68
EnviromentalImpactSt atement Development Proposals for the Barkarby Field October 13th S Presentation Bengoa Xavier Naldi Chiara Sai Florence Kai Kwarteng Owusu Akyaw Illueca Munoz Jacobo & Stojanovski Todor P r e s e n t

E nviromental I mpact S tatement

  • Upload
    adah

  • View
    36

  • Download
    3

Embed Size (px)

DESCRIPTION

E nviromental I mpact S tatement. D evelopment P roposals for the B arkarby F ield. S. B engoa X avier N aldi C hiara S ai F lorence K ai K warteng O wusu A kyaw I llueca M unoz J acobo & S tojanovski T odor. P r e s e n t. O ctober 13 th. P resentation. EIS. - PowerPoint PPT Presentation

Citation preview

Page 1: E nviromental I mpact S tatement

EnviromentalImpactStatementDevelopment Proposals for the Barkarby Field

October 13thSPresentation

Bengoa Xavier

Naldi Chiara

Sai Florence Kai

Kwarteng Owusu Akyaw

Illueca Munoz Jacobo &

Stojanovski Todor

P r e s e n t

Page 2: E nviromental I mpact S tatement

EIS

Description of Alternatives

Page 3: E nviromental I mpact S tatement

Zero-Alternative

Page 4: E nviromental I mpact S tatement
Page 5: E nviromental I mpact S tatement

• The proposed development does not take place

• The Barkarby Airport remains

• No -or few- new housing in the area

Zero-Alternative

Page 6: E nviromental I mpact S tatement

Zero-Alternative• Increasing road traffic of

approx. 2% per year

• Increasing noise pollution (plane and road traffic)

• Increasing air pollution (plane and road traffic)

Page 7: E nviromental I mpact S tatement

Zero-Alternative• Expansion of the IKEA

commercial area in the south

• Creation of a Natural Reserve around the Igelbäcken

• Slow restoration of military damaged forests

Page 8: E nviromental I mpact S tatement

Alternative 2The ”Anatomic” development

Page 9: E nviromental I mpact S tatement
Page 10: E nviromental I mpact S tatement

Alternative 2• The ”Anatomic” development

• The smallest option

• All around the Barkarby village with a green belt in between

Page 11: E nviromental I mpact S tatement

Alternative 2• Area concerned: 86.5 hectares

• 4600 new inhabitants

• 11 housing areas (9 with apartments – 2 with villas)

• No public transport network

Page 12: E nviromental I mpact S tatement

Description of AlternativesAlternative 4The ”American Dream” development

Page 13: E nviromental I mpact S tatement
Page 14: E nviromental I mpact S tatement

Alternative 4• The ”American Dream”

development• The medium-sized option• Mixed use: housing &

commercial/business• Only on the North of

Norrviksvägen

Page 15: E nviromental I mpact S tatement

Alternative 4• Area concerned: 95.49 hectares• 7170 new inhabitants & 3640

work places• 6 housing areas (6 with

apartments – 2 with villas) & 3 commercial/business areas

• Bus network, pedestrian and cycling paths in the housing areas

Page 16: E nviromental I mpact S tatement

Description of AlternativesAlternative 12The ”Tutti Frutti” development

Page 17: E nviromental I mpact S tatement
Page 18: E nviromental I mpact S tatement

Alternative 12• The ”Tutti Frutti” development• The biggest option• Mixed use: housing &

commercial/business• Around the village of Barkarby

(North, East and South)

Page 19: E nviromental I mpact S tatement

Alternative 12• Area concerned: 133 hectares• 11000 new inhabitants• 7 housing areas, all with

apartments & some commercial areas (undefined)

• New tunnel under the whole area moving the transiting traffic

• Bus network, pedestrian and cycling paths

Page 20: E nviromental I mpact S tatement

EIS

TrafficAir Quality

Page 21: E nviromental I mpact S tatement

Traffic Assumptions• Traffic increase 2% per year

• Timescale of 10 years

Page 22: E nviromental I mpact S tatement

Air QualityCO Emissions

Page 23: E nviromental I mpact S tatement
Page 24: E nviromental I mpact S tatement
Page 25: E nviromental I mpact S tatement
Page 26: E nviromental I mpact S tatement
Page 27: E nviromental I mpact S tatement
Page 28: E nviromental I mpact S tatement

Air QualityNO2 Emissions

Page 29: E nviromental I mpact S tatement
Page 30: E nviromental I mpact S tatement
Page 31: E nviromental I mpact S tatement
Page 32: E nviromental I mpact S tatement
Page 33: E nviromental I mpact S tatement
Page 34: E nviromental I mpact S tatement

Main Facts

• NO2 is the only pollutant to be considered

• Not a major threat over 10 meters

• Motorway represents the main pollutant source

Page 35: E nviromental I mpact S tatement

EIS

TrafficNoise Impact

Page 36: E nviromental I mpact S tatement

  baseline 0-alt Alt 2 Alt 4 Alt 12

point1 71,45 72,10 76,60 73,25

point2 61,25 62,60 58,40 63,90 62,40

point3 58,40 61,60 73,40 62,05 68,45

point4 54,60 55,00 57,10 55,75 54,65

point5 68,60 68,15 67,05

Baseline

Page 37: E nviromental I mpact S tatement

  baseline 0-alt Alt 2 Alt 4 Alt 12

point1 71,45 72,10 76,60 73,25

point2 61,25 62,60 58,40 63,90 62,40

point3 58,40 61,60 73,40 62,05 68,45

point4 54,60 55,00 57,10 55,75 54,65

point5 68,60 68,15 67,05

0-Alternative

Page 38: E nviromental I mpact S tatement

  baseline 0-alt Alt 2 Alt 4 Alt 12

point1 71,45 72,10 76,60 73,25

point2 61,25 62,60 58,40 63,90 62,40

point3 58,40 61,60 73,40 62,05 68,45

point4 54,60 55,00 57,10 55,75 54,65

point5 68,60 68,15 67,05

Page 39: E nviromental I mpact S tatement

  baseline 0-alt Alt 2 Alt 4 Alt 12

point1 71,45 72,10 76,60 73,25

point2 61,25 62,60 58,40 63,90 62,40

point3 58,40 61,60 73,40 62,05 68,45

point4 54,60 55,00 57,10 55,75 54,65

point5 68,60 68,15 67,05

Page 40: E nviromental I mpact S tatement

  baseline 0-alt Alt 2 Alt 4 Alt 12

point1 71,45 72,10 76,60 73,25

point2 61,25 62,60 58,40 63,90 62,40

point3 58,40 61,60 73,40 62,05 68,45

point4 54,60 55,00 57,10 55,75 54,65

point5 68,60 68,15 67,05

Page 41: E nviromental I mpact S tatement

Mitigation Measures• Public-bus network

• Speed limit

• No-building area

• Screens

Page 42: E nviromental I mpact S tatement
Page 43: E nviromental I mpact S tatement
Page 44: E nviromental I mpact S tatement
Page 45: E nviromental I mpact S tatement

EIS

HydrologyWater Quality & Runoff

Page 46: E nviromental I mpact S tatement

Runoff

• Baseline runoffs:

• Igelbäcken 45 l/s

• Bällstaån 120 l/s

Page 47: E nviromental I mpact S tatement

Runoff• Very small runoff increase• Cumulative impacts. Be careful!!!

New built-up surface (ha) Runoff (L/s)Alternative 2 5.11 45.0109Alternative 4 7.17 45.0287Alternative 12 12.85 45.0514

New built-up surface (ha) Runoff (L/s)Alternative 2 15.45 120.0579Alternative 4 38.23 120.2682Alternative 12 31.55 120.1252

Igelbäcken catchment area

Bällstaån catchment area

Page 48: E nviromental I mpact S tatement

Nitrogen increase (%) Phosphorus increase (%)Alternative 2 -7.50 0Alternative 4 -9.06 0Alternative 12 -13.97 0

Nitrogen increase (%) Phosphorus increase (%)Alternative 2 -10.00 0.26Alternative 4 -15.25 5.10Alternative 12 -11.69 0.68

Igelbäcken

Bällstaån

Water Quality• Less nitrogen released • Phosphorus increase in Bällstaån

Page 49: E nviromental I mpact S tatement

Main Facts• Overflow will increase

• Improved water quality

Page 50: E nviromental I mpact S tatement

EIS

EcologyFlora, fauna & landscape

Page 51: E nviromental I mpact S tatement

Impacts on Landscape• 0 Alternative

Fragmentation

• Other alternatives Opens the ”Green wedge”

Page 52: E nviromental I mpact S tatement

Impacts on Flora

• Only impact will be on the edge of the forests (ecotones) for alternative 2 and 4

Deciduous, coniferous, oak trees, grass

Page 53: E nviromental I mpact S tatement

Impacts on Fauna

• Alternative 4 and 12 are close to the Igelbäcken Impact on fish

• Mitigation Restricted access to the stream

Stone Loach and Spinned Loach

Page 54: E nviromental I mpact S tatement

EIS

Social

Page 55: E nviromental I mpact S tatement
Page 56: E nviromental I mpact S tatement

Population & Economic Growth

• Population base & high level for the municipality (Regional plan)

• Green buildings concept

Page 57: E nviromental I mpact S tatement

Green buildings concept• "Typical" buildings consume more of our

resources than necessary, negatively impact the environment, and generate a large amount of waste.

• Energy efficiency, use renewable energy• Water conservation • Waste minimization• Reduced operation and maintenance costs

Page 58: E nviromental I mpact S tatement
Page 59: E nviromental I mpact S tatement
Page 60: E nviromental I mpact S tatement

72.44 31.34 72.44 31.34

Page 61: E nviromental I mpact S tatement

Public Participation

• Interviews & questionnaires

• Meetings

Page 62: E nviromental I mpact S tatement

EIS

Monitoring

Page 63: E nviromental I mpact S tatement

Agency responsible for monitoring

Agency responsible for retaining

monitoring results

Mon

tly

Qua

rter

ly

Ann

ualy

Upo

n co

mpl

ains

or

requ

ests

TrafficCounty Administration

BoardX X

County Administration Board

NoiseCounty Administration

BoardX X

County Administration Board

Air qualitySwedish

Meteorological and Hydrological Institute

X XCounty Administration

Board

Water quality in Igelbäcken

Stockholm Water Institute

X XCounty Administration

Board

Fish population in Igelbäcken

Swedish Museum of Natural History or National Board of

Fisheries

X XCounty Administration

Board

Frequency

Monitoring plan

Page 64: E nviromental I mpact S tatement

EIS

Conclusion &Recommendations

Page 65: E nviromental I mpact S tatement

• No big difference between the alternatives for environmental impacts

• Big differences in social impacts

We decide to recommend

Alternative 4

Page 66: E nviromental I mpact S tatement

• Better balance between the needs for housing and the economic development of the area

• Avoids uncertainty concerning further development of the IKEA commercial area

Page 67: E nviromental I mpact S tatement

• Very good public transport network

• Limited impact on the environment (no excavation, no deforestation)

• Improvement of water quality (especially in the Igelbäcken)

Page 68: E nviromental I mpact S tatement