes:

i. Change Management training - Sensitization and awareness creation regarding

benefits of CCTNS. This part of the training focuses on the general benefits of IT

systems such as automation of routine and redundant tasks or moving from the

paper-based records management to a more sophisticated electronic records

system that can alleviate the efforts to create reports.

ii. Role-based training on the CCTNS application – This training should be in a role

based, benchmarked and standardized format, multi-lingual and lead to learning

completion and assessment. It should also allow for self-learning and retraining.

Training would include mechanism for demonstration using audio/ video/

simulated/ demo practice exercises and evaluation of trainees.

iii. ―Train the Trainer‖ programs- where members of the police staff would be trained

to enable them to conduct further training programs, thus helping build up

scalability in the training program and also reducing the dependency on external

vendors for training.

iv. System Administrator training- a few members of the police staff with high

aptitude would be trained to act as system administrators and troubleshooters for

CCTNS.

SI shall deliver training to the end users utilizing the infrastructure at the District Training

Centers. Role-based training for the senior officers will be carried out at suitable location in

the State by the System Integrator.

SI is required to install the CCTV cameras across all the training locations and ensure that its

feed is made available over the network. The network connectivity for this purpose shall be

provided by the Rajasthan Police. SI is required to get approval of specifications of the CCTV

cameras prior to installation. For the purpose of payment related to training, SI is required

to submit the recording of the training along with the invoice to the Rajasthan police.

SI shall also impart simulated training on the actual CAS (State) with some real life like

database. The SI should create case studies and simulation modules that would be as close to

the real life scenario as possible. The objective of conducting such trainings would be to give

first hand view of benefits of using CAS system. Such training should also be able to provide

the participant a clear comparison between the old way of crime and criminal investigation

against the post CCTNS scenario. This training may seem similar to role play training

mentioned in the section above. However, in this simulated training, the SI would ensure

that the IO‘s are provided an environment that would be exactly similar at a Police Station

post CAS (State) implementation.

Most of the training would be an Instructor-Led Training (ILT) conducted by trained and

qualified instructors in a classroom setting. To maintain consistency across CCTNS trainings,

standard templates should be used for each component of a module.

An ILT course will have the following components:

Course Presentation (PowerPoint)

Page 188: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 188 of 241

Instructor Demonstrations (CAS - Application training environment)

Hands-on Exercices (CAS - Application training environnent)

Application Simulations: Miniature version of CAS Application with dummy data

providing exposure to the IOs to a real life scenario post implementation of CAS

Job Aids (if required)

Course Evaluations (Inquisition)

In addition to the ILT, for the modules that may be more appropriate to be conducted

through a Computer Based Training (CBT), a CBT should be developed for them. CBT should

involve training delivered through computers with self instructions, screenshots, simulated

process walk-through and self assessment modules.

Select set of police staff with high aptitude group and/or relevant prior training, are to be

imparted with the training/skills to act as system administrators and also as troubleshooters

with basic systems maintenance tasks including hardware and network.

g) Develop Training Material

i. Customization of the Training Manuals, User Manuals, Operational and

Maintenance Manuals provided along with the CCTNS CAS Software.

ii. Design and development of the Training Manuals, User Manuals, Operational

and Maintenance Manuals for the modules developed at Rajasthan Police level.

In cases where the training material may be made available by MHA/ NCRB, it is the SI‘s

responsibility to ensure the relevance of the material to the State/UT, customize if necessary

and own up the delivery and effectiveness. All the training material needs to be provided in

two languages i.e Hindi and English.

SI shall ensure that the training content meets all the objectives of the training course. The

material shall be developed in English and Hindi based on the target group. SI shall also

develop the training material for delivery through Computer Based Training, Instructor Led

Training, Online User Material/ Help Manuals and Job Aids.

SI shall provide detailed training material providing step-by-step approach in soft and hard

copies to all police stations and offices for reference.

Rajasthan Police has developed an online Learning Management System for providing access

to all training content online including documents, demo, audio, video, simulation and

practice, assessment, self learning and context sensitive help and monitoring, support and

reporting etc., which is deployed at State Data Centre. The SI may take-over and improves

upon the existing application to suit the above requirements. Brief details of LMS are

mentioned below:

Page 189: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 189 of 241

S.

No.

Applicatio

n Name

Type Description Deployment

Details / Current

No. of users

Application

Information

1

Learning

Managemen

t System

Online Developed on

Java Platform

Database –

MySQL

User

Authentication -

Active

Directory

Installed in State

Data Centre,

Jaipur

Expected to be

used by approx.

50,000 users

Online Training

nomination

e-Resource

Management

Typing Tutorial

Online Exams

Online

Feedback/

Survey

h) Deliver Training to Trainers (Internal and Trainers from the Training

Colleges)

SI shall help Rajasthan Police in assessing and selecting the internal trainers as well as the

trainers at training colleges who can conduct the end user training subsequent to the training

by the SI. SI shall coordinate the ‗Train the Trainer‘ session for the identified trainers to

ensure that they have the capability to deliver efficient training. For Train the Trainer

training the Rajasthan Police would nominate 2 trainers per District.

In addition to the training delivered to the end-users, the trainers should also be trained on

effectively facilitate and deliver training to end users. Also, it is advisable to always run pilots

for any training program before deployment. This training will hence serve as the pilot and

as a training session for trainers as well. In addition to this the SI should take support from

the ToT trained staff for delivering the training in the respective Districts. In addition the

end-user training sessions, ToT training will consist of three segments:

i. The first segment will be set of workshops covering effective presentation skills

and coaching techniques and discussing the benefits and structure of the trainer

model.

ii. The second segment will be the formal CCTNS training which will consist of all

modules of CCTNS relevant for their role. This would also include Networking

concepts (in view on RSWAN, SecLAN, VPNoBB), Troubleshooting computer

hardware, Application software and Operating system, Application installation

and up-gradation of patches, User creation & role management and effective use

of LMS.

iii. The third segment will be a teach-back session where trained trainers will present

course content and receive feedback regarding content, flow, and presentation

techniques. This will also include a feedback session where trainers can provide

feedback on the training materials, flow, comprehension level, and accuracy.

i) Training Effectiveness Evaluation

To measure the effectiveness of all the end user trainings conducted by SI as part of this

project, SI shall be responsible for preparing the set of questions, i.e. a question bank from

Page 190: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 190 of 241

which random questions would be selected and uploaded for online test of the trainees,

Rajasthan Police or its nominated agencies/ representatives would validate and approve the

question bank. SI will be required to make all arrangements, including the software for

conducting online test, trainees‘ attendance while premises and infrastructure would be

provided by Rajasthan Police.

For the purpose of evaluation and passing criteria following process shall be followed:

Online Examination shall be administered by SI under the supervision of competent

Police officials (District e-Mission Team). As part of this examination each trainee

shall also undertake the role based test on CAS in a dummy environment. SI has to

ensure that the dummy/test environment of CAS is accessible across all training

centers.

SI shall also ensure that each trainee is registered in Learning Management System

(LMS) and CAS application. District eMission Team shall verify this as part of

completion of training.

SI shall also compile the number of sessions undertaken by the trainees in LMS.

District eMission Team shall validate that a minimum number of training sessions

have been undertaken by each trainee. The minimum number of sessions required by

each trainee shall be defined mutually between SI and the Rajasthan Police at the

time of finalization of training plan.

Rajasthan Police shall deploy a central team which shall monitor the progress of

training and its effectiveness.

Based on the above three steps the final passing certificate shall be issued by the

competent authority stating that the concerned trainee is ready for using CAS in

police station. A minimum of 90% of trainees from each batch need to pass without

which SI shall be required to retake the training of failed candidates of those batches.

If in a particular batch 90% of candidates pass the test, training of that batch would

be considered as successful and training of failed trainess of these batch would be

arranged by competent authority at his own level.

In case of dispute the competent authority at PHQ level would decide the issue.

SI shall consolidate all the certificates and submit it along with the invoice as stated

in the payment schedule in Volume 2 of this RFP.

Rajasthan Police will periodically monitor the training effectiveness through the

performance metrics and Service levels and provide necessary feedback to SI. SI shall be

responsible for incorporating the feedback and arrange for conducting refresher training,

wherever needed.

6.7.3 Training and Capacity Building As-Is

a) Need for Capacity Building

The Department of Police, Government of Rajasthan has recognized the potential of

Information and Communication Technology (ICT) in strengthening the performance of the

police delivery system in the State and is keen to adopt & infuse IT in the applicable areas.

Accordingly, the department has defined the following key objectives for the CCTNS project

(IT initiative of the department):-

The following goals and objectives have been defined for CCTNS:

Page 191: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 191 of 241

i. To Empower the Police Officers on duty to effectively provide services to the

citizens and other departments

ii. To eliminate Drudgery from the current Police Station processes, essentially

eliminating the need of repetitive data entry at various data entry points

iii. To Provide Enhanced Tools for Investigation, Crime Prevention, Law & Order

Maintenance and other functions like Traffic Management, Emergency Response,

etc.

iv. To Increase Operational Efficiency

v. To create platforms at State and Central levels for sharing crime and criminal

information / databases across states and across the country. This would enable

easy sharing of real-time information/ intelligence across

vi. To implement secure channels for data and information sharing police stations

and districts at the State level and across states at the National level

vii. To improve the service delivery to the public/ citizen/ stakeholders

Capacity Building is a highly critical component of CCTNS. The objective of CCTNS Capacity

Building (CB) initiatives is to empower the direct users and other stakeholders of CCTNS to

optimally use CCTNS and enhance outcomes in crime investigation, criminals tracking and

other core police functions; and also ensure a smooth functioning of CCTNS.

Success of CCTNS, both in short term as well as long term has unswerving dependency on

the level of penetration it is able to accomplish. Drawing upon the diverse challenges

expected for the implementation of CCTNS, specifically the workforce challenges, it is

apparent that capacity building is the need of the hour to further ensure that CCTNS as a

program is successful.

The implementation of the multiple solutions and new process will significantly impact the

functioning of police force across India. The challenge will be to empower and support the

workforce to understand, learn, and adopt the new way of working in order to fully realize

the potential benefits of this fundamental change.

To manage a large scale implementation which impacts a mammoth number of users directly

or indirectly, a comprehensive and well-structured Capacity Building approach is required.

Capacity Building approach would include availability of requisite infrastructure and

resources to support the entire program. It would also ensure that the required user groups

receive sufficient training to equip them with the skills required to efficiently use or be aware

of the new processes and/or systems.

In totality Capacity Building Programs will assist in:

Identify the training audience groups

Training delivery methods

Training development and delivery resource

Hence, the objectives of developing a Capacity Building Program are:

To motivate, train and capacitate police workforce

Efficiently embark on the revised roles and responsibilities as part of CCTNS

Embed sustainability of the project

To ensure successful implementation of CCTNS

Page 192: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 192 of 241

b) Snapshots of Capacity Building Initiatives in the State

Capacity Building is an important aspect of this CCTNS project. It envisages improving the

efficiency of the police personnel, basically, by providing role based and ICT basic training at

the initial stage of Capacity Building. Under Capacity Building scheme Rajasthan Police

personnel of all ranks, are to be trained on various relevant aspects of CCTNS Project

including Basic Computer Knowledge. As a first step towards this, Rajasthan Police wishes to

create computer awareness among all the officers and men of State Police force.

c) Institutional Framework for Police Training and Capacity Building in

Rajasthan

The computer training to the police personnel in the state has been started since 1995 during

implementation of CCIS project and CIPA project (in 2006). However, under CCTNS project,

―Basic Computer Training‖ is envisaged to acquaint and aware, the Police Personnel, with

basic function and nature of computers and its application. Concerted effort should be

directed towards providing exposure of computers especially to ground level functionary.

Figure 16: Police Training - Organizational Structure

Addl. DGP (Training) is in charge of Training both initial and in-service for various ranks for

Rajasthan Police. He controls various training Institutions including RPA, RPTC, Police

Training Schools and Police Motor Driving School in the state and has to nominate officers

for undergoing training in central government training institutions. He has to get the

syllabus for various trainings revised by DGP. The Training Directorate keeps a record of all

initial and in-service trainings.

IGP of the Range periodically visits the police training schools or institutions in his Range

and guide the Principal/commandant. He sends his observations to ADG (Training)

regarding the functioning of police training institutions periodically.

Page 193: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 193 of 241

The details of Rajasthan Police current strength :-( Source: www.police.rajasthan.gov.in)

Police Officials Current strength Sanctioned Posts

Indian Police Service Officers 162 206

Rajasthan Police Service Officers 565 795

Police Subordinate Service

Inspector 909 1162

Sub Inspector 2279 4084

Assistant Sub Inspector 3963 5661

Head Constable 7886 10033

Constable 59147 71414

Police Training Institutions in the State

Police Training Institutions Role

1. Rajasthan police Academy, Jaipur Main centre of training for Rajasthan

Police officers of the level of constables

to gazetted officers (RPS/IPS)

Imparts training of S.I. to IPS officers of

Rajasthan police

2. Rajasthan Police Training College,

(RPTC) Jodhpur

Imparts training to R.A.C. personnel

from the rank of constable to Company

Commander

also offers training of other armed and

civil police personnel

3. Police Training School, Kishangarh

(1950) Imparts training to police constables up to

Inspector rank officers

4. Police Training School Kherwara (1975) -do-

5. Police Training School, Jhalawar -do-

6. Police Training School Jodhpur (1975) -do-

7. Police Motor Driving School, Bikaner

(1999). trains police officials in vehicle driving and

maintenance

8. Security Training School (STS), at RPA,

Jaipur (1962) conducts specialization and refresher courses

on various aspects of security and intelligence

to train the SSB personnel

9. District Training Centers (DTC) There are 41 DTCs across Rajasthan, under

CCTNS project where Basic ICT Awareness

training is conducted.

Table 14:Police Training Institutions in the State

Page 194: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 194 of 241

Training in these centers is given keeping in mind the growing complexities of crime,

violence, communal and law and order situations. New subjects relating to human rights,

atrocities against women, police custodial deaths, police-public relations, juvenile

delinquency, cyber crime, pollution control and environment awareness have to be tackled.

The trainees are imbued with the principles of social service and made familiar with the

latest findings in criminology, human behavior, police-community relations, gender issues,

community policing, human resource development and other allied subjects.

Training Courses Conducted at Rajasthan Police Academy

RPA conducts following types of training courses for different ranks of Police Officers in the

state. Promotion cadre courses are held from time to time for posts of the rank of head

constables to inspectors. Various types of special training programs, including on the job

training is being imparted to police personnel. Training is a continuous process and the

courses are geared to meet the challenges faced by the police personnel.

S. No. Course Type Target Audience/Duration

1 Basic Courses 1. IPS officers/ 6weeks

2. RPS officers/1 year

3. SIs-/1 year

4. Constables-/9 months

2 Promotional courses (45 days)

1. ASI to SIs

2. SIs to Inspectors

3. Head constables to ASI

3 Specialized courses

a. Computer awareness

b. Cybercrime investigation

1. SI to ASP (2 days)

2. SI to SP (2 days)

4 Refresher Courses

a. Computer appreciation courses- 4

days, 1 week, 2 week and 4 weeks

b. Orientation course for Dy.SP

c. Induction course for

Inspectors/SI

1. RPS officers

2. SIs

3. Constables

5 Training on Soft Skills HC to Inspectors (4 Days)

Table 15: Training Courses

d) Capacity Building Initiatives undertaken by the Department

The State Crime Records Bureau is designated as Nodal Agency in the state for

implementation of CCTNS project in the state. The table below gives a snapshot of the

personnel trained so far in basic computer training (ICT Basics of 5 days),

Designation No. of Personnel

Trained by In-house

trainers

No. of Personnel

Trained by RKCL (Out-

source)

Addl. S.P. 53 -

DY. S.P. 160 -

Page 195: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 195 of 241

Ins. 495 -

S.I. 1178 -

A.S.I. 2332 -

H.C. 2899 -

CONST. 25707 2620

OA/ UDC/ LDC 242 -

TOTAL 33066 2620

Table 16: Trained Personnel in ICT Courses

As a part of CCTNS capacity building program, following initiatives have been planned/

undertaken by the state government

Strengthening Capacity of the existing training institutions:

Establishment of computer lab at District level Training Centers (DTCs) to

conduct Basic ICT training for police personnel at district level and their capacity

building

Emphasis on capacity building i.e. computer awareness and training before

implementation of the project

Focus on training of all police personnel in the state

Integration of computer training in the induction training curricula of all police

cadres

Provision made to provide computer training in the In-service training, refresher

training as well as in Promotional training courses

The infrastructure for computer training made available during 2010-11 to the

police training institutions including the DTCs under CCTNS project is indicated

in the table below:

i. Infrastructure provided to Police Training Institutions (CCTNS

Project):

Infrastructure SCRB RPA RPTC PTSs (5) District

Training

Centers (41)

Total

Server Computer

(High-end

computer)

2 2 1 1 x5=5 1x41=41 51

Computer 33 33 22 22x5 = 110 10x41=41 608

Printer 2 2 2 2x5 = 10 1x41=41 57

UPS 1

(5KV)

1

(5KV)

1

(5KV)

1x5=5 KV 0

1 (3

KV)x41=41

8 (5 KV)

41 (3 KV)

Page 196: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 196 of 241

LCD Projector 1 1 1 1x5=5 1x41=41 49

Multi functional

Printer

1 1 1 1x5=5 0 8

White screen 1 1 1 1x5=5 1x41=41 49

White Board 1 1 1 1x5=5 1x41=41 49

Internet

connectivity

Yes Yes Yes Yes Yes

Table 17: Infrastructure for Police Training Institutions (CCTNS Project)

Page 197: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 197 of 241

ii. Details of infrastructure provided to Police Training Institutions (to be considered for AMC)

S. No.

Item Qty Make Model Description Warranty Details

1 Server Computer (High-end Desktop)

43 Dell Optiplex Desktop computer with Intel V pro configuration. 19" TFT Digital Colour Monitor with Windows 7 preloaded with media and documentation

Upto 24-03-2013 (Expired)

2 Computer 430 Dell Optiplex Desktop computer with Intel Core 2 Duo. 19" TFT Digital Colour Monitor with Windows 7 preloaded with media and documentation

Upto 24-03-2013 (Expired)

3 Computer 147 Dell Optiplex Desktop computer with Intel Core 2 Duo. 19" TFT Digital Colour Monitor with Windows 7 preloaded with media and documentation

Upto 23-01-2014 (Expired)

4 Computer 22 Dell Optiplex Desktop computer with Intel Core 2 Duo. 19" TFT Digital Colour Monitor with Windows 7 preloaded with media and documentation

Upto 05-09-2014

5 Printer 43 Samsung (43 nos.)

ML-3471 ND

Laser printer resolution in dpi: Mono 600X600, paper size A4, print speed in PPM:32, Port:1 USB, Network card 10/100: Yes, Duplexing: Yes

Upto 24-03-2011 (Expired)

6 Printer 7 Canon (7 nos.)

LBP 6750 DN

Laser printer resolution in dpi: Mono 600X600, paper size A4, print speed in PPM:32, Port:1 USB, Network card 10/100: Yes, Duplexing: Yes

Upto 23-01-2012 (Expired)

7 Multi functional Printer

7 Canon MF4570DN Digital Copier & multifunctional Office machine printer, Type: Laser, Mono/ Colour: Mono, Min. printing speed: 25 ppm, Category: Duplex, ADF/ DADF: ADF, N/w:Yes, Fax: Yes

Upto 24-04-2012 (Expired)

8 UPS 3 kVA with DC Power pack

41 Numeric 3 kVA Online UPS with isolation transformer suitable for single phase AC input and single phase AC output, Floor mounted type, Indicative backup time: 60 minutes

Upto 24-03-2011 (Expired)

9 UPS 5 kVA with DC Power pack

1 Numeric 5 kVA Online UPS with isolation transformer suitable for single phase AC input and single phase AC output, Floor mounted type, Indicative backup time: 60 minutes

Upto 24-03-2011 (Expired)

Page 198: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 198 of 241

S. No.

Item Qty Make Model Description Warranty Details

10 UPS 5 kVA with DC Power pack

14 IPC 5 kVA Online UPS with isolation transformer suitable for single phase AC input and single phase AC output, Floor mounted type, Indicative backup time: 60 minutes

Upto 23-01-2012 (Expired)

11 LCD Projector 42 Epson (42 nos.)

EB825H Brightness: 3000 Lumens Resolution: XGA Lamp life: 4000 hours Contrast ratio: 2000:1 Interface: Computer, Video, USB memory device, Wireless device with RGB out Accessories: Remote, Cables, Drivers on CD

Upto 06-05-2011 (Expired)

12 LCD Projector 7 Sanyo (7 nos.)

PLC XU 305

Brightness: 3000 Lumens Resolution: XGA Lamp life: 4000 hours Contrast ratio: 2000:1 Interface: Computer, Video, USB memory device, Wireless device with RGB out Accessories: Remote, Cables, Drivers on CD

Upto 29-02-2012 (Expired)

Table 18:Infrastructure for Police Training Institutions (CCTNS Project) for AMC)

Page 199: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 199 of 241

j) Challenges Anticipated for CCTNS

Like all big Information and Communication Technology (ICT) changes in organizations as

complex as the Indian Police, CCTNS is expected to face a lot of challenges. It is going to be a

huge change for everyone and requires strengthening of all supporting levers. In the course

of detailed As–Is assessment, following challenges were highlighted and needs to be kept in

mind while designing and implementing the capacity building program for CCTNS:

S.

No

Challenges

Type

Challenges to Pre-empt

1. People

Challenges

• Varying basic education level among police staff across PS

that impacts the uptake of any IT skills

• Feeling of ―…we were recruited for field work in police...

and not for Data Entry‖

• Lack of incentives

• Among the duties of the Police, documentation and data

entry holds least priority and value. Hence, it is very

difficult for police staff to focus on IT knowledge/ data

entry

• Working on computers is considered as a special skill and a

non – executive job

• Resources that are IT savvy are overburdened with

requests pertaining to computer operations by other

colleagues

• Age also plays a factor where staff beyond a certain age is

hesitant to pick up IT skills and hence resist usage of such

system

2. Process

Challenges

• State Police Manuals mandates maintaining multiple

registers that contains redundant and repetitive data

• There is no standardization of some reports and registers

across the state.

• Manual preparation of reports such as Monthly Crime

Review, Monthly Statement on Crime Statistic System

• Manual delivery of these reports as physical copies to

DCRB/ SCRB/ NCRB

• Duplicate data entry at multiple stages, within the same

office and at higher offices

• Manual preparation of Query responses for RTI,

Parliament, Higher Offices, etc

3. Infrastructure/

Technology

Challenges

• Power Supply Issues:

• Improper maintenance of hardware and software at PS

• Information available in silos

• Absence of an interconnected databases and networks at

the Control room

• Poor road connectivity at Semi-urban and Urban PS

Table 19: Challenges for CCTNS project

Page 200: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 200 of 241

6.7.4 Implementation Plan

a) Training and Capacity Building Plan

Capacity Building for CCTNS Project will allow State‘s Nodal Agency to manage day to day

challenges faced as a result of the project and to ensure a sustainable operating model during

and after implementation and stabilization.

Building capacities at various levels is critical to the successful implementation of the

recommended IT initiatives. Also, the training programs would cover Change Management

and awareness programs in addition to CCTNS-specific programs in order to ensure

adoption of the system at the police station level.

i. Main Training Themes

Based on their needs and the objectives of CCTNS, training programs would be organized

under the following themes:

1. Creating awareness about the benefits of ICT and CCTNS project

2. Role-based training on the CCTNS application

3. ―Train the Trainer‖ programs, where members of the police staff would be

trained to enable them to conduct further training programs, thus helping

build up scalability in the training program and also reducing the dependency

on external vendors for training.

4. System Administrator training: selected members of the police staff with high

aptitude would be trained to act as system administrators and troubleshooters

for CCTNS.

The above themes are expanded as below:

1. Change Management and Orientation to CCTNS training

Creating awareness about the benefits of ICT and CCTNS project

Highlight expected changes and role of various change agents in the project

Prepare the police workforce to accept imminent changes and impact of the

project

For the training program "Orientation to change management and Introduction

to CCTNS" (for Higher officials) the SI shall only invite Change management

experts/ eminent speakers who have national and international recognition

particularly in the field of e-Governance or relevant domain.

For the training program "Change Management and Introduction to CCTNS

(Middle & Junior Officials)" the SI shall only invite Change management experts/

eminent speakers who have national recognition and relevant experience

particularly in the field of e-Governance.

Page 201: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 201 of 241

2. Role based training on application software

The training should focus on the users getting comfortable to use the CCTNS

application.

This training would be tailored according to the unique requirements of each user

category. The training program must ensure to cover the following user

categories:

o Senior police officers (there might be sub-categories in this category with

training needs differing from each other; for example, the training for

SP/SSP will have to reflect their requirements in comparison to the

requirements of an IGP)

o Station House Officers (SHO)

o Investigating officers

o Station Writers

o Court Constables

o Duty officers

Hindi Keyboard Usage and Typing training, which shall contain the basics of

the usage of Hindi Keyboard. It shall also equip candidates with familiarity of the

computer keyboard and train them on typing skills so that work place efficiency and

productivity is improved.

3. “Train the Trainer” Programs

Select set of police staff with high aptitude group and/or relevant prior training,

are to be trained as trainers who would, in turn, train their colleagues.

―Train the Trainer‖ program could be held at a central location or two

The trained trainers would, in turn, conduct training programs for their

colleagues at lower levels such as the district

Trainers would be trained to impart training in role-based training on CCTNS.

4. Specialized training on system administration and troubleshooting

Select set of police staff with high aptitude group and/or relevant prior training, are to be

imparted with the training/skills to act as system administrators and also as troubleshooters

with basic systems maintenance tasks including hardware and network such as:

Information Security & IT Infrastructure Security

Data centre & Network Administration

Hardware Components, Installation & maintenance

Project Management tool and MIS

Data structures, Database management,

Page 202: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 202 of 241

6.7.5 Indicative Training Plan for the Members of Police Department

The following is an indicative training plan for members of state police departments based on the nature of their responsibilities:

S.

No.

Name of the

Training

Program

Indicative

Duration

(Days)

Indicative

Location

Target Audience Group

A

Group

B

Group

C

Avg.

Batch

Size

Estd.

no. of

batches

Total

trainees

1 Orientation to

Change

Management

and

Introduction to

CCTNS (Higher

Officials)

1 SCRB/

PHQ/ RPA

Addl DGs, IGs, DIGs,

SP of PHQ, IG Range,

CP, DCP, District SP

100 0 0 15 7 100

2 Change

Management

and

Introduction to

CCTNS

1 RPA, SCRB,

District

Training

Centers

Addl SPs, Dy S.P.,

SHO of Selected

Locations

67 163 320 12 45 550

3 Role Based

training and

Management

Information

System (Higher

officials)

1 SCRB/PHQ/

RPA

Addl DGs, IGs, DIGs,

SP of PHQ, IG Range,

CP, DCP, District SP

100 0 0 15 7 100

4 Role Based

Training and

Basic ICT

4+1 SCRB,

District

Training

Centers

Addl SPs, Dy S.P.,

SHO of Selected

Locations

67 163 320 12 45 550

Page 203: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 203 of 241

5 Change

Management

and Role Based

Training and

Basic ICT

4+1+1 SCRB,

District

Training

Centers

Investigation

Officers, Head

Constables,

Constables of

Selected

Locations,

Heads of various

Police Functions

of Selected

Locations

District Mission

Teams

CCTNS core team

3756 20756 12 2042 24513

6 Project

Management,

Document

Management

System/

Reporting

2 SCRB CCTNS core team 0 15 0 15 1 15

7 Information

Security & IT

Infrastructure

Security

15 SCRB CCTNS core team 0 10 0 10 1 10

Data centre &

Network

Administration

Hardware

Components,

Installation &

Page 204: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Page 204 of 241

maintenance

8 Train the

Trainer (Role

based)

5 SCRB 2 Trainers per

District/ Police

Training institute

- - - 15 6 100

Table 20: Indicative Training Plan

Page 205: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 205 of 241

6.7.6 Handholding Support

SI shall deploy one competent person per police station for 6 days (8 hours per day) in a

week for a period of 6 months or 12 months for 2 police station (would be decided by

Rajasthan Police) to support the staff in that police station and ensure that the staffs in that

police station are able to use CCTNS on their own by the end of the support period. The

Rajasthan Police would intimate the successful bidder the date of deployment of resources at

least 1 month before. Periodic assessment of Police station staff shall be done by Rajasthan

Police to assess effectiveness of Handholding support. SI shall provide sufficient training on

CAS and related Police functioning and network architecture for proposed stack . SI shall

also develop separate training material required for training the Handholding persons at no

extra cost to Rajasthan Police.

SI shall update the weekly attendance of Handholding staff verified by SHO on PM tool.

a) Handholding – Scope of work

The technically qualified and trained person deployed at police stations shall do the

following:

i. Use and troubleshoot for various hardware items provided at the police station

such as computer, printer, network components, digital camera, digital pen etc.

as required under the project.

ii. Use the core application software to perform the policing functions and data entry

as per the person‘s role.

iii. Able to perform any other functions that may be required under the ambit of the

CCTNS project

iv. As and when newer versions of system or application software are introduced

within the period of handholding support at a particular police station, the

handholding staff shall provide adequate training to the concerned police

personnel.

v. In case a new police official joins the police station during the handholding phase,

it will be the handholding person‘s responsibility to ensure that the official is

conversant with all the activities required towards CCTNS functioning.

vi. The handholding staff should assist the police in installation and updation of any

required software needed under the CCTNS project, including updation of PM

tool and Master data.

vii. Create documentation for Knowledge Transfer (KT) before 5 months of

Handholding period, that can be used by the police station staff after closure of

the handholding phase and train at least 2 persons identified by the respective

District Mission team.

viii. The handholding staff must be IT savvy and aware of basic IT trouble shooting

procedure. The person should be able to rectify level 1 issues related to CAS, other

software and hardware. The resolution to the queries raised by the police

personnel must adhere to the SLAs for post implementation phase defined in the

SI agreement. Handholding person shall maintain a separate register to record all

issues and their resolution.

ix. The handholding staff will also conduct CCTNS related workshops (if required)

and refresher courses for the police station staff and effectively use LMS.

Page 206: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 206 of 241

x. Handholding staff should have detailed understanding of CAS application and

should be able to provide support related to any technical or workflow related

query raised by the personnel.

xi. Handholding staff should be able to rectify IT related issues being faced by Police

officials during data entry in CAS.

xii. Any issues that need to be escalated to the SI helpdesk for resolution should be

taken up by the handholding person and tracked till closure of the query.

xiii. The handholding staff should assist the police personnel in coordinating with any

higher offices that may be required for proper functioning of CCTNS.

xiv. The handholding staff of each police station shall submit a daily report to the

police station detailing the activities undertaken during the day. The report will

also contain detailed status of each activity along with its resolution and current

status.

b) Qualification / Experience Criteria

i. Graduate with at least 6 month certification in IT and overall experience of 1-2

years of experience in application software/ LAN/ WAN/ PC troubleshooting,

Data Entry on Computer Applications. Working proficiency on office suite.

Fresher‘s can also be considered but having at least one of the following

educational qualifications: BCA, MCA, B.Sc (Computer science/ Information

technology), M.Sc (Computer science/ Information technology) , PGDCA, O-

Level, B- Tech.

ii. Working proficiency of Hindi typing is mandatory.

iii. The handholding staff should have sufficient experience in installation and

updating of any required software.

Page 207: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 207 of 241

6.8 ANNEXURE VII GOVERNANCE STRUCTURE

This section will provide the governance structure that will be created at the State level to

monitor the implementation of the CCTNS project. As per the Guidelines issued by the

Ministry of Home Affairs, Government of India, The State Police Department shall constitute

appropriate governance and operations structures, and in alignment with the structures

recommended by DIT, GOI under NeGP guidelines. The following governance committees

shall form the institutional framework for implementation, monitoring and evaluation of

CCTNS project.

a) State Apex Committee

b) State Empowered Committee

c) State Mission Team

d) District Mission Team

The following figure depicts the proposed governance structure for implementation of

CCTNS project in Rajasthan:

Figure 17: Proposed Governance Structure for CCTNS Project

The table below provides the committees/ teams that form part of the governance structure

and their roles and responsibilities as defined in the CCTNS implementation guidelines

provided by MHA.

Committee / Team Roles & Responsibilities

State Apex

Committee

Reviewing progress of the Project,

Overseeing utilization of funds,

Policy Directions and Guidance for successful

execution of the Project,

Ensuring continuance of Mission Leader for sufficient

duration, and

Page 208: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 208 of 241

Creating a supporting environment for the success of

the project

State

Empowered

Committee

Disbursement of funds to Districts and other

units/agencies

Approval of BPR proposals

Sanction for various project components, as may be

specified, including the Hardware/Software

procurement as per the specifications from NIC

Approval of various Project Components and

Functionalities to be covered in the Project

Review progress of the Project

Ensure proper Training arrangements

Ensure deployment of appropriate handholding

personnel

Other important policy and procedural issues

Guidance to State/District Mission Teams

State Mission

Team

Operational responsibility for the Project

Formulating Project Proposals

Getting sanction of GOI for various projects

Hardware rollout and operationalization

Co-ordination with various agencies

Resolution of all software related issues, including

customization

Resolution of all other issues hindering the Project

Progress

Any other decision to ensure speedy implementation of

the project

Assist the State Apex and Empowered Committees

District

Mission Team

Prepare District Project Proposal

Ensure proper Rollout of the Project in each selected

Police Station

Ensure hardware and software installation, and

operationalization of the Project

Training of all police personnel in the District

Site preparation and availability of all utilities

Ensure separate account keeping for the Project

Ensure the performance of Handholding staff

Deliverable

Review Team

Participate in meetings and requirement finalization

Review various deliverables submitted by SI

Suggest changes/ deviations with respect to the Scope

mentioned in the RFP

Review progress of the Project

Co-ordination with various agencies/ stakeholders

Resolution of all software related issues, including

customization

Page 209: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 209 of 241

Resolution of all other issues hindering the Project

Progress

Assist the State Mission Team

a) State Apex Committee

The composition of State Apex Committee is as following:

S No Designation Role

1 Chief Secretary Chairperson

2 Addl. Chief Secretary, Home Co-chair

3 Director General of Police Member

4 Director, SCRB Member

5 Secretary, Finance (Expenditure) Member

6 Secretary (IT) Member

7 SIO, NIC Rajasthan Member

8 Representative of MHA, GOI Member

9 Nodal Officer CCTNS Project Member Secretary

b) State Empowered Committee

The composition of State Empowered Committee is as following:

S

No

Designation Role

1 Director General of Police Chairman

2 Addl. DGP, Crime, Rajasthan

3 Addl. DGP, ATS & SOG, Rajasthan Member

3 Director, SCRB, Rajasthan Member

4 Jt. Secretary,Home (Police), GoR Member

5 Jt. Secretary, Finance (Expenditure IV), GoR Member

6 Representative of NCRB Member

7 Representative of DoIT&C, Rajasthan Member

8 SIO, NIC Rajasthan Member

9 Representative of State Implementation Agency Member

10 S.P., SCRB Nodal Officer

Page 210: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 210 of 241

c) State Mission Team

The composition of State Mission Team is as following:

S No Designation

1 Director, SCRB

2 DIG, Training, Rajasthan

3 DIG, Crime, Rajasthan

4 Nodal Officer, CCTNS, Rajasthan

4 Representative of State Implementation Agency

6 SIO, NIC Rajasthan

d) District Mission Team

The composition of District Mission Team will have the following members:

S

No

Designation Role

1 Superintendent of Police of District Chairman

2 Addl. SP/ Dy. SP Member

3 DIO, NIC Member

4 One officer from District Police having

computer knowledge

Member

e) Deliverable Review Team

The composition of Deliverable Review Team will have the following members:

S

No

Designation Role

1 Superintendent of Police, SCRB Chairman

2 Dy. Superintendent of Police, SCRB Member

3 Representative of SPMU Member

4 One officer from DoIT&C (GoR) Member

5 Domain Expert Special Invitee

f) Other Agencies

i. State Designated Agency

―State Designated Agency‖, (agency/society/public sector unit) at the state level that would

serve as a channel for transfer of funds from GoI to states and from state governments to the

vendors implementing CCTNS. Identification of such an agency/society and routing funds

through it would ensure the following. Centre for Development of Police Science and

Management (CDPSM) has been nominated as State Designated Agency.

Timely payments for time-critical events

Page 211: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 211 of 241

Strict control on utilization of funds for intended purpose

Sustainability even beyond plan period

Enable States in timely hiring of experts and internal capacity building

ii. State Project Management Consultant

Since the implementation of CCTNS and a significant part of the functionality of CCTNS

application are driven by the states, State Project Management Consultants is engaged to

support the State Empowered Committee in the following areas

Preparation of Detailed Project Report (DPR)

Assisting the state in identifying the state Systems Integrator (SI):

o Customizing the model RFP (Request for Proposal) provided by MHA/NCRB

o Releasing the RFP assisting the state in managing the bid process

o Assisting the states with the assessment of techno-commercial appraisal of

bids in identifying the state level Systems Integrator (SI)

Developing the functional specifications for the extensions/enhancements of

CCTNS application not covered by MHA/NCRB.

iii. State Project Management Unit

In order to monitor the progress on CCTNS the state would engage a state-level Program

Management Unit (SPMU).The scope of SPMU‘s work would include the following:

Overall project planning and management in collaboration with state Empowered

Committee and State/District Mission teams: includes planning, supervising the

overall progress of the project, monitor conformance with the timelines, budgets

and service levels.

Review the scope and technical solutions (covering all CCTNS components)

provided by the SI

Acceptance testing and acceptance

Perform structured transition and rollout

Post-deployment reviews

Confirm and monitor service levels through the engagement with the SI through

periodic reviews

Monitor the implementation of the project according to the project plan and

report to the state Empowered Committee and CPMU

Assess the progress of the implementation and recommend release of funds to the

state nodal agency for the SI

iv. System Integrator

CCTNS adopts a ―bundling of services‖ approach to implementation. Accordingly, all the

implementation components at the state level are ―bundled‖ and contracted out to a single

Systems Integrator (SI) who would act as a single point of contact and accountability for the

implementation, integration and performance of CCTNS. The bundle of services would

include the following:

Program Planning and Management

The SI would customize and implement CCTNS core application provided by

NCRB under the guidance of and in consultation with NIC.

Page 212: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 212 of 241

The SI would develop and deploy additional functionality that is scoped under

CCTNS (for some of the additional functionality, the central nodal agency would

provide the functional specifications to ensure standardization across states).

Procurement, installation and commissioning of hardware (including PCs,

peripherals, etc.) at police stations and higher offices including site preparation

Procurement, deployment and commissioning of communications infrastructure

(Network, Wiring, Switches etc.) at all police stations and higher offices; SWAN

and State Data Center would be leveraged to the extent possible.

Capacity building

o Awareness and Sensitization of benefits of IT along with the application level training

o Trainers Training

o System Administration and Support Training

o Handholding support to the police stations for 6 months

o Change management

Procurement, configuration and commissioning of specialized infrastructure and

applications as necessary

Utilization Statements/ Progress Reports

Digitization of Historical Records

Application, System and Network Maintenance

Helpdesk Support

The SI would be held responsible for the outcomes of the program and their payments would

be linked to the progress of the project as well as the outcomes of the program. The payment

schedule will be based on achieving milestones of the Project as well as on accomplishing

those milestones with predefined SLAs and Standard. The state would select a SI through a

competitive bidding process.

Page 213: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 213 of 241

6.9 ANNEXURE VIII ITEMS WHICH CAN BE DROPPED, IN CASE OF

SHORTAGE OF FUNDS OR DUE TO ANY OTHER REASONS

In case of shortage of funds or due to any other reasons, some items may have to be dropped

for executing the project with the available funds. The following items may be dropped/

reduced from the Bill of Material (in that order) to bring the overall project cost within the

available funds:

S. No.

Category No. of units

1 Hand Holding Support 760

2 Client Systems (It is proposed that no. of client systems at Police Stations & Higher Offices may be reduced as follows) 1) New PS and CIPA 1 PS : 3 in place of 4 2) Circle Office : 2 in place of 3 3) Range Office : 3 in place of 4 4) Addl. SP Office : 3 in place of 10 5) PHQ : 45 in place of 50 6) PCR (District) : 2 in place of 3 7) SP office : Unchanged (10)

638

3 Table and Chair 638

4 Desktop in place of Workstation 297

5 Environmental Control (AC) 760

Page 214: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 214 of 241

6.10 ANNEXURE IX: SERIAL NUMBER OF EXISTING HARDWARE AT DC AND

CLIENT LOCATIONS

a) Serial nos. of Hardware delivered at DC

S.

No.

Component Serial No.

1 Access Switch HP A5120 CN23BYR19D

CN23BYR182

CN23BYR116

CN23BYR0NQ

2 Blade server (HP BL460c-G7) SGH2174D61

SGH2174D45

SGH2174D4L

SGH2174D53

SGH2174D63

SGH2174D65

SGH2174D59

SGH2174D4T

SGH2174D5L

SGH2174D6B

SGH2174D55

SGH2174D5R

SGH2174D69

SGH2174D5D

SGH2174D4Y

SGH2174D5J

SGH2174D5W

SGH2174D4D

SGH2174D4R

SGH2174D49

SGH2174D5Y

SGH2174D51

SGH2174D5B

SGH2174D4F

SGH2174D5N

SGH2174D4J

Page 215: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 215 of 241

S.

No.

Component Serial No.

3 Core router HP MSR50 CN1BD0X008

CN1BD0X00N

4 Core Switch HP A7510 CN21D56007

CN1BD5602D

5 Database server HP DL585 G7 SGH2174PFS

SGH2174PH0

SGH2174PFF

SGH2174PFK

6 Firewall HP-Series-4AA3-7159ENW CN24B7H009

CN24B7H004

7 SAN HP 3 Par SGH2187043

8 SAN switch HP SN3000B FC USB215300S

USB215300M

9 Tape Library HP MSL 4048 MXA213Z00D

Page 216: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 216 of 241

b) Serial nos. of Hardware delivered at Client Locations

Component Desktop CPU (HP Elite 8200 PC)

Desktop Monitor (HP Compaq LE1902X)

Multi Function Printer (HP Pro-M1536dnf)

16 Port Switch (HP v1410)

External Hard Disk Drive (Seagate 160 GB)

Serial Nos. 1. INA251TBY8 2. INA251TBZ0 3. INA251TBY2 4. INA251TBWY 5. INA251TBXQ 6. INA251TBZV 7. INA251TBX2 8. INA251TBYW 9. INA2517TBY1 10. INA251TBYK 11. INA251TBZQ 12. INA251TBY7 13. INA251TBYH 14. INA251TBYF 15. INA251TBXP 16. INA251TC07 17. INA251TC06 18. INA251TBZS 19. INA251TBZN 20. INA2517TBYJ 21. INA251TBZD 22. INA251TBYV 23. INA2517TBXD 24. INA251TBXS 25. INA251TBXN 26. INA251TBZT 27. INA251TBXX 28. INA251TBX7 29. INA251TBXR 30. INA251TBZR 31. INA2517TBZF 32. INA251TC09 33. INA251TBX8 34. INA251TBX3

1. 3CQ23822R2 2. 3CQ23822NY 3. 3CQ23817FS 4. 3CQ23817D6 5. 3CQ23817DW 6. 3CQ23817FR 7. 3CQ23817FH 8. 3CQ23822QP 9. 3CQ23822QX 10. 3CQ23822RH 11. 3CQ23817BV 12. 3CQ23817J8 13. 3CQ23817F8 14. 3CQ23817FJ 15. 3CQ23817D1 16. 3CQ23822NS 17. 3CQ23822RQ 18. 3CQ23822P2 19. 3CQ23817CP 20. 3CQ23822RV 21. 3CQ23817CF 22. 3CQ23817DQ 23. 3CQ23822QY 24. 3CQ23817CH 25. 3CQ23817DX 26. 3CQ23817FY 27. 3CQ23817FW 28. 3CQ23822QG 29. 3CQ23822QK 30. 3CQ23822Q4 31. 3CQ23822NR 32. 3CQ23817G8 33. 3CQ23822SC 34. 3CQ23822NV

1. CND9D9NCF5 2. CND9D9NCJW 3. CND9D9NCQ9 4. CND9D9NCJD 5. CND9D9NCRH 6. CND9D9NCQP 7. CND9D9NCNQ 8. CND9D9NCRL 9. CND9D9NCQT 10. CND9D9NCJ 11. CND9D9NCQX 12. CND9D9NCR4 13. CND9D9NCQD 14. CND9D9NBZ4 15. CND9D9NCJK 16. CND9D9NCRN 17. CND9D9NC8H 18. CND9D9NCR9 19. CND9D9NC24 20. CND9D9NC92 21. CND9D9NC8Q 22. CND9D9NCR6 23. CND9D9NCR8 24. CND9D9NC8N 25. CND9D9NCTK 26. CND9D9NC91 27. CND9D9NCT7 28. CND9D9NC8B 29. Serial no. not available

1. CN2158K0KC 2. CN2158K09T 3. CN2158K0SD 4. CN2168K1MH 5. CN2158K0Z8 6. CN2168K0K2 7. CN2158K247 8. CN2168K0FQ 9. CN2168K1KQ 10. CN2158K1MB 11. CN2168KQYA 12. CN2158K390 13. CN2128K22S 14. CN2168K0Q6 15. CN2158K1QS 16. CN2126K2PM 17. CN2158K0QM 18. CN2158K19Q 19. CN2158K221 20. CN2158K00S 21. CN2128K1V9 22. CN2118K1HB 23. CN2158K149 24. CN2158K0BN 25. CN2158K0GX 26. CN2158K1NJ 27. CN2128K1DB 28. CN2128K146 29. CN2128K1MC 30. Serial no. not

available 31. Serial no. not

available 32. Serial no. not

1. 9LSZOAQV 2. 5LSBN4NE 3. 4MT07GRP 4. 5LSEYJVF 5. 5JS30BQO 6. 5LSFE5JW 7. 5LSBWTL3 8. 9LS2K5BP

Page 217: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 217 of 241

Component Desktop CPU (HP Elite 8200 PC)

Desktop Monitor (HP Compaq LE1902X)

Multi Function Printer (HP Pro-M1536dnf)

16 Port Switch (HP v1410)

External Hard Disk Drive (Seagate 160 GB)

35. INA251TBZC 36. INA251TBYZ 37. INA251TBXV 38. INA251TBZK 39. INA251TBXF 40. INA251TC05 41. INA251TBX6 42. INA251TBX5 43. INA251TBXM 44. INA251TBYP 45. INA251TBYG 46. INA251TBZ7 47. INA251TBY5 48. INA251TBZP 49. INA251TBYB 50. INA251TCO3 51. INA251TBZZ 52. INA251TBX9 53. INA251TBZ8 54. INA251TBX0 55. INA251TBZ1 56. INA251TBZ5 57. INA251TBY4 58. INA251TBZ9 59. INA251TBZX 60. INA251TBXW 61. INA251TBZ3 62. INA251TBXL 63. INA251TBXK 64. INA251TBZ2 65. INA251TBYQ 66. INA251TBXC 67. INA251TBZ4 68. INA251TBYY 69. INA251TBX4 70. INA251TBYC

35. 3CQ23817CC 36. 3CQ23817BM 37. 3CQ23822NW 38. 3CQ23817D8 39. 3CQ23817JH 40. 3CQ23822QR 41. 3CQ23822QC 42. 3CQ23822QN 43. 3CQ23817FK 44. 3CQ23817CD 45. 3CQ23817F7 46. 3CQ23822P1 47. 3CQ23122QJ 48. 3CQ2381FC 49. 3CQ23817DF 50. 3CQ23822Q6 51. 3CQ23817HI 52. 3CQ23822NQ 53. 3CQ23817G3 54. 3CQ23817G6 55. 3CQ23822QW 56. 3CQ23817FB 57. 3CQ23822RX 58. 3CQ23817CV 59. 3CQ23817FF 60. 3CQ23817DV 61. 3CQ23817DV 62. 3CQ23817XW 63. 3CQ23822RS 64. 3CQ23822RY 65. 3CQ23817CM 66. 3CQ23817CN 67. 3CQ23822QT 68. 3CQ23817DD 69. 3CQ23822NX 70. 3CQ23817B1

available 33. Serial no. not

available 34. Serial no. not

available 35. Serial no. not

available

Page 218: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 218 of 241

Component Desktop CPU (HP Elite 8200 PC)

Desktop Monitor (HP Compaq LE1902X)

Multi Function Printer (HP Pro-M1536dnf)

16 Port Switch (HP v1410)

External Hard Disk Drive (Seagate 160 GB)

71. INA251TBZM 72. INA251TBWX 73. INA251TBX1 74. INA251TCO8 75. INA251TBZB 76. INA251TBWZ 77. INA251TBXB 78. INA251TBYD 79. INA251TBY6 80. INA251TCO4 81. INA251TBY9 82. INA251TBXH 83. INA251TBXG 84. INA251TCO2 85. INA251TBYL 86. INA251TBY3 87. INA251TBZG 88. INA251TBYT 89. INA251TBXZ 90. INA251TBZH 91. INA251TBZL 92. INA251TBYS 93. INA251TBYM 94. INA251TC00 95. INA251TBYX 96. INA251TBZJ 97. INA251TBZY 98. INA251TBYN 99. INA251TBXJ 100. INA251TBXT 101. INA251TBYO 102. INA251TBZ6 103. INA251TBXY 104. INA251TCO1 105. INA251TBYR 106. INA251TBZW

71. 3CQ23817FD 72. 3CQ23822NZ 73. 3CQ23817DT 74. 3CQ23817F2 75. 3CQ23822N4 76. 3CQ23817DG 77. 3CQ23817FN 78. 3CQ23817CL 79. 3CQ23822NP 80. 3CQ23822Q0 81. 3CQ23817GZ 82. 3CQ23822RP 83. 3CQ23822N8 84. 3CQ238179V 85. 3CQ23817DL 86. 3CQ23822PO 87. 3CQ23817G4 88. 3CQ23822RW 89. 3CQ23817DH 90. 3CQ23822RJ 91. 3CQ23822RN 92. 3CQ23817JG 93. 3CQ23817FV 94. 3CQ23817CG 95. 3CQ23822NG 96. 3CQ23822S8 97. 3CQ23817CW 98. 3CQ23822QD 99. 3CQ23822DQ 100. 3CQ23817D9 101. 3CQ23822SB 102. 3CQ23822QS 103. 3CQ23817C9 104. 3CQ23817DN 105. 3CQ23817D7 106. 3CQ23817DC

Page 219: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 219 of 241

c) Specification of existing Hardware as specified in previous RFP

i. BLADE SERVERS (HP BL460c-G7)

S.

No.

Specifications as per previous RFP

1 Blade can be half / full height with I/O connectivity to backplane

2 2 Quad core @ 2.0 GHz or Higher clock speed processor available with 4 MB shared

L3 cache, 1066 MHz / 2000 MT/s FSB

3 Min 32 GB DDR3 RAM with min 8 Nos. free slots for future expandability.

4 Minimum Memory: 32 GB scalable to 128 GB per blade

5 The Blade should have redundant 8 Gbps Fiber Channel HBA/ FC Ports/connectivity

(only for database server)

6 2 X 10 Gbps or 2 X 1 Gbps ( LAN ports/connectivity with TCP / IP offload engine

support / dedicated chipset for network I/O on blade server

7 2 X 146GB HDD (SAS/SATA/FATA) or more Hot swap/Hot Plug system disks with

RAID Controller (Level 0,1 for mirroring)

8 VGA / Graphics Port / Controller

9 Should support heterogeneous OS platforms

ii. DATABASE SERVERS (HP DL585 G7)

S. No. Specifications as per previous RFP

1 Minimum 4x Quad core processor with 2.1 GHz or higher processor available,

Expandable to minimum 4 physical processor with min 4 MB L3 cache per

processor

2 OS support: Microsoft® Windows Server 2003 / 2008, Enterprise Edition / Red

Hat® Enterprise Linux 5 & 4 AP / SUSE® Linux Enterprise Server 9 / Solaris for

x86

3 Memory (RAM): Min. 64 GB scalable to 256 GB

4 RAID controller with RAID 0/1/5 with 256 MB cache

5 HDD hot pluggable: 4 x 146 GB 2.5‖ 10 K RPM HDD (SAS/SATA/FATA) or more

Page 220: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 220 of 241

6 Disk bays: Support for min 8 small form factor hot plug SAS / SCSI hard drives

7 At least 4 x 10/100/1000 Mbps Ethernet ports or more

8 2 x 8 Gbps Fiber Channel Ports

9 PortsRear: Two USB ports (Ver 2.0); RJ-45 Ethernet; keyboard and mouse; no

parallel port Front: One USB (Ver 2.0)

10 Graphics controller: SVGA / PCI bus / ATI® ES 1000 / min 16MB SDRAM

std/max / 1280x1024 at 16M colors

11 Optical / diskette: 8X / 24X slim-line DVD ROM drive shared across chassis

12 Security: Power-on password / admin password / unattended boot / selectable boot

/ boot without keyboard

13 Power supplies: Hot plug redundant AC power supply

14 Management feature to identify failed components even when server is switched

off.

15 Rack Mountable

16 It should provide Secure Sockets Layer (SSL) 128 bit

17 Encryption and Secure Shell (SSH) Version 2 and support VPN for secure access

over internet.

18 Should be able to manage systems through a web-browser.

iii. SAN Switch (HP SN3000B FC)

S.

No.

Specifications as per previous RFP

Feature Description

1 Performance 8 Gbps Fibre Channel

2 Ports 16-24Fibre Channel

3 Aggregate Switch Bandwidth 384 Gbps Maximum

4 Protocol Support Fibre Channel

5 Availability No single point of failure.

6 Media Types No single point of failure.

Page 221: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 221 of 241

7 Upgradeability Standard 16 Ports; 8 Port on Demand upgrades

8 Form Factor 1U

iv. L3 /Core Switch (48 Ports 10/100/1000) (HP A7510 Switch Chassis)

S. No. Specifications as per previous RFP

1 Core Switch with internal firewall

Chassis based switch with in-built redundancy (power supply)

Layer 3 switch

Should be easily scalable. Should have modular architecture with Min 10 slots

which can be used for line cards.

Should support Gigabit running on fibre

Should support to providing Port level redundancy

Should have sufficient memory to support the entire feature.

19‖ rack mountable

Full duplex operation

Support for secured Web-Based Management

Support for Enhanced STP functions

High MTBF Support

Operating LED Signal

The Switches must be able to generate Syslog Messages with timestamp and

Severity codes, which can be exported to a Syslog Server.

The Switches must be able to Build up its own inventory (like Device Name, Chassis

Type, Memory, Flash, Software ver. Etc)

2 Interfaces / Slots

a. Support for Gigabit interfaces – SX, LX, 1000Base T

b. All service/payload cards/modules must be hot swappable

c. Support for 10GbE Ports for up-linking the distribution switches/access switches

Page 222: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 222 of 241

S. No. Specifications as per previous RFP

/ Servers/ connectivity with network

Should support 24 Port GE module and 48 Port GE module

Should support 10 G port module

Should support 24 SFP module

3 Layer 2 Features: -

L2 Switching Support

L2 Multi-Homing Support

L2 Multicast Support – IGMP Snooping

Multi-Link Trunking

Multiple Spanning tree Domain (802.1s), IEEE 802.1w rapid spanning tree and

IEEE 802.3ad

Multi Instance Spanning Tree support for Load sharing on redundant links and fast

convergence time

Spanning-Tree Protocol (IEEE 802.1D) per bridge group

Multicast must be supported in hardware so that performance is not affected by

multiple multicast instances.

To support at least 2000 VLANs/switch

To support at least 50K MAC addresses / switch

To support bundling of multiple physical ports into a single logical channel, to offer

aggregate bandwidth

Should support virtual distribution architecture allow for the combination of two or

more switches into a single logical network entity having more switch performance

and more port density.

Support should have switching capacity of minimum 1.1 Tbps or more

The switch fabric/Supervisor engine support configurable in Active/Active and or

Active/Backup modes.

Switch should have forwarding rate of minimum 720 Mpps or more

4 Layer 3 Features: -

Page 223: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 223 of 241

S. No. Specifications as per previous RFP

Support for high-performance routing with support for RIPv1, RIPv2, OSPF,BGP

Support for VRRP or equivalent

Secondary Addressing

Classless Interdomain routing

Support for DHCP Server

To support a minimum of 4000 ACL entries

Should Support IPv6 in Hardware

5 Other Features: -

Support for ACLs based on source and destination Media Access Control (MAC)

addresses, IP addresses, or Transmission Control Protocol (TCP)/User Datagram

Protocol (UDP) ports

IEEE 802.1Q VLAN Support – Port based VLANs

Support for Routed VLAN, Port based and QoS based ACLs

Support for Multicast routing protocols (PIM) and Internet Group Management

Protocol (IGMP) snooping in hardware, IP Multicast Support: IGMP snooping,

supporting IGMP v1, v2 and v3

Support for industry standard Differentiated Services Code Point field (DSCP)

and/or the 802.1p Class of Service (CoS) field.

Classification and reclassification based on source/destination IP address,

source/destination Media Access Control (MAC) address or the Layer 4 TCP/UDP

ports.

Ability to classify, reclassify, police, and mark the incoming packets before the

packet is placed in the shared buffer.

Scheduling using Weighted Round Robin (WRR)

Congestion control via Weighted Random Early Detection (WRED).

Support for rate-limiting via Committed Access Rate (CAR) with a granularity of

increments of 64 Kbps

6 Policy Based Quality of Services (PB-QoS): -

Page 224: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 224 of 241

S. No. Specifications as per previous RFP

Policy Based QoS Support

Per Port Priority Based QoS

802.1p Support

Priority Queues

Bandwidth Engineering & Management – Per Port Minimum, Rate Limiting, excess

bursting, shaping

Support for L3/L4 filtering capabilities for inter VLAN traffic

High Priority Transmit Queuing/strict queues.

QoS-based forwarding based on IP precedence

7 Redundancy: -

Redundant Power Supply Unit, Fan tray and Fabric for core switch

support Link Aggregation

Spanning Tree (802.1d) with support for spanning tree per VLAN or Equivalent

Feature

8 Security Features: -

Layer 3 /4 Access Control Lists (ACLs) standard and extended

Security (User Access): Internal DB/External RADIUS /TACACS+

Configuration Change Tracking

System Event Logging

Syslog

Support for 802.1X Authentication

MAC lockdown for port security

Hardware based broadcast control

9 IEEE Standard Compliance: -

802.1Q VLAN tagging

802.1p Priority

802.1D Spanning Tree

Page 225: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 225 of 241

S. No. Specifications as per previous RFP

802.3u Fast Ethernet

802.3x Flow Control

802.3z Gigabit Ethernet.

802.3ab 1000Base-T (Gigabit Ethernet over Copper)

Should also support Fiber Modules

802.3ae Should support 10 Gbps Ethernet

v. Core Router (HP A-MSR 50-60)

S.

No.

Specifications as per previous RFP

1 Router Architecture: The router architecture should have following

features

Modular Chassis, the architecture should be based on high performance,

distributed / centralized forwarding architecture.

Should support Voice, Video, Security

It should support Single Operating System which includes all the feature set

2 Interface Support

Ethernet LAN Ports -> 3 x 10/100/1000 Mbps Ethernet port. It should support

additional Gigabit Ethernet modules i.e. both 10/100/1000 or SFP type

(upgradable )

It should support the industries widest range of wired and wireless

connectivity options such as T1/E1, T3/E3, 3G, copper and fiber GE, etc

3 Performance & Memory Required:

Performance Requirements for 64 byte packet -> Minimum 1.2 Mpps

4 Hardware:

Should support minimum default DRAM = 1 GB, maximum DRAM =2GB

External Compact Flash minimum default = 256MB, maximum External

Page 226: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 226 of 241

S.

No.

Specifications as per previous RFP

Compact Flash = 1GB and above

2 External USB 2.0

One Serial console port

One Serial auxiliary port

Should support AC and PoE, Power-supply options

Should support internal RPS

Should support 6 High port density WAN interface Modules

Should support 3G standards High-Speed Packet Access (HSPA)

Should have Min three Gigabit Ethernet Port

5 Voice & Video DSP support

Voice & Video DSP support

Support Voice interface i.e. FXS, FXO, PRI, BRI

6 Router Functional Requirements

QoS -> ToS, CoS, Queuing, prioritizing, Resource Reservation Protocol (RSVP)

NAT -> NAT, PAT

Access Control -> Required

Protocol Support Required:

RIP, BGP4, Policy based Routing, PPP, HDLC, OSPF Version 2, Support for

IPV6.

Re-distribution of routes from on Routing protocol should not be a

bottleneck. All the above features should be provisioned in the router from day

1.

Congestion Management:

The router should have proper congestion management to eliminate

Network congestion when the link is overloaded.

Random Early Detection, Weighted Fair/priority Queuing,

IP precedence or DSCP.

Page 227: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 227 of 241

S.

No.

Specifications as per previous RFP

IP Multicasting: Type Forwarding -> MBGP/PIM-DM/PIM-SM

7 Bandwidth Optimization:

The following bandwidth optimization features should be

Dial-Backup

Dial-on-Demand

Inactivity timeouts

8 Accounting:

The following accounting features should be supported:

Packet & Byte Counts

Start Time Stamp & End Time Stamps.

Network Time Protocol

Input & Output interface ports.

Type of service, TCP Flags & Protocol

Source & Destination IP addresses

Source & Destination TCP/UDP ports

9 Security Requirements:

The offered router should have following security features:

Support for Standard Access Lists to provide supervision and control.

Controlled SNMP Access through implementation of Access Lists on the router

to ensure SNMP access only to the SNMP manager or the NMS workstation

Controlled SNMP access through the use of SNMP with MD5 authentication.

Multiple Privilege Levels for managing & monitoring

Support for Remote Authentication User Service (RADIUS) and AAA

PPP CHAP support

10 Management Features :

The offered router should have the following Management

Page 228: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 228 of 241

S.

No.

Specifications as per previous RFP

Features:

The Router shall support Telnet, SSH, Console access.

The router shall support FTP or TFTP for easy software upgrades over the

network.

Network Management services shall be provided using open standards based

protocols like SNMP V2/V3

Configuration Management: The Router shall support configuration

management through the command line interface. GUI based software

configuration utility shall be provided. Support of configuration on web

interface shall be available.

Event and System logging: Event and system history logging functions shall be

available. The Router shall generate system alarms on events. Facility to put

selective logging of events onto a separate hardware where the analysis of log

shall be available.

Pre-planned scheduled Reboot Facility: The Router shall support the pre-

planned timed reboot to upgrade their hardware to a new software feature and

plan the rebooting as an off-peak time.

Power: Internal Redundant Power supply 230 V AC 50 Hz,

Mounting:

The offered router should be 19" rack mountable

Accessories:

Should come with all necessary power cords, adapters, data cables, connectors,

CDs, manuals, brackets accessories, wire managers, etc, required for

installation and commissioning of the equipment.

vi. Tape Library (HP Storage Works MSL 4048)

S. No. Specifications as per previous RFP

1 Minimum 2 latest generation LTO drives

Page 229: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 229 of 241

Interface

2 Fiber Channel Interface

Other Specifications

3 Should have sufficient speed backup to Tape Library in High Availability for

backing up data from the SAN without any user intervention.

4 Should be able to backup 50% of the entire production landscape in 8 hours

window.

5 Should support latest generation LTO drives or latest technology based

library with at least 2 latest generation LTO drives tape drives (>=4), rack

mountable with redundant power supplies.

6 Cartridges should have physical capacity up to 1600 GB per cartridge

compressed; 800 GB native.

7 At least 50 latest generation LTO drive Media Cartridges with 5 Cleaning

Cartridges, Barcode labels shall also be provided

vii. Storage Area Network (SAN) (HP 3 Par)

S.

No.

Specifications as per previous RFP

1 SAN controller - Dual Active Controller

2 Cache - 16 GB Total Mirrored Cache for Disk IO Operations scalable to min 32 GB

3 Host interface - For front-end host connectivity, the storage system should be

configured with sufficient number of 4/8Gbps FC ports or SAS port with

sufficient SAS links, so as to provide an aggregated total bandwidth of at least

32Gbps across all the controllers.

4 Drive interface - For back-end connectivity, the storage system should be

configured with sufficient number of 4/8Gbps FC ports or sufficient 6 Gbps of

SAS-II back-end ports/ lanes across all the controllers so as to provide an

aggregated bandwidth of at least 16Gbps across all the controllers.

5 RAID levels Supported - 0, 1, 5 / 6

6 Fans and power supplies - Dual redundant, hot-swappable

7 SAN support - Box should be compatible of SAN environment

8 SAN specifications shall have the following:

Page 230: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 230 of 241

S.

No.

Specifications as per previous RFP

9 The storage array shall be configured with at least 16 GB cache scalable to min 32

GB mirrored across two storage controllers for disk I/O operations.

10 Storage subsystem shall support 146GB/300GB/400GB/600GB or higher 10 K

RPM Fiber channel/SAS drives & 750GB/1TB SATA/FATA/NL-SAS or equivalent

drives in the same device array

11 Presently, the storage sub system shall be configured with 300 GB/ 450 GB of

Performance drives and 750 GB or higher on SATA / equivalent for archiving

purpose.

12 The storage system must provide upgrade path to larger or future array controller

and software technology while maintaining the existing investment.

13 The storage array proposed should have an upgrade path from the earlier

generation product to the current generation product.

14 All the necessary software to configure and manage the storage space, RAID

configuration, logical drives allocation, virtualization, snapshots (including snap

clones and snap mirrors) for entire capacity etc.

15 Redundant power supplies, batteries and cooling fans and data path and storage

controller.

16 Load balancing must be controlled by system management software tools.

17 The multi-path software should support the supplied storage and operating

systems.

18 The storage array must have complete cache protection mechanism either by de-

staging data or providing complete cache data protection with battery backup for

up to 72 hours or more.

19 The storage system should be scalable from 30 TB to 60 TB of raw capacity using

40% on Fiber Channel/ SAS drives and 60% on SATA / equivalent drives using

the same configuration as Quoted in this tender. The Storage should have at least

4 ports of 4 Gbps Frontend ports and 4 no‘s of back end ports of 4 Gbps the

storage array must have the capability to do array based remote replication using

FCIP or IP technology.

20 The storage array should support block level Synchronous and Asynchronous

replication across heterogeneous storage arrays from different OEMs.

21 The storage array should support Operating System Platforms & Clustering

including: Windows Server 2003 (Enterprise Edition), Sun Solaris, HP-UX, IBM-

AIX, Linux / Solaris for x86. Any software or license required to enable

connectivity to these OS should be included.

22 Storage should support non-disruptive online firmware upgrade for both

Controllers and disk drives.

23 The storage array should support hardware based data replication at the Block

level across all models of the offered family.

Page 231: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 231 of 241

S.

No.

Specifications as per previous RFP

24 The storage should provide automatic rerouting of I/O traffic from the host in

case of primary path failure.

25 Should provision for LUN masking, fiber zoning and SAN security

26 Should support storage virtualization, i.e. Easy logical drive expansion.

27 Should support hot-swappable physical drive raid array expansion with the

addition of extra hard disks

28 Should be able to support clustered and individual servers at the same time.

29 Should be able to take "snapshots" of the stored data to another logical drive on a

different Disk/RAID Group for backup purposes

30 Should be configured with "snapshots and clone"

31 Vendor should also offer storage performance monitoring and management

software.

32 The vendor must provide the functionality of proactive monitoring of Disk drive

and Storage system for all possible hard or soft disk failure

viii. Desktops (HP Compaq 8200 Elite Convertible Minitower)

S.

No.

Specifications as per previous RFP

1 CPU Intel Core i5- 650 / AMD Phenom II X4 975 processor or higher

2 No of Cores Minimum 2

3 CPU Speed Minimum 3.20 GHz or higher

4 Chipset Compatible to supplied CPU

5 Cache

Memory

Minimum 4 MB L3 or Higher

6 Memory 4 GB DDR-III or higher

7 HDD 320 GB SATA or higher

8 Monitor 18.5 inch (measured diagonally) Display Type: TFT

9 Keyboard Min. 104 Keys OEM Mechanical Key Board (Bi Lingual

Hindi/English)

Page 232: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 232 of 241

S.

No.

Specifications as per previous RFP

10 Mouse Two Button Optical Scroll Mouse

11 Optical Drive DVD Writer Drive

12 Ports Min. 6 USB 2.0 ( 2 In front), 1 Serial, 1 Parallel, PS/2 (For

Keyboard), 1 RJ- 45, Audio in/out, headphone and microphone

13 Memory Slot 4 DIMM Slots

14 Power

requirements

Input voltage 90 – 264 / 100 – 240 VAC, 50/60 Hz, 47 – 63 Hz,

active PFC (85% High Efficiency)

ix. Multi-Function Laser (Print/ Scan/ Copy) (HP Laserjet 1536 dnf )

S.

No.

Specifications as per previous RFP

1 Print speed,

black (normal

quality mode)

Up to 25 ppm

2 Print resolution,

black

Minimum of 600 x 600 x 2 dpi

3 Print technology Laser

4 Recommended

monthly print

volume

Minimum of 2000 pages

5 Memory,

standard

128 MB

6 Memory,

maximum

Minimum of 128 MB

7 Processor speed 500 MHz or Above

8 Paper tray(s) Minimum 3

9 Duplex printing

(printing on both

Automatic

Page 233: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 233 of 241

S.

No.

Specifications as per previous RFP

sides of paper)

10 Media sizes,

standard

Letter, legal, executive, statement, 8.5 x 13 in, custom 3.0 x

5.0 to 8.5 x 14 in, envelope (Com10, Monarch #7-3/4)

11 Media types Paper (bond, color, letterhead, plain, preprinted, prepunched,

recycled, rough, light), envelopes, labels, cardstock,

transparencies, user-defined

12 Connectivity 1 Hi-Speed USB 2.0; 1 10/100 Ethernet network port

13 Scanner Flatbed with automatic document feed, upto 1200 dpi;; Scan

size maximum (flatbed): 215.9 x 297 mm (8.5 x11.7 inches),

Scan speed: upto 15 PPM

14 Copier Black-white Up to 600x600 dpi, Copy speed (black, draft

quality, A4):Up to 15 cpm, Copy resolution (black graphics):

Up to 1200 x 600 dpi, Copier resize: 25 to 400%

x. L2 Switch - 16 port (HP 1410-16G : J9560A)

S.

N

o.

Specifications as per previous RFP

1 MAC Address Table

Size

8K

2 Switch Fabric 3.2Gbps Forwarding Capacity

3 Transmission Method Store-and-Forward

4 Diagnostic LEDs Per Unit: Power

5 Per Port: Activity/Link, Speed

6 Packet Buffer

Memory

512Kbytes Buffer Memory per Device

7 QoS 802.1p (4 Queues)

Page 234: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 234 of 241

S.

N

o.

Specifications as per previous RFP

8 Acoustics 0db

9 Connectivity 10/100/1000

10 Network Protocol and

Standards

IEEE 802.3 Ethernet, 802.3u Fast Ethernet, 802.3x Flow

Control, 802.1p QoS

11 Emissions FCC Class A, CE Class A

12 Power Supply 100-240VAC, 50/60 Hz 0.3 A Internal Power Supply

13 Environmental RoHS Compliant

14 Temperature Operating: 32° to 104°F (0° to 40°C)

15 Storage 32° to 140°F (0° to 60°C)

16 Operating 15% to 90% RH (Non-Condensing)

Page 235: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 235 of 241

6.11 ANNEXURE X DISTRICTWISE DATA OF CASES REGISTERED AND

SAMPLE FORMS FOR DATA DIGITIZATION

a) District wise data of cases registered in the last 10 years

S. No. District Name Cognizable crimes registered

(2004-2013)

1. Ajmer 79645

2. Bhilwara 67225

3. Nagaur 54332

4. Tonk 44936

5. Jaipur City (E) 64586

6. Jaipur City (N) 53424

7. Jaipur City (S) 62871

8. Jaipur City (W) 19456

9. Jaipur Rural 82968

10. Jhunjhunu 50191

11. Sikar 58435

12. Dausa 54363

13. Alwar 115101

14. Bikaner 53523

15. Churu 36282

16. Ganganagar 81744

17. Hanumangarh 57610

18. Bharatpur 95292

19. Sawai Madhopur 43481

20. Dholpur 44556

21. Karauli 46628

22. Jodhpur East 6492

23. Jodhpur West 45040

24. Jodhpur Rural 34763

25. Jalore 29560

26. Jaisalmer 12584

27. Barmer 36496

28. Pali 60244

29. Sirohi 25877

30. Kota City 70442

31. Kota Rural 34574

32. Bundi 51322

33. Jhalawar 50935

34. Baran 48557

35. Udaipur 90747

36. Banswara 34060

37. Chittorgarh 67454

38. Dungarpur 24107

39. Rajsamand 33899

Page 236: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 236 of 241

40. Pratapgarh 18232

41. GRP Ajmer 11152

42. GRP Jodhpur 2603

TOTAL 2055789

Page 237: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 237 of 241

b) History Sheeter Form:-

Page 238: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 238 of 241

Page 239: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 239 of 241

6.12 ANNEXURE XI SPECIFICATIONS - LAN CABLING AND MULTIPOINT

CONTROL UNIT (MCU) FOR VIDEO CONFERENCING

a) LAN Cabling

S No DESCRIPTION CAT 6 UTP Cabling System

1. Type Unshielded Twisted pair, Category 6,

ANSI/TIA/EIA 568-B.2.1

2. Material

3. Conductor 24 AWG solid bare copper

4. Insulation Polyethylene /Polyolefin

5. Jacket Flame Retardant PVC

6.

Approvals

UL Listed, ETL verified to ANSI/TIA/EIA

568-b.2.1 Cat6

7.

Operating Temperature -20 Deg.C up to +60 Deg.C

8.

Frequency Tested up to 250 MHz

9.

Packing Box of 305 meters

10.

Delay Skew 25ns-45ns /100m MAX.

11.

Impedance 100 Ohms +/- 6 ohms

12.

Performance characteristics to

be provided along with bid

Attenuation, Pair-to-pair and PS NEXT,

ELFEXT and PSELFEXT, Return Loss, ACR

and PS ACR

b) Multipoint Control Unit (MCU) for Video Conferencing:

Features/ Components

Protocols H.323 V.4, SIP, H.320, H.239, H.235, H.281

G.711, G.729

H.261, H.263, H.264

System

Capacity

H.323/SIP : The MCU should be equipped to support 1080p 30 fps in

Symmetric Continuous presence simultaneously on IP upto 4 Mbps

bandwidth in the same MCU without cascading and without stacking.

6.12.1

Page 240: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 240 of 241

SIP Protocol

Support

Interoperability support for ISDN, H.323

Audio H.323 conference participants: G.711, G.722, G.722.1, G.723.1, G.728, or

G.729 audio encoding

SIP conferencing participants: G.711, G.722.1, G.723.1, or G.729 audio

encoding

Video/

Display

Voice-activated switching with adjustable switching delay (H.261,

H.263, and H.264 video)

Continuous Presence conference:

Basic windowed display must show minimum four conference

participants at a time

Voice detection: In conferences with five or more participants, voice

detection automatically switches an off-screen speaker into one of the

display windows

Enhanced Continuous Presence

Picture in Picture

Dynamic layout according to the number of conference participants

Multiple voice-activated modes, including All See One, You See Me,

Auto-Zoom, and recent Automatic Switching

Text and frame overlay Should support symmetrical and asymmetrical up and down streams

for optimal bandwidth utilization

High-definition performance (Up to 1080p@30fps)

Bandwidth

Matching

Each endpoint in a video conference should participate according to

individual video bandwidth capabilities without affecting the

connection of other participants

Quality of

Service (QoS)

Support for Differentiated Services markings (ToS, CoS)

Security and

Privacy

Password protection for conferences to ensure privacy for participants

Administrative functions should be password-protected

Scalability Capable of creating large conferences by cascading conferences

between multiple Multipoint Control Units. Capable to increase the conferencing capacity by creating an MCU

cluster.

Web-Based

Monitoring

and

Management

MCU Administration Web interface should provide remote monitoring

and configuration from any location using a Web browser:

Real- time conference control

Password protection

Access levels required:

Page 241: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-I -CCTNS Rajasthan

Rajasthan Police Page 241 of 241

a. Administrator

b. Conference manager

c. User

Conference statistics

Sub-conferencing

Conference admission

Operator assistance

LAN

Interface

1 x 10/100/1000 Mbps LAN interface

Power 220 V AC, 50 Hz with internal redundant power supply

Additional

Feature

MCU Should have the feature to integrate with the IP-EPABX to

provide complete Video and Voice Solution.

Page 242: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

E-GOVERNANCE

MISSION MODE PROJECT

(MMP)

CRIME AND CRIMINAL TRACKING

NETWORK & SYSTEMS

RFP FOR SELECTION OF SYSTEM

INTEGRATOR

VOLUME – II: Commercial and Bidding

Terms

RELEASED BY:

Rajasthan Police

Government of Rajasthan

Page 243: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 2 of 121

Table of Contents

LIST OF ABBREVIATIONS / ACRONYMS ................................................................................. 5

1 INVITATION FOR BID (IFB) AND NOTICE INVITING BID (NIB) ........................... 11

2 INSTRUCTION TO BIDDERS ............................................................................................... 14

2.1 INTRODUCTION ............................................................................................................................. 14

2.2 SALE OF BIDDING/ TENDER DOCUMENTS ................................................................................... 14

2.3 PRE-BID MEETING/ CLARIFICATIONS .......................................................................................... 14

2.4 CHANGES IN THE BIDDING DOCUMENT ....................................................................................... 15

2.5 PERIOD OF VALIDITY OF BIDS ...................................................................................................... 15

2.6 FORMAT AND SIGNING OF BIDS.................................................................................................... 15

2.7 COST & LANGUAGE OF BIDDING .................................................................................................. 16

2.8 ALTERNATIVE/ MULTIPLE BIDS ................................................................................................... 17

2.9 BID SECURITY ............................................................................................................................... 17

2.10 DEADLINE FOR THE SUBMISSION OF BIDS.................................................................................... 18

2.11 WITHDRAWAL, SUBSTITUTION, AND MODIFICATION OF BIDS .................................................... 19

2.12 OPENING OF BIDS ......................................................................................................................... 19

2.13 SELECTION METHOD: ................................................................................................................... 20

2.14 CLARIFICATION OF BIDS ............................................................................................................... 20

2.15 OVERALL EVALUATION PROCESS ................................................................................................. 20

2.16 PRE-QUALIFICATION CRITERIA ................................................................................................... 21

2.17 SUB-CONTRACTING ...................................................................................................................... 24

2.18 EVALUATION OF TECHNICAL PROPOSALS .................................................................................... 24

2.19 TECHNICAL EVALUATION SCORING MATRIX: .............................................................................. 27

2.20 NON-MATERIAL NON-CONFORMITIES IN BIDS ........................................................................ 31

2.21 TECHNICAL PROPOSAL ................................................................................................................. 31

2.22 TABULATION OF TECHNICAL BIDS ........................................................................................... 32

2.23 EVALUATION & TABULATION OF COMMERCIAL BIDS .............................................................. 33

2.24 CORRECTION OF ARITHMETIC ERRORS IN COMMERCIAL BIDS ............................................... 34

2.25 COMPARISON OF RATES OF FIRMS OUTSIDE AND THOSE IN RAJASTHAN ................................. 34

2.26 PRICE AND PURCHASE PREFERENCE IN EVALUATION............................................................... 34

2.27 NEGOTIATIONS WITH BIDDER ...................................................................................................... 34

2.28 EXCLUSION OF BIDS AND DISQUALIFICATION ......................................................................... 35

Page 244: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 3 of 121

2.29 LACK OF COMPETITION ............................................................................................................. 36

2.30 ACCEPTANCE OF THE SUCCESSFUL BID AND AWARD OF CONTRACT ......................................... 36

2.31 INFORMATION AND PUBLICATION OF AWARD .............................................................................. 37

2.32 RAJASTHAN POLICE‟S RIGHT TO ACCEPT OR REJECT ANY OR ALL BIDS ................................... 37

2.33 ADVANCE BANK GUARANTEE ................................................................................................... 37

2.34 PERFORMANCE SECURITY DEPOSIT (PSD) .............................................................................. 38

2.35 EXECUTION OF CONTRACT ....................................................................................................... 39

2.36 CONFIDENTIALITY .................................................................................................................... 39

2.37 CANCELLATION OF PROCUREMENT PROCESS ............................................................................... 39

2.38 CODE OF INTEGRITY FOR BIDDERS .......................................................................................... 40

2.39 INTERFERENCE WITH PROCUREMENT PROCESS ...................................................................... 41

2.40 APPEALS.................................................................................................................................... 41

2.41 STAY OF PROCUREMENT PROCEEDINGS ........................................................................................ 43

2.42 VEXATIOUS APPEALS & COMPLAINTS ...................................................................................... 43

2.43 OFFENSES BY FIRMS/ COMPANIES ........................................................................................... 43

2.44 DEBARMENT FROM BIDDING.................................................................................................... 44

2.45 MONITORING OF CONTRACT .................................................................................................... 45

2.46 RISK AND PURCHASE ................................................................................................................ 45

3 IMPLEMENTATION PLAN, PAYMENT TERMS AND SCHEDULE........................... 47

3.1 IMPLEMENTATION AND ROLL OUT PLAN ........................................................................ 47

3.2 PAYMENT SCHEDULES AND MILESTONES .................................................................................... 50

3.2.1 Payment Schedule ............................................................................................................. 50

4 FORMATS .................................................................................................................................. 56

4.1 FORMATS FOR THE PRE-QUALIFICATION RESPONSE .................................................. 56

4.2 FORMATS FOR THE TECHNICAL BID RESPONSE (WITH SIGN AND COMPANY SEAL) ..... 64

4.2.1 Undertaking on Patent Rights ......................................................................................... 64

4.2.2 Undertaking on Conflict of Interest ................................................................................ 65

4.2.3 Non-Malicious Code Certificate ...................................................................................... 66

4.2.4 Undertaking On Pricing of Items of Technical Response............................................ 67

4.2.5 Undertaking on Offline Functionality ............................................................................ 68

4.2.6 Undertaking on Provision for Required Storage Capacity ........................................ 69

4.2.7 Undertaking on Compliance and Sizing of Infrastructure ......................................... 70

Page 245: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 4 of 121

4.2.8 Undertaking on Provision of Support for Software .................................................... 71

4.2.9 Undertaking on Service Level Compliance ................................................................... 72

4.2.10 Undertaking on Deliverables ........................................................................................... 73

4.2.11 Undertaking on Training the Users ............................................................................... 74

4.2.12 Undertaking on Support to Certification....................................................................... 75

4.2.13 Undertaking on Exit Management and Transition ..................................................... 76

4.2.14 Undertaking on Continuous Improvement ................................................................... 77

4.2.15 Undertaking on Personnel ............................................................................................... 78

4.2.16 Undertaking on Provision of Work Environment at SCRB ........................................ 80

4.2.17 Undertaking on request for Changes to the Contract Clauses by the bidder ........... 81

4.2.18 Undertaking from OEM on Authorization of use of their OEM products ............... 82

4.2.19 Certificate of Conformity/No Deviation ........................................................................ 83

4.2.20 Bidder’s Authorization Certificate .................................................................................. 84

4.2.21 Bill of Material – Software Solution .............................................................................. 85

4.2.22 Bill of Material for Infrastructure .................................................................................. 87

4.2.23 Profiles of Previous Project Experience ......................................................................... 91

4.2.24 Team Profile ....................................................................................................................... 92

4.2.25 Suggestions on Changes to Contract Clauses ............................................................... 94

4.3 FORMATS FOR THE COMMERCIAL BID RESPONSE ....................................................... 95

4.3.1 Commercial Proposal Cover Letter ................................................................................ 95

4.3.2 Commercial Bid Format ................................................................................................... 97

4.4 NON – DISCLOSURE AGREEMENT (NDA) ....................................................................... 106

4.5 FORMAT FOR SUBMISSION OF QUERIES FOR CLARIFICATION ............................... 108

4.6 EARNEST MONEY DEPOSIT ................................................................................................ 109

4.7 BID COVER LETTER............................................................................................................... 113

4.8 ADVANCE BANK GUARANTEE ............................................................................................ 115

4.9 PERFORMANCE BANK GUARANTEE ................................................................................ 118

4.10 MEMORANDUM OF APPEAL UNDER THE RTPP ACT, 2012 ......................................... 121

Page 246: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 5 of 121

LIST OF ABBREVIATIONS / ACRONYMS

ABG Advance Bank Guarantee

ADG Additional Director General of Police

AMC Annual Maintenance Contract

Act The Rajasthan Transparency in Public Procurement Act, 2012

(Act No. 21 of 2012) and Rules thereto

Authorized

Signatory

The bidder‟s representative/ officer vested (explicitly, implicitly,

or through conduct) with the powers to commit the authorizing

organization to a binding agreement. Also called signing officer/

authority having the Power of Attorney (PoA) from the competent

authority of the respective Bidding firm.

BE Bachelor of Engineering

BG Bank Guarantee

BoM Bill of Material

BoQ Bill of Quantity

Bid/ eBid A formal offer made in pursuance of an invitation by a procuring

entity and includes any tender, proposal or quotation in electronic

format

Bid Security A security provided to the procuring entity by a bidder for securing

the fulfillment of any obligation in terms of the provisions of the

bidding documents.

Bidder Any person/ firm/ agency/ company/ contractor/ supplier/

vendor participating in the procurement/ bidding process with the

procurement entity

Bidding

Document

Documents issued by the procuring entity, including any

amendments thereto, that set out the terms and conditions of the

given procurement and includes the invitation to bid

CCA Controller of Certifying Authorities

CCTNS Crime and Criminal Tracking Network & Systems

CIPA Common Integrated Police Application

CMMi Capability Maturity Model Integration

CST Central Sales Tax

Page 247: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 6 of 121

Contract/

Procurement

Contract

A contract entered into between the procuring entity and a

successful bidder concerning the subject matter of procurement

Contract/

Project Period

Contract/ Project Period shall commence from the date of Signing

of Contract till 5 Years, which includes Operations & Maintenance

Services after successful commissioning of project.

DBA Database Administrator

DC Data Centre

DGP Director General of Police

DR Disaster Recovery

DSC Digital Signature Certificate

Day A calendar day as per Government of Rajasthan

EMS Enterprise Management System

eGRAS Online Government Receipts Accounting System (e-GRAS) is an e-

Governance Initiative of Government of Rajasthan under Mission

Mode Project category and is part of Integrated Financial

Management System (IFMS). e-GRAS facilitates collection of tax/

non-tax revenue in both the modes: online as well as manual. All

types of government revenue may be deposited online using this

website: https://egras.raj.nic.in/

ETDC Electronic Testing & Development Center

FDR Fixed Deposit Receipt

GoI/ GoR Govt. of India/ Govt. of Rajasthan

Goods All articles, material, commodities, electricity, livestock, furniture,

fixtures, raw material, spares, instruments, software (Application

& System Software), machinery, equipment, industrial plant,

vehicles, aircraft, ships, railway rolling stock and any other

category of goods, whether in solid, liquid or gaseous form,

purchased or otherwise acquired for the use of a procuring entity

as well as services or works incidental to the supply of the

goods if the value of services or works or both does not exceed

that of the goods themselves

HIPS Host Intrusion Prevention System

ICT Information and Communication Technology.

Page 248: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 7 of 121

IFB Invitation for Bids (A document published by the procuring

entity inviting Bids relating to the subject matter of

procurement and any amendment thereto and includes notice

inviting Bid and request for proposal)

INR Indian Rupee

IPR Intellectual Property rights

ISI Indian Standards Institution

ISO International Organization for Standardization

IT Information Technology

ITB Instruction to Bidders

LAN Local Area Network

LD Liquidated Damages

LoI Letter of Intent

MBA Master of Business Administration

MCA Master of Computer Application

Month A calendar month as per Government of Rajasthan

MoU Memorandum of Understanding

NDA Non – Disclosure Agreement

NIB Notice Inviting Bid

Notification A notification published in the Official Gazette

OEM Original Equipment Manufacturer

PAN Permanent Account Number

PBG Performance Bank Guarantee

PC Purchase Committee

PHQ Police Headquarters

PKI Public Key Infrastructure

PMP Project management Professional

PQ Pre-Qualification

Procurement

Process

The process of procurement extending from the issue of

invitation to Bid till the award of the procurement contract or

Page 249: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 8 of 121

cancellation of the procurement process, as the case may be

Procurement The acquisition by purchase, lease, license or otherwise of works,

goods or services, including award of Public Private Partnership

projects, by a procuring entity whether directly or through an

agency with which a contract for procurement services is entered

into, but does not include any acquisition without consideration,

and “procure” or “procured” shall be construed accordingly

PSD/ SD Performance Security Deposit/ Security Deposit

PSU Public Sector Unit

Purchaser Person or entity that is a recipient of a good or service provided by

a seller (bidder) under a purchase order or contract of sale. Also

called buyer. Rajasthan Police in this RFP document.

QGR Quarterly Guaranteed Revenue

QOS Quality of service

RDBMS Relational Database management system

ROC Registrar of Companies

RVAT Rajasthan Value Added Tax

Services Any subject matter of procurement other than goods or works and

includes physical, maintenance, professional, intellectual,

consultancy and advisory services or any service classified or

declared as such by a procuring entity and does not include

appointment of any person made by any procuring entity

SAN Storage Area Network

SATA Serial Advanced Technology Attachment

SLA Service Level Agreement is a negotiated agreement between two

parties wherein one is the customer and the other is the service

provider. It is a service contract where the level of service is

formally defined. In practice, the term SLA is sometimes used to

refer to the contracted delivery time (of the service) or

performance.

SMS Storage management Software

SPMU State Project Management Unit

State Public

Procurement

http://sppp.raj.nic.in

Page 250: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 9 of 121

Portal

UT Union Territory

VAT/ CenVAT Value Added Tax/ Central VAT

Page 251: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 10 of 121

RFP Datasheet

Invitation For Bid (IFB)

and Notice Inviting

Tender (NIT)

1

Page 252: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 11 of 121

1 INVITATION FOR BID (IFB) AND NOTICE INVITING BID (NIB)

RFP Reference No and Date V-15(25)SCRB/CCTNS/Purchase Committee/2013; 22/01/2014

Subject Matter of

Procurement

Selection of System Integrator for Crime and Criminal Tracking

Network & Systems

Websites for downloading

Bidding Document,

Corrigendum’s,

Addendums etc.

http://sppp.raj.nic.in, http://eproc.rajasthan.gov.in, and

http://police.rajasthan.gov.in/

Period of Sale of Bidding

Document (Start/ End

Date)

Start Date/Time-22/01/2014; 5:00 pm

End Date/Time- 11/03/2014; 3:00pm

Bid Security and Mode of

Payment

A sum of Rs. 1.46 crore (Rupees One Crore Forty Six Lakhs

only) in form of Demand Draft/Bankers Cheque/Bank

Guarantee in favour of "DIRECTOR GENERAL OF POLICE"

payable at "Jaipur", Rajasthan issued by any Scheduled bank

OR

deposit through eGRAS:- https://egras.raj.nic.in/

Tender Fee and Mode of

Payment

A sum of Rs. 500/- (Rupees Five Hundred only) in form of

Demand Draft in favour of "DIRECTOR GENERAL OF

POLICE" payable at "Jaipur", Rajasthan

RISL Processing Fee and

Mode of Payment

A sum of Rs. 1000/- (Rupees One Thousand only) in form of

Demand Draft in favour of “Managing Director, RISL” payable

at “Jaipur”.

Date/ Time/ Place of Pre-

bid Conference

Date/ Time-07/02/2014 ; 11:00 am

Place- Conference Room, State Crime Records Bureau, Nehru

Nagar, Near Rajasthan Police Academy, Jaipur, Rajasthan-

302016

Last date for submission of

written queries for

clarifications

Date/ Time-07/02/2014 ; 10:00 am

Manner, Start/ End Date

for the submission of Bids

Manner- Online at eProc website

(http://eproc.rajasthan.gov.in)

Start Date-22/01/2014

End Date- 11/03/2014

Submission of Banker’s

Cheque/ Demand Draft for

Tender Fee, RISL

Start Date/Time-22/01/2014; 5:00 pm

End Date/Time- 11/03/2014; 3:00pm

Page 253: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 12 of 121

Processing Fee and Bid

Security

Note:

1) To participate in online bidding process, Bidders must procure a Digital Signature

Certificate (Type III) as per Information Technology Act-2000 using which they can

digitally sign their electronic bids. Bidders can procure the same from any CCA

approved certifying agency, i.e. TCS, Safecrypt, Ncode etc. Bidders who already have

a valid Digital Signature Certificate (DSC) need not procure a new DSC. Also, bidders

must register on http://eproc.rajasthan.gov.in (bidders already registered on

http://eproc.rajasthan.gov.in before 30-09-2011 must register again).

2) Rajasthan Police will not be responsible for delay in online submission due to any

reason. For this, bidders are requested to upload the complete bid well advance in

time so as to avoid last minute rush or any other unforeseen issues.

3) Bidders are also advised to refer "Bidders Manual Kit" available at eProc website for

further details about the e-Tendering process.

Page 254: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 13 of 121

Address for Communications for the purpose of this RFP

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

RFP Datasheet

2

Instruction to Bidders

Page 255: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 14 of 121

2 INSTRUCTION TO BIDDERS

2.1 Introduction

a) The RFP document consists of three volumes:

i. RFP Volume I: Functional & Technical Requirements

ii. RFP Volume II: Commercial and Bidding Terms

iii. RFP Volume III: Contractual and Legal Terms

2.2 Sale of Bidding/ Tender Documents

a) The bidder can download the RFP documents from the Rajasthan Police website

www.police.rajasthan.gov.in‎ and also from State Public Procurement Portal

(http://sppp.raj.nic.in) and e-Procurement portal (http://eproc.rajasthan.gov.in).

b) A non- refundable Demand Draft for Rs 500/-as a tender fee drawn in favour of

DIRECTOR GENERAL OF POLICE payable at Jaipur, Rajasthan should be

submitted manually before the due date and time of Bid submission without which

tender will be considered as incomplete and non responsive. The scanned copy of

demand draft of RFP document fees should be submitted along with Technical

proposal.

c) The bidders are expected to examine all instructions, forms, terms, project

requirements and other information in the RFP documents. Failure to furnish all

information required as mentioned in the RFP documents or submission of a

proposal not substantially responsive to the RFP documents in all respects will be

at the bidder's risk and may result in rejection of the proposal.

2.3 Pre-bid Meeting/ Clarifications

a) Rajasthan Police will host a Pre-Bid Conference as per details mentioned in the

NIB to clarify doubts of potential bidders with respect to the RFP, and reply to pre-

bid queries will be published on the respective websites.

b) The representatives of the interested organizations may attend the pre-bid

conference at their own cost. The purpose of the conference is to provide bidders

with information regarding the RFP.

c) Pre-Bid Conference will also provide each bidder an opportunity to seek

clarifications/suggestions regarding any aspect of the RFP and the project,

including suggestions on ambiguity and transparency in the RFP. The bidder

should submit the pre-bid clarifications/suggestions in the format provided at

clause 4.5. The last date of submitting clarifications requests by the bidder and

response to clarifications by Rajasthan Police will be as per NIB.

Page 256: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 15 of 121

2.4 Changes in the Bidding Document

a) At any time, prior to the deadline for submission of Bids, the Rajasthan Police may

for any reason, whether on its own initiative or as a result of a request for

clarification by a bidder, modify the bidding documents by issuing an addendum in

accordance with the provisions below.

b) In case, any modification is made to the bidding document or any clarification is

issued which materially affects the terms contained in the bidding document, the

Rajasthan Police shall publish such modification or clarification in the same

manner as the publication of the initial bidding document.

c) In case, any clarification or modification [para 2.4 (b)] is issued with respect to the

bidding document, the Rajasthan Police may, prior to the last date for submission

of Bids, extend such time limit in order to allow the bidders sufficient time.

d) Any bidder, who has submitted his Bid in response to the original invitation, shall

have the opportunity to modify or re-submit it within the extended time period.

2.5 Period of Validity of Bids

a) Bids submitted by the bidders shall remain valid for 180 days from the due date of

the bid submission as specified in the NIB. A Bid valid for a shorter period shall be

rejected by the Rajasthan Police as non-responsive Bid.

b) In exceptional circumstances, Rajasthan Police may request the bidders to extend

the bid validity period for an additional specified period of time. If bidder

refuses the request then such refusal shall be treated as withdrawal of Bid and in

such circumstances bid security will not be forfeited.

c) Any bidder who agrees to extend the validity of bid and submits the new/extended

bid security as requested by Rajasthan Police will be eligible for bid validation.

2.6 Format and Signing of Bids

a) Bidders must submit their bids online at e-Procurement portal i.e.

http://eproc.rajasthan.gov.in.

b) All the documents uploaded should be digitally signed with the DSC of authorized

signatory.

c) A Single stage Two part system shall be followed for the Bid: -

i. Technical Bid

ii. Commercial Bid

i. The technical bid shall consist of the following documents: -

S.No. Documents Type Document Format

Fee Details

1. Bidding document Fee (Tender Fee) Proof of submission (PDF)

2. RISL Processing Fee(eProc) Instrument/ Proof of

submission (PDF)

3. Bid Security Instrument/ Proof of

Page 257: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 16 of 121

submission (PDF)

Pre- Qualification Documents

4. Response to the Pre-Qualification Requirements shall be prepared

in accordance with the requirements specified in this RFP and in

the format prescribed in this Volume.

Technical Documents

5. The Technical Proposal shall be prepared in accordance with the

requirements specified in this RFP and in the formats prescribed in

this volume.

ii. Commercial bid shall include the following documents: -

S.No. Documents Type Document Format

1. Commercial Bid – Covering Letter On bidder‟s letter head

duly signed by authorized

signatory as per

Annexure-4.3.1 (PDF)

2. Commercial Bid – Format As per BoQ (.XLS) format

available on e-

Procurement portal &

Annexure-4.3.2

d) The bidder should ensure that all the required documents, as mentioned in this

bidding document, are submitted along with the Bid and in the prescribed format

only. Non-submission of the required documents or submission of the documents

in a different format/ contents may lead to the rejection of the Bid submitted by the

bidder.

e) Rajasthan Police will not accept delivery of proposal in any manner other than that

specified in this volume. Proposal delivered in any other manner shall be treated as

defective, invalid and rejected.

2.7 Cost & Language of Bidding

a) The Bidder shall bear all costs associated with the preparation and submission of

its Bid. Rajasthan Police shall not be responsible or liable for any costs, regardless

of the outcome of the bidding process.

b) The bidding document /correspondence/documents exchanged between the Bidder

and the Rajasthan Police shall be written only in English Language. Supporting

documents and printed literature that are part of the Bid may be in another

language provided they are accompanied by an accurate translation of the relevant

passages in English only, for purposes of interpretation of the Bid.

Page 258: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 17 of 121

2.8 Alternative/ Multiple Bids

Alternative Solution / Multiple Bids shall not be considered at all. Bidder shall not quote

for multiple brands/ make/ models. Technical bid should mention details of

quoted/make/model in the “Format 4.2.24: Bill of Material” as given in the technical bid.

2.9 Bid Security

Any bidder, if not exempted, participating in the procurement process will be required to

furnish the bid security as specified in the NIB.

a) In lieu of bid security, a bid securing declaration shall be taken from Departments

of the State Government, Undertakings, Corporations, Autonomous bodies,

Registered Societies and Cooperative Societies which are owned,/ controlled or

managed by the State Government and Government Undertakings of the Central

Government.

b) Bid security instrument or a bid securing declaration shall necessarily accompany

the technical bid.

c) Bid security of a bidder lying with the Rajasthan Police in respect of other bids

awaiting decision shall not be adjusted towards bid security for the fresh bids. The

bid security originally deposited may, however, be taken into consideration in case

bids are re-invited.

d) The bid security may be given in the form of a banker‟s cheque or demand draft or

Bank Guarantee in specified format, of a scheduled bank or deposited through

eGRAS. The bid security must remain valid for thirty days (30) beyond the original

or extended validity period of the bid.

e) The issuer of the bid security and the confirmer, if any, of the bid security, as well

as the form and terms of the bid security, must be acceptable to the Rajasthan

Police.

f) Prior to presenting a submission, a bidder may request the Rajasthan Police to

confirm the acceptability of proposed issuer of a bid security or of a proposed

confirmer, if required. The Rajasthan Police shall respond promptly to such a

request.

g) The Bank Guarantee presented as bid security shall be confirmed from the

concerned issuing bank. However, the confirmation of the acceptability of a

proposed issuer or of any proposed confirmer does not preclude the Rajasthan

Police from rejecting the bid security on the ground that the issuer or the

confirmer, as the case may be, has become insolvent or has otherwise ceased to be

creditworthy.

h) The bid security of unsuccessful bidders shall be refunded soon after final

acceptance of successful bid and signing of Agreement and submitting performance

security.

i) The Bid security taken from a bidder may be forfeited, including the interest, if any,

in the following cases, namely: -

i. when the bidder withdraws or modifies its bid after opening of bids;

Page 259: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 18 of 121

ii. when the bidder does not execute the agreement, if any, after placement of

supply/ work order within the 15 days;

iii. when the bidder fails to commence the supply of the goods or service or

execute work as per supply/ work order within the time specified;

iv. when the bidder does not deposit the performance security within 15 days

after the supply/ work order is placed; and

v. if the bidder breaches any provision of code of integrity, prescribed for

bidders, specified in the bidding document.

j) Notice will be given to the bidder with reasonable time before bid security

deposited is forfeited.

k) No interest shall be payable on the bid security.

l) In case of the successful bidder, the amount of bid security may be adjusted in

arriving at the amount of the Performance Security, or refunded if the successful

bidder furnishes the full amount of performance security.

m) The Rajasthan Police shall promptly return the bid security after the earliest of the

following events, namely:-

i. the expiry of validity of bid security;

ii. the execution of agreement for procurement and performance security is

furnished by the successful bidder;

iii. the cancellation of the procurement process;

2.10 Deadline for the submission of Bids

a) Bids shall be received online at e-Procurement portal before due date and time as

specified in the NIB.

b) Normally, the date of submission and opening of Bids would not be extended. In

exceptional circumstances or when the bidding document are required to be

substantially modified as a result of discussions in pre-bid meeting/ conference or

otherwise and the time with the prospective bidders for preparation of Bids

appears insufficient, the date may be extended by the Rajasthan Police. In such

case the extension date will be communicated to the bidders as was done on the

time of issuing of the NIB and will also be updated on on the State Public

Procurement Portal, Rajasthan Police portal if applicable. It would be ensured that

after issue of corrigendum, reasonable time is available to the bidders for

preparation and submission of their Bids. The Rajasthan Police shall also publish

such modifications in the bidding document in the same manner as the publication

of initial bidding document. In case bid submission or opening day is a non-

working day as per Government of Rajasthan( GoR), then the bid submission and

opening will be done on next working day.

Page 260: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 19 of 121

2.11 Withdrawal, Substitution, and Modification of Bids

a) Bidder may withdraw its Bid or re-submit its Bid (technical and/ or commercial

cover) as per the instructions/ procedure mentioned at e-Procurement website

under the section “Bidder‟s Manual Kit”.

b) Bids withdrawn shall not be opened and processed further.

2.12 Opening of Bids

a) Total transparency will be observed while opening the proposals/bids.

b) Rajasthan Police, reserves the rights at all times to postpone or cancel a scheduled

bid opening.

c) The bids will be opened, in two sessions,

i. Pre-qualification & Technical Bid

ii. Commercial Bid

Commercial bids of those bidders whose technical bids qualify would be opened, in the

presence of bidders‟ representatives who choose to attend the Bid opening sessions on

the specified date, time and address.

The bidders‟ representatives who are present shall sign a register evidencing their

attendance. In the event of the specified date of bid opening being declared a holiday for

Rajasthan Police, the Bids shall be opened at the same time and location on the next

working day. However if there is no representative of the bidder, Rajasthan Police, shall

go ahead and open the bid of the bidders.

d) All the documents comprising of technical Bid/ cover shall be opened &

downloaded from the e-Procurement website (only for the bidders who have

submitted the prescribed fee(s) to Rajasthan Police).

e) The Purchase committee shall conduct a preliminary scrutiny of the opened

technical Bids to assess the prima-facie responsiveness and ensure that the: -

i. bid is accompanied by tender document fee, bid security or bid securing

declaration and processing fee;

ii. bid is valid for the period, specified in the tender document;

iii. bid is unconditional and the bidder has agreed to give the required

performance security;

iv. other conditions, as specified in the tender document are fulfilled

v. any other information which the committee may consider appropriate.

f) No Bid shall be rejected at the time of Bid opening except the Bids not

accompanied with the proof of payment or instrument of the required price of

bidding document, processing fee and bid security.

g) The Commercial Bid cover will be kept unopened and shall be opened on the date

and time intimated to the bidders who qualify in the evaluation of technical Bids.

Page 261: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 20 of 121

2.13 Selection Method:

a) The selection method is Quality cum Cost Based Selection (QCBS).

2.14 Clarification of Bids

a) To assist in the examination, evaluation, comparison and qualification of the Bids,

the purchase committee may, at its discretion, ask any bidder for a clarification

regarding its Bid. The committee‟s request for clarification and the response of the

bidder shall be through the e-Procurement portal.

b) Any clarification submitted by a bidder with regard to its Bid that is not in response

to a request by the committee shall not be considered.

c) No change in the prices or substance of the Bid shall be sought, offered, or

permitted, except to confirm the correction of arithmetic errors discovered by the

committee in the evaluation of the commercial Bids.

d) No substantive change to qualification information or to a submission, including

changes aimed at making an unqualified bidder, qualified or an unresponsive

submission, responsive shall be sought, offered or permitted.

2.15 Overall Evaluation Process

a) A tiered evaluation procedure will be adopted for evaluation of proposals, with the

technical evaluation being completed before the commercial proposals are opened

and compared.

b) Only those bidders who qualify on the Pre qualification criteria‟s will qualify for the

next level that is evaluation of the technical bids.

c) Rajasthan Police will review the technical bids of the short-listed bidders to

determine whether the technical bids are substantially responsive. Bids that are not

substantially responsive are liable to be disqualified. Rajasthan Police may seek

inputs from their professional, external experts in the technical and commercial

evaluation process.

d) The Rajasthan Police shall assign technical score to the bidders based on the

technical evaluation criteria. The bidders with a technical score above the threshold

as specified in the technical evaluation criteria shall technically qualify for the

commercial evaluation stage.

e) The commercial bids for the technically qualified bidders will then be opened and

reviewed to determine whether the commercial bids are substantially responsive.

Page 262: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 21 of 121

2.16 Pre-Qualification Criteria

The invitation for bids is open to all entities registered in India who fulfil prequalification

criteria as specified below:

S

No

The Bidder shall satisfy all of the

criteria below:

Supporting Document

Required

a. The Bidder should be an Information

Technology System Integrator with a

registered office and operations in

India. The company should be

operational in India for at least last five

(5) financial years as on 31st March

2013. The Bidder has to be a single legal

entity.

Certificate of Incorporation/

Registration

b. The Bidder must have an office in

Jaipur, Rajasthan or should furnish an

undertaking that the same would be

established within two months of

signing the contract.

Self certification by the bidder

c. The Bidder must have an annual

turnover of not less than Rs. 500

Crore in each of the last five financial

years (as on 31-03-2013) from IT

services (IT Infrastructure

procurement and commissioning, IT

Application Customization, Integration

with legacy systems, Deployment and

Maintenance). The Bidder should have

a positive net worth of at-least Rs. 100

Crore for last year (as on 31-03-2013)

Audited/Certified Annual Financial

Statements and/or Annual Report

for the five financial years.

d. The Bidder must have a proven track

record of providing a successful

„Turnkey Solution‟ for at least 5 IT-

project in India in last 5 years as on 31st

March 2013. At least one of the 5

quoted projects should be an integrated

turnkey project of a value of Rs. 20

Crores or more in India including

setting up and configuring the hardware

(Servers, Desktop, Network Clients) and

Bidder must provide supporting

documentary proof in form of work

orders confirming year and area of

activity, value of services delivered

for that project, Completion / Partial

Completion Certificate from Client

or self certification confirming year

and value of Bidder‟s scope of work

completed by the Bidder and its

value along with Reference details of

Page 263: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 22 of 121

implementing software solution

including Operating Systems,

Infrastructure Management Software,

RDBMS, establishment of LAN / WAN

including Firewalls, IPS, PKI, etc. and

providing life cycle support.

the Client.

e. The Bidder must have a proven track

record of successfully completed or

implementing at least 2 e-

Governance projects summing up

to a value of Rs. 10 Crores or above in

last 5 years as on 31st March 2013.

Bidder must provide supporting

documentary proof in form of work

orders confirming year and area of

activity, value of services delivered

for that project, Completion / Partial

Completion Certificate from Client

or self certification confirming year

and value of Bidder‟s scope of work

completed by the Bidder and its

value along with Reference details of

the Client.

f. The Bidder must have prior experience

of working on at least 1 Software

services Project for Central / State

Government / PSU undertaken in the

last 5 years as on 31st March 2013. The

project cost should be of Rs. 5 Crore

or more .

Bidder must provide supporting

documentary proof in form of work

orders confirming year and area of

activity, value of services delivered

for that project, Completion / Partial

Completion Certificate from Client

or self certification confirming year

and value of Bidder‟s scope of work

completed by the Bidder and its

value along with Reference details of

the Client.

g. The performance security deposit of the

bidder should have not been forfeited

during last 5 years, due to its non-

performance in any CCTNS project in

India or any e-Governance project in

Rajasthan

Self certification by the bidder

h. The Bidder must have been assessed

and must possess a valid certification

for SEI CMMi (Capability Maturity

Model Integration) Level 5

Copy of SEI CMMi Level 5 certificate

or reassessment self certification (in

case if reassessment is applied for).

In case of pending reassessment, the

bid shall be rejected if the Bidder

fails to submit the valid certificate a

Page 264: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 23 of 121

day before the date of opening of

Commercial Bids or by 26.03.2014,

whichever is earlier.

If, for any reason, the last date for

submission of Bid is extended

beyond 26.03.2014, the CMMi level

5 certificate must be submitted

alongwith the Bid itself.

i. The Bidder must have been assessed

and must possess a valid ISO 9001:

2008, ISO 27001 or above

certificate as on the date of submission

of bid

Copy of ISO 9001: 2008 / 27001 or

above compliance certificates

j. Bidder should: -

not be insolvent, in receivership,

bankrupt or being wound up, not

have its affairs administered by a

court or a judicial officer, not have

its business activities suspended

and must not be the subject of legal

proceedings for any of the foregoing

reasons;

not have, and their directors and

officers not have, been convicted of

any criminal offence related to their

professional conduct or the making

of false statements or

misrepresentations as to their

qualifications to enter into a

procurement contract within a

period of three years preceding the

commencement of the procurement

process, or not have been otherwise

disqualified pursuant to debarment

proceedings;

not have a conflict of interest in the

procurement in question as

specified in the bidding document.

comply with the code of integrity as

specified in the bidding document.

A Self Certified letter as per Format

4.1 – (iii): Self-Declaration

Page 265: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 24 of 121

Notes:

i. ‘IT-projects‟ relates to projects involving IT Infrastructure procurement and

commissioning, IT Application Customization, Integration with legacy

systems, Deployment and Maintenance

ii. ‟e - Governance projects‟ is defined as „deployment of IT systems for

Central/State Government Departments or Government Undertakings in

India.

iii. „Software Services Project‟ relates to projects involving development or

deployment of an IT application and Maintenance of the same.

iv. In respect of both i and ii above, the Bidder should have been directly

responsible for the implementation of the projects.

2.17 Sub-Contracting

For items such as Site Preparation, Data digitization/migration the bidder may work

with a sub-contractor firm(s); however sub-contracting is subject to written approval

from Rajasthan Police. The bidder cannot sub-contract the core activities of CCTNS

implementation such as Hardware & IT infrastructure implementation, CAS

Customization/Application Development, capacity building and handholding. The

Successful bidder shall provide plan of activities to be sub-contracted with the technical

proposal for Site Preparation, Data digitization and migration. It is clarified that the

Successful bidder shall be the principal employer for all claims arising from the liabilities

statutory or otherwise, concerning the sub-contractors. The Successful bidder

undertakes to indemnify the Rajasthan Police or its nominated agencies from any claims

on the grounds stated hereinabove.

Subcontracting non-core activities as mentioned above to companies fulfilling the

following conditions;-

Data digitization/migration:-

a) Preference should be given who has experience in CCTNS project.

b) The subcontractor should be in the business for last 3 years (March,2013).

c) The subcontractor must have Service Tax Registration Number/PAN Number

d) The sub-contractor must have completed atleast 1 project for Government/PSU

in the relevant field.

2.18 Evaluation of Technical Proposals

The evaluation of the Technical bids will be carried out in the following manner:

a) The bidders' technical solution proposed in the bid document is evaluated as per

the requirements specified in the RFP and adopting the evaluation criteria as

specified in this RFP. The bidders are required to submit all required

Page 266: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 25 of 121

documentation in support of the evaluation criteria specified (e.g. detailed project

citations and completion certificates, client contact information for verification,

profiles of project resources and all others) as required for technical evaluation.

b) The committee may seek oral clarifications from the bidders. The primary function

of clarifications in the evaluation process is to clarify ambiguities and uncertainties

arising out of the evaluation of the bid documents. Oral clarifications provide the

opportunity for the committee to state its requirements clearly and for the

bidder to more clearly state its proposal. The committee may seek inputs from

their professional and technical experts in the evaluation process.

c) Following will be the technical evaluation methodology:

i. Technical Bid would be evaluated and marks would be awarded out of total

50 Marks.

ii. Only those bidders, who score more than 70% marks in technical bid will

qualify for the second round ( i.e commercial evaluation of the bids).

iii. The Rajasthan Police will intimate bidders about the results of the technical

evaluation through a written communication or through email. The technical

scores of the bidders will be announced prior to the opening of the

commercial bids.

iv. The technically shortlisted bidders will be informed of the date and venue of

the opening of the commercial bids through a written communication or

through email.

v. The technical response must meet all mandatory compliance requirements.

Bidder must submit undertakings and document as per format prescribed in

this RFP. Failure to meet any of the following may result in the

disqualification of the technical bid response.(For complete details on the

undertakings and formats, refer to section 4, of this RFP)

S No Name of Undertakings/Document Type Format No

1. Undertaking on Patent Rights 4.2.1

2. Undertaking on Conflict of Interest 4.2.2

3. Undertaking on Non-malicious Code Certificate 4.2.3

4. Undertaking on Pricing of Items of Technical

Response 4.2.4

5. Undertaking on Offline Functionality 4.2.5

6. Undertaking on Provision of Required Storage

Capacity 4.2.6

7. Undertaking on Compliance and Sizing of

Infrastructure 4.2.7

Page 267: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 26 of 121

8. Undertaking on Provision for Support for Software 4.2.8

9. Undertaking on Service Level Compliance 4.2.9

10. Undertaking on Deliverables 4.2.10

11. Undertaking on Training for Users 4.2.11

12. Undertaking on Support to Certification 4.2.12

13. Undertaking on Exit Management and Transition 4.2.13

14. Undertaking on Continuous Improvement 4.2.14

15. Undertaking on Personnel 4.2.15

16. Undertaking on Provision of Work Environment 4.2.16

17. Undertaking on Changes to the Contract Clauses 4.2.17

18. Undertaking from OEM on Authorization of use of

their OEM products. 4.2.18

19. Certificate of Conformity/No Deviation 4.2.19

20. Bidder‟s Authorization Certificate 4.2.20

21. Bill of Material – Software Solution 4.2.21

22. Bill of Material for Infrastructure 4.2.22

23. Undertaking on Profiles of Previous Project

Experience 4.2.23

24. Team Profile 4.2.24

Page 268: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 27 of 121

2.19 Technical Evaluation Scoring Matrix:

S.

No.

Evaluation Criteria Point System Max

Score

1 Past Experience and Organizational Strength

A Number of years in System

Integration

The Bidder should be operational as System Integrator in India in the last 5

financial years as on 31st March 2013: -

>10 Years - 7 Points;

>8 =< 10 Years - 5 Points;

> 5 =< 8 Years - 3 Points;

Bidder shall submit Purchase Order/ Work Order issued by client as a

supporting document.

7

B Implementation experience of e-

governance projects

Note: Please provide work order

for all the stated projects and

project completion certificates for

completed projects

The Bidder should have experience in implementing at least 2 e-governance

projects each of order value of Rs. 10 crore or above in the last 5 financial years.

The points shall be awarded on the following basis: -

i. 1 mark for each project under implementation

ii. 2 marks for each completed project

7

Page 269: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 28 of 121

C Experience of working on software

(design/ development) projects for

GoI / any of the State/UT

Note: Please provide work order

for all the stated projects and

project completion certificates for

completed projects

The Bidder should have experience of at least one project on software

(design/development) with order value of at least Rs 5 crore in last 5 years for

the Government of India/State/UT governments or Public Sector Units. The

points shall be awarded on the following basis:-

i. 1 mark for each project under implementation

ii. 2 marks for each completed project

7

D Experience of working on Turn-key

IT projects

Note: Please provide work order

for all the stated projects and

project completion certificates for

completed projects

The Bidder should have experience in providing Turn-key solution for at least 5

IT projects in last 5 financial years. The points shall be awarded on the following

basis:-

i. 1 mark for each project under implementation

ii. 2 marks for each completed project

7

E Operation and Maintenance of

Data Centre or Disaster Recovery

Note: Please provide work order

for all the stated projects and

project completion certificates for

The Bidder should have experience in Operation & Maintenance of atleast 2

Data Centre and /or Disaster Recovery Projects in the Government Domain in

the last 5 years. The points shall be awarded on the following basis:-

i. 1 mark for each project under Operations and Maintenance phase

7

Page 270: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 29 of 121

completed projects ii. 2 marks for each completed project (O&M)

F Mission Mode Projects (MMP) in

India

Note: Please provide work order

for all the stated projects and

project completion certificates for

completed projects

The Bidders having experience in implementing Mission Mode Projects (MMP)

would be evaluated as under: -

i. 1 mark for each project under implementation

ii. 2 marks for each completed project

5

G Capacity Building and Change

Management

Note: Please provide work order

for all the stated projects and

project completion certificates for

completed projects

The Bidder should have experience in at least one capacity building (Training

Government Personnel) and change management project (worth of at least Rs.

50 Lakhs or above) for any Central/ State/ UT Government/ PSUs in India in

the last 5 years. The points shall be awarded on the following basis:-

i. 1 mark for each project under implementation

ii. 2 marks for each for completed project

5

Page 271: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-II -CCTNS Rajasthan

Rajasthan Police Page 30 of 121

H Financial Strength The Bidder must have an annual turnover of more than Rs. 500 Crores in each

of the last 5 year. The points shall be awarded on the following basis:-

Annual Turnover of

> 1500 Crores each for the past 5 years - 5 Points;

>1000<=1500 Crores each for the past 5 years - 3 Points;

>500<=1000 Crores each for the past 5 years – 2 Points;

5

Total 50

Note:

1. Only those Projects will be considered which have been either allotted OR allotted and completed between 1st April 2008 and

31st March 2013.

2. Bidder shall submit Work Order (for projects under implementation and completed) and Project Completion Certificate (for

completed projects) issued by client only.

3. One project can be considered for evaluation under multiple criteria, wherever applicable.

Page 272: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 31 of 121

2.20 Non-material Non-conformities in Bids

a) The purchase committee may waive off any non-conformities in the Bid that do not

constitute a material deviation, reservation or omission, the Bid shall be deemed to

be substantially responsive.

b) The purchase committee may request the bidder to submit the necessary

information or document like audited statement of accounts/ CA Certificate,

Registration Certificate, VAT/ CST clearance certificate, ISO/ CMMi Certificates,

etc. within a reasonable period of time. Failure of the bidder to comply with the

request may result in the rejection of its Bid.

c) The purchase committee may rectify non-material nonconformities or omissions

on the basis of the information or documentation received from the bidder under

(b) above.

2.21 Technical Proposal

a) The technical proposal should include all the mandatory undertakings

b) The technical proposal should address all the areas/ sections as specified by the

RFP and should contain a detailed description of how the bidder will provide the

required services outlined in this RFP. It should articulate in detail, as to how the

bidder‟s Technical Solution meets the requirements specified in the RFP Volume I.

The technical proposal must not contain any pricing information. If the

technical proposal contains any commercial information, the proposal is liable to

be rejected. In submitting additional information, please mark it as

“supplementary” to the required response. If the bidder wishes to propose

additional services (or enhanced levels of services) beyond the scope of this RFP,

the proposal must include a description of such services as a separate and

distinct attachment to the proposal.

c) The technical proposal must furnish details about previous project experience for

all the criteria in the technical evaluation matrix in the format provided in the RFP

d) The Technical Proposal should be structured under the following minimum heads

i. Overview of the proposed solution that meets the requirements specified in

the RFP

ii. Overall proposed Solution, technology, and deployment architecture

iii. Security architecture

iv. Integration and Interfacing Architecture

v. Network architecture

vi. Details of the Solution as per the format provided in the RFP

vii. Bill of material of all the components (i.e. software, hardware, etc.) as per the

formats provided in the RFP.

Page 273: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 32 of 121

viii. Approach & methodology for project development and implementation

including the project plan

ix. Overall Governance Structure and Escalation Mechanism

x. Project team structure, size, capability and deployment plan (Total

Staffing plan including numbers)

xi. Training and Communication Strategy for key stakeholders of the project

xii. Key Deliverables (along with example deliverables, where possible)

xiii. Project Management, reporting and review methodology

xiv. Strategy for conducting Operations & Maintenance

xv. Risk Management approach and plan

xvi. Certification from the OEMs on the Infrastructure proposed by bidder

xvii. Bidder‟s experience in all the project related areas as highlighted in Bid

evaluation criteria

xviii. Data Migration/ Digitization,

xix. Change Management / Capacity Building

xx. Exit Management

e) Comprehensive Project Plan along with manpower deployment plan and resources

to be dedicated to the project.

f) The technical proposal shall also contain bidder‟s plan to address the key

challenges anticipated during the execution of the project.

g) Rajasthan Police is also open to any suggestions that the bidder may want to render

with respect to the approach adopted for the assignment in the light of their

expertise or experience from similar assignments. However, this should not lead

to the submission date being missed or extended.

2.22 Tabulation of Technical Bids

a) If Technical Bids have been invited, they shall be tabulated by the purchase

committee in the form of a comparative statement to evaluate the qualification of

the bidders against the criteria for qualification set out in the bidding document.

b) The members of purchase committee shall give their recommendations below the

table as to which of the bidders have been found to be qualified in evaluation of

Technical Bids and sign it.

c) The number of firms qualified in technical evaluation, if less than three and it is

considered necessary by the Rajasthan Police to continue with the procurement

process, reasons shall be recorded in writing and included in the record of the

procurement proceedings.

Page 274: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 33 of 121

d) The bidders who qualified in the technical evaluation shall be informed in writing

about the date, time and place of opening of their commercial Bids.

2.23 Evaluation & Tabulation of Commercial Bids

The Rajasthan Police shall take following actions for evaluation of commercial Bids:-

a) for two part Bid system, the commercial Bids (as per Format 4.3.2 & BoQ) of the

bidders who qualified in technical evaluation shall be opened online at the notified

time, date and place by the purchase committee in the presence of the bidders or

their representatives who choose to be present.

b) the process of opening of the commercial Bids shall be similar to that of technical

Bids.

c) the names of the bidders, the rates given by them and conditions put, if any, shall

be read out and recorded;

d) conditional Bids are liable to be rejected;

e) the evaluation shall include all costs and all taxes and duties applicable to the

bidder as per law of the Central/ State Government/ Local Authorities, and the

evaluation criteria specified in the bidding documents shall only be applied.

i. For Quality and Cost based Selection (QCBS), the following formula will be

used for the evaluation of the bids.

The scores will be calculated as:

Bb = 0.3*Tb + (0.7)*(Cmin/Cb * 100)

Where

Bb = Overall score of bidder under consideration (calculated up to two

decimal points)

Tb = Technical score for the bidder under consideration

Cb = Commercial bid for the bidder under consideration

Cmin = Lowest Commercial Bid among the financial proposals under

consideration

f) Bidder will have to ensure that cost of O&M phase should be equal to or greater

than 20% of the total project cost. All bids in which O&M cost is less than 20% of

overall Project cost are liable to be rejected.

g) The bidder achieving the highest overall score may be invited for negotiations (as

per Clause 2.27)for awarding the contract. In case of a tie where two or more

bidders achieve the same highest overall score, the bidder with the higher technical

score will be invited first for negotiations for awarding the contract.

Page 275: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 34 of 121

h) The purchase committee will prepare a comparative statement in tabular form in

accordance with rules along with its report on evaluation of commercial Bids and

recommend the highest score Bid to Rajasthan Police;

i) It shall be ensured that the offer recommended for sanction is justifiable looking to

the prevailing market rates of the goods, works or service required to be procured.

2.24 Correction of Arithmetic Errors in Commercial Bids

The purchase committee shall correct arithmetical errors in substantially responsive

Bids, on the following basis, namely: -

a) if there is a discrepancy between the unit price and the total price that is obtained

by multiplying the unit price and quantity, the unit price shall prevail and the total

price shall be corrected, unless in the opinion of the purchase committee there is an

obvious misplacement of the decimal point in the unit price, in which case the total

price as quoted shall govern and the unit price shall be corrected;

b) if there is an error in a total corresponding to the addition or subtraction of

subtotals, the subtotals shall prevail and the total shall be corrected; and

c) if there is a discrepancy between words and figures, the amount in words shall

prevail, unless the amount expressed in words is related to an arithmetic error, in

which case the amount in figures shall prevail subject to clause (a) and (b) above.

2.25 Comparison of rates of firms outside and those in Rajasthan

While tabulating the commercial Bids of those firms which are not entitled to price

preference, the element of Rajasthan Value Added Tax (RVAT) shall be excluded from

the rates quoted by the firms of Rajasthan and the element of Central Sales Tax (CST)

shall be included in the rates of firms from outside Rajasthan for commercial bid

evaluation purpose.

2.26 Price and purchase preference in evaluation

Price and purchase preference notified by the State Government (GoR) and as

mentioned in the bidding document shall be considered in the evaluation of Bids and

award of contract.

2.27 Negotiations with Bidder

a) Except in case of procurement by method of single source procurement or

procurement by competitive negotiations, to the extent possible, no negotiations

shall be conducted after the pre-bid stage. All clarifications needed to be sought

shall be sought in the pre-bid stage itself.

b) Negotiations may, be undertaken only, when the rates are considered to be much

higher than the prevailing market rates.

Page 276: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 35 of 121

c) The purchase committee have full powers to undertake negotiations. Detailed

reasons and results of negotiations shall be recorded in the proceedings.

d) The highest overall score bidder will be informed in writing either through

registered letter and e-mail (if available). A minimum time of seven days will be

given for negotiations. In case of urgency the purchase committee, after recording

reasons, may reduce the time, provided the highest overall score bidder has

received the intimation and consented to regarding holding of negotiations.

e) Negotiations shall not make the original offer made by the bidder inoperative. The

purchase committee shall have option to consider the original offer in case the

bidder decides to increase rates originally quoted or imposes any new terms or

conditions.

f) In case of non-satisfactory achievement of rates from the highest overall score

bidder, purchase committee may choose to make a written counter offer to the

highest overall score bidder and if this is not accepted by bidder , then the

committee may decide to reject and re-invite Bids or to make the same counter-

offer first to the second highest overall score bidder, and so on . This procedure

would be used in exceptional cases only.

g) In case the rates even after the negotiations are considered very high, fresh Bids

may - be invited.

2.28 Exclusion of Bids and Disqualification

a) Rajasthan Police shall exclude and disqualify a Bid, if: -

i. the information submitted, concerning the qualifications of the bidder, was

false or constituted a misrepresentation; or

ii. the information submitted, concerning the qualifications of the bidder, was

materially inaccurate or incomplete; and

iii. the bidder is not qualified as per pre-qualification criteria mentioned in the

bidding document;

iv. the Bid materially deviates from the requirements specified in the bidding

document or it contains false information;

v. the bidder while submitting the Bid or his agent or any one acting on his

behalf, gave or agreed to give, to any officer or employee of the Rajasthan

Police or other governmental authority a gratification in any form, or any

other thing of value, so as to unduly influence the procurement process;

vi. a bidder, in the opinion of the Rajasthan Police, has a conflict of interest

materially affecting fair competition.

b) Bid shall be excluded and disqualified as soon as the cause for its exclusion and

disqualification is discovered.

Page 277: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 36 of 121

2.29 Lack of competition

a) Situation may arise where, if after evaluation of Bids, the purchase committee may

end-up with one responsive Bid only. In such situation, the purchase committee

would check as to whether while floating the NIB all necessary requirements to

encourage competition like standard bid conditions, industry friendly

specifications, wide publicity, sufficient time for formulation of Bids, etc. were

fulfilled. If not, the NIB would be re-floated after rectifying deficiencies. The bid

process shall be considered valid even if there is one responsive Bid, provided that:

i. the Bid is technically qualified;

ii. the price quoted by the bidder is assessed to be reasonable;

iii. the Bid is unconditional and complete in all respects;

iv. there are no obvious indicators of cartelization amongst bidders; and

v. the bidder is qualified as per the provisions of pre-qualification criteria in the

bidding document

b) The purchase committee shall prepare a justification note for approval by the

Empowered committee of the Rajasthan Police, with the concurrence of the

accounts member.

c) In case of dissent by any member of purchase committee, the Empowered

committee shall decide as to whether to sanction the single Bid or re-invite Bids

after recording reasons.

d) If a decision to re-invite the Bids is taken, market assessment shall be carried out

for estimation of market depth, eligibility criteria and cost estimate.

2.30 Acceptance of the successful Bid and award of contract

a) The Rajasthan Police after considering the recommendations of the purchase

committee and the conditions of Bid, if any, commercial implications, trials,

sample testing and test reports, etc., shall accept or reject the successful Bid. If any

member of the purchase committee has disagreed or given its note of dissent, the

matter shall be referred to the Empowered committee, for decision.

b) Decision on Bids shall be taken within original validity period of Bids and time

period allowed to Rajasthan Police for taking decision. If the decision is not taken

within the original validity period or time limit allowed for taking decision, then

the matter may be referred to the Empowered Committee for decision.

c) The Bid submitted by bidder shall be treated as successful only after the purchase

committee ensures that it is in compliance with the terms and condition mentioned

in this bidding document.

d) Rajasthan Police may award the contract to the bidder whose offer has been

determined to be the highest score in accordance with the evaluation criteria set

out in the bidding document.

Page 278: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 37 of 121

e) Prior to the expiration of the period of bid validity, the Rajasthan Police shall

inform the successful bidder, in writing, that its Bid has been accepted.

f) As soon as a Bid is accepted by the Rajasthan Police, a written intimation will be

sent to the concerned bidder by registered post or email. Bidder shall sign the

contract within 15 days of issue of LoI. Bidder will have to submit a PBG of value as

defined in RFP

g) If the issuance of formal letter of acceptance is likely to take time, in the meanwhile

a Letter of Intent (LOI) may be sent to the bidder. The acceptance of an offer is

complete as soon as the letter of acceptance or letter of intent is sent by email to the

email id of the bidder given in the bidding document. Until a formal contract is

executed, the letter of acceptance or LOI shall constitute a binding contract.

h) The bid security of the bidders whose Bids could not be accepted shall be refunded

soon after the contract with the successful bidder is signed and its performance

security is obtained.

2.31 Information and publication of award

Information of award of contract shall be communicated to all participating bidders and

published on the respective website(s) as specified in NIB.

2.32 Rajasthan Police’s right to accept or reject any or all Bids

The Rajasthan Police reserves the right to accept or reject any Bid, and to annul (cancel)

the bidding process and reject all Bids at any time prior to award of contract, without

thereby incurring any liability to the bidders.

2.33 Advance Bank Guarantee

Advance Bank Guarantee equalling to the 5% of the cost of implementation (against the

advance of equal amount given by Rajasthan Police) would be furnished by the bidder as

per the format provided in this RFP from scheduled bank. Details of the bank are to be

furnished in the commercial offer. The Advance Bank Guarantee (ABG) should be

furnished at the time of signing of the contract and should be valid for 2 year from the

date of signing of the contract. The bidder will have to extend the validity of ABG if

required at the discretion of Rajasthan Police. The bidder would submit the appropriate

supporting documents for the utilization of advance amount within 15 days from the last

day of the fund utilization. The applicable interest rate of 18%, if the advance amount is

not utilized during initial 6 months, shall be charged and adjusted against the due

payment of the bidder. The amount given against the ABG will be adjusted during the

payment due at the time of Project Go-Live.

Page 279: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 38 of 121

2.34 Performance Security Deposit (PSD)

a) Prior to execution of agreement, Performance security shall be obtained from the

successful bidder.

b) The amount of performance security shall be 10% of the amount of supply order /

work order .

c) Performance security shall be furnished in any one of the following forms: -

i. deposited through eGRAS;

ii. Bank Draft or Banker's Cheque of a scheduled bank;

iii. National Savings Certificates and any other script/ instrument under

National Savings Schemes for promotion of small savings issued by a Post

Office in Rajasthan, if the same can be pledged under the relevant rules. They

shall be accepted at their surrender value at the time of bid and formally

transferred in the name of Rajasthan Police with the approval of Head Post

Master;

iv. Bank Guarantee/s of a scheduled bank (Refer Format 4.9): It shall be verified

from the issuing bank. Other conditions regarding Bank Guarantee shall be

same as mentioned in the bidding document for bid security;

v. Fixed Deposit Receipt (FDR) of a scheduled bank. It shall be in the name of

Rajasthan Police on account of bidder and discharged by the bidder in

advance. The Rajasthan Police shall ensure before accepting the FDR that the

bidder furnishes an undertaking from the bank to make payment/ premature

payment of the FDR on demand to the Rajasthan Police without requirement

of consent of the bidder concerned. In the event of forfeiture of the

performance security, the Fixed Deposit shall be forfeited along with interest

earned on such Fixed Deposit

d) Performance security furnished in the form specified in clause [ii.] to [v.] of (c)

above shall remain valid for a period of 60 days beyond the date of completion of

all contractual obligations of the bidder, including warranty obligations and

maintenance and defect liability period.

e) Forfeiture of Performance Security Deposit: Security amount in full or part may be

forfeited, including interest, if any, in the following cases:-

i. when any terms and condition of the contract is breached.

ii. when the bidder fails to make complete supply satisfactorily.

iii. if the bidder breaches any provision of code of integrity, prescribed for

bidders, specified in the bidding document.

f) Notice will be given to the bidder with reasonable time before PSD deposited is

forfeited.

g) No interest shall be payable on the PSD.

Page 280: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 39 of 121

2.35 Execution of Contract

a) A procurement contract shall come into force from the date of issue of the letter of

acceptance or letter of intent.

b) The successful bidder shall sign the procurement contract within 15 days from the

date issue of letter of acceptance or letter of intent.

c) If the bidder, whose Bid has been accepted, fails to sign contract and/or fails to

furnish the required performance security within specified period, the Rajasthan

Police shall take action against the successful bidder as per the provisions of the

bidding document and RTPP Act, 2012 & RTPP Rules, 2013. The Rajasthan Police

may, in such case, cancel the procurement process or if it deems fit, offer for

acceptance the rates of the next highest overall score bidder, in accordance with the

criteria and procedures set out in the bidding document.

d) The bidder will be required to execute the agreement on a non-judicial stamp paper

as applicable at its own cost and to be purchased from Rajasthan only.

2.36 Confidentiality

a) Notwithstanding anything contained in this bidding document but subject to the

provisions of any other law for the time being in force providing for disclosure of

information, bidder shall not disclose any information if such disclosure, in its

opinion, is likely to: -

i. impede enforcement of any law;

ii. affect the security or strategic interests of India;

iii. affect the intellectual property rights or legitimate commercial interests of

Rajasthan Police;

b) The bidder shall treat all communications with Rajasthan Police related to the

procurement process in such manner as to avoid their disclosure to competing

bidders or to any other person not authorized to have access to such information.

c) The Rajasthan Police may impose on bidders and sub-contractors, if there are any

for fulfilling the terms of the procurement contract, conditions aimed at protecting

information, the disclosure of which violates (a) above.

d) In addition to the restrictions specified above, the Rajasthan Police, while

procuring a subject matter of such nature which requires the Rajasthan Police to

maintain confidentiality, may impose condition for protecting confidentiality of

such information.

2.37 Cancellation of procurement process

a) If this procurement process has been cancelled, it shall not be reopened but it shall

not prevent the Rajasthan Police from initiating a new procurement process for the

same subject matter of procurement, if required.

Page 281: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 40 of 121

b) A Rajasthan Police may, for reasons to be recorded in writing, cancel the process of

procurement initiated by it -

i. at any time prior to the acceptance of the successful Bid; or

ii. after the successful Bid is accepted in accordance with (d) and (e) below.

c) The Rajasthan Police shall not open any bids or proposals after taking a decision to

cancel the procurement and shall return such unopened bids or proposals.

d) The decision of the Rajasthan Police to cancel the procurement and reasons for

such decision may communicated to bidders that participated in the procurement

process.

e) If a bidder/ organization is convicted of any offence under the any Act, the

Rajasthan Police may: -

i. cancel the relevant procurement process if the Bid of the convicted bidder has

been declared as successful but no procurement contract has been entered

into;

ii. cancel the relevant contract or forfeit the payment of all or a part of the

contract value if the procurement contract has been entered into between the

Rajasthan Police and the convicted bidder.

2.38 Code of Integrity for Bidders

a) No person participating in a procurement process shall act in contravention of the

code of integrity prescribed by the State Government.

b) The code of integrity include provisions for: -

i. prohibiting

1. any offer, solicitation or acceptance of any bribe, reward or gift or any

material benefit, either directly or indirectly, in exchange for an unfair

advantage in the procurement process or to otherwise influence the

procurement process;

2. any omission, including a misrepresentation that mislead or attempts to

mislead so as to obtain a commercial or other benefit or avoid an

obligation;

3. any collusion, bid rigging or anti-competitive behavior to impair the

transparency, fairness and progress of the procurement process;

4. improper use of information shared between the Rajasthan Police and the

bidders with an intent to gain unfair advantage in the procurement

process or for personal gain;

5. any commercial or business transactions between the bidder and any

officer or employee of the Rajasthan Police;

6. any coercion including impairing or harming or threatening to do the

same, directly or indirectly, to any party or to its property to influence the

Page 282: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 41 of 121

procurement process; any obstruction of any investigation or audit of a

procurement process;

ii. disclosure of conflict of interest;

iii. disclosure by the bidder of any previous transgressions with any entity in

India or any other country during the last three years or of any debarment by

any other procuring entity.

c) Without prejudice to the provisions below, in case of any breach of the code of

integrity by a bidder or prospective bidder, as the case may be, the Rajasthan

Police may take appropriate measures including: -

i. exclusion of the bidder from the procurement process;

ii. calling-off of pre-contract negotiations and forfeiture or encashment of bid

security;

iii. forfeiture or encashment of any other security or bond relating to the

procurement;

iv. recovery of payments made by the Rajasthan Police along with interest

thereon at bank rate;

v. cancellation of the relevant contract and recovery of compensation for loss

incurred by the Rajasthan Police;

vi. Debarment of the bidder from participation in future procurements of the

Rajasthan Police for a period not exceeding three years.

2.39 Interference with Procurement Process

A bidder, who: -

a) withdraws from the procurement process after opening of commercial bids;

b) withdraws from the procurement process after being declared the successful

bidder;

c) fails to enter into procurement contract after being declared the successful bidder;

d) fails to provide performance security or any other document or security required in

terms of the bidding documents after being declared the successful bidder,

without valid grounds,

shall, in addition to the recourse available in the bidding document or the

contract, be punished with fine which may extend to fifty lakh rupees or ten per cent

of the assessed value of procurement, whichever is less.

2.40 Appeals

a) The appeals for grievance redressal during procurement process of service and

goods shall be filed under 'The Rajasthan Transparency Public Procurement Act

2012 and RTPP Rules, 2013.

b) Subject to “Appeal not to lie in certain cases” below, if any bidder or prospective

bidder is aggrieved that any decision, action or omission of the Rajasthan

Page 283: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 42 of 121

Police is in contravention to the provisions of the Act or the rules or guidelines

issued there under, he may file an appeal to such officer of the Rajasthan Police, as

may be designated by it for the purpose, within a period of 10 days from the date of

such decision or action, omission, as the case may be, clearly giving the specific

ground or grounds on which he feels aggrieved:

i. Provided that after the declaration of a bidder as successful in terms of

“Award of Contract”, the appeal may be filed only by a bidder who has

participated in procurement proceedings.

ii. Provided further that in case a Rajasthan Police evaluates the technical Bid

before the opening of the commercial Bid, an appeal related to the matter of

commercial Bid may be filed only by a bidder whose technical Bid is found to

be acceptable.

c) The officer to whom an appeal is filed under (a) above shall deal with the appeal as

expeditiously as possible and shall endeavor to dispose it of within 30 days from

the date of filing of the appeal.

d) If the officer designated under (a) above fails to dispose of the appeal filed under

that sub-section within the period specified in (c) above, or if the bidder or

prospective bidder or the Rajasthan Police is aggrieved by the order passed, the

bidder or prospective bidder or the Rajasthan Police, as the case may be, may file a

second appeal to an officer or authority designated by the State Government in this

behalf within 15 days from the expiry of the period specified in (c) above or of the

date of receipt of the order passed under (b) above, as the case may be.

e) The officer or authority to which an appeal is filed under (d) above shall deal with

the appeal as expeditiously as possible and shall endeavor to dispose it of within 30

days from the date of filing of the appeal:

f) The officer or authority to which an appeal may be filed under (a) or (d) above shall

be :

First Appellate Authority: DGP, Rajasthan Police

Second Appellate Authority: ACS (Home), Government of Rajasthan

g) Form of Appeal:

i. Every appeal under (a) and (d) above shall be as per Format-4.10 along with

as many copies as there are respondents in the appeal.

ii. Every appeal shall be accompanied by an order appealed against, if any,

affidavit verifying the facts stated in the appeal and proof of payment of fee.

iii. Every appeal may be presented to First Appellate Authority or Second

Appellate Authority, as the case may be, in person or through registered post

or authorized representative.

h) Fee for Appeal: Fee for filing appeal:

i. Fee for first appeal shall be rupees two thousand five hundred and for second

appeal shall be rupees ten thousand, which shall be non-refundable.

Page 284: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 43 of 121

ii. The fee shall be paid in the form of bank demand draft or banker‟s cheque of

a Scheduled Bank payable in the name of Appellate Authority concerned.

i) Procedure for disposal of appeal:

i. The First Appellate Authority or Second Appellate Authority, as the case may

be, upon filing of appeal, shall issue notice accompanied by copy of appeal,

affidavit and documents, if any, to the respondents and fix date of hearing.

ii. On the date fixed for hearing, the First Appellate Authority or Second

Appellate Authority, as the case may be, shall,-

1. hear all the parties to appeal present before him; and

2. peruse or inspect documents, relevant records or copies thereof relating to

the matter.

iii. After hearing the parties, perusal or inspection of documents and relevant

records or copies thereof relating to the matter, the Appellate Authority

concerned shall pass an order in writing and provide the copy of order to the

parties to appeal free of cost.

iv. The order passed under (c) shall also be placed on the State Public

Procurement Portal.

j) No information which would impair the protection of essential security interests of

India, or impede the enforcement of law or fair competition, or prejudice the

legitimate commercial interests of the bidder or the Rajasthan Police, shall be

disclosed in a proceeding under an appeal.

2.41 Stay of procurement proceedings

While hearing of an appeal, the officer or authority hearing the appeal may, on an

application made in this behalf and after affording a reasonable opportunity of hearing

to the parties concerned, stay the procurement proceedings pending disposal of the

appeal, if he is satisfied that failure to do so is likely to lead to miscarriage of justice.

2.42 Vexatious Appeals & Complaints

Whoever intentionally files any vexatious, frivolous or malicious appeal or complaint

under the “The Rajasthan Transparency Public Procurement Act 2012” and RTPP Rules

2013, with the intention of delaying or defeating any procurement or causing loss to

Rajasthan Police or any other bidder, shall be punished with fine which may extend to

twenty lakh rupees or five per cent of the value of procurement, whichever is less.

2.43 Offenses by Firms/ Companies

1. Where an offence under “The Rajasthan Transparency Public Procurement Act

2012”, RTPP Rules, 2013 has been committed by a company, every person who at

the time the offence was committed was in charge of and was responsible to the

Page 285: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 44 of 121

company for the conduct of the business of the company, as well as the company,

shall be deemed to be guilty of having committed the offence and shall be liable to

be proceeded against and punished accordingly:

2. Provided that nothing contained in this sub-section shall render any such person

liable for any punishment if he proves that the offence was committed without his

knowledge or that he had exercised all due diligence to prevent the commission of

such offence.

3. Notwithstanding anything contained in (a) above, where an offence under this Act

has been committed by a company and it is proved that the offence has been

committed with the consent or connivance of or is attributable to any neglect on

the part of any director, manager, secretary or other officer of the company, such

director, manager, secretary or other officer shall also be deemed to be guilty of

having committed such offence and shall be liable to be proceeded against and

punished accordingly.

4. For the purpose of this section-

i. "company" means a body corporate and includes a limited liability

partnership, firm, registered society or co- operative society, trust or other

association of individuals; and

ii. "director" in relation to a limited liability partnership or firm, means a

partner in the firm.

e) Abetment of certain offenses: Whoever abets an offence punishable under this Act,

whether or not that offence is committed in consequence of that abetment, shall be

punished with the punishment provided for the offence.

2.44 Debarment from Bidding

a) A bidder shall be debarred by the State Government if he has been convicted of an

offence

i. under the Prevention of Corruption Act, 1988 (Central Act No. 49 of 1988);

or

ii. under the Indian Penal Code, 1860 (Central Act No. 45 of 1860) or any other

law for the time being in force, for causing any loss of life or property or

causing a threat to public health as part of execution of a public

procurement contract.

b) A bidder debarred under (a) above shall not be eligible to participate in a

procurement process of Rajasthan Police for a period not exceeding three years

commencing from the date on which he was debarred.

c) If Rajasthan Police finds that a bidder has breached the code of integrity prescribed

in terms of “Code of Integrity for bidders” above, it may debar the bidder for a

period not exceeding three years.

d) Where the entire bid security or the entire performance security or any substitute

thereof, as the case may be, of a bidder has been forfeited by the Rajasthan Police

Page 286: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 45 of 121

in respect of any procurement process or procurement contract, the bidder may be

debarred from participating in any procurement process undertaken by the

Rajasthan Police for a period not exceeding three years.

e) Rajasthan Police, shall not debar a bidder under this section unless such bidder has

been given a reasonable opportunity of being heard.

2.45 Monitoring of Contract

a) Rajasthan Police with the assistance of SPMU may monitor the progress of the

contract during its delivery period.

b) During the delivery period the Rajasthan Police with the assistance of SPMU shall

keep a watch on the progress of the contract and shall ensure that quantity of goods

and service delivery is in proportion to the total delivery period given, if it is a

severable contract, in which the delivery of the goods and service is to be obtained

continuously or is batched. If the entire quantity of goods and service is to be

delivered in the form of completed work or entire contract like fabrication work,

the process of completion of work may be watched and inspections of the selected

bidder‟s premises where the work is being completed may be inspected.

c) If delay in delivery of goods and service is observed a performance notice would be

given to the selected bidder to speed up the delivery.

d) Any change in the constitution of the firm, etc. shall be notified forth with by the

successful bidder in writing to the Rajasthan Police and such change shall not

relieve any former member of the firm, etc., from any liability under the contract.

e) No new partner/ partners shall be accepted in the firm by the selected bidder in

respect of the contract unless he/ they agree to abide by all its terms, conditions

and deposits with Rajasthan Police through a written agreement to this effect. The

bidder‟s receipt for acknowledgement or that of any partners subsequently

accepted as above shall bind all of them and will be sufficient discharge for any of

the purpose of the contract.

2.46 Risk and Purchase

Rajasthan Police will be entitled to purchase elsewhere at the cost and risk of the vendor,

either the whole or part of the O&M services which the vendor has failed to deliver

within the stipulated time and/or to the satisfaction of Rajasthan Police. The selected

bidder shall be liable for any loss that Rajasthan Police may sustain by reason of such

risk purchases. Rajasthan Police reserves the right to cancel the contract , if performance

with respect to quality and delivery is unsatisfactory; and Rajasthan Police shall have the

right to enter into contract with other vendors against such cancellation of contract

against risk purchase clause. The conditions of the contract provide for effecting

purchase at the risk and cost of the contractor in the event of their failure in making

supply of the stores within the stipulated delivery period/extended delivery period.

Page 287: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 46 of 121

Payment Terms and

Schedule

3

Page 288: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 47 of 121

3 IMPLEMENTATION PLAN, PAYMENT TERMS AND SCHEDULE

3.1 IMPLEMENTATION AND ROLL OUT PLAN

CCTNS Rajasthan will be rolled out in single phase over a period of 2 years. The

implementation phase is further sub-divided in to five parts as activity wise:-

a) Site Preparation

b) Hardware delivery and commissioning

c) Capacity Building and Change management

d) Data digitization and migration

e) CAS customization ( may go beyond two years)

SI shall prepare a detailed roll-out plan for each of the Districts and get the same

approved by the Rajasthan Police. SI is also responsible for conducting workshops for

the key officers (State Mission Team, District Mission Team, and District Core Team) of

the Districts / State for presenting the District-Wise roll-out plan and get the approval

from the District Teams before getting the final approval of the State Mission Team. The

SI shall also provide the necessary assistance for the key officers (State Mission Team,

District Mission Team, and District Core Team) of the Districts / State during the design

and implementation of CCTNS in the State.

List of Deliverables Time Lines

(In weeks)

Signing of Contract T

Deployment of onsite Project Manager and critical vertical leads

(Networking, Infrastructure, CAS customization, Capacity Building &

Data Digitization)

T

Detailed project plan and project Kick off report

Capacity Building and Change Management Plan

Manpower Deployment Plan

Risk Management and Mitigation Plan

T+3

Deployment of On-site development team of 3 members, as per the

requirement for CAS customization (Agile)- Setting up of development

environment

T+3

Data Center & Data Recovery Site survey & deployment strategy report T+5

Study of existing Learning Management System (LMS) application

available with Rajasthan Police and propose enhancements

T+6

Site survey report of (38) Pilot and client locations T+6

Data digitization and migration plan T+6

Page 289: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 48 of 121

List of Deliverables Time Lines

(In weeks)

DC, DR, (38) Pilot and other Client locations infrastructure deployment

plan and finalized BoM

T+6

Possession of Existing DC infrastructure and deployment at CAS build

(version) available at that time.

T+6

Project Management Tool installation report T+7

Initiation of :

Preparation of training curriculum and training material

Proposed enhancements in LMS application

Development of Computer Based tutorials (CBTs)

T+8

Orientation to Change Management & Introduction to CCTNS Training

(Higher Officials) Completion report

T+8

Upload of Finalized detailed Project Plan on Project Management tool T+8

Develop at least one CBT as PoC for FIR registration module in CAS T+8

Initiation of :

Role based training program

Change Management & Introduction to CCTNS Training (Junior &

Middle level)

Core team training (Project Management, Document Management

System/ Reporting)

T+8

Deploy enhanced version of LMS after due improvements &

modifications to the satisfaction of Rajasthan Police

T+10

Project Management training Completion Report T+10

Copy of PO for hardware/ software at DC, DR, 38 locations (Pilot) &

Client locations

T+12

POC report (for 4 locations) and revised plan for Data Digitization &

Migration

T+12

Site Preparation Completion Report T+16

Change Management Training (Junior and Middle level) Completion

report

T+18

DC & DR replication plan T +22

Role based Training (Higher Officials) Completion report T+24

Train the Trainer (Role based) training Completion Report T+24

UAT & Commissioning of DC, NOC & Help desk T+ 24

UAT & Commissioning of DR T+25

UAT & Commissioning of Client Infrastructure T+ 32

Hand Holding deployment plan T+32

Third party audit and certification of report of DC & DR & Client T + 32

Page 290: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 49 of 121

List of Deliverables Time Lines

(In weeks)

location commissioning and acceptance

Go-Live of DC,DR and Client locations T + 32

Specialized training on system administration and troubleshooting

Completion Report

T+38

Role based training (Middle & Junior Officials) Completion report

1. Completion of 50% of total Role Based Training in T+35

2. Completion of 75% of total Role Based Training in T+53

3. Completion of 100% of total Role Based Training in T+70

T+70

Completion of data digitization and migration

1. Completion of 50% of total data digitization and migration and

validation in T+43

2. Completion of 75 % of total data digitization and migration and

validation in T+ 66

3. Completion of 100 % of total data digitization and migration

and validation in T+ 86

T + 86

Final validation and acceptance of all digitized data by Rajasthan Police T + 94

Migration of digitized data to production environment T+ 98

Knowledge transfer plan T + 100

Go-Live of Project (includes but not limited to)

1. Commissioning of DC & DR

2. Commissioning of Hardware at Client Locations

3. Completion of all training modules

4. Completion of Data Digitization & Migration

5. Completion of CAS customization as per approved ADC during

implementation phase

6. Third Party Audit & Acceptance

T+ 104

CAS Customization, Configuration and Deployment

As per approved Agile development cycle by Rajasthan Police during

implementation phase(though customization may continue even after

Go-Live of the project

T + 100

Operations & Maintenance Phase

Monthly Progress Report on Project including SLA Monitoring

Report and Exception Report

Details on all the issues logged

O & M for 3 years

after Go-Live of

Project

Notes:

Page 291: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 50 of 121

1. These timelines are subject to change in case of situations beyond control of SI or

Rajasthan Police.

2. The above deliverables in the form of reports or documents shall be reviewed within

15 days of submission, subject to SI's incorporation of comments or suggestions given

by Rajasthan Police.

3. In case any deliverables are not upto the mark and is rejected by the purchaser, the

submission date will be considered as appropriate deliverable submitted on next date

and LD shall be imposed as per contract.

3.2 Payment Schedules and Milestones

3.2.1 Payment Schedule

The payment schedule and milestones are divided into two phases:

a) Implementation Phase

b) Operations and Maintenance Phase

a) Implementation Phase

The payment schedule for implementation phase is divided in 3 sections below.

S. No Payment Head Payment Terms (Milestones)

I) Advance Payment

1. Advance Payment 5 % of the Implementation Cost against

the ABG

II) CAS Customization

1. Customization of CAS

80% of Man Month cost on the

completion of Agile development as

approved for particular ADC in a

particular quarter

20% after successful execution for 2

months

III) Project Implementation

1. a) Orientation to Change

Management and

Introduction to CCTNS

(Higher Officials)

b) Project Management,

Document Management

System/ Reporting

100% payment to be made on successful

completion of each training module.

Page 292: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 51 of 121

S. No Payment Head Payment Terms (Milestones)

c) Train the Trainer (Role

based)

d) Role Based training and

Management Information

System (Higher officials)

e) Specialized training on

system administration and

troubleshooting

2. Data Centre 30% payment on delivery of DC

equipments.

30% payment on Commissioning of DC

20% payment to be paid on Go-live of

project

20% payment would be paid in 12 equated

Quarterly Guaranteed Revenue (QGRs)

during O&M phase

3. Disaster Recovery Site 30% payment on Delivery of Equipments

at DR site.

30% payment on Commissioning of DR

site.

20% payment to be paid on Go-live of

project

20% payment would be paid in 12 equated

Quarterly Guaranteed Revenue (QGRs)

during O&M phase

Successful bidder to provide undertaking

stating that any movement of

installed/commissioned hardware (if

required) shall be done at no additional cost

to Rajasthan Police.

Page 293: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 52 of 121

S. No Payment Head Payment Terms (Milestones)

4. Site Preparation (Including

Electrical fittings, Earthing,

LAN cabling, Furniture etc)

80% Payment to be made on pro-rata

basis for the number of Sites prepared,

and audited by the Rajasthan

Police/SPMU/Any other agency specified

by Rajasthan Police, for the district(s)

completed in a particular quarter

20% payment would be paid in 12

equated Quarterly Guaranteed Revenue

(QGRs) during O&M phase

5. Hardware for PS & HO ( as

specified in BoM of Volume-I of

this RFP)

30% payment - on pro-rata basis on the

equipments delivered at all locations in

the district (s); in a particular quarter.

30% payment - on pro-rata basis on the

equipments commissioned with offline

CAS application at all locations in the

district (s); in a particular quarter

20% payment will be paid on Go-live of

project

20% payment would be paid in 12

equated Quarterly Guaranteed Revenue

(QGRs) during O&M phase

6. a) Change Management and

Introduction to CCTNS

(Middle & Junior Officials)

a) Role Based Training and

Basic ICT (Middle & Junior

Officials)

80% payment – on pro-rata basis for the

training which have been successfully

completed; in the district(s) in a

particular quarter. Minimum 90%

trainees need to pass in each of the

training session; if less than 90% trainees

pass then, training needs to be imparted

again for those who have not passed the

examination.

20% payment will be paid on Go-live of

project

Page 294: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 53 of 121

S. No Payment Head Payment Terms (Milestones)

7. Third Party Audit 50% payment after Go- Live of DC,DR

and Client Locations

10% payment on Go-Live of the project

40% payment would be paid in 12

equated Quarterly Guaranteed Revenue

(QGRs) during O&M phase

8. Data Digitization and Data

Migration

60% payment on pro rata basis on

completion of Data Digitization and Data

Migration at all locations in the

district(s); in a particular quarter

20% payment on final validation and

acceptance of all digitized data by

Rajasthan Police

20% payment on Go-Live of project

9. Handholding Support Handholding support will start to assist

the police station once the client

hardware is commissioned and CAS usage

commences. 100% payment would be

paid in Quarterly Guaranteed Revenue

(QGRs) based on the attendance sheet.

Note:

i. All payments to be made on pro-rata basis and on Go-Live basis (as

mentioned above in the table), shall be made quarterly. A "Quarter" is defined

as a financial year quarter i.e. April-June, July-September and so on.

ii. All payments to the successful bidder shall be made upon submission of

invoices along with relevant approvals from Rajasthan Police. Successful

bidder shall submit an undertaking along with the product invoice that all

products supplied are brand new, original and without any encumbrance.

iii. Successful bidder shall submit a certificate by the 7th of every month certifying

that all payments due in the previous month have been made to their

suppliers.

iv. Rajasthan Police shall have the authority to ask successful bidder to submit

no-dues certificate from suppliers of Hardware, Software and services, at any

stage during the project period.

Page 295: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 54 of 121

b) Operations and Maintenance Phase

The Operations and maintenance phase will start as soon as Go-Live of the project is

achieved. The successful bidder is supposed to adhere to the SLA and provide post

implementation support of warranty for a period of 3 years after Go-Live of the project.

The lump sum cost quoted for Operations and Maintenance phase will be divided into 12

equated Quarterly Guaranteed Revenue (QGR) for a period of 3 years from Go-Live of

the project. The payments during the Operations and Maintenance period will be made

at the end of every quarter after the delivery of the services upon satisfactorily adhering

to the SLA's as defined in this RFP.

Whenever the penalty is levied on Successful bidder for failing to meet the

required SLA, the quarterly installment shall be paid and the penalty (if any)

will be adjusted in the subsequent quarterly installment(s)

The payment against the hardware will be made on the basis of the actual

quantity of the items procured. Rajasthan Police will have the right for

reduction / addition in the quantity proposed. Any payments will be done on

the basis of the unit rates quoted by the bidder in the Commercial bid

Note:- 100% payment of paper and toner would be paid in pro-rata basis on material

supplied at locations covered in a particular quarter.

Page 296: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 55 of 121

Formats

4

Page 297: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 56 of 121

4 FORMATS

4.1 FORMATS FOR THE PRE-QUALIFICATION RESPONSE

Pre-Qualification Requirements Proposal: Bidders are requested to submit their

responses for the Pre-Qualification Requirements in five (5) parts, clearly labeled

according to the following criteria.

a) Part-I- Details of the Organization

i. Organizational Details

This part must include a general background of the Bidder organization (limited to 400

words) along with other details of the organization as per the format provided below in

this section. Enclose the mandatory supporting documents listed in format provided

below.

Details of the Organization

Name

Nature of the legal status in India

Nature of business in India

Date of Incorporation

Date of Commencement of Business

Address of the Headquarters

Address of the Registered Office in India

Other Relevant Information

Mandatory Supporting Documents:

a) Certificate of Incorporation from Registrar Of Companies (ROC)

b) Relevant sections of Memorandum of Association of the company or filings to the stock

exchanges to indicate the nature of business of the company

Page 298: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 57 of 121

ii. Commercial Strength Details

The bidder must also provide the commercial details of the organization (as per format

provided below in this section). Enclose the mandatory supporting documents listed in

format provided below in this section.

Commercial Information

FY 2008-09 FY 2009-10 FY 2010-11 FY 2011-12 FY 2012-13

Revenue (in

INR crores)

Profit Before

Tax (in INR

crores)

Other Relevant Information

Mandatory Supporting Documents:

a) Auditor Certified commercial statements for the Last five commercial years; 2008-09,

2009-10, 2010-2011, 2011-2012 and 2012-13 (Please include only the sections on P&L,

revenue and the assets, not the entire balance sheet.)

iii. Self declaration letter

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

In response to the NIB Ref. No. _____________________________ dated

___________ for {Project Title}, as an Owner/ Partner/ Director/ Auth. Sign. of

Page 299: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 58 of 121

____________________________________, I hereby declare that presently our

Company/ firm _________________, at the time of bidding,: -

a) possess the necessary professional, technical, financial and managerial

resources and competence required by the Bidding Document issued by the

Purchaser;

b) have fulfilled my/ our obligation to pay such of the taxes payable to the Union

and the State Government or any local authority as specified in the Bidding

Document;

c) is having unblemished record and is not declared ineligible for corrupt &

fraudulent practices either indefinitely or for a particular period of time by any

State/ Central government/ PSU/ UT.

d) does not have any previous transgressions with any entity in India or any other

country during the last three years

e) does not have any debarment by any other procuring entity

f) is not insolvent in receivership, bankrupt or being wound up, not have its

affairs administered by a court or a judicial officer, not have its business

activities suspended and is not the subject of legal proceedings for any of the

foregoing reasons;

g) does not have, and directors and officers convicted of any criminal offence

related to their professional conduct or making of false statements or

misrepresentations as to their qualifications to enter into a procurement

contract within a period of three years preceding the commencement of the

procurement process, or have been otherwise disqualified pursuant to

debarment proceedings;

h) does not have a conflict of interest as mentioned in the bidding document

which materially affects the fair competition.

i) will comply with the code of integrity as specified in the bidding document.

If this declaration is found to be incorrect then without prejudice to any other action that

may be taken as per the provisions of the applicable Act and Rules thereto prescribed by

GoR, my/ our security may be forfeited in full and our bid, to the extent accepted, may be

cancelled.

Thanking you,

Name of the Bidder: -

Authorised Signatory: -

Seal of the Organization: -

Date:

Place:

Page 300: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 59 of 121

iv. Address of the Office in Rajasthan or alternatively an undertaking

that the same would be established within two months of signing

the contract.

b) Part-II-Relevant IT Project Experience

Bidders must provide details of relevant IT project experience as per the format provided

below in this section. The projects mentioned here should match with the projects

quoted by the Bidder in order to satisfy the qualification requirements. Enclose the

mandatory supporting documents listed in format provided below in this section.

Relevant IT project experience

General Information

Name of the project

Client for which the project was

executed

Name and contact details of the

client

Project Details

Description of the project

Scope of services

Service levels being offered

Technologies used

Outcomes of the project

Other Details

Total cost of the project

Total cost of the services provided by the

Bidder

Duration of the project (no. of months,

start date, completion date, current

status)

Other Relevant Information

Page 301: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 60 of 121

Mandatory Supporting Documents:

a) Letter from the client to indicate the successful completion of the projects

Project Capability Demonstration

Complete details of the scope of the project shall be provided to indicate the relevance

to the pre-qualification criterion (which is part of minimum qualification criteria).

These capabilities may be spread over the five projects (which are part of minimum

qualification criteria) and not essentially in this project alone.

c) Part-III-Relevant e-Governance Project Experience

Bidders must provide details of relevant e-Governance project as per the format

provided below in this section. The projects mentioned here should match with the

projects quoted by the Bidder in order to satisfy the qualification requirements. Enclose

the mandatory supporting documents listed in format provided below in this section.

Relevant e-Governance project experience

General Information

Name of the project

Client for which the project was executed

Name and contact details of the client

Project Details

Description of the project

Scope of services

Service levels being offered

Technologies used

Outcomes of the project

Other Details

Total cost of the project

Page 302: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 61 of 121

Relevant e-Governance project experience

Total cost of the services provided by the

Bidder

Place (town, state) where the project was

executed (deployment, operations and

maintenance)

Duration of the project (no. of months,

start date, completion date, current

status)

Other Relevant Information

Mandatory Supporting Documents:

a) Letter from the client to indicate the successful completion of the projects (setting up

software, hardware and network infrastructure and development of the application)

Project Capability Demonstration

Complete details of the scope of the project shall be provided to indicate the relevance

to the pre-qualification criterion (which are part of minimum qualification criteria)

Following are the capabilities essential for the project. These capabilities may be spread

over the 2 projects (which are part of minimum qualification criteria) and not

essentially in this project alone. However, demonstration of these capabilities is

compulsory. Bidders are required to provide information substantiating their

qualification related to the any/ all of the capabilities. The capabilities are:

1. Online Portal Applications using SOA/Web Services with Service

Orchestration – Software Architecture, Design, Development, and

Maintenance:

Should have demonstrated this in multiple large-scale projects

Should have implemented in situations requiring high availability, security and

scalability

Should have demonstrated capabilities to meet and exceed performance levels and

service levels

2. System Integration:

Should have demonstrated ability to deliver turnkey projects successfully from design

through deployment

Should have a demonstrated ability to integrate with legacy systems as well as other

new software systems

Page 303: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 62 of 121

Relevant e-Governance project experience

Should have demonstrated experience in installation, commissioning and provisioning

of hardware, software, network in Data Centre environments

3. Project and Program Management:

Should have extensive experience in large scale project and program management

Should have experience handling multiple stakeholders and locations

Should have extensive experience in implementing and supporting projects for users in

multiple locations.

4. Commercial Strength:

Should have commercial capability to mobilize resources for large multi-year e-

governance projects

5. Capacity Building and Change Management, Awareness and Promotion:

Should have demonstrated capability in conducting capacity building and change

management programs for government stakeholders

Should have demonstrated capability in conducting promotion and awareness

campaigns for user communities

d) Part-IV-Relevant Software Services Project Experience

Bidders must provide details of relevant Software Services project experience as per the

format provided below in this section. The projects mentioned here should match with

the projects quoted by the Bidder in order to satisfy the qualification requirements.

Enclose the mandatory supporting documents listed in format provided below in this

section.

Relevant IT project experience

General Information

Name of the project

Client for which the project was

executed

Name and contact details of the

client

Project Details

Description of the project

Page 304: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 63 of 121

Relevant IT project experience

Scope of services

Service levels being offered

Technologies used

Outcomes of the project

Other Details

Total cost of the project

Total cost of the services provided by the

Bidder

Duration of the project (no. of months,

start date, completion date, current

status)

Other Relevant Information

Mandatory Supporting Documents:

a) Letter from the client to indicate the successful completion of the projects

Project Capability Demonstration

Complete details of the scope of the project shall be provided to indicate the relevance

to the pre-qualification criterion (which are part of minimum qualification criteria)

e) Part-V- Proof of Certification

Enclose the supporting documents for Assessment and Certification (CMMi Level 5

and ISO 9001:2008, ISO 27001 or above)

Page 305: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 64 of 121

4.2 FORMATS FOR THE TECHNICAL BID RESPONSE (With sign and

company seal)

4.2.1 Undertaking on Patent Rights

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Patent Rights

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/ We as bidder do hereby undertake that none of the deliverables being provided

by us is infringing on any patent or intellectual and industrial property rights as

per the applicable laws of relevant jurisdictions having requisite competence.

2. I/We also confirm that there shall be no infringement of any patent or

intellectual and industrial property rights as per the applicable laws of relevant

jurisdictions having requisite competence, in respect of the equipments, systems

or any part thereof to be supplied by us. I shall indemnify Rajasthan Police,

against all cost/claims/legal claims/liabilities arising from third party claim in

this regard at any time on account of the infringement or unauthorized use of

patent or intellectual and industrial property rights of any such parties, whether

such claims arise in respect of manufacture or use. Without prejudice to the

aforesaid indemnity, the successful bidder shall be responsible for the completion

of the supplies including spares and uninterrupted use of the equipment and/or

system or any part thereof to Rajasthan Police, and persons authorized by

Rajasthan Police, irrespective of the fact of claims of infringement of any or all

the rights mentioned above.

3. If it is found that it does infringe on patent rights, I absolve Rajasthan Police, of

any legal action.

Yours faithfully,

Authorized Signatory

Designation

Page 306: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 65 of 121

4.2.2 Undertaking on Conflict of Interest

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Conflict of Interest

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

I/ We as bidder do hereby undertake that there is, absence of, actual or potential conflict

of interest on the part of the bidder or any prospective subcontractor due to prior,

current, or proposed contracts, engagements, or affiliations with Rajasthan Police.

I/We also confirm that there are no potential elements (time frame for service delivery,

resource, commercial or other) that would adversely impact the ability of the bidder to

complete the requirements as given in the RFP.

I/We undertake and agree to indemnify and hold Rajasthan Police, harmless against all

claims, losses, damages, costs, expenses, proceeding fees of legal advisors (on a

reimbursement basis) and fees of other professionals incurred (in the case of legal fees &

fees of professionals, reasonably) by Rajasthan Police, and/or its representatives, if any

such conflict arises later.

Yours faithfully,

Authorised Signatory

Designation

Page 307: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 66 of 121

4.2.3 Non-Malicious Code Certificate

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Non-Malicious Code Certificate

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We hereby certify that the software being offered / developed as part of the

contract does not and will not contain any kind of malicious code that would activate

procedures to:

(a) Inhibit the desired and the designed function of the equipment /

solution.

(b) Cause damage to the user or his equipment / solution during or after the

operational exploitation of the equipment / solution.

(c) Tap information regarding network, network users and information

stored on the network that is classified and / or relating to National Security, thereby

contravening Official Secrets Act 1923.

2. There are / will be no Trojans, Viruses, Worms, Spywares or any malicious

software on the system and in the software offered or software that will be developed.

3. Without prejudice to any other rights and remedies available to Rajasthan Police,

I/We am liable under Information Technology Act, 2000, IT amendment Act, 2008 and

Indian Penal Code 1860 in case of physical damage, loss of information and those

relating to copyright and Intellectual Property rights (IPRs), caused due to activation of

any such malicious code in offered / developed software.

Yours faithfully,

Authorised Signatory

Designation

Page 308: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 67 of 121

4.2.4 Undertaking On Pricing of Items of Technical Response

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Pricing of Items of Technical Response

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

I/We do hereby undertake that Commercial Proposal submitted by us is inclusive of all

the items in the technical proposal and is inclusive of all the clarifications provided/may

be provided by us on the technical proposal during the evaluation of the technical offer.

I understand and agree that our Commercial Proposal is firm and final and that any

clarifications sought by you and provided by us would not have any impact on the

Commercial Proposal submitted by us.

Yours faithfully,

Authorized Signatory

Designation

Page 309: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 68 of 121

4.2.5 Undertaking on Offline Functionality

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Offline Functionality

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We as bidder do hereby undertake to design and develop all the offline

functionality required by Rajasthan Police, for the CCTNS project.

2. I/We acknowledge that the offline functionality requirement stated in Volume –

I of the RFP is indicative and that the complete range of required offline functionality

will be identified and clarified during the systems study phase of the CCTNS project.

I/We further confirm that I undertake to design and develop the offline functionality

identified during the systems study phase as required by Rajasthan Police, to be part of

CCTNS Project.

Yours faithfully,

Authorized Signatory

Designation

Page 310: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 69 of 121

4.2.6 Undertaking on Provision for Required Storage Capacity

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Provision for Required Storage Capacity

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We as bidder do hereby undertake that the proposed storage at the Disaster

Recovery Site meets the minimum RFP requirements in terms of a minimum

usable capacity of XX TB (with XXTB on FC and XXTB on SATA or

equivalent drives with storage array (FC) configured on Raid XX

configuration) on the day of commissioning the infrastructure.

2. I/We as bidder do hereby undertake that the proposed storage at the Disaster

Recovery Site as per our sizing will be sufficient to meet the RFP

requirements in terms of storing the required data.

Yours faithfully,

Authorized Signatory

Designation

Page 311: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 70 of 121

4.2.7 Undertaking on Compliance and Sizing of Infrastructure

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Compliance and Sizing of Infrastructure

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We as bidder do hereby undertake that I have proposed and sized the

hardware and all software (including licenses) based on information provided

by Rajasthan Police, in its RFP document and in accordance with the Service

Level requirements and minimum specifications provided for Software

licenses, Servers, SAN Storage, SAN Switch, Tape Library, Enterprise

Management System, Anti Virus, Backup Software and assure Rajasthan

Police, that the sizing is for all the functionality envisaged in the RFP

document.

2. Any augmentation of the proposed solution or sizing of any of the proposed

solutions (software and hardware) in order to meet the minimum tender

requirements and/or the requisite Service Level requirements given by

Rajasthan Police, will be carried out at no additional cost to Rajasthan Police.

Yours faithfully,

Authorized Signatory

Designation

Page 312: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 71 of 121

4.2.8 Undertaking on Provision of Support for Software

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Provision of Support for Software

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We as bidder do hereby undertake the provision for Annual maintenance

support/Warranty support (as defined in Annexure 6 Volume I of RFP) by OEM for all

the primary components (Web Server, Application Server, Database and Operating

System) of the Core Application Software for both State and Centre during the duration

of the contract period.

2. I/We also undertake to provide the support needed for any 3rd party products

proposed as part of Application Software during the duration of the contract period.

Yours faithfully,

Authorized Signatory

Designation

Page 313: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 72 of 121

4.2.9 Undertaking on Service Level Compliance

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Service Level Compliance

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We as bidder do hereby undertake that I shall monitor, maintain, and

comply with the service levels stated in the Annexure 1 of Volume 1 of RFP to

provide quality service to Rajasthan Police.

2. However, if the proposed number of resources is found to be not sufficient in

meeting the tender and/or the Service Level requirements given by Rajasthan

Police, then I/We will augment the team without any additional cost to

Rajasthan Police.

Yours faithfully,

Authorized Signatory

Designation

Page 314: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 73 of 121

4.2.10 Undertaking on Deliverables

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Deliverables

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We as bidder do hereby undertake the adherence to the certification and

standards applicable to the processes, deliverables/artefacts to be submitted to

Rajasthan Police, proposed as part of the bidding document.

2. I/We also recognize and undertake that the Deliverables/artefacts shall be

presented and explained to Rajasthan Police, and other key stakeholders (identified by

Rajasthan Police), and also take the responsibility to provided clarifications as requested

by Rajasthan Police.

3. I/We also understand that the acceptance, approval and sign-off of the

deliverables by Rajasthan Police, will be done on the advice of State Mission Team/

SPMU. I/We understand that while all efforts shall be made to accept and convey the

acceptance of each deliverable in accordance with the project schedule, no deliverable

will be considered accepted until a specific written communication to that effect is made

by Rajasthan Police.

Yours faithfully,

Authorized Signatory

Designation

Page 315: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 74 of 121

4.2.11 Undertaking on Training the Users

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Training the Users

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We hereby undertake to train users as per Rajasthan Police‟s requirements

stated in the bidding document. I further undertake that:

i. I/We shall carry out a comprehensive training needs analysis and

accordingly design the training program

ii. Our training program would include, at the minimum, classroom training

followed by supervised work sessions

iii. I/We shall prepare all necessary training materials and deliver the

training as per project requirements.

Yours faithfully,

Authorized Signatory

Designation

Page 316: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 75 of 121

4.2.12 Undertaking on Support to Certification

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Support to Certification

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We understand that application (including the application and the associated

IT systems) have to be certified by a 3rd party agency (to be identified by Rajasthan

Police) before the system is commissioned.

2. I/We understand that, the responsibility to ensure successful certification lies

with the bidder.

3. I/We hereby undertake that I shall do all that is required of the bidder to ensure

that system will meet all the conditions required for certification.

Yours faithfully,

Authorized Signatory

Designation

Page 317: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 76 of 121

4.2.13 Undertaking on Exit Management and Transition

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Exit Management and Transition

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We hereby undertake that at the time of completion of the engagement, I shall

successfully carry out the exit management and transition (to Rajasthan Police, or to an

agency identified by Rajasthan Police) to Rajasthan Police‟s satisfaction.

2. I/We further undertake to complete the following as part of the Exit Management

and Transition:

i. Capacity Building at Rajasthan Police,

a. I/We undertake to design team/organization structure at Rajasthan

Police, to manage the system

b. I/We undertake to carry out an analysis of the skill set requirement at

Rajasthan Police, to manage system and carry out the training &

knowledge transfer required at Rajasthan Police, to manage system

ii. Transition of project artefacts and assets

a. I/We undertake to complete the updating of all project documents

and other artefacts and handover the same to Rajasthan Police, before

transition

b. I/We undertake to design Standard Operating Procedures to manage

system (including application and IT systems), document the same

and train Rajasthan Police, personnel on the same.

3. I/We also understand that the Exit Management and Transition will be

considered complete on the basis of approval from Rajasthan Police.

Yours faithfully,

Authorized Signatory

Designation

Page 318: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 77 of 121

4.2.14 Undertaking on Continuous Improvement

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Continuous Improvement

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We understand that Continuous improvement of application is highly critical

for Rajasthan Police, and that the bidder is expected to be the lead driver of continuous

improvement during the application management phase.

2. I/We also understand that the improvements proposed as part of this Continuous

Improvement initiative will not be the ordinary enhancements, but will be significant

changes that result in a quantum leap in meeting user needs and improving the

outcomes in policing.

3. I/We further understand that whether a proposed change forms part of

Continuous Improvement or is a minor change that will have to be incorporated into the

application as part of the Application Management Services will be determined by the

State Mission Team.

Yours faithfully,

Authorized Signatory

Designation

Page 319: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 78 of 121

4.2.15 Undertaking on Personnel

(Company letterhead) [Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Personnel

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We as bidder do hereby undertake that those persons whose profiles were part

of the basis for evaluation of the bids and have been identified as “Key Personnel”

of the proposed team, including Project Manager, Project Leads (Capacity

Building, O&M, Infrastructure, Data Digitization and CAS Customization), and

Domain Expert for the design and development of software for the CCTNS

project, shall be deployed during the Project as per our bid submitted in response

to the RFP.

2. I/We undertake that any of the identified “Key Personnel” shall not be removed

or replaced without the prior written consent of Rajasthan Police.

3. Under exceptional circumstances, if the Key Personnel are to be replaced or

removed, I/We shall put forward the profiles of personnel being proposed as

replacements, which will be either equivalent or better than the ones being

replaced. However, whether these profiles are better or equivalent to the ones

being replaced will be decided by Rajasthan Police. Rajasthan Police, will have

the right to accept or reject these substitute profiles.

4. I/We also undertake to staff the Project with competent team members in case

any of the proposed team members leave the Project either due to voluntary

severance or disciplinary actions against them.

5. I/We undertake that the resources will be full time assigned to the CCTNS project

and will not be working simultaneously on other projects.

6. I/We acknowledge that Rajasthan Police, has the right to seek the replacement of

any member of the Project team being deployed by us, based on the assessment

of Rajasthan Police, that the person in question is incompetent to carry out the

tasks expected of him/her or found that person does not really possess the skills

Page 320: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 79 of 121

/experience/qualifications as projected in his/her profile or on the ground of

security concerns or breach of ethics.

7. In case I/we will assign or reassign any of the team members, I/We shall be

responsible, at our expense, for transferring all appropriate knowledge from

personnel being replaced to their replacements within a reasonable time.

Yours faithfully,

Authorized Signatory, Designation

Page 321: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 80 of 121

4.2.16 Undertaking on Provision of Work Environment at SCRB

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on Provision of Work Environment at premises of Nodal

Agency

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We as bidder do hereby understand that the onsite team of Software

Development Agency operating out of Rajasthan Police, premises will be

provided only with seating space. Any other requirements such as Desktops/ PC,

software will be bidder‟s responsibility.

Yours faithfully,

Authorized Signatory

Designation

Page 322: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 81 of 121

4.2.17 Undertaking on request for Changes to the Contract Clauses by

the bidder

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Undertaking on request for Changes to Contract Clauses by the

bidder

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

1. I/We as bidder do hereby acknowledge that I/We understand that the

request for changes to contract clauses and any other terms and conditions in

the RFP, submitted in our proposal as per the RFP are just suggestions for

change.

2. I/We understand that it is neither guaranteed that these requests for changes

will be accepted in the final contract nor this process will be construed as any

commitment from Rajasthan Police, to consider those suggestions.

Yours faithfully,

Authorized Signatory

Designation

Page 323: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 82 of 121

4.2.18 Undertaking from OEM on Authorization of use of their OEM

products

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Subject: Issue of the Manufacturer‟s Authorisation Form (MAF)

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

We {name and address of the OEM} who are established and reputed original

equipment manufacturers (OEMs) having factories at {addresses of manufacturing

location} do hereby authorize {M/s __________________________} who is our

{Distributor/ Channel Partner/ Retailer/ Others <please specify>} to bid, negotiate

and conclude the contract with you against the aforementioned reference for the

following Hardware/ Software manufactured by us: -

{OEM will mention the details of all the proposed product(s) with their

make/ model.}

We undertake to provide OEM Warranty for the offered Hardware/ Software, as

mentioned above, for 3 Years. However, end to end support will be provided upto

project completion period.

We hereby confirm that the offered Hardware/ Software is not likely to be declared as

End-of-Sale within next 1 year from the date of bid submission.

We hereby confirm that the offered Hardware/ Software is not likely to be declared as

End-of-Service/ Support within next 5 years from the date of bid submission.]

Yours faithfully,

For and on behalf of M/s (Name of the manufacturer)

(Authorized Signatory)

Name, Designation & Contact No.:

Address: ___________________________________

Seal:

Page 324: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 83 of 121

4.2.19 Certificate of Conformity/No Deviation

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Reference: NIB/ RFP Ref. No. _____________________ dated ________

CERTIFICATE

This is to certify that, the specifications of Hardware & Software which I have mentioned

in the Technical bid, and which I shall supply, if I am awarded with the work, are in

conformity with the minimum specifications of the bidding document and that there are

no deviations of any kind from the specifications.

Also, I have thoroughly read the bidding document and by signing this certificate, I

hereby submit our token of unconditional acceptance to all the terms & conditions of the

bidding document without any deviations.

I also certify that the price I have quoted is inclusive of all the cost factors involved in the

end-to-end implementation and execution of the project, to meet the desired standards

set out in the bidding Document.

Thanking you,

Name of the Bidder: -

Authorised Signatory: -

Seal of the Organization: -

Date:

Place:

Page 325: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 84 of 121

4.2.20 Bidder’s Authorization Certificate

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Reference: NIB/ RFP Ref. No. _____________________ dated ________

I {Name/ Designation} hereby declare/ certify that {Name/ Designation} is hereby

authorized to sign relevant documents on behalf of the company/ firm in dealing with

NIB reference No. ______________________ dated _________. He/ She is also

authorized to attend meetings & submit technical & commercial information/

clarifications as may be required by you in the course of processing the Bid. For the

purpose of validation, his/ her verified signatures are as under.

Thanking you,

Name of the Bidder: - Verified Signature:

Authorized Signatory: - Name of verifier

Seal of the Organization: - Designation

Date: Company Seal

Place:

Page 326: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 85 of 121

4.2.21 Bill of Material – Software Solution

The below list is

indicative only 1

Reference

in the

submitted

proposal

(Please

provide

page

numbers/s

ection-

number/vol

ume)

Propose

d

Solution

(Provide

the

Product

Name or

fill

Custom

Built, in

case of a

new

develop

ment)

Descrip

tion

(includ

e major

feature

s/

service

s only)

Number

of

Licenses

(Develop

ment

Environ

ment)

Num

ber

of

Licen

ses

(UAT

)

Numb

er of

Licens

es

(Train

ing)

Numbe

r of

License

s (Data

Centre -

Product

ion)

Num

ber

of

Licen

ses

(DR

Site)

Compli

ance

with

the

minim

um

Feature

s asked

in the

RFP

Storage management

Software (SMS)

Enterprise Management

System (EMS)

Host Intrusion Prevention

System (HIPS)

Document management

Page 327: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 86 of 121

System(DMS)

Antivirus

Backup Software

Others

Page 328: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 87 of 121

4.2.22 Bill of Material for Infrastructure

The bidder should note that the Bill of materials detailed below is indicative, and that the exact location for installation of the

commissioned hardware would be as per the approval of Rajasthan Police.

Technical Bill of

Materials

(The list below is

indicative only)

Re

fer

en

ce

o

f th

e

info

rm

atio

n

in

the

Su

bm

itted

P

ro

po

sa

l

(Ple

ase

p

ro

vid

e

pa

ge

nu

mb

er

/se

ctio

n-

nu

mb

er

/vo

lum

e)

Se

rv

ice

s

pr

op

ose

d

to

be

ho

ste

d o

n th

e S

er

ve

r

Qu

an

tity

Ma

ke

an

d M

od

el

Ye

ar

of In

tro

du

ctio

n

Op

er

atin

g

Sy

ste

m

alo

ng

with

v

er

sio

n

(if

ap

plic

ab

le)

Pr

oc

es

so

r a

nd

Nu

mb

er

of

Co

re

s

Offe

re

d

(if

ap

plic

ab

le)

Ar

ch

itec

tur

e

(RIS

C/E

PIC

/CIS

C)

(if ap

plic

ab

le)

RA

M (if a

pp

lica

ble

)

HD

D (if a

pp

lica

ble

)

LA

N

Po

rts

(if

ap

plic

ab

le)

HB

A (if a

pp

lica

ble

)

Ad

ditio

na

l Info

rm

atio

n

as

re

qu

ire

d to

ind

ica

te

the

c

om

plia

nc

e

to

the

re

qu

ire

me

nts

in

th

e

RF

P

(ex

, C

ap

ac

ity,

Dis

k

Sp

ac

e,)

Co

mp

lian

ce

a

s p

er

th

e

Sp

ec

ifica

tion

s

giv

en

in

the

RF

P (Y

es

/No

)

Data Center

Global Load Balancer

Server Load Balancer

IDS/IPS

External Firewall

KVM Switch

FC-IP Router (DC-

DR Replication)

Disaster Recovery (DR)

Application Server

Database Server

Web Server

Page 329: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 88 of 121

Mail & Messaging

Backup Server

Access Control

Server/ Single Sign

On Server

Antivirus Server

SAN (External

Storage) - List the

total capacity offered

on

FC and SATA disks

Tape Library

SAN Switch

KVM Switch

L3 Core Switch

L2 Access Switch

IDS/IPS

External Firewall

Internal Firewall

Core Router

Others (Insert each

item in a separate

row as required)

Client Side Infrastructure

Client

System/Desktop/PC

Offline Server

Page 330: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 89 of 121

Duplex Printer

MFD Printer

UPS 2 kVA

UPS 1 kVA

Gen Set 2.1 kVA

Digital Camera

Switch 16 port

Electronic Pen

External Hard Disk

Drive

Environmental

Control (AC)

Others (Insert each

item in a separate

row as required)

Site Preparation

Chairs

Tables

White Board

Fire Extinguisher

Power Strips

LAN cabling

Operational expenses

of Paper and toner

Others (Insert each

item in a separate

row as required)

Page 331: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 90 of 121

Miscellaneous

Others (Insert each

item in a separate

row as required)

Page 332: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 91 of 121

4.2.23 Profiles of Previous Project Experience

Relevant Project experience

General Information

Name of the project

Client for which the project was executed

Name and contact details of the client

Project Details

Description of the project

Scope of services

Service levels being offered

Technologies used

Outcomes of the project

Other Details

Total cost of the project

Total cost of the services provided by the

Bidder

Duration of the project (no. of months,

start date, completion date, current

status)

Other Relevant Information

Mandatory Supporting Documents:

a) Letter from the client to indicate the successful completion of the projects

Project Capability Demonstration

Please provide complete details regarding the scope of the project to indicate the

relevance to the requested technical evaluation criterion.

Page 333: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 92 of 121

4.2.24 Team Profile

Format for the Profiles

Name of the person

Current Designation / Job Title

Current job responsibilities

Proposed Role in the Project

Proposed Responsibilities in the Project

Academic Qualifications:

Degree

Academic institution graduated from

Year of graduation

Specialization (if any)

Key achievements and other relevant information (if any)

Professional Certifications (if any)

Total number of years of experience

Number of years with the current company

Summary of the Professional / Domain Experience

Number of complete life cycle implementations carried out

The names of customers (Please provide the relevant names)

Past assignment details (For each assignment provide details

regarding name of organizations worked for, designation,

responsibilities, tenure)

Prior Professional Experience covering:

Organizations worked for in the past

o Organization name

o Duration and dates of entry and exit

Page 334: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 93 of 121

o Designation

o Location(s)

o Key responsibilities

Prior project experience

o Project name

o Client

o Key project features in brief

o Location of the project

o Designation

o Role

o Responsibilities and activities

o Duration of the project

Please provide only relevant projects.

Proficient in languages (Against each language listed indicate if

read/write/both)

Each profile must be accompanied by the following undertaking from the staff member:

(Alternatively, a separate undertaking with the same format as below with all the names

of the proposed profiles should be provided)

Certification

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly

describes my qualifications, my experience. I understand that any willful misstatement

described herein may lead to my disqualification or dismissal, if engaged.

Signature:

Date:

[Signature of staff member or authorized representative of the staff] Day/Month/Year

Full name of authorized representative:

Page 335: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 94 of 121

4.2.25 Suggestions on Changes to Contract Clauses

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sub: Changes to the Contract Clauses

Reference: NIB/ RFP Ref. No. _____________________ dated ________

Sir,

I request you to consider the following changes to the Contract Clauses:

S.

No.

Page

Number

Section /

Para No.

Original

Text

Suggested

Change

Reason for

Change

1

2

3

4

Yours faithfully,

Authorized Signatory

Designation

Page 336: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 95 of 121

4.3 FORMATS FOR THE COMMERCIAL BID RESPONSE

4.3.1 Commercial Proposal Cover Letter

(Company letterhead)

[Date]

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Reference: NIB No. :___________________________________

Dated:__________

Dear Sir,

Ref: RFP for Selection of System Integrator for the Implementation of

CCTNS in Rajasthan Police

I/We, the undersigned bidder, having read & examined in detail, the Bidding Document,

the receipt of which is hereby duly acknowledged, I/We the undersigned, offer to supply/

work as mentioned in the Scope of the work, Bill of Material, Technical specifications,

Service Level Standards & in conformity with the said bidding document for the same.

I/ We undertake that the prices are in conformity with the specifications prescribed. The

quote/ price are inclusive of all cost likely to be incurred for executing this work. The

prices are inclusive of all type of govt. taxes/duties as mentioned in the financial bid

(BoQ).

I/ We undertake, if our bid is accepted, to deliver the goods in accordance with the

delivery schedule specified in the schedule of Requirements.

I/We hereby declare that in case the contract is awarded to us, I/We shall submit the

contract performance guarantee as prescribed in the bidding document.

I/We agree to abide by this bid for a period of 180 days after the last date fixed for bid

submission and it shall remain binding upon us and may be accepted at any time before

the expiry of that period.

Page 337: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 96 of 121

Until a formal contract is prepared and executed, this bid, together with your written

acceptance thereof and your notification of award shall constitute a binding Contract

between us.

I/We hereby declare that our bid is made in good faith, without collusion or fraud and

the information contained in the bid is true and correct to the best of our knowledge and

belief.

I/We understand that you are not bound to accept any bid you may receive.

I/We agree to all the terms & conditions as mentioned in the bidding document and

submit that I/We have not submitted any deviations in this regard.

Date:

Authorized Signatory

Name:

Designation:

Page 338: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 97 of 121

4.3.2 Commercial Bid Format

{to be submitted by the bidder only in BoQ format (.XLS) available at eProc portal}

Note: Rajasthan Police would be at liberty to increase or reduce the offered quantity of

each item based on price discovery.

i. Table 1: Implementation Cost (CAPEX)

S.

No.

Category No of

Components

/ Units of

Service

(X)

Rate (per

unit)

(Y)

Taxes and

Other

Duties

(Z)

Total Cost =

(X*Y)+Z

(INR)

I. Data Centre Related Costs (including 3 year Warranty)

Hardware at DC

1) Global Load

Balancer

1

2) Server Load

Balancer

1

3) IDS/IPS 2

4) External

Firewall

2

5) KVM Switch 1

6)

FC-IP Router

(DC-DR

Replication)

2

7) Others

Software at DC

1) Enterprise

Management

System (EMS)

1

2)

Host Intrusion

Prevention

System (HIPS)

1

3) Antivirus 2905

4) Backup Software 1

5)

Others

Integration and Installation

1) DC Services 1

Page 339: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 98 of 121

S.

No.

Category No of

Components

/ Units of

Service

(X)

Rate (per

unit)

(Y)

Taxes and

Other

Duties

(Z)

Total Cost =

(X*Y)+Z

(INR)

II Disaster Recovery Site Costs (Including 3 year warranty)

Hardware at DR site

1) Application

Server

2

2) Database Server 2

3) Web Server 1

4) Backup Server 1

5)

Access Control

Server/ Single

Sign On Sever

1

6) Antivirus Server 1

7)

Mail &

Messaging

Server

2

8)

SAN (External

Storage) - List

the total

capacity offered

on FC and SATA

disks

1

9) Tape Library 1

10) SAN Switch 2

11)

KVM Switch 1

12) L 3 Core Switch 1

13) L2 Access

Switch

2

14) IDS/IPS 2

15) External 1

Page 340: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 99 of 121

S.

No.

Category No of

Components

/ Units of

Service

(X)

Rate (per

unit)

(Y)

Taxes and

Other

Duties

(Z)

Total Cost =

(X*Y)+Z

(INR)

Firewall

16) Internal Firewall 1

17) Core Router 1

18) Others

Software at DR site

1) Storage

management

Software (SMS)

1

2) Document

Management

System (DMS)

1

3)

Host Intrusion

Prevention

System (HIPS)

1

4) Antivirus As per

requirement

5) Backup Software 1

6) Others 1

Integration and Installation

1) DR Services 1

III CAS

customization

Costs

1) CAS

customization

Man Month

(3960 Man

Days) rate

180

IV Capacity

Building Costs

for state level/

specialized

trainings

Page 341: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 100 of 121

S.

No.

Category No of

Components

/ Units of

Service

(X)

Rate (per

unit)

(Y)

Taxes and

Other

Duties

(Z)

Total Cost =

(X*Y)+Z

(INR)

1) Orientation to

Change

Management

and

Introduction to

CCTNS (Higher

Officials)

1

2)

Role Based and

Management

Information

System training

(Higher

officials)

1

3)

Project

Management,

Document

Management

System/

Reporting

training

1

4)

Specialized

training on

system

administration

and

troubleshooting

1

5) Training of

Trainers

1

V Capacity

Building Costs

for district

level trainings

at district

level

1) Change

Management

and

Introduction to

1

Page 342: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 101 of 121

S.

No.

Category No of

Components

/ Units of

Service

(X)

Rate (per

unit)

(Y)

Taxes and

Other

Duties

(Z)

Total Cost =

(X*Y)+Z

(INR)

CCTNS (Middle

& Junior

Officials)

training

2)

Role Based

Training and

Basic ICT

(Middle &

Junior Officials)

training

1

VI Site

Preparation at

Client Side

Costs

1) LAN Cabling 479

2) Chair 2326

3) Table 2326

4) White Board 479

5) Power Strips 479

6) Fire

Extinguisher

479

7)

Others

VII Hardware

Related Costs

including

Warranty for

the period of 3

years from

Go-Live of

Project at

Client Site

IT Infrastructure at Client Site

1) Client Systems

(PC/ Desktop)

2470

Page 343: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 102 of 121

S.

No.

Category No of

Components

/ Units of

Service

(X)

Rate (per

unit)

(Y)

Taxes and

Other

Duties

(Z)

Total Cost =

(X*Y)+Z

(INR)

(Cost of the

computer

includes

Operating

System and

Office suite)

2) External HDD 752

3) Offline Server 297

4)

Duplex Laser

Printer

297

5)

Multi-Function

Laser Printer

(Print/Scan/Cop

y)

1460

6) Switch 16port 1015

7) UPS 2 KVA with

120 min backup

1344

8) UPS 1 KVA 100

9) Gen Set 2.1 KVA 760

10) Digital Camera 760

11) Electronic Pen 760

12) Environmental

Control(AC)

760

13) Others

VIII Data

migration and

Digitization of

Historical

Data Costs

1) Data migration

and Digitization

1

IX Third Party

Page 344: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 103 of 121

S.

No.

Category No of

Components

/ Units of

Service

(X)

Rate (per

unit)

(Y)

Taxes and

Other

Duties

(Z)

Total Cost =

(X*Y)+Z

(INR)

Audit

1) Third Party

Audit

1

X Hand Holding

Support Costs

1) Hand Holding

Support

760

A = Total for Services Provided During Implementation

Phase (Sum of items I – X):(In figures)

A = Total for Services Provided During Implementation

Phase (Sum of items I – X):(In words)

ii. Table 2: Operation and Maintenance Cost (OPEX)

S.

No.

Category Rate

(Y)

Taxes and

Other Duties

(Z)

Total Cost = Y+Z

(INR)

1) Operations and

Maintenance

Services for DC &

DR (including

existing Hardware)

for 3 years(after

Go-Live of the

Project) in QGR

2) Operations and

Maintenance

Services for 3 years

for client locations

(including existing

hardware) (after

Page 345: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 104 of 121

Go-Live of the

Project) in QGR

3) Comprehensive

AMC for 3 years

for maintenance of

all hardware,

software, solution

at District Training

Centres *

4) Comprehensive

AMC* for 4th Year

5) Comprehensive

AMC* for 5th Year

B = Cost of Operations and Maintenance Services

for 3 years(In Figures)

B = Cost of Operations and Maintenance Services

for 3 years(In Words)

*Cost of AMC above in Item no:3,4,5 will not be considered for QCBS

evaluation.

iii. Table 3: Consumable Items Cost

S.

No.

Category No of

Componen

ts / Units of

Service

(X)

Rate(per

unit)

(Y)

Taxes and

Other Duties

(Z)

Total Cost X= Y+Z

(INR)

1) Operational

expenses of Paper

Ream

156960

2) Operational

expenses of Toner

26160

C = Total Cost of Operational expenses of Paper and toner (1 &2)

till the completion of Project(In Figures)

C = Total Cost of Operational expenses of Paper and toner (1 &2)

till the completion of Project (In Words)

Page 346: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 105 of 121

iv. Table 4: Commercial Bid Summary -Total Cost (D)

S No Cost Component Cost for Calculation(INR)

1 Implementation Cost (A)

2 Operations and Maintenance Cost (B)

3 Cosumable Items Cost (C)

Total Cost (D=A+B+C) for QCBS Evaluation(In

figures)

Total Cost (D=A+B+C) for QCBS Evaluation(In

Words)

Page 347: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 106 of 121

4.4 NON – DISCLOSURE AGREEMENT (NDA)

[Company Letterhead]

This AGREEMENT (hereinafter called the “Agreement”) is made on the [day] day of the

month of [month], [year], between, Rajasthan Police, on the one hand, (hereinafter

called the “Purchaser”) and, on the other hand, [Name of the bidder] (hereinafter called

the “Successful Bidder”) having its registered office at [Address]

WHEREAS

The “Purchaser” has issued a public notice inviting various organizations to propose for

hiring services of an organization for provision of services under the CCTNS Project

(hereinafter called the “Project”) of the Purchaser;

The Bidder, having represented to the “Purchaser” that it is interested to bid for the

proposed Project,

The Purchaser and the Bidder agree as follows:

1. In connection with the “Project”, the Purchaser agrees to provide to the Bidder a

Detailed Document on the Project vide the Request for Proposal contained in three

volumes. The Request for Proposal contains details and information of the Purchaser

operations that are considered confidential.

2. The Bidder to whom this Information (Request for Proposal) is disclosed shall:

a. Hold such Information in confidence with the same degree of care with which

the Bidder protects its own confidential and proprietary information;

b. Restrict disclosure of the Information solely to its employees, agents and

contractors with a need to know such Information and advise those persons

of their obligations hereunder with respect to such Information;

c. Use the Information only as needed for the purpose of bidding for the Project;

d. Except for the purpose of bidding for the Project, not copy or otherwise

duplicate such Information or knowingly allow anyone else to copy or

otherwise duplicate such Information; and

e. Undertake to document the number of copies it makes

f. On completion of the bidding process and in case unsuccessful, promptly

return to the Purchaser, all Information in a tangible form or certify to the

Purchaser that it has destroyed such Information.

3. The Bidder shall have no obligation to preserve the confidential or proprietary nature

of any Information which:

a. Was previously known to the Bidder free of any obligation to keep it

confidential at the time of its disclosure as evidenced by the Bidder‟s written

records prepared prior to such disclosure; or

b. Is or becomes publicly known through no wrongful act of the Bidder; or

c. Is independently developed by an employee, agent or contractor of the Bidder

not associated with the Project and who did not have any direct or indirect

access to the Information.

Page 348: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 107 of 121

4. The Agreement shall apply to all Information relating to the Project disclosed by the

Purchaser to the Bidder under this Agreement.

5. The Purchaser will have the right to obtain an immediate injunction enjoining any

breach of this Agreement, as well as the right to pursue any and all other rights and

remedies available at law or in equity for such a breach.

6. Nothing contained in this Agreement shall be construed as granting or conferring

rights of license or otherwise, to the bidder, in any of the Information.

Notwithstanding the disclosure of any Information by the Purchaser to the Bidder,

the Purchaser shall retain title and all intellectual property and proprietary rights in

the Information. No license under any trademark, patent or copyright, or application

for same that are now or thereafter may be obtained by such party is either granted

or implied by the conveying of Information. The Bidder shall not alter or obliterate

any trademark, trademark notice, copyright notice, confidentiality notice or any

notice of any other proprietary right of the Purchaser on any copy of the Information,

and shall reproduce any such mark or notice on all copies of ch Information.

7. This Agreement shall be effective from the date the last signature is affixed to this

Agreement and shall continue in perpetuity.

8. Upon written demand of the Purchaser, the Bidder shall (i) cease using the

Information, (ii) return the Information and all copies, notes or extracts thereof to

the Purchaser forthwith after receipt of notice, and (iii) upon request of the

Purchaser, certify in writing that the Bidder has complied with the obligations set

forth in this paragraph.

9. This Agreement constitutes the entire agreement between the parties relating to the

matters discussed herein and supersedes any and all prior oral discussions and/or

written correspondence or agreements between the parties. This Agreement may be

amended or modified only with the mutual written consent of the parties. Neither

this Agreement nor any right granted hereunder shall be assignable or otherwise

transferable.

10. CONFIDENTIAL INFORMATION IS PROVIDED “AS IS” WITH ALL FAULTS. IN

NO EVENT SHALL THE PURCHASER BE LIABLE FOR THE ACCURACY OR

COMPLETENESS OF THE CONFIDENTIAL INFORMATION.

11. This Agreement shall benefit and be binding upon the Purchaser and the Bidder and

their respective subsidiaries, affiliate, successors and assigns.

12. This Agreement shall be governed by and construed in accordance with the Indian

laws.

For and on behalf of the Bidder

___(Signature)______

(Name of the Authorized Signatory)

Date

Address

Location:

Page 349: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 108 of 121

4.5 FORMAT FOR SUBMISSION OF QUERIES FOR CLARIFICATION

Bidders requiring specific points of clarification may communicate with

Rajasthan Police, during the specified period using the following format:

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

BIDDER’S REQUEST FOR CLARIFICATION

Name of Organization

submitting request

Name & position of person

submitting request

Full formal address of the

organization including

phone, fax and email points

of contact

Tel:

Fax:

Email:

S.

No

Bidding Document

Reference(s)

(section number/

page)

Content of RFP

requiring

Clarification

Points of clarification

required

Note: - Queries must be strictly submitted only in the prescribed format (.XLS/ .XLSX/

.ODF). Queries not submitted in the prescribed format will not be considered/

responded at all by the Rajasthan Police. Also, kindly attach the scanned copy of the

receipt towards the submission of the bidding/ tender document fee with the pre-bid

queries.

Page 350: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 109 of 121

4.6 EARNEST MONEY DEPOSIT

(To be stamped in accordance with Stamp Act and to be issued by a Scheduled bank

having its branch at Jaipur and payable at par at Jaipur, Rajasthan)

To

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Sir,

1. In accordance with your Notice Inviting Bid for <please specify the project title>

vide NIB reference no. <please specify> M/s. …………………………….. (Name & full

address of the firm) (Hereinafter called the “Bidder”) hereby submits the Bank

Guarantee to participate in the said procurement/ bidding process as mentioned in

the bidding document.

It is a condition in the bidding documents that the Bidder has to deposit Bid Security

amounting to <Rs. ______________ (Rupees <in words>)> in respect to the NIB Ref.

No. _______________ dated _________ issued by Rajasthan Police, Jaipur,

Rajasthan (hereinafter referred to as Rajasthan Police) by a Bank Guarantee from a

Scheduled Bank having its branch at Jaipur irrevocable and operative till the bid validity

date (i.e. 180 days from the date of submission of bid). It may be extended if required in

concurrence with the bid validity.

And whereas the Bidder desires to furnish a Bank Guarantee for a sum of <Rs.

______________ (Rupees <in words>)> to the Rajasthan Police as earnest money

deposit.

2. Now, therefore, we the ……………………………….…… (Bank), a body corporate

constituted under the Banking Companies (Acquisition and Transfer of

Undertaking) Act. 1969 (delete, if not applicable) and branch Office at…………………...

(hereinafter referred to as the Guarantor) do hereby undertake and agree to pay

forthwith on demand in writing by the Rajasthan Police of the said guaranteed

amount without any demur, reservation or recourse.

Page 351: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 110 of 121

3. We, the aforesaid bank, further agree that the Rajasthan Police shall be the sole

judge of and as to whether the Bidder has committed any breach or breaches of any

of the terms costs, charges and expenses caused to or suffered by or that may be

caused to or suffered by the Rajasthan Police on account thereof to the extent of the

Earnest Money required to be deposited by the Bidder in respect of the said bidding

document and the decision of the Rajasthan Police that the Bidder has committed

such breach or breaches and as to the amount or amounts of loss, damage, costs,

charges and expenses caused to or suffered by or that may be caused to or suffered

by the Rajasthan Police shall be final and binding on us.

4. We, the said Bank further agree that the Guarantee herein contained shall remain in

full force and effect until it is released by the Rajasthan Police and it is further

declared that it shall not be necessary for the Rajasthan Police to proceed against the

Bidder before proceeding against the Bank and the Guarantee herein contained shall

be invoked against the Bank, notwithstanding any security which the Rajasthan

Police may have obtained or shall be obtained from the Bidder at any time when

proceedings are taken against the Bank for whatever amount that may be

outstanding or unrealized under the Guarantee.

5. Any notice by way of demand or otherwise hereunder may be sent by special courier,

telex, fax, registered post or other electronic media to our address, as aforesaid and

if sent by post, it shall be deemed to have been given to us after the expiry of 48

hours when the same has been posted.

6. If it is necessary to extend this guarantee on account of any reason whatsoever, we

undertake to extend the period of this guarantee on the request of our constituent

under intimation to you.

7. The right of the Rajasthan Police to recover the said amount of <Rs.

______________ (Rupees <in words>)> from us in manner aforesaid will not be

precluded/ affected, even if, disputes have been raised by the said M/s.

……….………………(Bidder) and/ or dispute or disputes are pending before any court,

authority, officer, tribunal, arbitrator(s) etc..

8. Notwithstanding anything stated above, our liability under this guarantee shall be

restricted to <Rs. ______________ (Rupees <in words>)> and our guarantee

shall remain in force till bid validity period i.e. <please specify> days from the last

date of bid submission and unless a demand or claim under the guarantee is made

on us in writing within three months after the Bid validity date, all your rights under

the guarantee shall be forfeited and we shall be relieved and discharged from all

liability thereunder.

9. This guarantee shall be governed by and construed in accordance with the Indian

Laws and we hereby submit to the exclusive jurisdiction of courts of Justice in India

for the purpose of any suit or action or other proceedings arising out of this

guarantee or the subject matter hereof brought by you may not be enforced in or by

such count.

Page 352: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 111 of 121

10. We hereby confirm that we have the power/s to issue this Guarantee in your favor

under the Memorandum and Articles of Association/ Constitution of our bank and

the undersigned is/are the recipient of authority by express delegation of power/s

and has/have full power/s to execute this guarantee under the Power of Attorney

issued by the bank in your favour.

Date ………………… (Signature) ……………………………………….

Place ………………… (Printed Name) ………………………………….

(Designation) ……………………………………

(Bank‟s common seal) ………………………….

In presence of:

WTTNESS (with full name, designation, address & official seal, if any)

(1) ………………………………………

………………………………………

(2) ………………………………………

………………………………………

Bank Details

Name & address of Bank :

Name of contact person of Bank:

Contact telephone number:

GUIDELINES FOR SUBMISSION OF BANK GUARANTEE

The Bank Guarantee shall fulfil the following conditions in the absence of which they

cannot be considered valid: -

1. Bank Guarantee shall be executed on non- judicial stamp paper of applicable value

purchased in the name of the bank.

2. Two persons should sign as witnesses mentioning their full name, designation,

address and office seal (if any).

3. The Executor (Bank Authorities) may mention the power of attorney No. and date of

execution in his/ her favour authorizing him/ her to sign the document. The Power

of Attorney to be witnessed by two persons mentioning their full name and address.

4. The Bank Guarantee should be executed by a Scheduled Bank only.

5. Non – Judicial stamp paper shall be used within 6 months from the date of Purchase

of the same. Bank Guarantee executed on the non-judicial stamp paper after 6 (six)

months of the purchase of such stamp paper shall be treated as non-valid.

Page 353: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 112 of 121

6. The contents of Bank Guarantee shall be strictly as per format prescribed by

Rajasthan Police

7. Each page of Bank Guarantee shall bear signature and seal of the Bank and B.G.

number.

8. All corrections, deletions etc. in the Bank Guarantee should be authenticated by

signature of Bank Officials signing the Bank Guarantee.

9. Bank should separately send through registered post/courier a certified copy of Bank

Guarantee, mentioning Bid reference, Bid title and bidder name, directly to the

Purchaser's communication address as mentioned in the bidding document.

Page 354: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 113 of 121

4.7 BID COVER LETTER

[Cover Letter]

[Date]

To,

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

Dear Sir,

Ref: RFP for Selection of System Integrator for Implementation of CCTNS in

Rajasthan Police

I/We, the undersigned, having examined the RFP, the receipt of which is hereby duly

acknowledged, offer to provide the professional services as required and outlined in the

RFP for the CCTNS Project.

I/We attach hereto the technical response as required by the RFP, which constitutes our

proposal.

I/We confirm that the information contained in this response or any part thereof,

including its exhibits, and other documents and instruments delivered or to be delivered

to Rajasthan Police is true, accurate, verifiable and complete. This response includes all

information necessary to ensure that the statements therein do not in whole or in part

mislead the department in its short-listing process.

I/We fully understand and agree to comply that on verification, if any of the information

provided here is found to be misleading the short listing process, I/We are liable to be

dismissed from the selection process or termination of the contract during the project, if

selected to do so.

I/We agree for unconditional acceptance of all the terms and conditions set out in the

RFP document and also agree to abide by this tender response for a period of 180 days

from the date fixed for bid opening.

Page 355: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 114 of 121

I/We hereby declare that in case the contract is awarded to us, I/We shall submit the

contract performance guarantee bond in the form prescribed in the Format 4.9 of this

RFP.

I/We agree that you are not bound to accept any tender response you may receive. I/We

also agree that you reserve the right in absolute sense to reject all or any of the products/

services specified in the tender response.

It is hereby confirmed that I/We am entitled to act on behalf of my organization and

empowered to sign this document as well as such other documents, which may be

required in this connection.

Dated this Day of 2013/14

(Signature) (In the capacity of)

(Name)

Duly authorized to sign the Tender Response for and on behalf of:

(Name and Address of Company) Seal/Stamp of bidder

Witness Signature:

Witness Name:

Witness Address:

CERTIFICATE AS TO AUTHORISED SIGNATORIES

I,,……………………………, the Company Secretary of …….…………………, certify that

……………………………………………………………… who signed the above Bid is authorized to do

so and bind the company by authority of its board/ governing body.

Date:

Signature:

(Company Seal) (Name)

Page 356: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 115 of 121

4.8 ADVANCE BANK GUARANTEE

(To be stamped in accordance with Stamp Act and on a Stamp Paper purchased from

Rajasthan State only and to be issued by a Scheduled bank having its branch at Jaipur

and payable at par at Jaipur, Rajasthan)

To,

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

1. In consideration of the "Rajasthan Police" having agreed to exempt M/s

..........................(hereinafter called "the said Contractor(s)" from the demand, under

the terms and conditions of an Work Order No...................................dated

.....................made between the Rajasthan Police and .......................(Contractor) for

the work ................. of Security Deposit for the due fulfilment by the said Contractor

(s) of the terms and conditions contained in the said work order, on production of a

Advance Bank Guarantee for Rs...................(Rupees ........................................only),

we ...................(indicate the name of the Bank), (hereinafter referred to as "the

Bank") at the request of ..................Contractor(s) do hereby undertake to pay to the

Rajasthan Police an amount not exceeding

Rs...................(Rupees..................................only) on demand.

2. We................. (Indicate the name of Bank), do hereby undertake to pay

Rs.................... (Rupees............................only), the amounts due and payable under

this guarantee without any demur or delay, merely on a demand from the Rajasthan

Police. Any such demand made on the bank by the Rajasthan Police shall be

conclusive as regards the amount due and payable by the Bank under this guarantee.

The Bank Guarantee shall be completely at the disposal of the Rajasthan Police and

We....................... (Indicate the name of Bank), bound ourselves with all directions

given by Rajasthan Police regarding this Bank Guarantee. However, our liability

under this guarantee shall be restricted to an amount not exceeding Rs......................

(Rupees....................only).

3. We.......................(indicate the name of Bank), undertake to pay to the Rajasthan

Police any money so demanded notwithstanding any dispute or disputes raised by

the contractor(s) in any suit or proceeding pending before any Court or Tribunal or

Arbitrator etc. relating thereto, our liability under these presents being absolute,

unequivocal and unconditional.

4. We.....................(indicate the name of Bank) further agree that the performance

guarantee herein contained shall remain in full force and effective up to <1 year from

date of signing of contract> and that it shall continue to be enforceable for above

specified period till all the dues of Rajasthan Police under or by virtue of the said

Agreement have been fully paid and its claims satisfied or discharged or till the

Page 357: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 116 of 121

Rajasthan Police certifies that the terms and conditions of the said Agreement have

been fully and properly carried out by the said Contractor(s) and accordingly

discharges this guarantee.

5. We ...........................(indicate the name of Bank) further agree with the Rajasthan

Police that the Rajasthan Police shall have the fullest liberty without our consent and

without affecting in any manner our obligations hereunder to vary any of the terms

and conditions of the said work order or to extend time of performance by the said

Contractor(s) from time to time or to postpone for any time or from time to time any

of the powers exercisable by the Rajasthan Police against the said Contractor(s) and

to forbear or enforce any of the terms and conditions relating to the said work order

and we shall not be relieved from our liability by reason of any such variation, or

extension being granted to the said Contractor(s) or for any forbearance, act or

omission on the part of the Rajasthan Police or any indulgence by the Rajasthan

Police to the said Contractor(s) or by any such matter or thing whatsoever which

would but for this provision, have effect of so relieving us.

6. The liability of............................. (indicate the name of Bank), under this guarantee

will not be discharged due to the change in the constitution of the Bank or the

contractor(s).

7. We .............................. (indicate the name of Bank), lastly undertake not to revoke

this guarantee except with the previous consent of the Rajasthan Police in writing.

8. This advance bank Guarantee shall remain valid and in full effect, until it is decided

to be discharged by the Rajasthan Police. Notwithstanding anything mentioned

above, our liability against this guarantee is restricted to Rs...........................

(Rupees..............................only).

9. It shall not be necessary for the Rajasthan Police to proceed against the contractor

before proceeding against the Bank and the guarantee herein contained shall be

enforceable against the Bank notwithstanding any security which the Rajasthan

Police may have obtained or obtain from the contractor.

10. We .............................. (indicate the name of Bank) verify that we have a branch at

Jaipur, Rajasthan. We undertake that this Bank Guarantee shall be payable at any of

its branch at Jaipur, Rajasthan. If the last day of expiry of Bank Guarantee happens

to be a holiday of the Bank, the Bank Guarantee shall expire on the close of the next

working day.

11. We hereby confirm that we have the power(s) to issue this guarantee in your favour

under the memorandum and articles of Association/ constitution of our bank and the

undersigned is/ are the recipient of authority by express delegation of power(s) and

has/have full power(s) to execute this guarantee for the power of attorney issued by

the bank.

Dated..........................day of....................For and on behalf of the <Bank> (indicate the

Bank)

Signature

Page 358: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 117 of 121

(Name &

Designation)

Bank's Seal

The above performance Guarantee is accepted by the Rajasthan Police

For and on behalf of the Rajasthan Police

Signature

(Name & Designation)

Page 359: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 118 of 121

4.9 PERFORMANCE BANK GUARANTEE

(To be stamped in accordance with Stamp Act and on a Stamp Paper purchased from

Rajasthan State only and to be issued by a Scheduled bank having its branch at Jaipur

and payable at par at Jaipur, Rajasthan)

To,

Nodal officer, CCTNS

State Crime Records Bureau,

Nehru Nagar, Near Rajasthan Police Academy,

Jaipur, Rajasthan- 302016

1. In consideration of the "Rajasthan Police" having agreed to exempt M/s

..........................(hereinafter called "the said Contractor(s)" from the demand, under

the terms and conditions of an Work Order No...................................dated

.....................made between the Rajasthan Police and .......................(Contractor) for

the work ................. of Security Deposit for the due fulfilment by the said Contractor

(s) of the terms and conditions contained in the said work order, on production of a

Bank Guarantee for Rs...................(Rupees ........................................only), we

...................(indicate the name of the Bank), (hereinafter referred to as "the Bank") at

the request of ..................Contractor(s) do hereby undertake to pay to the Rajasthan

Police an amount not exceeding Rs...................(Rupees..................................only) on

demand.

2. We................. (Indicate the name of Bank), do hereby undertake to pay

Rs.................... (Rupees............................only), the amounts due and payable under

this guarantee without any demur or delay, merely on a demand from the Rajasthan

Police. Any such demand made on the bank by the Rajasthan Police shall be

conclusive as regards the amount due and payable by the Bank under this guarantee.

The Bank Guarantee shall be completely at the disposal of the Rajasthan Police and

We....................... (Indicate the name of Bank), bound ourselves with all directions

given by Rajasthan Police regarding this Bank Guarantee. However, our liability

under this guarantee shall be restricted to an amount not exceeding Rs......................

(Rupees....................only).

3. We.......................(indicate the name of Bank), undertake to pay to the Rajasthan

Police any money so demanded notwithstanding any dispute or disputes raised by

the contractor(s) in any suit or proceeding pending before any Court or Tribunal or

Arbitrator etc. relating thereto, our liability under these presents being absolute,

unequivocal and unconditional.

4. We.....................(indicate the name of Bank) further agree that the performance

guarantee herein contained shall remain in full force and effective up to <DATE> and

that it shall continue to be enforceable for above specified period till all the dues of

Rajasthan Police under or by virtue of the said Agreement have been fully paid and

its claims satisfied or discharged or till the Rajasthan Police certifies that the terms

Page 360: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 119 of 121

and conditions of the said Agreement have been fully and properly carried out by the

said Contractor(s) and accordingly discharges this guarantee.

5. We ...........................(indicate the name of Bank) further agree with the Rajasthan

Police that the Rajasthan Police shall have the fullest liberty without our consent and

without affecting in any manner our obligations hereunder to vary any of the terms

and conditions of the said work order or to extend time of performance by the said

Contractor(s) from time to time or to postpone for any time or from time to time any

of the powers exercisable by the Rajasthan Police against the said Contractor(s) and

to forbear or enforce any of the terms and conditions relating to the said work order

and we shall not be relieved from our liability by reason of any such variation, or

extension being granted to the said Contractor(s) or for any forbearance, act or

omission on the part of the Rajasthan Police or any indulgence by the Rajasthan

Police to the said Contractor(s) or by any such matter or thing whatsoever which

would but for this provision, have effect of so relieving us.

6. The liability of............................. (indicate the name of Bank), under this guarantee

will not be discharged due to the change in the constitution of the Bank or the

contractor(s).

7. We .............................. (indicate the name of Bank), lastly undertake not to revoke

this guarantee except with the previous consent of the Rajasthan Police in writing.

8. This performance Guarantee shall remain valid and in full effect, until it is decided to

be discharged by the Rajasthan Police. Notwithstanding anything mentioned above,

our liability against this guarantee is restricted to Rs...........................

(Rupees..............................only).

9. It shall not be necessary for the Rajasthan Police to proceed against the contractor

before proceeding against the Bank and the guarantee herein contained shall be

enforceable against the Bank notwithstanding any security which the Rajasthan

Police may have obtained or obtain from the contractor.

10. We .............................. (indicate the name of Bank) verify that we have a branch at

Jaipur, Rajasthan. We undertake that this Bank Guarantee shall be payable at any of

its branch at Jaipur, Rajasthan. If the last day of expiry of Bank Guarantee happens

to be a holiday of the Bank, the Bank Guarantee shall expire on the close of the next

working day.

11. We hereby confirm that we have the power(s) to issue this guarantee in your favour

under the memorandum and articles of Association/ constitution of our bank and the

undersigned is/ are the recipient of authority by express delegation of power(s) and

has/have full power(s) to execute this guarantee for the power of attorney issued by

the bank.

Dated..........................day of....................For and on behalf of the <Bank> (indicate the

Bank)

Signature

Page 361: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 120 of 121

(Name &

Designation)

Bank's Seal

The above performance Guarantee is accepted by the Rajasthan Police

For and on behalf of the Rajasthan Police

Signature

(Name & Designation)

Page 362: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) - Vol-II-Rajasthan

Rajasthan Police Page 121 of 121

4.10 MEMORANDUM OF APPEAL UNDER THE RTPP ACT, 2012

Appeal No ………of ……………

Before the ………………………… (First/ Second Appellate Authority)

1. Particulars of appellant:

a. Name of the appellant: <please specify>

b. Official address, if any: <please specify>

c. Residential address: <please specify>

2. Name and address of the respondent(s):

a. <please specify>

b. <please specify>

c. <please specify>

3. Number and date of the order appealed against and name and designation of the

officer/ authority who passed the order (enclose copy), or a statement of a decision,

action or omission of the Rajasthan Police in contravention to the provisions of the

Act by which the appellant is aggrieved: <please specify>

4. If the Appellant proposes to be represented by a representative, the name and postal

address of the representative: <please specify>

5. Number of affidavits and documents enclosed with the appeal: <please specify>

6. Grounds of appeal (supported by an affidavit): <please specify>

7. Prayer: <please specify>

Place …………………………………….

Date ……………………………………

Appellant's Signature

Page 363: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

E-GOVERNANCE

MISSION MODE PROJECT

(MMP)

CRIME AND CRIMINAL TRACKING

NETWORK & SYSTEMS

RFP FOR SELECTION OF SYSTEM

INTEGRATOR

VOLUME – III: Contractual and Legal

Terms

RELEASED BY:

Rajasthan Police

Government of Rajasthan

Page 364: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 2 of 40

Table of Contents

1 GENERAL TERMS AND CONDITIONS OF TENDER & CONTRACT .......................... 5

1.1 CONTRACT DOCUMENTS ............................................................................................................ 7

1.2 INTERPRETATION ...................................................................................................................... 7

1.3 LANGUAGE ................................................................................................................................ 8

1.4 ELIGIBLE GOODS AND RELATED SERVICES ................................................................................ 8

1.5 SCOPE OF WORK ....................................................................................................................... 8

1.6 DELIVERY & INSTALLATION....................................................................................................... 9

1.7 SELECTED BIDDER’S RESPONSIBILITIES .................................................................................... 9

1.8 PURCHASER’S RESPONSIBILITIES .............................................................................................. 9

1.9 CONTRACT PRICE .................................................................................................................... 10

1.10 RECOVERIES FROM SELECTED BIDDER .................................................................................... 10

1.11 TAXES & DUTIES ..................................................................................................................... 10

1.12 INTELLECTUAL PROPERTY RIGHTS .......................................................................................... 10

1.12.1 Product Fixes ................................................................................................................. 10

1.12.2 Bespoke development: .................................................................................................. 11

1.12.3 Pre-existing work: ........................................................................................................ 11

1.13 COPYRIGHT ............................................................................................................................. 11

1.14 CONFIDENTIAL INFORMATION................................................................................................. 11

1.15 SPECIFICATIONS AND STANDARDS ........................................................................................... 12

1.16 PACKING AND DOCUMENTS ..................................................................................................... 13

1.17 INSURANCE ............................................................................................................................. 13

1.18 TRANSPORTATION ................................................................................................................... 13

1.19 INSPECTION ............................................................................................................................ 14

1.20 SAMPLES ................................................................................................................................. 14

1.21 DRAWL OF SAMPLES ................................................................................................................ 15

1.22 TESTING CHARGES .................................................................................................................. 15

1.23 REJECTION.............................................................................................................................. 15

1.24 DELIVERY PERIOD & EXTENT OF QUANTITY – REPEAT ORDERS .............................................. 16

1.25 FREIGHT ................................................................................................................................. 16

1.26 PAYMENTS .............................................................................................................................. 16

1.27 LIQUIDATED DAMAGES (LD) ................................................................................................... 16

1.28 LICENSES ................................................................................................................................ 17

1.29 SETTLEMENT OF DISPUTES ...................................................................................................... 17

Page 365: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 3 of 40

1.30 LEGAL PROCEEDINGS .............................................................................................................. 17

1.31 AUTHENTICITY OF EQUIPMENT ............................................................................................... 17

1.32 WARRANTY ............................................................................................................................. 18

1.33 INDEMNIFICATION .................................................................................................................. 19

1.34 PATENT INDEMNITY ................................................................................................................ 20

1.35 LIMITATION OF LIABILITY ....................................................................................................... 21

1.36 FORCE MAJEURE .................................................................................................................... 21

1.37 CHANGE ORDERS AND CONTRACT AMENDMENTS .................................................................... 24

1.38 TERMINATION ......................................................................................................................... 24

1.39 EFFECTS OF TERMINATION ..................................................................................................... 25

1.40 PERSONNEL ............................................................................................................................ 26

1.41 TRADEMARKS, PUBLICITY........................................................................................................ 27

1.42 NOTICES ................................................................................................................................. 27

1.43 VARIATIONS AND FURTHER ASSURANCE ................................................................................. 27

1.44 COMPLIANCE WITH APPLICABLE LAW ...................................................................................... 28

1.45 PROFESSIONAL FEES ............................................................................................................... 28

1.46 ETHICS .................................................................................................................................... 28

1.47 EXIT MANAGEMENT ................................................................................................................ 28

2 SPECIAL TERMS AND CONDITIONS OF TENDER & CONTRACT ........................... 34

2.1 PAYMENT TERMS AND SCHEDULE ........................................................................................... 34

2.2 SERVICE LEVEL STANDARDS/ REQUIREMENTS/ CONTRACT..................................................... 34

2.3 CHANGE REQUESTS/ MANAGEMENT ....................................................................................... 34

3 ANNEXURE ............................................................................................................................... 37

3.1 DRAFT AGREEMENT FORMAT ......................................................................................... 37

Page 366: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 4 of 40

General Terms and

Conditions of Tender &

Contract

1

Page 367: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 5 of 40

1 GENERAL TERMS AND CONDITIONS OF TENDER & CONTRACT

Bidders should read these conditions carefully and comply strictly while sending their

bids.

a) Definitions

For the purpose of clarity, the following words and expressions shall have the meanings

hereby assigned to them: -

i. “Contract” means the Contract entered into between the Purchaser and the

successful/ selected bidder, together with the Contract Documents referred to

therein, including all attachments, appendices, and all documents incorporated

by reference therein.

ii. “Contract Documents” means the documents listed in the Contract, including any

amendments thereto.

iii. “Contract Price” means the price payable to the successful/ selected bidder as

specified in the Contract, subject to such additions and adjustments thereto or

deductions there from, as may be made pursuant to the Contract.

iv. “Contract/ Project Period” means the Contract/ Project Period shall commence

from the date of Signing of Contract till 5 Years which includes Operations &

Maintenance Services after successful commissioning of project.

v. “Day” means a calendar day as per GoR.

vi. “Delivery” means the transfer of the Goods from the successful/ selected bidder

to the Purchaser in accordance with the terms and conditions set forth in the

Contract.

vii. “Completion” means the fulfilment of the related services by the successful/

selected bidder in accordance with the terms and conditions set forth in the

Contract.

viii. “Goods” means all articles, material, commodities, electricity, livestock, furniture,

fixtures, raw material, spares, instruments, software (Application and System

Software), machinery, equipment, industrial plant, vehicles, aircraft, ships,

railway rolling stock and any other category of goods, whether in solid, liquid or

gaseous form, purchased or otherwise acquired for the use of a procuring entity

as well as services or works incidental to the supply of the goods if the value of

services or works or both does not exceed that of the goods themselves.

ix. “Purchaser/ Tendering Authority/ Procuring Entity” means Person or entity that

is a recipient of a good or service provided by a seller (bidder) under a purchase

order or contract of sale. Also called buyer, Rajasthan Police in this RFP

document.

x. “BoM” means the Bill of Material

Page 368: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 6 of 40

xi. “Services” means any subject matter of procurement other than goods or works

and includes physical, maintenance, professional, intellectual, consultancy and

advisory services or any service classified or declared as such by a procuring

entity and does not include appointment of any person made by any procuring

entity

xii. “Subcontractor” means any person, private or government entity, or a

combination of the above, including its legal successors or permitted assigns, to

whom any part of the Goods to be supplied or execution of any part of the related

services is subcontracted by the successful/ selected bidder.

xiii. “Supplier/ Successful or Selected bidder” means the person, private or

government entity, or a combination of the above, whose Bid to perform the

Contract has been accepted by the Purchaser and is named as such in the

Contract, and includes the legal successors or permitted assigns of the successful/

selected bidder.

xiv. “The Site,” where applicable, means the designated project place(s) named in the

bidding document.

xv. “SLA” means Service Level Contract is a negotiated contract between two parties

wherein one is the Purchaser and the other is the successful Bidder. It is a service

contract where the level of service is formally defined. In practice, the term SLA is

sometimes used to refer to the contracted delivery time (of the service) or

performance.

xvi. “SOW” means Scope of Work for Successful bidder

xvii. “ETDC” means Electronic Testing & Development Center

xviii. “FOR/ FOB” means Free on Railway or Freight on Board

xix. “GoI/ GoR” means Govt. of India/ Govt. of Rajasthan

xx. “GF & AR” means General Financial and Accounts Rules of Rajasthan

xxi. “GR” means Goods receipt

xxii. “INR” means Indian Rupee

xxiii. “ISI” means Indian Standards Institution

xxiv. “ISO” means International Organization for Standardization

xxv. “LD” means Liquidated Damages

xxvi. “NIB” means Notice Inviting Bid

xxvii. “OEM” means Original Equipment Manufacturer

xxviii. “PSD/ SD” means Performance Security Deposit/ Security Deposit

xxix. “STQC” means Standardization Testing and Quality Certification, GoI

xxx. “TDS” means Tax Deduction at Source

xxxi. “VAT/ CenVAT” means Value Added Tax/ Central VAT

xxxii. “WO/ PO” means Work Order/ Purchase Order

xxxiii. “MAF” means Manufacture Authorization Form

Page 369: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 7 of 40

xxxiv. “RTPPR” means Rajasthan Transparency in Public Procurement Rules, 2013.

xxxv. “RTPPA” means Rajasthan Transparency in Public Procurement Act, 2012.

xxxvi. “SPMU” means State Project Management Unit.

xxxvii. “CDPSM” means Centre for Development of Police Science and Management.

Note: The bidder shall be deemed to have carefully examined the conditions,

specifications, size, make and drawings, etc., of the goods to be supplied and related

services to be rendered. If the bidder has any doubts as to the meaning of any portion of

these conditions or of the specification, drawing, etc., he shall, before submitting the Bid

and signing the contract refer the same to the procuring entity and get clarifications.

1.1 Contract Documents

Subject to the order of precedence set forth in the Contract, all documents forming the

Contract (and all parts thereof) are intended to be correlative, complementary, and

mutually explanatory.

1.2 Interpretation

a) If the context so requires it, singular means plural and vice versa.

b) Entire Contract: The Contract constitutes the entire contract between the

Purchaser and the Supplier/ Selected Bidder and supersedes all communications,

negotiations and contracts (whether written or oral) of parties with respect thereto

made prior to the date of Contract.

c) Amendment: No amendment or other variation of the Contract shall be valid

unless it is in writing, is dated, expressly refers to the Contract, and is signed by a

duly authorized representative of each party thereto.

d) Non-waiver: Subject to the condition (f) below, no relaxation, forbearance, delay,

or indulgence by either party in enforcing any of the terms and conditions of the

Contract or the granting of time by either party to the other shall prejudice, affect,

or restrict the rights of that party under the Contract, neither shall any waiver by

either party of any breach of Contract operate as waiver of any subsequent or

continuing breach of Contract.

e) Any waiver of a party’s rights, powers, or remedies under the Contract must be in

writing, dated, and signed by an authorized representative of the party granting

such waiver, and must specify the rights and the extent to which it is being waived.

f) Severability: If any provision or condition of the Contract is prohibited or rendered

invalid or unenforceable, such prohibition, invalidity or unenforceability shall not

affect the validity or enforceability of any other provisions and conditions of the

Contract.

Page 370: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 8 of 40

1.3 Language

a) The Contract as well as all correspondence and documents relating to the Contract

exchanged by the successful/ selected bidder and the Purchaser, shall be written in

English language only. Supporting documents and printed literature that are part of

the Contract may be in another language provided they are accompanied by an

accurate translation of the relevant passages in the language specified in the special

conditions of the contract, in which case, for purposes of interpretation of the

Contract, this translation shall govern.

b) The successful/ selected bidder shall bear all costs of translation to the governing

language and all risks of the accuracy of such translation.

1.4 Eligible Goods and Related Services

a) All articles/ goods being bid, other than those marked in the Bill of Material

(BoM)- (Annexure-6 of Volume- I of the RFP) should be the ones which

areproduced in volume and are used by a large number of users in India/ abroad.

All products quoted by the successful/ selected bidder must be associated with

specific make and model number, item code and names and with printed literature

describing configuration and functionality. Any deviation from the printed

specifications should be clearly mentioned in the offer document by the bidder/

supplier. Also, the bidder is to quote/ propose only one make/ model against the

respective item.

b) The OEM/ Vendor of the quoted product must have its own registered spares depot

in India having adequate inventory of the equipment being quoted for providing

the necessary spares as per the requirements of this bidding document.

c) The OEM/ Vendor of the quoted product should also have its direct representation

in India in terms of registered office for at least past 3 years. The presence through

any Distribution/ System Integration partner contract will not be accepted.

d) Bidder must quote products in accordance with above clause “Eligible goods and

related services”.

1.5 Scope of Work

a) Subject to the provisions in the bidding document and contract, the goods and

related services to be supplied shall be as specified in the bidding document.

b) Unless otherwise stipulated in the Contract, the scope of work shall include all such

items not specifically mentioned in the Contract but that can be reasonably inferred

from the Contract as being required for attaining delivery and completion of the

goods and related services as if such items were expressly mentioned in the

Contract.

c) The bidder shall not quote and supply any hardware/ software that is likely to be

declared as End of Sale in next 1 year and End of Service/ Support for a period of 5

Page 371: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 9 of 40

Years from the last date of bid submission. OEMs are required to mention this in

the Contract for all the quoted hardware/ software. If any of the hardware/

software is found to be declared as End of Sale/ Service/ Support, then the bidder

shall replace all such hardware/ software with the latest ones having equivalent or

higher specifications without any financial obligation to the Purchaser.

1.6 Delivery & Installation

a) Subject to the conditions of the contract, the delivery of the goods and completion

of the related services shall be in accordance with the delivery and completion

schedule specified in the bidding document. The details of supply/ shipping and

other documents to be furnished by the successful/ selected bidder are specified in

the bidding document and contract.

b) The contract for the supply can be repudiated at any time by the Purchaser, if the

supplies are not made to his satisfaction after giving an opportunity to the bidder of

being heard and recording the reasons for repudiation.

c) The Supplier/ Selected Bidder shall arrange to supply, install and commission the

ordered materials/ system as per specifications within the specified delivery and

commissioning period at various offices and locations mentioned in the bidding

document.

d) Shifting the place of Installation: The Purchaser will be free to shift the place of

installation within the same State. The successful/ selected bidder shall provide all

assistance, except transportation, in shifting of the equipment at no additional cost.

e) If the selected bidder feels that shifting of equipment anywhere within the state or

outside is in the interest of the project, the bidder may request the same to

Purchaser. If mutually agreed the place of installation may be changed. All cost in

such case would be borne by bidder.

1.7 Selected Bidder’s Responsibilities

The Selected Bidder shall supply all the goods and related services included in the

scope of supply in accordance with the provisions of bidding document and contract.

1.8 Purchaser’s Responsibilities

a) Whenever the supply of goods and related services requires that the Selected

Bidder obtain permits, approvals, and import and other licenses from local public

authorities, the Purchaser may provide support if so required by the Selected

Bidder.

Page 372: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 10 of 40

1.9 Contract Price

a) The Contract Price shall be paid as specified in the contract subject to any additions

and adjustments thereto, or deductions there from, as may be made pursuant to

the Contract.

b) Prices charged by the Selected Bidder for the Goods delivered and the Related

Services performed under the Contract shall not vary from the prices quoted by the

Selected Bidder in its bid.

1.10 Recoveries from Selected Bidder

a) Recoveries of liquidated damages, short supply, breakage, rejected articles shall

ordinarily be made from bills.

b) Amount may also be withheld to the extent of short supply, breakages, and rejected

articles and in case of failure in satisfactory replacement by the supplier along with

amount of liquidated damages shall be recovered from his dues and security

deposit available with the department.

c) In case, recovery is not possible recourse will be taken under RTPPR or any other

law in force.

1.11 Taxes & Duties

a) The TDS, Raj-VAT, Service Tax etc., if applicable, shall be deducted at source/ paid

by Purchaser as per prevailing rates.

b) For goods supplied from outside India, the successful/ selected bidder shall be

entirely responsible for all taxes, stamp duties, license fees, and other such levies

imposed outside the country.

c) For goods supplied from within India, the successful/ selected bidder shall be

entirely responsible for all taxes, duties, license fees, etc., incurred until delivery of

the contracted Goods to the Purchaser.

d) If any tax exemptions, reductions, allowances or privileges as per prevailing laws,

to the successful/ selected bidder in India, the Purchaser may provide necessary

support.

1.12 Intellectual Property Rights

1.12.1 Product Fixes

All products and related solutions and fixes provided pursuant to this contract shall be

licensed according to the terms of the license contract packaged with or otherwise

applicable to such product. The successful bidder would be responsible for arranging any

licenses associated with products without any additional cost to the Purchaser. “Product”

means any computer code, web-based services, or materials comprising commercially

released, pre-release or beta products (whether licensed for a fee or no charge) and any

derivatives of the foregoing

Page 373: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 11 of 40

which are made available to Purchaser for license which is published by product owner

or its affiliates, or a third party. “Fixes” means product fixes that are either released

generally (such as commercial product service packs) or that are provided to successful

bidder when performing services (such as workarounds, patches, bug fixes, beta fixes

and beta builds) and any derivatives of the foregoing.

1.12.2 Bespoke development:

The IPR (Intellectual Property Rights) rights for any bespoke development done during

the implementation of the project will lie with Purchaser. Any customization in the

Application based on the requirements of the Purchaser, the source code of the

customized Application shall be the property of the Purchaser.

1.12.3 Pre-existing work:

All IPR including the source code and materials (other than products or fixes) developed

or otherwise obtained independently of the efforts of a party under this contract (“pre-

existing work”) shall remain the sole property of that party. During the performance of

the services for this contract, each party grants to the other party (and their sub-

contractors as necessary) a non-exclusive license to use, reproduce and modify any of its

pre-existing work provided to the other party solely for the performance of such services.

Except as may be otherwise explicitly agreed to in a statement of services, upon payment

in full, the successful bidder should grant Purchaser a non-exclusive, enterprise wide,

fully paid-up enterprise edition license(s) to use, reproduce and modify (if applicable)

the pre-existing work in the form delivered to Purchaser as part of the service

deliverables only for its internal business operations.

Purchaser’s license to pre-existing work is conditioned upon its compliance with the

terms of this contract and the enterprise wide license for unlimited number of users

applies solely to the pre-existing work that bidder leaves with Purchaser at the

conclusion of performance of the services

1.13 Copyright

The copyright in all drawings, design documents, source code and other materials

containing data and information furnished to the Purchaser by the Selected Bidder

herein shall remain vested in the Selected Bidder, or, if they are furnished to the

Purchaser directly or through the Selected Bidder by any third party, including suppliers

of materials, the copyright in such materials shall remain vested in such third party.

1.14 Confidential Information

a) The Purchaser and the Selected Bidder shall keep confidential and shall not,

without the written consent of the other party hereto, divulge to any third party any

drawings, documents, data, or other information furnished directly or indirectly by

the other party hereto in connection with the Contract, whether such information

Page 374: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 12 of 40

has been furnished prior to, during or following completion or termination of the

Contract.

b) The Selected Bidder may furnish to its Subcontractor, if permitted, such

documents, data, and other information it receives from the Purchaser to the

extent required for the Subcontractor to perform its work under the Contract, in

which event the Selected Bidder shall obtain from such Subcontractor an

undertaking of confidentiality similar to that imposed on the Selected Bidder.

c) The Purchaser shall not use such documents, data, and other information received

from the Selected Bidder for any purposes unrelated to the Contract. Similarly, the

Selected Bidder shall not use such documents, data, and other information received

from the Purchaser for any purpose other than the design, procurement, or other

work and services required for the performance of the Contract.

d) The obligation of a party under sub-clauses above, however, shall not apply to

information that: -

i. the Purchaser or Selected Bidder need to share with other institutions

participating in the Contract;

ii. now or hereafter enters the public domain through no fault of that party;

iii. can be proven to have been possessed by that party at the time of disclosure

and which was not previously obtained, directly or indirectly, from the other

party; or

iv. otherwise lawfully becomes available to that party from a third party that has

no obligation of confidentiality.

e) The above provisions shall not in any way modify any undertaking of

confidentiality given by either of the parties hereto prior to the date of the Contract

in respect of the supply or any part thereof.

f) The provisions of this clause shall survive completion or termination, for whatever

reason, of the Contract.

1.15 Specifications and Standards

a) All articles supplied shall strictly conform to the specifications, trademark laid

down in the bidding document and wherever articles have been required according

to ISI/ ISO/ other applicable specifications/ certifications/ standards, those

articles should conform strictly to those specifications/ certifications/ standards.

The supply shall be of best quality and description. The decision of the competent

authority/ purchaser whether the articles supplied conform to the specifications

shall be final and binding on the selected bidder.

b) Technical Specifications and Drawings

i. The Selected Bidder shall ensure that the goods and related services comply

with the technical specifications and other provisions of the Contract.

ii. The Selected Bidder shall be entitled to disclaim responsibility for any design,

data, drawing, specification or other document, or any modification thereof

Page 375: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 13 of 40

provided or designed by or on behalf of the Purchaser, by giving a notice of

such disclaimer to the Purchaser.

iii. iii. The goods and related services supplied under this Contract shall conform

to the standards mentioned in bidding document and, when no applicable

standard is mentioned, the standard shall be equivalent or superior to the

official standards whose application is appropriate to the country of origin of

the Goods.

c) Wherever references are made in the Contract to codes and standards in

accordance with which it shall be executed, the edition or the revised version of

such codes and standards shall be those specified in the bidding document. During

Contract execution, any changes in any such codes and standards shall be applied

only after approval by the Purchaser and shall be treated in accordance with the

general conditions of the contract.

1.16 Packing and Documents

a) The Selected Bidder shall provide such packing of the Goods as is required to

prevent their damage or deterioration during transit to their final destination, as

indicated in the Contract. During transit, the packing shall be sufficient to

withstand, without limitation, rough handling and exposure to extreme

temperatures, salt and precipitation, and open storage. Packing case size and

weights shall take into consideration, where appropriate, the remoteness of the

final destination of the Goods and the absence of heavy handling facilities at all

points in transit.

b) The packing, marking, and documentation within and outside the packages shall

comply strictly with such special requirements as shall be expressly provided for in

the Contract, including additional requirements, if any, specified in the contract,

and in any other instructions ordered by the Purchaser.

1.17 Insurance

The goods will be delivered at the destination location as defined in the bidding

document in perfect condition. The Goods supplied under the Contract shall be fully

insured against loss by theft, destruction or damage incidental to manufacture or

acquisition, transportation, storage, fire, flood, under exposure to weather and delivery

at the designated project locations, in accordance with the applicable terms. The

insurance charges will be borne by the supplier and Purchaser will not be required to pay

such charges if incurred.

1.18 Transportation

The selected bidder shall be responsible for transport by sea, rail and road or air and

delivery of the material in the good condition to the consignee at destination. In the

event of any loss, damage, breakage or leakage or any shortage the bidder shall be liable

Page 376: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 14 of 40

to make good such loss and shortage found at the checking/ inspection of the material by

the consignee. No extra cost on such account shall be admissible.

1.19 Inspection

a) The Purchaser or his duly authorized representative shall at all reasonable time

have access to the selected bidder’s premises and shall have the power at all

reasonable time to inspect and examine the materials and workmanship of the

goods/ equipment/ machineries during manufacturing process or afterwards as

may be decided. Inspection shall be made as required by the Purchaser at the time

of delivery and installation of goods (at selected bidder’s cost).

b) The selected bidder shall furnish complete address of the premises of his factory,

office, go-down and workshop where inspection can be made together with name

and address of the person who is to be contacted for the purpose.

c) After successful inspection, it will be selected bidder’s responsibility to dispatch

and install the equipment at respective locations without any financial liability to

the Purchaser. However, supplies when received at respective locations shall be

subject to inspection to ensure whether they conform to the specification.

d) The selected bidder has to follow the Standard Operating Procedures (SOP) as

provided in the bidding document based on the guidelines issued by NCRB and

MHA, GoI to implement CCTNS project in the state.

1.20 Samples

a) When notified by the Purchaser to the bidder/ selected bidder, goods marked in the

Bill of Material shall be accompanied by four sets of samples of the articles quoted

properly packed. Such samples if submitted personally will be received in the office.

A receipt will be given for each sample by the officer receiving the samples. Samples

if sent by train, etc., should be despatched freight paid and the R/R or G.R. should be

sent under a separate registered cover. Samples for catering/ food items should be

given in a plastic box or in polythene bags at the cost of the bidder.

b) Each sample shall be marked suitably either by written on the sample or on a slip of

durable paper securely fastened to the sample, the name of the bidder and serial

number of the item, of which it is a sample in the schedule.

c) Approved samples would be retained free of cost upto the period of six months after

the expiry of the contract. Purchaser shall not be responsible for any damage, wear

and tear or loss during testing, examination, etc., during the period these samples are

retained.

d) The Samples shall be collected by the bidder/ selected bidder on the expiry of

stipulated period. Purchaser shall in no way make arrangements to return the

samples. The samples uncollected within 9 months after expiry of contract shall be

forfeited by Purchaser and no claim for their cost, etc., shall be entertained.

Page 377: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 15 of 40

e) Samples not approved shall be collected by the unsuccessful bidder. Purchaser will

not be responsible for any damage, wear and tear, or loss during testing,

examination, etc., during the period these samples are retained. The uncollected

samples shall be forfeited and no claim for their cost, etc., shall be entertained.

f) Supplies when received may be subject to inspection to ensure whether they conform

to the specifications or with the approved samples. Where necessary or prescribed or

practical, tests shall be carried out in Government laboratories, reputed testing

house like STQC (ETDC) and the like and the supplies will be accepted only when the

articles conform to the standard of prescribed specifications as a result of such tests.

g) The selected bidder shall at its own expense and at no cost to the Purchaser carry out

all such tests and/ or inspections of the Goods and Related Services as are specified

in the bidding document.

1.21 Drawl of Samples

In case of tests, wherever feasible, samples shall be drawn in four sets in the presence of

selected bidder or his authorised representative and properly sealed in their presence.

Once such set shall be given to them, one or two will be sent to the laboratories and/ or

testing house and the third or fourth will be retained in the office for reference and

record.

1.22 Testing charges

Testing charges shall be borne by the Government. In case of test results showing that

supplies are not upto the prescribed standards or specifications, the testing charges shall

be payable by the selected bidder.

1.23 Rejection

a) Articles not approved during inspection or testing shall be rejected and will have to

be replaced by the selected bidder at his own cost within the time fixed by the

Purchaser.

b) If, however, due to exigencies of Purchaser 's requirements, such replacement

either in whole or in part, is not considered feasible, the Purchaser after giving an

opportunity to the selected bidder of being heard shall for reasons to be recorded,

deduct a suitable amount from the approved rates. The deduction so made shall be

final.

c) The rejected articles shall be removed by the bidder/ selected bidder within 15 days

of intimation of rejection, after which Purchaser shall not be responsible for any

loss, shortage or damage and shall have the right to dispose of such articles as he

thinks fit, at the selected bidder’s risk and on his account.

Page 378: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 16 of 40

1.24 Delivery period & Extent of Quantity – Repeat Orders

a) The time specified for delivery shall be deemed to be the essence of the contract

and the successful bidder shall arrange supplies within the period on receipt of the

work order from the Purchaser.

b) The selected bidder shall arrange supplies within the stipulated time period.

c) If the Rajasthan Police does not procure any subject matter of procurement or

procures less than the quantity specified in the bidding documents due to change in

circumstances, the bidder shall not be entitled for any claim or compensation.

d) Repeat orders for extra items or additional quantities may be placed on the rates

and conditions given in the contract within one month of last delivery. Delivery or

completion period may also be proportionately increased. The limits of repeat

order shall be as under: - 50% of the value of goods or services of the original

contract.

1.25 Freight

a) All goods must be sent freight paid through Railways or goods transport.

b) In case supply is desired to be sent by the Purchaser by passenger train, the entire

railway freight will be borne by the bidder.

c) Remittance charges on payment made shall be borne by the bidder.

1.26 Payments

a) Unless otherwise agreed between the parties, payment for the delivery of the goods

will be made on submission of bill in proper form by the bidder to the Purchaser in

accordance with G.F.& A.R. All remittance charges will be borne by the bidder.

b) In case of disputed items, 10% to 25% of the amount shall be withheld and will be

paid on settlement of the dispute.

c) Payment in case of those goods which need testing shall be made only when such

tests have been carried out, test results received conforming to the prescribed

specification.

1.27 Liquidated Damages (LD)

a) In case of extension in the delivery period with liquidated damages the recovery

shall be made on the basis of following percentages of value of goods which the

bidder has failed to supply/ install/ complete:-

delay up to one fourth period of the prescribed delivery period: 2.5%

delay exceeding one fourth but not exceeding half of the prescribed period: 5.0%

delay exceeding half but not exceeding three fourth of the prescribed

Page 379: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 17 of 40

period: 7.5%

delay exceeding three fourth of the prescribed period: 10%

b) Fraction of a day in reckoning period of delay in supplies shall be eliminated if it is

less than half a day.

c) The maximum amount of liquidated damages shall be 10% of the contract value.

d) If the supplier requires an extension of time in completion of contractual supply on

account of occurrence of any hindrance, he shall apply in writing to the authority,

which has placed the supply order, for the same immediately on occurrence of the

hindrance but not after the stipulated date of completion of supply.

e) Delivery period may be extended with or without liquidated damages if the delay in

the supply of goods is on account of hindrances beyond the control of the bidder.

Penalty

f) The Service Level Agreement (SLA) as per Annexure 1 of Volume 1, would be

imposed on the successful bidder for any deviation from agreed performance

benchmark during the O&M phase of this project.

1.28 Licenses

Bidders must make their own arrangements to obtain import licence, if necessary. If a

bidder imposes conditions which are in addition to or in conflict with the conditions

mentioned herein, his bid is liable to summary rejection. In any case none of such

conditions will be deemed to have been accepted unless specifically mentioned in the

letter of acceptance of bid issued by the Purchaser.

1.29 Settlement of Disputes

If any dispute arise out of the contract with regard to the interpretation, meaning and

breach of the terms of the contract, the matter shall be referred to by the Parties to the

DG, Rajasthan Police who will appoint his next level deputy as the Sole Arbitrator of the

dispute who will not be related to this contract and whose decision shall be final. The

disputes settlement procedure shall be as per Arbitration and Conciliation Act, 1996 of

Government of India.

1.30 Legal Proceedings

All legal proceedings, regarding contract, by any of the parties (Purchaser or Successful

Bidder) shall have to be lodged in courts situated in Rajasthan and not elsewhere.

1.31 Authenticity of Equipment

a) The selected bidder shall certify that the supplied goods are brand new, authentic,

not refurbished, conform to the description and quality as specified in this bidding

document and are free from defects in material, workmanship and service.

b) If during the contract period, the said goods be discovered counterfeit/

unauthentic, or are not in compliance to the specification and quality mentioned in

Page 380: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 18 of 40

the bidding document, the decision of the Purchaser in that behalf will be final and

conclusive, notwithstanding the fact that the Purchaser may have inspected and

approved the said goods. Such rejection of the goods will be at the selected bidder’s

risk and all the provisions relating to rejection of goods etc., shall apply. The

selected bidder shall, if so called upon to do, replace the goods etc., or such portion

thereof as is rejected by Purchaser, otherwise the selected bidder shall pay such

damage. Nothing herein contained shall prejudice any other right of the Purchaser

in that behalf under this contract or otherwise.

c) Goods accepted by the Purchaser in terms of the contract shall in no way dilute

Purchaser’s right to reject the same later, if found deficient in terms of the this

clause of the contract.

1.32 Warranty

a) The bidder must supply all items with comprehensive on-site OEM warranty valid

for 3 years from the successful Go-Live of the project after the goods, or any

portion thereof as the case may be, have been delivered to, installed and accepted

at the final destination(s) indicated in the bidding document. However, if delay of

installation is more than a month’s time due to the reasons ascribed to the bidder,

the warranty shall start from the date of last successful installation of the items

covered under the Purchase Order.

b) At the time of goods delivery, the selected bidder shall submit a certificate/

undertaking from all the respective OEMs mentioning the fact that the goods

supplied are covered under comprehensive warranty & support for the prescribed

period.

c) The Purchaser shall give a written notice to the selected bidder stating the nature of

any defect together with all available evidence thereof, promptly following the

discovery thereof. The Purchaser shall afford all reasonable opportunity for the

selected bidder to inspect such defects. Upon receipt of such notice, the selected

bidder shall expeditiously cause to repair the defective goods or parts thereof or

replace the defective goods or parts thereof with brand new genuine/ authentic

ones having similar or higher specifications from the respective OEM, at no cost to

the Purchaser. Any goods repaired or replaced by the selected bidder shall be

delivered at the respective location without any additional costs to the Purchaser.

d) If having been notified, the selected bidder fails to remedy the defect within the

period specified, the Purchaser may proceed to take within a reasonable period

such remedial action as may be necessary, in addition to other recourses available

in terms and conditions of the contract and bidding document.

e) During the warranty period, the bidder shall also be responsible to ensure adequate

and timely availability of spare parts needed for repairing the supplied goods.

f) The warranty on supplied software media, if any, should be at least 90 days.

Page 381: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 19 of 40

1.33 Indemnification

a) Subject to Clause mentioned below, Successful bidder (the "Indemnifying Party")

undertakes to indemnify Purchaser (the "Indemnified Party") from and against all

Losses on account of bodily injury, death or damage to tangible personal property

arising in favor of any person, corporation or other entity (including the

Indemnified Party) attributable to the Indemnifying Party's performance or non-

performance under this contract to the extent of the Indemnifying Party's

comparative fault in causing such Losses.

b) The indemnities set out in the above clause shall be subject to the following

conditions:

i. The Indemnified Party as promptly as practicable informs the Indemnifying

Party in writing of the claim or proceedings and provides all relevant

evidence, documentary or otherwise;

ii. The Indemnified Party shall, at the cost of the Indemnifying Party, give the

Indemnifying Party all reasonable assistance in the Defense of such claim

including reasonable access to all relevant information, documentation and

personnel provided that the Indemnified Party may, at its sole cost and

expense, reasonably participate, through its attorneys or otherwise, in such

Defense;

iii. If the Indemnifying Party does not assume full control over the Defense of a

claim as provided in this Article, the Indemnifying Party may participate in

such Defense at its sole cost and expense, and the Indemnified Party will have

the right to defend the claim in such manner as it may deem appropriate, and

the cost and expense of the Indemnified Party will be included in Losses;

iv. The Indemnified Party shall not prejudice, proceedings or pay or accept any

claim, or compromise any proceedings or claim, without the written consent

of the Indemnifying Party;

v. All settlements of claims subject to indemnification under this Article will:

a) Be entered into only with the consent of the Indemnified Party,

which consent will not be unreasonably withheld and include an

unconditional release to the Indemnified Party from the

claimant or plaintiff for all liability in respect of such claim; and

b) Include any appropriate confidentiality contract prohibiting

disclosure of the terms of such settlement;

vi. The Indemnified Party shall account to the Indemnifying Party for all awards,

settlements, damages and costs (if any) finally awarded in favor of the

Indemnified Party which are to be paid to it in connection with any such

claim or proceedings;

vii. The Indemnified Party shall take steps that the Indemnifying Party may

reasonably require to mitigate or reduce its loss as a result of such a claim or

proceedings;

Page 382: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 20 of 40

viii. In the event that the Indemnifying Party is obligated to indemnify an

Indemnified Party pursuant to this Article, the Indemnifying Party will, upon

payment of such indemnity in full, be subrogated to all rights and defenses of

the Indemnified Party with respect to the claims to which such

indemnification relates; and

ix. If a Party makes a claim under the indemnity set out under clause mentioned

above in respect of any particular Loss or Losses, then that Party shall not be

entitled to make any further claim in respect of that Loss or Losses (including

any claim for damages).

1.34 Patent Indemnity

a) The supplier/ selected bidder shall, subject to the Purchaser’s compliance with sub-

clause (b) below, indemnify and hold harmless the Purchaser and its employees

and officers from and against any and all suits, actions or administrative

proceedings, claims, demands, losses, damages, costs, and expenses of any nature,

including attorney’s fees and expenses, which the Purchaser may suffer as a result

of any infringement or alleged infringement of any patent, utility model, registered

design, trademark, copyright, or other intellectual property right registered or

otherwise existing at the date of the Contract by reason of: -

i. the installation of the Goods by the supplier/ selected bidder or the use

of the Goods in the country where the Site is located; and

ii. the sale in any country of the products produced by the Goods.

Such indemnity shall not cover any use of the Goods or any part thereof other than for

the purpose indicated by or to be reasonably inferred from the Contract, neither any

infringement resulting from the use of the Goods or any part thereof, or any products

produced thereby in association or combination with any other equipment, plant, or

materials not supplied by the supplier/ selected bidder, pursuant to the Contract.

b) If any proceedings are brought or any claim is made against the Purchaser arising

out of the matters referred to above, the Purchaser shall promptly give the

supplier/ selected bidder a notice thereof, and the supplier/ selected bidder may at

its own expense and in the Purchaser’s name conduct such proceedings or claim

and any negotiations for the settlement of any such proceedings or claim.

c) If the supplier/ selected bidder fails to notify the Purchaser within thirty (30) days

after receipt of such notice that it intends to conduct any such proceedings or

claim, then the Purchaser shall be free to conduct the same on its own behalf.

d) The Purchaser shall, at the supplier’s/ selected bidder’s request, afford all available

assistance to the supplier/ selected bidder in conducting such proceedings or claim,

and shall be reimbursed by the supplier/ selected bidder for all reasonable

expenses incurred in so doing.

e) The Purchaser shall indemnify and hold harmless the supplier/ selected bidder and

its employees, officers, and Subcontractors (if any) from and against any and all

suits, actions or administrative proceedings, claims, demands, losses, damages,

Page 383: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 21 of 40

costs, and expenses of any nature, including attorney’s fees and expenses, which

the supplier/ selected bidder may suffer as a result of any infringement or alleged

infringement of any patent, utility model, registered design, trademark, copyright,

or other intellectual property right registered or otherwise existing at the date of

the Contract arising out of or in connection with any design, data, drawing,

specification, or other documents or materials provided or designed by or on behalf

of the Purchaser.

1.35 Limitation of Liability

Except in cases of gross negligence or wilful misconduct: -

a) neither party shall be liable to the other party for any indirect or consequential loss

or damage, loss of use, loss of production, or loss of profits or interest costs,

provided that this exclusion shall not apply to any obligation of the selected bidder

to pay liquidated damages and other penalties as defined in the bidding document,

to the Purchaser; and

b) the aggregate liability of the selected bidder to the Purchaser, whether under the

Contract, in tort, or otherwise, shall not exceed the amount specified in the

Contract, provided that this limitation shall not apply to the cost of repairing or

replacing defective equipment, or to any obligation of the selected bidder to

indemnify the Purchaser with respect to patent infringement.

1.36 Force Majeure

The Successful bidder or the Purchaser as the case may be, shall be entitled to suspend

or excuse performance of its respective obligations under this Contract to the extent that

such performance is impeded by an event of force majeure (‘Force Majeure’).

Force Majeure events

A Force Majeure event means any event or circumstance or a combination of events and

circumstances referred to in this Clause, which:

a) Is beyond the reasonable control of the affected Party;

b) Such Party could not have prevented or reasonably overcome with the exercise of

reasonable skill and care;

c) Does not result from the negligence of such Party or the failure of such Party to

perform its obligations under this contract;

d) Is of an incapacitating nature and prevents or causes a delay or impediment in

performance; and

e) May be classified as all or any of the following events: Such events include:

I. Non-Political Events

Page 384: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 22 of 40

a) Act of God, including earthquake, flood, inundation, landslide, exceptionally

adverse weather conditions, storm, tempest, hurricane, cyclone, lightning, thunder,

volcanic eruption, fire or other extreme atmospheric conditions;

b) Radioactive contamination or ionizing radiation or biological contamination except

as may be attributable to the Successful bidder’s use of radiation or radio-activity

or biologically contaminating material;

c) Strikes, lockouts, boycotts, labor disruptions or any other industrial disturbances

as the case may be not arising on account of the acts or omissions of the Successful

bidder and which affect the timely implementation and continued operation of the

Project; or

d) Any event or circumstances of a nature analogous to any of the foregoing.

II. Political Events

a) Change in Law, other than any Change in Law for which relief is provided under

this Contract;

b) Expropriation or compulsory acquisition by the Purchaser or any of their

nominated agencies of any material assets or rights of the Successful bidder;

c) Unlawful or unauthorized revocation of, or refusal by Purchaser or any of their

nominated agencies, GoI or any of its agencies to renew or grant any clearance or

Required Consents required by the Successful bidder to perform its obligations

without valid cause, provided that such delay, modification, denial, refusal or

revocation did not result from the Successful bidder’s inability or failure to comply

with any condition relating to grant, maintenance or renewal of such Required

Consents applied on a non-discriminatory basis;

d) Any judgment or order of any court of competent jurisdiction or statutory authority

in India made against the Successful bidder in any proceedings for reasons other

than failure of the Successful bidder to comply with Applicable Laws or Required

Consents or on account of breach thereof, or of any contract, or enforcement of this

contract or exercise of any of its rights under this contract;

e) Any requisition of the Project by any other authority; or

f) Any requisition of the Project by the Purchaser or any of their nominated agencies.

g) For the avoidance of doubt, suspension of the Project in accordance with the

provisions of this contract shall not be considered a requisition for the purposes of

Force Majeure event.

III. Other Events

a) An act of war (whether declared or undeclared), hostilities, invasion, armed conflict

or act of foreign enemy, blockade, embargo, prolonged riot, insurrection, terrorist

or military action, civil commotion or politically motivated sabotage, for a

continuous period exceeding seven (v') days.

For the avoidance of doubt, it is expressly clarified that the failure on the part of the

Successful bidder under this contract to implement any disaster contingency planning

Page 385: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 23 of 40

and back-up and other data safeguards in accordance with the terms of this contract

against natural disaster, fire, sabotage or other similar occurrence shall not be deemed to

be a Force Majeure event.

Notification procedure for Force Majeure

a) The affected Party shall notify the other Party of a Force Majeure event within

seven (7) days of occurrence of such event. If the other Party disputes the claim for

relief under Force Majeure it shall give the claiming Party written notice of such

dispute within thirty (30) days of such notice. Such dispute shall be dealt with in

accordance with the dispute resolution mechanism in accordance with this Clause

b) Upon cessation of the situation which led the Party claiming Force Majeure, the

claiming Party shall within seven (7) days hereof notify the other Party in writing of

the cessation and the Parties shall as soon as practicable thereafter continue

performance of all obligations under this Contract.

Allocation of costs arising out of Force Majeure

a) Upon the occurrence of any Force Majeure Event prior to the Effective Date, the

Parties shall bear their respective costs and no Party shall be required to pay to the

other Party any costs thereof.

b) Upon occurrence of a Force Majeure Event after the Effective Date, the costs

incurred and attributable to such event and directly relating to the Project (‘Force

Majeure Costs’) shall be allocated and paid as follows:

• Upon occurrence of a Non-Political Event, the Parties shall bear their

respective Force Majeure Costs and neither Party shall be required to pay to

the other Party any costs thereof.

• Upon occurrence of an Other Event of Force Majeure, all Force Majeure

Costs attributable to such Other Event, and not exceeding the Insurance

Cover for such Other Event, shall be borne by the successful bidder.

• Upon occurrence of a Political Event, all Force Majeure Costs attributable to

such Political Event shall be reimbursed by Purchaser to the successful

Bidder.

• For the avoidance of doubt, Force Majeure Costs may include interest

payments on debt, operation and maintenance expenses, any increase in the

cost of the Services on account of inflation and all other costs directly

attributable to the Force Majeure Event.

• Save and except as expressly provided in this Clause, neither Party shall be

liable in any manner whatsoever to the other Party in respect of any loss,

damage, costs, expense, claims, demands and proceedings relating to or

arising out of occurrence or existence of any Force Majeure Event or exercise

of any right pursuant hereof.

Consultation and duty to mitigate

a) Except as otherwise provided in this Clause, the affected Party shall, at its own cost,

take all steps reasonably required to remedy and mitigate the effects of the Force

Page 386: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 24 of 40

Majeure event and restore its ability to perform its obligations under this contract

as soon as reasonably practicable. The Parties shall consult with each other to

determine the reasonable measures to be implemented to minimize the losses of

each Party resulting from the Force Majeure event. The affected Party shall keep

the other Parties informed of its efforts to remedy the effect of the Force Majeure

event and shall make reasonable efforts to mitigate such event on a continuous

basis and shall provide written notice of the resumption of performance hereunder.

1.37 Change Orders and Contract Amendments

a) The Purchaser may at any time order the selected bidder through Notice in

accordance with clause “Notices” , to make changes within the general scope of the

Contract in any one or more of the following: -

i. drawings, designs, or specifications, where Goods to be furnished under

the Contract are to be specifically manufactured for the Purchaser;

ii. the method of shipment or packing;

iii. the place of delivery; and

iv. the related services to be provided by the selected bidder.

b) If any such change causes an increase or decrease in the cost of, or the time

required for, the selected bidder’s performance of any provisions under the

Contract, an equitable adjustment shall be made in the Contract Price or in the

Delivery and Completion Schedule, or both, and the Contract shall accordingly be

amended. Any claims by the selected bidder for adjustment under this clause must

be asserted within thirty (30) days from the date of the selected bidder’s receipt of

the Purchaser’s change order.

c) Prices to be charged by the selected bidder for any related services that might be

needed but which were not included in the Contract shall be agreed upon in

advance by the parties and shall not exceed the prevailing rates charged to other

parties by the selected bidder for similar services.

1.38 Termination

a) Termination for Default

i. The procuring entity may, without prejudice to any other remedy for breach of

contract, by written notice of default of at least 30 days sent to the selected

bidder, terminate the contract in whole or in part: -

1. If the selected bidder fails to deliver any or all quantities of the

goods/services within the time period specified in the contract, or any

extension thereof granted by Purchaser; or

2. If the selected bidder fails to perform any other obligation under the

contract within the specified period of delivery of service or any

extension granted thereof; or

Page 387: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 25 of 40

3. If the selected bidder, in the judgement of the Purchaser, is found to

be engaged in corrupt, fraudulent, collusive, or coercive practices in

competing for or in executing the contract.

4. If the selected bidder commits breach of any condition of the contract.

ii. If Purchaser terminates the contract in whole or in part, amount of PSD may be

forfeited.

b) Termination for Insolvency

Purchaser may at any time terminate the Contract by giving a written notice of at least

30 days to the selected bidder, if the selected bidder becomes bankrupt or otherwise

insolvent. In such event, termination will be without compensation to the selected

bidder, provided that such termination will not prejudice or affect any right of action or

remedy that has accrued or will accrue thereafter to Purchaser.

c) Termination for Convenience

i. Purchaser, by a written notice of at least 30 days sent to the selected bidder

may terminate the Contract, in whole or in part, at any time for its convenience.

The Notice of termination shall specify that termination is for the Purchaser’s

convenience, the extent to which performance of the selected bidder under the

Contract is terminated, and the date upon which such termination becomes

effective.

ii. Depending on merits of the case the selected bidder may be appropriately

compensated on mutually agreed terms for the loss incurred by the contract if

any due to such termination.

iii. The Goods that are complete and ready for shipment within twenty-eight (28)

days after the selected bidder’s receipt of the Notice of termination may be

accepted by the Purchaser at the Contract terms and prices; the decision of

Purchaser would be final. For the remaining Goods, the Purchaser may elect:

1. To have any portion completed and delivered at the Contract terms

and prices; and/or

2. To cancel the remainder and pay to the selected bidder an agreed

amount for partially completed Goods and Related Services and for

materials and parts previously procured by the selected bidder.

1.39 Effects Of Termination

a) In the event that Purchaser terminates this Contract pursuant to failure on the part

of the Successful bidder to comply with the conditions as contained in this Clause

and depending on the event of default, Performance Guarantee furnished by

Successful bidder may be forfeited.

b) Upon termination of this Contract, the Parties will comply with the Exit

Management requirements set in this Contract.

c) In the event that Purchaser terminates this Contract, the compensation will be

decided in accordance with terms and condition of this Contract.

Page 388: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 26 of 40

d) On termination of this Contract for any reason, the Purchaser will decide the

appropriate course of action.

1.40 Personnel

a) The personnel assigned by Successful bidder to perform the Services shall be

employees of Successful bidder, and under no circumstances shall such personnel

be considered employees of Purchaser or its nominated agencies. The Successful

bidder shall have the sole responsibility for the supervision and control of its

personnel and for payment of such personnel’s compensation, including salary,

withholding of income taxes and social security taxes, worker’s compensation,

employee and disability benefits and the like and shall be responsible for all

obligations of an employer subject to Applicable Law.

b) The Successful bidder shall use its best efforts to ensure that sufficient personnel

are assigned to perform the Services and those personnel have appropriate

qualifications to perform the Services. After discussion with Successful bidder,

Purchaser shall have the right to require the removal or replacement of any such

personnel performing work under this Contract. In the event that Purchaser or its

nominated agencies requests that any personnel be replaced, the substitution of

such personnel shall be accomplished pursuant to a mutually agreed upon

schedule.

c) The Successful bidder shall also be responsible to train certain employees of

Purchaser, or its nominated agencies with regard to the Services being provided by

the Successful bidder as and when required by the Purchaser or its nominated

agencies during the entire project period. The parameters of the training required

for these employees of Purchaser or its nominated agencies shall be communicated

by Purchaser or its nominated agencies to the Successful bidder periodically and

shall be in accordance with the latest procedures and processes available in the

relevant areas of work.

d) In the event that the Purchaser or its nominated agencies identifies any personnel

of Successful bidder as “Key Personnel”, then the Successful bidder shall not

remove such personnel from the Purchaser or its nominated agencies engagement

without the prior written consent of Purchaser or its nominated agencies unless

such removal is the result of an unavoidable circumstance including but not limited

to resignation, termination, medical leave, etc.

e) Except as stated in this Clause, nothing in this Contract will limit the ability of

Successful bidder to freely assign or reassign its employees; provided that

Successful bidder shall be responsible, at its expense, for transferring all

appropriate knowledge from personnel being replaced to their replacements.

Purchaser or its nominated agencies shall have the right to review and approve

Successful bidder’s plan for any such knowledge transfer. Successful bidder shall

maintain the same or higher standards for skills and professionalism among

replacement personnel as in personnel being replaced.

Page 389: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 27 of 40

f) Each Party shall be responsible for the performance of all its obligations under this

Contract as the case may be and shall be liable for the acts and omissions of its

employees and agents in connection therewith.

g) Neither Party will solicit for employment or knowingly hire an employee of the

other Party with whom such Party has contact pursuant to project engagements

under this Contract. This restriction shall not apply to employees of either Party

responding to advertisements in job fairs or news media circulated to the general

public.

1.41 Trademarks, Publicity

The successful bidder shall not use the trademarks of the Purchaser without the prior

written consent. Except as required by law or the rules and regulations, the successful

bidder shall not publish or permit to be published either along or in conjunction with any

other person any press release, information, article, photograph, illustration or any other

material of whatever kind relating to this Contract, the SLA or the business without prior

reference to and approval in writing from the Purchaser. Such approval may not to be

unreasonably withheld or delayed by the Purchaser.

1.42 Notices

a) Any notice or other document which may be given by either Party under this

Contract shall be given in writing in person or by pre-paid recorded delivery post,

email or by facsimile transmission.

b) In relation to a notice given under this Contract, any such notice or other document

shall be addressed to the other Party’s principal or registered office.

c) In relation to a notice given under the Contract, a Party shall specify the Parties’

address for service of notices, any such notice to be copied to the Parties at the

addresses set out in this Clause.

d) Any such notice or other document shall be deemed to have been given to the other

Party (or, if relevant, its relevant associated company) when delivered (if delivered

in person) if delivered between the hours of 9.00 am and 5.00 pm at the address of

the other Party set forth above or if sent by fax, provided the copy fax is

accompanied by a confirmation of transmission, or on the next working day

thereafter if delivered outside such hours, and 7 days from the date of posting (if by

letter).

e) Either Party to this Contract may change its address, telephone number, facsimile

number and nominated contact for notification purposes by giving the other

reasonable prior written notice of the new information and its effective date.

1.43 Variations and Further Assurance

a) No amendment, variation or other change to this Contract shall be valid unless

authorized in accordance with the change control procedure as set out in this

Page 390: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 28 of 40

Contract. Such amendment shall be made in writing and signed by the duly

authorized representatives of the Parties to this Contract.

b) Each Party to this Contract agrees to enter into or execute, without limitation,

whatever other contract, document, consent and waiver and to do all other things

which shall or may be reasonably required to complete and deliver the obligations

set out in this Contract.

1.44 Compliance with Applicable Law

Each Party to this Contract accepts that its individual conduct shall (to the extent

applicable to it) at all times comply with all laws, rules and regulations of government

and other bodies having jurisdiction over the area in which the Services are undertaken

provided that changes in such laws, rules and regulations which result in a change to the

Services shall be dealt with in accordance with the Change Control Schedule set out in

this Contract. For the avoidance of doubt the obligations of the Parties to this Contract

are subject to their respective compliance with all local, state, national, supra-national,

foreign and international laws and regulations.

1.45 Professional Fees

All expenses incurred by or on behalf of each Party to this Contract , including all fees of

agents, legal advisors, accountants and actuaries employed by either of the Parties in

connection with the negotiation, preparation and execution of this Contract shall be

borne solely by the respective Party which incurred them.

1.46 Ethics

The Successful bidder represents, warrants and covenants that it has given no

commitments, payments, gifts, kickbacks, lavish or expensive entertainment, or other

things of value to any employee or agent of Purchaser or its nominated agencies in

connection with this contract and acknowledges that the giving of any such payment,

gifts, entertainment, or other things of value is strictly in violation of Purchaser standard

policies and may result in cancellation of this Contract.

1.47 Exit Management

Purpose

a) This clause sets out the provisions, which will apply on expiry or termination of

the Contract.

b) In the case of termination during the project implementation and Operation and

Management, the Parties shall agree at that time whether, and if so during what

period, the provisions of this clause shall apply.

c) The Parties shall ensure that their respective associated entities carry out their

respective obligations set out in this clause.

Transfer of Assets

Page 391: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 29 of 40

a) Purchaser shall be entitled to serve notice in writing on the successful bidder at

any time during the exit management period as detailed hereinabove requiring

the successful bidder and/or its sub contractors to provide the Purchaser with a

complete and up to date list of the Assets within 30 days of such notice.

Purchaser shall then be entitled to serve notice in writing on the successful bidder

at any time prior to the date that is 30 days prior to the end of the exit

management period requiring the successful bidder to sell the Assets, if any, to be

transferred to Purchaser or its nominated agencies at book value as determined

as of the date of such notice in accordance with the provisions of relevant laws.

b) In case of contract being terminated by Purchaser, Purchaser reserves the right to

ask successful bidder to continue running the project operations for a period of 6

months after termination orders are issued. The other liquidated damages and

SLA would be applicable during this period.

c) Upon service of a notice under this Article the following provisions shall apply:

i. in the event, if the Assets to be transferred are mortgaged to any financial

institutions by the successful bidder, the successful bidder shall ensure

that all such liens and liabilities have been cleared beyond doubt, prior to

such transfer. All documents regarding the discharge of such lien and

liabilities shall be furnished to the Purchaser.

ii. All risk in and title to the Assets to be transferred / to be purchased by the

Purchaser pursuant to this Article shall be transferred to Purchaser, on

the last day of the exit management period.

iii. Purchaser shall pay to the successful bidder on the last day of the exit

management period such sum representing the Net Block (procurement

price less depreciation as per provisions of Companies Act) of the Assets

to be transferred as stated in the Terms of Payment Schedule.

iv. Payment to the outgoing successful bidder shall be made to the tune of

last set of completed services / deliverables, subject to SLA requirements.

v. The outgoing successful bidder will pass on to Purchaser and/or to the

Replacement successful bidder, the subsisting rights in any leased

properties/ licensed products on terms not less favorable to Purchaser/

Replacement successful bidder, than that enjoyed by the outgoing

successful bidder.

Cooperation and Provision of Information

During the exit management period:

a) The Successful bidder will allow the Purchaser access to information reasonably

required to define the then current mode of operation associated with the

provision of the services to enable the Purchaser to assess the existing services

being delivered;

b) Promptly on reasonable request by the Purchaser, the successful bidder shall

provide access to and copies of all information held or controlled by them which

they have prepared or maintained in accordance with this contract relating to any

Page 392: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 30 of 40

material aspect of the services (whether provided by the Successful bidder or sub

contractors appointed by the Successful bidder). The Purchaser shall be entitled

to copy of all such information. Such information shall include details pertaining

to the services rendered and other performance data. The Successful bidder shall

permit the Purchaser or its nominated agencies to have reasonable access to its

employees and facilities as reasonably required to understand the methods of

delivery of the services employed by the Successful bidder and to assist

appropriate knowledge transfer.

Confidential Information, Security and Data

a) The Successful bidder will promptly on the commencement of the exit

management period supply to the Purchaser the following:

i. Information relating to the current services rendered and Purchaser and

performance data relating to the performance of sub contractors in

relation to the services;

ii. Documentation relating to Project’s Intellectual Property Rights;

iii. Documentation relating to sub-contractors;

iv. All current and updated data as is reasonably required for purposes of

Purchaser or its nominated agencies transitioning the services to its

replacement bidder in a readily available format nominated by the

Purchaser, ;

v. All other information (including but not limited to documents, records

and contracts) relating to the services reasonably necessary to enable

Purchaser or its nominated agencies, or its replacement bidder to carry

out due diligence in order to transition the provision of the Services to

Purchaser or its nominated agencies, or its replacement bidder (as the

case may be).

b) Before the expiry of the exit management period, the Successful bidder shall

deliver to the Purchaser all new or up-dated materials from the categories set out

in Schedule above and shall not retain any copies thereof, except that the

Successful bidder shall be permitted to retain one copy of such materials for

archival purposes only.

c) Before the expiry of the exit management period, unless otherwise provided

under the Contract, the Purchaser shall deliver to the Successful bidder all forms

of Successful bidder confidential information, which is in the possession or

control of Purchaser .

Employees

a) Promptly on reasonable request at any time during the exit management period,

the Successful bidder shall, subject to applicable laws, restraints and regulations

(including in particular those relating to privacy) provide to the Purchaser a list

of all employees (with job titles) of the Successful bidder dedicated to providing

the services at the commencement of the exit management period.

Page 393: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 31 of 40

b) Where any national, regional law or regulation relating to the mandatory or

automatic transfer of the contracts of employment from the Successful bidder to

the Purchaser, or a replacement bidder ("Transfer Regulation") applies to any or

all of the employees of the Successful bidder, then the Parties shall comply with

their respective obligations under such Transfer Regulations.

c) To the extent that any Transfer Regulation does not apply to any employee of the

Successful bidder, department, or its replacement bidder may make an offer of

employment or contract for services to such employee of the Successful bidder

and the Successful bidder shall not enforce or impose any contractual provision

that would prevent any such employee from being hired by the SPMU or any

replacement bidder.

Transfer of Certain Contracts

On request by the Purchaser the Successful bidder shall effect such assignments,

transfers, licenses and sub-licenses as the Director General of Police may require the

same in the name of Director General of Police, Rajasthan or its replacement bidder in

relation to any equipment lease, maintenance or service provision contract between

Successful bidder and third party licensor, vendors, and which are related to the services

and reasonably necessary for the carrying out of replacement services by the Purchaser

or its replacement bidder.

Rights of Access to Premises

a) At any time during the exit management period, where Assets are located at the

Successful bidder's premises, the Successful bidder will be obliged to give

reasonable rights of access to (or, in the case of Assets located on a third party's

premises, procure reasonable rights of access to) the Purchaser and/or any

replacement bidder in order to make an inventory of the Assets.

b) The Successful bidder shall also give the Purchaser or any of its nominated

agency or any replacement bidder right of reasonable access to the Successful

bidder's premises and shall procure the Purchaser or any of its nominated agency

and any replacement bidder rights of access to relevant third party premises

during the exit management period and for such period of time following

termination or expiry of the Contract as is reasonably necessary to migrate the

services to the Purchaser , or a replacement bidder.

General Obligations of the Successful bidder

a) The Successful bidder shall provide all such information as may reasonably be

necessary to effect as seamless a handover as practicable in the circumstances to

the Purchaser or its replacement bidder and which the Successful bidder has in

its possession or control at any time during the exit management period.

b) For the purposes of this Schedule, anything in the possession or control of any

Successful bidder, associated entity, or sub contractor is deemed to be in the

possession or control of the Successful bidder.

Page 394: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 32 of 40

c) The Successful bidder shall commit adequate resources to comply with its

obligations under this clause.

Exit Management Plan

a) The Successful bidder shall provide the Purchaser with a recommended exit

management plan ("Exit Management Plan") which shall deal with at least the

following aspects of exit management in relation to the Contract as a whole and

in relation to the Project Implementation, and the Operation and Management

SLA.

i. A detailed program of the transfer process that could be used in

conjunction with a replacement bidder including details of the means to

be used to ensure continuing provision of the services throughout the

transfer process or until the cessation of the services and of the

management structure to be used during the transfer;

ii. plans for the communication with such of the Successful bidder's sub

contractors, staff, suppliers, customers and any related third party as are

necessary to avoid any material detrimental impact on the Purchaser’s

operations as a result of undertaking the transfer;

iii. (if applicable) proposed arrangements for the segregation of the

Successful bidder's networks from the networks employed by Purchaser

and identification of specific security tasks necessary at termination;

iv. Plans for provision of contingent support to Purchaser and replacement

bidder for a reasonable period after transfer.

b) The Successful bidder shall re-draft the Exit Management Plan annually

thereafter to ensure that it is kept relevant and up to date.

c) Each Exit Management Plan shall be presented by the Successful bidder to and

approved by the Purchaser or its nominated agencies.

d) The terms of payment as stated in the Terms of Payment Schedule includes the

costs of the Successful bidder complying with its obligations under this Schedule.

e) In the event of termination or expiry of Contract, and Project Implementation,

each Party shall comply with the Exit Management Plan.

f) During the exit management period, the Successful bidder shall use its best

efforts to deliver the services.

g) Payments during the Exit Management period shall be made in accordance with

the Terms of Payment Schedule.

h) This Exit Management plan shall be furnished in writing to the Purchaser or its

nominated agencies within 90 days from the Effective Date of this Contract.

Page 395: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 33 of 40

2

Special Terms and

Conditions of Tender &

Contract

Page 396: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 34 of 40

2 SPECIAL TERMS AND CONDITIONS OF TENDER & CONTRACT

2.1 Payment Terms and Schedule

Refer Volume- II of this RFP

2.2 Service Level Standards/ Requirements/ Contract

Refer Annexure- 1 of Volume - I of this RFP

2.3 Change Requests/ Management

a) An institutional mechanism will be set up for taking decisions regarding requests

for changes. The Purchaser will set up a Change Control Committee with

members from the procurement agency and the selected bidder. If it is unable to

reach a consensus, the decision of the Purchaser will be final.

b) Purchaser may at any time, by a written order given to the bidder , make changes

within the general scope of the Contract in any one or more of the following: -

i. Designs, specifications, requirements which software or service to be

provided under the Contract are to be specifically developed and rendered

for Purchaser.

ii. The method of deployment, shipping or packing.

iii. Schedule for Installation Acceptance.

iv. The place of delivery and/or the services to be provided by the bidder.

c) The change request/ management procedure will follow the following steps: -

i. Identification and documentation of the need for the change - The

information related to initiator, initiation date and details of change

required and priority of the change will be documented by Purchaser.

ii. Analysis and evaluation of the Change Request - Impact of the change in

terms of the estimated effort, changed schedule, cost and the items

impacted will be analysed and documented by the bidder.

iii. Approval or disapproval of the change request – Purchaser will approve

or disapprove the change requested including the additional payments for

software development, quoted man-month rate shall be used for cost

estimation, efforts of all technical resources- project manager, analyst,

software developer, testing engineer, database architecture etc shall be

taken into account for total man-month estimation to carry out the s/w

development resulting from the change request. For all technical

resources irrespective of their experience and specialisation, the quoted

man-month rate shall be used. Efforts of support staff shall not be taken

into consideration for this purpose.

iv. Implementation of the change – The change will be implemented in

accordance to the agreed cost, effort, and schedule by the selected bidder.

Page 397: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 35 of 40

v. Verification of the change - The change will be verified by Purchaser on

implementation of the change request.

d) All changes outside the scope of supplies agreed to herein which may have likely

financial implications in terms of the overall cost/ time of the project shall be

undertaken by successful bidder only after securing the express consent of

Purchaser. In the event that the consent of Purchaser is not received then the

change will not be carried out.

e) While approving any change request, if required, Purchaser may ask the bidder to

deploy the required resources on-site.

f) If any such change outside the scope of supplies agreed to herein causes an

increase or decrease in cost of, or the time required for, firm’s performance of any

provisions under the Contract, equitable adjustments shall be made in the

Contract Price or Delivery Schedule, or both, and the Contract shall accordingly

be amended. Any claims by firm for adjustment under this must be asserted

within 30 (thirty) days from the date of successful bidder receiving the Purchaser

change order which shall not be unreasonably withheld or delayed.

Page 398: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 36 of 40

Annexure

3

Page 399: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 37 of 40

3 ANNEXURE

3.1 DRAFT AGREEMENT FORMAT

This Contract is made and entered into on this _____________ day of , <<Year>> by

and between Governor of Rajasthan acting through Additional Director General of Police

and Member Secretary of the CDPSM, Rajasthan Police Academy, Jaipur, India (herein

after referred to as Purchaser) which term or expression, unless excluded by or

repugnant to the subject or context, shall include his successors in office and assignees

on ONE PART

And

M/s , a company registered under with

its registered office at (herein after referred as the “Successful Bidder/ Supplier”) which

term or expression, unless excluded by or repugnant to the subject or context, shall

include his successors in office and assignees on the OTHER PART.

Whereas,

Purchaser is desirous of appointing an agency for <project title> as per the Scope of

Work and Terms and Conditions as set forth in the RFP document dated of

<NIB No >.

And whereas

The successful bidder/supplier represents that it has the necessary experience for

carrying out the overall work as referred to herein and has submitted a bid and

subsequent clarifications for providing the required services against said NIB and RFP

document issued in this regard, in accordance with the terms and conditions set forth

herein and any other reasonable requirements of the Purchaser from time to time.

And whereas

Purchaser has accepted the bid of supplier and has placed the Work Order vide Letter

No. __________________ dated _______, on which M/s__________ has given

their acceptance vide their Letter No._____________ dated ____________.

And whereas

M/s The successful bidder/ supplier has deposited a sum of Rs. ________________/-

(Rupees _________________) in the form of __________________ ref no.

_________________ dated ______________ of ____________ Bank and valid

up to _____________ as security deposit for the due performance of the contract.

Page 400: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 38 of 40

Now it is hereby agreed to by and between both the parties as under: -

1. The NIB Ref. No. ____________________________ dated ___________

and RFP document dated _________ issued by Purchaser along with its

enclosures/ annexures, wherever applicable, are deemed to be taken as part of this

contract and are binding on both the parties executing this contract.

2. In consideration of the payment to be made by Purchaser to supplier at the rates set

forth in the work order no. ____________________ dated_________ will duly

supply the said articles set forth in “Annexure-I: Bill of Material” thereof and provide

related services in the manner set forth in the RFP, along with its enclosures/

annexures and Technical Bid along with subsequent clarifications submitted by

supplier.

3. The Purchaser do hereby agree that if supplier shall duly supply the said articles and

provide related services in the manner aforesaid observe and keep the said terms and

conditions of the RFP and Contract, the Purchaser will pay or cause to be paid to

supplier, at the time and the manner set forth in the said conditions of the RFP, the

amount payable for each and every project milestone & deliverable. The mode of

Payment will be as specified in the RFP document.

4. The timelines for the prescribed Scope of Work, requirement of services and

deployment of technical resources shall be effected from the date of work order i.e.

____________ and completed by supplier within the period as specified in the

RFP document.

5. supplier has failed to supply/ install/ complete: -

a) Delay up to one fourth period of the prescribed delivery period,

successful installation & completion of work

2.5%

b) Delay exceeding one fourth but not exceeding half of the prescribed

delivery period, successful installation & completion of work.

5.0%

c) Delay exceeding half but not exceeding three fourth of the

prescribed delivery period, successful installation & completion of

work.

7.5%

d) Delay exceeding three fourth of the prescribed delivery period,

successful installation & completion of work.

10.0%

Note:

i. Fraction of a day in reckoning period of delay in supplies/ maintenance

services shall be eliminated if it is less than half a day.

ii. The maximum amount of agreed liquidated damages shall be 10%.

iii. If supplier requires an extension of time in completion of contractual supply

on account of occurrence of any hindrances, he shall apply in writing to the

Page 401: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 39 of 40

authority which had placed the work order, for the same immediately on

occurrence of the hindrance but not after the stipulated date of completion of

supply.

iv. Delivery period may be extended with or without liquidated damages if the

delay in the supply of goods in on account of hindrances beyond the control of

supplier.

6. All disputes arising out of this agreement and all questions relating to the

interpretation of this agreement shall be decided as per the procedure mentioned in

the RFP document.

In witness whereof the parties have caused this contract to be executed by their

Authorized Signatories on this _____day of _______________, 2013.

Signed By: Signed By:

( )

Designation:,

Company:

For and on behalf of Governor of

Rajasthan

In the presence of:

In the presence of:

( )

Designation:

Company:

( )

Designation:

For and on behalf of Governor of

Rajasthan

Page 402: E-GOVERNANCE MISSION MODE PROJECT (MMP ... - Rajasthan …police.rajasthan.gov.in/Rajasthan/Tender/Amended_RFP_CCTNS... · crime and criminal tracking network & systems rfp for selection

Mission Mode Project-CCTNS Request for Proposal (RFP) Vol-III -CCTNS Rajasthan

Rajasthan Police Page 40 of 40

( )

Designation:

Company:

( )

Designation:

For and on behalf of Governor of

Rajasthan